Loading...
HomeMy WebLinkAboutNutmeg Recycling Plan 05-19 ATTACHMENT K OPERATION AND MANAGEMENT PLAN NUTMEG RECYCLING 300 RYE STREET SOUTH WINDSOR, CT NUTMEG ®N � � a w-RECYCLING �aewvdea��'�� Page 11 Attachment K-{operation and Management Plan 1. FACILITY OVERVIEW: Nutmeg Recycling, LLC (Nutmeg) currently operates a Beverage Container Processing and Recycling Facility as well as a Limited Processing Recycling Facility at 300 Rye Street in South Windsor, CT. The facility has been in operation since 2005 and the site location and area map is presented as Figure 1. The building is approximately 175,000 square feet (sf), with approx. 14,600 sf office and 161,000 sf manufacturing/warehouse spaces. This Operation & Management Plan (O&MP) has been prepared in support of a Connecticut Department of Energy and Environment (CTDEEP) Permit Application for Construction and Operation of a Solid Waste facility - Volume Reduction Plant — Intermediate Processing Facility classification, which is proposed to expand Nutmeg's current operations covered under a CTDEEP General Permit Registration for Limited Processing Recycling Facility (permit no. 132-346) in order to handle the planned additional volumes of bulk fiber and paper product waste streams. Nutmeg shall operate and maintain the facility consistent with this O&MP in such a manner as to ensure that the facility is able to receive and process recyclable material in accordance with CTDEEP Permit requirements and in accordance with Section 22a- 208a of the Connecticut General Statutes and Sections 22a-209-1 through 17 of the Regulations of Connecticut State Agencies (RCSA). Nutmeg shall be responsible for all labor, material, and other costs of operation and management as may be required to assure that the facility is efficiently and appropriately accepting and processing the recovered, recyclable material as required by the Permit, this O&MP and in full compliance with all applicable Federal, State, and local laws, rules, regulations and (other applicable) permits. Appllcation. for Volume Reduction Plant-Intermediate Processing Facility Submitted by Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Page Attachment K o Operation and Management Plan 2. TRAFFIC: The Nutmeg facility began operations in 2005 generally in its present configuration and use as a combined Beverage Container Processing and Recycling Facility and a Limited Processing Recycling Facility. The site was originally constructed for plastics manufacturing, and then in the mid-1980's was operated by Handy & Harman Refining Group as a precious metals reclamation facility, which closed in the 1990's. Previous Traffic Studies and Approvals In support of obtaining local permits from the South Windsor Planning and Zoning Commission (P&Z), Nutmeg retained the services of traffic engineer Bruce A. Hillson, PE of Traffic Engineering Solutions, PC. The Nutmeg site's traffic report was presented to the P&Z in May 2003 for traffic impacts at the Nutmeg site drive, along Rye Street and also at the intersection of Rye Street and Sullivan Avenue (Route 194). The Hillson '03 analysis included a traffic study of then-current conditions (from data collected from previous reports and 2001 traffic counts) and planned site-generated traffic for full build- out (170,000 sf) based upon information provided by Nutmeg, as well as a projection of anticipated 2007 traffic flows, which were prepared and studied to include additional traffic volumes associated with a future industrial park to be constructed in the vicinity (the planned South Windsor Technologies Center on Sullivan Avenue). Based upon the findings from the Hillson '03 study, P&Z approval was granted and it was concluded that the Nutmeg facility would not create adverse traffic impacts to the surrounding road network; the only stipulation pertaining to traffic and imposed as a condition of approval required that the Nutmeg site access drive be relocated approximately 360 feet to the west from its previous location in order to both widen the drive entrance/exit and to improve sight-line distance looking east toward Troy Road for left turns leaving the Nutmeg facility. This work was completed to the Town's satisfaction. A separate traffic study was completed in May 2006 by James G. Bubaris, PE of Bubaris Traffic Associates for the planned Aldi's grocery distribution facility at 295 Rye Street. Due to the Aldi's facility's proximity to Nutmeg, this Bubaris '06 traffic study is relevant for review of the additional traffic associated with the proposed expansion of Nutmeg recycling activities at this time, as the Bubaris '06 traffic study included the same study area(s) as the Hillson '03 traffic analysis, and therefore included actual traffic counts and analysis representative of the Nutmeg facility operations (comparison discussed below). Similar to the Hillson'03 report, the Bubaris '06 report also included Application for'Volume reduction Plant®intermediate Processing Facility Sutmitted by Nutmeg recycling; 300 rye St., South Windsor, CT 06074 Page 13 Attachment K- Operation and Management Plan additional traffic volumes associated with the future South Windsor Technologies Center industrial park on Sullivan Avenue. Additionally, due to the planned increase in truck traffic to be associated specifically with the Aldi's facility, which was designed as a 500,000 sf grocery store warehouse and distribution center, the Bubaris '06 study estimated Aldi's site-generated traffic volumes would result in an additional 240 to 260 vehicles per hour (vph) during both the AM and PM peak periods on Rye Street. Also, various limitations with regard to Rye Street and Sullivan Avenue road conditions and geometry, as well as traffic concerns at those roads' intersection, were identified and evaluated by the P&Z. As condition of approval for Aldi's, the P&Z required that significant roadway and traffic improvements be constructed for both Rye Street and at the intersection with Sullivan Avenue and that these improvements for the project be reviewed and approved by the State Traffic Commission. These improvements included the widening of Rye Street for a length of approximately 0.6 miles from the intersection of Sullivan Avenue to the east up to a point approximately 150 feet east of the Nutmeg site drive, thereby improving traffic flow and turning movements occurring at the Nutmeg drive. In addition, the intersection at Sullivan Avenue was reconfigured for geometry and was signalized, thereby creating a more regulated traffic flow for those volumes of traffic originating from Sullivan Avenue and travelling eastbound on Rye Street; this is particularly noteworthy for the PM peak period when eastbound traffic on Rye Street is observed and modeled to be the greatest. Lastly, various drainage and road improvements were installed along Rye Street to overall improve the road and traffic safety. Discussion of Nutmeg Facility Traffic Generation A review of both of the above traffic studies finds very good correlation between the Bubaris `06 actual traffic counts on Rye Street and the Hillson '03 study's predicted traffic flows for the 2007 timeframe included in that earlier study. Specifically, under full build-out conditions for the site-generated traffic from the Nutmeg facility, the Hillson '03 study predicted that traffic flows on Rye Street during the AM peak period would be approximately 267 vph westbound (WB) and 76 vph eastbound (EB). This compares well with the Bubaris '06 study, which counted actual volumes at 261 vph WB and 64 vph EB on Rye Street at Nutmeg. The PM peak period similarly demonstrates good correlation: Hillson '03 predicted 103 vph WB and 300 vph EB, while Bubaris '06 measured 81 vph WB and 231 vph EB on Rye Street at Nutmeg. The Hillson '03 study indicated that site-generated traffic at the Nutmeg facility would consist of a total of 61 automobile and 20 truck trips during the AM peak period, and Appircation for Volume Reduction Plant-1ntQrrnediate processing Facility Sx t mi ted y Nutmeg Recycling, 300 Rye St.; South Windsor, CT 06074 Faye 14 Attachment K- Operation and Management Plan then a corresponding traffic generation of 84 automobile and 20 truck trips for the PM peak period. The Bubaris '06 study, which included figures depicting traffic counts at locations immediately east and west of the Nutmeg drive (at Troy Road to the east and at the proposed Aldi's drive location to the west) indicated that the actual traffic generation during both the AM and PM peak periods from Nutmeg was lower than what was predicted in the Hillson '03 report. Presented below is a summary provided by Nutmeg for actual 2011 traffic generation at the facility and what is planned for the expansion of additional volumes of bulk fiber and paper product waste streams for the Nutmeg facility. These current vehicles entering and leaving the Nutmeg facility were compiled by Nutmeg from their existing employee parking counts as well as scale tickets and shipping/receiving deliveries associated with current activities: Current Traffic Generation 2011 - Nutme Rec clip peak am off peak day peak pm late evening enter leave enter leave enter leave enter Leave Trucks 5 16 40 j 40 16 i 5 5 ` 5 — -------------- ------------- - - — - -- Employee cars 25 3 8 30 10 10 5 5 Total Trips 49 trips 118 rtri-ps 41 trips 20 Proposed Traffic Generation -Nutmeg Recycling peak am off peak day peak pm late evening enter leave enter leave enter leave enter Leave Trucks 16 27 65 65 27 16 5 5 ------------- - ---- - - — -: ------------ - Employee cars 25 3 8 30 10 10 5 5 Total Trips 71 tri s 168 trips 63 trips 20 Conclusion The original site-generated traffic volumes developed for Nutmeg from the Hillson'03 traffic report indicated that site-generated traffic at the Nutmeg facility would consist of a total of 61 automobile and 20 truck trips during the AM peak period, with a corresponding traffic generation of 84 automobile and 20 truck trips for the PM peak period. From the most recent information supplied by Nutmeg (table above), both the current 2011 and proposed traffic generation are well below those evaluated from the original traffic study for full build-out conditions at the Nutmeg facility as developed at the time of their original traffic approvals (in 2005). Application for Volume Reduction Plant-Intermediate Processing Facility Submitted by Nutmeg Recycling, 300 Rye St.; South Windsor, CT 06074 Page 15 Attachment K- Operation and Management Plan In addition, subsequent to Nutmeg's operation as a combined Beverage Container Processing and Recycling Facility and a Limited Processing Recycling Facility, additional traffic studies and approvals associated with proximate development along Rye Street have resulted in multiple and significant improvements to the road network in the vicinity of the Nutmeg facility; thereby increasing the capacity and safety of the surrounding road networks on Rye Street and Sullivan Avenue to handle an order of magnitude greater volume of truck traffic associated with those other developments. It is concluded that the proposed expansion of additional volumes of bulk fiber and paper product waste streams at Nutmeg in accordance with the attached CTDEEP Permit Application for Construction and Operation of a Solid Waste facility - Volume Reduction Plant — Intermediate Processing Facility will have no adverse impacts on traffic operations on the surrounding road network. Application for Volume Reduction Plant_Intermediate Processing Facility Siae,�ritted by Nutmeg Recycling, 300 Rye St., South 'Windsor, CT 06074 r- age io Attachment K-Operation and Management Pfan 3. MANAGEMENT: This section presents an overview of the Nutmeg facility's management structure and organization. In addition, supplemental information pertaining to the financial capabilities to manage the facility is presented in Attachment J — Business Information. Nutmeg Recycling, LLC - Organizational Chart fNutmeg Recycling: South Vlndsor.CT Plant Manager— George Sevc t Office Mana Manager I 9 Shift Supervisor Staff Accountant ;Licensed Public Fernando Garcia Maintenance Beth Benoit Weigher ; Shift Su Supervisor pervisor John Amado Dora Papathanasiou Gary Polanco ga Licensed Public Weigher: Traffic Control Administratve Inspector Loader Operator Baler Operator Assistant Duties, Responsibilities and Experience of Management & Operational Personnel Plant Manager— George Sevc Duties / Responsibilities: George is responsible for all plant operations and building management. In addition to daily plant operations, he oversees the maintenance department for a continued safe and productive operation. He controls costs through an extensive preventative maintenance program, meeting budget projections for a profitable operation. He assures that a high quality of material is produced for optimum sales. Experience: George has 22 years of experience in the recycling industry. He also has 20 years of experience in equipment maintenance. Prior to joining Nutmeg Recycling, George was a key maintenance manager for TOMRA of North America, a large bottle law reverse vending company, for all aspects of machine maintenance. He has an extensive mechanical maintenance background, as his family owns several maintenance shops. Application for'Vdiume Reduction Pant®intermediate Processing Fac?,'ity Submitted by Nutmeg R-acycfing, 300 Rye St., South Windsor, CT 06074 Page 17 Attachment K- Operation and Management Plan Qualifications: George attended Sacred Heart University in Connecticut studying business. George has been an employee of Nutmeg Recycling for 5 years. Staff Accountant— Beth Benoit Duties / Responsibilities: To manage and then report all financial transactions to the plant manager. Experience: Beth has 15 years of experience in the recycling industry specifically in the financial and operational aspects of the business. Qualifications: Employee of Nutmeg Recycling for 5 years. Office Manager— Dora Papathanasiou Duties / Responsibilities: To oversee and manage all aspects of the office including administrative personnel, scale operation, sales and billing, shipping and receiving, and payroll. Experience: Dora has 12 years of experience as an office manager in the recycling industry. Qualifications: Dora has been an employee of Nutmeg for 12 years; she is also a Licensed Public Weigher for the State of Connecticut. Shift Supervisor— Fernando Garcia Duties / Responsibilities: To supervise processing operation, including Traffic Controller/Inspector, Baler and Loader Operators. To ensure safety training is completed as set forth in corporate safety manual. Experience: Fernando has 10 years of experience as a shift supervisor in the recycling industry. Qualifications: Fernando has been an employee of Nutmeg for 4 years. He is a Certified Forklift Instructor. Shift Supervisor— Gary Polanco Duties / Responsibilities: To supervise processing operation, including Traffic Controller/Inspector, Baler and Loader Operators. To assist Shift Supervisor Fernando Garcia in the company in-house safety training program. Experience: Gary has 10 years of experience as a shift supervisor. Qualifications: Gary has been an employee of Nutmeg for 5 years. Maintenance Supervisor—John Amado Duties / Responsibilities: To perform repairs and preventative maintenance on all plant vehicles and equipment as directed by the plant manager. To supervise all maintenance personnel. Experience: John has 18 years of experience as a maintenance mechanic. Qualifications: John has completed OSHA training, Lock-Out Tag-Out training, Hazmat training, electrical controls training and is a skilled welder. Application for Volume Reduction Plant-Irtarmediate Processing Facility ;r;erittad u/Nutineg Recycling, 300 Rye St., South Windsor, CT 06074 Page 110 Attachment K-Operation and Management Plan Licensed Public_Weigher/Administrative Assistant Duties / Responsibilities: To operate the truck scale, perform data entry and reception duties. Experience: 3 — 5 years administrative experience needed. Qualifications: Must be a licensed public weigher, must be computer literate. Traffic Controller/ Inspector Duties / Responsibilities: To direct trucks to the appropriate areas (yard, scale or bunker), view the incoming product as it is received to watch for hazardous materials or contaminants. Experience: 3 — 5 years warehouse experience preferably in the recycling or trash industry. Qualifications: Must complete in-house safety training. Baler Operator Duties / Responsibilities: Runs baler, making sure proper material is fed into baler, removes any contaminants from material before it enters the baler, ensures baler is compacting to the proper density for the material being run, requests random bale weights to ensure bales are meeting material requirements, inspects bales for proper ties and number of wires, and maintains a clean area. Experience: 3 — 5 years baler operator experience is required. Qualifications: Must complete in-house safety training. Loader Operator Duties / Responsibilities: Loads material into hoppers that feed processing lines, controls rate of production by giving direction to sorter, directs or places material into proper bunker, loads outgoing material into trucks or trailers, maintains loader cleanliness and greases fitting daily. Experience: 3 — 5 years loader experience, preferably in the recycling or trash industry. Qualifications: Must complete in-house safety training. Application for Vodume Reduction Plan'--Intermediate Processing Facility &;bmitted.0"si Nutmeg Recycling, 300.Rye St., South Windsor CT 06074 Page 19 Attachment K-Operation and Management Plan The following is the typical minimum staffing that will be maintained at the facility Position Headcount Plant Manager 1 Assistant to Plant 2 Manager/Administrative Line Supervisors Sorters 20 Equipment operators 4 Maintenance/Janitorial 3 Total 30 Methods of Communication All Nutmeg employees (and job classifications) listed in the above organizational chart have company supplied cellular phones. The truck scale and dock office are equipped with intercoms and department phone numbers to communicate with the main office. Operating Hours for Receiving of Recyclable Materials Warehouse/Plant: Monday— Friday - 7am — 11 pm, Saturday 7am — 1 pm Office /Truck Scale: Monday— Friday - 7am — 9pm, Saturday 7am — 1 pm In-house Training & Company Safety Program(s) Nutmeg maintains both an in-house training program for compliance with industry best standards as well as comprehensive facility health & safety plan. A copy of that plan's table of contents is provided as Appendix 1 to this O&MP. All of these policies are in written format and are available for employees to review. Nutmeg is committed to treating safety as its number one priority. All management and employees are thoroughly instructed and integrated into the comprehensive safety philosophy when first hired. It is incumbent on each employee to fully understand their job and responsibility to never place themselves or their co-worker in harm's way. Employees will receive further policy instruction and safety training through monthly Facility Safety Meetings. Each employee is required to attend every meeting and sign an attendance sheet. The shift supervisor is also in charge of the safety committee which meets monthly to suggest any topics that might need more attention. The shift supervisor is a certified forklift instructor and certifies all forklift operators via an in- house training program. As)Ph'cation for V�iume Rad?jctior, Plant Intermediate Processing Facility r=r ed vy Nutmeg Pecyrling, ;300 Rye St., South Windsor. CT 06074 Page 110 Attachment K- Operation and Management Plan In-house training is necessary to properly train and assess new employees as well as periodically evaluate and refresh the level of training and awareness for existing employees and those staff that may be assigned new or different responsibilities. Topic examples for routine safety meetings include but are not limited to: injury reporting, respirator usage, eye safety, needle. sticks, job safety analysis, electrical safety, ergonomics, forklift safety, disaster readiness, back safety, hand and power tool safety, ladder safety, safety attitude, personal protective equipment, process safety management, and pandemics. Machine Operator Safetv All machine operators should have a copy of the equipment's safety features. This outlines the do's and don'ts of the machine. It will also address where emergency shut- offs are and safety limit switches. If your equipment does not have an operating manual or safety information on it, you should contact the manufacturer and demand it. Copies of all the facility's equipment safety items should be posted or placed near the equipment they are running as well as put into the all facility safety book which should be easily attainable for anybody entering the facility. Some equipment operators are required by OSHA to have some form of training. A copy of proof of this training should be placed into the employees file and a master listing for that piece of equipment should be kept in the all Plant safety book. Machine operators should be instructed not to operate their equipment without the proper guards being in place. Rolling Stock Equipment Operators Only trained and Nutmeg approved operators will be allowed to operate equipment. The following are minimum standards of safety in the operation of equipment. Each operator should study, know and, above all, follow all guidelines. No employee is to operate any piece of Nutmeg equipment without the supervisor's knowledge and approval. • Check equipment to see that it is in safe operating condition. If in doubt, contact your supervisor and do not operate until approval is given. • Do not speed, and do not stop suddenly. • Slow down at intersections. • Be on the alert for pedestrians. • Do not attempt to exceed the capacity of your equipment by carrying loads which are too heavy or unbalanced. • Operators should face their destination. If unable to see over the load, the vehicle should be driven backwards. • Never leave a vehicle unattended. • When parked, buckets/blades flat to ground, shift levers in neutral, & brakes set. • Never allow anyone to ride in buckets or blade. Application for Volume Reduction Plant-Intermediate Processing l°acilit Su=bmuted y Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Page 111 Attachment K- Operation and Management Plan Rolling Stock Equipment Operators must complete a daily Rolling Stock Checklist. This checklist is to be turned into the supervisor prior to beginning the shift. CTDEEP Operators Certifications Nutmeg currently has no certified operator(s) pursuant to RCSA 22a-209-6 for their present or proposed commercial operations. At this time, Plant Manager George Sevc has been designated to pursue the requisite certification. Other supervisory personnel will be identified for certification prior to start-up to provide the appropriate level of certified operator presence during commercial operations. Emergencies and Shut-downs All Nutmeg employees will follow the Emergency Evacuation Plan in the event of an emergency. A copy of the Nutmeg facility's evacuation plan is provided as a figure in Appendix 2 to this O&MP. Employees are to consult supervisors for any emergency concerns. The supervisor will evaluate the need to evacuate the building and will implement the proper emergency response. In the event of an emergency requiring evacuation the supervisors will sound an audible alarm. Employees are to depress emergency stop buttons and exit building as indicated by emergency route posters located at sorting platforms, lunch rooms and office areas. All employees are to congregate immediately at the designated area indicated by emergency route posters for a personnel count. Management will accumulate timecards for personnel count reasons. If safety permits, management will make a facility inspection to ensure all employees have left the building. Periodic drills will take place and will be timed for efficiency sake. Employees are to treat all drills as a real emergency. In the event that an emergency, electrical outage, equipment failure or other event (e.g. strike, severe weather, etc.) might cause actual or potential disruption to the Nutmeg facility's operation, then receipt of incoming waste streams and deliveries could be halted and diverted to other owner facilities such that recyclable materials would not accumulate at the Nutmeg facility. Recent experiences with severe weather storms Irene (tropical storm) and Alfred (nor'easter) in the late summer and fall of 2011 demonstrated that Nutmeg management has in-place an appropriate and workable set of procedures and contingency planning to by-pass the Nutmeg facility and utilize other owner facilities in other jurisdictions to satisfy client needs and demands for non- interrupted waste stream handling. Application, for Volume Reduction Plant-intermediate Processing Facility f.iNutnneg Recycling, 300 Rye St,, South Windsor, CT 06074 Page 112 Attachment K- Operation and Management Plan 4. FACILITY OPERATIONS: For the proposed Volume Reduction Plant — Intermediate Processing Facility, Nutmeg proposes to handle 80,000 tons of recyclable wastes per year: at a rate of 280 tons per day over a period of 5.5 days a week (see hours of Operating Hours, above). At the time of this Permit application, there are no existing or identified contracts with any municipalities and the sources for waste stream materials are to be determined. As indicated in Part V: Facility Information of the Permit application, only cardboard, food/beverage containers and plastic containers, scrap metal, and paper are planned for processing and onsite storage. A typical daily breakdown of materials handled would be: • 145 tons baled • 30 tons transfer loaded (preprocessed) • 105 tons loaded into open tops trailers for shipping As discussed under "Emergencies and Shut-downs" (above), in the event of an emergency Nutmeg would divert incoming waste streams to a different client facility. Also for short-term out bound shipments, in the event of any temporary disruption to loading/unloading or shipping and transport, Nutmeg can store approximately 6,000 cy of baled material inside building in designated areas. Processing will be conducted indoors and within the existing facility as presented in Figures 2 and 3. The existing layout of the overall Nutmeg facility will remain substantially unchanged, including: an existing processing building space with an indoor area that will serve for the volume reduction plant, which will be located in the present location of the current operations covered under their CTDEEP General Permit Registration for Limited Processing Recycling Facility permit (#132-346); one truck scale; and, sufficient outdoor staging area(s) for loaded and/or empty trucks and/or containers. The existing Beverage Container Processing and Recycling Facility will remain as currently located in a separate indoor area. Process Equipment Nutmeg intends to utilize their existing mechanical equipment covered under their CTDEEP General Permit Registration for Limited Processing Recycling Facility permit (#132-346). This equipment, a Balemaster Baler, model no. 07333 consists of two Application for Volume Reduction }plant Intermediate Processing Facility ,at;mitted 4;y Nutmeg Recycling, 300 Rye ,fit., South Windsor, CT 607-4 Page 13 ......... Attachment K-Operation and Management Plan the baler unit, and this system is capable of processing 12 tons per hour. A copy of the supplier's schematic drawing plan is provided as a figure in Appendix 3 to this O&MP. Wastes loading/unloading will be handled by rolling equipment identified as: two (2) loaders— Caterpillar 938H with 6 cubic yard (cy) bucket and Volvo L20B with 3 cy grapple buckets, each capable of loading a 100 cy trailer in approximately 25-30 minutes; and, two (2) forklift units— each with 6,000 pound capacity and capable of loading/unloading approximately 40,000 pounds of bales in 30 minutes. Residue Currently minimal residue is handled by Nutmeg facility. Following the proposed expansion of additional volumes of bulk fiber and paper product waste streams at Nutmeg in accordance with the attached CTDEEP Permit Application, it is anticipated that Nutmeg will continue to use one 40 cy roll-off onsite to collect all residues from operations, sweeping, building maintenance, rubbish or other materials. It is anticipated that this single roll-off will require offsite disposal approximately once every two weeks to handle all necessary volumes and to inhibit odors. Waste Stream Material Receiving Recyclable material received at the facility shall be accepted and processed by Nutmeg. The Traffic Controller/Inspector will inspect the delivered material to determine and ensure the load complies with the incoming materials approved in the Permit. The material will be either transfer loaded (unprocessed) as appropriate, stored for future processing, or loaded onto the feed line into the processing system. Should there be excessive contaminants that include rejected or potentially hazardous material, the loader operator will immediately segregate the material and contact the Plant Manager, and follow the procedures specified as follows: The loader operator will be well trained in proper inspection and identification of material quality, and follow these steps: 1. Inspect all incoming loads of recyclable material. 2. Identify contaminated, rejected or potentially hazardous material. 3. Immediately report discovery of contaminated material to the Plant Manager, Shift Supervisor and Licensed Public Weigher(scale operator). 4. If necessary,follow appropriate spill identification, reporting and record-keeping in accordance with regulations and the facility health &safety plan. 5. If possible and appropriate, re-load contaminated material onto the vehicle that made the delivery, and direct the hauler to exit the facility with the contaminated material. 6. In the event the material cannot be removed immediately, and if possible and appropriate,the contaminated material will be separated from acceptable material, Application for Volume Reduction Plant—Intermediate Processing Facility Submitted by Nutmeg Recycling,300 Rye St.,South Windsor,CT 06074 Page 114 ........__ ...--_.. - _ Attachment K-Operation and Management Plan and contained in a segregated pile or into suitable containers,for proper removal by the hauler that made the delivery. 7. The hauler will be directed to remove the material at its own expense from the facility grounds. The Plant Manager will provide a report of the incident, including: 1. Date and time of delivery. 2. Hauler name and truck identification, including license plate. 3. Photographs and detailed description of the contaminated material. 4. The hauler will be required to report the disposition and handling of the rejected material for future reference. Records Nutmeg already has in-place sufficient and appropriate procedures and record keeping and reporting requirements to comply with their CTDEEP General Permit Registration for Limited Processing Recycling Facility. All incoming recyclables will be weighed on the scale by the Licensed Public Weigher (scale operator). The SMS Scale Database system maintains records for all incoming and outgoing load information that includes dates,times, amounts in pounds/tons and all pertinent customer information. Weights are entered automatically into the scale software thereby creating a Certified Weighing Ticket; the scale operator then enters the truck number, customer and product waste stream onto the ticket and prints out for signatures. All outgoing rec clables p ( ) p g g g Y will be weighed using the same scale and recorded in the same manner. The scale software g g produces daily, weekly, monthly and quarterly reports. The scale operator will report to the CTDEEP as required. Recyclable materials, after being handled, processed and/or baled, will be stored in the facility designated storage area(s), which will be divided into sections by material type to facilitate proficient inventory procedures and loading of outgoing shipments. Bales will be moved using the forklift; other material may be handled by the loaders. Nutmeg management monitors the facility's baled inventory on a daily basis and automatically schedules outgoing shipments to ensure that inventories are kept to a minimum and within Permit approvals. Customarily, it is also a priority to facilitate the total shipment of all loads by month's end. Environmental Controls Nutmeg takes pride in the appearance and upkeep of the facility building and grounds. The watch words that are stressed are "clean as you go", where it is each employees responsibility Application for Volume Reduction Plant—Intermediate Processing Facility Submitted by Nutmeg Recycling,300 Rye St.,South Windsor,CT 06074 Page 115 Attachment K- Operation and Management Plan Odor, noise and dust issues have not been excessive nor resulted in any complaints under their current CTDEEP General Permit Registration for Limited Processing Recycling Facility. It is anticipated that current good housekeeping measures (as discussed below) will continue to be sufficient with the proposed expansion of Nutmeg recycling activities at this time. Liquid wastes are minimal and are covered under their CTDEEP General Permit Registration for Discharge of Miscellaneous Sewer Compatible Wastewaters (permit no. GM1000150). Vector control is provided by a maintenance contract with TerminixTM. These services have been in-place since 2006 and a copy of the contract as well as a most recent regular service and inspection report is provided in Appendix 4 to this O&MP. The facility, including the grounds and exterior of the building, shall be maintained: • Pick up all loose materials (i.e., paper, plastic, cans) daily and return them to the tipping floor. Areas of concern include: perimeter fence line, parking areas, walkways, building perimeter, loading/unloading areas, and access roads. • Sweep parking areas and loading/unloading areas as needed and as directed by the plant manager— currently the facility has an Elgin Pelican® sweeper onsite. • Sweep walkways daily. • Cut grass areas as needed, with grass trimmings delivered to the nearest composting site if available. • Water lawns and shrubs