Loading...
HomeMy WebLinkAboutSatellite Tool Company Addition TOWN OF SOUTH WINDSOR - - PLANNING&ZONING COMMISSION I i APPLICATION FORM Application No: 3 1! C M A 9 Q i 7 Official Receipt Dater S00,U41*80A PLANNING DEPT. Receipt No: r 0 APPLICANT: 0�/0 Pi�Sna,1v►egr•IYIC� $L �S^>}f`t�c:��� T+r1� PROJECT NAME: ADDRESS: iS ��'n v►� r^�� �.c%cny OWNER OF RECORD ON LAND RECORDS: t.i Kea 5 i{C ADDRESS: 1 Z ki'?cA,.gin�_yi�Ca So,j- ► COMPLETE LOCATION OF PROPERTY: 18 S G mtreyre . cV m O•tk ZL SOCK 1�S ASSESSOR'S MAP # PARCEL# ZONE NAME, ADDRESS, TEL&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: thrl's ` 3icc�rn ram,e) Ct cx ,2 C7'Z�f 2-�55�� Fri"� 8k0--2'f 2`8SS7 Estimated presentation 42 ac-Corn THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certificate of Mailing) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certificate of Mailing) Site Plan of Development ❑ General Plan of Development- State Hearing per Section 14-55 for ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑Zoning ❑ Subdivision -Attach proposed amendment (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other (explain in detail) An A placation Pending sign is required to be posted on the property for,all applica,tio 'ten (10) days prior to being heard by the Commission., Sire of Appii Signature of Prdpe Owner r' PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 4/5/11 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond,Walter Summers,Jeff Doolittle Ray Favreau,Karl Reichle, Mark Owens, Chris Dougan, Sherry Roy, Ron Asselin, John Caldwell, Dennis Sheridan FROM: Michele Lipe, AICP, Town Planner The Planning&Engineering Departments have received plans for the following projects: Appl 11-09P, South Satellite Tool Addition Location: 185 Commerce Way ® Site Plan ❑ Subdivision No. Acres 1+ Zone I ® Industrial ❑ Commercial ❑ Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: 3,600 sf addition Future Town-owned property involved? ❑Yes ®No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Please comment by 4/15/11 and return to the Planning Department. tQY1N Sf4 7-� O-P SIOU& ?V c U w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSOR-CO � TELEPHONE (860) 644-2511 CERTIFIED MAIL 7008 1300 00014578 3863 June 8, 2011 Chris Eseppi PDS Engineering&Consulting Inc 107 Old Windsor Road Bloomfield CT 06002 Dear Mr. Essepi: Re: Appl. 11-09P, Satellite Tool Company Addition We are pleased to advise you that the above mentioned application was approved on June 7, 2011 for a Site Plan of Development. This approval is for a 3,600 sf addition on property located at 185 Commerce Way, I zone, as shown on plans prepared by PDS Engineering dated May 10, 2011, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including bonds in the amount $10,000 for stabilization, $5,000 to ensure proper placement and maintenance of erosion and sediment controls. 4. All bonds must be in one of the forms described in the enclosed Bond Policy. 5. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 8. The building street number must be included on the final plan. 9. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10.All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 11.If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). Black and white transparent mylars of Sheet C101 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, 10 Patrick Kennedy, Chairman Planning and Zoning Commission PK/ma cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal