Loading...
HomeMy WebLinkAbout11-24PTown Square at Evergreen Wk Mod r AN RECEIVED S�"IIPMAN &GOODWINLLP® MAY 0 I �i1;2 COUNSELORS AT LAW SOUTH WIND60R PLANNING DEPT. Christopher J.Smith Phone: (860)251-5606 Fax: (860)251-5318 cjsmith@goodwin.com May 7, 2012 Via email correspondence and overnight: Ms. Michele R. Lipe Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Request to modify conditions associated with approval of Application 11-24P, Final Plan for Evergreen Walk, LL C, pursuant to Section 4.2.15,.for real property known as "Evergreen Walk, "to be located on a portion of 151 Buckland Road, including portions of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400.feet north of Smith Street, South Windsor, Connecticut. Approval of Final Plan granted on September 13, 2011, by the Planning and Zoning Commission ("Approval'). Dear Director of Planning Lipe, As you are aware, the undersigned law firm represents the owner/applicant, Evergreen Walk, LLC, concerning the above-referenced Approval. On behalf of Evergreen Walk, LLC, I respectfully submit this Request to Modify certain conditions of the subject Approval to accommodate a build out of the approved Final Plan. I enclose ten copies of the following documentation in support of this Request to Modify: 1. Approval letter of September 19, 2011, with attached conditions designated as "Attachment A" - 2 pages (please see Exhibit 1 attached hereto); 2. Draft of proposed new conditions of approval, Attachment A, to be substituted for a portion of the Attachment A incorporated into the September 13, 2011 approval (please see Exhibit 2 attached hereto); and 3. Draft of proposed new Special Conditions to be substituted for the Special Conditions incorporated into the September 13, 2011 approval (please see Exhibit 3 attached hereto). ONE CONSTITUTION PLAZA HARTFORD, CONNECTICUT 06103-1919 860-251-5000 WWW.SHIPMANGOODWIN.COM It is my understanding that the Commission may schedule this request for consideration at the Commission's meeting of Tuesday, May 22, 2012. We look forward to working with you and the Commission on this request, which, if granted, will enable the build out of the approved Final Plan to proceed. Thank you for your, and the Commission's, consideration and assistance concerning this request. As always, best regards. Vet my yours. ,r 17 i Christophe J. Smith cc: Evergreen Walk, LLC (with enclosures) Alan F. Lamson, AICP (with enclosures) 2266652v1 2 r SOyN SZ4 C o - C U w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OSoRo�'� TELEPHONE (860) 644-2511 CERTIFIED MAIL 7008 1300 0001 4578 4082 September 19, 2011 Alan F. Lamson FLB Architecture&Planning 19 Silver Lane East Hartford, CT 06118 Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include: relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space [121 hotel rooms(71,550 square feet)]; general commercial space(9,800 square feet); office space(28,405 square feet)];to be completed in two phases and to be located on a portion of 151 Buckland Road [within "Evergreen Walk" including portions of Units 6 and 7),and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone. We are pleased to advise you that the Planning&Zoning Commission voted on September 13, 2011 to approve the above referenced application for Final Plan approval as shown on plans prepared by Fuss & O'Neil,project number 2481.S20 dated 4/25/11 as revised,with the following modifications. 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of erosion and sediment controls;$50,000 for construction of stormwater systems; and $30,000 for wetland plantings. 4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars. 5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.2.13 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 9. The building street numbers must be included on the final plan. 10. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. Exhibit 1 12.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). 13.The Town Engineer's review comments dated September 8,2011, as revised 9/13/11 must be incorporated into the final plans. 14.The zoning data table must include all zoning data(e.g.parking and open space)and included on the plans to be filed in the Town Clerk's office. 15.The phasing of the improvements of the required open space should be clarified on the plans. 16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture and Design Review Committee and the Planning and Zoning Commission prior to issuance of building permits. 7.The Fire Chiefs comments regarding fire hydrant locations must be added to the plans.. 18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for Final Plan"document submitted by the applicant and included as Attachment A. 19. The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave. must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2. 20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended north up to the unit 8 parcel. 21.A school bus shelter must be added to the plans in a location designated by the Board of Education in compliance with current BOE policies. 22.The developer must examine the sequencing of the traffic lights along Buckland Road and make adjustments to the timing as appropriate. 23. The roof top screening for the hotel must be added to block the views from Buckland Road of all the mechanical units. Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans) must be submitted to°this 4Co'mmission to.be'stamped•and sighed. The..etters of approval of inns Cornnussion as Well as the Inland Wetlands Agency/Conservation Commission must be.reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Patrick Kennedy, Chairman PK/ma Planning and Zoning Commission cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal } Phasing Sequence for Final Plan as Provided in Site Plan Application Phase 1• 1. Temporary extension of Evergreen Way behind LA Fitness to Tamarack Avenue (adjacent to ECHN2),including temporary sidewalk for pedestrian access. 2. Widening and improvements to Tamarack Avenue (north-south along Town Square project). 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and LL Bean). 4. Pedestrian access from LL Bean site to Town Square.along south side.-of Tamarack Avenue. 5. Pedestrian access and improvements between Shops at Evergreen Walk and Town Square. 6. Modifications to and lighting at Shops at Evergreen Walk. 7. Site Preparation Parts Aand B (includes construction of Detention Basins 2 and 2a). 8. South portion of ring road through Town Square. 9. Town Square construction. 10. Hotel and associated parking,access drives,sidewalks,utilities and other improvements. 11. South residential building and associated parking,access drives,sidewalks,utilities and other improvements. 12. Water main loop to serve Phase 1 and Phase 2. 13. Natural gas loop to serve Phase 1 and Phase 2. 14. Commercial buildings (2) south of hotel and within Town Square,and associated sidewalks,utilities and other improvements. Phase 2: 1. Trunk sewer relocation. 2. Northerly residential building and associated parking,access drives,sidewalks, utilities and other improvements. f r 3. Office condominiums and associated parking,access drives,sidewalks,utilities and other improvements. Special Phasing Conditions: I. Prior to commencing construction activities in Phase 2: (a) the commercial building shall be"substantially constructed" in Phase 1,which means that all framing, sheathing and roofing of the commercial building in Phase 1 shall be completed; (b) the improvements at the Buckland Road and Tamarack intersection shall be completed; (c)the temporary internal connection of Tamarack and Evergreen Way shall be completed(without final coat); and (d) a surety or performance guaranty bond,as provided by law,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 1,which site improvements shall constitute all utilities,storm water system components,site lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding. All such site improvements in Phase 1 and items (b) and (c)above shall be completed within one year of the date that building construction activities in Phase 2 are commenced. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 1. However,site preparation,construction of the site improvements,and construction of the building foundations in Phase 2,shall be permitted without having to complywith the aforementioned provisions provided for in this special phasing condition. 2. Prior to the issuance of the final certificate of occupancy for the residential building- in Phase 2: (a) all construction in Phase 1 shall be completed,including all site improvements;(b) at least fifty(50%)percent of the commercial buildings required for the 2:1 residential/commercial square footage ratio in Phase 2 shall be "substantially constructed," which means that all framing,sheathing and roofing of such commercial buildings shall be completed;and (c) a surety or performance guaranty bond,as provided bylaw,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 2, which shall constitute all utilities,storm water system components,site lighting, retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 2. 2 2032139vl ATTACHMENT A (PROPOSED NEW ADDITIONAL CONDITIONS) Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue (north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 3. Modifications and improvements to Tamarack Avenue (east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Expansion of the existing, temporary detention basin to be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building, unless Detention Basins 2 and 2a have been previously constructed; and 2260516v2 Exhibit 2 7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the office buildings. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 2 2260516v2 b SPECIAL CONDITIONS (PROPOSED NEW SPECIAL CONDITIONS) 1. Prior to commencing the construction of the second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be completed within one year of the date that building construction activities for the second residential building are commenced. A reduction in the amount of said surety bond or other financial guaranty shall be permitted as site improvements covered by said surety bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. 2. Prior to the issuance of the final certificate of occupancy for the second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #1, shall be completed within one year of the date of commencing the construction of the second residential building; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. A reduction in the amount of said surety bond or other financial guaranty, as provided by law, shall be permitted as site improvements for the second-residential building are completed. 2260596v1 Exhibit 3 �.Nf4 t N S < Tlc0m� �sou.� V&U&ot c u 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•C�N TELEPHONE(860) 644-2511 CERTIFIED MAIL 7011 0470 0003 7146 8270 June 1, 2012 Christopher J. Smith, Esq. Shipman &Goodwin LLP One Constitution Plaza Hartford, CT 06103-1919 Dear Attorney Smith: Re: Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street, Buckland Road Gateway zone. The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the change to approval condition 18 as follows: 18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions" and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail. Black and white transparent mylars of Sheet#1 CS 101 —CS 104; CG112 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely,, �j &Wvj� Patrick Kennedy, Chair Planning and Zoning Commission Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control NED Fire Marshal PK/11z SCAN SUBSTITUTE ATTACHMENT A ADDITIONAL CONDITIONS Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue(north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building; and (b) If construction of the northeast residential building is commenced prior to the completion of the southwest residential building, the existing, temporary detention basin will be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building, unless Detention Basins 2 and 2a have been previously constructed. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the first office building. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8 to the north as well as prior to the issuance of the final certificate of occupancy for the second residential building. A temporary access path must also be incorporated from the residential development to the walking trail prior to the issuance of the final certificate of occupancy for the second residential building. 2 ATTACHMENT A SUBSTITUTE ADDITIONAL CONDITIONS Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue(north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and LL Bean),to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building; and (b) If construction of the northeast residential building is commenced prior to the completion of the southwest residential building, the existing, temporary detention basin will be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building, unless Detention Basins 2 and 2a have been previously constructed. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the first office building. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8 to the north as well as prior to the issuance of the final certificate of occupancy for the second residential building. A temporary access path must also be incorporated from the residential development to the walking trail prior to the issuance of the final certificate of occupancy for the second residential building. 2 SPECIAL CONDITIONS (PROPOSED NEW SPECIAL CONDITIONS) 1. Prior to the issuance of a building permit for the second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; however, all improvements at the Buckland Road and Tamarack intersection shall be completed when certificates of occupancy have been issued for 75% of the approved units in the first residential building at Town Square; (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; however, this temporary internal extension shall be completed prior to the issuance of the final certificate of occupancy for the first residential building; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be completed within one year of the date that the building permit is issued for the second residential building at Town Square. A reduction in the amount of any surety bonds or other financial guaranties, as provided by law, shall be permitted as site improvements covered by said surety bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. 2. Prior to the issuance of any certificate of occupancy for a unit within the second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #1, shall be completed within one year of the issuance of the building permit for the second residential building at Town Square; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding; however, all site improvements associated with the second residential building shall be completed within one year of the issuance of the first certificate of occupancy for a unit in the second residential building. A reduction in the amount of said surety bond or other financial guaranty, as provided by law, shall be permitted as site improvements for the second residential building are completed. 2260596v2 N St4 o � r7-0� 01P Soam ?d&U&Ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �f�OsoR c°N� TELEPHONE (860) 644-2511 CERTIFIED MAIL 7011 0470 0003 7146 8270 June 1, 2012 Christopher J. Smith, Esq. Shipman&Goodwin LLP One Constitution Plaza Hartford, CT 06103-1919 Dear Attorney Smith: Re: Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street, Buckland Road Gateway zone. The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the change to approval condition 18 as follows: 18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions" and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail. Black and white transparent mylars of Sheet#1 CS101 —CS104; CGl 12 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely,.,,, Patrick Kennedy, Chair Planning and Zoning Commission Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal 'a 2NED PK/llz SCAN t�W N Sf4 G v F G � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�dSOR-CO TELEPHONE (860) 644-2511 CERTIFIED MAIL 7011 0470 0003 7146 8270 June 1, 2012 Christopher J. Smith, Esq. Shipman& Goodwin LLP One Constitution Plaza Hartford, CT 06103-1919 Dear Attorney Smith: Re:Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street, Buckland Road Gateway zone. The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the change to approval condition 18 as follows: 18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions" and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail. Black and white transparent mylars of Sheet#1 CS101 —CS104; CG112 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely,�� Patrick Kennedy, Chair Planning and Zoning Commission Cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal PK/11z SUBSTITUTE ATTACHMENT A ADDITIONAL CONDITIONS Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian access,to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue(north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel,whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building; and (b) If construction of the northeast residential building is commenced prior to the completion of the southwest residential building, the existing, temporary detention basin will be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building,unless Detention Basins 2 and 2a have been previously constructed. - 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks,utilities and other improvements,to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements,to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the first office building. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8 to the north as well as prior to the issuance of the final certificate of occupancy for the second residential building. A temporary access path must also be incorporated from the residential development to the walking trail prior to the issuance of the final certificate of occupancy for the second residential building. .4 2 SPECIAL CONDITIONS (PROPOSED NEW SPECIAL CONDITIONS) 1. Prior to the issuance of a building permit for the second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded,as provided by law; however, all improvements at the Buckland Road and Tamarack intersection shall be completed when certificates of occupancy have been issued for 75% of the approved units in the first residential building at Town Square; (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; however, this temporary internal extension shall be completed prior to the issuance of the final certificate of occupancy for the first residential building; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be completed within one year of the date that the building permit is issued for the second residential building at Town Square. A reduction in the amount of any surety bonds or other financial guaranties, as provided by law, shall be permitted as site improvements covered by said surety bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. 2. Prior to the issuance of any certificate of occupancy for a unit within the second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #1, shall be completed within one year of the issuance of the building permit for the second residential building at Town Square; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding; however, all site improvements associated with the second residential building shall be completed within one year of the issuance of the first certificate of occupancy for a unit in the second residential building. A reduction in the amount of said surety bond or other financial guaranty, as provided by law, shall be permitted as site improvements for the second residential building are completed. 2260596v2 ATTACHMENT A SUBSTITUTE ADDITIONAL CONDITIONS Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue(north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and LL Bean),to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue,to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building; and (b) If construction of the northeast residential building is commenced prior to the completion of the southwest residential building, the existing, temporary detention basin will be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building,unless Detention Basins 2 and 2a have been previously constructed. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks,utilities and other improvements,to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements,to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks,utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the first office building. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8 to the north as well as prior to the issuance of the final certificate of occupancy for the second residential building. A temporary access path must also be incorporated from the residential development to the walking trail prior to the issuance of the final certificate of occupancy for the second residential building. 2 i Y RECEIVED SHIPMAN &GOODWINLLP® MAY G ! 2012 COUNSELORS AT LAW SOUTH WINDSOR PLANNING DEPT. Christopher J.Smith Phone: (860)251-5606 Fax: (860)251-5318 cismith@goodwin.com May 7, 2012 Via email correspondence and overnight: Ms. Michele R. Lipe Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Request to modify conditions associated with approval of Application 11-24P, Final Plan-for Evergreen Walk, LLC, pursuant to Section 4.2.15,for real property known as "Evergreen Walk, "to be located on a portion of 151 Buckland Road, including portions of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400.feet north of Smith Street, South Windsor, Connecticut. Approval of Final Plan granted on September 13, 2011, by the Planning and Zoning Commission ("Approval'). Dear Director of Planning Lipe, As you are aware, the undersigned law firm represents the owner/applicant, Evergreen Walk, LLC, concerning the above-referenced Approval. On behalf of Evergreen Walk, LLC, I respectfully submit this Request to Modify certain conditions of the subject Approval to accommodate a build out of the approved Final Plan. I enclose ten copies of the following documentation in support of this Request to Modify: 1. Approval letter of September 19, 2011, with attached conditions designated as "Attachment A" - 2 pages (please see Exhibit 1 attached hereto); 2. Draft of proposed new conditions of approval, Attachment A, to be substituted for a portion of the Attachment A incorporated into the September 13, 2011 approval (please see Exhibit 2 attached hereto); and 3. Draft of proposed new Special Conditions to be substituted for the Special Conditions incorporated into the September 13, 2011 approval (please see Exhibit 3 attached hereto). ONE CONSTITUTION PLAZA HARTFORD,CONNECTICUT 06103-1919 1 860-251-5000 WWW.SHIPMANGOODWIN.COM 1 R 1 It is my understanding that the Commission may schedule this request for consideration at the Commission's meeting of Tuesday, May 22, 2012. We look forward to working with you and the Commission on this request, which, if granted, will enable the build out of the approved Final Plan to proceed. Thank you for your, and the Commission's, consideration and assistance concerning this request. As always, best regards. V my yours C istophe J. Smith cc: Evergreen Walk, LLC (with enclosures) Alan F. Lamson, AICP (with enclosures) 2266652v1 2 Dy'N Sf4 00 +i f ti w� 1540 SULLIVAN AVENUE•SOUTH WINDSOR, CT 06074 f�dSoa•co� TELEPHONE (860) 644-2511 CERTIFIED MAIL 7008 1300 0001 4578 4082 September 19, 2011 Alan F. Lamson FLB Architecture&Planning 19 Silver Lane East Hartford, CT 06118 Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include: relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space [121 hotel rooms(71,550 square feet)];general commercial space(9,800 square feet); office space(28,405 square feet)];to be completed in two phases and to be located on a portion of 151 Buckland Road [within "Evergreen Walk" including portions of Units 6 and 7),and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone. We are pleased to advise you that the Planning&Zoning Commission voted on September 13,2011 to approve the above referenced application for Final Plan approval as shown on plans prepared by Fuss & O'Neil,project number 2481.S20 dated 4/25/11 as revised,with the following modifications. 1. Prior to commencement of any site work,a meeting must be held with Town Staff. 2. No building permit will be issued until the'final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of erosion and sediment controls;$50,000 for construction of stormwater systems; and$30,000 for wetland plantings. 4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars. 5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.23 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 9. The building street numbers must be included on the final plan. 10. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. Exhibit 1 12.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). 13.The Town Engineer's review comments dated September 8,2011, as revised 9/13/11 must be incorporated into the final plans. 14.The zoning data table must include all zoning data(e.g.parking and open space)and included on the plans to be filed in the Town Clerk's office. 15.The phasing of the improvements of the required open space should be clarified on the plans. 16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture and Design Review Committee and the Planning and Zoning Commission prior to issuance of building permits. 7.The Fire Chiefs comments regarding fire hydrant locations must be added to the plans: 18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for Final Plan"document submitted by the applicant and included as Attachment A. 19. The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave. must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2. 20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended north up to the unit 8 parcel. 21.A school bus shelter must be added to the plans in a location designated by the Board of Education in compliance with current BOE policies. 22.The developer must examine the sequencing of the traffic lights along Buckland Road and make adjustments to the timing as appropriate. 23. The roof top screening for the hotel must be added to block the views from Buckland Road of all the mechanical units. Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans) must be submitted to°this Conuriission to.'oe stamped and signed. Tlie.letters of approval of this Commission as Well as the Inland Wetlands Agency/Conservation Commission must be.reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Patrick Kennedy, Chairman ' PK/ma Planning and Zoning Commission cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal fi s Phasing Sequence for Final Plan as Provided in Site Plan Application Phase 1• 1. Temporary extension of Evergreen Way behind LA Fitness to Tamarack Avenue (adjacent to EC HN2),including temporary sidewalk for pedestrian access. 2. Widening and improvements to Tamarack Avenue(north-south along Town Square project). 3. Modifications and improvements to Tamarack Avenue(east-west between Shops at Evergreen Walk and IL Bean). 4. Pedestrian access from LL Bean site to Town Square-along south side::of Tamarack Avenue. 5. Pedestrian access and improvements between Shops at Evergreen Walk and Town Square. 6. Modifications to and lighting at Shops at Evergreen Walk. 7. Site Preparation Parts A and B (includes construction of Detention Basins 2 and 2a). 8. South portion of ring road through Town Square. 9. Town Square construction. 10. Hotel and associated parking,access drives,sidewalks,utilities and other improvements. 11. South residential building and associated parking,access drives,sidewalks,utilities and other improvements. 12. Water main loop to serve Phase I and Phase 2. 13. Natural gas loop to serve Phase 1 and Phase 2. 14. Commercial buildings (2)south of hotel and within Town Square,and associated sidewalks,utilities and other improvements. Phase 2: 1. Trunk sewer relocation. 2. Northerly residential building and associated parking,access drives,sidewalks, utilities and other improvements. � f 3. Office condominiums and associated parking,access drives,sidewalks,utilities and other improvements. Special Phasing Conditions: 1. Prior to commencing construction activities in Phase 2: (a) the commercial building shall be "substantiallyconstructed" in Phase 1,which means that all framing, sheathing and roofing of the commercial building in Phase 1 shall be completed; (b) the improvements at the Buckland Road and Tamarack intersection shall be completed; (c) the temporary internal connection of Tamarack and Evergreen Way shall be completed(without final coat);and (d) a surety or performance guaranty bond,as provided bylaw,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 1,which site improvements shall constitute all utilities,storm water system components,site lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding. All such site improvements in Phase 1 and items (b) and (c)above shall be completed within one year of the date that building construction activities in Phase 2 are commenced. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 1. However,site preparation,construction of the site improvements,and construction of the building foundations in Phase 2,shall be permitted without having to complywith the aforementioned provisions provided for in this special phasing condition. 2. Prior to the issuance of the final certificate of occupancy for the residential building- in Phase 2: (a) all construction in Phase 1 shall be completed,including all site improvements;(b) at least fifty(500/0)percent of the commercial buildings required for the 2:1 residential/commercial square footage ratio in Phase 2 shall be "substantially constructed,"which means that all framing,sheathing and roofing of such commercial buildings shall be completed;and(c) a surety or perfori-nance guaranty bond,as provided bylaw,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 2, which shall constitute all utilities,storm water system components,site lighting, retaining wails,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 2. 20321390 2 ATTACHMENT A (PROPOSED NEW ADDITIONAL CONDITIONS) Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue (north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 3. Modifications and improvements to Tamarack Avenue (east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Expansion of the existing, temporary detention basin to be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building, unless Detention Basins 2 and 2a have been previously constructed; and 2260516v2 Exhibit 2 7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the office buildings. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 2 2260516v2 6 SPECIAL CONDITIONS (PROPOSED NEW SPECIAL CONDITIONS) 1. Prior to commencing the construction of the second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be completed within one year of the date that building construction activities for the second residential building are commenced. A reduction in the amount of said surety bond or other financial guaranty shall be permitted as site improvements covered by said surety bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. 2. Prior to the issuance of the final certificate of occupancy for the second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #1, shall be completed within one year of the date of commencing the construction of the second residential building; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. A reduction in the amount of said surety bond or other financial guaranty, as provided by law, shall be permitted as site improvements for the second-residential building are completed. 2260596vl Exhibit 3 Request to Modify Conditions Associated With Approval of Application 11-24P, Final Plan for Evergreen Walk, LLC May 22, 2012 l � Submitted by: Christopher J. Smith, Esq. Shipman & Goodwin LLP One Constitution Plaza Hartford, CT 06103-1919 Phone: (860) 251-5606 Fax: (860) 251-5318 Email: cjsmith@goodwin.com i On behalf of Owner/Applicant: Evergreen Walk, LLC I i � RECEIVED MAY 2 2 2012 SOUTH MOOR IU NiNG DEPT. Exhibit A r ` It is my understanding that the Commission may schedule this request for consideration at the Commission's meeting of Tuesday, May 22, 2012. ' We look forward to working with you and the Commission on this request, which, if granted, will enable the build out of the approved Final Plan to proceed. Thank Y you for our, and the Commission's, consideration and assistance concerning Y this request. As always, best regards. - 1 Verb �uly yours, '�Christophe J. Smith PC: Evergreen Walk LLC with enclosures y g � ) Alan F. Lamson, AICP (with enclosures) 2266652vl 1 1 1 2 1 . (OWN Sp4 C c7-- y Y : . kv 1540 SULLIVAN AVENUE e SOUTH WINDSOR, CT 06074 f�OSox'co TELEPHONE(860) 644-2511 CERTIFIED MAIL 7008 1300 0001 4578 4082 September 19, 2011 Alan F. Lamson FLB Architecture&Planning 19 Silver Lane East Hartford, CT 06118 Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include: i relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space [121 hotel rooms(71,550 square feet)]; general commercial space(9,800 square feet); office space(28,405 square feet)]; to be completed in two phases and to be located on a portion of 151 Buckland Road [within "Evergreen Walk" including portions of Units 6 and 7), and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone. We are pleased to advise you that the Planning&Zoning Commission voted on September 13, 2011 to approve the above referenced application for Final Plan approval as shown on plans prepared by Fuss &O'Neil, project number 248LS20 dated 4/25/11 as revised, with the following modifications. 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of erosion and sediment controls; $50,000 for construction of stormwater systems; and$30,000 for wetland ' plantings. 4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars. j5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.23 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 18. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 119. The building street numbers must be included on the final plan. 10. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. Exhibit 1 12. If a State Traffic Commission certificate is required,no building permits will be issued_ until the certificate has been issued(per CGS §14-311). 13. The Town Engineer's review comments dated September 8,2011, as revised 9/13/11*must be incorporated into the final plans. r14.The zoning data table must include all zoning data(e.g.parking and open space) and included on the plans to be filed in the.Town Clerk's office. 15.The phasing of the improvements of the required open•space should be clarified on the plans. 16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture and Design Review Committee and the Planning and Zoning Commission prior to issuance of building permits. i7.The Fire Chief s comments regarding fire hydrant locations must be added to the plans. 18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for Final Plan"document submitted by the applicant and included as Attachment A. 19.The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave: must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2. r20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended north up to the unit 8 parcel. 21.A school bus shelter must be added to the plans in a location designated by the Board of Education in compliance with current BOE policies. 22.The developer must examine the sequencing of the traffic lights along Buckland Road and make adjustments to the timing as appropriate. r 23.The roof top screening for the hotel must be added to block the views from Buckland Road of all the mechanical units. Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans) must be submitted t&this Coiiunission to.be`stamped;and signed. Theaetters of approval of this Commssion as ,well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After them mylars have been signed by the Commission,the will be returned to you for filing in the Office of the Y � Y Y g Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Y Patrick Kennedy, Chairman PK/ma Planning and Zoning Commission Fc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal r Phasing Sequence for Final Plan as Provided in Site Plan Application Phase 1: 1. Temporary extension of Evergreen Way behind LA Fitness.to Tamarack Avenue (adjacent to ECHN2),including temporary sidewalk for pedestrian access. 2. Widening and improvements to Tamarack Avenue (north-south along Town Square project). 