Loading...
HomeMy WebLinkAboutApp 07-58P Water Pollution Control Faci TOWN OF SOUTH WINDSOR PLANNING& ZONING COMMISSION aw N sF APPLICATION FORM Application No: d� 0 RECEIVED 407 Va �- Official Receipt Date: OCT Receipt No: _ � 0 4 �007_ �f�' _ ��•`��, 4C1 •Cf SOUTH WINDSOR PLANNING DEPT. APPLICANT: Matthew B. Galligan PROJECT NAME: Water Pollution Control Facility Upgrade ADDRESS: 1 Vibert Road, South Windsor, CT 06074 OWNER OF RECORD ON LAND RECORDS: Town of South Windsor ADDRESS: 1540 Sullivan Aveneue South Windsor CT 06074 COMPLETE LOCATION OF PROPERTY: ASSESSORS.MAP#4 45 - PARCEL#91800001 ZONE A-40 NAME, ADDRESS,TEL&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Fred Shaw, 1540 Sullivan Ave..; South Windsor, CT 06074 Tel 860-644-2511, ext. 24.7 FAX: 860-644-72.80 - Estimated presentation time: 10 min. THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone.Change to.. ... .. (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing-Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) EXI Site Plan of Development ❑ General Plan of Development 0 Earth Filling(Sec. 15) and/or Earth Removal (Sec. 14.-Public Hearing Required) ❑ Regulation Amendment ❑Zoning ❑Subdivision (Attach proposed amendment) (Public Hearing Required) ❑ Temporary and Conditional Permit for(Public Hearing.Required) ❑ In Law apartment/Accessory Apartment(Public Hearing Required) ❑ Major Home Occupation for(Public Hearing Required) ❑ Other(explain in detail) g g q p property An Application Pending sign is re wired to be posted on thefor all applications ten (10) daps prior to being heard by the Commission. ignature of App cant Signature of Property Owner South • • Planning Department Me -1-11-10 To: Dennis Botticello From: Marcia A Banach,AICP, Director of Planning CC: Michael J. Gantick, Director of Public Works; C. Fred Shaw, Superintendent of Pollution Control;Jeffrey Doolittle, P.E.,Town Engineer; Jeffrey Folger, Environmental Planner Date: July 2, 2009 Re: Temporary stockpiling at Botticello Property, R014 John Fitch Blvd Per our recent discussion, lease be advised your property located at R014 John Fitch Blvd has the necessary staff approval to stockpile excess earth material from the Town's Treatment Plant construction project. The following conditions must be adhered to: 1. This approval is for temporary stockpiling only; no spreading, compacting or otherwise using the stockpiled material as fill on this property without the required Planning &Zoning Commission earth filling permit. 2. Any and all erosion & sediment control measures required by Jeff Folger, Environmental Planner, must be implemented on and around the stockpiling area. 3. Stockpiling is NOT allowed within 80 feet of any wetlands area. If you have any questions regarding this approval, please do not hesitate to contact me. 1540 Sullivan Avenue,South Windsor,CT 06074 PH 860-644-2511 ext 253 Fax 860-644-2780 Email marcia.banach@southwindsor.org v A`4ON S�� ~ Tiovf� O-P Sou ?d&U&Ot e � 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074.2786 R.co AREA CODE 860/644.2511 FAX 860/644-3781 OFFICE OF THE TOWN COUNCIL January 24, 2008 Mr. Matthew B. Galligan, Town Manager Town of South Windsor D 1540 Sullivan Avenue �,�b� South Windsor, Ct. 06074 JAN 2 5 Zoos Dear Mr. Galligan: sp��Nwrpso�P��NtNcpEPT. At its Regular Meeting of January 22, 2008, the South Windsor Town Council approved the following Resolution: WHEREAS, Weston & Samson, and Woodard & Curran, Engineering Consultants to the Town of South Windsor have prepared a plan that identifies upgrades that are necessary to Dry Pit Pump Stations; and WHEREAS, the Water Pollution Control Authority has recommended to the Town Council that these upgrades be done; and WHEREAS, the Town Council intends to appropriate $2,675,000 for the planning, acquisition and construction of upgrades to Dry Pit Pump Stations; and WHEREAS, any plan that includes the use of Town monies, must first be submitted to the South Windsor Planning and Zoning Commission for a report pursuant to Section 8-24 of the Connecticut General Statutes } 8-24 Referral — Dry Pit Pump Stations January 24, 2008 Page 2 NOW, THEREFORE, BE IT RESOLVED that the upgrades to the Dry Pit Pump Stations be submitted to the South Windsor Planning & Zoning Commission for a report pursuant to Section 8-24 of the Connecticut General Statutes., Respectfully submitted Deborah W. Reid Clerk of the Council cc: Mike Gantick, Director of Public Works Fred Shaw; Superintendent of Pollution Control Joseph Carino, Chair,WPCA Marcia Banach, Director of Planning Patrick Kennedy, Chair, Planning'& Zoning Commission , R • V ti ¢��SOR•CO��� - Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24,.2009 • Town of South Windsor Departments: F Planning: M. Lipe pointed out that CHN and CDM must comply with all requirements of the approval letter from Planning&Zoning Commission dated 10123107(see attached), including but not limited to the following: • CDM/CHN must submit final mylar of L-3 drawing to Planning Office with approval letters from Planning& Zoning, Inland/Wetlands and WPCA incorporated into the mylar. CDM will file signed mylar in the Office of the Town Clerk. No building permit will be issued until final mylars have been filed in the Town Clerk's office. • CDM/CHN must also submit four(4) sets of L drawings and civil drawings to Planning Office for"Final Plan"stamp and signature. 2 sets will be retained by Planning Department,2 sets will be sent to the field. • L-3 Drawing and civil drawings used in the field must bear the stamp "Final Plan"and authorized signature of the Town of South Windsor • Tree of significance (30"butternut)should be field located and wood retained for Town use. o Wetlands: CHN must notify J. Folger in Wetlands office after E&S controls are installed for inspection by enforcement officer. Wetlands Enforcement Officer will inspect mitigation areas in the latter stages of the project. o Engineering:J. Doolittle stated that Engineering Dept is interested in site drainage and site grading aspects of the project. CHN must submit as-built mylar of site utility installations to Engineering Department upon completion of underground installations. o Police: Requested a list of Emergency Numbers for project personnel. CHN will submit list of names and numbers to CDM. CDM will add CDM personnel and forward to Town for addition of Town personnel. CDM will issue final list to Police Dept and Town officials. • Utility Discussion: Utility company representatives did not attend. • Communication and correspondence o All communications directed to CDM contact o CDM will provide questions and inquiries to respective disciplines and Owner contacts o Fred Shaw is primary contact for Town of South Windsor. Page 2 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24, 2009 o Contractor is required to take construction photographs per specification section 01300 paragraph 1.08. • As-Builts o CHN must maintain a current set on site at all times for review by CDM per general conditions article 6.12. • Project Sign o Contractor shall erect a project sign per Part II of the supplemental conditions. CHN will have sign made up with current dollar values listed. CHN can modify values later, if necessary. M. Lipe requested that CHN fill out permit request with Planning Dept to erect sign. • MBE/WBE Goals o Reporting per Part II of the supplemental conditions. CHN to send compliance reports to Steve Kasle for the field files, 2.0% - MBE; 3.0% -WBE. Two executed Subcontracts to Owner within 10 days of agreement signing per CWFM-1-Revised that was supplied with the bid documents. CHN expects to have unsigned subcontracts out to Marquis Masonry and Malcolm Arnold(Plumbing) later this week. Per S. Bujalski all MBE/WBE subs have CT certifications. P. Grochowski stated that executed MBE/WBE subcontracts must be on file with DEP before processing of first pay estimate, or CHN must show evidence of good faith effort of complying with MBEWBE requirements. • Certified Payrolls (See Part II of the supplemental conditions) o Contractor to complete "Contracting Agency Certification Form" o Contractor to send 1 copy of payrolls to Steve Kasle for the field files. • Taxes o Contractor is relieved of paying sales and use taxes per article 6.10.A of the general conditions as modified by the supplemental conditions. o Contractor's "Exempt Purchase Certificate" is located near the back of Part II of the supplemental conditions. • E-Room o CDM will develop an E-room for contract use. F. Shaw asked that Drew Guild in IT Dept be added to E-room. CDM will reinvite Stan Bujalski, Stela Marusin, ivonne Hall& Tim Friend. • Construction Meetings - - - - o Coordination meetings held at a-minimum monthly-to resolve - -- - coordination