as needed based on rainfall. Similarly, the processing areas will be kept clean. To achieve Nutmeg's quality levels, the facility must be kept clean employees will: • Clean all machines and process equipment as detailed in their technical manual. • Dump all trash receptacles regularly. • Sweep the processing floors daily. • Sweep up all loose recyclable materials daily, and return to the tipping floor for reprocessing. • Clean windows in the processing rooms weekly. Appilfcat cn, for Volume Reduction Plant-lntermedlate Processing Facility 3.cjcm tted / Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Page 116 Attachment K- Operation and Management Plan Giro Drn+,ft^......;^n a on . Fire protection at the Nutmeg facility is routinely inspected by the Town of South Windsor Fire Marshal Walter Summers as well as an approved maintenance and testing company (Allied Sprinkler). Quarterly maintenance and inspections and testing services have been in-place since 2009 and a copy of the current contract as well as a most recent regular service and inspection report is provided in Appendix 5 to this O&MP. The fire control and alarm system panel (Silent Knight — IntelliKnight Model 5700) is connected directly to a security service (DubaldoTM) which notifies the fire department's dispatcher. The Town of South Windsor has full-time police and voluntary fire emergency services. In addition, the Town has a volunteer ambulance corps and is also serviced by the Advanced Life Saving (ALS) service associated with the nearby Manchester Memorial Hospital. All fire extinguishers are up to date and are recharged, inspected and tagged annually. All hydrants have been inspected, tested and are fully operational and approved by the Town Fire Marshal. Source of fire suppression water is Connecticut Water Company. Nutmeg has retained Allied Sprinkler to design and install an expansion of the sprinkler system for the operational areas to be associated with the planned expansion of Nutmeg recycling activities for the proposed Volume Reduction Plant — Intermediate Processing Facility. The drawings for this proposed sprinkler system expansion are provided in Appendix 6 to this O&MP. On December 20, 2011 Nutmeg and Allied Sprinkler met and reviewed these drawings with the Town Fire Marshal and he indicated that they were acceptable and that approval(s) would be handled at the time of construction and upon submission of a building permit for the work. Application for }Volume Reduction Plant-Intermediate Processing Facility S-_�bn fitted-y Nutm, ag Recycling, 300 Rye St., South Windsor, CT 06074 Page 117 Attachment K- Operation and Management Plan Maintenance Lockout-Tag-Out Policy (LOTO) Lockout-Tag-out procedures are to protect employees from accidental machine start- up/movement. The most common device consists of a locking device, which is attached to a motor/control panel or disconnect switch, plus a durable red and white tag that identifies the device as the LOTO and the person implementing it. Employees will be verbally notified by either supervisors or maintenance personnel, anytime a Lockout- Tag-out procedure will affect their work process. Additional Lockout Tag-out information is posted throughout the Facility. Employees must be able to identify the Lockout Tag- out device affixed to any machine. Equipment with Lockout-Tag-out devices may not be restarted by anyone except the person who applied the Lockout device. Power equipment may not be operated by anyone but maintenance personnel without the Lockout/Tag-out device in place. Maintenance personnel will receive advanced training in this policy. Maintenance and Repair Plan A. Introduction The maintenance of the Facility is the responsibility of Nutmeg. All functions for operating the Facility occur under the direction of the Plant Manager. It is understood that the Plant Manager, though knowledgeable, will not be able to perform all the tasks required in the operation of the Facility. Facility maintenance is the responsibility of the maintenance staff, thereby freeing the Plant Manager to concentrate efforts in other areas. There are four (4) categories of maintenance, which any Facility can encounter. The first of these categories is the visual inspection and cleaning of the equipment. The second is the greasing, oiling, tightening, realigning, etc. of the equipment. The third is the Class B overhaul of the equipment and the fourth is a Class A overhaul or replacement. For clarification, a Class B overhaul entails parts replacement short of a major overhaul, such as hoses, motors, etc. A Class A overhaul is a total rebuilding of the machine with replacement of all major components. The actions in the first three (3) categories can be accomplished by the in-house maintenance staff. The fourth category requires a management decision regarding time and money restraints on utilizing sub- contracted maintenance. This manual focuses on categories one and two. For category three, the individual manufacturer's manuals are utilized, and category four requires manuals and A,c,olicat;'o fcr I I fume deduct on Plant-Intermediate Processing Fac iity mit'?d ;v Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Page 11E Attachment K- Operation�and Management Plan assistance from the manufacturers or subcontractors. This section is intended as a ready reference for the Facility maintenance staff and establishes maintenance policies and procedures, as well as providing information on maintenance schedules and other maintenance related functions. This information in no way supersedes the manufacturer's maintenance and service manuals. It is intended as an overview for equipment allowing for rapid response to problems as well as a guideline for daily upkeep. It is extremely important that all policies and procedures be strictly adhered to. B. Establishing a Formalized Maintenance Program There exists a requirement for a formalized maintenance program consisting of clearly defined procedures for managing and performing'maintenance. This volume provides guidance for the formulation of systems and techniques, which can be adapted to the needs of a particular facility and are practical for implementation. In evaluating practicality, the resources available to the Facility must be considered: including men, money, material, time, and space. Simplicity is the key to the development of a successful program. All facilities will require and benefit from the basic systems. The larger facilities may afford greater sophistication with increased administrative and technical performance. Nutmeg shall maintain all maintenance reporting and procedures performed on a computerized system developed by Nutmeg to specifically address the requirements of Facility. 1. Basic Objectives The basic objective of maintenance management is the optimum use of available manpower, Equipment, material, and money by: • providing effective support and response to management and operational requirements; • increasing the productivity of the maintenance work force; • insuring a high standard of maintenance performance; and • achieving economic goals in the maintenance of facilities. 2. Purpose • Ensure maintenance is performed on a scheduled basis rather than on an intermittent, break-down basis. • Take corrective action before advanced deterioration necessitates major repairs. • Ensure repairs are timely and efficient. • Improve maintenance capacity and quality. • Ensure that the Equipment of the physical facilities meets their functional requirements. App/lcadon for Volume Reduction Plant- Intermediate Processing Facility S1Avrn t ed by Nutmeg Recycling, 300 Rye St., South- Windsor, CT 06074 Page 119 Attachment K- Operation and Management Plan • Provide direct control over the use of the maintenance labor force. • Eliminate over-maintenance, as well as under maintenance. • Develop and maintain Equipment maintenance history to identify areas that need corrective action by management. 3. Benefits The following are benefits that will result from a successful maintenance management system. Most will be realized in a relatively short time with the remainder being essentially long range in nature: • An increase of life expectancy of buildings, Equipment, and physical facilities. • Increased productivity of maintenance force. • Greater reliability & availability of services as a result of uniform & uninterrupted operation. • Improved morale of maintenance personnel through a more logical division of functions and a clear definition of their maintenance duties. • Reduce the need for capital investment by using existing facilities to their full life expectancy. • Availability of information on work in process, completed and pending, to aid in management decisions. • Availability of data to support budget submission. 4. Control A manual of maintenance control procedures cannot meet every condition and remove the need for judgment and discretion. A procedure manual is a tool to anticipate and present a means of guidance to help with the decisions to be made. The elements providing measures of control in the development and the operation of a maintenance system include: • Inventory of equipment • Maintenance requirements • Condition of Facility and property • Effectiveness of the maintenance program • Work classification • Planning, organizing, and estimating • Work authorization • Material requirements. • Shop scheduling (as appropriate), • Reports and form control, and • Adequate spare parts inventory. Appi'catyor+ for Volurne Reduct;on Plant Intermediate Processing Facility S-.-bf fitted f`Nutrr:eg Rscr ing. 300 Rye ,St., South Windsor, CT 06074 Page 120 Attachment K- C?peratian and Management Flan 5. The Maintenance Program c M airnviiiarice pivy-iai—n cons iala vi f.IiCVC[-ItdlivC HdInce d1-1U Scf-1eUl.lieC1 maintenance, as described in the following paragraphs. 6. Preventative Maintenance Preventative Maintenance includes pre-scheduled actions designed to preserve structural, Process, and equipment integrity. This portion of the program maintains maximum equipment efficiency, extends equipment life, and minimizes maintenance costs. The objectives are to: • Reduce complex maintenance requirements to simple procedures that are easily identified and managed. • Define requirements, schedule and control. • Manual manpower needs and material needs. • Identify areas for improvement of preventative maintenance and techniques. 7. Scheduled Maintenance The portion of the program designed to return equipment to normal operating condition through priority assignment. 8. Casualty Prevention and Control: These are inspections and actions designed to minimize and control the risk of casualties to buildings, equipment, and personnel, and meet requirements of authorities having jurisdiction. 9. Operations: The day-to-day schedule of Facility coverage including all operating and standby equipment. 