May 7, 2012
Via email correspondence and overnight:
Ms. Michele R. Lipe
Director of Planning
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Request to modify conditions associated with approval of Application 11-24P,
Final Plan for Evergreen Walk, LL C, pursuant to Section 4.2.15,.for real
property known as "Evergreen Walk, "to be located on a portion of 151
Buckland Road, including portions of Units 6 and 7, and being approximately
1,200 feet west of Buckland Road and 400.feet north of Smith Street, South
Windsor, Connecticut. Approval of Final Plan granted on September 13, 2011,
by the Planning and Zoning Commission ("Approval').
Dear Director of Planning Lipe,
As you are aware, the undersigned law firm represents the owner/applicant, Evergreen
Walk, LLC, concerning the above-referenced Approval. On behalf of Evergreen Walk, LLC,
I respectfully submit this Request to Modify certain conditions of the subject Approval to
accommodate a build out of the approved Final Plan.
I enclose ten copies of the following documentation in support of this Request to
Modify:
1. Approval letter of September 19, 2011, with attached conditions designated as
"Attachment A" - 2 pages (please see Exhibit 1 attached hereto);
2. Draft of proposed new conditions of approval, Attachment A, to be substituted
for a portion of the Attachment A incorporated into the September 13, 2011
approval (please see Exhibit 2 attached hereto); and
3. Draft of proposed new Special Conditions to be substituted for the Special
Conditions incorporated into the September 13, 2011 approval (please see
Exhibit 3 attached hereto).
ONE CONSTITUTION PLAZA HARTFORD, CONNECTICUT 06103-1919 860-251-5000 WWW.SHIPMANGOODWIN.COM
It is my understanding that the Commission may schedule this request for consideration
at the Commission's meeting of Tuesday, May 22, 2012.
We look forward to working with you and the Commission on this request, which, if
granted, will enable the build out of the approved Final Plan to proceed.
Thank you for your, and the Commission's, consideration and assistance concerning
this request.
As always, best regards.
Vet my yours.
,r
17
i
Christophe J. Smith
cc: Evergreen Walk, LLC (with enclosures)
Alan F. Lamson, AICP (with enclosures)
2266652v1
2
r
SOyN SZ4
C
o -
C U
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
r�OSoRo�'� TELEPHONE (860) 644-2511
CERTIFIED MAIL 7008 1300 0001 4578 4082
September 19, 2011
Alan F. Lamson
FLB Architecture&Planning
19 Silver Lane
East Hartford, CT 06118
Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include:
relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space
[121 hotel rooms(71,550 square feet)]; general commercial space(9,800 square feet); office space(28,405
square feet)];to be completed in two phases and to be located on a portion of 151 Buckland Road [within
"Evergreen Walk" including portions of Units 6 and 7),and being approximately 1,200 feet west of
Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone.
We are pleased to advise you that the Planning&Zoning Commission voted on September 13, 2011 to approve
the above referenced application for Final Plan approval as shown on plans prepared by Fuss & O'Neil,project
number 2481.S20 dated 4/25/11 as revised,with the following modifications.
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of
erosion and sediment controls;$50,000 for construction of stormwater systems; and $30,000 for wetland
plantings.
4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars.
5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.2.13 of the Zoning
Regulations.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water
Pollution Control Authority.
9. The building street numbers must be included on the final plan.
10. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
Exhibit 1
12.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate
has been issued(per CGS §14-311).
13.The Town Engineer's review comments dated September 8,2011, as revised 9/13/11 must be incorporated
into the final plans.
14.The zoning data table must include all zoning data(e.g.parking and open space)and included on the plans
to be filed in the Town Clerk's office.
15.The phasing of the improvements of the required open space should be clarified on the plans.
16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture
and Design Review Committee and the Planning and Zoning Commission prior to issuance of building
permits.
7.The Fire Chiefs comments regarding fire hydrant locations must be added to the plans..
18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for
Final Plan"document submitted by the applicant and included as Attachment A.
19. The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave.
must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2.
20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended
north up to the unit 8 parcel.
21.A school bus shelter must be added to the plans in a location designated by the Board of Education in
compliance with current BOE policies.
22.The developer must examine the sequencing of the traffic lights along Buckland Road and make
adjustments to the timing as appropriate.
23. The roof top screening for the hotel must be added to block the views from Buckland Road of all the
mechanical units.
Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together
with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans)
must be submitted to°this 4Co'mmission to.be'stamped•and sighed. The..etters of approval of inns Cornnussion as
Well as the Inland Wetlands Agency/Conservation Commission must be.reproduced on the mylars.
After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,
Patrick Kennedy, Chairman
PK/ma Planning and Zoning Commission
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
}
Phasing Sequence for Final Plan as Provided in Site Plan Application
Phase 1•
1. Temporary extension of Evergreen Way behind LA Fitness to Tamarack Avenue
(adjacent to ECHN2),including temporary sidewalk for pedestrian access.
2. Widening and improvements to Tamarack Avenue (north-south along Town Square
project).
3. Modifications and improvements to Tamarack Avenue(east-west between Shops at
Evergreen Walk and LL Bean).
4. Pedestrian access from LL Bean site to Town Square.along south side.-of Tamarack
Avenue.
5. Pedestrian access and improvements between Shops at Evergreen Walk and Town
Square.
6. Modifications to and lighting at Shops at Evergreen Walk.
7. Site Preparation Parts Aand B (includes construction of Detention Basins 2 and 2a).
8. South portion of ring road through Town Square.
9. Town Square construction.
10. Hotel and associated parking,access drives,sidewalks,utilities and other
improvements.
11. South residential building and associated parking,access drives,sidewalks,utilities
and other improvements.
12. Water main loop to serve Phase 1 and Phase 2.
13. Natural gas loop to serve Phase 1 and Phase 2.
14. Commercial buildings (2) south of hotel and within Town Square,and associated
sidewalks,utilities and other improvements.
Phase 2:
1. Trunk sewer relocation.
2. Northerly residential building and associated parking,access drives,sidewalks,
utilities and other improvements.
f r
3. Office condominiums and associated parking,access drives,sidewalks,utilities and
other improvements.
Special Phasing Conditions:
I. Prior to commencing construction activities in Phase 2: (a) the commercial building
shall be"substantially constructed" in Phase 1,which means that all framing,
sheathing and roofing of the commercial building in Phase 1 shall be completed; (b)
the improvements at the Buckland Road and Tamarack intersection shall be
completed; (c)the temporary internal connection of Tamarack and Evergreen Way
shall be completed(without final coat); and (d) a surety or performance guaranty
bond,as provided by law,shall be provided in an amount to assure the completion
of all site improvements intended to be completed as part of Phase 1,which site
improvements shall constitute all utilities,storm water system components,site
lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding. All such site improvements in
Phase 1 and items (b) and (c)above shall be completed within one year of the date
that building construction activities in Phase 2 are commenced. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 1. However,site preparation,construction of
the site improvements,and construction of the building foundations in Phase 2,shall
be permitted without having to complywith the aforementioned provisions provided
for in this special phasing condition.
2. Prior to the issuance of the final certificate of occupancy for the residential building-
in Phase 2: (a) all construction in Phase 1 shall be completed,including all site
improvements;(b) at least fifty(50%)percent of the commercial buildings required
for the 2:1 residential/commercial square footage ratio in Phase 2 shall be
"substantially constructed," which means that all framing,sheathing and roofing of
such commercial buildings shall be completed;and (c) a surety or performance
guaranty bond,as provided bylaw,shall be provided in an amount to assure the
completion of all site improvements intended to be completed as part of Phase 2,
which shall constitute all utilities,storm water system components,site lighting,
retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 2.
2
2032139vl
ATTACHMENT A
(PROPOSED NEW ADDITIONAL CONDITIONS)
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as
provided in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue (north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
3. Modifications and improvements to Tamarack Avenue (east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side
of Tamarack Avenue, to be completed prior to the issuance of the final
certificate of occupancy for the first residential building or hotel, whichever
certificate issues first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Expansion of the existing, temporary detention basin to be completed to
accommodate runoff from the northeast residential building prior to the
issuance of the final certificate of occupancy for the northeast residential
building, unless Detention Basins 2 and 2a have been previously
constructed; and
2260516v2 Exhibit 2
7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
12. Northeast residential building and its associated parking, access drives,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of a final certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the office buildings.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
2
2260516v2
b
SPECIAL CONDITIONS
(PROPOSED NEW SPECIAL CONDITIONS)
1. Prior to commencing the construction of the second residential building at Town
Square: (a) the improvements at the Buckland Road and Tamarack intersection
shall have commenced and the portion of the work that is not completed shall be
bonded, as provided by law; (b) the temporary internal connection of Tamarack
Avenue and Evergreen Way in the vicinity of the southern ECHN office
building and LA Fitness shall have commenced and the portion of the work that
is not completed shall be bonded, as provided by law; and (c) a surety bond or
other financial guaranty, as provided by law, shall be provided in an amount to
ensure the completion of all site improvements intended to be completed as part
of the site construction of the first residential building, which improvements
shall constitute all utilities, storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. All such site
improvements noted above shall be completed within one year of the date that
building construction activities for the second residential building are
commenced. A reduction in the amount of said surety bond or other financial
guaranty shall be permitted as site improvements covered by said surety bond or
other financial guaranty are completed. However, site preparation, construction
of the site improvements, and construction of the building foundations for the
second residential building shall be permitted without having to comply with the
aforementioned provisions provided for in these special conditions.
2. Prior to the issuance of the final certificate of occupancy for the second
residential building: (a) all construction of the first residential building shall be
completed, including all site improvements, or a surety bond or other financial
guaranty, as provided by law, in the amount of the unfinished work shall be
provided, but in any event all such site improvements associated with the first
building as referenced above, #1, shall be completed within one year of the date
of commencing the construction of the second residential building; and (b) a
surety bond or other financial guaranty, as provided by law, shall be provided in
an amount to ensure the completion of all site improvements intended to be
completed as part of the construction of the second residential building which
shall constitute all utilities, storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. A reduction in the
amount of said surety bond or other financial guaranty, as provided by law,
shall be permitted as site improvements for the second-residential building are
completed.
2260596v1 Exhibit 3
�.Nf4 t N S <
Tlc0m� �sou.� V&U&ot
c u
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
SOR•C�N TELEPHONE(860) 644-2511
CERTIFIED MAIL 7011 0470 0003 7146 8270
June 1, 2012
Christopher J. Smith, Esq.
Shipman &Goodwin LLP
One Constitution Plaza
Hartford, CT 06103-1919
Dear Attorney Smith:
Re: Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC
We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify
conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for
real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions
of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street,
Buckland Road Gateway zone.
The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the
change to approval condition 18 as follows:
18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions"
and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in
Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail.
Black and white transparent mylars of Sheet#1 CS 101 —CS 104; CG112 with the above modifications, together
with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)
must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as
well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the
mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town
Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,, �j &Wvj�
Patrick Kennedy, Chair
Planning and Zoning Commission
Cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control NED
Fire Marshal
PK/11z SCAN
SUBSTITUTE ATTACHMENT A
ADDITIONAL CONDITIONS
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided
in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue(north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final certificate
of occupancy for the first residential building.
3. Modifications and improvements to Tamarack Avenue(east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of
Tamarack Avenue, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building; and
(b) If construction of the northeast residential building is commenced prior to
the completion of the southwest residential building, the existing,
temporary detention basin will be completed to accommodate runoff from
the northeast residential building prior to the issuance of the final
certificate of occupancy for the northeast residential building, unless
Detention Basins 2 and 2a have been previously constructed.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks,utilities and other improvements, to be completed prior to the issuance
of the final certificate of occupancy for the southwest residential building.
12. Northeast residential building and its associated parking, access drives, sidewalks,
utilities and other improvements, to be completed prior to the issuance of a final
certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the first office building.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8
to the north as well as prior to the issuance of the final certificate of occupancy for
the second residential building. A temporary access path must also be
incorporated from the residential development to the walking trail prior to the
issuance of the final certificate of occupancy for the second residential building.
2
ATTACHMENT A
SUBSTITUTE ADDITIONAL CONDITIONS
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided
in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue(north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final certificate
of occupancy for the first residential building.
3. Modifications and improvements to Tamarack Avenue(east-west between Shops
at Evergreen Walk and LL Bean),to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of
Tamarack Avenue, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building; and
(b) If construction of the northeast residential building is commenced prior to
the completion of the southwest residential building, the existing,
temporary detention basin will be completed to accommodate runoff from
the northeast residential building prior to the issuance of the final
certificate of occupancy for the northeast residential building, unless
Detention Basins 2 and 2a have been previously constructed.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks,utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks,utilities and other improvements, to be completed prior to the issuance
of the final certificate of occupancy for the southwest residential building.
12. Northeast residential building and its associated parking, access drives, sidewalks,
utilities and other improvements, to be completed prior to the issuance of a final
certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks,utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the first office building.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8
to the north as well as prior to the issuance of the final certificate of occupancy for
the second residential building. A temporary access path must also be
incorporated from the residential development to the walking trail prior to the
issuance of the final certificate of occupancy for the second residential building.
2
SPECIAL CONDITIONS
(PROPOSED NEW SPECIAL CONDITIONS)
1. Prior to the issuance of a building permit for the second residential building at
Town Square: (a) the improvements at the Buckland Road and Tamarack
intersection shall have commenced and the portion of the work that is not
completed shall be bonded, as provided by law; however, all improvements at
the Buckland Road and Tamarack intersection shall be completed when
certificates of occupancy have been issued for 75% of the approved units in the
first residential building at Town Square; (b) the temporary internal connection
of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN
office building and LA Fitness shall have commenced and the portion of the
work that is not completed shall be bonded, as provided by law; however, this
temporary internal extension shall be completed prior to the issuance of the final
certificate of occupancy for the first residential building; and (c) a surety bond
or other financial guaranty, as provided by law, shall be provided in an amount
to ensure the completion of all site improvements intended to be completed as
part of the site construction of the first residential building, which
improvements shall constitute all utilities, storm water system components, site
lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs,
signs, line striping, guiderails, fences, grading and seeding. All such site
improvements noted above shall be completed within one year of the date that
the building permit is issued for the second residential building at Town Square.
A reduction in the amount of any surety bonds or other financial guaranties, as
provided by law, shall be permitted as site improvements covered by said surety
bond or other financial guaranty are completed. However, site preparation,
construction of the site improvements, and construction of the building
foundations for the second residential building shall be permitted without having
to comply with the aforementioned provisions provided for in these special
conditions.
2. Prior to the issuance of any certificate of occupancy for a unit within the second
residential building: (a) all construction of the first residential building shall be
completed, including all site improvements, or a surety bond or other financial
guaranty, as provided by law, in the amount of the unfinished work shall be
provided, but in any event all such site improvements associated with the first
building as referenced above, #1, shall be completed within one year of the
issuance of the building permit for the second residential building at Town
Square; and (b) a surety bond or other financial guaranty, as provided by law,
shall be provided in an amount to ensure the completion of all site
improvements intended to be completed as part of the construction of the second
residential building which shall constitute all utilities, storm water system
components, site lighting, retaining walls, driveways, parking areas, roadways,
sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding;
however, all site improvements associated with the second residential building
shall be completed within one year of the issuance of the first certificate of
occupancy for a unit in the second residential building. A reduction in the
amount of said surety bond or other financial guaranty, as provided by law,
shall be permitted as site improvements for the second residential building are
completed.
2260596v2
N St4
o � r7-0� 01P Soam ?d&U&Ot
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
�f�OsoR c°N� TELEPHONE (860) 644-2511
CERTIFIED MAIL 7011 0470 0003 7146 8270
June 1, 2012
Christopher J. Smith, Esq.
