Loading...
HomeMy WebLinkAbout12-18P Colby's Corner Subdivision TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION APPLICATION FORM Application No: / 71 Official Receipt Date: '1 1O I d Receipt No: APPLICANT: yw PROJECT NAME: tY ADDRESS: /� �Cs *' �T•, ( ;J��• .lr C` e6e;'7V OWNER OF RECORD ON LAND RECORDS: crrli r R- )4-z—C& f Ar-D ADDRESS: -3 F J � �'I1, c�'►''► (,.�9�7c `t , C� �1(,n'� COMPLETE LOCATION OF PROPERTY: t��' C' � (sd- GIS PIN # 8-31-6)0319!J ZONE � � NAME, ADDRESS, TEL & FAX # OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: c► ,c � ' o f 11` �� 67%, 2 yl r Estimated presentation time: /' m THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required, Certificate of Mailing) ❑ Open Space Subdivision/Resubdivision (Public Hearing Required; certificate of mailing) � -Subdivision -^Minor ❑ Major ❑ Resubdivision (Public Hearing Required)❑ Minor ❑ Major ❑ Conditional Subdivision Approval ❑ Special Exception to Table (Public Hearing, Certificate of Mailing) ❑ Site Plan of Development ❑ General Plan of Development ❑ Dept of Motor Vehicle License - State Hearing per Section 14-55 for ❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision - Attach proposed amendment (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commissio . Signature of Applicant Signature of Propert O r ° 1 TOWN OF SOUTH WINDSOR CHECKLIST OF REQUIRED SUBMISSION DOCUMENTS SUBDIVISIONS/RESUBDIVISIONS APPLICANT_ S G D rT KE L L. E )� PROJECT NAME ' 'V/J' �, e�' This checklist must be signed by plan preparer(P.E/L.S) declaring that all required information is provided. Place a check mark for each item supplied. Subdivision Minor Regular I. PROJECT PLOT INFORMATION A. General Information __X _ 1. Appl. &owner name, address x x X 2. Engineer&land surveyor name, address, license no. &seal x x 3. Key map at 1" = 100'scale showing location of tract with reference to surrounding properties, streets, municipal boundaries, etc., within 500'. Key map must include: x x X a. Outline of buildings. _ X b. Layout of streets and lots. c. Surrounding property boundaries-within 500 feet. - x d. Names of abutting property owners. A/A e. Proposed-open spaces and recreation areas. x f. Driveway cuts on abutting properties and any properties across from proposed site 2 Subdivision Minor Regular X_ g. Distance to and name of nearest intersection street. X 4. A schedule of required and provided zoning district requirements including lot area, lot frontage, lot depth,yard setbacks, open space. variances granted, etc. x x X 5. North arrow and scale. x x 6. Appropriate certification block. x x 7. Date of original drawing and all revisions. x x 8. Name of development. x x B. Plot plan at 1" = 40'scale an standard 18"x 24' or 24" x 36"sheets with a 'h"' ruled margin containing the following data. Developments which require more than two 24" x 36" sheets may submit the plot plan at 1" = 100'scale. x x -_ I. Metes and bounds description showing dimensions, bearings, curve data, length of tangents, radii, arcs, chords, and central angles for all centerlines and rights-of-way, and centerline curves on streets. Monuments are required at corners and angles of all new streets and new street lines, at all points of curvature and tangency, and at critical corners and angles of all new Town open space. Coordinates for monuments shall be in tabular form. x x X 2. CGS datum shall be used on all subdivisions accessible to controls. The Town Engineer shall determine the accessibility of these controls. _ 3. Lot layout numbers, square