10. Maintenance Classification Maintenance requirements are divided into two major classifications to facilitate the design and development of systems and procedures. Maintenance classifications are: (1) Preventative and (11) Scheduled. C. Preventative Maintenance The sum of those actions performed on operational Equipment, buildings, and grounds that contribute to uninterrupted operation of Equipment and Facilities is classified as Preventative Maintenance. These maintenance actions are performed on a scheduled basis rather than intermittently or on breakdown. Application for Volume Reduction Plant-Intermediate Processing Facility S hmittea y Nutmeg Recycling, 300 Rye St., South ✓ Windsor, CT 06074 Page 121 Attachment K- Operation and Management Plan 1. Objectives The system is designed to assist each facility to: • Reduce the complex maintenance requirements to simple procedures easily identified and managed. • Define the Preventative Maintenance requirements, schedule and control their performance, describe the methods and tools to be used, and provide for the prevention or detection of impending breakdowns. • Forecast and plan manpower and material needs. • Plan and schedule maintenance. • Detect areas for improved training and maintenance techniques. 2. Scheduled Maintenance The sum of those actions required to restore Equipment to normal operating condition on a non-emergency basis is classified as Scheduled Maintenance. These maintenance actions must be anticipated in so far as is possible and provision made for their accomplishment. The manner of work generation complicates the actual scheduling. Preventative Maintenance Requirements are pre-determined, lending themselves to advance planning and schedule adjustment. Scheduled maintenance may be generated as a result of Preventative Maintenance inspections and actions, notification of deficiencies observed by members of other areas and the development of breakdown. 3. Scheduled Maintenance Classifications The actual planning and accomplishment of Scheduled Maintenance should be based on the establishment of priorities in consideration of the effect upon total operations of the Facility. A Maintenance Work Order is completed to document the maintenance required. Four priority levels are derived from the following classifications of maintenance required. 1. Problem will cause immediate system downtime. 2. Problem requires attention within 24 hours. 3. Problem is a nuisance but does not require immediate attention. 4. Contract maintenance is required. Casualty Prevention and Control: This program is designed to meet the Facility's responsibility for maximum risk avoidance through the identification and implementation of procedures that reduce the operational and environmental hazards. Professional management, personnel selection Appiicat on for Volume Reduction Plant-lntermedlate Processing Facility ji,, ;rItted_;)y Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Fagg � 22 Attachment K- Operation and Management Plan and development, standard operating procedures, maintenance, and resource management and technical support programs are all necessary to the formulation of the casualty prevention and control organization. Specific features include: • Liaison with regulatory agencies • Tests and inspections required by regulatory agencies • Elimination of fire hazards • Implementation of department safety policies • Instruction of staff in emergency responsibilities and procedures • Assistance as necessary in the development of disaster plans D. Equipment, Tools, Parts 1. Maintenance Tools and Equipment Maintenance personnel are responsible for the care and inventory of all tools. Tools requiring replacement due to reasonable wear or fatigue, will be purchased at Nutmeg's expense. Tools that are lost, stolen, or break due to misuse, will be replaced at the maintenance personnel expense, collectively. Maintenance personnel that desire to supply their own tools, do so at their own risk and will not be reimbursed by Nutmeg under any condition. 2. Spare Parts Lists A successful maintenance program is dependent on the availability and organization of spare parts for equipment in case of breakdown. It is the intent of this Maintenance Program to maintain an available inventory of spare parts whether it be maintained by the Facility, vendors, or both. In most cases "necessary" spare parts will be maintained by the Facility. In some cases available vendor inventory, which can be delivered in emergency fashion, will be utilized. This will be especially true in large dollar inventory items. Nutmeg intends to work with the Authority to update the spare parts list, which requires a final inventory prior to commencement of the Agreement. Once finalized, this list will be added to the Operations and Maintenance Plan. 3. Spare Parts Numbering and Location It is extremely necessary to organize all of the Facility's inventories of spare parts. It is therefore, necessary to assign spare parts numbers and locations to facilitate finding the part when it is needed, especially to someone unfamiliar with the part. There are three (3) basic forms utilized in maintaining a spare parts inventory: • Spare Parts Inventory and Location - Identifies parts utilizing Equipment name and number and part OEM number. • Spare Parts Vendor Master List - Identifies quantity on hand and reorder point. Appiicatl,�n for Volume Reduction Plant-intermediate Processing Fac l?ty Sucmkt-- yX Nutmeg Recycling, 300 Rya 5t,, South Windsor, CT 06074 Page 123 Attachment K- Operation and Management Plan • Spare Parts ID Tags - Identifies bin location of part. Each segment of the system has its own bin location. For example, all conveyors that are similar have one spare parts bin. 4. Spare Parts Vendor Master List The Vendor Master List identifies all vendors associated with a piece of Equipment. This list will be maintained on the Atlas computerized maintenance program. 5. Spare Parts Tag • Identifies part description and vendor part number. • Is filled out upon check in of part prior to placing in bin. • Upon use of part, the parts tag is deposited in the "parts used" bucket to help facilitate the inventory system. Daily, or as necessary, the tags are compared to the spare part inventory to update the inventory and parts ordered when dictated by minimum quantity. E. Equipment Identification Specific Equipment is set forth at the end of Schedule 3. This Equipment list will be updated after completion of the Retrofit and added to the end of this O & M Plan. Each of Nutmeg's facilities has numerous pieces of Equipment. It is necessary to maintain a master equipment list for logistical purposes. It is also necessary to utilize an Equipment numbering system to facilitate the operation of the remainder of the maintenance program. The documentation that will be generated by completing the following programs, will be furnished to the Authority's Service Coordinator and Nutmeg's Safety & Maintenance Manager on a monthly basis. All documentation will be submitted with the monthly Invoice. F. Maintenance Work Order Instructions The following are instructions for filling out a Maintenance Work Order (MWO) requesting or defining maintenance requirements: o Plant: Enter Plant name. o Date: Enter date of generation. o MWO # Maintenance will enter a number. o Equipment#: Enter equipment ID#from Equipment master list. Appi I cation for volume Reduction Plant- Intermediate Processing Facility �"7ittad jbl Nutmeg Recycling, 300 Rye St., South Windsor, CT 06074 Page 124 Attachment K- Operation and Management Plan o Equipment Name: Enter name. nine r-ri.�...... .r. ..� . Ent—Iwo vwIIItJIG�G %A i�OtrlIJJllvl1 vl toobie 11 of -wo k. T Iy LU UC d5 specific as possible. o Priority: Circle priority number using the following guidelines: Priority 1: Problem will cause immediate system down time or jeopardize employee safety Priority 2: Problem requires attention within 24 hours. Priority 3: Problem is a nuisance but does not require immediate attention Priority 4: Contract maintenance required. The majority of all MWO's should have a priority 2 or 3. Priority 1 MWO's are overridden by emergency breakdowns and should not be confused. MWO's are not required for emergency situations. • Work Performed: Maintenance will enter description of work performed • Stock Parts Used: Maintenance will enter parts numbers of parts used • Inventory logs should be adjusted to reflect use • Non-Stock Parts Used: Maintenance will enter list of non-stock parts used • Cost: Maintenance will enter and total costs of parts o Date: Maintenance will enter dates of work performed • Hours: Maintenance will enter (mm. 1/4 hr) of hours of mechanical • (M), electrical (E), and instrumentation (1) performed • Remarks: Maintenance will enter remarks on anything unusual about work. • Originators: Signature of person originating MWO. • Maintenance: Signature of maintenance person. • Date completed: Maintenance will enter completion date and also notify originator of completion. apclication fbr Volume Reduction Paartt- #ntermediate Processing Facility �AC^�rtted�y Nutmeg Recycling, 300 Rye St,; South Windsor, CT 06074 Page 125 Attachment K- Operatier and Management Plant • Completed MWO's would be filed in the master maintenance file. At the end of each month, copies of the completed MWO's should be forwarded to Manager of Safety & Maintenance and the Authority's Service Coordinator. • Uncompleted MWO's should be kept in the shop on clipboards designating each priority. G. Equipment Maintenance History 1. Definition Maintenance history is defined as the amount of maintenance accomplished during any specific time period on Equipment within a given Facility. Maintenance history is utilized in many ways (i.e., hours of maintenance per unit of production, labor costs, specific maintenance performed on a piece of Equipment, etc.). 2. Responsibility The maintenance history of all Facilities will be compiled by each Facility's Manager, or appointee, on a monthly basis based on information obtained from each Facility's maintenance personnel. 3. Methods The information will be kept on the equipment maintenance history log. H. Preventative Maintenance This portion of the manual will walk you through the requirements for the Preventative Maintenance Program. The instructions and checklists will help you identify and perform the required tasks. The most important facet of this program is the person performing the P/M. It is imperative that this program be performed as designed to assure the purposes of the Maintenance Program are achieved by minimizing equipment downtime. J. Preventative Maintenance for Operating Equipment • The remainder of this section includes the checklists for Preventative Maintenance at the Facility. PM is broken down into daily, weekly, monthly, quarterly, semi-annual, and annual checklists. K. Daily Preventative Maintenance To be done on a daily basis. Keep recorded on log and keep on file. 'ppj at or. for Vo ume Deduct-on Pant,-- Intern adiate Processing Pac lity dra tted by Nutmeg Recycling, 300 Rye St., South Windsor, CT 06f39� Page ; 26 Attachment,K O.Peration and Management Plan 7 Prnrnccinn 1 inn a. Every morning visually inspect all moving Equipment for proper operation. 2. Conveyors a. Inspect belts on all conveyors to assure alignment, and splices to prevent unnecessary tearing. b. Visually inspect all moving Equipment for proper operation. c. Insure all guards are in place. d. Check for structural integrity on all conveyors. e. Clean debris from in and around Equipment. 3. Processing Line a. Every morning visually inspect all moving Equipment for proper operation. 4. Conveyors a. Visually inspect all conveyors belts for alignment and splices to prevent tearing. b. Inspect all equipment for proper operation. c. Insure all guards are in place. d. Check equipment for integrity. 