problems. The first construction progress meeting will be Page 5 of 6 TOWN OF SOUTH WINDSOR, CONNECTICUT WATER POLLUTION CONTROL FACILITY UPGRADE PRE-CONSTRUCTION AGENDAJMINUTES* JUNE 24, 2009 *Minutes in italics INTRODUCTIONS ATTENDEES (see attached sheet) The Town of South Windsor: Michael J. Gantick, DPW Fred Shaw, Superintendant Pollution Control DEP: CDM: Tom Joyce, Construction Manager Steve Kasle, Senior Resident Engineer Joe Virgadula, Project Engineer Bill Meserve, Project Manager C H Nickerson: Stan Bujalski, Project Manager • Utility Discussion: • Communication and correspondence o All communications directed to CDM contact o CDM will provide questions and inquiries to respective disciplines and Owner contacts • Safety o Contractor's sole responsibility per general conditions article 6.13 o All visitors to the site must check in with CHN. CHN to provide a sign delegating such. • Time o Contract start time is twenty days after the effective date of the Agreement (May 28,2009). Therefore, June 17, 2009 o Contract duration is 900 calendar days. o Contract completion date is December 4, 2011, CHN please verify. o Liquidated damages are $2,000 per calendar day. o Allowable Working Hours are_7:00 AM to6.00 PM Monday through Friday per specification section 01046 1.01.B. 1 • Schedules/Insurance 1. Per General Condition article 2.05 the following schedules are to be submitted within 10 days of the agreement. Preliminary Construction Schedule. Monthly updates are required per specification section 01300 paragraph 1.09. 2. Schedule of Shop Drawings. 3. Schedule of Values for Payment Purposes. • Permits o The contractor is required to obtain a Town of South Windsor building permit prior to commencing construction, local fees are waived per specification section 01170 paragraph 1.15. o Subsequent permits are the responsibility of the contractor (NPDES - SWPPP, NOI's per specification 01110 paragraph 1.011, electrical, plumbing etc.). • Payment Estimates o AIA format? o Deliver "pencil" copy to CDM by the ?th of each month. 30 day review cycle for payment by Owner per Article 14.02.C. of the special conditions. o How many copies are required by the City? o Retainage (per Part II of the supplemental conditions) is 5% of the work up to 50%, 2% after 50% completion until Substantial Completion. The 5% may be reinstated after 50% complete if the contractor falls behind schedule. • Specifications o Provide erosion control per specifications 02270. Contractor is notified of erosion control provisions per 01110 paragraph 1.01.E o Water for construction purposes can be used without charge providing it is metered per specification section 1046 paragraph 1.09. o Contractor shall abide by article 4.06 of the general conditions and as revised by the supplemental conditions when dealing with hazardous environmental conditions as identified in the contract. o A Heath and Safety plan is required per specification section 13740. • Submittals o All shop drawings, RFI's, etc shall be clearly identified using an approved numbering system as specified in section 01300. o Provide up to ten (10) copies as requested by CDM. Allow up to 30 days for review & reply, time sensitive submittals may be expedited. Tom Joyce, CDM is contact for submittals. o MOPO schedule is required with 60 days of contract start per, specification 01810 paragraph 1.03.A. - o Per special conditions article 6.17 D.1 Efficiency Guarantee Bonds need to be executed for those pieces of equipment that require it. 2 VOL. 2005PAGE 85 4947 I, Stephen Wagner, Chairman of the South Windsor Zoning Board of Appeals hereby certify that on July 7, 2005, the Zoning Board of Appeals granted to: The Town of South Windsor, a 31' variance to section 10.2 for pump station improvements to allow a structure 4' from the front property line, I zone. on premises located: 1492 John Fitch Boulevard and more particularly bounded and described as follows: BEGINN240 at a point in the northwesterly property line-of the Trustees, said point being, distant 49.5 feet northwesterly of and approximately -opposite•staltion 1239...+:G•5..of said center,line of location;.. Thence northeasterly 48 feet more or lc•sa to A po3iit distant 39.5 feet northwesterly of and approximately opposite station 1239 4 38 of said center line of location; Thence again northeasterly, In a lino parallel with and distant 39.5 Feet northwesterly of and measured at rig angles from said canter line of location, 570 feet more or loss to a point in the northeasterly end of sAid•Aareel 2, said point being approximately.opposite station 1233 t 68 of said venter line of iocatibn: Containing 12,340 square-feet more or lass. I IIIIIII IIIIII III IIIII IIIII IIIII IIIII IIIII IIIII IIIII IIIII�illll llll11111111111111 Doc ID: 001700410001 Type: LAN Book 2005 page 85 File# 4947 OWNER OF RECORD: Town of South Windsor Dated at South Windsor, Connecticut this 21 st day of July, 2005. AP ephen Wagner, Chai erson PUBLIC ACT#75-317 Received for Record this I(S� day of 2006 at 4,() VOLUME TOWN CLERK JTCb-U, q---LC� STATE OF CONNECTICUT . ., AM DEPARTMENT OF ENVIRONMENTAL PROTECTION RECEIVED . VU/T bJStMe .• RAN3TUCIT t JUN 0 4 2009 SOUTH MMOSOR RMWOW, Permittee : Town of South Windsor Water Pollution Control Facility 1540 Sullivan Avenue South Windsor, CT 06074 Attn: Fred Shaw Permit No. : SCEL-200701033 Permit Type: Stream Channel Encroachment Line Town: South Windsor SCEL MAP #: CONN-SW-3&4 The Commissioner of Environmental Protection has approved your application to conduct certain regulated activities. Your attention is directed to the conditions of the enclosed permit or certificate. You should read the enclosed document carefully, as all construction or work must conform to that which is authorized. If you have any questions concerning the enclosed document, please contact this office at (860) 424-3019.. zr�` Date D se Ruz i ca, gVector Inland Water Resbfirces Division COPIES FURNISHED TO: All Parties Conservation Commission DEP Fisheries Inland Wetland Agency U.S. Army Corps of Engineers Planning & Zoning Commission (Printed on Recycled Paper) 79 Elm Street • Hartford,CT 06106-5127 www.ct.gov/dep An Equal Opportunity Employer 44 ci u m 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786 ��tiosoR:coN�� AREA CODE 860/644-2511 FAX 860/644-3781 OFFICE OF THE TOWN COUNCIL 7,DJanuary 24, 2008 Mr. Matthew B. Galligan, Town Manager Town of South Windsor 1540 Sullivan Avenue South Windsor, Ct. 06074 Dear Mr. Galligan: At its Regular Meeting of January 22, 2008, the South Windsor Town Council approved the following Resolution: WHEREAS, Camp, Dresser & McKee, Engineer Consultants to the Town of South Windsor have prepared a plan that identifies upgrades that are necessary to the Water Pollution Control Facility Treatment Plant; and WHEREAS, the Water Pollution Control Authority has recommended to the Town Council that these upgrades be done; and WHEREAS, the Town Council intends to appropriate $39,300,000 for the planning, acquisition and construction of upgrades to the Water Pollution Control Facility Treatment Plant; and WHEREAS, any plan that includes the use of Town monies, must first be submitted to the South Windsor Planning and Zoning Commission for a report pursuant to Section 8-24 of the Connecticut General Statutes 8-24 Referral —Water Pollution Control Facility Treatment Plan January 24, 2008 Page 2 NOW, THEREFORE, BE IT RESOLVED that the upgrades to the Water Pollution Control Facility Treatment Plant be submitted to the South Windsor Planning and Zoning Commission for a report pursuant to Section 8-24 of the Connecticut General Statutes. Respectfully submitted Ditel ah u.), Deborah W. Reid Clerk of the Council cc: Mike Gantick, Director of Public Works Fred Shaw, Superintendent of Pollution Control Joseph Carino, Chair, WPCA Marcia Banach, Director of Planning Patrick Kennedy, Chair, Planning &Zoning Commission c r C � 9 � 4'N�8 R.Co��E' ,SOW N Sf1 O-Psoa� V 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR•ca TELEPHONE (860) 644-2511 January 17, 2008 Karen M. Isherwood, P.E. Design Professionals, Inc. 425 Sullivan Avenue South Windsor, CT 06074 Re: Final Approval The South Windsor Housing Authority&The Metro Realty Group, Ldt. Dear Ms. Isherwood: The South Windsor Water Pollution Control Authority, at its regular meeting of January 8, 2008, gave final approval of proposed plans submitted by The South Windsor Housing Authority &The Metro Realty Group as presented for a sewer connection on a private sewer located on the Gerber Property, which would discharge into the South Windsor system on Diane Drive; and as more specifically shown on plans entitled"The Hillstead, Site Plan/Special Exception/Resubdivision, 25 Gerber Road, South Windsor, Connecticut"; Prepared