Shipman&Goodwin LLP
One Constitution Plaza
Hartford, CT 06103-1919
Dear Attorney Smith:
Re: Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC
We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify
conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for
real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions
of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street,
Buckland Road Gateway zone.
The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the
change to approval condition 18 as follows:
18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions"
and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in
Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail.
Black and white transparent mylars of Sheet#1 CS101 —CS104; CGl 12 with the above modifications, together
with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)
must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as
well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the
mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town
Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,.,,,
Patrick Kennedy, Chair
Planning and Zoning Commission
Cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal 'a 2NED
PK/llz SCAN
t�W N Sf4
G v F
G �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f�dSOR-CO TELEPHONE (860) 644-2511
CERTIFIED MAIL 7011 0470 0003 7146 8270
June 1, 2012
Christopher J. Smith, Esq.
Shipman& Goodwin LLP
One Constitution Plaza
Hartford, CT 06103-1919
Dear Attorney Smith:
Re:Appl. 11-24P, Request to modify conditions associated with Final Plan Approval for Evergreen Walk LLC
We are pleased to advise you that the Planning & Zoning Commission voted on May 22, 2012 to modify
conditions associated with the Final Plan approval for Evergreen Walk, LLC, pursuant to Section 4.2.15, for
real property known as "Evergreen Walk", to be located on a portion of 151 Buckland Road, including portions
of Units 6 and 7, and being approximately 1,200 feet west of Buckland Road and 400 feet north of Smith Street,
Buckland Road Gateway zone.
The approval is subject to the original approval conditions in the letter dated September 19, 2011 with the
change to approval condition 18 as follows:
18. The conditions of the site plan for the Development Area Plan include the "Additional Conditions"
and "Special Conditions" as provided in Substitute Attachment A. In the event that any conditions in
Substitute Attachment A conflict with the original approval, Substitute Attachment A shall prevail.
Black and white transparent mylars of Sheet#1 CS101 —CS104; CG112 with the above modifications, together
with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)
must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission as
well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the
mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town
Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,��
Patrick Kennedy, Chair
Planning and Zoning Commission
Cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
PK/11z
SUBSTITUTE ATTACHMENT A
ADDITIONAL CONDITIONS
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided
in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian
access,to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue(north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final certificate
of occupancy for the first residential building.
3. Modifications and improvements to Tamarack Avenue(east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of
Tamarack Avenue, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel,whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building; and
(b) If construction of the northeast residential building is commenced prior to
the completion of the southwest residential building, the existing,
temporary detention basin will be completed to accommodate runoff from
the northeast residential building prior to the issuance of the final
certificate of occupancy for the northeast residential building,unless
Detention Basins 2 and 2a have been previously constructed. -
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks,utilities and other improvements,to be completed prior to the issuance
of the final certificate of occupancy for the southwest residential building.
12. Northeast residential building and its associated parking, access drives, sidewalks,
utilities and other improvements,to be completed prior to the issuance of a final
certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the first office building.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8
to the north as well as prior to the issuance of the final certificate of occupancy for
the second residential building. A temporary access path must also be
incorporated from the residential development to the walking trail prior to the
issuance of the final certificate of occupancy for the second residential building.
.4
2
SPECIAL CONDITIONS
(PROPOSED NEW SPECIAL CONDITIONS)
1. Prior to the issuance of a building permit for the second residential building at
Town Square: (a) the improvements at the Buckland Road and Tamarack
intersection shall have commenced and the portion of the work that is not
completed shall be bonded,as provided by law; however, all improvements at
the Buckland Road and Tamarack intersection shall be completed when
certificates of occupancy have been issued for 75% of the approved units in the
first residential building at Town Square; (b) the temporary internal connection
of Tamarack Avenue and Evergreen Way in the vicinity of the southern ECHN
office building and LA Fitness shall have commenced and the portion of the
work that is not completed shall be bonded, as provided by law; however, this
temporary internal extension shall be completed prior to the issuance of the final
certificate of occupancy for the first residential building; and (c) a surety bond
or other financial guaranty, as provided by law, shall be provided in an amount
to ensure the completion of all site improvements intended to be completed as
part of the site construction of the first residential building, which
improvements shall constitute all utilities, storm water system components, site
lighting, retaining walls, driveways, parking areas, roadways, sidewalks, curbs,
signs, line striping, guiderails, fences, grading and seeding. All such site
improvements noted above shall be completed within one year of the date that
the building permit is issued for the second residential building at Town Square.
A reduction in the amount of any surety bonds or other financial guaranties, as
provided by law, shall be permitted as site improvements covered by said surety
bond or other financial guaranty are completed. However, site preparation,
construction of the site improvements, and construction of the building
foundations for the second residential building shall be permitted without having
to comply with the aforementioned provisions provided for in these special
conditions.
2. Prior to the issuance of any certificate of occupancy for a unit within the second
residential building: (a) all construction of the first residential building shall be
completed, including all site improvements, or a surety bond or other financial
guaranty, as provided by law, in the amount of the unfinished work shall be
provided, but in any event all such site improvements associated with the first
building as referenced above, #1, shall be completed within one year of the
issuance of the building permit for the second residential building at Town
Square; and (b) a surety bond or other financial guaranty, as provided by law,
shall be provided in an amount to ensure the completion of all site
improvements intended to be completed as part of the construction of the second
residential building which shall constitute all utilities, storm water system
components, site lighting, retaining walls, driveways, parking areas, roadways,
sidewalks, curbs, signs, line striping, guiderails, fences, grading and seeding;
however, all site improvements associated with the second residential building
shall be completed within one year of the issuance of the first certificate of
occupancy for a unit in the second residential building. A reduction in the
amount of said surety bond or other financial guaranty, as provided by law,
shall be permitted as site improvements for the second residential building are
completed.
2260596v2
ATTACHMENT A
SUBSTITUTE ADDITIONAL CONDITIONS
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as provided
in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue(adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue(north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final certificate
of occupancy for the first residential building.
3. Modifications and improvements to Tamarack Avenue(east-west between Shops
at Evergreen Walk and LL Bean),to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side of
Tamarack Avenue,to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building; and
(b) If construction of the northeast residential building is commenced prior to
the completion of the southwest residential building, the existing,
temporary detention basin will be completed to accommodate runoff from
the northeast residential building prior to the issuance of the final
certificate of occupancy for the northeast residential building,unless
Detention Basins 2 and 2a have been previously constructed.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks,utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks,utilities and other improvements,to be completed prior to the issuance
of the final certificate of occupancy for the southwest residential building.
12. Northeast residential building and its associated parking, access drives, sidewalks,
utilities and other improvements,to be completed prior to the issuance of a final
certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks,utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the first office building.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
17. Construct walking trail around detention basins 2 and 2a and from there to Unit 8
to the north as well as prior to the issuance of the final certificate of occupancy for
the second residential building. A temporary access path must also be
incorporated from the residential development to the walking trail prior to the
issuance of the final certificate of occupancy for the second residential building.
2
i Y
RECEIVED
SHIPMAN &GOODWINLLP® MAY G ! 2012
COUNSELORS AT LAW SOUTH WINDSOR PLANNING DEPT.
Christopher J.Smith
Phone: (860)251-5606
Fax: (860)251-5318
cismith@goodwin.com
May 7, 2012
Via email correspondence and overnight:
Ms. Michele R. Lipe
Director of Planning
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Request to modify conditions associated with approval of Application 11-24P,
Final Plan-for Evergreen Walk, LLC, pursuant to Section 4.2.15,for real
property known as "Evergreen Walk, "to be located on a portion of 151
Buckland Road, including portions of Units 6 and 7, and being approximately
1,200 feet west of Buckland Road and 400.feet north of Smith Street, South
Windsor, Connecticut. Approval of Final Plan granted on September 13, 2011,
by the Planning and Zoning Commission ("Approval').
Dear Director of Planning Lipe,
As you are aware, the undersigned law firm represents the owner/applicant, Evergreen
Walk, LLC, concerning the above-referenced Approval. On behalf of Evergreen Walk, LLC,
I respectfully submit this Request to Modify certain conditions of the subject Approval to
accommodate a build out of the approved Final Plan.
I enclose ten copies of the following documentation in support of this Request to
Modify:
1. Approval letter of September 19, 2011, with attached conditions designated as
"Attachment A" - 2 pages (please see Exhibit 1 attached hereto);
2. Draft of proposed new conditions of approval, Attachment A, to be substituted
for a portion of the Attachment A incorporated into the September 13, 2011
approval (please see Exhibit 2 attached hereto); and
3. Draft of proposed new Special Conditions to be substituted for the Special
Conditions incorporated into the September 13, 2011 approval (please see
Exhibit 3 attached hereto).
ONE CONSTITUTION PLAZA HARTFORD,CONNECTICUT 06103-1919 1
860-251-5000 WWW.SHIPMANGOODWIN.COM
1
R 1
It is my understanding that the Commission may schedule this request for consideration
at the Commission's meeting of Tuesday, May 22, 2012.
We look forward to working with you and the Commission on this request, which, if
granted, will enable the build out of the approved Final Plan to proceed.
Thank you for your, and the Commission's, consideration and assistance concerning
this request.
As always, best regards.
V my yours
C istophe J. Smith
cc: Evergreen Walk, LLC (with enclosures)
Alan F. Lamson, AICP (with enclosures)
2266652v1
2
Dy'N Sf4
00
+i f ti
w� 1540 SULLIVAN AVENUE•SOUTH WINDSOR, CT 06074
f�dSoa•co� TELEPHONE (860) 644-2511
CERTIFIED MAIL 7008 1300 0001 4578 4082
September 19, 2011
Alan F. Lamson
FLB Architecture&Planning
19 Silver Lane
East Hartford, CT 06118
Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include:
relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space
[121 hotel rooms(71,550 square feet)];general commercial space(9,800 square feet); office space(28,405
square feet)];to be completed in two phases and to be located on a portion of 151 Buckland Road [within
"Evergreen Walk" including portions of Units 6 and 7),and being approximately 1,200 feet west of
Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone.
We are pleased to advise you that the Planning&Zoning Commission voted on September 13,2011 to approve
the above referenced application for Final Plan approval as shown on plans prepared by Fuss & O'Neil,project
number 2481.S20 dated 4/25/11 as revised,with the following modifications.
1. Prior to commencement of any site work,a meeting must be held with Town Staff.
2. No building permit will be issued until the'final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of
erosion and sediment controls;$50,000 for construction of stormwater systems; and$30,000 for wetland
plantings.
4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars.
5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.23 of the Zoning
Regulations.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water
Pollution Control Authority.
9. The building street numbers must be included on the final plan.
10. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
Exhibit 1
12.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate
has been issued(per CGS §14-311).
13.The Town Engineer's review comments dated September 8,2011, as revised 9/13/11 must be incorporated
into the final plans.
14.The zoning data table must include all zoning data(e.g.parking and open space)and included on the plans
to be filed in the Town Clerk's office.
15.The phasing of the improvements of the required open space should be clarified on the plans.
16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture
and Design Review Committee and the Planning and Zoning Commission prior to issuance of building
permits.
7.The Fire Chiefs comments regarding fire hydrant locations must be added to the plans:
18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for
Final Plan"document submitted by the applicant and included as Attachment A.
19. The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave.
must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2.
20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended
north up to the unit 8 parcel.
21.A school bus shelter must be added to the plans in a location designated by the Board of Education in
compliance with current BOE policies.
22.The developer must examine the sequencing of the traffic lights along Buckland Road and make
adjustments to the timing as appropriate.
23. The roof top screening for the hotel must be added to block the views from Buckland Road of all the
mechanical units.
Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together
with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans)
must be submitted to°this Conuriission to.'oe stamped and signed. Tlie.letters of approval of this Commission as
Well as the Inland Wetlands Agency/Conservation Commission must be.reproduced on the mylars.
After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,
Patrick Kennedy, Chairman '
PK/ma Planning and Zoning Commission
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
fi s
Phasing Sequence for Final Plan as Provided in Site Plan Application
Phase 1•
1. Temporary extension of Evergreen Way behind LA Fitness to Tamarack Avenue
(adjacent to EC HN2),including temporary sidewalk for pedestrian access.
2. Widening and improvements to Tamarack Avenue(north-south along Town Square
project).
3. Modifications and improvements to Tamarack Avenue(east-west between Shops at
Evergreen Walk and IL Bean).
4. Pedestrian access from LL Bean site to Town Square-along south side::of Tamarack
Avenue.
5. Pedestrian access and improvements between Shops at Evergreen Walk and Town
Square.
6. Modifications to and lighting at Shops at Evergreen Walk.
7. Site Preparation Parts A and B (includes construction of Detention Basins 2 and 2a).
8. South portion of ring road through Town Square.
9. Town Square construction.
10. Hotel and associated parking,access drives,sidewalks,utilities and other
improvements.
11. South residential building and associated parking,access drives,sidewalks,utilities
and other improvements.
12. Water main loop to serve Phase I and Phase 2.
13. Natural gas loop to serve Phase 1 and Phase 2.
14. Commercial buildings (2)south of hotel and within Town Square,and associated
sidewalks,utilities and other improvements.
Phase 2:
1. Trunk sewer relocation.
2. Northerly residential building and associated parking,access drives,sidewalks,
utilities and other improvements.
� f
3. Office condominiums and associated parking,access drives,sidewalks,utilities and
other improvements.
Special Phasing Conditions:
1. Prior to commencing construction activities in Phase 2: (a) the commercial building
shall be "substantiallyconstructed" in Phase 1,which means that all framing,
sheathing and roofing of the commercial building in Phase 1 shall be completed; (b)
the improvements at the Buckland Road and Tamarack intersection shall be
completed; (c) the temporary internal connection of Tamarack and Evergreen Way
shall be completed(without final coat);and (d) a surety or performance guaranty
bond,as provided bylaw,shall be provided in an amount to assure the completion
of all site improvements intended to be completed as part of Phase 1,which site
improvements shall constitute all utilities,storm water system components,site
lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding. All such site improvements in
Phase 1 and items (b) and (c)above shall be completed within one year of the date
that building construction activities in Phase 2 are commenced. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 1. However,site preparation,construction of
the site improvements,and construction of the building foundations in Phase 2,shall
be permitted without having to complywith the aforementioned provisions provided
for in this special phasing condition.
2. Prior to the issuance of the final certificate of occupancy for the residential building-
in Phase 2: (a) all construction in Phase 1 shall be completed,including all site
improvements;(b) at least fifty(500/0)percent of the commercial buildings required
for the 2:1 residential/commercial square footage ratio in Phase 2 shall be
"substantially constructed,"which means that all framing,sheathing and roofing of
such commercial buildings shall be completed;and(c) a surety or perfori-nance
guaranty bond,as provided bylaw,shall be provided in an amount to assure the
completion of all site improvements intended to be completed as part of Phase 2,
which shall constitute all utilities,storm water system components,site lighting,
retaining wails,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 2.
20321390 2
ATTACHMENT A
(PROPOSED NEW ADDITIONAL CONDITIONS)
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as
provided in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue (north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
3. Modifications and improvements to Tamarack Avenue (east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
4. Pedestrian access from LL Bean site to Town Square adjacent to the south side
of Tamarack Avenue, to be completed prior to the issuance of the final
certificate of occupancy for the first residential building or hotel, whichever
certificate issues first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Expansion of the existing, temporary detention basin to be completed to
accommodate runoff from the northeast residential building prior to the
issuance of the final certificate of occupancy for the northeast residential
building, unless Detention Basins 2 and 2a have been previously
constructed; and
2260516v2 Exhibit 2
7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
12. Northeast residential building and its associated parking, access drives,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of a final certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the office buildings.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
2
2260516v2
6
SPECIAL CONDITIONS
(PROPOSED NEW SPECIAL CONDITIONS)
1. Prior to commencing the construction of the second residential building at Town
Square: (a) the improvements at the Buckland Road and Tamarack intersection
shall have commenced and the portion of the work that is not completed shall be
bonded, as provided by law; (b) the temporary internal connection of Tamarack
Avenue and Evergreen Way in the vicinity of the southern ECHN office
building and LA Fitness shall have commenced and the portion of the work that
is not completed shall be bonded, as provided by law; and (c) a surety bond or
other financial guaranty, as provided by law, shall be provided in an amount to
ensure the completion of all site improvements intended to be completed as part
of the site construction of the first residential building, which improvements
shall constitute all utilities, storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. All such site
improvements noted above shall be completed within one year of the date that
building construction activities for the second residential building are
commenced. A reduction in the amount of said surety bond or other financial
guaranty shall be permitted as site improvements covered by said surety bond or
other financial guaranty are completed. However, site preparation, construction
of the site improvements, and construction of the building foundations for the
second residential building shall be permitted without having to comply with the
aforementioned provisions provided for in these special conditions.
2. Prior to the issuance of the final certificate of occupancy for the second
residential building: (a) all construction of the first residential building shall be
completed, including all site improvements, or a surety bond or other financial
guaranty, as provided by law, in the amount of the unfinished work shall be
provided, but in any event all such site improvements associated with the first
building as referenced above, #1, shall be completed within one year of the date
of commencing the construction of the second residential building; and (b) a
surety bond or other financial guaranty, as provided by law, shall be provided in
an amount to ensure the completion of all site improvements intended to be
completed as part of the construction of the second residential building which
shall constitute all utilities, storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. A reduction in the
amount of said surety bond or other financial guaranty, as provided by law,
shall be permitted as site improvements for the second-residential building are
completed.
2260596vl Exhibit 3
Request to Modify Conditions Associated
With Approval of Application 11-24P,
Final Plan for Evergreen Walk, LLC
May 22, 2012
l �
Submitted by:
Christopher J. Smith, Esq.
Shipman & Goodwin LLP
One Constitution Plaza
Hartford, CT 06103-1919
Phone: (860) 251-5606
Fax: (860) 251-5318
Email: cjsmith@goodwin.com
i
On behalf of Owner/Applicant:
Evergreen Walk, LLC
I
i �
RECEIVED
MAY 2 2 2012
SOUTH MOOR IU NiNG DEPT.
Exhibit A
r `
It is my understanding that the Commission may schedule this request for consideration
at the Commission's meeting of Tuesday, May 22, 2012.
' We look forward to working with you and the Commission on this request, which, if
granted, will enable the build out of the approved Final Plan to proceed.
Thank Y
you for our, and the Commission's, consideration and assistance concerning
Y
this request.
As always, best regards.
- 1
Verb �uly yours,
'�Christophe J. Smith
PC: Evergreen Walk LLC with enclosures y
g � )
Alan F. Lamson, AICP (with enclosures)
2266652vl
1
1
1
2
1 .
(OWN Sp4
C c7--
y Y
: . kv 1540 SULLIVAN AVENUE e SOUTH WINDSOR, CT 06074
f�OSox'co TELEPHONE(860) 644-2511
CERTIFIED MAIL 7008 1300 0001 4578 4082
September 19, 2011
Alan F. Lamson
FLB Architecture&Planning
19 Silver Lane
East Hartford, CT 06118
Re: Appl. 11-24 P,Evergreen Walk LLC,Final Plan approval,pursuant to Section4.2.15 to include:
i relocation of residential structures [totaling 203,447 square feet]; 109,755 square feet of commercial space
[121 hotel rooms(71,550 square feet)]; general commercial space(9,800 square feet); office space(28,405
square feet)]; to be completed in two phases and to be located on a portion of 151 Buckland Road [within
"Evergreen Walk" including portions of Units 6 and 7), and being approximately 1,200 feet west of
Buckland Road and 400 feet north of Smith Street; Buckland Road Gateway Development Zone.
We are pleased to advise you that the Planning&Zoning Commission voted on September 13, 2011 to approve
the above referenced application for Final Plan approval as shown on plans prepared by Fuss &O'Neil, project
number 248LS20 dated 4/25/11 as revised, with the following modifications.
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission,including bonds in the amount of $50,000 to ensure proper placement and maintenance of
erosion and sediment controls; $50,000 for construction of stormwater systems; and$30,000 for wetland
' plantings.
4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars.
j5. All bonds must be in one of the forms described in the enclosed Bond Policy.
6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Article 9.1.23 of the Zoning
Regulations.
7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
18. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water
Pollution Control Authority.
119. The building street numbers must be included on the final plan.
10. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
Exhibit 1
12. If a State Traffic Commission certificate is required,no building permits will be issued_ until the certificate
has been issued(per CGS §14-311).
13. The Town Engineer's review comments dated September 8,2011, as revised 9/13/11*must be incorporated
into the final plans.
r14.The zoning data table must include all zoning data(e.g.parking and open space) and included on the plans
to be filed in the.Town Clerk's office.
15.The phasing of the improvements of the required open•space should be clarified on the plans.
16.Architectural elevations for all non-residential building in Phase II must be reviewed by the Architecture
and Design Review Committee and the Planning and Zoning Commission prior to issuance of building
permits.
i7.The Fire Chief s comments regarding fire hydrant locations must be added to the plans.
18.The conditions of the site plan phasing of the Development Area Plan include the"Phasing Sequence for
Final Plan"document submitted by the applicant and included as Attachment A.
19.The blinking light for the pedestrian crossing at the intersection of Evergreen Way and Tamarack Ave:
must be evaluated for its effectiveness prior to the issuance of the final Certificate of Occupancy in Phase 2.
r20.The Recreational trail shown for phase 1 must be connected to the trail in phase 2 and the trail extended
north up to the unit 8 parcel.
21.A school bus shelter must be added to the plans in a location designated by the Board of Education in
compliance with current BOE policies.
22.The developer must examine the sequencing of the traffic lights along Buckland Road and make
adjustments to the timing as appropriate.
r 23.The roof top screening for the hotel must be added to block the views from Buckland Road of all the
mechanical units.
Black and white transparent mylars of Sheet # CS101- CS104; CG112 with the above modifications, together
with three blueprint copies of the entire set of.plans (including architectural elevations and'landscaping.plans)
must be submitted t&this Coiiunission to.be`stamped;and signed. Theaetters of approval of this Commssion as
,well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars.
After them mylars have been signed by the Commission,the will be returned to you for filing in the Office of the
Y � Y Y g
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,
Y
Patrick Kennedy, Chairman
PK/ma Planning and Zoning Commission
Fc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
r
Phasing Sequence for Final Plan as Provided in Site Plan Application
Phase 1:
1. Temporary extension of Evergreen Way behind LA Fitness.to Tamarack Avenue
(adjacent to ECHN2),including temporary sidewalk for pedestrian access.
2. Widening and improvements to Tamarack Avenue (north-south along Town Square
project).
3. Modifications and improvements to Tamarack Avenue (east-west between Shops at
Evergreen Walk and LL Bean).
4. Pedestrian access from LL Bean site to Town Square.along south sidef Tamarack
Avenue.
5. Pedestrian access and improvements between Shops at Evergreen Walk and Town
Square.
6. Modifications to and lighting at Shops at Evergreen Walk.
1 7. Site Preparation Parts A and B (includes construction of Detention Basins 2 and 2a).
8. South portion of ring road through Town Square.
9. Town Square construction.
10. Hotel and associated parking,access drives,sidewalks,utilities and other
improvements.
' 11. South residential building and associated parking,access drives,sidewalks,utilities
and other improvements.
12. Water main loop to serve Phase 1 and Phase 2.
13. Natural gas loop to serve Phase 1 and Phase 2.
14. Commercial buildings (2) south of hotel and within Town Square,and associated
sidewalks,utilities and other improvements.
Phase 2:
1. Trunk sewer relocation.
2. Northerly residential building and associated parking, access drives,sidewalks,
utilities and other improvements.
1 3. Office condominiu
ms and associated parking,access drives,sidewalks,utilities and
other improvements.
Special Phasing Conditions:
1. Prior to commencing construction activities in Phase 2: (a) the commercial building
shall be "substantially constructed" in Phase 1,which means that all framing,
sheathing and roofing of the commercial building in Phase 1 shall be completed; (b)
the improvements at the Buckland Road and Tamarack intersection shall be
completed; (c)the temporary internal connection of Tamarack and Evergreen Way
shall be completed (without final coat);and (d) a surety or performance guaranty
bond,as provided bylaw,shall be provided in an amount to assure the completion
of all site improvements intended to be completed as part of Phase 1,which site
improvements shall constitute all utilities,storm water system components,site
lighting,retaining walls,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding. All such site improvements in
Phase 1 and items (b) and (c) above shall be completed within one year of the date
- that building construction activities in Phase 2 are commenced. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 1. However,site preparation,construction of
1 the site improvements,and construction of the building foundations in Phase 2,shall
be permitted without having to complywith the aforementioned provisions provided
for in this special phasing condition.
2. Prior to the issuance of the final certificate of occupancy for the residential building
in Phase 2: (a) all construction in Phase 1 shall be completed,including all site
improvements; (b)at least fifty(50%)percent of the commercial buildings required
' for the 2:1 residential/commercial square footage ratio in Phase 2 shall be
"substantially constructed," which means that all framing,sheathing and roofing of
such commercial buildings shall be completed; and(c) a surety or performance
guaranty bond,as provided bylaw,shall be provided in an amount to assure the
completion of all site improvements intended to be completed as part of Phase 2,
which shall constitute all utilities,storm water system components,site lighting,
retaining wails,driveways,parking areas,roadways,sidewalks,curbs,signs,
linestriping,guiderails,fences,grading and seeding in Phase 2. A reduction in the
amount of said surety or performance guaranty bond shall be permitted as site
improvements are completed in Phase 2.
2032139v1
2
I
ATTACHMENT A
(PROPOSED NEW ADDITIONAL CONDITIONS)
' Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as
provided in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian
raccess, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
1 2. Widening and.improvements to Tamarack Avenue (north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
3. Modifications and improvements to Tamarack Avenue (east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building:
t4. Pedestrian access from LL Bean site to Town Square adjacent to the south side
of Tamarack Avenue, to be completed prior to the issuance of the final
certificate of occupancy for the first residential building or hotel, whichever
certificate issues first.
S. Pedestrian access and improvements between the Shops at Evergreen Walk and
Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) Expansion of the existing, temporary detention basin to be completed to
accommodate runoff from the northeast residential building prior to the .
issuance of the final certificate of occupancy for the northeast residential
building, unless Detention Basins 2 and 2a have been previously
constructed; and
2260516v2 Exhibit 2
7 (b) Construction of Detention Basins 2 and 2a to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
improvements, to be completed prior to�the issuance of the final certificate of
1 occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks, -utilities and other improvements, to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
12. Northeast residential building and its associated access drives,
parking,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of a final certificate of occupancy for the northeast residential building.
13. Office buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the office buildings.
14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
15. Natural as loop to be completed prior to the issuance of the final certificate of
g P P
occupancy for the first residential building.
16. Trunk sewer relocation to be
completed prior to the issuance of the final
p
certificate of occupancy for the northeast residential building.
I
1
1
2
' 2260516v2
SPECIAL CONDITIONS
(PROPOSED NEW SPECIAL CONDITIONS)
1. Prior to commencing the construction of the second residential building at Town
Square: (a) the improvements at the Buckland Road and Tamarack intersection
shall have commenced and the portion of the work that is not completed shall be
bonded, as provided by law; (b) the temporary internal connection of Tamarack
Avenue and Evergreen Way in the vicinity of the southern ECHN office
building and LA Fitness shall have commenced and the portion of the work that
is not completed shall be bonded, as provided by law; and (c) a surety bond or
other financial guaranty, as provided by law, shall be provided in an amount to
1 ensure the completion of all site improvements intended to be completed as part
of the site construction of the first residential building, which improvements
shall constitute all utilities, storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. All such site
improvements noted above shall be completed within one year of the date that
building construction activities for the second residential building are
commenced. A reduction in the amount of said surety bond or other financial
guaranty shall be permitted as site improvements covered by said surety bond or
other financial guaranty are completed. However, site preparation, construction
of the site improvements, and construction of the building foundations for the
' second residential building shall be permitted without having to comply with the
aforementioned provisions provided for in these special conditions.
' 2. Prior to the issuance of the final certificate of occupancy for the second
residential building: (a) all construction of the first residential building shall be
completed, including all site improvements, or a surety bond or other financial
guaranty, as provided by law, in the amount of the unfinished work shall be
provided, but in any event all such site improvements associated with the first
building as referenced above, #l, shall be completed within one year of the date
of commencing the construction of the second residential building; and (b) a
surety bond or other financial guaranty, as provided by law, shall be provided in
' an amount to ensure the completion of all site improvements intended to be
completed as part of the construction of the second residential building which
shall constitute all utilities,storm water system components, site lighting,
retaining walls, driveways, parking areas, roadways, sidewalks, curbs, signs,
line striping, guiderails, fences, grading and seeding. A reduction in the
amount of said surety bond or other financial guaranty, as provided by law,
shall be permitted as site improvements for the second residential building are
completed.
2260596vi Exhibit 3
Exhibit B
rATTACHMENT A
(PROPOSED NEW ADDITIONAL CONDITIONS)
Additional conditions of approval for Final Plan of Town Square at Evergreen Walk as
provided in Site Plan Application:
1. Temporary extension of Evergreen Way behind LA Fitness and Tamarack
' Avenue (adjacent to ECHN2), including temporary sidewalk for pedestrian
access, to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
2. Widening and improvements to Tamarack Avenue (north-south adjacent to the
Town Square project), to be completed prior to the issuance of the final
certificate of occupancy for the nfft-he461 residential building.
3. Modifications and improvements to Tamarack Avenue (east-west between Shops
at Evergreen Walk and LL Bean), to be completed prior to the issuance of the
final certificate of occupancy for the first residential building.
Pedestrian access from LL Bean site to Town Square adjacent to the south side
of Tamarack Avenue, to be completed prior to the issuance of the final
certificate of occupancy for the first residential building or hotel, whichever
certificate issues first.
5. Pedestrian access and improvements between the Shops at Evergreen Walk and
' Town Square, to be completed prior to the issuance of the final certificate of
occupancy for the first residential building or hotel, whichever certificate issues
first.
6. Modifications to and lighting in the parking area west of the Shops at Evergreen
Walk to be completed prior to the issuance of the final certificate of occupancy
for the first residential building.
7 (a) palion
CW Qul sw , i ��'y
and
D21 If construction of the northeast residential building is commencer_t riot
to the coo nnletion of the southwest residential building. the existing,
temporary detention basin to&W be completed to accommodate runoff
from the northeast residential building prior to the issuance of the final
certificate of occupancy for the northeast residential building, unless
2260516v-23
Detention Basins 2 and 2a have been previously constructed;-and 7
{b) corsst cti l etcanden,-3 w4as--2-a-n4-2a4o,- c�c�plc�te l
r t€�tlt'--isstmnew+ th -teal-pert x a -o ccu ant-y-folrth €�uthw ht-
re-s4de-ndal-buRdhig..
8. Town Square south entry drive to be completed prior to the issuance of the final
certificate of occupancy for the southwest residential building.
' 9. Construction of the proposed Town Square public space component to be
completed prior to the issuance of the final certificate of occupancy for the first
residential building.
10. Hotel and its associated parking, access drives, sidewalks, utilities and other
i improvements, to be completed prior to the issuance of the final certificate of
occupancy for the hotel.
11. Southwest residential building and its associated parking, access drives,
sidewalks, utilities and other improvements, to be completed prior to the
issuance of the final certificate of occupancy for the southwest residential
building.
12. Northeast residential building and its associated parking, access drives,
' sidewalks, utilities and other improvements, to be completed prior to the
issuance of a final certificate of occupancy for the northeast residential building.
' 13. Qffice buildings and their associated parking, access drives, sidewalks, utilities
and other improvements, to be completed prior to the issuance of the final
certificate of occupancy for the f=office bt ldings WWuig.
i14. Water main loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
' 15. Natural gas loop to be completed prior to the issuance of the final certificate of
occupancy for the first residential building.
16. Trunk sewer relocation to be completed prior to the issuance of the final
certificate of occupancy for the northeast residential building.
1L Construct walking trail around detention basins 2 and 2a and from_there to Unit
8 to the north prior to the issuance of the final certificate of occupant for he
second residential building.
I 2260516v2-2 2
Document comparison by Workshare Professional on Thursday, May 17, 2012 3:40:16
PM
Document-1 1D interwovenSite://SGDMS/SG/2260516/2
Mi
' Description 11#2260516v2<SG> =Attachment A 4/2012
Document 2 ID interwovenSite://SGDMS/SG/2260516/3
Description #2260516v3<SG> -Attachment A 4/2012
' Rendering set standard
Style change
Format change
Inserted cell
Deleted cell :���;� .�ug_r; :A.�,�=����~nW.:�, ��A
' Moved cell
Split/Merged cell
' Paddin cell
1 Count
Insertions 9
Deletions 8
' Moved from 1
Moved to . 1
Style change 0
Format changed 0
Total changes 19
i
SPECIAL CONDITIONS
' (PROPOSED NEW SPECIAL CONDITIONS)
I1. Prior to c�mmet�c- g-tlenrr�� ,nfthe issuance of a building newt for the
' second residential building at Town Square: (a) the improvements at the
Buckland Road and Tamarack intersection shall have commenced and the
portion of the work that is not completed shall be bonded, as provided by law;
however_ all improvements at the Buckland_Road and Tamarack intersection
1 shall be completed when certificates of occupancy have been issued for 75% of
the approved its in the first residodal_building at Town Saua_re: (b) the
temporary internal connection of Tamarack Avenue and Evergreen Way in the
r vicinity of the southern ECHN office building and LA Fitness shall have
commenced and the portion of the work that is not completed shall be bonded,
as provided by law: however. this tem, orary internal extension shall be
co leeted prior to the issuance of the final certificate of occupancy for the first
residential building; and (c) a surety bond or other financial guaranty, as
provided by law, shall be provided in an amount to ensure the completion of all
site improvements intended to be completed as part of the site construction of
the first residential building, which improvements shall constitute all utilities,
storm water system components, site lighting, retaining walls, driveways,
parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails,
fences, grading and seeding. All such site improvements noted above shall be
' completed within one year of the date that building eenstfueUon-
A permit is issued for the second residential building ar--ems --ed.
TownSauue-
A. reduction in the amount of said=,surety bendbmda or other financial
gu; xtyguaranties. as rovid by lbw,shall be permitted as site improvements
' covered by said surety.bond or other financial guaranty are completed.
However, site preparation, construction of the site improvements, and
construction of the building foundations for the second residential building shall
be permitted without having to comply with the aforementioned provisions
provided for in these special conditions.
I2. Prior to the issuance of. -final=certificate of occupancy for a unit within the
' second residential building: (a) all construction of the first residential building
shall be completed, including all site improvements, or a surety bond or other
financial guaranty, as provided by law, in the amount of the unfinished work
shall be provided, but in any event all such site improvements associated with
the first building as referenced above, #1, shall be completed within one year of
the datcissuance of con g the oden-e€huilding hermit for the
second residential building at Town aua=; and (b) a surety bond or other
financial guaranty, as provided by law, shall be provided in an amount to ensure
the completion of all site improvements intended to be completed as part of the
construction of the second residential building which shall constitute all utilities,
2260596v4-2
storm water system components, site lighting, retaining walls, driveways,
parking areas, roadways, sidewalks, curbs, signs, line striping, guiderails,
' fences, grading and seeding: however all site imRroyements associated with the
second residential buildi j shall be co iLleted within one year of the issuance of
' the first certificate of occupancy or a unit in the second residential building. A
reduction in the amount of said surety bond or other-financial guaranty, as
provided by law, shall be permitted as site improvements for the second
' residential building are completed.
1
2260596v4-2. 2
Document comparison by Workshare Professional on Thursday, May 17, 2012 2:33:15
PM
Document 1 ID interwovenSite://SGDMS/SG/2260596/1
Description 2260596vl<SG> - SPECIAL CONDITIONS 4/2012
Document 2 1D interwovenSite://SGDMS/SG/2260596/2
Description #2260596v2<SG> SPECIAL CONDITIONS 4/2012
Renderin set standard
' L
TnSertion
�rrczxv'r'r
naoyedfi;em
MQxQd
Style change
Format charge
Inserted cell rt
Deleted cell :�.��� • ��u=�. �i_•� «:g..
Moved cell
Split/Merged cell
,Padding cell
Count
Insertions 17
Deletions 12
Moved from 0
Moved to 0
Style change 0
Format chan ed 0
Total changes 1 29
Exhibit C 1
k
Y
1 9
I r .
t\,
W U _ '�� ti • � C r�
1 i a
ABC
31
\ d'�a
fie, { �''�� � � �� � •
K
r� r■� �r r r r r �r r � r r r it r r� r r r
Company Overview
• Bonaventure is headquartered in Arlington, VA and was founded in 1999
•We specialize in development of high end apartments on the east coast
• Our management company currently manages a portfolio of 5,000+ units from
the Washington, DC metro area to Charleston, SC
•Our philosophy: If we combine great locations, distinctive architecture,
exceptional amenities, and sustainablematerials, we can create vibrant and
lasting communities
• Our "old school" investment philosophy is to build and hold for the long term.
We meticulously plan our properties up front to minimize repairs and
replacements down the road
•Our target project size is 200 units, which allows us to achieve an efficientuse
of resources through both construction costs and operational costs during
lease-up and at stabilization
BONAVENTURE
REALTY GROUP, LL6.
The Cascades
aad Z,..ti,isz, "i .b ye .,
Location: Virginia Beach,Virginia
#of Units: 226 units+22,000 SF Retail
Project Costs: $33Million
0 R
x '
" TIMELINE:
j Site Plan Approval: Dec 2008
Building Permits Issued: Dec 2008
Close with Financing: Feb 2009
Break Ground: Feb 2009
First Move-Ins: Jan 2010
Construction Complete: July 2010
Stabilized Occupancy: Dec 2010
The Cascades is an A+ community in the strongest submarket in the -
Hampton Roads market. In addition to 226 apartment units we have
developed a mixed use component with 22,000 sgft of restaurant and retail
on the round level. The property features fine) a g p p y y appointed residences,
upscale project amenities, and a convenient, accessible location. Residents
of the property enjoy an abundance of upscale shopping, dining, and
recreational amenities all conveniently nearby. The deal structure used for
this transaction is a Joint Venture with the land owner.
Development Team:
Architect: Humphrey's and Partners
Contractor: Marlyn Development
Engineer: MSA,PC
Legal: Sykes,Bourdon,Ahern&Levy
Lender: Wells Fargo FHA 221(d)(4)HUD insured
BONAVENTURE CASE STUDY
�.. REALTY GROUP. LLG.
A5
Aura at Towne Place
Towne Place at Greenbrier is an existing 78,000 specialty retail development F
consisting of various upscale shops and restaurants, such as Jos A Bank, Jason's
Deli, Chicos, and Surf Rider. Bonaventure will be adding 215 luxury apartments
featuring upgraded finishes and features in two buildings. The 4-story buildings
have been designed to fit in with the existing retail.The project will bring to life
the walk-able mixed use reality desired by many planners in Hampton roads.The
deal structure used for this transaction is a fee simple purchase.This property is
currently under construction.
Development Team:
Architect: JPrice Architecture
Contractor: Marlyn Development
Engineer: Engineering Services
Legal: Kaufman and Canoles
Lender: Wells Fargo FHA 221(d)(4)HUD insured
Services Rendered:
Development
Management - R zonings
Location: Chesapeake,Virginia
#of Units: 215 units
Project Costs: $28 Million
TIMELINE:
Site Plan Approval: Mar 2010
Building Permits Issued: Aug 2010
Close with Financing: July 2011
Break Ground: July 2011
First Move-Ins: May 2012
rs Construction Complete: Sept 2012
Stabilized Occupancy: Mar 2013
BONAVENTURE CASE STUDY
REALTY GROUP, LL6
r� rr r rr rr r rr rr rr rr �r r rr rr r� rr rr rr r�
Promenade Pointe
Location: Norfolk,Virginia
=` #of Units: 183 units
Project Costs: $27 Million
Services Rendered:
� �. Development
Management Rezonings
1? � �
Promenade Pointe is planned to be a resort style community on the banks of the
Lafayette River system.The 183 luxury apartments will feature upgraded finishes and ifSFr
features such as granite countertops, gourmet kitchens, lofted units, vaulted ceilings,
and expansive water views. In addition, we have partnered with the City of Norfolk to
offer local students the chance to learn about the local ecosystem and wildlife, at our
on-site wetlands. Canoes and a canoe launch pier are available for use by residents TIMELINE:
and local schools.The deal structure used for this transaction is a fee simple purchase. Site Plan Approval: March 2012
We assembled this infill site and led the rezoning effort. Building Permits Issued: June 2012
Development Team: Close with Financing: June 2012
.Architect: Cox,Kliewer&Co.LLC Break Ground: June 2012
Contractor: KBS First Move-Ins: Sept 2013
Engineer: Hassel&Folkes Construction Complete: Jan 2014
Legal: Kaufman and Canoles
Stabilized Occupancy: Apr 2014
Lender: Wells Fargo FHA 221(d)(4)HUD insured
BONAVENTURE
CASE STUDY
REALTY GROUP. LLC.
r� rr Ir �r rr r rr rr �r r �■Ir r rr r� r� r r� r rr
t
M9 N
mom
mos _ ,
F sit
4'
.. Tat.
B 0 N VENTURE
3.
v v y
7 �-
x.
3
f. 1
S ;jyIk-
„r
vTEST
" t
r x �
�r
1£
u
I
wj n
SKY
t .
r s r r r r r r r ® ® r rr rr rr r rr rr rr
c 1 ROOM
4w n r i
� r `
F r
1
y'�G fix". g.v ty � •, �� 3
r,
aJR
w�M-�:.. �. 1 u.. y3. .:x" 4� �` i s xx,x a•t»"i{� s ''hy�„#�:M
h
��
/
REALTY G:ZQU P, '
ar rr r� r rr r r r ® r r r rr rr ar �r r� rr r�
kt v
:'• '!v+, fin.- � / 1
�rr�k � �� i� 'Aar �, }#� �• �� �
@t
�"
rn'
F�
r�
y
j
"
4BONAVEN'i
R EA LT`� GRgUo �C
Community Amenities
i
Common Area Amenities and Buildina Features:
*Clubhouse with Fireplace & Lounge Area
*Resort style Swimming Pool with Outdoor Kitchen
and Gas Grills
•24-hour Fitness Center & Cardio Room w/ LCD TV's
z •24-hour Internet Cafe Equipped with WiFi
•Elevators
*Secured Building Access Via Key Card
*Trash Disposal Chutes Inside the Buildings
*Extra Storage
•Covered Parking
TBO. NAVENTURE
REALTY GROUP, LLE
Apartment Finishes
Apartment Features & Amenities:
• Nine-foot Ceilings
Y
• Gourmet Kitchens and Breakfast
Bars
• Granite Countertops
• Stainless Steel Appliances
• Full-size Washer and Dryer
• Loft units w/ Vaulted Ceilings*
• Sunrooms*
• Balconies or Patios
• Bay Windows*
p'
• Built-in Computer Desks*
* In select units
BONAVENTLJRE
REALTY GROUP, LLQ
1 i Ye z iv��f R<Y 1zb"1
i
1
:1.
f
J 4 � � _•
��: � rr r� r,• � r = e
of
/
57
r 1 rt
Iffal
t:
t
i
1
1
$� A
1 ..
Exhibit C2
BONAVENTURE REALTY GROUP, LLC
Corporate Dossier
Mm
.� � mac'„ '•�` wo� �._-, e, r ® � - -
.........
p,
r,
4 O P v A
. a .
------------ ..
..............................
14
_ r REALTY GROUP, LLC;
BONAVENTURE
RHALTY GROUP, LLc Bonaventure at a Glance
Overview
' Bonaventure Realty Group, LLC (Bonaventure) is a multifamily real estate development and
property management firm focused on the east coast. We develop distinctive luxury multi-family
' communities in great locations, such that they can operate at the top of the market for decades. Our
long-term, value-oriented approach to acquisitions & developments has produced exceptional
returns for our investors.
' Company Prole
Bonaventure is a real estate investment and asset management firm specializing in multi-family
asset management, development and redevelopment, primarily on the east coast. Bonaventure is
fully integrated to oversee every phase of the acquisition, construction, management, and
disposition of our properties.
As principals, the Dunton family has 40 years of experience investing in multi-family real estate in
the Washington, D.C. metro area. Bonaventure was founded in 1999 by Dwight Dunton III as the
' active manager of the family's real estate interests and has since grown to count institutions and
dozens of high net-worth individuals among its investors.
Bonaventure generallyseeks to develop multi-family projects of quality construction, in good
locations and with easy access to transportation systems.
By combining great locations, distinctive architecture, exceptional amenities, and sustainable
' materials, we create reliable income producing assets that bear fruit for decades.
Bonaventure focuses on long-term wealth creation and value. Because properties are held long
' term after completion, we focus on creating lasting communities which are continually well
maintained.
' Bonaventure currently manages a portfolio in excess of 5,000 units.
1
Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206
Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com
Bonaventure at a Glance
Development Design
Our signature developments are meticulously planned during
the design stage. We pay close attention to the "little things."
From unit layouts to refuse disposal, it is our priority to
' provide an exceptional, luxury, and worry free environment
for our residents. We realize that every apartment
development is not the same, and that in these important *}#
design decisions, we are helping our future residents to choose
our communities over others.
Construction
Bonaventure specializes in developing wood framed communities,
which range between 3 and 5 stories. Most of our projects have
elevators; and some contain structured parking..
Bonaventure is also experienced in complete redevelopment of
' existing structures, for both functioning apartment buildings and Y ;
historic buildings.
' As the project manager for our developments, we ensure that all
projects are brought in on schedule and on budget. Although we
have staff on site during construction, we hire a general contractor to
manage the construction process.
Integrated Property Management Operations
Bonaventure has a 3rd party affiliate which manages all of its multi-
family communities.
Our formula for success: -
• Provide superior customer service
• Focus on residents and staff
• Concentrate on operational and financial goals
• Put emphasis on employee training, development, and hiring =k
d,
1 /
Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206
Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com
Bonaventure at a Glance
I
We provide our residents with upscale living through a strong amenity package that encourages
' recreation and interaction on site. We also offer upgrades to apartments depending on the desires
of the resident. Here are some of the features and amenities of our apartment communities:
tApartment Features&Amenities:
Nine-foot Ceilings
Garages
Elevators
Sunrooms
Balconies or Patios
Gourmet Kitchens and Breakfast Bars
Stainless Steel Appliances
Granite Countertops
Full-size Washer and Dryer
Loft units w/Vaulted Ceilings
Bay Windows
' Controlled Entry
Built-in Computer Desks
Common Area Amenities:
Clubhouse with Fireplace&Lounge Area
Resort style Swimming Pool with Gas Grills and Outdoor Fire Pit
tTheater Room for Viewing Movies
24-hour Fitness Center&Cardio Room w/LCD TV's
24-hour Internet Cafe equipped with Wireless Internet
' Rooms for Bicycle Storage
Trash Disposal Chutes inside the Buildings
Extra Storage -
' Covered Parking
Office 2700 South Quincy Street, Suite 500 Arlington, Virginia 22206
Phone 703.567.4590 Fax 703.832.8319 www.Bonaventure.com
Location: Virginia Beach,Virginia
#of Units: 215 units+22,000 SF Retail
Project Costs: $33Million
x ' TIMELINE:
' is Site Plan Approval: Dec 2008
Building Permits Issued: Dec 2008
Close with Financing: Feb 2009
J`. Break Ground: Feb 2009
j p First Move-Ins: Jan 2010
Construction Complete: July 2010
- We-4 a ' _u Stabilized Occupancy: Dec 2010
The Cascades is an A+ community in the strongest submarket in the
Hampton Roads market. In addition to 226 apartment units we have
developed a mixed use component with 22,000 sqft of restaurant and retail
on the ground level. The property features finely appointed residences, -
upscale project amenities, and a convenient, accessible location. Residents
of the property enjoy an abundance of upscale shopping, dining, and r
recreational amenities all conveniently nearby. The deal structure used for "
this transaction is a Joint Venture with the land owner. ;
Development Team:
Architect: Humphrey's and Partners
F� t.
