HomeMy WebLinkAboutSatellite Tool Company Addition TOWN OF SOUTH WINDSOR - -
PLANNING&ZONING COMMISSION I
i APPLICATION FORM
Application No: 3 1! C M A 9 Q i 7
Official Receipt Dater
S00,U41*80A PLANNING DEPT.
Receipt No: r
0
APPLICANT: 0�/0 Pi�Sna,1v►egr•IYIC� $L �S^>}f`t�c:��� T+r1�
PROJECT NAME:
ADDRESS: iS ��'n v►� r^�� �.c%cny
OWNER OF RECORD ON LAND RECORDS: t.i Kea 5 i{C
ADDRESS: 1 Z ki'?cA,.gin�_yi�Ca So,j- ►
COMPLETE LOCATION OF PROPERTY: 18 S G mtreyre . cV m O•tk ZL SOCK 1�S
ASSESSOR'S MAP # PARCEL# ZONE
NAME, ADDRESS, TEL&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
thrl's `
3icc�rn ram,e) Ct cx ,2 C7'Z�f 2-�55�� Fri"� 8k0--2'f 2`8SS7 Estimated presentation
42 ac-Corn
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required and Certificate of Mailing)
❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required)
❑ Subdivision ❑ Minor ❑ Major
❑ Resubdivision (Public Hearing Required) ❑ Minor❑ Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certificate of Mailing)
Site Plan of Development
❑ General Plan of Development- State Hearing per Section 14-55 for
❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required)
❑ Regulation Amendment ❑Zoning ❑ Subdivision -Attach proposed amendment (Public Hearing Required)
❑ Temporary and Conditional Permit for (Public Hearing Required)
❑ In Law apartment/Accessory Apartment (Public Hearing Required)
❑ Major Home Occupation for (Public Hearing Required)
❑ Other (explain in detail)
An A placation Pending sign is required to be posted on the property for,all applica,tio 'ten (10) days
prior to being heard by the Commission.,
Sire of Appii Signature of Prdpe Owner
r'
PLANNING DEPARMENT
IN-HOUSE REFERRAL FORM
DATE: 4/5/11
TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond,Walter Summers,Jeff Doolittle
Ray Favreau,Karl Reichle, Mark Owens, Chris Dougan, Sherry Roy, Ron Asselin,
John Caldwell, Dennis Sheridan
FROM: Michele Lipe, AICP, Town Planner
The Planning&Engineering Departments have received plans for the following projects:
Appl 11-09P, South Satellite Tool Addition
Location: 185 Commerce Way
® Site Plan ❑ Subdivision No. Acres 1+ Zone I
® Industrial ❑ Commercial ❑ Residential No. Lots/Units
Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System
Project Description: 3,600 sf addition
Future Town-owned property involved? ❑Yes ®No
❑ new street(s) ❑ new detention area
❑ new open space/recreation area ❑ active ❑passive
Planning Department notes:
Please comment by 4/15/11 and return to the Planning Department.
tQY1N Sf4
7-� O-P SIOU& ?V
c U
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f�OSOR-CO � TELEPHONE (860) 644-2511
CERTIFIED MAIL 7008 1300 00014578 3863
June 8, 2011
Chris Eseppi
PDS Engineering&Consulting Inc
107 Old Windsor Road
Bloomfield CT 06002
Dear Mr. Essepi:
Re: Appl. 11-09P, Satellite Tool Company Addition
We are pleased to advise you that the above mentioned application was approved on June 7, 2011 for a Site
Plan of Development.
This approval is for a 3,600 sf addition on property located at 185 Commerce Way, I zone, as shown on plans
prepared by PDS Engineering dated May 10, 2011, as revised. This approval is subject to the following
modifications:
1. Prior to commencement of any site work, a meeting must be held with Town Staff.
2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office.
3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation
Commission, including bonds in the amount $10,000 for stabilization, $5,000 to ensure proper placement
and maintenance of erosion and sediment controls.
4. All bonds must be in one of the forms described in the enclosed Bond Policy.
5. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning
Regulations.
6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of
South Windsor.
7. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water
Pollution Control Authority.
8. The building street number must be included on the final plan.
9. Pavement markings must be maintained in good condition throughout the site drives and parking areas.
10.All free standing signs and/or building signs require the issuance of a sign permit before they are erected.
11.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate
has been issued(per CGS §14-311).
Black and white transparent mylars of Sheet C101 with the above modifications, together with three blueprint
copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to
this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well
as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars.
After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the
Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department.
Sincerely,
10
Patrick Kennedy, Chairman
Planning and Zoning Commission
PK/ma
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal