HomeMy WebLinkAboutWPCA 280 Sullivan Avenue C�
' Tiov V V I slot V&U140t
a
w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SOR-CO TELEPHONE (860) 644-2511
March 9, 2011
Galen B. Semprebon, P.E., LEED AP
Design Professionals, Inc.
425 Sullivan Avenue
South Windsor, CT 06074
Re: New Country Auto, 280 Sullivan Avenue
Dear Mr. Semprebon:
The South Windsor Water Pollution Control Authority, at its regular meeting of March 1, 2011,
approved the application as presented for connection to the Town's sewerage system for an existing
commercial building located at 280 Sullivan Avenue, South Windsor, CT as more specifically shown on
plans entitled "New Country Auto, Site Plan Modification/Special Exception, 280-302 Sullivan Avenue,
South Windsor, Cr Prepared by Design Professionals, Inc., South Windsor, CT; "Site Design Plan"
Sheet 3 of 3, Job No. 2989, Dated 12/7/2010 with Revisions of 2/3/2011 and 2/22/2011.
This approval is subject to the following conditions:
1. A draft of an easement allowing the Town access to manhole on the building sewer for
monitoring purposes must be reviewed and receive the prior approval of the Town Attorney;
2. Technical approval of the Town of South Windsor Engineering Department;
3. Final Authority approval and acceptance of the sanitary sewerage connection will be
conditional upon the sewer line having been installed and inspected by the Town staff, and
upon the written verification of the Town staff that said sanitary sewer line was installed in
substantial conformance with the design plans approved by the Authority, and meeting all
Town regulations and appropriate technical specifications relating to sanitary sewer
construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Joseph J. Carino, Chairman
Water Pollution Control Authority
cc: Michael J. Gantick, Director of Public Works
Jeff Doolittle, Town Engineer
Michele Lipe, Town Planner
Chris Dougan, Chief Building Inspector
RECENED TOWN OF SOUTH WINDSOR
W TER POLLUTION CONTROL AUTHORITY
FEB 2 2 2011 APPLICATION FORM
SPUTH WINDSUR
UBLIC WORKS
Application No.:
Date Received
Date Scheduled For
Applicant New Country Auto
Address' 280 Sullivan Avenue,South Windsor,CT 06074
Telephone No 860-202-0960
Owner of Record on Land Records 280 Sullivan Avenue LLC
Owner's Address PO Box 797,South Windsor,CT 06074
Property Description:
Assessor's Map# 122 Parcel# 15 Vol. 1047 Page 233
Pr0]ect Title: New Country Auto
Inquiries to be Directed to: (Name,Address,Telephone No.) Galen B.Semprebon,P.E.,LEED AP
Design Professionals,Inc.,425 Sullivan Avenue,South Windsor,CT 06074 860-291-8755
Approvals Previously Received (Check) IWA P&Z ✓ ZBA
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection- Residential Use
a.Subdivision
b. Single Unit
c. Other Explain
d. Type of Approval: Concept Final
2., Sewer Extension/Connection- - Industrial/Commercial User
a. New Connection
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge ✓
d. Other Explain,
e. Type of Approval Concept Final. ✓
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal Explain
6. Other Explain
—2
Applican' •e Date
LZ-L(
Owner's Signature Date
-- �tcv �5 w I Vuel-2)S
y,A�1nr..bcc- 2gn SuLc.a,�. C