Contractor: Marlyn Development
Engineer: MSA, PC
Legal: Sykes, Bourdon,Ahern & Levy t.
Lender: Wells Fargo FHA 221(d)(4) HUD insured Y`
w? 9•
BONAVENTURE CASE STUDY
REALTY GROUP, LLC
��*► � �,.-^+ems... 'IRd 4`�,� p� � .:.:: M;
I
0
,
i
NM
s _
4 4
�nh r I
9 tK til v �'
f
................
rac ukti Msay
"
a d
ativ�.�R
1.
4
,
k•t" 1 a
f riYim . .
re
01
�r r MW loot OMNI look MIND @owl lool OMNI OMNI No@ lool Now loot 11=0
s � �
Towne Place at Greenbrier is an existing 78,000 specialty retail development
consisting of various upscale shops and restaurants, such as Jos A Bank, Jason's
Deli, Chicos, and Surf Rider. Bonaventure will be adding 215 luxury apartments
featuring upgraded finishes and features in two buildings. The 4-story buildings
have been designed to fit in with the existing retail. The project will bring to life
the walk-able mixed use reality desired by many planners in Hampton roads.The
deal structure used for this transaction is a fee simple purchase. This property is
currently under construction.
Development Team:
Architect: JPrice Architecture
Contractor: Marlyn Development
Engineer: Engineering Services
Legal: Kaufman and Canoles
Lender: Wells Fargo FHA 221(d)(4) HUD insured
Services Rendered:
Development
Location: Chesapeake,Virginia
#of Units: 215 units
Project Costs: $28 Million
TIMELINE:
Site Plan Approval: Mar 2010
Building Permits Issued: Aug 2010
Close with Financing: July 2011
Break Ground: July 2011
First Move-Ins: May2012
Construction Complete: Sept 2012
Stabilized Occupancy: Mar 2013
_..,.+...::.
BONAVENTLJRE CASE STUDY
im REALTY GROUP. LLC
IIW
Location: Norfolk,Virginia
#of Units: 183 units
Project Costs: $27.3 Million
Services Rendered:
Development
v
"17
Promenade Pointe is planned to be a resort style community on the banks of the
Lafayette River system. The 183 luxury apartments will feature upgraded finishes and �' =
features such as granite countertops, gourmet kitchens, lofted units, vaulted ceilings,
Sr
and expansive water views. In addition, we have partnered with the City of Norfolk to Nil ,
offer local students the chance to learn about the local ecosystem and wildlife, at our
on-site wetlands. Canoes and a canoe launch pier are available for use by residents TIMELINE:
and local schools.The deal structure used for this transaction is a fee simple purchase. Site Plan Approval: March 2012
We assembled this infill site and led the rezoning effort. Building Permits Issued: June 2012
Development Team: Close with Financing: June 2012
Architect: Cox, Kliewer&Co. LLC Break Ground: June 2012
Contractor: KBS First Move-Ins _Sept 2013
Engineer: Hassel& Folkes Construction Complete: Jan 2014
Legal: Kaufman and Canoles Stabilized Occupancy: Apr 2014
Lender: Wells Fargo FHA 221(d)(4) HUD insured
BONAVENTUPd CASE STUDY
REALTY GROUP. LLC
Exhibit D
s �' F Sr. '' tryL• T iYf. � -=`�rx}"P�p t f �. ors r ^.+A�
t,Y�.'/'� '•1 Ir f'�`��i'tf��. - r Grt��K, �,<j ;>,t �•��g'71;:. _ � ` �" �. �1 ^•r� -� L
I..•4 r r � � s."...,+a r tA', T x# k s -( n.,k. +.. jr .-0.'. R.. ,`-. � � .
t ;f�r s• r`? �A S+;
G ra 1
r.
I
,• -• ,: .... tr tt _ ,�,., ,. :: � �,a Ors @1� � �[�l `.. I'rwt'.
(..: '.; , ••'r7t.- _... y r -' ..- .y.. .. .' r,. .c„ to J' s' .I tr ;[ nr+" ff,� ,1,�. .
s 7,': k rnv :. ,. .,. ._ '.- hsv _.:. .'"�'-"�„r,�,c:_+�.�_..._� :, ,+r. •l.. ���.. rl - p ,f�;� L,,r7r; '•1 :at( 1
. ,.., J'.-:� 1,:)I �F• - �;4� p,+., a. .-ttY.• 1. �'S• Y• B, !•:al.�.. '"� I 1:., •, A w/(.
I. . �r .:.,, ... _.. '. 'rr ��' -, •. :< ,f-,,rr.r :...,.'•� � ,..y,. ..,. ,� �.r� ,n!�'.c.. 41.J•.�p f.: pr.an }j(,:i
. ..,�� ,M ,,. y :. _ .�IS.�f['�'i.r: r_. .�.•... t pyyl�' rrpy
Y<,-'` '.�'•t4iJ, <.;r.`i':. 1 .1. J ,d - � -_ . a "g � •L,m a' ri;!� t �:._G� � � i� �• Y-.:Y k ''' r., ;
..k�� -,�' �I gf I ��1 :,cg�.r, F•ar y r i � �u` k� r: -a�1. .•�;7AM. !r
'1 . :an 1 4•�,q .ES r �
t �. ',. -, � I �:,� :�: 3' liar. ,�., m,�••.
�� D•"-tR.. r: 6 1 'e..�. i:sr..�t,., -�', ,rr�; ,�,. ;,��.
.
N L' 1
�; r„ ,.rf,: "'•�h,.q _. � ,,• ;,; ,.. �� r�' � ,R;(r; ''i, tare: .ik—' i��i'. i�
I .'i' I ��,! n.•. `
,
JAA
^9����'y1�,�ra.
-
.r
.• L
N pty^ 1I
I I
.S
i
6 t:r�ar� :sr.�;.,�t�i•a�• •. _ +..... �.. __ .;,. _1 ..5. ,I„� St �4Y:I�fI _ �io'e�-^qr"^ — - _
;"+,�f•"^�� .,. ... ,4. -,. � ;�.. : '. rs d .. �ri�`t v� ''t _•r. r Y xan,r•W„';�,_.�
:b t �� � �';X,.r, ,., ,. cam•-+-,�. � ,=i. �'y '} �.
.t
- �::.-���a,L, .re".x�.'f"S'd "r a�;t,4'" '�"' .• ••+1.idt!'' r � ._ ... �t i ..
r
,
• Ar i 5•DI'��Z y)�l'A.�,�. rfi�.. ',r;" _ T ,'}+.yr /.•:.`f1.1C�'iF ya / 5 •` .., y :
J..+f..
tout
- �n n�„ .".. f, -.v,:"s;a. .�.., .:.LA1 r � „. !".. ..-. -�.. � 1': -,,. I ..,-. •. _ .. - �• .: „•• -)f-.. �:-� };• A.. l', 1' ,•_ .`.�" -'1 'I
, ,w,r,.-e , I;.t.., ..,.- +t i+•,� .,�,..t; ,.,r., . ;mil_ i 1 _i r. a t �:.
�'I(til�.:� 'ai�Q��;D•�;h, V"V]1�1tdisoc' i' t lectl
+. ?'•ts is r ` �.;r tp ,�r o � i ��._ !I t � ..
,
wig
� t '�f ax��, •(� 37A�1 �i it... _r r ���yrytl. ".E. _,
`i' r'�s ��\y �} `:� , �`FJ1;' �c :,� �/..111 •f o r1Tr�,,,,.s.1ie.. �""*�'�'�r -
VCR
•i Lr,`R17•7i � I ILI-AIL.' � .�:' �1r..;'r •r.` e e•` 3 :, �" .
�Orj •� ,_ I I II I'I' L)�.., Il;,,t I �'.'.i II"�� L.
t' fr I I I �I•,' J —
' ,� K, •� I � � ,7 i
t� F. .,....h .,o '?ram•1 �I. � :I ,. `fRJ-�, s 1M 1 �n I
f PRO
.i�f1,. d ST'„�s.`.Lid. - _ ',ij'�j. �:r• �... 1}`)Tr., ' � I if
gl..•� ,yrr�, ILL t JKl _ 4 '�` '.j � to -
-/
I >
I'
I _ i
i —
K� �
ry
MEi { ... .,l � - ;: +:. .h•' ��;;. -.' ��t.A+�.. =`h. E�'.'�{ �;�t it,; i � �cc�l. y,,, �I ':V. ,.
�V a r
f
r
} <�� s � 7ar `..'� E -talg•r J s rt?: .<. 1` &7� _w a— I I!,
77
rf,X
yyr
- rw '�`.,y s � '�s c• .v'N'fts,,, �_ t_ ter, •,:- As ti _ .er, �.+:-A
necticu
e
__—_-..un./JiY:,"slLli'S.'" y. �..:., _ ... c. - 2•�ra_�.c�C�
i -
1
1
i
1
10 /
1 I ,
r -
4
r
/ t
Al
x
I•-,,. . -..., . ,`,":_, .A -.,� ,'..� `�f .'�.`...�s`•t- , � :.,:,�...... .., ,- , ,.;.. mot." r y... 1.. } � - a� 1"^,t. r� --yi-'
rr
t- � �:;n / " :�Y" � � '" � 'ri•:-:'" 'e�`,�.a. t M1. �� � �[1.. h is a.
r r
1 a�
n
M1
�s
N:
„
, 1
I �
Exhibit E
�\\ f' �� • \`` +1 t r/r !' : / I : \I ;.. .� �\ '� _ �_/ ti_ r--i 1'' .tat `� - ..J /.. ♦ _, - -
,.. t r ♦ ♦ `1 \♦ It !\ I ,.\ ` �.}' 1 '., f - I,r- __ L� J �1115 - _-( -�L ':\ _
t 7. �\ \\\'1 \� , ++\ 61 / , / +\ \ ♦\\\ a� 'L� \ ~. ]$ 1I � � __ o<�y. �< � � .�'r(o." -r"l-__ v J -•ra--
\♦ ♦ I /_ t ♦1 I �1i /- � __ \ may' +a t ,J `�• IC1---
;♦ _ �•\\\\ t / % �1 .EKISTINO.,
a\ LDI SIORM
T.F.1169
r - :\ W \, .♦ 1c 1 `. t__. \ rrrr ♦♦n� INV..100.2 E-u •. PA t\,' J ''-G,J `�-\ _ z____1�\lt P /� Y to...
t ' :\�' \'�``\\ f1 \♦\\'\ f __ ----- -- — mv'.109.i(w)
CO 1EE`STNGLa1, f.at'//
---J0`-T2`CPP
-J-� `\ ♦: ``'.♦�i J \` �_g' / TYPE 1'C CATCH 4),r�=,+cy�_
T1BS-(MATCH (STING PAVEMENT ELEVATION)` <1j! _ �_ �YJ- X � �'" P' }��� "��t�+ -+��"••� _ - _ _ \ 4
INV.T79.8 f t'_�T �..y, �`= �.-.•� �:! it�-i-.0 / " T- _. ,�- aie-i+�r_�_�t _ � � T 1 .H�
18'-12"CPP
J i :/'' - `.`♦�\ ♦,\ l I ,/ EXISTING,PAVMENT AND C�RB l
MEET EXIS
..v _ w+">• _-`'y t `_' _Jrl / (
-TYPE'C CATCH BASIN / % ) ! 1 -;.p'r �
1 ----_-i' 1�• (
\� \ T.F.118.2(MATCH EXF7M1,PAVEMENT•'ELEVAMN I - Li• _ �•..en. I ` f /•� P,,,.• r J•-o / . a -•-'� ,1 a i•
'\
\ /r `�.- _/'"� \..- - ✓ terra_ ��.. .Y. ,' T t 1.` - . I +4 S .p '4 _ 1\ ` \1'�♦ 11�3t. 'i t
r ___—BRUMINOUS:CONCRETE CURB }• ir,. �r -- , _ -�.::., �.�J :-,\ �,' ��'�.� 1( 1�.
Jrr /� _ - `�� \♦�� r-r"'i i _. -. _-t+e__� l •< - \'`������� 'j
�♦ r��J -.---- ` ----- -- � / - 1t ���\�\�\_ � - I \' �.\ It,1. ';
rrr +•,,/` I •+r' ' �• _' �- '" .+1+`� .�\ I II l V
-. .-_ --- --
_ - � i r , .�•- - ���\'"'\�� '`I'` I I it PPP .��`� �i(f'� -'CONNECT WATER SERVICE MAIN-- r•
ta+� � ��,-\�\••�• ____ -! .--J._
!/
� �i/-./ /� -+t9---_--. -_ --a-:•--'_ 7EYPORAR73'9(Nu10US CONCRETE WALKN I :����"�Z` i� '4''•�.-/ /f/ h ��.
-. I _ :I�`-�\�Z �� � ♦ { I F
UMPORARY.2V ROAD _._-.-_. l / I / `_. --/
2.
I 5 e � � ` t '
- -'\, /J//%/ +- tz- -_ _ _ -taa-__ �, '/ ,. -'-. 'D c t --o � ----!T� � 1 /t• ( _r1]
If
It
._� i� �_- --^?a--.•-, I, _ '-ENISIING' [9 \�_� __ —— - — -11II I�
: I : __ _t15-- -- -- ^..ra�� /�•t? RSAD`�_`ct�_ _ r' ��1��= -_ - -- _ _ -.�Jl�'I� � 1'/�R:..�.S��I
-_ _ _HANDIC
- AP RAMP_ _,--t11��� !" e-- _.•�"�� _ __ - -- f /�. '1 +tt 7 f..�
uEEt EXysTJae ISAVELtEM AND cuae
'
•\ -1za -It � -,�
zg -• \� e 1_- II /%_yo ��...-_ .- _1--- 9.If
(OPEN
INN. IZ "'+r
PvictEf fUTTUPE ROADJ-
`♦:~ \ n1 8' TEES'
EXISTWG SAN.
COT
AV¢AENT \.%>' \ CONNECT WATER'SERACE MAINS �♦ `1 i - -_ t'
1 ♦ - i
L.A. FITNESS
- PROD.UANAGER: ... -
SEAL SEAL - - BDALE. HORL: 92 - EVERGREEN WALK,LLC
'. : .. CHEF DESIGNER:iNER: DATE 09109100-eel AfiO
REYIEWeO BY, DATE VERT DATE:09109t20ti
DaTUM FUSS&ONEILL ROADWAY PLAN
" HORz: EVERGREEN WAY EXTENSION
m 1. DA'0elN11 T2D COMMENTS VERT: - 196 TIAM1TFOI;D ROhU
MANY111STL'R,CfWNPl`fIf.170UNn �+ e�
o No, -0ATE EBCRIPTION By +o z®D =461wn TOWN SQUARE AT EVERGREEN WALK VG-q 1 12
R REYlstons - GRAPHIC SCALE SOUTH WIM)SOR CONNECTICUT
:
1 CONDITION #1
Y / " !n,,,,4�•,.a r,: .,l t Evergreen WalkLLC _ . +e
F rs.