3. Modifications and improvements to Tamarack Avenue (east-west between Shops at Evergreen Walk and LL Bean). 4. Pedestrian access from LL Bean site to Town Square.along south sidef Tamarack Avenue. 5. Pedestrian access and improvements between Shops at Evergreen Walk and Town Square. 6. Modifications to and lighting at Shops at Evergreen Walk. 1 7. Site Preparation Parts A and B (includes construction of Detention Basins 2 and 2a). 8. South portion of ring road through Town Square. 9. Town Square construction. 10. Hotel and associated parking,access drives,sidewalks,utilities and other improvements. ' 11. South residential building and associated parking,access drives,sidewalks,utilities and other improvements. 12. Water main loop to serve Phase 1 and Phase 2. 13. Natural gas loop to serve Phase 1 and Phase 2. 14. Commercial buildings (2) south of hotel and within Town Square,and associated sidewalks,utilities and other improvements. Phase 2: 1. Trunk sewer relocation. 2. Northerly residential building and associated parking, access drives,sidewalks, utilities and other improvements. 1 3. Office condominiu ms and associated parking,access drives,sidewalks,utilities and other improvements. Special Phasing Conditions: 1. Prior to commencing construction activities in Phase 2: (a) the commercial building shall be "substantially constructed" in Phase 1,which means that all framing, sheathing and roofing of the commercial building in Phase 1 shall be completed; (b) the improvements at the Buckland Road and Tamarack intersection shall be completed; (c)the temporary internal connection of Tamarack and Evergreen Way shall be completed (without final coat);and (d) a surety or performance guaranty bond,as provided bylaw,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 1,which site improvements shall constitute all utilities,storm water system components,site lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding. All such site improvements in Phase 1 and items (b) and (c) above shall be completed within one year of the date - that building construction activities in Phase 2 are commenced. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 1. However,site preparation,construction of 1 the site improvements,and construction of the building foundations in Phase 2,shall be permitted without having to complywith the aforementioned provisions provided for in this special phasing condition. 2. Prior to the issuance of the final certificate of occupancy for the residential building in Phase 2: (a) all construction in Phase 1 shall be completed,including all site improvements; (b)at least fifty(50%)percent of the commercial buildings required ' for the 2:1 residential/commercial square footage ratio in Phase 2 shall be "substantially constructed," which means that all framing,sheathing and roofing of such commercial buildings shall be completed; and(c) a surety or performance guaranty bond,as provided bylaw,shall be provided in an amount to assure the completion of all site improvements intended to be completed as part of Phase 2, which shall constitute all utilities,storm water system components,site lighting, retaining wails,driveways,parking areas,roadways,sidewalks,curbs,signs, linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the amount of said surety or performance guaranty bond shall be permitted as site improvements are completed in Phase 2. 2032139v1 2 I ATTACHMENT A (PROPOSED NEW ADDITIONAL CONDITIONS) ' Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian raccess, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 1 2. Widening and.improvements to Tamarack Avenue (north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 3. Modifications and improvements to Tamarack Avenue (east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building: t4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. S. Pedestrian access and improvements between the Shops at Evergreen Walk and Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) Expansion of the existing, temporary detention basin to be completed to accommodate runoff from the northeast residential building prior to the . issuance of the final certificate of occupancy for the northeast residential building, unless Detention Basins 2 and 2a have been previously constructed; and 2260516v2 Exhibit 2 7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to�the issuance of the final certificate of 1 occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks, -utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated access drives, parking, sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. 13. Office buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the office buildings. 14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 15. Natural as loop to be completed prior to the issuance of the final certificate of g P P occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final p certificate of occupancy for the northeast residential building. I 1 1 2 ' 2260516v2 SPECIAL CONDITIONS (PROPOSED NEW SPECIAL CONDITIONS) 1. Prior to commencing the construction of the second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to 1 ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be completed within one year of the date that building construction activities for the second residential building are commenced. A reduction in the amount of said surety bond or other financial guaranty shall be permitted as site improvements covered by said surety bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the ' second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. ' 2. Prior to the issuance of the final certificate of occupancy for the second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #l, shall be completed within one year of the date of commencing the construction of the second residential building; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in ' an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities,storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. A reduction in the amount of said surety bond or other financial guaranty, as provided by law, shall be permitted as site improvements for the second residential building are completed. 2260596vi Exhibit 3 Exhibit B rATTACHMENT A (PROPOSED NEW ADDITIONAL CONDITIONS) Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided in Site Plan Application: 1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack ' Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian access, to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 2. Widening and improvements to Tamarack Avenue (north-south adjacent to the Town Square project), to be completed prior to the issuance of the final certificate of occupancy for the nfft-he461 residential building. 3. Modifications and improvements to Tamarack Avenue (east-west between Shops at Evergreen Walk and LL Bean), to be completed prior to the issuance of the final certificate of occupancy for the first residential building. Pedestrian access from LL Bean site to Town Square adjacent to the south side of Tamarack Avenue, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 5. Pedestrian access and improvements between the Shops at Evergreen Walk and ' Town Square, to be completed prior to the issuance of the final certificate of occupancy for the first residential building or hotel, whichever certificate issues first. 6. Modifications to and lighting in the parking area west of the Shops at Evergreen Walk to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 7 (a) palion CW Qul sw , i ��'y and D21 If construction of the northeast residential building is commencer_t riot to the coo nnletion of the southwest residential building. the existing, temporary detention basin to&W be completed to accommodate runoff from the northeast residential building prior to the issuance of the final certificate of occupancy for the northeast residential building, unless 2260516v-23 Detention Basins 2 and 2a have been previously constructed;-and 7 {b) corsst cti l etcanden,-3 w4as--2-a-n4-2a4o,- c�c�plc�te l r t€�tlt'--isstmnew+ th -teal-pert x a -o ccu ant-y-folrth €�uthw ht- re-s4de-ndal-buRdhig.. 8. Town Square south entry drive to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. ' 9. Construction of the proposed Town Square public space component to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 10. Hotel and its associated parking, access drives, sidewalks, utilities and other i improvements, to be completed prior to the issuance of the final certificate of occupancy for the hotel. 11. Southwest residential building and its associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the southwest residential building. 12. Northeast residential building and its associated parking, access drives, ' sidewalks, utilities and other improvements, to be completed prior to the issuance of a final certificate of occupancy for the northeast residential building. ' 13. Qffice buildings and their associated parking, access drives, sidewalks, utilities and other improvements, to be completed prior to the issuance of the final certificate of occupancy for the f=office bt ldings WWuig. i14. Water main loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. ' 15. Natural gas loop to be completed prior to the issuance of the final certificate of occupancy for the first residential building. 16. Trunk sewer relocation to be completed prior to the issuance of the final certificate of occupancy for the northeast residential building. 1L Construct walking trail around detention basins 2 and 2a and from_there to Unit 8 to the north prior to the issuance of the final certificate of occupant for he second residential building. I 2260516v2-2 2 Document comparison by Workshare Professional on Thursday, May 17, 2012 3:40:16 PM Document-1 1D interwovenSite://SGDMS/SG/2260516/2 Mi ' Description 11#2260516v2<SG> =Attachment A 4/2012 Document 2 ID interwovenSite://SGDMS/SG/2260516/3 Description #2260516v3<SG> -Attachment A 4/2012 ' Rendering set standard Style change Format change Inserted cell Deleted cell :���;� .�ug_r; :A.�,�=����~nW.:�, ��A ' Moved cell Split/Merged cell ' Paddin cell 1 Count Insertions 9 Deletions 8 ' Moved from 1 Moved to . 1 Style change 0 Format changed 0 Total changes 19 i SPECIAL CONDITIONS ' (PROPOSED NEW SPECIAL CONDITIONS) I1. Prior to c�mmet�c- g-tlenrr�� ,nfthe issuance of a building newt for the ' second residential building at Town Square: (a) the improvements at the Buckland Road and Tamarack intersection shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law; however_ all improvements at the Buckland_Road and Tamarack intersection 1 shall be completed when certificates of occupancy have been issued for 75% of the approved its in the first residodal_building at Town Saua_re: (b) the temporary internal connection of Tamarack Avenue and Evergreen Way in the r vicinity of the southern ECHN office building and LA Fitness shall have commenced and the portion of the work that is not completed shall be bonded, as provided by law: however. this tem, orary internal extension shall be co leeted prior to the issuance of the final certificate of occupancy for the first residential building; and (c) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the site construction of the first residential building, which improvements shall constitute all utilities, storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding. All such site improvements noted above shall be ' completed within one year of the date that building eenstfueUon- A permit is issued for the second residential building ar--ems --ed. TownSauue- A. reduction in the amount of said=,surety bendbmda or other financial gu; xtyguaranties. as rovid by lbw,shall be permitted as site improvements ' covered by said surety.bond or other financial guaranty are completed. However, site preparation, construction of the site improvements, and construction of the building foundations for the second residential building shall be permitted without having to comply with the aforementioned provisions provided for in these special conditions. I2. Prior to the issuance of. -final=certificate of occupancy for a unit within the ' second residential building: (a) all construction of the first residential building shall be completed, including all site improvements, or a surety bond or other financial guaranty, as provided by law, in the amount of the unfinished work shall be provided, but in any event all such site improvements associated with the first building as referenced above, #1, shall be completed within one year of the datcissuance of con g the oden-e€huilding hermit for the second residential building at Town aua=; and (b) a surety bond or other financial guaranty, as provided by law, shall be provided in an amount to ensure the completion of all site improvements intended to be completed as part of the construction of the second residential building which shall constitute all utilities, 2260596v4-2 storm water system components, site lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails, ' fences, grading and seeding: however all site imRroyements associated with the second residential buildi j shall be co iLleted within one year of the issuance of ' the first certificate of occupancy or a unit in the second residential building. A reduction in the amount of said surety bond or other-financial guaranty, as provided by law, shall be permitted as site improvements for the second ' residential building are completed. 