5. Baler a. Motor- check for signs of stress. b. Hydraulic tank - inspect and clean breather element, replace if necessary. c. Hydraulic fuel filter- change filter elements. d. Hydraulic fluid - oil sample analysis, replace as needed. e. Hydraulic tank magnets - remove, inspect, clean. f. Oil cooler- inspect and remove debris. g. Photo sensor- clean lens. App lcatio,,7 fa-'Volume Reduction Plant-Intermediate Processing Facif ly cam,ted ^!Nutmeg Recycling, 300 Rye St., South Windsor, C?06074 Page 127 Attachment K- O.oeration and Management Plan h. Main rams - clean debris from behind platen, check bolts for tightness, grease, inspect seals and wear bands, replace as needed. i. Ties stem - inspect spools, tracks, ear mechanisms, remove track and Y P P 9 related parts, wash thoroughly and replace. j. Clean all needle heads. k. Insure proximity switches are in correct position and free from obstruction. I. Clean debris from knotter. m. Clean wire wheels. n. Remove debris from under and behind flap cylinder. o. Remove debris from backside of ram. p. Check and correct oil leaks. q. Clean air filter inside out using compressed air. r. Clean power pack/machine with air. s. Material shearing blades - check bolts for tightness, blade condition and adjustment. t. Check and tighten Allen screws on fingers. u. Oil chain on conveyors. v. Check and correct tension on ruffler v belts. w. Grease bale length counter wheel. x. Change oil filters. 6. OCC Separator Disc Screen a. Inspect all Rotors and shafts b. Clean any build-up of debris on shafts L. Weekly Preventative Maintenance These items are to be performed every week. Preferably on Monday except for power cleaning which should be done on the weekend. Appi cation for Volume Pay+=action Plant- Irterrrediate Processing Facility <atmitted by Nutmeg Recycling, 300 Rye St., South Windsor, CT 060T4 Page 128 Attachment K- Operation and AVanagement Plan Processing Line: 7 C nnyn J • Grease all bearings and idlers. • Inspect gear box for correct lubricant level. • Inspect drives for alignment and operation. • Insure all nuts and bolts are tight. 2. Baler • Grease needle gantry. • Clean wire pusher. • Tighten all nuts and bolts. • Check cylinder, fixing pins. • Check cylinder fixing pins security. • Check cylinder, fixing eyes. • Clean needle slides in ram. • Clean "dog" slides. • Oil cut/support wheels. • Wipe down entire machine. • Check all electrical wiring for insulation damage. • Check all hoses for wear. • Insure all safety switches work. • Check conveyor gear box oil Electric: 1. Control Panels • Clean filters and inside and outside of cabinets. Applfcatio,- for V�hwvme Reduction Plant—Intermediate Processing Facility S crrmr d bl Nutmeg recycling, 300 Rye St., South Windsor, CT 06074 Page 129 Attachment K- Operation and klanagement Plan 2. HVAC • Check filters for plugging. Replace as necessary. 3. Lighting • Insure all fixtures are working. Replace bulbs as necessary. M. Annual Preventative Maintenance Instructions The annual P/M should be done in January - preferably during the first week. As the P/M is accomplished the annual P/M checklist should be filled out and filed. Balers • Change hydraulic oil. • Change oil filters. Electrical Gear • All electric gear should be checked by an electrician for balancing, contact leaning, and calibration by a qualified electrical maintenance contractor. • All electrical terminations should be tightened. Equipment Rebuilds • Determine through operation and maintenance history when and what rebuilds are necessary on a predictive basis to eliminate downtime. App cation for Vo/ume Peducti�n., Plant In arn?ed°ate Pro.essing Facility Sacr�,it�ed u,,114utJ-reg Recycling, 300 Rye St., South Windsor, CT 06074 Figure 1 Site Location Map NUTMEG RECYCLING LLC 300 RYE STREET SOUTH WINDSOR, CONNECTICUT TOPG! map printed on 05/26/11 from "Untitled.tpo" 72037.000' W 72036.000' W 72035,000' W 72034.000' 1 'Y' '} -. ��qey~ -_- ` • _ - �y � J-ego'. - ,y 5 �� ` _ 0 n� �Qbb q4 C� ZY ~` �•• ��` 4, LNf1 _..if fD .�=� _ • Q � • East win $ ° • t �4 • .: , Z .e:• a Lf5 4 / ' _4_ �..J • r • s f �r ILA _ - 1Z6_ 72037,000' W 72036,000' W 72035.000' W 72-34,600' MN� TN 0 -5 1 MILE 14`!° 1000 FEET 0 500 1000 METERS Map created with TOPG!aD @2003 National Geographic(vnfnu.nationa%eographic.com+topo) 58H Connecticut Avenue United States Department of the Interior Project:Nutmeg Recycling South Windsor, Connecticut Geological Survey Zr Telephone:(860)282-1700 7.5 Minute Series Topographic Map Apex Job#:5981-001 / Contour Interval: 20 feet O Scale: 1 inch=2,000 feet 11 111 Af South Windsor, CT Date:January 2011 APEX -.- 2 3 4 5 6 E Unoccupied Office Space Empty Storage Room Electrical Switch Gear APEX 371, 2T-0 6 Y 270 cu.yd. -0• '` 175 Misc. Bales Bw•3 gz loose Office Mix Or 525 cu.yd. Approx.New 0 oor 540 cu.yd.d® —� p Location-Wall Width 1' New Loading loose SS Ramp 240 cu.yd. 175 OCC Bales Z Z z ir-n}• J J No loose OCC Or 525 cu.yd. z W r 0 0 nw� Pallet ' 9 3 3 VaulUnust 75 Paper Bales g 0 Q U o �, Scale r 525 cu.yd. Er " W W W ,� 3' Baler N — > r< 19 175 PP Bales o z M Fenced-in Or 525 cu.yd. Supply Pick Station Storage & Conveyor 175 LDPE Bales 26'-6• Or 525 cu.yd. ND, D",E DEBDNIBTDN B. 21 20'- • Incline Feed MD EBE ND. �e„_DD, MD B 4 Outbound 281.1' DES DSY - ,•. Conveyor D BY - 3- p C1.ED Br Loading Docks DAM DR""k1G NAEE N.f.i �gJII Maintenance NOT TO SCALE 3 I I�1,- 4 �441" Room Pallet Storage 3'-1� sEEr nnE 1t B-II1 4'-2' FLOOR PLAN 180 Aluminum Bales 28 2 Oif Bales 26-6 175 OCC Bales D D ZD 150 PET Bales Or 540 cu.yd. Or 450 cu.yd. Or 900 cu.yd. Or 525 cu.yd. ® FIGURE 3 APPENDIX 1 -Health & Safety Table of Contents (Nutmeg Recycling- Hudson Baylor) ENUT,MEG mRECY(LING HUD S ON BAYL OR TABLE OF CONTENTS I. Safety and Health Policy Statement II. Accident Investigation and Reporting Safety Program Forms: Accident, Incident,or Near Miss Investigation Report Training Attendance Roster(Accident Investigation) III. Back Safety in the Workplace Program Forms: Training Attendance Roster(Back Safety) IV. Bio-Medical Waste Management Safety Program V. Bio-Safety and Bloodborne Pathogen Safety Program Forms: Cleaning and Disinfecting Schedule Exposure Control Plan Hepatitis B Vaccine Statement Safer Medical Devise Use Evaluation Sharps Injury Log Training Attendance Roster(Bloodborne Pathogens) Training Information on Bloodborne Diseases Training Text of the Bloodborne Pathogen Regulation VI. Blood and Bodily Fluids (Incidental) Exposure Safety Program Forms: Training Attendance Roster Blood and Bodily Fluids (Incidental)Exposure VII. Crisis and Disaster Planning Safety Program Forms: Bomb Threat Checklist Disaster Program Template Earthquake Preparedness Evacuation/Relocation Procedure Training Attendance Roster(Crisis and Disaster Planning) VIII. Electrical [General] Safety Program Forms: Appliance Safety(Cord and Plug Equipment) Electrical Safety(General)Program Assessment Training Attendance Roster(Electrical Safety General) Safety Manual Table of Contents Page i of 5 Rev.[02t09] IX. Emergency Action,Evacuation, and Fire Prevention Safety Program Forms: Emergency Action Plan Exit and Egress (Life Safety)Requirements Fire Drill or Rvacuatinn Accec_cmPn_t_ Fire Prevention Plan Monthly Fire Extinguisher Review Training Attendance Roster(Emergency Action and/or Fire Extinguisher) Types of Fire Protection Systems X. Ergonomics and MSD Safety Program Forms: Ergonomic Office/Computer Safety Checklist Ergonomic Work Area Screening and Analysis Tool Training Attendance Roster(Ergonomics) XI. Fall Protection Safety Program Forms: Fall hazard Evaluation Fall Protection Equipment Inspection Checklist Fall Protection Program Assessment Fall Protection Requirements Example Chart Fall Protection Training Completion Certificate Fall Protection Wallet Card Fall Protection Written Procedure Training Attendance Roster(Fall Protection(PFAS)) XII. First Aid and Emergency Medical Response Safety Program Forms: First Aid Kit Supply Requirements Training Attendance Roster(First Aid Basics) XIII. Flammable and Combustible Liquids Safety Program Forms: Flammable Liquid Storage Program Assessment Training Attendance Roster(Flammable Liquids) Safety Manual Table of Contents Page 2 of a Rev.[02109] XIV. Forklift [Powered Industrial Truck] Safety Program Forms: Forklift Operator Daily Inspection Checklist Forklift Operator Evaluation Assessment Forklift or Pallet Jack Operator Log Forklift or Pallet Jack Operator Use Requirements Forklift Program Assessment Forklift Training Completion Certificate Forklift Training Wallet Cards Pallet Jack Operator Daily Inspection Checklist Pallet Jack Operator Evaluation Training Attendance Roster(Forklift or Pallet Jack Operator) Truck Designations and Truck Use in Hazardous Atmospheres Truck Forklift Operating Rules Poster[English] (California) Truck Forklift Operating Rules Poster [Spanish] (California) XV. General Safety Awareness Program Forms: General Safety Rules for All Departments New Employee Safety Orientation Training Training Attendance Roster(General Safety) XVI. Hand and Portable Power Tool Safety Program Forms: Hand and Portable Power Tool Guarding and Safety Requirements Hand and Portable Power Tool Program Assessment Training Attendance Roster(Hand and Portable Power Tool) XVII. Hazard Communication Safety Program Forms: Chemical Inventory List Hazard Communication Written Program Hazard Communication Program Assessment Training Attendance Roster(Hazard Communication) XVIII. Job Hazard Analysis (JHA) Safety Program Forms: Job Hazard Analysis Job Hazard Analysis Process Examples Job Hazard Analysis Survey Questions Training Attendance Roster(Job Hazard Analysis) XIX. Lead Exposure Safety Program Forms: Training Attendance Roster(Lead Exposure Awareness) Safety Manual Table of Contents Page 3 of 5 Rev.(02/09] XX. Lock-Out/Tag-Out Safety Program Forms: LOTO Absent Employee Lock Removal Procedure LOTO Determination of Applicability LOTO Equipment List LOTO Program Assessment LOTO Written Procedure LOTO Written Procedure Inspection Certificate LOTO Written Procedure List Training Attendance Roster(Lockout/TagOut) XXI. Machine Guarding Safety Program Forms: Machine Guarding Evaluation of Applicability Machine Guarding Program Assessment Machine Guarding Using Presence Sensing Devices Training Attendance Roster(Machine Guarding) XXII. Marking Industrial Hazards Safety Program Forms: Training Attendance Roster(Marking Industrial Hazards) XXIII. Mechanical Power Press Safety Program Forms: Machine Guarding Using Presence Sensing Devices Training Attendance Roster(Mechanical Power Press Safety) XXIV. Noise Exposure and Hearing Conservation Safety Program Forms: Noise Exposure and Hearing Conservation Program Assessment Noise Exposure Computation and Rating Tables Text of Noise and Hearing Conservation Standard Training Attendance Roster(Noise and Hearing Conservation) XXV. OSHA Recordkeeping Safety Program Forms: OSHA 300/300A/301 Paychex Accident, Incident,or Near Miss Investigation Report Training Attendance Roster(OSHA Recordkeeping) XXVI. Personal Protective Equipment Safety Program Forms: Certificate of Hazard Assessment Personal Protective Equipment Assessment Training Attendance Roster(Personal Protective Equipment) XXVH. Portable Ladder Safety Program Forms: Ladder Safety Checklist Training Attendance Roster(Portable and Fixed Ladders and Mobile Stairs) Safety Manual Table of Contents Page 4 of i Rev.