footage of all lots, and all lot dimensions. Iron pins are required at all property angle points. No lots shall be divided on 2 sheets. x x — - 4. Yard setbacks dimensioned. x x 5. Easements, noting grantors, grantees and purpose. x x must be shown in table format, e.g. below Grantor Grantee Type of Date Filed VoVPg Easement 3 Subdivision Minor Regular \1A 6. Development phasing, if proposed. x x _ 7. Names of abutting property.owners. x x 8. Proposed street names (use approved list of names). x x QA 9. All open space reserved for common or public uses. x x X10. Appropriate A-2 certification & LS seals. x x H Topographic map at same scale as plot plan containing all data included on the plot plan plus the following: _X 1. All existing structures, streets, wetlands and existing watercourses, or other environmentally structs sensitive areas, including enough data streets x beyond property boundaries to allow a wetlnds reasonable evaluation of the property's tidpin ecological relationship to surrounding areas, 100 yr. floodplain, x �C _2. Existing and proposed contours to extend a x sufficient amount beyond subject property, to determine the effects on the property as follows (town mapping): 100' x up to 3% grade: I'contour interval 3% grade &over; 2'contour interval X 3. Boundary limits, nature, and extent of wooded areas, specimen trees, and other significant physical features. x x _ A 4. Existing system of drainage of subject site and of any larger tract or basin of which it is a part (can use Town stormwater x x study). 5. Drainage area map. * x 6. Drainage calculations * x N71 7. Perc test data, preliminary indication of septic system feasibility if individual sanitary * x sewerage systems provided. 4 Subdivision Minor Regular _8. Proposed utility infrastructure plans, including sanitary sewer. water, storm water management. * x 9. Spot and finished elevations at all property corners, corners of all structures or dwellings, or proposed first floor elevations x x X 10. Construction details(per standard specs.) * x J/ 11. Road and paving cross-sections (per, standard specs). * x A 12. Proposed street names. x x N A 13. Landscape plan and details. x x _ 14. Site identifications signs, traffic control signs, and directional signs. * x V 15. Sight triangles at new road intersections. * x X_ 16. Sight triangles at driveway entrance x x (where there may be a question).. j R17. Vehicular and pedestrian circulation patterns (less detail necessary for preapplications, concept plan, and general plan of development. * x III . Plans and profiles (1" = 40'horizontally and 1" = 4'vertically) showing the following: x Jg a. Layout of streets in sections coordinated by stations with the profile. x A b. Street plan showing roadways, drainage, and partial lot lines x 5 Subdivision Minor Regular IV A c. Profile of roadway showing existing and finished grades, all tangent grades, and all vertical curve information x /�_ d. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage pipe material to be described. x kJ A e. Typical/critical cross-sections where grading is outside street right-of-way or is at street right- of-way. x _hl A f. Where any storm drainage line discharges into an existing brook, sufficient profile of this brook will be shown to determine conditions. x N g. Profiles shall show all sanitary sewer lines and manholes, including pipe material, elevations, sizes, lengths, and slopes of pipes. Top of foundation elevations for habitable buildings shall be shown. * x lA 15. Traffic report(by traffic