1 2260596v4-2. 2 Document comparison by Workshare Professional on Thursday, May 17, 2012 2:33:15 PM Document 1 ID interwovenSite://SGDMS/SG/2260596/1 Description 2260596vl<SG> - SPECIAL CONDITIONS 4/2012 Document 2 1D interwovenSite://SGDMS/SG/2260596/2 Description #2260596v2<SG> SPECIAL CONDITIONS 4/2012 Renderin set standard ' L TnSertion �rrczxv'r'r naoyedfi;em MQxQd Style change Format charge Inserted cell rt Deleted cell :�.��� • ��u=�. �i_•� «:g.. Moved cell Split/Merged cell ,Padding cell Count Insertions 17 Deletions 12 Moved from 0 Moved to 0 Style change 0 Format chan ed 0 Total changes 1 29 Exhibit C 1 k Y 1 9 I r . t\, W U _ '�� ti • � C r� 1 i a ABC 31 \ d'�a fie, { �''�� � � �� � • K r� r■� �r r r r r �r r � r r r it r r� r r r Company Overview • Bonaventure is headquartered in Arlington, VA and was founded in 1999 •We specialize in development of high end apartments on the east coast • Our management company currently manages a portfolio of 5,000+ units from the Washington, DC metro area to Charleston, SC •Our philosophy: If we combine great locations, distinctive architecture, exceptional amenities, and sustainablematerials, we can create vibrant and lasting communities • Our "old school" investment philosophy is to build and hold for the long term. We meticulously plan our properties up front to minimize repairs and replacements down the road •Our target project size is 200 units, which allows us to achieve an efficientuse of resources through both construction costs and operational costs during lease-up and at stabilization BONAVENTURE REALTY GROUP, LL6. The Cascades aad Z,..ti,isz, "i .b ye ., Location: Virginia Beach,Virginia #of Units: 226 units+22,000 SF Retail Project Costs: $33Million 0 R x ' " TIMELINE: j Site Plan Approval: Dec 2008 Building Permits Issued: Dec 2008 Close with Financing: Feb 2009 Break Ground: Feb 2009 First Move-Ins: Jan 2010 Construction Complete: July 2010 Stabilized Occupancy: Dec 2010 The Cascades is an A+ community in the strongest submarket in the - Hampton Roads market. In addition to 226 apartment units we have developed a mixed use component with 22,000 sgft of restaurant and retail on the round level. The property features fine) a g p p y y appointed residences, upscale project amenities, and a convenient, accessible location. Residents of the property enjoy an abundance of upscale shopping, dining, and recreational amenities all conveniently nearby. The deal structure used for this transaction is a Joint Venture with the land owner. Development Team: Architect: Humphrey's and Partners Contractor: Marlyn Development Engineer: MSA,PC Legal: Sykes,Bourdon,Ahern&Levy Lender: Wells Fargo FHA 221(d)(4)HUD insured BONAVENTURE CASE STUDY �.. REALTY GROUP. LLG. A5 Aura at Towne Place Towne Place at Greenbrier is an existing 78,000 specialty retail development F consisting of various upscale shops and restaurants, such as Jos A Bank, Jason's Deli, Chicos, and Surf Rider. Bonaventure will be adding 215 luxury apartments featuring upgraded finishes and features in two buildings. The 4-story buildings have been designed to fit in with the existing retail.The project will bring to life the walk-able mixed use reality desired by many planners in Hampton roads.The deal structure used for this transaction is a fee simple purchase.This property is currently under construction. Development Team: Architect: JPrice Architecture Contractor: Marlyn Development Engineer: Engineering Services Legal: Kaufman and Canoles Lender: Wells Fargo FHA 221(d)(4)HUD insured Services Rendered: Development Management - R zonings Location: Chesapeake,Virginia #of Units: 215 units Project Costs: $28 Million TIMELINE: Site Plan Approval: Mar 2010 Building Permits Issued: Aug 2010 Close with Financing: July 2011 Break Ground: July 2011 First Move-Ins: May 2012 rs Construction Complete: Sept 2012 Stabilized Occupancy: Mar 2013 BONAVENTURE CASE STUDY REALTY GROUP, LL6 r� rr r rr rr r rr rr rr rr �r r rr rr r� rr rr rr r� Promenade Pointe Location: Norfolk,Virginia =` #of Units: 183 units Project Costs: $27 Million Services Rendered: � �. Development Management Rezonings 1? � � Promenade Pointe is planned to be a resort style community on the banks of the Lafayette River system.The 183 luxury apartments will feature upgraded finishes and ifSFr features such as granite countertops, gourmet kitchens, lofted units, vaulted ceilings, and expansive water views. In addition, we have partnered with the City of Norfolk to offer local students the chance to learn about the local ecosystem and wildlife, at our on-site wetlands. Canoes and a canoe launch pier are available for use by residents TIMELINE: and local schools.The deal structure used for this transaction is a fee simple purchase. Site Plan Approval: March 2012 We assembled this infill site and led the rezoning effort. Building Permits Issued: June 2012 Development Team: Close with Financing: June 2012 .Architect: Cox,Kliewer&Co.LLC Break Ground: June 2012 Contractor: KBS First Move-Ins: Sept 2013 Engineer: Hassel&Folkes Construction Complete: Jan 2014 Legal: Kaufman and Canoles Stabilized Occupancy: Apr 2014 Lender: Wells Fargo FHA 221(d)(4)HUD insured BONAVENTURE CASE STUDY REALTY GROUP. LLC. r� rr Ir �r rr r rr rr �r r �■Ir r rr r� r� r r� r rr t M9 N mom mos _ , F sit 4' .. Tat. B 0 N VENTURE 3. v v y 7 �- x. 3 f. 1 S ;jyIk- „r vTEST " t r x � �r 1£ u I wj n SKY t . r s r r r r r r r ® ® r rr rr rr r rr rr rr c 1 ROOM 4w n r i � r ` F r 1 y'�G fix". g.v ty � •, �� 3 r, aJR w�M-�:.. �. 1 u.. y3. .:x" 4� �` i s xx,x a•t»"i{� s ''hy�„#�:M h �� / REALTY G:ZQU P, ' ar rr r� r rr r r r ® r r r rr rr ar �r r� rr r� kt v :'• '!v+, fin.- � / 1 �rr�k � �� i� 'Aar �, }#� �• �� � @t �" rn' F� r� y j " 4BONAVEN'i R EA LT`� GRgUo �C Community Amenities i Common Area Amenities and Buildina Features: *Clubhouse with Fireplace & Lounge Area *Resort style Swimming Pool with Outdoor Kitchen and Gas Grills •24-hour Fitness Center & Cardio Room w/ LCD TV's z •24-hour Internet Cafe Equipped with WiFi •Elevators *Secured Building Access Via Key Card *Trash Disposal Chutes Inside the Buildings *Extra Storage •Covered Parking TBO. NAVENTURE REALTY GROUP, LLE Apartment Finishes Apartment Features & Amenities: • Nine-foot Ceilings Y • Gourmet Kitchens and Breakfast Bars • Granite Countertops • Stainless Steel Appliances • Full-size Washer and Dryer • Loft units w/ Vaulted Ceilings* • Sunrooms* • Balconies or Patios • Bay Windows* p' • Built-in Computer Desks* * In select units BONAVENTLJRE REALTY GROUP, LLQ 1 i Ye z iv��f R<Y 1zb"1 i 1 :1. f J 4 � � _• ��: � rr r� r,• � r = e of / 57 r 1 rt Iffal t: t i 1 1 $� A 1 .. Exhibit C2 BONAVENTURE REALTY GROUP, LLC Corporate Dossier Mm .� � mac'„ '•�` wo� �._-, e, r ® � - - ......... p, r, 4 O P v A . a . ------------ .. .............................. 14 _ r REALTY GROUP, LLC; BONAVENTURE RHALTY GROUP, LLc Bonaventure at a Glance Overview ' Bonaventure Realty Group, LLC (Bonaventure) is a multifamily real estate development and property management firm focused on the east coast. We develop distinctive luxury multi-family ' communities in great locations, such that they can operate at the top of the market for decades. Our long-term, value-oriented approach to acquisitions & developments has produced exceptional returns for our investors. ' Company Prole Bonaventure is a real estate investment and asset management firm specializing in multi-family asset management, development and redevelopment, primarily on the east coast. Bonaventure is fully integrated to oversee every phase of the acquisition, construction, management, and disposition of our properties. As principals, the Dunton family has 40 years of experience investing in multi-family real estate in the Washington, D.C. metro area. Bonaventure was founded in 1999 by Dwight Dunton III as the ' active manager of the family's real estate interests and has since grown to count institutions and dozens of high net-worth individuals among its investors. Bonaventure generallyseeks to develop multi-family projects of quality construction, in good locations and with easy access to transportation systems. By combining great locations, distinctive architecture, exceptional amenities, and sustainable ' materials, we create reliable income producing assets that bear fruit for decades. Bonaventure focuses on long-term wealth creation and value. Because properties are held long ' term after completion, we focus on creating lasting communities which are continually well maintained. ' Bonaventure currently manages a portfolio in excess of 5,000 units. 1 Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206 Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com Bonaventure at a Glance Development Design Our signature developments are meticulously planned during the design stage. We pay close attention to the "little things." From unit layouts to refuse disposal, it is our priority to ' provide an exceptional, luxury, and worry free environment for our residents. We realize that every apartment development is not the same, and that in these important *}# design decisions, we are helping our future residents to choose our communities over others. Construction Bonaventure specializes in developing wood framed communities, which range between 3 and 5 stories. Most of our projects have elevators; and some contain structured parking.. Bonaventure is also experienced in complete redevelopment of ' existing structures, for both functioning apartment buildings and Y ; historic buildings. ' As the project manager for our developments, we ensure that all projects are brought in on schedule and on budget. Although we have staff on site during construction, we hire a general contractor to manage the construction process. Integrated Property Management Operations Bonaventure has a 3rd party affiliate which manages all of its multi- family communities. Our formula for success: - • Provide superior customer service • Focus on residents and staff • Concentrate on operational and financial goals • Put emphasis on employee training, development, and hiring =k d, 1 / Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206 Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com Bonaventure at a Glance I We provide our residents with upscale living through a strong amenity package that encourages ' recreation and interaction on site. We also offer upgrades to apartments depending on the desires of the resident. Here are some of the features and amenities of our apartment communities: tApartment Features&Amenities: Nine-foot Ceilings Garages Elevators Sunrooms Balconies or Patios Gourmet Kitchens and Breakfast Bars Stainless Steel Appliances Granite Countertops Full-size Washer and Dryer Loft units w/Vaulted Ceilings Bay Windows ' Controlled Entry Built-in Computer Desks Common Area Amenities: Clubhouse with Fireplace&Lounge Area Resort style Swimming Pool with Gas Grills and Outdoor Fire Pit tTheater Room for Viewing Movies 24-hour Fitness Center&Cardio Room w/LCD TV's 24-hour Internet Cafe equipped with Wireless Internet ' Rooms for Bicycle Storage Trash Disposal Chutes inside the Buildings Extra Storage - ' Covered Parking Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206 Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com Location: Virginia Beach,Virginia #of Units: 215 units+22,000 SF Retail Project Costs: $33Million x ' TIMELINE: ' is Site Plan Approval: Dec 2008 Building Permits Issued: Dec 2008 Close with Financing: Feb 2009 J`. Break Ground: Feb 2009 j p First Move-Ins: Jan 2010 Construction Complete: July 2010 - We-4 a ' _u Stabilized Occupancy: Dec 2010 The Cascades is an A+ community in the strongest submarket in the Hampton Roads market. In addition to 226 apartment units we have developed a mixed use component with 22,000 sqft of restaurant and retail on the ground level. The property features finely appointed residences, - upscale project amenities, and a convenient, accessible location. Residents of the property enjoy an abundance of upscale shopping, dining, and r recreational amenities all conveniently nearby. The deal structure used for " this transaction is a Joint Venture with the land owner. ; Development Team: Architect: Humphrey's and Partners F� t. Contractor: Marlyn Development Engineer: MSA, PC Legal: Sykes, Bourdon,Ahern & Levy t. Lender: Wells Fargo FHA 221(d)(4) HUD insured Y` w? 9• BONAVENTURE CASE STUDY REALTY GROUP, LLC ��*► � �,.