HomeMy WebLinkAboutSouth Windsor Covered Batting Cages TOWN OF SOUTH WINDSOR
PLANNING & ZONING COMMISSION .` `° ..
A
APPLICATION FORM
Application No:
" -- rV '
Official Receipt Date: J U N 0 3 2011
Receipt No: c201 IA5a
SOUTH WINDSOR PLANNING DEPT.
APPLICANT: dGJAJ 6,04- cS°!fc! �Sd �y64 C
PROJECT NAME: nVE,'��E?) ;ITT/.tIG 6E T Z-1 7-4 -E Z-F,46itC ed—MI ° c'-V
ADDRESS: Z OV71
OWNER OF RECORD ON LAND RECORDS: eif TT 7/-/ GLi�.cr�Sd,
ADDRESS:
COMPLETE LOCATION OF PROPERTY: C 69AMP BF s�4( EkS' /A iVZk-T /RCL'f1'S
GIS PIN # ZONE
NAME, ADDRESS, TEL 8s FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Estimated presentation time: /0 1a11AJ,
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required, Certificate of Mailing)
❑ Open Space Subdivision/Resubdivision (Public Hearing Required; certificate of mailing)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required)❑ Minor ❑ Major
❑ Conditional Subdivision Approval
❑ Sp M Exception to Table (Public Hearing, Certificate of Mailing)
ite Plan of Development
❑ General Plan of Development
❑ Dept of Motor Vehicle License - State Hearing per Section 14-55 for
❑ Earth Filling (Sec. 7.6) and/or Earth Removal (Sec. 7.16 - Public Hearing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision - Attach proposed amendment (Public Hearing Required)
❑ Temporary and Conditional Permit for (Public Hearing Required)
❑ In Law apartment/Accessory Apartment (Public Hearing Required)
❑ Major Home Occupation for (Public Hearing Required)
❑ Other (explain in detail)
An Application Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
Si nat e of Applicant , ature of Property Owner
STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN
PROJECT TOSW Batting/Pitching Facility—Ayers Road APPL.#11-18P
ENGMER/ARCHITECT PROJ.#
Submit mylars of sheets:
1. Prior to commencement of any site work,a meeting must be held with Town Staff.
2. All plans used in the field by the developer must bear the stamp and authorized signature of the
Town of South Windsor.
3. Pavement markings must be maintained in good condition throughout the site drives and parking
areas.
4. All free standing signs and/or building signs require the issuance of a sign permit before they are
erected.
V
��
Appl #11-18P, Site Plan Modification, TOSW
Batting/Pitching Facility, Ayers Road
Planning Department Report
1. Request for site plan modification for a 25' x 50' batting/pitching facility at the
Little League fields at Ayers Road, A-20 zone.
2. Architectural and Design Review Committee reviewed this application on May
21. While they were not excited about the metal building, they acknowledged
that it is a utilitarian building for a utilitarian use.
The ADRC had the following recommendations:
- the facility should be painted with some neutral color such as tan or
beige;
- additional landscaping should be coordinated between Sup't of Parks and
the Town Planner;
- the applicant should explore some way to secure the facility in the off-
season.
3. There is no new lighting shown proposed with this project.
If this application is approved, the Planning Dept has no requested approval
modifications.
LA
- _
G�
L� l� —
tie
V
South Windsor Little League
Proposed Covered Batting Cage Project ,jam
® January 2011 •
For the past year, the South Windsor Little League Board of Directors has been discussing the need to
improve its batting training facilities to meet the needs of its players. On a typical evening during the
spring season, there are at least 6 to 8 teams of 12 players each that need to use the existing batting
cages (2). During the summer season, the batting cages are used by All Star teams, visiting District 8
teams and the Summer Baseball program. The proposed batting cage project would benefit
approximately 600 - 700 registered players in the league.
In reviewing the need for improved facilities, we discussed the merits of having a covered facility. It
would allow for would practices during inclement weather and would offer the possibility of extending
practices after it gets dark earlier in the afternoon during the spring and fall seasons. This idea
expanded from covering the existing cages to keeping those (2) as they currently are and adding the
covered facility next to them, giving the league a total of (4) batting cage lanes.
The proposed batting cages would be situated
parallel to the existing batting cages as shown
x in the photo to the left.
Major B Proposed The structure can be painted to any desired
Batting Ca es color in order to make it look less
r m
"institutional".