engineer) [\)A 16. Open space site improvement plan. * x K)A 17. Architectural elevations/information per Sect. 8.70 of the zoning regulations * - if required by Town Engineer ALL INFORMATION REQUIRED ABOVE IS INCLUDED IN THIS APPLICATION AT THE TIME OF SUBMISSION. Date �- PI Pr parr February 2002; updated 7/28/05; updated 6/7/11 W:\Planning Admin\Forms\Check Lists\Subdivisions Check List.doc PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 4/11/12 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Walter Summers, Jeff Doolittle Ray Favreau, Karl Reichle, Mark Owens, Chris Dougan, Sherry McGann, Ron Asselin, John Caldwell, Dennis Sheridan FROM: Michele Lipe, AICP, Town Planner The Planning&Engineering Departments have received plans for the following projects: Appl 12-18P, Colby's Corner Location: Northwest corner of Slater Street and Deming Street ❑ Site Plan ® Subdivision No. Acres 1.5 Zone AA-30 ❑ Industrial ❑ Commercial ❑ Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: Subdivision to create one new lot Future Town-owned property involved? ❑ Yes ® No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Please comment by 4/18/12 and return to the Planning Department. MEMORANDUM To: Michele Lipe, Town Planner From: Jeffrey Doolittle,Town Engineer Bobb Grillo, Project Engineer Date: 4/13/12 RE: Application 12-18P—Kelley Subdivision 389 Slater Street Engineering has reviewed plans for the above application and has the comments listed below. The Town plans to reconstruct Slater Street beginning in June 2012, between Oakland Road and Deming Street, including the intersection of Slater and Deming. Most of our comments relate to making any necessary utility cuts in Slater Street before this road is reconstructed. 1. The sewer lateral should be installed for the proposed house to beyond the street line now, before the Town reconstructs the road. 2. The gas service line for the proposed house should be located on Deming Street so it does not need to go under the road pavement. 3. Sleeves should be installed now for the water, electric, phone and cable service lines to the proposed house before the town reconstructs the road. 4. A sewer lateral and sleeves for all utility service lines should be installed now for the proposed utility easement, before the Town reconstructs the road. 5. The cellar floor elevation of the proposed house is below the top of the catch basin that the foundation drain is to connect to, so a back flow preventer valve should be installed in the foundation drain. Please contact us if you have any questions. Post-it"Fax Note 7671 Date S pages 10 From To ' Co./Dept. Co. Phone# Phone# Fax# Fax# Appl #12-18P, Colby's Corner Subdivision Meeting 4-24-12 1. Request for approval of a one-lot subdivision of 389 Slater Street, AA- 30 zone. The site is approx. 1.6 acres and there is an existing house with a driveway on to Slater Street. 2. Minimum lot size required in the AA-30 zone is 30,000 sf. The minimum lot size proposed is 32,185 square feet for the existing house and 34,775 sq ft for the new lot. 3. The new lot will have a driveway onto Deming Street, located away from the intersection. There are no sidewalks along Slater Street of Deming Street near this site. 4. There is an existing hedgerow of trees on the new lot that screens the existing house. 5. There are no regulated wetlands on the property. 6. The site will be serviced by public water and sewers. WPCA approval is required. 