Re: Connecticut Studios,LLC Office Building—WPCA Approval
Dear Mr. Smedberg:
The South Windsor Water Pollution Control Authority, at its special meeting of September 4,
2012, gave approval to the application as presented for connection to the Town's sewerage
system for a proposed office building located at R011A Chapel Road, 245 Chapel Road, R008
John Fitch Blvd., and 240 Ellington Road, South Windsor, CT, as more specifically shown on
plans entitled "CT Studios, Security & Construction Office, South Windsor, Connecticut"
Prepared by Vanasse Hangen Brustlin, Inc., Middletown, CT; Project No. 72189.10, Sheet C-1
"Overall Utility Plan", C-2 "Phase 1 Utility Plan", C-3 "Phase 1 Site Plan", Dated 8/28/2012 and
P-1 "Plumbing Plan: Duplex Sewage Ejector System" Dated, 8/27/2012. This approval is
subject to the following conditions:
(1) Installation of a sewer ejector pump system for the Office and for the force main for
connection to the previously approved sanitary sewer;
(2) Technical approval of the Town of South Windsor Engineering Department; and
(3) Final Authority approval and acceptance of the sanitary sewerage connection will be
conditional upon the installed sewer line having been inspected by the Town staff, and
upon the written verification of the Town staff that said sanitary sewer line was installed
in substantial conformance with the design plans approved by the Authority, and meeting
all regulations and appropriate technical specifications relating to sanitary sewer
construction.
The sewer connection charge will be $11,980.54 for 3.245 acres. This approval letter must be
superimposed on the final approval plans.
Very truly yours,
'chard Aries, Chairman
Water Pollution Control Authority
RA:ead
cc: Michael J. Gantick, Director of Public Works
Jeff Doolittle, Town Engineer
Michele LLpe,pirector of Planning
Chris Dougan, Chief Building Inspector
CT Studios, LLC c/o Ralph Palumbo
FRECEIVED
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY 0 2012
APPLICATION FORMWINUbURApplication No.: WORKS
Date Received
Date Scheduled For
Applicant CT Studios, T.T.c
Address1300 Division Road; Suite 201 , West Warwick, RT 02893
Telephone No.: 4 01 -8 8 5-1 0 0 0
Owner of Record on Land Records
Owner's Address *
Property Description: R01 1 A and 245 Chapel Rd. , R008. John Fitch Blvd. ,
Assessor's Map 240 F�lircton Rd. Vol. Page ID# 1800R011A,
ari
Project Title: Connecticut Studios 18000245, 4770R008,
CT Studios
LLC 30300240
Inquiries to be Directed to: (Name,Address,Telephone No.) c o Ralph �alumbo
1300 Division Road, Suite 201 , West Warwick, RT 02893 ( 401 )-885-1000
Approvals Previously Received(Check) IWA P&Z ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection- -Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2. Sewer Extension/Connection- -Industrial/Commercial User
a. New Connection
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge
d. Other. X Explain Project Modification - additional building
e. Type of Approval: Concept Final
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal ,Explain
6. Other Explain
T— R [� :3 / /Z--
Applicant' Signature Date
I
0-,x7nPr's Signature Date
*RefQr to previousl ub fitted Property Owner Consent-To-FTle and 11,egalCounsel
Consent-To-Represent sletLers.
taeewv'erge mderor.Application Submittal Procedures)
[RE:CEIVED
' Transportation
Land Development � ,�Environmental ® 2 %S e r v i c e s VVIIVUSurzC WORKS
imagination innovation energy Creating results for our clients and benefits for our communities
August 28,2012 Vanasse Han-aQn Brustlin. Inc.
Ref: 72189
Mr. C.Frederick Shaw
Superintendent
South Windsor Water Pollution Control Authority
1540 Sullivan Avenue
South Windsor,Connecticut 06074
Re: Connecticut Studios,LLC Office Building
Parcel identification numbers:4770R008,30300240, 18000245,&180OR011A
Water Pollution Control Authority Application
Dear Mr.Shaw,
On behalf of CT Studios,LLC,Vanasse Hangen Brustlin,Inc. (VHB)is submitting a package
for the above project for an additional office building to your office for review and approval
by the Water Pollution Control Authority. Please find enclosed the following information
with respect to the above referenced project:
• One(1) original signed application
• Two(2)copies of the following plans dated August 28,2012:
o C-1: Overall Utility Plan
o C-2: Phase 1 Utility Plan
o C-3: Phase 1 Site Plan
o P-1: Plumbing Plan: Duplex Sewage Ejector System
With this application,we respectfully request to be placed on the agenda for the September
41h 2012 WPCA meeting. Should you have any questions or require additional information,
please do not hesitate to call us at(401)272-8100.
Very truly yours,
VANASSE HANGEN BRUSTLIN,INC.
��
FOR Robert Smedberg,PE
Project Manager
Enclosures
cc: Ralph Palumbo,DiGennaro&Palumbo,LLP
Aaron E.Capone,DCK Worldwide,LLC
54 Tuttle Place
Middletown, Connecticut 06457-1847
860.632.1500■FAX 860.632.7879
C:\Users\pvitaliano\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\BM03YD5L\120828 SubrAffl*t0f14@\dRhVQ. cn
www.vhb.com