A
A
A line of tall vertical trees such as arbor vitae
can be planted along the side of the structure
Existing that faces Nevers Road. This will help to
Battin Cages ' conceal the appearance of the structure along
the one main public view outside of the SWLL
Complex.
The structure would be situated so that it
would not interfere with the left field area of
Dup&y Field or any potential outfield fencing
Minor A Pro P osed Liner� of that field.
of Trees
This is an existing structure at This structure is concealed by IThis interior photo shows a
Kempsville High School trees as planned for the SWLL possible equipment set-up
South Windsor Little League
Proposed Covered Batting Cage Project
January 2011
Quick Facts:
Manufacturer: SteelMaster Buildings, LLC
www.battingdomesusa.com
800-341-7007 ext. 8167
Specs: 25' wide x 50' long x 14' high
structurally sound to withstand CT snow and wind load ratings
stamped architectural drawings provided by SteelMaster, LLC
30 year no-rust guarantee Energy Star exterior coating
20 degree impact on interior temperature
3 men /one weekend to construct
can have interior lighting
includes skylights
can have open or closed ends...ours would probably have open ends
can be painted to enhance appearance
Existing SteelMaster building in East Granby, Existing SteelMaster building in East Haven,
CT CT
i
-,a
t0W N Sf9
p 71s�� �So� ?d&u&ot
c
a �
M . C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f�OSOR-CO TELEPHONE (860) 644-2511
Hand Delivered
June 15,2011
Matthew Galligan
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Galligan:
Re: Appl. 11-18P,TOSW Covered Batting Cages
We are pleased to advise you that the Planning &Zoning Commission voted on June 14, 2011 to approve with
modifications the above referenced application for a Site Plan of Development.
This approval is for a 25' X 50' batting/pitching facility at property located at 138 Ayers Road,RR zone, as
shown on plans prepared by Design Professionals Inc. dated February 1998, as revised. This approval is subject
to the following modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
3. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
4. All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
Sincerely,
Patrick Kennedy, Chairman
Planning and Zoning Commission
PK/ma .
cc: Ray Favreau
Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
<ONNN Sf4
c
F V To� / V-O{i(.'N L� W G U
m
wC, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
r�OsOR.CO � TELEPHONE (860) 644-2511
October 21, 2011
Town of South Windsor
Parks &Recreation
Attn: Ray Favreau
150 Nevers Road
South Windsor CT 06074
Dear Mr. Favreau:
Re: Preconstruction Meeting for Appl. 11-18P,TOSW Covered Batting Cages
IN ATTENDANCE
Ray Favreau Parks &Recreation 860-648-6355
John Caldwell Parks &Recreation 860-648-6355
Michele Lipe TOSW Planning 860-644-2511 ext. 253
Jeff Doolitte TOSW Engineering 860-644-2511 ext. 245
Pete Romanello SW Little League Secretary 860-644-7999
Dan Childree DCGC 860-644-4358
Chris Dougan Building Dept 860-644-2511 ext. 232
Al Maxamino SW Little League 860-644-7999
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1. During construction a crushed stone tracking pad may need to be installed and maintained to minimize
tracking of dirt/gravel on to Ayers Road, Calcium chloride or water is to be used for dust control as
required.
2. Perimeter area of project to cordoned off with construction fence
Public Works
1. Any problems and/or questions regarding construction of this project will be directed to Don
Childree in the field at phone 860-644-4358.
2. Implementation on change order form in quadruplicate with 4 copies of the drawing. Town will
attempt to turn around within 24 hours.
3. Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday.
4. A street cut permit is needed for any work within Ayer Road. This can be obtained from the
Engineering Department.
Planning Department
1. Final plans needed with correct size of structure and color of the structure before a zoning permit
can be issued.
2. Method of securing the facility(fencing or doors)must be included in the final plans.
SNET/NU
1. Contact utilities for coordination of utilities connection and/or call before you dig.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on
a company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
3. Erect temporary sign on the site during construction identifying the project.
4. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official required prior to issuance for building permit. Concerns were
expressed with the engineered sealed drawing being modified by applicant. Applicant to contact
company regarding revising plan. Chief Building Official to contact other towns to determine types
of inspections needed.
Very truly yours,
Michele R. Lipe, AICP
Town Planner
MRL/ma
cc: Jeffrey Doolittle,Town Engineer
Bernie Drabek, Engineering Inspector
Karl Reichle, Public Works
Christopher Dougan, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
Walter Summers, Fire Marshal
CL&P
SBC/SNET