7. The applicant is showing a utility easement along the northern property boundary. He has indicated that a barn might be built some time in the future and utility service would be desired. 8. Street trees are typically required, however because of the number of existing trees on site, the Tree Warden does not feel they are warranted. If this application is approved, Planning Dept has no other requested modifications. 0 N Sf4 xTiow� Oles � m � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•CO�c TELEPHONE (860) 644-2511 April 30, 2012 Mr. Scott R Kelley 389 Slater Street South Windsor, CT 06074 Re: Appl. # 18-12P, Colby's Corner Subdivision Dear Mr. Kelley: We are pleased to advise you that the Planning & Zoning Commission voted on April 24, 2012, to approve with modifications Application #18-12P, request for a 2 lot minor subdivision of 1.5 acres to be known as "Colby's Corner", on property located on the northwest corner of Slater Street and Deming Street, AA-30 zone. This approval is subject to the following modifications: 1. This approval is for two (2)lots, numbered 1 and 2. 2. Drainage and construction for this subdivision is subject to the approval of the Town Engineer. 3. All lots shall be serviced by the Town of South Windsor sanitary sewer system and are subject to the approval of the Water Pollution Control Authority. 4. Water shall be supplied to this subdivision by public. 5. Trees within the street trees easement and any other trees on land that is currently or will in the future become Town-owned land are to be planted in accordance with the enclosed Tree Planting Specifications. 6. Prior to commencement of any site work, a preconstruction meeting must be held with Town Staff. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. All easements for conservation purposes, drainage or utilities, that may be required in connection with the approval of this subdivision, must be submitted on standard Town easement form where appropriate, to this Commission prior to filing the mylars and issuance of building permits. All deeds for open space, public improvements and roadways must be submitted prior to request for Town acceptance; all deeds must be in accordance with the policy for accepting deeds and must be approved by the Engineering Department and Town Attorney. 9. Footing drains are required for each house. Prior to the building of any structure on a lot, a topographic map, drawn to a scale of 1" =40', shall be submitted for each lot in the subdivision, showing proposed contours, elevations and the location of the footing drains. No building permits will be issued until the proposed contours, floor elevations and location of footing drains have been approved by the Town Engineer. 10. If, for any reason, finished grading and other individual lot site work is not completed, the Town Engineer shall determine the amount of a cash bond to ensure final grading and site work. This cash bond must be submitted prior to issuance of a Certificate of Occupancy. 11. Quantity estimates must be submitted to the Town Engineer(on the enclosed form) for the purpose of determining subdivision bonding. All bonds shall conform to the enclosed bond policy and shall be posted prior to filing the final plans in the Town Clerk's office. If the developer chooses to submit a Letter of Credit for a one year term, said Letter of Credit must be renewed on a yearly basis until completion of the development. If a new Letter of Credit has not been received within 30 days before the expiration date, the Commission may, at its option, call the Letter it is holding. 12. A drainage assessment fee in the amount of$50.00 shall be submitted to this Commission. 13. No building permits will be issued until all modifications have been complied with, and the final plans have been filed in the Town Clerk's office. 14. The Town Engineer's review comments dated 4/13/12 must be incorporated into the final plans. 15. A street tree waiver has been granted in accordance with Section C.2.c.(3) of the Subdivision regulations. 16. The building line must be corrected to coincide with the easement line. A black and white transparent mylar of Sheet # CP-01 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. After the mylar has been signed by the Commission, it will be returned to you for filing in the Office of the Town Clerk by August 11, 2012. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely Patrick Kennedy, Chairman Planning and Zoning Commission Cc: Town Engineer Chief Building Official Assessor Fire Marshal Registrars Board of Education Attachments: Bonding policy Quantity Estimates PK/llz W�Planning\PlanningAdmin\PZC\ActionsApprovals\2012Actions\12-18P BOND TRANSMITTAL DATE: \-J V ' F• 2-Q 12 APPLICANT NAME FE L LE -ADDREss g. i LAT E R FEZ T 7 PROJECT LOCATION/ADDRESS SI Y/novylt i(I LOT SUBDIVISION P&Z OR DM/CC APPLICATION NUMBER .AMOUNT OF BOND CHECK NUMBER DEPARTMENT I(� SUBMITTED BY LlqukEAj NAME k-i+m 6 6 �i)l�C , 2 D ( 2— DATE RECEIVED BY FINANCE NAME� DATE SUB ACCOUNT NUMBER s O ® / & 1 11WwnLa7ldclroUlPlacoiue D Wa i 1F..1r mh-Bo�DTMMM nAL08-27-0IAoc r PROJECT: J TOWN OF SOUTH WINDSOR STREET: BOND ESTIMATE FORM P&Z ID: — 2007 CALENDAR YEAR ENGINEER::— DATE: WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 1 CLEARING &GRUBBING LS STRIP&STOCKPILE 2 TOPSOIL CY 5.00 EARTH EXCAVATION (EXCLUDING ROADWAY 3 &TRENCH CY 14.00 ROADWAY 4 EXCAVATION CY 14.00 EARTH TRENCH EXC. 5 (0-4ft) CY 10.00 EARTH TRENCH EXC. 6 (0-1 oft) CY 14.00 EARCH TRENCH EXC. 7 (0- 15ft) CY 25.00 EARTH TRENCH EXC. 8 (0-20ft) CY 45.00 9 ROADWAY EXC. (ROCK) CY 65.00 ROCK TRENCH EXC. 10 (0-4ft) CY 100.00 ROCK TRENCH EXC. 11 (0- loft) CY 125.00 ROCK TRENCH EXC. 12 (0- 15ft) CY 140.00 ROCK TRENCH EXC. 13 (0-20ft) CY 150.00 FORMATION OF 14 SUBGRADE SY 2.00 15 SUBBASE GRAVEL CY 25.00 PROCESSED 16 AGGREGATE TONS 27.00 17 COMMON BORROW CY 21.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Pagel WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 18 GRAVEL BORROW CY 22.00 BIT. 19 CONCRETE (CLASS 1) TONS 78.00 BIT. 20 CONCRETE (CLASS II) TONS 75.00 6"ASPHALT LIP 21 CURBING LF 4.00 ROAD WIDENING 22 COMPLETE SY 60.00 CONC. SIDEWALK 4' 23 WIDE LF 45.00 STORM DRAINAGE SYSTEM COMPONENTS 60" RCP CLASS IV IN 24 PLACE LF 120.00 54" RCP CLASS IV IN 25 PLACE LF 100.00 48" RCP CLASS IV IN 26 PLACE LF 100.00 42" RCP CLASS IV IN 27 PLACE LF 85.00 36" RCP CLASS IV IN 28 PLACE LF 76.00 30" RCP CLASS IV IN 29 PLACE LF 62.00 24" RCP CLASS IV IN 30 PLACE LF 58.00 18" RCP CLASS IV IN 31 PLACE LF 48.00 15" RCP CLASS IV IN 32 PLACE 45.00 POLYETHYLENE PIPE 33 8"ADS-N-12 OR EQUAL 25.00 34 10"ADS-N-12 OR EQUAL 30.00 35 12"ADS-N-12 OR EQUAL 35.00 36 15"ADS-N-12 OR EQUAL 40.00 37 18"ADS-N-12 OR EQUAL 45.00 38 TOTAL 0.00 0.00 0.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 2 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 UNDERDRAINS 40 6" PVC SDS 35 IN PLACE LF 30.00 41�8" PVC SDR 35 IN PLACE LF 32.00 RIPRAP 42 MODIFIED RIPRAP CY 77.00 43 INTERMEDIATE RIPRAP CY 79.00 44 STANDARD RIPRAP CY 97.00 DRAINAGE STRUCTURES 45 TYPE"C"CATCH BASIN EA 3,000.00 TYPE"C"DOUBLE 46 GRATE EA 4,000.00 TYPE"C-L"CATCH 47 BASIN EA 3,000.00 48 MANHOLE EA 3,000.00 MANHOLE W/DROP 49 INLET EA 5,000.00 MANHOLE OVER TEN 50 FEET EA 4,800.00 51 HEADWALL EA 52 ENDWALL EA 53 BOX CULVERT LF 54 15" FLARED END EA 670.00 55 18" FLARED END EA 750.00 56 24" FLARED END EA 900.00 57 36" FLARED END EA 1,200.00 DETENTION OUTLET 58 STRUCTURE EA 4,500.00 10"WIDE GRAVE 59 ACCESSROAD LF 15.00 60 RESET M.H. OR C.B. EA 900.