[02109] XXVIII. Rim Wheel Servicing Safety Program Forms: Training Attendance Roster(Rim Wheel Servicing Awareness) XXIX. Safe Driving and Vehicle/Fleet Safety Program Forms: Motor Vehicle Accident Report Safe Driving Vehicle Inspection Checklist Training Attendance Roster(Safe Driving) XXX. Safety Checklists Forms: Company Specific Corrective Actions Safety Checklist [General Safety] Safety Checklist [Manufacturing] Safety Checklist [Office] Safety Checklist [OSHA Self-Inspection] XXXI. Safety Meetings and Committee Charter Safety Program Forms: Safety Committee Task Sheet Training Attendance Roster(Safety Committee Overview) XXXIL Stairway and Fixed-Ladder Industrial Safety Program Forms: Training Attendance Roster(Portable and Fixed Ladders and Mobile Stairs) XXXHL Walking and Working Surfaces Safety Program Forms: Walking and Working Surfaces Program Assessment Training Attendance Roster(Walking and Working Surfaces) XXXIV. Welding, Cutting, and Brazing Safety Program Forms: Hot Work Permit Supplemental Arc Welding and Cutting Information Supplemental Oxygen-Fuel Gas Welding &Cutting Information Supplemental Resistance Welding Information Training Attendance Roster(Welding, Cutting, and Brazing) Welding, Cutting, and Brazing Program Assessment XXXV. Working in Extreme Temperatures Safety Program Forms: Cold Related Injuries and Illnesses Heat Illness Prevention Plan(California required) Training Attendance Roster(Working In Temperature Extremes) Safety Manual Table of Contents Page 5 of 5 Rev.[02/09] APPENDIX 2 - Evacuation Plan Nutmeg Recycling amomTMEG ON, U mR- ECYCLI, N,G Plant Evacuation Instructions: * -You are here When alarm sounds,leave building by indicated route and -----. Primary Evacuation Route assemble to the emergency evacuation assembly area in northwest corner of parking lot at the scale for attendance and ----- Secondary Evacuation await further instructions. 211d Floor Offices Route L4--, �q = All Yellow Boxes are Exits Ly 1 f Offices , U e + ! Q � LL � 1 CU 1 I 1! ti ! �r. c F' ";� Via::`•" . Emergency Evacuation rr`: Assembly Area Scale O NUTMEG @RECYCLING IAL5 APPENDIX 3 —Baler Schematic Drawing Nutmeg Recycling INNUTMEG im RECYCLING 35'-COLUMNS 35'-COLUMNS 7� 2'-4"—. Lk ] I rz� PIT PLATES u 20'-1 7/8" 4'-2. OPTIONAL } I 11 BELT6. 6' 40' 40' COLUMNS SB-M-60-32-150-11-AG-A-0-3-VFD 80' SLIDER BED SORT CONVEYOR 54'-11' �+-►rwu�aacurvasraa e ��r ss��..iu+t,rres MS ° Q Q LIF Al ° ° a i'-iD 3i4'-j _ 35 80'-0 5/8'-OAL PLAN VIEW CB-2-60-6-14-12-BG-0-40-1 D--ON-VFD 5'-0 7/16'-- 60" COMBO BELT CONVEYOR '5��9. 17'-6 1/4- CENTER I SHAFT OAFi HEIGHT I, 3'-8"-PIT �--18'-5 7/16"— 32'-6 5/8' 7'-6 40'-PIT ELEVATION COPYRIGHT (C) 2007 MARATHON EQUIPMENT CO. NOTE. THIS DRAWING IS AN ACCURATE DEPICTION OF EQUIPMENT PROVIDED BY MARATHON ONLY. ANY REPRESENTATION OF BUILDING AND OTHER EQUIPMENT ARE FROM BEST AVAILABLE INFORMATION AND MAY OR MAY NOT BE ACCURATE. DIMENSIONS MAY CHANGE UP ON ACTUAL DESIGN FX'I -9"WAY WUS AMM-w-0.26m ❑ APPROVED - MANUFACTURING MAY PROCEED. SORT SYSTEM ❑ APPROVED, EXCEPT AS NOTED - RESUBMIT FOR HUDSON BAYLOR DRAWING, MANUFACTURING MAY PROCEED. _ ❑ NOT APPROVED - CORRECT DRAWING AS OR.DC NOTED AND RESUBMIT. CX. rpp. + APPROVED BY.• DATE 9 OlQ7 CtJAIPAF WVMMIM SCALE-- OATE AL Tou--f i 16` NOTE, APPROVED COPY OF THIS DRAWING MUST BE YMNUIUN NV. DRAIMING NO. RECEIVED TO BEGIN MANUFACTURE OF UNIT. gEtRrOD PA. 63817b APPENDIX 4 — TerminixTM Contract & Regular Service Nutmeg Recycling KINUTMEG le ING mRF(Y(L Mrt sc, . `Purchaser/8ilhnigAdress .° - 1 .., Sr Company 4 i + r ! Contact Address Telephone ,l City Address State Zip City Telephone .T State Zip- ❑ Multiple Locations Attach Location Listing Terminix Commercial Pest Control Service Terminix will perform regularly scheduled service at the above service address for the control of the following pests: Service Frequency ❑ Cockroaches ,❑ Mice outhly ❑ Semi-Monthly CI Silverfish 0 Ants(excluding Carpenter,Pharaoh and Fire) C&Bi-Milluthly `f Weekly ❑ Rats ElOther ElQuarterly ❑ Other Additional Service Information Addendums Indicated Forrns are Part of this Agreement Customer Preparation Checklist Part 1 ❑ Sighting Log Equipment Sales Customer Preparation Checklist Part 2 _ Customer Prep.Checklist for Apartments Service Schedule Checklist I ! Optional Payment Schedule 1 Wit' t Initial Service Charge $ Down Payment - A Regular Service Charge S mount Sequenceunnc�l Annual Total S Received At Completion Less 3%Year.Advance Payment 5 _ Amount Dcpmii Numbu Account Number � J j Total Due _ ---- - - - -- You may recognize a 311/lo discount for pre-paying one years service charge in advance This is to certify that Tax Exemption Certificate Number has been furnished with this Agreeni enf to 'fermium. This agreement is subject to the Terms and Conditions on the front and track, - including the Mandatory Arbitration provision. Customer/Agent signature This agreement is for an initial period of twelve months from the date of the first service and,unless canceled by the Purchaser,will aulotnalically continue on a monthly basis until canceled by either party upon thirty (30) days-notice.This agreement is not valid unless accepted by custonul within 30 days of submission. In the event you have any questions or complaints,1'ou may contact Terminix Authorization a Terminix representative by calling i-8o0-TERMINIX(17800-837-6464) Terminix Office Telephone B,Y --- - _..- -- - Address Title - -------— Date ----- - ------ CIsRM NIX REPfiESENTAt'tV (print name) DAR. TEJWINIX REPR ES ENT1i`I'I V a SIGNArURE TERM ITFIX 'Not available in California ww—:tterminix.com Key#33231 Rev.4/06 R/P M7 CUSTOMER COPY 4)007 1he Terminix International Conoamr LP, L OPER)WD.R:S NAME&CERTIFICA71ON 4 TERM►/Nix TERMITE and PEST CONTROL REGULAR SERVICE AND INSPECTION REPORT BRANCH ACCOUNT RT. TELEPHONE GRID S-DAY F T I PRODUCTION TIME IN TIME OUT o vo SERVICE PROPERTY AT SERVICE CENTER CA TARGEIT F'EST- SERVICE INSTRUCTIONS y TREATED INSPECTED D j J� L CRAWL bih'IE I I I i t 0 2 Q 11�011-s 1 02 v -S L-j L IV 1*116 Aki:fkL.* 1 41-,i I fj'2 8- 0 U= -j v LI! ­2 TO 1 t,,, SUPERvTSOR S CONIME',!; TREATMENT CODES: C=Crack&Crevice S=Spot B=3' Band G=General T=Space Treatment EQUIPMENT CODES: A=Aerosol B&G=Comp.Air F=Fogger HD=Hand Dust T=Trap B=Bait Stat. SPECIAL SERVICE INSTRUCTIONS z CUSTOMER'S SIGNATURE AMOUNT PA D SERVICE TECI-INICIWrfGNATURE CASH CHECK 9 q!p 7111 4;)-2011 THE TERN41NIX,N-!E:7NWIONAL WtOPAN(I 0 1 7 2) OPWATOR-S NAME&CERTIFICATION# T�R1H//YIX Jvo� TERMITE and PEST CONTROL ul REGULAR SERVICE AND INSPECTION REPORT BRANCH ACCOUNT RT. TELEPHONE GRID S.DAY F T PRODUCTION TIME IN TIME OUT 0 14 sm, C SERVICE PROPERTY AT SERVICE CENTER ,)00 RYE f -T,,)�ITH Wit"JT3i 111, 1 0'L r'r 109" TARGET PEST SERVICE INSTRUCTIONS I TREATED INSPECTED L J L J b, LJ -S 0505y-b 1-4 r-1 LIVING ARBS 11�011-s 15024-S 050:W-5 CIT H R MOUNI, EQUIP i YA I �Iii!2 -Fr,]!7 I 28 Sii-ip Trap h,6 u(HH'Hir11Jj11- TuTh; SUPERVISOR'S COMMENTS: Treat for Infestation/Prevention or Inspect areas indicated. TREATMENT CODES: 0=Crack&Crevice S=Spot B=3' Band G=General T=Space Treatment EQUIPMENT CODES: A=Aerosol B&G=Comp.Air F=Fogger HD=-Hand Dust T=Trap B=Bait Stat SPECIAL SERVICE INSTRUCTIONS CUSTOMEWS-SIGNATURE AMOUNT PAID SERVICE I'FCHNICAVS SIONATURE CASH CHECK I FQt,A r',A APPENDIX 5 —Allied Sprinkler Contract & Regular Service Nutmeg Recycling N = = EG UTM , -,, mRECY(LINIG 12/22/2011 13:21 8604850602 ASMSINC PAGE 01/04 12/22/2011 11.45 0684858602 p 1NC: PACE 01/04 Allied Sprinkler and Mechodjoal Sys.Im_ l0 Hcm 1.489 .Burlington ,Ct.06015 Tote ; 860 S-15 74/Fax ; 1iSS-0+602 Nutrmg Recycleing.LLC Dam ; 1-2-2112 ,A,,tta ; George Saws FO Box 1.153 S.Windsor ,Ct.QW41 Re;Inspection Conuact for Sprinkler Fax ; 761-2424 System and Hydrants Owner; Nutmeg Recycliq LLC Locatiou ;300 Rya St. ,S.Windsor,Ct. .1a1mcdons to be QuMerly for Sprinkler System and yearly for hydrants - Cost of 1nspecdow Quarterly = $48M plm Q.tax Cost of Yearly Hydrant Insp.= $300.04 Plus Ct.taX ctiption of SpriWda Inspections;flow mWo dMiM to ssocrtWn water supply,Inspect.QauM for Static and Residual waWngs ,flow inspectors nest to activate flour switches,visual iwspec ion of sprinkler system , Description of Hy'dm t Test ;flow all hydrants oxi sire ,,ch=k physical condition ,luhricam Jxydmnts as needed ,cheeik for teaks ,map hytlmt 14?50ow. This Inspection Contract is feet the sole purpose of Inspwticrns as agxftd to herein , �rfC.�61P,� �0'��8t�0�3:�1 b6`bZt9�.0'9� ;uJadd L1:2� S'GO�-�-330 12/22/2011 13:21 8604850602 ASMSINC PAGE 02/04 1212212611 11:45 M34239602 ASWTN8 PAGE 82/04 Fkp2Of2 We do not include any material wjth tMs inspection contmetAny deficiencieS t*the oyWm tht must be cited will be comooWd va a tiaxe and Modal ins,Mm we have teed written giudwdution. coocs of written repoft to be sent to 1mW Ftrc ManhoU,C new pm- ttadve and St4W MiciWis if desired. Allied SptrinKe r and MechoWcal Sys W is hereby relieved of any*nd all YaWnsibility for wdons caused by Qwnen PM04401 or Alamo Co.that Umn in fWWo alorm or in any way disturbe or Cwtoxom ;Allied is held ham, Nutmg Recycling JLLC Allied Swirdder MwAA&W Sign- Sign,• t's?:QI ped :wda.� ZT:2T TTM-22-DEG 12/22/2011 13:21 8604850602 ASMSIMC PAGE 03/04 12/22/2011 11.45 86040%0602 PAGE 09104 Allied Spinbe;r and Mw.chaniow Sys Inc. PO Box 1 ,BurliR ,Ct.06013 `1'ele ;9W-485W1$741 Fax;860-485 Ne g.RnreydoinS,LLC Del&; 1-2-2041 Attu ;C urge SM. K)Eon 1153 S.Win(IWr ,Ct_OW74 Re:Inspection COW=for Spt7lnkler Fax ;860-?61-2424 System and Hyd to Qwrscr ;N'uttxtmg Rccycling LLC L cation ; 3M Rye St. ;S,Wiu&or ,Ct. ItwspeWons to be Quarterly for Sprinkler Systcm and yearly for Hydrants . Cost of Insp KtUons Quarwly = WDO plus Ct.tax Cost of dearly Hydrant Insp.= $8W OO Plus Ct.Nx Desodptiou of-Spfinkter Wpecdow ;flow resin dr to aocerWn water supply,lnspwt Cysuggg for State and Residual read qp ,flaw impcetOn test to activate now swltc ,visuat lospewon of sprinkler system, , D=M460n of Hydmt Tost;flow all hyc nts on site ,cha* pysicO Qondeticm ,lublic gw bydrenu as n ,chmk for leaks ,nap by lvc o na This Impection COMICt is four the sots puWe Of UAPOCdOns as agreed to herein j t�E:aaa� 20909)V@%-'()L 12/22/2011 13:21 8604850602 ASMSINC PAGE 04/34 12122/2011 11:45 0684850602 ASWINQ PAGE 84104 Page 2 of 2 `vie 40 not include gwy material with this inspection coubuctAny deflolancies to the system that must bs corrected will be cowleted on a time and material WS,OftOr WO Uwe rteeiVW w+kbnn allftNiZaOdA. Codes of written mpom to be sent to LQcW Fire Marshall,Owum Repra- senative and State Officials If desired. Anted Sprhikler and MeakWeal Sys i=is hereby whoved of any and all responsibility for action =wed by Owners Porso wl or Alum Co.that W=in false alarms or in any way distuM or custom :AxRC4 is held harmless. Nut mg R=Yr-lius LL C ADIed Spxiztkler Mechanical Sip,, Sign; Title- 1 10.2-as-Da+) Report of inspection & Testing of Water based Fire Protection Systems Quarterly and Annual Items to be Reviewed ALL QUESTIONS ARE TO BE FULLY ANSWERED AND ALL BLANKS To BE FILLED Inspecting firm(Contractor j`` D Inspection Contract# -- Name of Property: z- Inspector Name:_ :D �� 1� _,` ate: Page_...L_ Of_^�__ Inspection Frequency: .. Monthly Quarterly Annually Other Quarterly Report of Inspection of Quarterly Testing Requirements Wet Sprinkler System for Wet Sprinkler System (For a quarterly inspection, complete all items listed on �y N/A N FORM 64-106A"Report of Inspection Monthly items to be Reviewed" AND the items listed beiowr.) C-1.1 MalnDrain flow test with-Zin. (Y-)WA N valve full open; B-1.1 Hydraulic nameplate C-2.1 Sprksupply Gauge:psl B-1.2 Strainers&tllters C-2.2 Spkr.supply cleaned W/A gaugeZmaln drain flow properly identified