It
F r
13
6
cV# 0
No
77
PASSIVE OPEN SPACE \ ,,.� 1 - / I •/./' ,1
121,160 IF 2.77R
7'
• ...�>F vrr ��Lrl �[l QW
/f \` �caac� � a- l 1 7�.��rl.r �1�,!", If� ff !(1N f'I �o8�zs.� 0gg
�/ � .1 � `r • ', �.. ��tr/,� IfIJJ]l� '�C;(��il,l'/" i�Y� ��� Y+
LLJ
IS g
fag€ M}g7
°
✓1si� 1 se
1 i THE TOWN SQUARE AT EVRGREEN W,AIK
Residential Commorciai/Communfly — `�" P z4 S t
Builiding .+#of DU Ff.Area Floor Area
f
B Resid. 108 DU 102,940 SF' I _
' g< C Resid. 92 DU 91,135 SF 1 ' d Du111nr>,D-
• 0 N,a
D(Hotel) - - 121 Keysr74,840 SF 1 ts� 19,094
vs F Future - - 6,000 SF o m�l �� am, te,eee l
0 Future 4,800 SF Our. te.ees
H Office 20 UNITS/28,400 SF ° i roof:7aas9sF
Total 200 DU/194,075 SF 113,040 SFLL
��L /((] i�G_` /•/�rf
PARKING. ✓!I>�ll, '. o U
Required: ° fI)rf�. ': ✓:. i W
Commercial 9,800 SF 14.5 = 45 Spaces `l iT�l�j jl n� L�
Residential 200 Oil x 1.75 = 350 Spaces
' Hotel 121 KEYS x 1.0 = 123 Spaces soo
,EMPLOEES 10 SpacesfffT F,e
Office Conco.28 400SF x 4.5. _ 128 Spaces rr, � !1 I l ,
G 10 4 \ i �Lit _j
' a
Total 654 Spaces is 7 's s ( 11iW 1ll1 R �' 5 > J
Shawn: 707 Spaces J�f1TTTTTI i 5 Z Y
Secured Parkin 228 Space
s t iUj
General Parking 479 $ aces �. . MMf f* 12 P. U11TfITiI °P I 1 _ /� Uj
P _. ° uP TUR! -�.•�.- F.F 13&0 'L� r=u�- m iLt
�!q gqp 21 0f0 S.i. I 1 W Z
OPEN SPACE !1�, e(.Imo " Sj 1 IT i { t I �r U]11�^ (7 LWja
:—_
Required.200 X 750= 150,000 SF 3.44 A s��r��c� . e E•• '� I i l l F-�� ® ' ll11L i
Provided:Active = 38,400 SF .88 A IFFY lei \ /^ • . .sra, — — W
Passive = 121,150 SF 2.78 A ATp� � ��RArou ; > ttl
Total = 159,350 SF 3°66 A �nPry qt � TAM z z LLB Lu
t �i3� -` —_ o 0
�„(c ��� �e 1jy�NF -•�� (� ll I{1 i�=--i_� f��� a v r g
K � J 9,RSSi�fifrONF,,•/ '� 1 1 , f 1 (r,l Qu S P—�
S,jUFFERTORESIOENTIAL� Y � I cxEcr�o
- ..
• -' tare;.o a4.3 n,:s na) ��
a I •� ♦ I ((�� u � ` _er nenWalk L � ` ^a
- r w"� �,,,i a f N,.,,I i,�r•"r _.. I ✓i /` i ' �� \ ��, - I ��
1tr U.
/- -
>✓ - `���I;1\ �,\ ._..,` ` PAUIVE OPre SPACE
� t _ 121,1110 BF 2.77A +r( 7 ,
lr , caacRt r - � 7niraL_L ! e0.eeo�s. 11,051, U9�
I If
If
1 - THE TOWN SQUARE AT EVRGREEN WALK i!•L�
J logo
Residential Commercial/Community �` 2 / o�
Bullldin .#of DU Fi.Area Floor Area
_• _ �• • � ;
B Resid. 108 DU 102,940 SF �`'
C Resid. 92 DU 1 �9 ,135 SF a :
! - Oulldlnu 0
D(Hotel) - - 121 Keys/74,840 SF i I ° i�x i eiz
E F Future - - 5,006 SF
A ,G Future 4,800 SF 2fe: 10 000 1€!C ��� ��/ 40n ,e els
H Office 20' UNITS/28 400 SF Tote:74,836SF
V/ _Total 200 DU 184,075 SF 113,040 SF 477/
-
�Q
PARKING: ,,,G J ' o
' Required:
J r > - ice, u ; �' W
Commercial 9,800 SF x 4.5 = 45 Spaces o ��/(/j ri , '
Residential 200 DU x 1.75 = 350 Spaces
' Hotel 121 KEYS x 1.0 = 128 Spaces300 _ /(jam -
_EMPLOEES 10 Spaces e i
Office Conco.28,4008F x 4.5 . 128 Spaces 10 a *; �� �- r / J
Total 1e '
554 Spaces s, xe %
If
7 a �1 rr II ILJ Z � y S
' Shown: 707 Spaces v j U h?7T�77` ,/ �� 1- —f
Secured Parking 228 Spaces 4 %' WWUI W Y
General Parking 479 Spaces yrifi� I :P
C11�NfN o
t�OTUee%. 20 eP W- *�>
OPEN SPACE _). �/ 1 �/ li I z,om p® m
t l.f. n/ Z
` l F I I nTfff � o f I-� L{� W
' Required:200 X 75ti= 150,000 SF 3.44 A ���_ ec Pfa,r i E. - r a `.;��v LU
Provided:Active = \ r
s�38,400 SF .88 A iFFfi�d� '� /— . . , �. \ n (.--- --..1���i►-t1ll1 �� W �
sra
Passive _ _ 191,150 SF 2.78 A ATQ r F/ `�",r�+ao a
Total = 159,550 8F 3.66 A HFS�nfiNt >
' �� �q<ro��j� � --�,, • • �` �- - - TAM �� W Lu
LLJ
ACiLFJIOA}'////A�1�77eE016jeir�pjZUNF/ 1 �.. u�y�l/ - -1��,—^-- n
4i r //75 BUffER TO RESIDENTIAL ZOPIE� �jJ�(//.// /� _ ((�TTITCJ 11 I i �f SP_
1
Evergreen Walk LLCs a « _ - -
f W a
L
If
/
: / ► \ (, ___ ' 1 emu`
PASFIVF 0PFM 9PACE .. i 1t, 7-�� -•�..�-, _... f �•/'
121,150 6P 2.77 A i ,r I ' 1/�T •\1�• p
7-17
� I1T'"+tlTinJ}lj�
�..
i �f//' Apt �anrrrr�rri171,-U�/ ffl flj ffi �� g
if���/ / �'+� ) •, r is `^ . ''`�.��LLI f-�r' i� � �f53��
i 1 ���
,F aoo
/ B�NdinOW#LResidential
BU eRFI.Area VRumm Floor unfty �, '�,. i �• •. 2 �� \_ zs„5�sr
g 1 \ L
i B Resid. 108 BB 102,940 SF
� �g< C Resid. 92 DO 91,135 SF 1 - `0 �� euildinn a-
6 0(Hotel) - 121 Keys/74,840 SF I / �f� ~ isei9,09< `
F Future - 17,619
- 5,000 SF 99 t > \` 4ew 18615
e'ee6 /
0 Future 4,800 SF L2C e Pa '7
H Office 20 UNITS/28,400 SF s el oe,r+'j F!/ C? rotor 17�4 6&B sF J
Total 200 DO/194,075 SF 113,040 SF Ulr- 7 /•9/ �
LL
PARKINGc
i Required:
Commercial 9,800 SF x 4.5 = 45 Spaces �/ s
Residential 200 DU x 1.75 = 380 Spaces —
`
i Hotel 721 KEYS x 1.0 = 128 Spaces soo \� �� �r�`-
_EMPLOEES 10 Spaces a
,
Office Canon.28,4608F x 4.5 = 128 Spaces _ e l` `1 I ;. J� ' g J
Total 654 Spaces
Shawn: 747 Spaces / z
i - ffl zY
Secured Parkin 228 Spaces �; ,P { �' � W
0eneral Parking 479 Spaces mp^ tie aP. i BF ,� f
III 1' 1 I 2�Ato 6.i. -� a� a z
OPEN SPACE 1
�-�`} ( O+ auenwc eooe ` I l 1� � W
i li 1 s me
Required:240 X 750= 750,400 SF 3.44 A
Provided:Active = 38,400 SF .88 A /t ifl6rj3_.` /— srA� �_ ;I' I — I-- ; " — lll. a W
Total Passive _ 159,550 SF USA l H T e q SR C6 W LU
iNT/q TAM, 0 Q
B,Slyl. SfNE
APeT71,g9 E610XDe�E '� i 1 �. -�.�.� \. . .
fiq �m 1 �1,I SP-1
75'BUFFER TO RESIOENTIAL j j `
i- COWTION #4
r
�. • / / ♦ ` �li t a. -.�.a �,:>,.yi \� Evergreen Walk LLD
t I \ �� -.\\ _ � _ _ Faun
PF
JAP
Of
oo
P ve SPAN SPACE' • ;! , \� \\`!`` \� 121dSSSF2.77A 7; y,,� _
� 1>7� II17TIT
t. �� - `�e, �gNo •\ \JTTITFI -r n r �r zp
' rn� LCL1 1 n7T� 1 1I,r 3.
. P
r,
� t11111t 1''7Tlr,��
23
( J
' THE TOWN SQUARE AT EVRGAEEN WALK I:(`- - • � /�� 1�-1 �A
Residential Commercial/Community
BulNding .#of DU Fi.Area Floor Area � 1
' r � B REsld. 106 DU 102,940 SF I �� •' yam •• e�umnw o
�B o C Resid. 92 OU 91,136 SF I 9 �.�'�� ,, W S,Ss6 _.
/ �s D(Hotel) - 121 Keys174,840 SF I >
F Future - - 5,000 SF s4 arm 10,5ee V
�— On te,eea
O Future 4,800 SF 1
13�C m6.000 ' ��'. Total:74,S86 3F
H Office 20 UNIT3/28,400 SF snoop
Total 200 OW 194,076 SF 113,040 SFVt�I
PARKING; t �� ( ��f//�����71 �1�1' ✓'
' Required.
Commercial 8,800 SF x 4.5 — 45 Spaces
Residential 200 DU x 1,75 = 350 Spaces
Hates 121 KEYS x 1,0 = 128 Spaces 300 •" , � � 1, I
' _EMPLOEES 10 Spaces y s
J1T(i 171"rl "'\ �` Y
Office Conco.28,41103F x 4.5 = 128 Spaces ;u °° f ��' �' r' ` -` , —i
Total 654 Spaces (1J111LLL11�
• UUU��f�����I��I��IUUU
�,J7Tf1717T1i
' Shown: 707 Spaces
Secured Parking 228 Spaces W Q
General Parking p 479 Spaces Mim.� a _ 6n ,�6 ._ _ / LL!
'�. Furuxe /28 SP. vv:,2ao
1 1' 21Ato!i. � I ® �� --�
1 =h
WOPEN SPACE o
Required:200 X 750 15OA00 SF 3.44 A fa If
sr I 1 S
ifil II ffll(,I j— L[lll W
Provided:Active = 38,400 SF .88 A �F�� \ /- • . .arn7 w --— ——� Lam_ v }
Passive _ 121,150 SF 2.78 A FgTp� � ��Enawo . w.0 W W Total = 159,550 SF 3.66 A gESInFNTi� TA
"Z
' _ zOR
R
WliLLL, ,
/////// T�//AF+�irgaEE9atlay7
SP—1 15'HOPPER i0 RESi0ENT1AL Z08E�% ! -�`�- CHEME6
�% I{ iIitl7liiIIID1ftHil[�
Ev r9Teen Walk LLC _ r E
10
Op
IN
z ��f rim
f U-u(CrlQ
7=7-
_ . � . . 3.
1 „ _
P8S818E0 SPACE
\�.`"��� \�•� _12t,180 0 EP 2.7T A -
44 . 1CC
- �, o l,' ,
fH j7�, )'' l (lye-l/}j
\ �.
In
/ THE TOWN SQUAREAT EVRGREEN:WALK: is L`�... •' •
lll �f
Residential Cemmerdai/Cammunity 2 �
se do �
Bullidinp .#of DU Ft.Area Floor Area s.F
' B Resld. 108 DU 102,040 SF
C Resid. 92 DU 91,135 SF_ i A Eaalidin6 E.
DHotel - - 121 K s/74, x ta[>
(Hotel) By 340 SF � I • � ' _ / .� Intl 18,88� : �,
F Future - 5,000 SF 261b 17,611
OFuture 4,800SF e, I3� mil i. au0a•' ;efaTWO SF (, 0
/ i i
16
T Total
200 DW 194,075 SF20 UNITS/113,040 SF 28,400 SF s
, �
PARKING. � G' � LL
' Required: e �( I _.___=^
err ~� ✓:,
Commercial 8,800 SF x 4.5- . 45 Spaces ' / �lr/,, �)j) LU
Residential 200 DU x 1.75 = 350 Spaces �
r n
t Notes 121 KEYS x 1.0 Sm 123 Spaces aoo
_EMPLOEES 10 Spaces
R ea 1, Y 1 I r lil \ t o Y
Gfflee CenCO.28,460SF x 4.5 _ 128 Spaces fo
I
Total 654 Spaces
i I
4 0 �
n-1•�111-1111,�1-1 Il
Shown: 707 Spaces ti� ? 11 ��
-�
Secured Parking 228 Spaces • ;i �Jn
General Parking 479 Spaces ` rrm, N fG 100
_ ,� — W
R2E. lam F.P.126.0 ❑l� v.-0 n•-H ® J
ewa.a 21.010 S.F.
OPEN SPACE (I I iiJ z
`4y4' f W
Required:200 X 750= 160,000 SF 3.44 A '� Eow
I
Provided:Active = 38,400 SF .88 A ,t'� , ~�` Sra ---_ �� �' I 111. g W C7
Passive 12i.130 8F 2.78 AR tpi�tF, '�- ��"�7inao � �` - " -- W
RFsr c�,/ - n,o }
Total = 159,550 8F 3.88 A n�Nl.,��,�, -- , TA u, W >
WE
/ LL ,oars
O,RESIDaxn� rrrm,l III T SP-1
7S'9UfFEfl TO RESIDENTIAL tO,IE����//f1 �
Evergreen Walk LLC
.ate l,r°'1•••'�w+. .^ � �/ `� `.`` __� l/ - � � � _ — ��+
op
in
R' f 41
PAaeIY,OPEM,PII,E
` �.� 121,1 W 9F 2.11 p �..._ O.1" ]l})T-�
11
,_
--....
IT,?T��
r
THE TOWN SQUARE AT EVROREEN WALK ` ' 68
/ l l
boa
Residential Commercial/Cammunfty --�.� �� .• 2 / ze.�s� i
Buillding .#of DU FI Area Floor Area
8 Besld. 108 OU 102,040 SF ,
C Resld. 92 DU 61,135 SF - �'� '�;�, _ WNW a a -
D{Hotel} - - 121 Keys/74,840 SE I // ~\ Ist: 10,6e4
F Future . - 5,000 SF / 2wh r,s12
ft. isle,:
B Future 4,800 OF 13l, Intl / � 4Ur. 1s , t r
' H Office 20 UNITS/Z00 SF e / Total-to>ea sP C'
u yr
Total 200 DUt 194,075 OF 113,040 SF
, � Q w
' PARKING:
Required: ` �! '�J
Commercial 9,600 SF x 4.5 = 46 Spaces l'> j
Residential 200 OU x 1.75 = 350 Spaces + �i���T �•' '`tip /,
v
Hotel 121 KEYS x 1.0 = 128 Spaces 300
_EMPLOEES 10 Spaces _ Ci
Office Conco.28,4608F x 4.5 = 128 Spaces
1a •• _ I�
Total 654 Spaces ,� is - / � ( j (VwLW.1 111 T.
` / / erfs Q V
' Shown: 7(17 Spaces
Jfil?TT � 4i r
Secured Parking 228 Spaces General Parking - %Wi 10. 'Al
W.12.
21,010 s.a. w Z.
Z
OPEN SPACE r I saga i I J'I I i 6 L1w
J
Required:200 X 750= 150,000 SF 3.44 A '�-� . . • ea"E'.7T uN � o ` 1 I • �i. MNi; .�,.
Provided:Active _ 38,400 SF .88 A iFF,jaar>;�� `� �— • . .sTA,� �._� LLJ
Passive 121,150 SF 2.78 A �q to `nAwo _ �
Total = _169,550 SF 3.66 A q�sJnFry q R6� eE c__._- —_.___,� -- TA
z W w
j rr wE 0
/r
LLLL
/,��, 1� 11l �f I i . I TTIT>Z SP-1
75'9UFFEfl 70 flESIDE...Al MIE/ McKED
CONDITION #7A
-
��" tn,:,f-�,.a �,:,-yl Ever9roeri Walk LLO ( �Y IS
7.
I �1TrTT73-1—
J*
PASBIBE OPEN SPAI
180
721. BF 2.77 pIT
//�J,J J'I ffr ff/111 r - -•bs;.-.__./ ! 9
z
,, � ' • °£�p�A���D----_._ � �r��irl��-�1((t� �!�-JrU f 1o.��s �� s�������4�
9 e!,, $Jill
/ �� 1 uU1L(lRr KI sx �
s Nib
SOS. -
/ THE TOWN SQUARE AT ENGREEH WALK
�. Residential Cammefeiailcommunity 2
Builldina .#of DU Ff.Area Floor Area
Ig B Redd. 108 DU 102;940 SF _e�nAin,;—D-
C Resid. 92 DU 91,125 SF { // xnte
> ^�f`
D(Hotel) - - 121 Keys/74,840 SF ! 1su 19,6942nm 17,012
a F Future - - 5,000 SF m�l 4 . 10,680
G Future 4,800 SF ,> �3�F B F� �. Twat:74836 OF r`
H Office 20 UAITS/28,400 SF eaoBsr
Total 200 OW 104,075 SF 113,040 SFLu
f Q
PARKING•
Re uired: ,
Commercial 9,800 SF x 4.5 a- F 45 Spaces
Residential 200 OU x 1.75 = 350 Spaces
Hotel 121 KEYS x 1.0 = 128 Spaces 300 ? Y
_EMPLOEES 10 Spaces e
Office Conco.28,4603F x 4.6 a 128 Spaces -tc 4 9+
Total O V aces U� J
o.
' Shown: 707 Spaces ` i—.._._-... �/ / o Z
Secured Parking 228 Spaces li +l� 81 n(,pp 1Tk �: / f"I')
General Parking 479 Spaces �2eaP. �` P.F 12e.a I \�� — W
_ PUTUR!4 19 I 21,010 S.F. I r -� µ'1, 1� Z
�•�gr�ggspG/ � i 'N +f������ I R � ( I � -� "� f' J ?h• 1j,- �
OPEN SPACE - ' - en �"N( � I 1�1 I ITI I7TiTf U ! ! I .a .6°°° 11" a W
. .._ • Fsff4117 - ,
Required:200 X 750= 160,000 SF 3.44 A sf�•r�„ . . „Ne� U`
f!
Provided:Active � 38;400 SF .88 A �FFFR�jfi�� �•� . , /'__ . ' -sr^ wo `-.. . '.� � --------- l �—_-� - a a W W
Passive = 121,150 OF 2.78 A i ro AFs ��>' - � }
Tote! = 152,550 SF LBO A W
nFNT���? ' �� to
o�
Y�7111 I n r OanNN GRF;IeFRIp),TNf� 1 1 MGM 1 I !i,/' '"F SP-1
r/75'BUFFER TO RESIDENTIALJO L021E// CONDITIO
! cxEcae6
i
—
� .•` � 1��%' I a�,,., .-:,s �,:,„yt Ali 1 `� Evergreen Walk LLC - -� • T
1 i l t
r„ ♦ �"�r .♦ ♦n�u' ru; vie,. ' .\��_� _ �
♦;�.`� `:� �.n.r'� amp , \ ✓�,..f �, .• \` `� S
1 `.w..• �,.• `rcyf',.... ,,�. (r •• r : \ �. � _� : \,\ —'mil �: �= i6��I
1 11 L111 J � y , s
l am-: �c�
ASSS OPEN SPAEE \- ' TT
P IV 9�T _ / _ _/•
12,1,130 SF L77 A �jj�ll fi Rrnr/!'^�..."�•�:.�,..`'yi--=^ l •/
,�' a- ,�� , • -`�:ni• \JII .l�l/tll J ��� �JJIf����( / �°°'"° $ ������ ��
/ Ifl
rUS
THE TOWN 84UAHE AT EVROREEN WALK
Residential CommerciallCommunity
BulHdlnp .#of DU Ff.Area Floor Area
B Resld. 106 DU :102 940 SF
1 c Noteiraa N-
t� ('Redd. 92 DU 91,135 SF
D(Hotel) - - 121 Keys174,840 SF I ! ~ ism 19,694
3 17,612
F Future - - 5,000 SF e rA�) �; �� 490 110,00 l a
tiFuture 4,800SF 13±? v" eaoor o Tote:74,896SF
' H Office 20 UNITS/28,400 SF � ,'
Total 20D DUI 194,075 SF 113,040 SF ''�ttII''''IJ; /#i �i C�
LU
•�t.�I / .� \ � � � 1. LL
PARKINO: J ) ,
Required:
Commercial 9,800 SF x 4.5 _ 45 Spaces "" (71#1 �, V c .0
Residential 200 DU x 1.75 = 350 Spaces
Hotel 121 KEYS x 1.0 = 123 Spaces soo - "C
• " ] t: � � / \., Sip^ . ,'/ �� � Y
1 EMPLOEES 10 Spaces R
Office Conco.28 40OSF x 4.5 • 128 Spaces
Total 654 1.
Spaces ei -
P 7 s I a !` JLI11LLll u R /f 1•y�y
Shown: 707 Spaces I (J I FMT MfT
i Secured Parking 228 Spaces
General Parking
1 ` �) ,,.,a•. �u'i�al.�G.�� . � " 6UNMNQ 100
1jw
479 Spaces
L�AU
FUTURE - F 1 /.
W21A10 S.F.
OPEN SPACE dA 1J uJ
Required:200 X 750= 160,0003E 34 A P I�
Provided:Active = 38,400 SF .88 A OFF 6i��` \� /- st, _�_ —-- j I l l i l i ?a LU w Passive = 121,150 OF 2.78 A
Total = 159,550 SF 3.86 A RFSiplry,z�% OS �- --= — — TAM, z W w
1 —
1_ 9 ✓_1/1 1/1/,G 1 / ,_,/ \/ 111(,L11,�
3'8 P Rid! ��iT1�;101UN� 1 1 L.. . ITT U- : ` rrr_ I ( -rT'r(-r DOM
: SP_1
RE
75`BUFFER TO RESIDENTIAL IO:1E�/ 7 /f ! c eoFo
`/�`i' L1!ItI1�1 ' •I wr6_
—
'. Y I �::'� 1 a,,:..�was n,;,oa) �' ' - .�• ` Evergreen Walk LLG
mr
JJJLIJ
lot
�\ _ Ltl
PASSIVE OPEN SPACE
_r
121,158 or 2.77A
Lu
Milo
-
,!
! W 011
1 THE TOWN SQUARE AT EVRGREEN WALK
Residential commerciallcommunity
8ullldinp *of DU FI.Area Floor Area
D Resld. 108 DU :102,940 SF d ° '
C Resid. 92 DU 91;135 SF fiuuma� � �7 °°' l
` D(Hotel) - - 121 Keys/74,840 8F
/ C a F Future - - 5,DD0 SF g� {tl �i \ 2nd: 17,912 �j
0 Future 4,800 SF sale /% � <i 4a06
. ' Tatak 4,886 SF
H Office 20 UNITS12BA00 SF ��% r l `f Total 200 DU/194,075 SF 113,040 SF LL
LL
PARKING: J ijJ
' Required: Il/1 j /Tjnrj Af�✓ ! % W
Commercial 0,800 SF x 4.5 = 45 Spaces
Residential 200 DU x 1.75 = 350 Spaces
Hotel 121 KEYS x 1.0 = 128 Spaces son
! _EMPLOEES 10 Spaces J11T_ �,,
Office Conco.28 400SF x 4.5 128 S aces rl
p 4a I1 _
Total 654 Spaces _ ,� 1 I; f� (1-�(I1.LLLl I j U
Shown: 707 Spaces xs 1 1J111171177 I I
! -
Seeured Parking 228 Spaces ° h j 6
C 011fNHL� W z
General Parking 479 S aces Mgfh . au,o a,00 F f — —
p J FUTURE p, a8lP rr tze.6 1 1IJ L5 W
OPEN SPACE -- _ T'�'I,177��ITI�r y1ry Lu
.. - - PP FF44I17 � • �� \ � �""I 1 I PIT ' _ O � f� � I ll U I��
Required 200 X 750= 150,000 SF 3.44 A s r�� . . u,E I r ` ST. 1- �(lli g W C9
c I' 1 L_ _� � IY
Provided:Active _ 38;400 SF .BB A ,F'%�/� \ • .srA �--- L___ ; � __._ �Q
_ Lu
Passive 121,1508E 2:78A �Ffgro�`� _ �_—�--
Total = _159,550 SF 3.D9 A flFsNq`a/ � _ c6 -�- I Tad Lu z W Lu
-Tr-�
�t R .'.�r�l) !(/
75'BUFFER TO RESIDENTIAL1� � SP-1
// - �/, 1 -11 f Ilif�IifrN ICNIHIM� NTZ
,.,.__as �,777, _ t EvergroenwalkLlG
( \ ._
•"' � ice, • 1 �. . t � �•`� �� '- _�
US
IT
_
PASSIVE OPEN SPACE \ � � `11"•�.._"'-•-�-� � �•
121,11002.77A \ r7 Q 7 _ �"�`"-- --�°•• i •/ g
a•I•�.q �--_\� ` lllll//!�J'
q
;, �\�, : . • ---•->�'.,�.�gryD � �.JTr17rt7�j?��lr(,r� �Ty�N�[/fy ,� o�: �� MIX §
ITI (
WPM gB
29
'� � '' ,, 1 r '• (LC1LUl�/ T�7])7771'��� �' � egg a ��
THE TOWN SQUARE AT EVROREEN WALK
�u
• F,F' ]60
Residential csmmerciallcommunity
Bullldina W of 09 R.Area Floor Area \
B Resld. 10809 102,940 SF
C Resld. 92 BU 91,135 SF
0(Hotel) - 121 Keys/74,840 SF
Future _ 2n& 17,912- /
5,000 SF i �, am: 10,66e \ /
G Future 4,800 SF IS
Total.ia�"eas6 OF H Office 20 UNITS128,400 SF
Total 200 DU/194,076 SF 113,040 SF
' • � i.[.�/ ���j���'l�/// 'r��'`7j� ��, �°
PARKING
Required: /Commercial 9,800SF x4.5 45 Spaces
W
T g
Residential-200 DU x 1.75 = 350 Spaces
Hotel 121 KEYS x 1.0 = 128 Spaces soo "
j.
_ENIPLOEES 10 Spaces
Office Cones.28,40031F x 4.5 = 128 Spaces ` �lr......
Total 654 Spaces �j
812 a7 .�" y Q
1 iI 1 n-J.11lilli
' J ITfTIT]7il IT \ ,
' Shown: 707 Spaces �1f _
Secured Parking 228 Spaces _ W Q
General Parking 479 Spaces , I V"�I�'I Boo,66 f t —
F.F.120.0 1 W
21A10 S.F.
,• � V m o-cy rS1® a
OPEN SPACE >> ,` �. �� ! ,1 El
r (9 z
' LLJ
Required:200%750= 150,000 SF 3.44 A y1 r`�. . . ep F nr rrNe o goo SF o
Provided:Active = 38;400 SF J8 A 4,-'��r \ / - srq — _ , J a W
Passive = 121,150SF 2.78A / FRtpRF l p' \` n+ND =� - Q N
Total a 169,550 SF USA S�nFNl�O RIAr�' cs -- —'-- r A z Q Lu W
UT , JDBNCL
( j
fe >Ls �%� +f77Fe91aPHMej'� '� 1 r r — ! VRWM
1,_ �111LLL�(l �— _
T11TTT1 SP 1
//15/'9UFFEH TO HESIOENTIA!Z08E�� �'� G � �n�6
Wl f 1�� -. 1!1�� DATE
0117
Evergreen Walk LLC
F.T.
„r \:. '� , I _ -
,"� /' \•' 1 �� _ ��'�,� -:.:. �-- a a:
LQ�
PASSIVE OPEN SPACE ,'^� f, �- .,•��,,:c
' 1 ��t ✓i — ��`1 \� 121,15O BF 2.77 A +//
1 � tIf .. ""•--= _`��1� r \' rr I-�C( ��"ll,�(�f�J/,`„ �? "]�.n� � 1/_ T � g '
f �a�� s 11 ✓1 l�l�`l,Yr�IIJ 1
��777)7�.��11.'11L ' s �gMUM,��
' / 1 all 1 11
THE TOWN SQUARE AT EVROREEN WALK i : . • / x r \ I
/ Residential commercial/Cammunity
A,; 1
Builldina .#ofOil 1,Area Floor Area -...�, • � •` ` � ,
B ReshE. 106 DU 102,940 SF
' C Rasht. 92 DU 91,135 SF
i 91
j� D(Hotel) - 121 Keys/74,840 SE I - '� �' � lob eiiesse
8 F Future - - 5,000 SF . / 211tb 17,31
0 Future 4,800 OF
tA- xrm te,eaBE
,.
JJ J Total:74,836 SF
' H Office 20 UNITSl28,400 SF /. _
Total 200 DW 104,075 SF 113,040 SF
U
PARKING: I /
' - Repaired: \z,
Commercial 9,600 SF x 4.9 a 45 Spaces ', rr// 4P / .