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 3 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 61 62 63 SANITARY SEWER COMPONENTS 12"PVC IN PLACE SDR 6435 LF 110.00 10"PVC IN PLACE SDR 6535 LF 90.00 66 8" PVC IN PLACE SDR 35 LF 82.00 67 6" PVC IN PLACE SDR 35 LF / 44.00 GL 0 SANITARY SEWER STRUCTURES 68 Sanitary Manhole EA 3,850.00 SANITARY MANHOLE 69 W/DROP INLET EA 5,600.00 SANITARY MANHOLE 70 OVER 10 FT. 4,500.00 71 72 STRUCTURES &MISC ITEMS MODULAR BLOCK 73 RETAINING WALL SF 55.00 74 4'FENCE (TYPE: ) LF 12.00 GUIDE RAIL 75 (TYPE: ) LF 60.00 TOTAL 0.00 0.00 0.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 4 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 STRUCTURES &MISC ITEMS (CONT'D) END ANCHORAGE (TYPE: 76 ) EA 1,000.00 77 GUIDE POST EA 140.00 78 PAVEMENT MARKING LF 2.00 79 STREET SIGNS EA 130.00 80 TRAFFIC SIGNS EA 130.00 81 STREET LIGHTS EA 1,000.00 FURNISHING/PLACING 82 TOPSOIL SY 7.00 FERTILIZING, SEEDING 83 AND MULCHING SY 7.00 84 TREES EA 200.00 MAINTENANCE/PROTEC 85 TION OF TRAFFIC LS CONSTRUCTION 86 STAKING LS 87 AS-BUILTS LS 88 IRON PINS EA 6 150.00 CONCRETE 89 MONUMENTS EA 350.00 90 DRIVEWAY-BIT. CONC. SY 40.00 91 etc, X TOTAL 0.00 0.00 0.00 �v s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 5 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 Original Estimate Bond Reduction#1 Bond Reduction #2 TOTAL PAGE 1 0.00 0.00 0.00 TOTAL PAGE 2 0.00 0.00 0.00 TOTAL PAGE 3 0.00 0.00 0.00 SUBTOTAL 0.00 0.00 25% Contingencies x Subtotal 0.00 0.00 0.00 TOTAL 0.00 0.00 0.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 6 I 1014H Sf4 I C Town aps-otdA o c 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Soe-co TELEPHONE (860) 644-2511 { August 1, 2012 i Scott B. Kelley i 389 Slater Street South Windsor, CT 06074 i Dear Mr. Kelley, s Re: Appl 12-18P, Colby Corner Subdivision This is to advise you that the Planning and Zoning Commission voted on July 24, 2012 to set the Engineering Bond at $4,500 for subdivision improvements associated with the above mentioned application. Sincerely, Patrick Kennedy, Chairman Planning&Zoning Commission i s PK/llz I cc: Town Engineer Chief Building Official f i BOND TRANSMITTAL DATE: j t)ME , 2-012 APPLICANT NAME S_� L L,E .ADDRESS — ��9 d4:=ATE P AR T 60o 74 PROJECT LOCATION/ADDRESS-5 LOT SUBDIVISION �rvl.er P&Z OR M/CC APPLICATION NUMBER J�- i81 .AMOUNT OF BOND S6 SCI�c�t.Vl S t d CHECK NUMBER DEPARTMENT a ,� _ SUBMITTED BY /�U D (. NAME DATE RECEIVED BY FINANCE _ Qn /5 NAME DATE SUB ACCOUNT NUMBER S O O l 8 / �kowaLalldclrollu'IaroicC Dq* '" sioo\FormslPamits-Boalk B U TRANSMr TAL 08-27-01.4. PROJECT: t7clj TOWN OF SOUTH WINDSOR STREET: BOND ESTIMATE FORM P&Z ID: 2007 CALENDAR YEAR ENGINEER: C r.eFL DATE: WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 1 CLEARING &GRUBBING LS STRIP&STOCKPILE 2 TOPSOIL CY 5.00 EARTH EXCAVATION (EXCLUDING ROADWAY 3 &TRENCH CY 14.00 ROADWAY 4 EXCAVATION CY 14.00 EARTH TRENCH EXC. 5 (0-4ft) CY 10.00 EARTH TRENCH EXC. 6 (0-loft) CY 14.00 EARCH TRENCH EXC. 7 (0- 15ft) CY 25.00 EARTH TRENCH EXC. 8 (0-20ft) CY 45.00 9 ROADWAY EXC. (ROCK) CY 65.00 ROCK TRENCH EXC. 10 (0-4ft) CY 100.00 ROCK TRENCH EXC. 11 (0- loft) CY 125.00 ROCK TRENCH EXC. 12 (0-15ft) CY 140.00 ROCK TRENCH EXC. 13 (0-20ft) CY 150.00 FORMATION OF 14 SUBGRADE SY 2.00 15 SUBBASE GRAVEL CY 25.00 PROCESSED 16 AGGREGATE TONS 27.00 17 COMMON BORROW ICY 21.