Bm1.3 Exterior alarms C-3.1 Spkr system gauge—psi 8-2.0 Alarm panel clear: C-3.2 Spkr system gauge B-3.0 System left In service. '�/_�- with main drain flow:--Z-_psi AN WA N C-4.1 Water flow alarm i devices activated: 7 . C-4.2 Interior bldg. Warms operating C-4.3 Exterior alarms operating C-5.1 Inspectors test flow: psi -- C-6.1 71me to ring alarm from alarm check valve: / min.p sec. C-7.1 Time to ring alarm from flow switch: / min.o sec. C-8.1 Time to ring alarm from pressure switch: min.: -sec.:-- N/A N C-9.1 Gauges appear to be operating Va� properly. C-10.1 Did alarm supervisory company receive signal properly: C-10.2 Did alarm panel reset properly: C-11.0 Alarm panel clear C-12.0 System left in VA service: C-20.0 Comments: 0 (ALL NO ANSWERS TO BE FULLY E LAiNED) � Inspectors initials Owner/designated rep.initial Date: Page 3 of 3 nUTMEG RECYCLING ALLIED SPRINKLER & MECHANICAL SYSTEMS, INC. P.O. BOX 1489 BURLINGTON, CT. 06013 860-485-1574 Phone 860-485-0602 Fax 860-919-4165 Cell ADDENDUM (I.) Please be advised that ALLIED SPRINKLER & MECHANICAL SYSTEMS, INC. IS NOT RESPONSIBLE FOR ANY MODIFICATIONS TO THE OWNERS SPRINKLER SYSTEM. THE OWNERIOWNERS ARE RESPONSIBLE TO PULL PERMITS AND MEET STATE AND LOCAL REGULATIONS AS TO THE REDESIGN AND INSTALLATION OF SPRINKLER SYSTEMS. WE ARE NOT RESPONSIBLE PER NFPA-25 TO INSPECT PIPE, FITTINGS, AND SPRINKLER HEADS ABOVE CONCEALED SPACES SUCH AS SUSPENDED CEILINGS. ANY AREAS THAT ARE INACCESSIBLE UPON INSPECTION ARE THE SOLE RESPONSIBILITY OF THE OWNEFL THIS IS TO INCLUDE ALL AREAS WITHOUT HEAT WHERE A WET OR DRY SPRINKLER SYSTEM IS INSTALLED. JAMES D. WILLIAMS PRESIDENT JDWJd!rs 11/LLI Lr111 15: i4 tibb4ti51�bb1 ASMSINL PAGE 01/02 tp % �F4 v T-Own Ole Sow ll�crzc o 1.5440 SULLIVAN AVENUE+SOUTH WINDSOR, CT 06074 sa�t•car' MEPHON6(860)644-2511 PRIVATE HYDRANT'ANNUAL TEST Address of Building —ACK".) w �►�� L� Buildiug/ComplexNa Building QwnerlManager [ Mail' Address C3 Phony Hydrant# w Hydrant L=dfion �( Inspoctor Nam L hvecDor Phwc 8 G e- 4P,S- �'74- Test Danz cn Site map of locations and marts of on-situ hydrana is shown on skis re/ rpe 4 f� Hydrant checked for good physicei candidon.ftkokIrephice worry threads, worn hydrant operating nun and any other wont or datpm aged parts. Problems observed; Were these problems corrected? d Hydrant lubnea ud to ensure all stems, caps,plags and threw&are in proper Operlodng cortdaFtl 1L Problem observed. Were these problems concxted? 0 Hydrant seals checked for leaks and repatr C4 ff necessary. Problems observed: KifA Were these problems corrected? ------- AbM51NG PAGE 02/02 �a CYHydrant caps in place. Problems observed: Were these problems corrected? fk Woter wM flowed fuUy ope x for at test I minute. Problems observed: W/A. Were these problems cox rectW? IaTydrant drain operate properly. Problems observed: � p Were these problems corrected.? VHydraaf paWed car et ly"Red"(red destrta im a prevoo hydrant In South Windsor). Problems observed: Were these problem corrected? V3-foot cledralwe maintained around circuM erence of hydrant and F&e DepL can access without hindmnce. Problems observed: Were these problems corrected? LL APPENDIX 6 - Allied Sprinkler- Planned Expansion Fire Sprinkler System Nutmeg Recycling ENuw =TMwmEG 0 ORECYCLING THE RECYCLING F OILIONA.LS ALLIED .SPRINKLER & MECHANICAL INC. P.O. BOX 1489 BURLINGTON CT. 06013 HYDRAULIC CALCULATIONS FOR NUTMEG RECYCLING 300 RYE STREET FILE NUMBER: REMOTE I DATE: 12-20-11 -DESIGN DATA- OCCUPANCY CLASSIFICATION: GROUP A PLASTICS DENSITY: .24 gpm / 2000 sq. ft. AREA OF APPLICATION: 2094 sq. ft. COVERAGE PER SPRINKLER: 120 sq. ft. NUMBER OF SPRINKLERS CALCULATED: 17 sprinklers TOTAL SPRINKLER WATER FLOW REQUIRED: 438 gpm TOTAL WATER REQUIRED (including hose) : 938 gpm FLOW AND PRESSURE (@ BOR) : 238 gpm @ 44 psi SPRINKLER ORIFICE SIZE: 3/4 inch NAME OF CONTRACTOR: ALLIED SPRINKLER & MECHANICAL INC DESIGN/LAYOUT BY: DOUGLAS E SCO`I'T NICE'T Ili AUTHORITY HAZING JURISDICTI ?N: STATE Or' CT CONTRACTOR, CERTIFICATION NUMBER: CALCULATIOONS d`+ HASS COMPUTER PROGRAM (Lr(,ENSE # 16081491 ) HRS SYSTEMS, INC. PETERSBURG, TN 37144 PETERSBURG, TN 3714<1 SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 2 DATE,: 12/19/2011 C:IACAD DRAWINGS\ALLIED SPRINKLERANUTMEG\REMOTE 1 .SDF JOB TITLE: REMOTE WATER SUPPLY DATA SOURCE STATIC RFSIF_ FT�nW AVATT.- TnTAT, RFc)In NODE PRESS. PRESS. J PRESS, @ DEMAND PRESS. TAG (PSI) (PSI) (GPM) (PSI) (GPM) (PSI) SOURCE 70.0 63.0 1188.0 65.5 938.4 43.8 AGGREGATE FLOW ANALYSIS: TOTAL FLOW AT SOURCE 938.4 GPM TOTAL HOSE STREAM ALLOWANCE: AT SOURCE 500.0 GPM OTHER HOSE STREAM ALLOWANCES 0.0 GPM TOTAL DISCHARGE FROM ACTIVE: SPRINKLERS 438.4 GPM NODE ANALYSIS DATA NODE TAG ELEVATION NODE TYPE PRESSURE DISCHARGE ("T) (PSI) (GPM) 101 27.0 K= 8.00 9.0 24.0 102 27.0 K= 8.00 9.1 24. 1 103 27.0 K= 8.00 9.3 24 . 3 104 27.0 K= 8.00 9.7 24.9 105 27.0 K= 8.00 10.4 25.8 106 27.0 K= 8.00 11.5 27.2 107 27.0 K= 8.00 9.0 24.1 108 27.0 K= 8.00 9.1 24. 1 109 27.0 K= 8.00 9.3 24.4 110 27.0 K= 8.00 9.7 24.9 111 27.0 K= 8.00 10.5 25.9 112 27.0 K= 8 .00 11.6 27.2 113 27.0 K= 8.00 11.2 26.8 114 27.0 K= 8.00 11.3 26. 9 115 27.0 K= 8.00 11 .6 27.2 116 27.0, K= 8.00 12.1 27.8 117 27,0 K= 8.00 13. 3 28.8 5.0 - - - - 19. .1 - - - 02 25.0 - - - - 19.2 - - - 03 . J - - - - 19.6 - - - 04 25.r) - - - - 23.7 - - - 05 25.0 - - - - 24.3 - - - 06 25.0 - - - - 24.4 - - •- TOR - - - - 24.6 - - - B1 3.0 - - - - 34 . 2 - - -- B2 3.0 - - - - 42... - - - BOR i .0 - - - - 4" 1 - -- - SOURCE; 0.0 SOURCE 43.8 438.4 SPRIN_{-ER SYSTEM HYDRAULIC ANALYSIS Page 3 DATE:: 12/19/2011 C:\ACAD DRAWINGS\ALLIED SPRINKLER\NUTMEG\REMOTE 1 .SDF SOS TITLE: REMOTE PIPE DATA PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) HW(C) (FT) SUM. NODES (FT) (K) (PSI) (GPM) FL/FT (PSI) PiiDe: 1 -24.0 2.157 PL _ .00 PF 0.1 101 27 .0 8 .0 9.0 24.0 2 .1 120 FTG ---- PE 0.0 102 27 .0 8.0 9.1 24.1 0.005 TL 1C .00 Pv Pipe: 2 -48.1 2.157 PL 10.00 PF 0.2 102 27.0 8.0 9.1 24.1 4.2 120 FTG ---- PE 0.0 103 27.0 8.0 9.3 24.3 0.020 TL 10.00 Pv Pipe: 3 -72 .4 2.157 PL 10.00 PF 0.4 103 27.0 8.0 9 .3 24.3 6.4 120 FTG ---- PE 0.0 104 27 .0 8.0 9.7 24.9 0.042 TL 10.00 Pv Pipe: 4 -97 .3 2.157 PL 10,00 PF 0 .7 104 27.0 8.0 9.7 24.9 8 .5 120 FTG ---- PE 0.0 105 27.0 8.0 10.4 25.8 0 .073 TL 10.00 Pv Pipe: 5 -123.1 2.157 PL 10.00 PF 1.1 105 27.0 8.0 10.4 25.8 10.8 12C FTG ---- PE 0.0 106 27.0 8.0 11.5 27 .2 0.112 TL 10.00 PV Pipe: 6 -150.2 2 .157 PL 17 .00 PF 6.7 106 27.0 8.0 11 .5 27 .2 13.2 120 FTG 27 PE 0.9 01 25.0 0.0 19.1 0.0 0.162 TL 41 .61 Pv z�e Pi 7 -24.1 2.157 PL 10,00 PF 0.1 107 27.0 8.0 9.0 24 .1 2 .1 120 FTG ---- PE 0.0 108 27.0 8 .0 9.1 24.1 0.005 TL 10 .00 Pr Pipe: 8 -48.2 2 .157 PL 10.00 PE" 0.2 108 27.0 8 .0 9. 1 24.1 4 .2 120 FTG ---- PE 0.0 109 2".0 8 .0 9.3 24.4 0 .02C TL 10,00 ?V Pipe: 9 -72.6 2.157 PL 10.00 ?-F 0.4 i09 21 .0 8 .0 9.3 24.4 6.4 120 FTG ---- PF 0.0 1_0 27 .0 8.0 9.7 24 . 9 0.042 TL 10.00 Pv Pipe: 0 1 -97.5 2. 157 PL 10.00 PF 0 .7 110 27 .0 8 .0 9.7 24 .9 8.6 120 FTG ---- ?F 0.0 Ill 27 .0 8.0 10,E 25.9 0 .033 TL 10.00 D-V Pipe: 11 -123 .4 2 .157 PL 10.00 __ - .I i i 2 / .0 8 .0 0 . 5) 25.9 13 .8 12J FTG ---- P 77 0 .0 112 27 .0 3.0 11 . 6 27.2 0 ,113 TL 10,0C :) Pape: 12 -150.6 2 ,157 PL 17 ,00 -r 6,3 112 27 .0 8.0 11 , 6 27.2 13,2 123 -77G 2.' P= 0.9 02 25.0 0.0 19.2 0.0 0.163 TL 41. 61 P7i SPR:NKLER SYSTEM HYDRAULIC ANALYSIS fay 4 DATE: 12/19/2011 C:\ACAD DRAWING&ALLIED SPR2&Rz R\9 HEG\ TE 1 ,SDF JOB TITLE: REMOTE PIP TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT else. v L(FPS) H m) (FT) sum, NODES (ET) («) (PSI) (op) q2 (PST) Pipe: 13 -26.8 2.157 PL 10.00 PF 0.1 113 27.0 8.0 11.2 26.8 2.4 120 FTG ---- RE 0.0 114 27.0 8.0 11.3 26.9 0.007 TL 10.00 Pv Pipe: 14 -53.7 2.157 £1 10.00 PF 0.2 114 27.0 8.0 11.3 26. 9 4.7 I20 £2G ---- RE 0.e 115 27.0 8.0 11.6 27.2 0.024 TL 10.00 Pv Pipe: 15 -80.9 2.157 PL 10.00 PF 0.5 115 27.0 8.0 11,6 27.2 7.1 120 FTG ---- PE 0,2 116 27.0 8.0 12.1 27.8 0.052 TL 10.00 Pv Pipe: 16 -108.7 2.157 PL 10.00 £E 0.9 116 27.0 8.0 12.1 27.8 9.3 120 E G ---- PE o,o 117 27.0 8.0 13.0 28.8 o.e89 TL 10.00 Pv 2 e: 17 -137.5 2.157 PL 17 .00 PF 5.7 117 27,0 8.0 13.0 28.8 12.1 120 FIG 2I PE 0.9 03 25.0 0.0 19.6 0.0 0.138 TL 41.61 PV Pipe: Ia -150.2 4.026 2£ 12.00 PF 0.1 01 25.0 0.0 19.1 0.0 V8 I20 FIG ---- PE 0.0 02 25.0 0.0 19.2 0.0 0 .008 I£ 12.00 PV Pipe: 19 -300.9 4.026 PL 12.00 PF 0.3 02 25.0 0.0 19.2 0.0 7.6 I20 FIG ---- PE 0.0 03 25.0 0.0 19.6 0.0 0.028 TL 12.00 37 Pipe: 20 -438.4 4.026 2£ 74.33 PF 4.2 of 25.0 o.c 19.6 0.0 11 .0 120 FIG ---- PE 0.10 04 25A 0.0 23.7 0.0 0.056 IL 74.33 PV Pipe: 21 -438 .4 6.365 PL 67.33 PF 0.5 04 25.0 0.0 23.7 0 .0 4 .9 120 FTG --- PE 0.0 05 25.0 0.0 24.3 0,0 0. 008 TL 67 ,33 mz Pipe: 29 -433.4 7. 981 21 73.16 PF o.1 05 25.0 0.0 24.3 0.0 2.8 120 FIG ---- PE 0.: 06 25.0 0.0 24.4 0.0 0.002 TL 73.16 PV Pipe: :1 -438.4 7 . 981 21 82.91 PF 0.2 06 25.0 0.0 24 .4 0.0 2.8 120 FIG E PE 0.0 TOR 25.0 0.0 24 ,6 0.0 Y002 I£ 100 .11 PV Pipe: 32 -438.4 7 , 981 PL 22.00 PF 0.1 TOR 25.0 0.0 24 .6 0.0 2.8 12C EI2 E PE 9.5 31 3.0 0.0 34 .2 0.o 0. 002 TL 40.00 2v Pipe: as FIXED PRESSURE LOSS DEVICE a2 3.0 0.0 42.2 0.0 8.0 psi, 438.4 gpm BI 3.0 0.0 34 .2 Wo SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 5 DA'"E: 12/19/2011 C:\ACAD DRAWINGS\ALLIED SPRINKLER\NUTMEG\REMOTE i .SDF JOB TITLE: REMOTE PIPE TAG Q(GPM) DIA(IN) LENGTH PRESS. END ELEV. NOZ. PT DISC. VEL(FPS) RW(C) (FT) Slim. NODES (FT) (K) (-SI) (GPM) FL/FT (PSI) Pipe: 34 -438.4 7.981 PL 2.00 PF 0.0 B2 3.0 0.0 42.2 0.0 2.8 120 FTG ---- PE 0. 9 BOR 1.0 0.0 43.1 0.0 0.002 TL 2.00 PV Pipe: 35 -438.4 7.981 PL 50.00 PF 0.1 BOR 1 .0 0.0 43.1 0.0 2.8 140 FT EG PE 2.2 U1 -4.0 0.0 45.4 0.0 0.0C2 TL 79.26 PV Pipe: 36 -438.4 7.981 .PL 50.00 PF 0.� Ul -4 .0 0.0 45.4 0.0 2.8 140 FTG _ Pn -1 .7 SOURCE 0.v SRCE 43.8 (N/A) 0.002 TL 9E.55 PV NOTES, (HASS) : (1) Calculations were performed by the HASS 8 .1 computer Program under license no. 16081491 granted by HRS Systems, Inc. 208 South Public Square Petersburg, TN 37144 (931) 659-9760 (2) The system has been calculated to provide an average imbalance at each node of 0.004 gpm and a maximum imbalance at any node of 0.114 gpm. (3) Total pressure at each node is used in balancing t'r_e system. Maximum water velacity is 13.2 ft/sec at P4 ne =_ (4) Items listed in bold print on the corer sz-ee= are automatically transferred from the calculator_ repor_. (5) PIPE FITTINGS TABLE Pine Table Name: STANDAZD.P-? PAGE: x MATERIAL: S40 HW--: 120 Diameter Equivalent Fitting Lengths in Feet (in) T L 3 A D N �_- Tee -ngEl_ Ch kVly BfyVly Gat�71v AiinCL X D?+Ilv NP ee 2 .157 6. 15 12 .31 3 . 69 13.54 7 .38 1 .23 12 .31 12.31 12. _,l SPRINKLER SYSTEM HYDRAULIC ANALYSIS Page 6 DATE: 12/19/2011 C:4P.CAD DRAWINGS\ALLIED SPRINKLER AUTMEA REMOTE 1 .SDF vOB TITLE: REMOTE PAGE: A MATERIAL: S40 HWC: 120 Diameter Equivalent Fitting Lengths in Feet t i n t F T L c B G A D N El__ Tee LngEll ChkVly BfyVly GatVly AlmChk DPVly NPTee 4 .026 10.00 20.00 6.00 22.00 12.00 2.00 20.00 20.00 20.00 6.065 14.00 30.00 9.00 32.00 10.00 3.00 28.00 28.00 30.00 7.981 18.00 35.00 13.00 45.00 12.00 4 .00 31.00 31.00 35.00 C-4 0 WATER SUPPLY ANALYSIS 0 > Static: 70. 00 psi Resid: 63 . 00 psi Flow: 1188 . 0 gpm 80 . 0 AvhEtgga pressure 65.48 psi @ 938.4 gpm 2 Required pressure D 70 . 0 43.79 psi @ 938.4 gpm A. Source Supply Curve M B. System Demand Curve A 60 . 0 Ll 0 z > 50 . 0 P 2 R VJ E > S 40 . 0 > S a a U cn R 30 . 0 > E > P 20 . 0 -3 S 10 . 0 0 0 . 0 M M (:7 -14 . 7 40o 600 800 1000 1.200 1400 1600 1800 2000 . � E MLF�1tJ S1ZG • ��� �