-^+ems... 'IRd 4`�,� p� � .:.:: M; I 0 , i NM s _ 4 4 �nh r I 9 tK til v �' f ................ rac ukti Msay " a d ativ�.�R 1. 4 , k•t" 1 a f riYim . . re 01 �r r MW loot OMNI look MIND @owl lool OMNI OMNI No@ lool Now loot 11=0 s � � Towne Place at Greenbrier is an existing 78,000 specialty retail development consisting of various upscale shops and restaurants, such as Jos A Bank, Jason's Deli, Chicos, and Surf Rider. Bonaventure will be adding 215 luxury apartments featuring upgraded finishes and features in two buildings. The 4-story buildings have been designed to fit in with the existing retail. The project will bring to life the walk-able mixed use reality desired by many planners in Hampton roads.The deal structure used for this transaction is a fee simple purchase. This property is currently under construction. Development Team: Architect: JPrice Architecture Contractor: Marlyn Development Engineer: Engineering Services Legal: Kaufman and Canoles Lender: Wells Fargo FHA 221(d)(4) HUD insured Services Rendered: Development Location: Chesapeake,Virginia #of Units: 215 units Project Costs: $28 Million TIMELINE: Site Plan Approval: Mar 2010 Building Permits Issued: Aug 2010 Close with Financing: July 2011 Break Ground: July 2011 First Move-Ins: May2012 Construction Complete: Sept 2012 Stabilized Occupancy: Mar 2013 _..,.+...::. BONAVENTLJRE CASE STUDY im REALTY GROUP. LLC IIW Location: Norfolk,Virginia #of Units: 183 units Project Costs: $27.3 Million Services Rendered: Development v "17 Promenade Pointe is planned to be a resort style community on the banks of the Lafayette River system. The 183 luxury apartments will feature upgraded finishes and �' = features such as granite countertops, gourmet kitchens, lofted units, vaulted ceilings, Sr and expansive water views. In addition, we have partnered with the City of Norfolk to Nil , offer local students the chance to learn about the local ecosystem and wildlife, at our on-site wetlands. Canoes and a canoe launch pier are available for use by residents TIMELINE: and local schools.The deal structure used for this transaction is a fee simple purchase. Site Plan Approval: March 2012 We assembled this infill site and led the rezoning effort. Building Permits Issued: June 2012 Development Team: Close with Financing: June 2012 Architect: Cox, Kliewer&Co. LLC Break Ground: June 2012 Contractor: KBS First Move-Ins _Sept 2013 Engineer: Hassel& Folkes Construction Complete: Jan 2014 Legal: Kaufman and Canoles Stabilized Occupancy: Apr 2014 Lender: Wells Fargo FHA 221(d)(4) HUD insured BONAVENTUPd CASE STUDY REALTY GROUP. LLC Exhibit D s �' F Sr. '' tryL• T iYf. � -=`�rx}"P�p t f �. ors r ^.+A� t,Y�.'/'� '•1 Ir f'�`��i'tf��. - r Grt��K, �,<j ;>,t �•��g'71;:. _ � ` �" �. �1 ^•r� -� L I..•4 r r � � s."...,+a r tA', T x# k s -( n.,k. +.. jr .-0.'. R.. ,`-. � � . t ;f�r s• r`? �A S+; G ra 1 r. I ,• -• ,: .... tr tt _ ,�,., ,. :: � �,a Ors @1� � �[�l `.. I'rwt'. (..: '.; , ••'r7t.- _... y r -' ..- .y.. .. .' r,. .c„ to J' s' .I tr ;[ nr+" ff,� ,1,�. . s 7,': k rnv :. ,. .,. ._ '.- hsv _.:. .'"�'-"�„r,�,c:_+�.�_..._� :, ,+r. •l.. ���.. rl - p ,f�;� L,,r7r; '•1 :at( 1 . ,.., J'.-:� 1,:)I �F• - �;4� p,+., a. .-ttY.• 1. �'S• Y• B, !•:al.�.. '"� I 1:., •, A w/(. I. . �r .:.,, ... _.. '. 'rr ��' -, •. :< ,f-,,rr.r :...,.'•� � ,..y,. ..,. ,� �.r� ,n!�'.c.. 41.J•.�p f.: pr.an }j(,:i . ..,�� ,M ,,. y :. _ .�IS.�f['�'i.r: r_. .�.•... t pyyl�' rrpy Y<,-'` '.�'•t4iJ, <.;r.`i':. 1 .1. J ,d - � -_ . a "g � •L,m a' ri;!� t �:._G� � � i� �• Y-.:Y k ''' r., ; ..k�� -,�' �I gf I ��1 :,cg�.r, F•ar y r i � �u` k� r: -a�1. .•�;7AM. !r '1 . :an 1 4•�,q .ES r � t �. ',. -, � I �:,� :�: 3' liar. ,�., m,�••. �� D•"-tR.. r: 6 1 'e..�. i:sr..�t,., -�', ,rr�; ,�,. ;,��. . N L' 1 �; r„ ,.rf,: "'•�h,.q _. � ,,• ;,; ,.. �� r�' � ,R;(r; ''i, tare: .ik—' i��i'. i� I .'i' I ��,! n.•. ` , JAA ^9����'y1�,�ra. - .r .• L N pty^ 1I I I .S i 6 t:r�ar� :sr.�;.,�t�i•a�• •. _ +..... �.. __ .;,. _1 ..5. ,I„� St �4Y:I�fI _ �io'e�-^qr"^ — - _ ;"+,�f•"^�� .,. ... ,4. -,. � ;�.. : '. rs d .. �ri�`t v� ''t _•r. r Y xan,r•W„';�,_.� :b t �� � �';X,.r, ,., ,. cam•-+-,�. � ,=i. �'y '} �. .t - �::.-���a,L, .re".x�.'f"S'd "r a�;t,4'" '�"' .• ••+1.idt!'' r � ._ ... �t i .. r , • Ar i 5•DI'��Z y)�l'A.�,�. rfi�.. ',r;" _ T ,'}+.yr /.•:.`f1.1C�'iF ya / 5 •` .., y : J..+f.. tout - �n n�„ .".. f, -.v,:"s;a. .�.., .:.LA1 r � „. !".. ..-. -�.. � 1': -,,. I ..,-. •. _ .. - �• .: „•• -)f-.. �:-� };• A.. l', 1' ,•_ .`.�" -'1 'I , ,w,r,.-e , I;.t.., ..,.- +t i+•,� .,�,..t; ,.,r., . ;mil_ i 1 _i r. a t �:. �'I(til�.:� 'ai�Q��;D•�;h, V"V]1�1tdisoc' i' t lectl +. ?'•ts is r ` �.;r tp ,�r o � i ��._ !I t � .. , wig � t '�f ax��, •(� 37A�1 �i it... _r r ���yrytl. ".E. _, `i' r'�s ��\y �} `:� , �`FJ1;' �c :,� �/..111 •f o r1Tr�,,,,.s.1ie.. �""*�'�'�r - VCR •i Lr,`R17•7i � I ILI-AIL.' � .�:' �1r..;'r •r.` e e•` 3 :, �" . �Orj •� ,_ I I II I'I' L)�.., Il;,,t I �'.'.i II"�� L. t' fr I I I �I•,' J — ' ,� K, •� I � � ,7 i t� F. .,....h .,o '?ram•1 �I. � :I ,. `fRJ-�, s 1M 1 �n I f PRO .i�f1,. d ST'„�s.`.Lid. - _ ',ij'�j. �:r• �... 1}`)Tr., ' � I if gl..•� ,yrr�, ILL t JKl _ 4 '�` '.j � to - -/ I > I' I _ i i — K� � ry MEi { ... .,l � - ;: +:. .h•' ��;;. -.' ��t.A+�.. =`h. E�'.'�{ �;�t it,; i � �cc�l. y,,, �I ':V. ,. �V a r f r } <�� s � 7ar `..'� E -talg•r J s rt?: .<. 1` &7� _w a— I I!, 77 rf,X yyr - rw '�`.,y s � '�s c• .v'N'fts,,, �_ t_ ter, •,:- As ti _ .er, �.+:-A necticu e __—_-..un./JiY:,"slLli'S.'" y. �..:., _ ... c. - 2•�ra_�.c�C� i - 1 1 i 1 10 / 1 I , r - 4 r / t Al x I•-,,. . -..., . ,`,":_, .A -.,� ,'..� `�f .'�.`...�s`•t- , � :.,:,�...... .., ,- , ,.;.. mot." r y... 1.. } � - a� 1"^,t. r� --yi-' rr t- � �:;n / " :�Y" � � '" � 'ri•:-:'" 'e�`,�.a. t M1. �� � �[1.. h is a. r r 1 a� n M1 �s N: „ , 1 I � Exhibit E �\\ f' �� • \`` +1 t r/r !' : / I : \I ;.. .� �\ '� _ �_/ ti_ r--i 1'' .tat `� - ..J /.. ♦ _, - - ,.. t r ♦ ♦ `1 \♦ It !\ I ,.\ ` �.}' 1 '., f - I,r- __ L� J �1115 - _-( -�L ':\ _ t 7. �\ \\\'1 \� , ++\ 61 / , / +\ \ ♦\\\ a� 'L� \ ~. ]$ 1I � � __ o<�y. �< � � .�'r(o." -r"l-__ v J -•ra-- \♦ ♦ I /_ t ♦1 I �1i /- � __ \ may' +a t ,J `�• IC1--- ;♦ _ �•\\\\ t / % �1 .EKISTINO., a\ LDI SIORM T.F.1169 r - :\ W \, .♦ 1c 1 `. t__. \ rrrr ♦♦n� INV..100.2 E-u •. PA t\,' J ''-G,J `�-\ _ z____1�\lt P /� Y to... t ' :\�' \'�``\\ f1 \♦\\'\ f __ ----- -- — mv'.109.i(w) CO 1EE`STNGLa1, f.at'// ---J0`-T2`CPP -J-� `\ ♦: ``'.♦�i J \` �_g' / TYPE 1'C CATCH 4),r�=,+cy�_ T1BS-(MATCH (STING PAVEMENT ELEVATION)` <1j! _ �_ �YJ- X � �'" P' }��� "��t�+ -+��"••� _ - _ _ \ 4 INV.T79.8 f t'_�T �..y, �`= �.-.•� �:! it�-i-.0 / " T- _. ,�- aie-i+�r_�_�t _ � � T 1 .H� 18'-12"CPP J i :/'' - `.`♦�\ ♦,\ l I ,/ EXISTING,PAVMENT AND C�RB l MEET EXIS ..v _ w+">• _-`'y t `_' _Jrl / ( -TYPE'C CATCH BASIN / % ) ! 1 -;.p'r � 1 ----_-i' 1�• ( \� \ T.F.118.2(MATCH EXF7M1,PAVEMENT•'ELEVAMN I - Li• _ �•..en. I ` f /•� P,,,.• r J•-o / . a -•-'� ,1 a i• '\ \ /r `�.- _/'"� \..- - ✓ terra_ ��.. .Y. ,' T t 1.` - . I +4 S .p '4 _ 1\ ` \1'�♦ 11�3t. 'i t r ___—BRUMINOUS:CONCRETE CURB }• ir,. �r -- , _ -�.::., �.�J :-,\ �,' ��'�.� 1( 1�. Jrr /� _ - `�� \♦�� r-r"'i i _. -. _-t+e__� l •< - \'`������� 'j �♦ r��J -.---- ` ----- -- � / - 1t ���\�\�\_ � - I \' �.\ It,1. '; rrr +•,,/` I •+r' ' �• _' �- '" .+1+`� .�\ I II l V -. .-_ --- -- _ - � i r , .�•- - ���\'"'\�� '`I'` I I it PPP .��`� �i(f'� -'CONNECT WATER SERVICE MAIN-- r• ta+� � ��,-\�\••�• ____ -! .--J._ !/ � �i/-./ /� -+t9---_--. -_ --a-:•--'_ 7EYPORAR73'9(Nu10US CONCRETE WALKN I :����"�Z` i� '4''•�.-/ /f/ h ��. -. I _ :I�`-�\�Z �� � ♦ { I F UMPORARY.2V ROAD _._-.-_. l / I / `_. --/ 2. I 5 e � � ` t ' - -'\, /J//%/ +- tz- -_ _ _ -taa-__ �, '/ ,. -'-. 'D c t --o � ----!T� � 1 /t• ( _r1] If It ._� i� �_- --^?a--.•-, I, _ '-ENISIING' [9 \�_� __ —— - — -11II I� : I : __ _t15-- -- -- ^..ra�� /�•t? RSAD`�_`ct�_ _ r' ��1��= -_ - -- _ _ -.�Jl�'I� � 1'/�R:..�.S��I -_ _ _HANDIC - AP RAMP_ _,--t11��� !" e-- _.•�"�� _ __ - -- f /�. '1 +tt 7 f..� uEEt EXysTJae ISAVELtEM AND cuae ' •\ -1za -It � -,� zg -• \� e 1_- II /%_yo ��...-_ .- _1--- 9.If (OPEN INN. IZ "'+r PvictEf fUTTUPE ROADJ- `♦:~ \ n1 8' TEES' EXISTWG SAN. COT AV¢AENT \.%>' \ CONNECT WATER'SERACE MAINS �♦ `1 i - -_ t' 1 ♦ - i L.A. FITNESS - PROD.UANAGER: ... - SEAL SEAL - - BDALE. HORL: 92 - EVERGREEN WALK,LLC '. : .. CHEF DESIGNER:iNER: DATE 09109100-eel AfiO REYIEWeO BY, DATE VERT DATE:09109t20ti DaTUM FUSS&ONEILL ROADWAY PLAN " HORz: EVERGREEN WAY EXTENSION m 1. DA'0elN11 T2D COMMENTS VERT: - 196 TIAM1TFOI;D ROhU MANY111STL'R,CfWNPl`fIf.170UNn �+ e� o No, -0ATE EBCRIPTION By +o z®D =461wn TOWN SQUARE AT EVERGREEN WALK VG-q 1 12 R REYlstons - GRAPHIC SCALE SOUTH WIM)SOR CONNECTICUT : 1 CONDITION #1 Y / " !n,,,,4�•,.a r,: .,l t Evergreen WalkLLC _ . +e F rs. It F r 13 6 cV# 0 No 77 PASSIVE OPEN SPACE \ ,,.� 1 - / I •/./' ,1 121,160 IF 2.77R 7' • ...�>F vrr ��Lrl �[l QW /f \` �caac� � a- l 1 7�.��rl.r �1�,!", If� ff !(1N f'I �o8�zs.� 0gg �/ � .1 � `r • ', �.. ��tr/,� IfIJJ]l� '�C;(��il,l'/" i�Y� ��� Y+ LLJ IS g fag€ M}g7 ° ✓1si� 1 se 1 i THE TOWN SQUARE AT EVRGREEN W,AIK Residential Commorciai/Communfly — `�" P z4 S t Builiding .+#of DU Ff.Area Floor Area f B Resid. 108 DU 102,940 SF' I _ ' g< C Resid. 92 DU 91,135 SF 1 ' d Du111nr>,D- • 0 N,a D(Hotel) - - 121 Keysr74,840 SF 1 ts� 19,094 vs F Future - - 6,000 SF o m�l �� am, te,eee l 0 Future 4,800 SF Our. te.ees H Office 20 UNITS/28,400 SF ° i roof:7aas9sF Total 200 DU/194,075 SF 113,040 SFLL ��L /((] i�G_` /•/�rf PARKING. ✓!I>�ll, '. o U Required: ° fI)rf�. ': ✓:. i W Commercial 9,800 SF 14.5 = 45 Spaces `l iT�l�j jl n� L� Residential 200 Oil x 1.75 = 350 Spaces ' Hotel 121 KEYS x 1.0 = 123 Spaces soo ,EMPLOEES 10 SpacesfffT F,e Office Conco.28 400SF x 4.5. _ 128 Spaces rr, � !1 I l , G 10 4 \ i �Lit _j ' a Total 654 Spaces is 7 's s ( 11iW 1ll1 R �' 5 > J Shawn: 707 Spaces J�f1TTTTTI i 5 Z Y Secured Parkin 228 Space s t iUj General Parking 479 $ aces �. . MMf f* 12 P. U11TfITiI °P I 1 _ /� Uj P _. ° uP TUR! -�.•�.- F.F 13&0 'L� r=u�- m iLt �!q gqp 21 0f0 S.i. I 1 W Z OPEN SPACE !1�, e(.Imo " Sj 1 IT i { t I �r U]11�^ (7 LWja :—_ Required.200 X 750= 150,000 SF 3.44 A s��r��c� . e E•• '� I i l l F-�� ® ' ll11L i Provided:Active = 38,400 SF .88 A IFFY lei \ /^ • . .sra, — — W Passive = 121,150 SF 2.78 A ATp� � ��RArou ; > ttl Total = 159,350 SF 3°66 A �nPry qt � TAM z z LLB Lu t �i3� -` —_ o 0 �„(c ��� �e 1jy�NF -•�� (� ll I{1 i�=--i_� f��� a v r g K � J 9,RSSi�fifrONF,,•/ '� 1 1 , f 1 (r,l Qu S P—� S,jUFFERTORESIOENTIAL� Y � I cxEcr�o - .. • -' tare;.o a4.3 n,:s na) �� a I •� ♦ I ((�� u � ` _er nenWalk L � ` ^a - r w"� �,,,i a f N,.,,I i,�r•"r _.. I ✓i /` i ' �� \ ��, - I �� 1tr U. /- - >✓ - `���I;1\ �,\ ._..,` ` PAUIVE OPre SPACE � t _ 121,1110 BF 2.77A +r( 7 , lr , caacRt r - � 7niraL_L ! e0.eeo�s. 11,051, U9� I If If 1 - THE TOWN SQUARE AT EVRGREEN WALK i!•L� J logo Residential Commercial/Community �` 2 / o� Bullldin .#of DU Fi.Area Floor Area _• _ �• • � ; B Resid. 108 DU 102,940 SF �`' C Resid. 92 DU 1 �9 ,135 SF a : ! - Oulldlnu 0 D(Hotel) - - 121 Keys/74,840 SF i I ° i�x i eiz E F Future - - 5,006 SF A ,G Future 4,800 SF 2fe: 10 000 1€!C ��� ��/ 40n ,e els H Office 20' UNITS/28 400 SF Tote:74,836SF V/ _Total 200 DU 184,075 SF 113,040 SF 477/ - �Q PARKING: ,,,G J ' o ' Required: J r > - ice, u ; �' W Commercial 9,800 SF x 4.5 = 45 Spaces o ��/(/j ri , ' Residential 200 DU x 1.75 = 350 Spaces ' Hotel 121 KEYS x 1.0 = 128 Spaces300 _ /(jam - _EMPLOEES 10 Spaces e i Office Conco.28,4008F x 4.5 . 128 Spaces 10 a *; �� �- r / J Total 1e ' 554 Spaces s, xe % If 7 a �1 rr II ILJ Z � y S ' Shown: 707 Spaces v j U h?7T�77` ,/ �� 1- —f Secured Parking 228 Spaces 4 %' WWUI W Y General Parking 479 Spaces yrifi� I :P C11�NfN o t�OTUee%. 20 eP W- *�> OPEN SPACE _). �/ 1 �/ li I z,om p® m t l.f. n/ Z ` l F I I nTfff � o f I-� L{� W ' Required:200 X 75ti= 150,000 SF 3.44 A ���_ ec Pfa,r i E. - r a `.;��v LU Provided:Active = \ r s�38,400 SF .88 A iFFfi�d� '� /— . . , �. \ n (.--- --..1���i►-t1ll1 �� W � sra Passive _ _ 191,150 SF 2.78 A ATQ r F/ `�",r�+ao a Total = 159,550 8F 3.66 A HFS�nfiNt > ' �� �q<ro��j� � --�,, • • �` �- - - TAM �� W Lu LLJ ACiLFJIOA}'////A�1�77eE016jeir�pjZUNF/ 1 �.. u�y�l/ - -1��,—^-- n 4i r //75 BUffER TO RESIDENTIAL ZOPIE� �jJ�(//.// /� _ ((�TTITCJ 11 I i �f SP_ 1 Evergreen Walk LLCs a « _ - - f W a L If / : / ► \ (, ___ ' 1 emu` PASFIVF 0PFM 9PACE .. i 1t, 7-�� -•�..�-, _... f �•/' 121,150 6P 2.77 A i ,r I ' 1/�T •\1�• p 7-17 � I1T'"+tlTinJ}lj� �.. i �f//' Apt �anrrrr�rri171,-U�/ ffl flj ffi �� g if���/ / �'+� ) •, r is `^ . ''`�.��LLI f-�r' i� � �f53�� i 1 ��� ,F aoo / B�NdinOW#LResidential BU eRFI.Area VRumm Floor unfty �, '�,. i �• •. 2 �� \_ zs„5�sr g 1 \ L i B Resid. 108 BB 102,940 SF � �g< C Resid. 92 DO 91,135 SF 1 - `0 �� euildinn a- 6 0(Hotel) - 121 Keys/74,840 SF I / �f� ~ isei9,09< ` F Future - 17,619 - 5,000 SF 99 t > \` 4ew 18615 e'ee6 / 0 Future 4,800 SF L2C e Pa '7 H Office 20 UNITS/28,400 SF s el oe,r+'j F!/ C? rotor 17�4 6&B sF J Total 200 DO/194,075 SF 113,040 SF Ulr- 7 /•9/ � LL PARKINGc i Required: Commercial 9,800 SF x 4.5 = 45 Spaces �/ s Residential 200 DU x 1.75 = 380 Spaces — ` i Hotel 721 KEYS x 1.0 = 128 Spaces soo \� �� �r�`- _EMPLOEES 10 Spaces a , Office Canon.28,4608F x 4.5 = 128 Spaces _ e l` `1 I ;. J� ' g J Total 654 Spaces Shawn: 747 Spaces / z i - ffl zY Secured Parkin 228 Spaces �; ,P { �' � W 0eneral Parking 479 Spaces mp^ tie aP. i BF ,� f III 1' 1 I 2�Ato 6.i. -� a� a z OPEN SPACE 1 �-�`} ( O+ auenwc eooe ` I l 1� � W i li 1 s me Required:240 X 750= 750,400 SF 3.44 A Provided:Active = 38,400 SF .88 A /t ifl6rj3_.` /— srA� �_ ;I' I — I-- ; " — lll. a W Total Passive _ 159,550 SF USA l H T e q SR C6 W LU iNT/q TAM, 0 Q B,Slyl. SfNE APeT71,g9 E610XDe�E '� i 1 �. -�.�.� \. . . fiq �m 1 �1,I SP-1 75'BUFFER TO RESIOENTIAL j j ` i- COWTION #4 r �. • / / ♦ ` �li t a. -.�.a �,:>,.yi \� Evergreen Walk LLD t I \ �� -.\\ _ � _ _ Faun PF JAP Of oo P ve SPAN SPACE' • ;! , \� \\`!`` \� 121dSSSF2.77A 7; y,,� _ � 1>7� II17TIT t. �� - `�e, �gNo •\ \JTTITFI -r n r �r zp ' rn� LCL1 1 n7T� 1 1I,r 3. . P r, � t11111t 1''7Tlr,�� 23 ( J ' THE TOWN SQUARE AT EVRGAEEN WALK I:(`- - • � /�� 1�-1 �A Residential Commercial/Community BulNding .#of DU Fi.Area Floor Area � 1 ' r � B REsld. 106 DU 102,940 SF I �� •' yam •• e�umnw o �B o C Resid. 92 OU 91,136 SF I 9 �.�'�� ,, W S,Ss6 _. / �s D(Hotel) - 121 Keys174,840 SF I > F Future - - 5,000 SF s4 arm 10,5ee V �— On te,eea O Future 4,800 SF 1 13�C m6.000 ' ��'. Total:74,S86 3F H Office 20 UNIT3/28,400 SF snoop Total 200 OW 194,076 SF 113,040 SFVt�I PARKING; t �� ( ��f//�����71 �1�1' ✓' ' Required. Commercial 8,800 SF x 4.5 — 45 Spaces Residential 200 DU x 1,75 = 350 Spaces Hates 121 KEYS x 1,0 = 128 Spaces 300 •" , � � 1, I ' _EMPLOEES 10 Spaces y s J1T(i 171"rl "'\ �` Y Office Conco.28,41103F x 4.5 = 128 Spaces ;u °° f ��' �' r' ` -` , —i Total 654 Spaces (1J111LLL11� • UUU��f�����I��I��IUUU �,J7Tf1717T1i ' Shown: 707 Spaces Secured Parking 228 Spaces W Q General Parking p 479 Spaces Mim.� a _ 6n ,�6 ._ _ / LL! '�. Furuxe /28 SP. vv:,2ao 1 1' 21Ato!i. � I ® �� --� 1 =h WOPEN SPACE o Required:200 X 750 15OA00 SF 3.44 A fa If sr I 1 S ifil II ffll(,I j— L[lll W Provided:Active = 38,400 SF .88 A �F�� \ /- • . .arn7 w --— ——� Lam_ v } Passive _ 121,150 SF 2.78 A FgTp� � ��Enawo . w.0 W W Total = 159,550 SF 3.66 A gESInFNTi� TA "Z ' _ zOR R WliLLL, , /////// T�//AF+�irgaEE9atlay7 SP—1 15'HOPPER i0 RESi0ENT1AL Z08E�% ! -�`�- CHEME6 �% I{ iIitl7liiIIID1ftHil[� Ev r9Teen Walk LLC _ r E 10 Op IN z ��f rim f U-u(CrlQ 7=7- _ . � . . 3. 1 „ _ P8S818E0 SPACE \�.`"��� \�•� _12t,180 0 EP 2.7T A - 44 . 1CC - �, o l,' , fH j7�, )'' l (lye-l/}j \ �. In / THE TOWN SQUAREAT EVRGREEN:WALK: is L`�... •' • lll �f Residential Cemmerdai/Cammunity 2 � se do � Bullidinp .#of DU Ft.Area Floor Area s.F ' B Resld. 108 DU 102,040 SF C Resid. 92 DU 91,135 SF_ i A Eaalidin6 E. DHotel - - 121 K s/74, x ta[> (Hotel) By 340 SF � I • � ' _ / .� Intl 18,88� : �, F Future - 5,000 SF 261b 17,611 OFuture 4,800SF e, I3� mil i. au0a•' ;efaTWO SF (, 0 / i i 16 T Total 200 DW 194,075 SF20 UNITS/113,040 SF 28,400 SF s , � PARKING. � G' � LL ' Required: e �( I _.___=^ err ~� ✓:, Commercial 8,800 SF x 4.5- . 45 Spaces ' / �lr/,, �)j) LU Residential 200 DU x 1.75 = 350 Spaces � r n t Notes 121 KEYS x 1.0 Sm 123 Spaces aoo _EMPLOEES 10 Spaces R ea 1, Y 1 I r lil \ t o Y Gfflee CenCO.28,460SF x 4.5 _ 128 Spaces fo I Total 654 Spaces i I 4 0 � n-1•�111-1111,�1-1 Il Shown: 707 Spaces ti� ? 11 �� -� Secured Parking 228 Spaces • ;i �Jn General Parking 479 Spaces ` rrm, N fG 100 _ ,� — W R2E. lam F.P.126.0 ❑l� v.-0 n•-H ® J ewa.a 21.010 S.F. OPEN SPACE (I I iiJ z `4y4' f W Required:200 X 750= 160,000 SF 3.44 A '� Eow I Provided:Active = 38,400 SF .88 A ,t'� , ~�` Sra ---_ �� �' I 111. g W C7 Passive 12i.130 8F 2.78 AR tpi�tF, '�- ��"�7inao � �` - " -- W RFsr c�,/ - n,o } Total = 159,550 8F 3.88 A n�Nl.,��,�, -- , TA u, W > WE / LL ,oars O,RESIDaxn� rrrm,l III T SP-1 7S'9UfFEfl TO RESIDENTIAL tO,IE����//f1 � Evergreen Walk LLC .ate l,r°'1•••'�w+. .^ � �/ `� `.`` __� l/ - � � � _ — ��+ op in R' f 41 PAaeIY,OPEM,PII,E ` �.� 121,1 W 9F 2.11 p �..._ O.1" ]l})T-� 11 ,_ --.... IT,?T�� r THE TOWN SQUARE AT EVROREEN WALK ` ' 68 / l l boa Residential Commercial/Cammunfty --�.� �� .• 2 / ze.�s� i Buillding .#of DU FI Area Floor Area 8 Besld. 108 OU 102,040 SF , C Resld. 92 DU 61,135 SF - �'� '�;�, _ WNW a a - D{Hotel} - - 121 Keys/74,840 SE I // ~\ Ist: 10,6e4 F Future . - 5,000 SF / 2wh r,s12 ft. isle,: B Future 4,800 OF 13l, Intl / � 4Ur. 1s , t r ' H Office 20 UNITS/Z00 SF e / Total-to>ea sP C' u yr Total 200 DUt 194,075 OF 113,040 SF , � Q w ' PARKING: Required: ` �! '�J Commercial 9,600 SF x 4.5 = 46 Spaces l'> j Residential 200 OU x 1.75 = 350 Spaces + �i���T �•' '`tip /, v Hotel 121 KEYS x 1.0 = 128 Spaces 300 _EMPLOEES 10 Spaces _ Ci Office Conco.28,4608F x 4.5 = 128 Spaces 1a •• _ I� Total 654 Spaces ,� is - / � ( j (VwLW.1 111 T. ` / / erfs Q V ' Shown: 7(17 Spaces Jfil?TT � 4i r Secured Parking 228 Spaces General Parking - %Wi 10. 'Al W.12. 21,010 s.a. w Z. Z OPEN SPACE r I saga i I J'I I i 6 L1w J Required:200 X 750= 150,000 SF 3.44 A '�-� . . • ea"E'.7T uN � o ` 1 I • �i. MNi; .�,. Provided:Active _ 38,400 SF .88 A iFF,jaar>;�� `� �— • . .sTA,� �._� LLJ Passive 121,150 SF 2.78 A �q to `nAwo _ � Total = _169,550 SF 3.66 A q�sJnFry q R6� eE c__._- —_.___,� -- TA z W w j rr wE 0 /r LLLL /,��, 1� 11l �f I i . I TTIT>Z SP-1 75'9UFFEfl 70 flESIDE...Al MIE/ McKED CONDITION #7A - ��" tn,:,f-�,.a �,:,-yl Ever9roeri Walk LLO ( �Y IS 7. I �1TrTT73-1— J* PASBIBE OPEN SPAI 180 721. BF 2.77 pIT //�J,J J'I ffr ff/111 r - -•bs;.-.__./ ! 9 z ,, � ' • °£�p�A���D----_._ � �r��irl��-�1((t� �!�-JrU f 1o.��s �� s�������4� 9 e!,, $Jill / �� 1 uU1L(lRr KI sx � s Nib SOS. - / THE TOWN SQUARE AT ENGREEH WALK �. Residential Cammefeiailcommunity 2 Builldina .#of DU Ff.Area Floor Area Ig B Redd. 108 DU 102;940 SF _e�nAin,;—D- C Resid. 92 DU 91,125 SF { // xnte > ^�f` D(Hotel) - - 121 Keys/74,840 SF ! 1su 19,6942nm 17,012 a F Future - - 5,000 SF m�l 4 . 10,680 G Future 4,800 SF ,> �3�F B F� �. Twat:74836 OF r` H Office 20 UAITS/28,400 SF eaoBsr Total 200 OW 104,075 SF 113,040 SFLu f Q PARKING• Re uired: , Commercial 9,800 SF x 4.5 a- F 45 Spaces Residential 200 OU x 1.75 = 350 Spaces Hotel 121 KEYS x 1.0 = 128 Spaces 300 ? Y _EMPLOEES 10 Spaces e Office Conco.28,4603F x 4.6 a 128 Spaces -tc 4 9+ Total O V aces U� J o. ' Shown: 707 Spaces ` i—.._._-... �/ / o Z Secured Parking 228 Spaces li +l� 81 n(,pp 1Tk �: / f"I') General Parking 479 Spaces �2eaP. �` P.F 12e.a I \�� — W _ PUTUR!4 19 I 21,010 S.F. I r -� µ'1, 1� Z �•�gr�ggspG/ � i 'N +f������ I R � ( I � -� "� f' J ?h• 1j,- � OPEN SPACE - ' - en �"N( � I 1�1 I ITI I7TiTf U ! ! I .a .6°°° 11" a W . .._ • Fsff4117 - , Required:200 X 750= 160,000 SF 3.44 A sf�•r�„ . . „Ne� U` f! Provided:Active � 38;400 SF .88 A �FFFR�jfi�� �•� . , /'__ . ' -sr^ wo `-.. . '.� � --------- l �—_-� - a a W W Passive = 121,150 OF 2.78 A i ro AFs ��>' - � } Tote! = 152,550 SF LBO A W nFNT���? ' �� to o� Y�7111 I n r OanNN GRF;IeFRIp),TNf� 1 1 MGM 1 I !i,/' '"F SP-1 r/75'BUFFER TO RESIDENTIALJO L021E// CONDITIO ! cxEcae6 i — � .•` � 1��%' I a�,,., .-:,s �,:,„yt Ali 1 `� Evergreen Walk LLC - -� • T 1 i l t r„ ♦ �"�r .♦ ♦n�u' ru; vie,. ' .\��_� _ � ♦;�.`� `:� �.n.r'� amp , \ ✓�,..f �, .• \` `� S 1 `.w..• �,.• `rcyf',.... ,,�. (r •• r : \ �. � _� : \,\ —'mil �: �= i6��I 1 11 L111 J � y , s l am-: �c� ASSS OPEN SPAEE \- ' TT P IV 9�T _ / _ _/• 12,1,130 SF L77 A �jj�ll fi Rrnr/!'^�..."�•�:.�,..`'yi--=^ l •/ ,�' a- ,�� , • -`�:ni• \JII .l�l/tll J ��� �JJIf����( / �°°'"° $ ������ �� / Ifl rUS THE TOWN 84UAHE AT EVROREEN WALK Residential CommerciallCommunity BulHdlnp .#of DU Ff.Area Floor Area B Resld. 106 DU :102 940 SF 1 c Noteiraa N- t� ('Redd. 92 DU 91,135 SF D(Hotel) - - 121 Keys174,840 SF I ! ~ ism 19,694 3 17,612 F Future - - 5,000 SF e rA�) �; �� 490 110,00 l a tiFuture 4,800SF 13±? v" eaoor o Tote:74,896SF ' H Office 20 UNITS/28,400 SF � ,' Total 20D DUI 194,075 SF 113,040 SF ''�ttII''''IJ; /#i �i C� LU •�t.�I / .� \ � � � 1. LL PARKINO: J ) , Required: Commercial 9,800 SF x 4.5 _ 45 Spaces "" (71#1 �, V c .0 Residential 200 DU x 1.75 = 350 Spaces Hotel 121 KEYS x 1.0 = 123 Spaces soo - "C • " ] t: � � / \., Sip^ . ,'/ �� � Y 1 EMPLOEES 10 Spaces R Office Conco.28 40OSF x 4.5 • 128 Spaces Total 654 1. Spaces ei - P 7 s I a !` JLI11LLll u R /f 1•y�y Shown: 707 Spaces I (J I FMT MfT i Secured Parking 228 Spaces General Parking 1 ` �) ,,.,a•. �u'i�al.�G.�� . � " 6UNMNQ 100 1jw 479 Spaces L�AU FUTURE - F 1 /. W21A10 S.F. OPEN SPACE dA 1J uJ Required:200 X 750= 160,0003E 34 A P I� Provided:Active = 38,400 SF .88 A OFF 6i��` \� /- st, _�_ —-- j I l l i l i ?a LU w Passive = 121,150 OF 2.78 A Total = 159,550 SF 3.86 A RFSiplry,z�% OS �- --= — — TAM, z W w 1 — 1_ 9 ✓_1/1 1/1/,G 1 / ,_,/ \/ 111(,L11,� 3'8 P Rid! ��iT1�;101UN� 1 1 L.. . ITT U- : ` rrr_ I ( -rT'r(-r DOM : SP_1 RE 75`BUFFER TO RESIDENTIAL IO:1E�/ 7 /f ! c eoFo `/�`i' L1!ItI1�1 ' •I wr6_ — '. Y I �::'� 1 a,,:..�was n,;,oa) �' ' - .�• ` Evergreen Walk LLG mr JJJLIJ lot �\ _ Ltl PASSIVE OPEN SPACE _r 121,158 or 2.77A Lu Milo - ,! ! W 011 1 THE TOWN SQUARE AT EVRGREEN WALK Residential commerciallcommunity 8ullldinp *of DU FI.Area Floor Area D Resld. 108 DU :102,940 SF d ° ' C Resid. 92 DU 91;135 SF fiuuma� � �7 °°' l ` D(Hotel) - - 121 Keys/74,840 8F / C a F Future - - 5,DD0 SF g� {tl �i \ 2nd: 17,912 �j 0 Future 4,800 SF sale /% � <i 4a06 . ' Tatak 4,886 SF H Office 20 UNITS12BA00 SF ��% r l `f Total 200 DU/194,075 SF 113,040 SF LL LL PARKING: J ijJ ' Required: Il/1 j /Tjnrj Af�✓ ! % W Commercial 0,800 SF x 4.5 = 45 Spaces Residential 200 DU x 1.75 = 350 Spaces Hotel 121 KEYS x 1.0 = 128 Spaces son ! _EMPLOEES 10 Spaces J11T_ �,, Office Conco.28 400SF x 4.5 128 S aces rl p 4a I1 _ Total 654 Spaces _ ,� 1 I; f� (1-�(I1.LLLl I j U Shown: 707 Spaces xs 1 1J111171177 I I ! - Seeured Parking 228 Spaces ° h j 6 C 011fNHL� W z General Parking 479 S aces Mgfh . au,o a,00 F f — — p J FUTURE p, a8lP rr tze.6 1 1IJ L5 W OPEN SPACE -- _ T'�'I,177��ITI�r y1ry Lu .. - - PP FF44I17 � • �� \ � �""I 1 I PIT ' _ O � f� � I ll U I�� Required 200 X 750= 150,000 SF 3.44 A s r�� . . u,E I r ` ST. 1- �(lli g W C9 c I' 1 L_ _� � IY Provided:Active _ 38;400 SF .BB A ,F'%�/� \ • .srA �--- L___ ; � __._ �Q _ Lu Passive 121,1508E 2:78A �Ffgro�`� _ �_—�-- Total = _159,550 SF 3.D9 A flFsNq`a/ � _ c6 -�- I Tad Lu z W Lu -Tr-� �t R .'.�r�l) !(/ 75'BUFFER TO RESIDENTIAL1� � SP-1 // - �/, 1 -11 f Ilif�IifrN ICNIHIM� NTZ ,.,.