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 1 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 18 GRAVEL BORROW CY 22.00 BIT. 19 CONCRETE(CLASS I) TONS 78.00 BIT. 20 CONCRETE(CLASS II) TONS 75.00 6"ASPHALT LIP 21 CURBING LF 4.00 ROAD WIDENING 22 COMPLETE SY 60.00 CONC. SIDEWALK 4' 23 WIDE LF 45.00 STORM DRAINAGE SYSTEM COMPONENTS 60" RCP CLASS IV IN 24 PLACE LF 120.00 54" RCP CLASS IV IN 25 PLACE LF 100.00 48"RCP CLASS IV IN 26 PLACE LF 100.00 42" RCP CLASS IV IN 27 PLACE LF 85.00 36" RCP CLASS IV IN 28 PLACE LF 76.00 30" RCP CLASS IV IN 29 PLACE LF 62.00 24" RCP CLASS IV IN 30 PLACE LF 58.00 18" RCP CLASS IV IN 31 PLACE LF 48.00 15" RCP CLASS IV IN 32 PLACE 45.00 POLYETHYLENE PIPE 33 8"ADS-N-12 OR EQUAL 25.00 34 10"ADS-N-12 OR EQUAL 30.00 35 12"ADS-N-12 OR EQUAL 35.00 36 15"ADS-N-12 OR EQUAL 40.00 37 18"ADS-N-12 OR EQUAL 45.00 38 TOTAL 0.00 0.00 0.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 2 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 UNDERDRAINS 40 6" PVC SDS 35 IN PLACE LF 30.00 41 8" PVC SDR 351N PLACE LF 32.00 RIPRAP 42 MODIFIED RIPRAP CY 77.00 43 INTERMEDIATE RIPRAP CY 79.00 44 STANDARD RIPRAP CY 97.00 DRAINAGE STRUCTURES 45 TYPE"C"CATCH BASIN EA 3,000.00 TYPE"C'DOUBLE 46 GRATE EA 4,000.00 TYPE"C-L"CATCH 47 BASIN EA 3,000.00 48 MANHOLE EA 3,000.00 MANHOLE W/DROP 49 INLET EA 5,000.00 MANHOLE OVER TEN 50 FEET EA 4,800.00 51 HEADWALL EA 52 ENDWALL EA 53 BOX CULVERT LF 54 15" FLARED END EA 670.00 55 18" FLARED END EA 750.00 56 24"FLARED END EA 900.00 57 36"FLARED END EA 1,200.00 DETENTION OUTLET 58 STRUCTURE EA 4,500.00 10"WIDE GRAVE 59 ACCESSROAD LF 15.00 60 RESET M.H. OR C.B. EA 900.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 3 v i WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 61 62 63 SANITARY SEWER COMPONENTS 12"PVC IN PLACE SDR 6435 LF 110.00 10"PVC IN PLACE SDR 6535 LF 90.00 66 8"PVC IN PLACE SDR 35 LF 82.00 67 6" PVC IN PLACE SDR 35 LF /5-- 44.00 GC O SANITARY SEWER STRUCTURES 68 Sanitary Manhole EA 3,850.00 SANITARY MANHOLE 69 W/DROP INLET EA 5,600.00 SANITARY MANHOLE 70 OVER 10 FT. 4,500.00 71 72 STRUCTURES &MISC ITEMS MODULAR BLOCK 73 RETAINING WALL SF 55.00 74 4'FENCE (TYPE: ) LF 12.00 GUIDE RAIL 75 (TYPE: ) LF 60.00 TOTAL 0.00 0.00 0.00 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 4 WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 STRUCTURES &MISC ITEMS(CONT-D) END ANCHORAGE (TYPE: 76 ) EA 1,000.00 77 GUIDE POST EA 140.00 78 PAVEMENT MARKING LF 2.00 79 STREET SIGNS EA 130.00 80 TRAFFIC SIGNS EA 130.00 81 STREET LIGHTS EA 1,000.00 FURNISHING/PLACING 82 TOPSOIL SY 7.00 FERTILIZING, SEEDING 83 AND MULCHING SY 7.00 84 TREES EA 200.00 MAINTENANCE/PROTEC 85 TION OF TRAFFIC LS CONSTRUCTION 86 STAKING LS 87 AS-BUILTS LS 88 IRON PINS EA 6 150.00 ��xX CONCRETE 89 MONUMENTS EA 3 350.00 F91 90 DRIVEWAY-BIT. CONC. SY 40.00 x TOTAL 0.00 0.00 0.00 iv lqo 0 - Z" _ '13 1 1 -T-,e4 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 5 s r. WORK REMAINING BOND BOND UNIT REDUCTION NO. REDUCTION NO. ITEM DESCRIPTION UNIT QUANTITY PRICE COST 1 2 Original Estimate Bond Reduction#1 Bond Reduction #2 TOTAL PAGE 1 0.00 0.00 0.00 TOTAL PAGE 2 0.00 0.00 0.00 TOTAL PAGE 3 0.00 0.00 0.00 SUBTOTAL 0.00 0.00 26% Contingencies x Subtotal 0.00 0.00 0.00 TOTAL 0.00 0.00 0.00 � 9 s/engineering/forms/bond estimates/bondestimateform 2007-1 Page 6