Residential 200 DU x 1,79 = 300 Spaces
Hotel 121 KEYS x 1.0 = 129 Spaces son >a t,1 'l✓ ��� _
EMPLOEES 10 Spaces \ z
0#fice Conco.28,4608F x as 128 Spaces
Total 654 Spaces
= 111.!-1J11Lll1J� a — f 9;1 $y v
.? IJITM FM — : o
Shown: 707 Spaces I z
Secured Parking 228 SpacesVON W
Oeneral Parking 479 Spaces ` M1SeIdTdrLUa RD! t2 I'I•'� U�7T.-��TT��I,,II.j(f��l��� r� 2F.F.121LO
1Af0 9,.Fo.e 1 (J® E '�®11—.•yyJJ/� LU
N
?�
LU
OPEN SPACE '•�-/`' �_ eats �J f, o (7 w
' Required:200 X 750= 150,000 SF S.44 A s 1` °F�f,ullE a ® j gP i ,.� 0
Provided:Active = 38,400 SF .88 A /F��4,61 W
a
• - — .._ 0.f0 LV
: Passive 1f:1.t50 SF 2.78 A ;, FATpq��p/�c '`�rt.aroo �o >
Total = 159,560 SF LOS A s�nF '��� � _ �—'""-� "' W w
' NTrAt ta'' �ib� - �^ Tau "o
/
/ (B KfXOM %1/�'/ di71kAE 4 nm.n
/5'9UFFEfl TO RESIDENTIAI �� / � �. ! r CHEM
I {1 'r�I 1+F'1fF 1(17+T'rl,(7I
I E�I 1 ,1 i 1 1 II-��1!I t 1 , W�B117
' \ Ev►9 n Walk LLG — —
i
_
00 on
N��r ...�, Mom"� ,,,>� .,.,1 .. \ i ! ` �♦ � ( '. � � ``� �' I_ e�
b
A \ \` �mTrlt�rlT I F
,
eass,ve oew sent°
121,150ae2.77n
' THE TOWN SQUARE AT EVRGREEN WALKJOO
l:`'�- • •
/ av„
. raa1 0
Residential Commercial/Community
BulUding .#of 09 F6 Area Floor Area /
B Resld. 108 DU 102,940 SF
' 4�- C Reshl. 92 DU 91,135 SF I . _ n� l
as 0(Hotel) 121 Keys/74,840 SF 1 y 1nu 191694
F Future 5,000 SF e o f� aW ie we �}
G Future 4;800 SF 13__
H Office 20 UNITS/28,400 SF Tay,:t4,aasse
Total 200 OW 194,075 SF 113,040 SF
PARKING: iT, ?G� o
.. ..Required:
Commercial 9,800 SF x 4.5 = 45 Spaces 1 "�/�jy .[/ ''J 14�
Residential 200 0U x 1.75 = 360 Spaces e ,
Hotel 121 KEYS x 1.0 = 123 Spaces son , \ / - �'
�, Y
' _EMPLOEES 10 Spaces
Office Conco.28a 4b03F x 4.5 128 Spaces
Total 654 Spaces _ ai° Ors a I 1JJ-111_l -
II U1T1TT1 vto I
Shown: 707 Spaces [ r �- ' / u Z le
' Secured Parking 228 Spaces ° VilTl ITTIi� " I ' / W W
General Parking 479 Spaces M�� tam r o° j — U,
. )@ �� 5` II J alp o e.r. 1 u -1 !'1 f tw z
OPEN SPACE o (7 W
•f ® 1 .dW AF.
Required:200 X 750= 150,000 SF 3.44 A s . . • �FR" , a I I I r ! r t. _-�� � __ _L((1LL g C7
Provided:Active = 38,400 SF .88 A iF'� � srA h a LU
Passive = 121,150 SF 2.78 A n W W
Total = 159,550 SF USA nPryt°�`� c° I _._� TAM n z
S� z 3
E L 6A—
�IJ1L%.1
LRF SP_1
j/75'BUFFER TO RESIDENTIAL ZO11E�
BATE
..
' , . / / I ; /r f tat•,.�_ d.a n.:..,.� �l` II Evergreen Walk LLC f r _ ► �°E
r �• _ _ __ Ill ` ,,. _ ,� _ _ r:mo �s
r;. 07771
,:,�o!,;:�:.'U� ,..,,,i �.�•. ICI '\...... \ l l._ f7,
�1- � • \ �• `.lam � -CC �- =1� -
PA681VE SPIN SPACE \ II' 777
.. 1` ✓ y�
121,100 SF 2.77A .\ ./rT/r"II,�T�Y�-.
"/ � /,II ..•����_ =�;�"`l s,: �\. � (��wl(lr����"'`�r�17� r , ,'J r � � Mix
BRIMS
\r w
�; � ,, ,\�. . . -�R•,����� \� _�rrrrlwmn��l ;,,� �Nl��y/�Ij ;� o�' ��u-U!w41lUL1JJ1l�i7�>�.cwtoil a
L11CL w7T�L11ILL1 �
LtLLIJ
THE TOWN SQUARE AT EVRGREEN WALK
Residential CammerclallCammunity
Builidina .#of DU Fl.Area Floor Area \ I
B Resid. 1081111 102,940 SF
' l
�e< C Resid. 92 DU 91,155 SF emidtou R-R te1; \\
D(Hotel) - 121 Keys174,840 SF idaii eii
F F Fuhue - - 5,000 SF sa ! 2rdr 10,666
G Future 4,$00 8F v r�n�Gp•I Fi \ ! 4' , r w:isia 036 sF
H Office 20 UNITS728,400 SF -
' Total 200 DO/194,075 SF 113,040 SF
PARKING. '7TlT�jr• `-� , \ o U
Required:
Commercial 0,800 SF x 4.5 = 45 Spaces t' ,;,
Residential 200 DO x 1.75 = 350 Spaces se /IT1�,%/, / %n
Hotel 121 KEYS x 1.0 = 128 Spaces soo `t '�� �[✓
1
_ENPLOEES 10 Spaces Tii
\ Y
Office Conco.28,4603F x 4.5 = 128 Spaces
Total 854 Spaces ei° aka 9 Z „ I� (1jll1111.t1,�
q ti
e -. .q; I� I jfim rtri ITfI w !�_ 11 O: _�. Y
Shown: 707 Spaces II —--J Z -
' Secured Parking 228 Spaces
a�t
W
�� ewwc ion Parking 479 Spaces .. 6AM—� zearo S.F.
OPEN SPACE I*Tw Q/ wZ
Required.200%750= 160,000 SF 3.44 A ��_ . . fT uNE , I I I i+ f L _ I i � LLill11 g W 0
Provided.Active = 38,400 SF .88 A '.C. '\ �— • srA,r _ — __— I ° LU
Passive = 121,150 SF 2.78 A Fq to Grp, \' aAwq N > j
Total = 159,550 SF USA RES/nFry�� ll IDS / ,r=- '�aM z' Uj u 1
9ULLLj
S P—�1i 1 RESIDENTIAL ZOPIE��
Evergreen Walk LLC
�• \\ ,� ICI i
a�
JULtLyj
`4` �1
/47-77—lfz�;,-
�R_` c:� �\ PASBIVE GPM SPACE `` 77m}�1171m7 ��s
121,166 6P an a11',Tj1�T)�IT
\.117171171 l�L( n�w(Ij/
' \ ena<kor Ogg
brIfl tz
THE TOWN SQUARE AT EVROREEN WALK
BFF J00
Residential Comme[aial/Gommunily
Builidlna .#r of Oil Ff.Area Floor Area
9 Resid. 108 DU 102,940 SF : '� �•a�, ,��� � � e6nm. o-
g< ?` C Resid. 92 DU 91,135 SF I x-s�Ta—
D(Hoteu - 121 Keys/74,840 SF
/ &F Future - - 5,000 SF F / amp 17,612
O Future 4,800 8E ,
�A F•. \ f.1/ - toga 70.Ue686 OF
N Office 20 UNIT8/28A00 SF 60e0+,
Total 200 OW 194,075 SF 113,040 SF �Ij��''
.PARKING:
Required:
Commercial 9,800 SF x 4.5 45 Spaces
Residential 200 DU x 1.73 = 350 Spaces a �T cz--
Hotel 121 KEYS x i.0 = 128 Spaces soo � ; z
EMPLOEES 10 Spacess Y
It(IT(11(I
• 0fflce Genco.28,4608F x 4.5 = 128 Spaces A�-
Total 654 Spaces 1 er6 i �1�LI1llL1� lltll
I,JfiTi1TT1T(� ---
Shown: 707 Spaces J __ i' Z Y
Secured Parking 228 Spaces '� Cn s W Q
General Parking 479 Spaces nim� P P eu i66 __ LV
10 9.G, � -
OPEN SPACE - �_, �1G,4�4gAfT�� I I i I7TTPli I J If; a$ {� w
Required:200 X 750= 150,000 SF 3A4 A s �� Ep``q"r u -"�f�' a i '�p g q a IIIIIIII( ,IIiiIIII L.._: ��` a I ¢ U`
Provided:Active _ 38,400 SF .88 A iF�`�Zl�j� \ / - • . stA ''----- LU
Passive 121,150 SF 2.78 A -.- w
Total = 159,550 SF 8.66 A AFs�nfiN q�� = TAK a Z W810
w
Z3
I1,r IIr— � SP_1
75'SUFFEfl TO RESIDENTIAL IME.
!�� i � t((� ��� JIItII�I�1Ty11}j} �(�I�'I''�fr
Evergre n Walk
41
!is
PA�tYr0PLM 8PAC8 ...
121,160eP2.77n1T%1�h.7� �: 6
gill lad
nlw� " l1 "J 20. MIA 0;
aa°s �
1 THE TOWN SQUARE AT EVRGREEN WALK i•�- • ' �e e / avaa J�
Residential Commarcial/Community
Builidina .#at DO Ff.Area. Floor Area
8 Resh1. 108 OU 102,940 SF : _ ,
L 0ulidinn 0-
C Resid. 92 DU 91,135 SF ( •. �� � � •�9� � xntat•
121 Keys/74,840 SF I ,6�19,894
F Future - - 6,000 SF o T�� I 9A—' / /�/�� ` array., 16,985
O Future 4,800 SF , Mr. 18.111
TO -IiJ9 SF
- H Office 20 UNITS/28,400 SF . s,oerzi
u
Total 200 DU/194,075 SF 113,040 SFJL'�
U
PARKING: {I
h
Required, °
Commercial 9,800 SF x 4.5 45 Spaces / , o
Residential 200 Oil 1.75 = 350 Spaces `r [/ 3 i /
= s
Hotel 121 KEYS x 1.0 = 123 Spaces 300
' _EMPLOEES 10 Spaces
Office Conce.28,4003E x 4.0 128 Spaces
Total 654 Spaces _ if a - 4 II r 1f 1!11!111� C �� / �; o �(
C
Shown: 707 Spaces �� {ffiT1171TfT�T W Y
Secured Parking 228 Spaces n 'p I ,, ///J a W Q
General Parkin 479 Spaces `'J / ' I zl,r,n 7s. I o -�� Z
p L Yf Ne!�• ?Ltd 126,0 G o x�
OPEN SPACE ..teaUj
r.r.m.o
' Required:200 X 750= 150,000 3F 3.44 A `�� . . ea`r""'r � o ` i I t, + i "°°': I L[ltlll g'�i C9 I' L_ t _.__ �h'
Provided:Active = 38,400 SF .88 A /FF�°f/�ih� �� /_ srars L11111� _ — _ �� — — _ W Q:
Passive a 121.1.50 SF 2.78 A / Fq Tp —�Raao \ >
Total = 159,550 SF 3.66 A - TAM Z W w
1= .13
t F6 nD
Re —MU
sP-1
75'SUFFER iU RESIOENTIAL ZONE���// �
..
♦ t� �+ } ` Evergreen we LLc ,
W LE
ma
PAHBIYE OPEY SPACE
121,1609F 2.77A �.
7
,1V �lC�(
'� lo#6�P�� IE
aj
j THE TOWN SQUARE AT EVRGREEN WALK i l 2e P. )
flesidentia! CommeralalJCommnnity
BulNdinp .#of DU FL Area Floor Area �` j/ • �;�,�'�,�
' B Heald. 108 DU 102;940 SF C Heald. 92 DO 91,185 SF/ D(Hotel) . - 121 Key3174,840 SF i emrar6a e.
6 F Future -
B Future
5,000 SF fob 19,89r H Office 4,800 SF " m sA i 2rm fe99"se192 7
]3+t: �l --=
24 8,400 UNITS/2 $F � A49K� t Ova 18.955 / V
Total 20D DU/194,076 SF 113,040 SF . e,eeeH r 76ae T4,sa68F \ -
PARKING: ! `{ ;r �
i f �h Ir
� tt
Required: +N '�I)� �!(i > C
Commercial 8,800 SF x 4.6 = 46 Spaces .. ,• .,,_J �/ - �`�•' ,//, W
Residential 200 DU x 1.75 = 360 Spaces ! ,
' Hotel 121 KEYS x 1.0 = 128 spaces 300
_lice OEES 10 Spaces _ \ �>
Office Conco.28 4003E x 4.6 = 128 spaces
Total 1 �! -
�1TI77171 ! \` Y 654 Spaces i0 ° - ���.• ��
Shown; >
707 Spaces ° -'��• ti �� e " Q rj
� �, �
Secured Parking 228 Spaces � � — ' �'.�� � •j
General Parking 479 Spaces E L Z Z Y
' — o U t?t�P A t euauxa tab
OPEN SPACE '? , }/ I-
1
F.F. 126.T \-
lid d o ---, z
Required•240 X 750— 160,400 SF 8.44 A cP + ti + •� I 1 0 U►
Provided:Active a ,��, . . � \ a ! 8eM0.66, ' I 38,400$F .88 A °�� I I I rr1 I� r g.F. Luuj
Passive 12t 150 SF 2.78 As7A``�
'F�q '��` P' - — t—r (1t11 i
r
Iota! = CD
159,550 SF 3.66 A AFSIn s � e _ �i _ i ° —__ g� LL)
Fyr�gl ¢
>TA
j
1e 75'BUFFEfl i0 AESIDENTIALj p%j/� J' I °AM"r
-
o SP-1
- - _ /� , `l ` �7-FH-NfI-�-ill-'' �►J(' a�
�' Y / ;Ai _A.3 n•,ma) Evergreen Walk LLC - _ ' I.e
TO UNIT —
- •�.�` PASSIVE OPW SPACE •,,� : "I!(I ry, „�
121
t
//r � ; � LLl1((� ""'i•IT1Tt7T(j� o% _ s���fi � 6'S�
THE TOWN SQUARE AT /EVRGREN WAResidential LK
Gammual
Dulllding .#of DU FI.Area Floor Area
_ cam• 4
8 Resid. 100 DU 102,940 SF
�gC C Resid. 92 DO 91,135 SF I eut�Atna B.
D(HoteQ - - 121 Keys/74,840 SF
r F Future znm 10,97 )p
5,000 SFam: u,BeBE
G Future 4,800 SF
.a° -6�)Bf i _- �' J 41M 1!•eBe 'mil
H Office 20 UNITS128,400 SF -� Total-7a,esssP
•71'� ° i
' Total 200 DU/194,075 SF 113,040 SF ��f,
PARKING: I "')� ___.,� dc
Required.
W
Commercial 9,800 SF x 4.5 all 45 Spaces ° 1` iT� V �' '
Residential 200 DU x 1.75 = 350 Spaces
Hotel 121 KEYS x 1.0 = 128 Spaces soo •• • z
_EMPLOEES 10 Spaces R y 1', am s
Office Conco.28,4608F x 4.6 - 128 Spaces iti eB , (t(IiTT I(I - / ,J
Total 654 Spaces si 9"r° /ss t' / la _ y o Q> Ls' Shown: 707 Spaces �` ° l _ / W Z Y
Secured Parking 228 Spaces ` , r / w Q
General Parking 479 Spaces ;= 1 �rrL 9 1seaP a UiT(IIIIl 66 c,00 ! �._ _.----� z (W �y
F.F.126.0
L �7 I 21410 6.F. - l iy, W. Z
OPEN SPACE T7l7Tti iU o I (;< �1 l Ur W
fa.FFMu�E _ a \ I I I I viooiiW..
Required:200 X 750= 150,000 SF 3.44 A s��_ . T u„ _� '—� �-' �
Provided:Active = 38,400 SF .88 A iF� ir _-_\ /— • . .sra7£ ° i L — _i � a W
Passive - 121,150 SF 2.78 A Fq j p gyp, } Lu
Total = 159,550 SF 3.66 A A�s�afi cs — TAM lu
a z W Lu
��o
j��sicl� /�%/iJl�x6s� >oxj �� i, i 11 I t SP-1
� ��,15 9UFFEfi TO flES10ENTIAI�
1CONDITION #17