__as �,777, _ t EvergroenwalkLlG ( \ ._ •"' � ice, • 1 �. . t � �•`� �� '- _� US IT _ PASSIVE OPEN SPACE \ � � `11"•�.._"'-•-�-� � �• 121,11002.77A \ r7 Q 7 _ �"�`"-- --�°•• i •/ g a•I•�.q �--_\� ` lllll//!�J' q ;, �\�, : . • ---•->�'.,�.�gryD � �.JTr17rt7�j?��lr(,r� �Ty�N�[/fy ,� o�: �� MIX § ITI ( WPM gB 29 '� � '' ,, 1 r '• (LC1LUl�/ T�7])7771'��� �' � egg a �� THE TOWN SQUARE AT EVROREEN WALK �u • F,F' ]60 Residential csmmerciallcommunity Bullldina W of 09 R.Area Floor Area \ B Resld. 10809 102,940 SF C Resld. 92 BU 91,135 SF 0(Hotel) - 121 Keys/74,840 SF Future _ 2n& 17,912- / 5,000 SF i �, am: 10,66e \ / G Future 4,800 SF IS Total.ia�"eas6 OF H Office 20 UNITS128,400 SF Total 200 DU/194,076 SF 113,040 SF ' • � i.[.�/ ���j���'l�/// 'r��'`7j� ��, �° PARKING Required: /Commercial 9,800SF x4.5 45 Spaces W T g Residential-200 DU x 1.75 = 350 Spaces Hotel 121 KEYS x 1.0 = 128 Spaces soo " j. _ENIPLOEES 10 Spaces Office Cones.28,40031F x 4.5 = 128 Spaces ` �lr...... Total 654 Spaces �j 812 a7 .�" y Q 1 iI 1 n-J.11lilli ' J ITfTIT]7il IT \ , ' Shown: 707 Spaces �1f _ Secured Parking 228 Spaces _ W Q General Parking 479 Spaces , I V"�I�'I Boo,66 f t — F.F.120.0 1 W 21A10 S.F. ,• � V m o-cy rS1® a OPEN SPACE >> ,` �. �� ! ,1 El r (9 z ' LLJ Required:200%750= 150,000 SF 3.44 A y1 r`�. . . ep F nr rrNe o goo SF o Provided:Active = 38;400 SF J8 A 4,-'��r \ / - srq — _ , J a W Passive = 121,150SF 2.78A / FRtpRF l p' \` n+ND =� - Q N Total a 169,550 SF USA S�nFNl�O RIAr�' cs -- —'-- r A z Q Lu W UT , JDBNCL ( j fe >Ls �%� +f77Fe91aPHMej'� '� 1 r r — ! VRWM 1,_ �111LLL�(l �— _ T11TTT1 SP 1 //15/'9UFFEH TO HESIOENTIA!Z08E�� �'� G � �n�6 Wl f 1�� -. 1!1�� DATE 0117 Evergreen Walk LLC F.T. „r \:. '� , I _ - ,"� /' \•' 1 �� _ ��'�,� -:.:. �-- a a: LQ� PASSIVE OPEN SPACE ,'^� f, �- .,•��,,:c ' 1 ��t ✓i — ��`1 \� 121,15O BF 2.77 A +// 1 � tIf .. ""•--= _`��1� r \' rr I-�C( ��"ll,�(�f�J/,`„ �? "]�.n� � 1/_ T � g ' f �a�� s 11 ✓1 l�l�`l,Yr�IIJ 1 ��777)7�.��11.'11L ' s �gMUM,�� ' / 1 all 1 11 THE TOWN SQUARE AT EVROREEN WALK i : . • / x r \ I / Residential commercial/Cammunity A,; 1 Builldina .#ofOil 1,Area Floor Area -...�, • � •` ` � , B ReshE. 106 DU 102,940 SF ' C Rasht. 92 DU 91,135 SF i 91 j� D(Hotel) - 121 Keys/74,840 SE I - '� �' � lob eiiesse 8 F Future - - 5,000 SF . / 211tb 17,31 0 Future 4,800 OF tA- xrm te,eaBE ,. JJ J Total:74,836 SF ' H Office 20 UNITSl28,400 SF /. _ Total 200 DW 104,075 SF 113,040 SF U PARKING: I / ' - Repaired: \z, Commercial 9,600 SF x 4.9 a 45 Spaces ', rr// 4P / . Residential 200 DU x 1,79 = 300 Spaces Hotel 121 KEYS x 1.0 = 129 Spaces son >a t,1 'l✓ ��� _ EMPLOEES 10 Spaces \ z 0#fice Conco.28,4608F x as 128 Spaces Total 654 Spaces = 111.!-1J11Lll1J� a — f 9;1 $y v .? IJITM FM — : o Shown: 707 Spaces I z Secured Parking 228 SpacesVON W Oeneral Parking 479 Spaces ` M1SeIdTdrLUa RD! t2 I'I•'� U�7T.-��TT��I,,II.j(f��l��� r� 2F.F.121LO 1Af0 9,.Fo.e 1 (J® E '�®11—.•yyJJ/� LU N ?� LU OPEN SPACE '•�-/`' �_ eats �J f, o (7 w ' Required:200 X 750= 150,000 SF S.44 A s 1` °F�f,ullE a ® j gP i ,.� 0 Provided:Active = 38,400 SF .88 A /F��4,61 W a • - — .._ 0.f0 LV : Passive 1f:1.t50 SF 2.78 A ;, FATpq��p/�c '`�rt.aroo �o > Total = 159,560 SF LOS A s�nF '��� � _ �—'""-� "' W w ' NTrAt ta'' �ib� - �^ Tau "o / / (B KfXOM %1/�'/ di71kAE 4 nm.n /5'9UFFEfl TO RESIDENTIAI �� / � �. ! r CHEM I {1 'r�I 1+F'1fF 1(17+T'rl,(7I I E�I 1 ,1 i 1 1 II-��1!I t 1 , W�B117 ' \ Ev►9 n Walk LLG — — i _ 00 on N��r ...�, Mom"� ,,,>� .,.,1 .. \ i ! ` �♦ � ( '. � � ``� �' I_ e� b A \ \` �mTrlt�rlT I F , eass,ve oew sent° 121,150ae2.77n ' THE TOWN SQUARE AT EVRGREEN WALKJOO l:`'�- • • / av„ . raa1 0 Residential Commercial/Community BulUding .#of 09 F6 Area Floor Area / B Resld. 108 DU 102,940 SF ' 4�- C Reshl. 92 DU 91,135 SF I . _ n� l as 0(Hotel) 121 Keys/74,840 SF 1 y 1nu 191694 F Future 5,000 SF e o f� aW ie we �} G Future 4;800 SF 13__ H Office 20 UNITS/28,400 SF Tay,:t4,aasse Total 200 OW 194,075 SF 113,040 SF PARKING: iT, ?G� o .. ..Required: Commercial 9,800 SF x 4.5 = 45 Spaces 1 "�/�jy .[/ ''J 14� Residential 200 0U x 1.75 = 360 Spaces e , Hotel 121 KEYS x 1.0 = 123 Spaces son , \ / - �' �, Y ' _EMPLOEES 10 Spaces Office Conco.28a 4b03F x 4.5 128 Spaces Total 654 Spaces _ ai° Ors a I 1JJ-111_l - II U1T1TT1 vto I Shown: 707 Spaces [ r �- ' / u Z le ' Secured Parking 228 Spaces ° VilTl ITTIi� " I ' / W W General Parking 479 Spaces M�� tam r o° j — U, . )@ �� 5` II J alp o e.r. 1 u -1 !'1 f tw z OPEN SPACE o (7 W •f ® 1 .dW AF. Required:200 X 750= 150,000 SF 3.44 A s . . • �FR" , a I I I r ! r t. _-�� � __ _L((1LL g C7 Provided:Active = 38,400 SF .88 A iF'� � srA h a LU Passive = 121,150 SF 2.78 A n W W Total = 159,550 SF USA nPryt°�`� c° I _._� TAM n z S� z 3 E L 6A— �IJ1L%.1 LRF SP_1 j/75'BUFFER TO RESIDENTIAL ZO11E� BATE .. ' , . / / I ; /r f tat•,.�_ d.a n.:..,.� �l` II Evergreen Walk LLC f r _ ► �°E r �• _ _ __ Ill ` ,,. _ ,� _ _ r:mo �s r;. 07771 ,:,�o!,;:�:.'U� ,..,,,i �.�•. ICI '\...... \ l l._ f7, �1- � • \ �• `.lam � -CC �- =1� - PA681VE SPIN SPACE \ II' 777 .. 1` ✓ y� 121,100 SF 2.77A .\ ./rT/r"II,�T�Y�-. "/ � /,II ..•����_ =�;�"`l s,: �\. � (��wl(lr����"'`�r�17� r , ,'J r � � Mix BRIMS \r w �; � ,, ,\�. . . -�R•,����� \� _�rrrrlwmn��l ;,,� �Nl��y/�Ij ;� o�' ��u-U!w41lUL1JJ1l�i7�>�.cwtoil a L11CL w7T�L11ILL1 � LtLLIJ THE TOWN SQUARE AT EVRGREEN WALK Residential CammerclallCammunity Builidina .#of DU Fl.Area Floor Area \ I B Resid. 1081111 102,940 SF ' l �e< C Resid. 92 DU 91,155 SF emidtou R-R te1; \\ D(Hotel) - 121 Keys174,840 SF idaii eii F F Fuhue - - 5,000 SF sa ! 2rdr 10,666 G Future 4,$00 8F v r�n�Gp•I Fi \ ! 4' , r w:isia 036 sF H Office 20 UNITS728,400 SF - ' Total 200 DO/194,075 SF 113,040 SF PARKING. '7TlT�jr• `-� , \ o U Required: Commercial 0,800 SF x 4.5 = 45 Spaces t' ,;, Residential 200 DO x 1.75 = 350 Spaces se /IT1�,%/, / %n Hotel 121 KEYS x 1.0 = 128 Spaces soo `t '�� �[✓ 1 _ENPLOEES 10 Spaces Tii \ Y Office Conco.28,4603F x 4.5 = 128 Spaces Total 854 Spaces ei° aka 9 Z „ I� (1jll1111.t1,� q ti e -. .q; I� I jfim rtri ITfI w !�_ 11 O: _�. Y Shown: 707 Spaces II —--J Z - ' Secured Parking 228 Spaces a�t W �� ewwc ion Parking 479 Spaces .. 6AM—� zearo S.F. OPEN SPACE I*Tw Q/ wZ Required.200%750= 160,000 SF 3.44 A ��_ . . fT uNE , I I I i+ f L _ I i � LLill11 g W 0 Provided.Active = 38,400 SF .88 A '.C. '\ �— • srA,r _ — __— I ° LU Passive = 121,150 SF 2.78 A Fq to Grp, \' aAwq N > j Total = 159,550 SF USA RES/nFry�� ll IDS / ,r=- '�aM z' Uj u 1 9ULLLj S P—�1i 1 RESIDENTIAL ZOPIE�� Evergreen Walk LLC �• \\ ,� ICI i a� JULtLyj `4` �1 /47-77—lfz�;,- �R_` c:� �\ PASBIVE GPM SPACE `` 77m}�1171m7 ��s 121,166 6P an a11',Tj1�T)�IT \.117171171 l�L( n�w(Ij/ ' \ ena<kor Ogg brIfl tz THE TOWN SQUARE AT EVROREEN WALK BFF J00 Residential Comme[aial/Gommunily Builidlna .#r of Oil Ff.Area Floor Area 9 Resid. 108 DU 102,940 SF : '� �•a�, ,��� � � e6nm. o- g< ?` C Resid. 92 DU 91,135 SF I x-s�Ta— D(Hoteu - 121 Keys/74,840 SF / &F Future - - 5,000 SF F / amp 17,612 O Future 4,800 8E , �A F•. \ f.1/ - toga 70.Ue686 OF N Office 20 UNIT8/28A00 SF 60e0+, Total 200 OW 194,075 SF 113,040 SF �Ij��'' .PARKING: Required: Commercial 9,800 SF x 4.5 45 Spaces Residential 200 DU x 1.73 = 350 Spaces a �T cz-- Hotel 121 KEYS x i.0 = 128 Spaces soo � ; z EMPLOEES 10 Spacess Y It(IT(11(I • 0fflce Genco.28,4608F x 4.5 = 128 Spaces A�- Total 654 Spaces 1 er6 i �1�LI1llL1� lltll I,JfiTi1TT1T(� --- Shown: 707 Spaces J __ i' Z Y Secured Parking 228 Spaces '� Cn s W Q General Parking 479 Spaces nim� P P eu i66 __ LV 10 9.G, � - OPEN SPACE - �_, �1G,4�4gAfT�� I I i I7TTPli I J If; a$ {� w Required:200 X 750= 150,000 SF 3A4 A s �� Ep``q"r u -"�f�' a i '�p g q a IIIIIIII( ,IIiiIIII L.._: ��` a I ¢ U` Provided:Active _ 38,400 SF .88 A iF�`�Zl�j� \ / - • . stA ''----- LU Passive 121,150 SF 2.78 A -.- w Total = 159,550 SF 8.66 A AFs�nfiN q�� = TAK a Z W810 w Z3 I1,r IIr— � SP_1 75'SUFFEfl TO RESIDENTIAL IME. !�� i � t((� ��� JIItII�I�1Ty11}j} �(�I�'I''�fr Evergre n Walk 41 !is PA�tYr0PLM 8PAC8 ... 121,160eP2.77n1T%1�h.7� �: 6 gill lad nlw� " l1 "J 20. MIA 0; aa°s � 1 THE TOWN SQUARE AT EVRGREEN WALK i•�- • ' �e e / avaa J� Residential Commarcial/Community Builidina .#at DO Ff.Area. Floor Area 8 Resh1. 108 OU 102,940 SF : _ , L 0ulidinn 0- C Resid. 92 DU 91,135 SF ( •. �� � � •�9� � xntat• 121 Keys/74,840 SF I ,6�19,894 F Future - - 6,000 SF o T�� I 9A—' / /�/�� ` array., 16,985 O Future 4,800 SF , Mr. 18.111 TO -IiJ9 SF - H Office 20 UNITS/28,400 SF . s,oerzi u Total 200 DU/194,075 SF 113,040 SFJL'� U PARKING: {I h Required, ° Commercial 9,800 SF x 4.5 45 Spaces / , o Residential 200 Oil 1.75 = 350 Spaces `r [/ 3 i / = s Hotel 121 KEYS x 1.0 = 123 Spaces 300 ' _EMPLOEES 10 Spaces Office Conce.28,4003E x 4.0 128 Spaces Total 654 Spaces _ if a - 4 II r 1f 1!11!111� C �� / �; o �( C Shown: 707 Spaces �� {ffiT1171TfT�T W Y Secured Parking 228 Spaces n 'p I ,, ///J a W Q General Parkin 479 Spaces `'J / ' I zl,r,n 7s. I o -�� Z p L Yf Ne!�• ?Ltd 126,0 G o x� OPEN SPACE ..teaUj r.r.m.o ' Required:200 X 750= 150,000 3F 3.44 A `�� . . ea`r""'r � o ` i I t, + i "°°': I L[ltlll g'�i C9 I' L_ t _.__ �h' Provided:Active = 38,400 SF .88 A /FF�°f/�ih� �� /_ srars L11111� _ — _ �� — — _ W Q: Passive a 121.1.50 SF 2.78 A / Fq Tp —�Raao \ > Total = 159,550 SF 3.66 A - TAM Z W w 1= .13 t F6 nD Re —MU sP-1 75'SUFFER iU RESIOENTIAL ZONE���// � .. ♦ t� �+ } ` Evergreen we LLc , W LE ma PAHBIYE OPEY SPACE 121,1609F 2.77A �. 7 ,1V �lC�( '� lo#6�P�� IE aj j THE TOWN SQUARE AT EVRGREEN WALK i l 2e P. ) flesidentia! CommeralalJCommnnity BulNdinp .#of DU FL Area Floor Area �` j/ • �;�,�'�,� ' B Heald. 108 DU 102;940 SF C Heald. 92 DO 91,185 SF/ D(Hotel) . - 121 Key3174,840 SF i emrar6a e. 6 F Future - B Future 5,000 SF fob 19,89r H Office 4,800 SF " m sA i 2rm fe99"se192 7 ]3+t: �l --= 24 8,400 UNITS/2 $F � A49K� t Ova 18.955 / V Total 20D DU/194,076 SF 113,040 SF . e,eeeH r 76ae T4,sa68F \ - PARKING: ! `{ ;r � i f �h Ir � tt Required: +N '�I)� �!(i > C Commercial 8,800 SF x 4.6 = 46 Spaces .. ,• .,,_J �/ - �`�•' ,//, W Residential 200 DU x 1.75 = 360 Spaces ! , ' Hotel 121 KEYS x 1.0 = 128 spaces 300 _lice OEES 10 Spaces _ \ �> Office Conco.28 4003E x 4.6 = 128 spaces Total 1 �! - �1TI77171 ! \` Y 654 Spaces i0 ° - ���.• �� Shown; > 707 Spaces ° -'��• ti �� e " Q rj � �, � Secured Parking 228 Spaces � � — ' �'.�� � •j General Parking 479 Spaces E L Z Z Y ' — o U t?t�P A t euauxa tab OPEN SPACE '? , }/ I- 1 F.F. 126.T \- lid d o ---, z Required•240 X 750— 160,400 SF 8.44 A cP + ti + •� I 1 0 U► Provided:Active a ,��, . . � \ a ! 8eM0.66, ' I 38,400$F .88 A °�� I I I rr1 I� r g.F. Luuj Passive 12t 150 SF 2.78 As7A``� 'F�q '��` P' - — t—r (1t11 i r Iota! = CD 159,550 SF 3.66 A AFSIn s � e _ �i _ i ° —__ g� LL) Fyr�gl ¢ >TA j 1e 75'BUFFEfl i0 AESIDENTIALj p%j/� J' I °AM"r - o SP-1 - - _ /� , `l ` �7-FH-NfI-�-ill-'' �►J(' a� �' Y / ;Ai _A.3 n•,ma) Evergreen Walk LLC - _ ' I.e TO UNIT — - •�.�` PASSIVE OPW SPACE •,,� : "I!(I ry, „� 121 t //r � ; � LLl1((� ""'i•IT1Tt7T(j� o% _ s���fi � 6'S� THE TOWN SQUARE AT /EVRGREN WAResidential LK Gammual Dulllding .#of DU FI.Area Floor Area _ cam• 4 8 Resid. 100 DU 102,940 SF �gC C Resid. 92 DO 91,135 SF I eut�Atna B. D(HoteQ - - 121 Keys/74,840 SF r F Future znm 10,97 )p 5,000 SFam: u,BeBE G Future 4,800 SF .a° -6�)Bf i _- �' J 41M 1!•eBe 'mil H Office 20 UNITS128,400 SF -� Total-7a,esssP •71'� ° i ' Total 200 DU/194,075 SF 113,040 SF ��f, PARKING: I "')� ___.,� dc Required. W Commercial 9,800 SF x 4.5 all 45 Spaces ° 1` iT� V �' ' Residential 200 DU x 1.75 = 350 Spaces Hotel 121 KEYS x 1.0 = 128 Spaces soo •• • z _EMPLOEES 10 Spaces R y 1', am s Office Conco.28,4608F x 4.6 - 128 Spaces iti eB , (t(IiTT I(I - / ,J Total 654 Spaces si 9"r° /ss t' / la _ y o Q> Ls' Shown: 707 Spaces �` ° l _ / W Z Y Secured Parking 228 Spaces ` , r / w Q General Parking 479 Spaces ;= 1 �rrL 9 1seaP a UiT(IIIIl 66 c,00 ! �._ _.----� z (W �y F.F.126.0 L �7 I 21410 6.F. - l iy, W. Z OPEN SPACE T7l7Tti iU o I (;< �1 l Ur W fa.FFMu�E _ a \ I I I I viooiiW.. Required:200 X 750= 150,000 SF 3.44 A s��_ . T u„ _� '—� �-' � Provided:Active = 38,400 SF .88 A iF� ir _-_\ /— • . .sra7£ ° i L — _i � a W Passive - 121,150 SF 2.78 A Fq j p gyp, } Lu Total = 159,550 SF 3.66 A A�s�afi cs — TAM lu a z W Lu ��o j��sicl� /�%/iJl�x6s� >oxj �� i, i 11 I t SP-1 � ��,15 9UFFEfi TO flES10ENTIAI� 1CONDITION #17