Loading...
HomeMy WebLinkAboutWPCA Connecticut Studios LLC Office SSW N Sf4 o c 5 � 4, w` ?d&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 ox'CO TELEPHONE (860) 644-2511 September 17, 2012 Robert Smedberg, P.E. Vanasse Hangen Brustlin, Inc. 54 Tuttle Place Middletown, CT 06457 Re: Connecticut Studios,LLC Office Building—WPCA Approval Dear Mr. Smedberg: The South Windsor Water Pollution Control Authority, at its special meeting of September 4, 2012, gave approval to the application as presented for connection to the Town's sewerage system for a proposed office building located at R011A Chapel Road, 245 Chapel Road, R008 John Fitch Blvd., and 240 Ellington Road, South Windsor, CT, as more specifically shown on plans entitled "CT Studios, Security & Construction Office, South Windsor, Connecticut" Prepared by Vanasse Hangen Brustlin, Inc., Middletown, CT; Project No. 72189.10, Sheet C-1 "Overall Utility Plan", C-2 "Phase 1 Utility Plan", C-3 "Phase 1 Site Plan", Dated 8/28/2012 and P-1 "Plumbing Plan: Duplex Sewage Ejector System" Dated, 8/27/2012. This approval is subject to the following conditions: (1) Installation of a sewer ejector pump system for the Office and for the force main for connection to the previously approved sanitary sewer; (2) Technical approval of the Town of South Windsor Engineering Department; and (3) Final Authority approval and acceptance of the sanitary sewerage connection will be conditional upon the installed sewer line having been inspected by the Town staff, and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all regulations and appropriate technical specifications relating to sanitary sewer construction. The sewer connection charge will be $11,980.54 for 3.245 acres. This approval letter must be superimposed on the final approval plans. Very truly yours, 'chard Aries, Chairman Water Pollution Control Authority RA:ead cc: Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer Michele LLpe,pirector of Planning Chris Dougan, Chief Building Inspector CT Studios, LLC c/o Ralph Palumbo FRECEIVED TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY 0 2012 APPLICATION FORMWINUbURApplication No.: WORKS Date Received Date Scheduled For Applicant CT Studios, T.T.c Address1300 Division Road; Suite 201 , West Warwick, RT 02893 Telephone No.: 4 01 -8 8 5-1 0 0 0 Owner of Record on Land Records Owner's Address * Property Description: R01 1 A and 245 Chapel Rd. , R008. John Fitch Blvd. , Assessor's Map 240 F�lircton Rd. Vol. Page ID# 1800R011A, ari Project Title: Connecticut Studios 18000245, 4770R008, CT Studios LLC 30300240 Inquiries to be Directed to: (Name,Address,Telephone No.) c o Ralph �alumbo 1300 Division Road, Suite 201 , West Warwick, RT 02893 ( 401 )-885-1000 Approvals Previously Received(Check) IWA P&Z ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection- -Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection- -Industrial/Commercial User a. New Connection b. Request to Increase Flow Rate c. Change in Nature of Waste Discharge d. Other. X Explain Project Modification - additional building e. Type of Approval: Concept Final 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal ,Explain 6. Other Explain T— R [� :3 / /Z-- Applicant' Signature Date I 0-,x7nPr's Signature Date *RefQr to previousl ub fitted Property Owner Consent-To-FTle and 11,egalCounsel Consent-To-Represent sletLers. taeewv'erge mderor.Application Submittal Procedures) [RE:CEIVED ' Transportation Land Development � ,�Environmental ® 2 %S e r v i c e s VVIIVUSurzC WORKS imagination innovation energy Creating results for our clients and benefits for our communities August 28,2012 Vanasse Han-aQn Brustlin. Inc. Ref: 72189 Mr. C.Frederick Shaw Superintendent South Windsor Water Pollution Control Authority 1540 Sullivan Avenue South Windsor,Connecticut 06074 Re: Connecticut Studios,LLC Office Building Parcel identification numbers:4770R008,30300240, 18000245,&180OR011A Water Pollution Control Authority Application Dear Mr.Shaw, On behalf of CT Studios,LLC,Vanasse Hangen Brustlin,Inc. (VHB)is submitting a package for the above project for an additional office building to your office for review and approval by the Water Pollution Control Authority. Please find enclosed the following information with respect to the above referenced project: • One(1) original signed application • Two(2)copies of the following plans dated August 28,2012: o C-1: Overall Utility Plan o C-2: Phase 1 Utility Plan o C-3: Phase 1 Site Plan o P-1: Plumbing Plan: Duplex Sewage Ejector System With this application,we respectfully request to be placed on the agenda for the September 41h 2012 WPCA meeting. Should you have any questions or require additional information, please do not hesitate to call us at(401)272-8100. Very truly yours, VANASSE HANGEN BRUSTLIN,INC. �� FOR Robert Smedberg,PE Project Manager Enclosures cc: Ralph Palumbo,DiGennaro&Palumbo,LLP Aaron E.Capone,DCK Worldwide,LLC 54 Tuttle Place Middletown, Connecticut 06457-1847 860.632.1500■FAX 860.632.7879 C:\Users\pvitaliano\AppData\Local\Microsoft\Windows\Temporary Internet Files\Content.Outlook\BM03YD5L\120828 SubrAffl*t0f14@\dRhVQ. cn www.vhb.com