by Design Professionals, South Windsor, CT; Sheet No.: 5 of 11, "Utility Plan" Job. No.: 2525, Drawing No.:2525\2525_utilities.dwg, dated: October 5, 2007, with Revision Dates: 10-22-07, 11-21-07, and 12-5-07; also, Sheet No.: 5A of 11,"Utility Plan"Job No.: 2525, Drawing No.:2525\2525_utilities.dwg., dated: October 5, 2007, with Revision Date: 12/5/07. This approval is subject to the following conditions: 1. A draft of a private easement between the property owners must be reviewed and approved by the Town Attorney; 2. Technical approval of the Town of South Windsor Engineering Department; 3. Payment of a connection charge in the amount of $31,438.28 at time of connection (up until 6/30/2008); and 4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. Very truly yours, oseph J. Carino, Chairman Water Pollution Control Authority --JC:ead cc: Michael J. Gantick, Director of Public Works Jeff Doolittle,Town Engineer V Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector VOL. 19 40 PAGE 4 5 I, Thomas Berstene, Chairman of the South Windsor Zoning Board of Appeals hereby certify that on October 4, 2007, the Zoning Board of Appeals granted to: Town of South Windsor- Water Pollution Control Facility — a variance to section 2.14.C.1 for the expansion of a non- conforming structure on premises located: 1 Vibert Road, A-40 zone. and more particularly bounded and described as follows: Beginning at a merestone in the southerly line of Vibert Road, said point being four hundred seventy seven and 34/100 (477,34) feet .1 more or less westerly from the westerly line of Main Street as a -measured in the southerly line of 'Vibert Road,-said point also being in the northwesterly corner of land N/F ilyefte and in the northeaster- ly corner of tract' herein described; thence westerly along the south- erly line of Vibert Road nine hundred forty four- and 29/100 (944.29) . feet to a point; thence vgsterly by:an interior angle of 1870 05' '30" along the southerly •line of Vibert Road ftw- hundred eighty eight and 46/100•(US.46) feet to a point; thence southerly by an interior angle 790 38' 50" along land N/F•Joseph Vibert and along land N/F Shepard I.P.B.B. one thousand seventy and 21/100 (1070.21) feet to. a .point in 'the northerly line of land N/F Tift; thence easterly by an , -interior angle of 93o 191 .5011 along•.the northerly line of land N/F -rift one thousand three hundred seventy one and 50/100 (1,371.50) feet to an-iron pipe;thence northerly by an interior angle of 970`26' 10"along the westerly line of land N/F Thomas Curtin four hundred A'. twenty. six and 11/100 (426.11) feet to an iron pipe; thence easterly, by an interior.angle 2510 15-' 00" along the northerly line of land': - N/F Curtin sixty (60.0):feet to:an iron.pipe; thence northerly by.an interior angle*of 910 17' 50" along• the.westerly line of .other land of the Town.of: South Windsor two hundred ninety three and 18/100 . (293.18) feet to a merestone; thence northerly by an interior angle of 17r 16' 2011 -along the westerly line -of land N/F Shepard:one hundred twenty two and 09/100 (122.09) feet to a merestone; thence northerly by an•interioe.angle.1770 29! 50" along the westerly line of land N/F.Hyette one hundred fifty nine and 24/100 (159.24) feet to point of beginning. OWNER OF RECORD: TOWN OF SOUTH WINDSOR Dated at South Windsor, Connecticut this 4th day of October,2007. Doc ID: 001418850001 Type: LAN �80ok 1940 Page 45 Thomas Berstene, Chairperson File# 5726 PUBLIC ACT#75-317 Received for Record this day of 2006 at VOLUME PAGE TOWN CLERK RECEI AT N�TMwwMact � ham►, `� c�f m mom, TOWN CLERK .COW N SF4 ®® W I l� V I S-0� ?d&U&Ot O m � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 l�OSox•c° TELEPHONE (860) 644 2511 October 23,2007 Hand Delivered Mr. Matthew Galligan, Town Manager Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Galligan: Re: Appl#07-58P,Town of South Windsor Water Pollution Control Facility We are pleased to advise you that the Planning Department approved with modifications the above referenced application for a Site Plan of Development. This approval is for site plan modifications for building additions and site improvements to property located at 1 Vibbert Road, A-40 and FP Zone as shown on plans prepared by Camp Dresser& McKee, Inc., Job No. 1806-44466, dated July, 2006 as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands --Agency/Conservation Commission dated 10/17/07. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 6. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 7. The building street number must be included on the final plan. 8. Pavement markings must be maintained in good condition throughout the site drives and parking areas. i 9. Trees of significance that will be removed should be field located and wood retained for town use. Black and white transparent mylar of Sheet #L3 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, AIZC16 Patrick Kennedy, Chairman M l— Planning and Zoning Commission PK/mrl cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal t0y1N Sf4 00 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 S R•CO TELEPHONE (860) 644-2511 July 13, 2009 Fred Shaw, Superintendant of Pollution Control Town of South Windsor South Windsor CT 06074 Dear Mr. Shaw: Re: Preconstruction Meeting for App1.07-58P, TOSW Pollution Control Facility Upgrade 6/24/09 IN ATTENDANCE Town of South Windsor: NAME TITLE CONTACT INFO Michael J. Gantick Director of Public Works 644-2511 EXT. 242 Fred Shaw Superintendant Pollution Control 644-2511 EXT. 247 Michele Lipe Assistant Director of Planning 644-2511 EXT. 252 Jeff Folger Environmental Planner& Conservation Officer 644-2511 EXT. 229 Michael Rose Building Official 644-2511 EXT. 233 Bernie Drabek Inspector—Engineering 644-2511 EXT. 241 Bruce Lundie Facilities Mechanic-WPCF 289-0185 Tim Friend Plant Supervisor-WPCF 289-0185 DEP Paul Grochowski Accountant Ivonne Hall Sanitary Engineer Stela Marusin Sanitary Engineer CDM Bill Meserve Senior Project Manager Tom Joyce Construction Manger Steve Kasle Site Construction Manager Joe Virgadula Site Project Manager C H Nickerson(CHN) Stan Bujalski Executive VP/Project Manager v. Peter Cesca Site Superintendent Griffin Electric Larry Pantano Project Manager Matt Cabucio Project Foreman The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Vibbert Road and Main St. Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 3. As built plans are to include horizontal and vertical location of all stormdrains, underdrains, footing drains, and sanitary sewers, piping for waters, process flow, chemicals, air piping, electrical utility conduct and piping, etc. 4. Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday. 5. Keep Vibert Road clear of equipment and materials. 6. No paving after October 15 or before April 15 without written approval from Director of Public Works. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. ,f 2. All bonds required; mylar to go on file prior to issuance of building permit. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal(Commercial Facilities) 1) Documents—Complete set of stamped plans with the following: a. Plan review paid b. Code information sheet c. Exiting plans with travel distances d. Wall types e. Door schedule f. Mechanical, Electrical,reflected ceiling g. Fire alarm h. Basic sprinkler layout ** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS ** 2) Inspections: a. Above ceiling b. Penetrations and separations c. Sprinkler system A. Hydraulic calculations and cut sheets B. Underground flush and hydrostatic test C. System hydrostatic test D. Main drain test/inspectors test E. Outside bell F. NFPA 13 paperwork d. Fire Alarm e. Emergency lighting test f. Final Inspection ** PLEASE NOTE THE FOLLOWING 1. Consulting inspection will be welcomed 2. Multiple inspections can be done on the same day 3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on line. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, 100- , Michele R. Lipe,AICP Assistant Director of Planning MRL/ma cc: Jeffrey Doolittle, Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal CL&P SBC/SNET TOWN OF SOUTH WINDSOR, CONNECTICUT WATER POLLUTION CONTROL FACILITY UPGRADE PRE-CONSTRUCTION AGENDA/MINUTES* JUNE 24, 2009 Today's Date: June 26, 2009 *Minutes in italics ATTENDEES (see attached sheet) Town of South Windsor: • Michael J. Gantick, DPW Director • Fred Shaw, Superintendant Pollution Control • Tim Friend, Plant Supervisor • Michele Lipe, Assistant Director of Planning • Jeff Folger, Environmental Planner& Conservation Officer • Jeff Doolittle, Town Engineer • Michael Rose, Building Official • Bernie Drabek, Inspector- Engineering Department • Bruce Lundie, Facilities Mechanic DEP: • Paul Grochowski, Accountant • Ivonne Hall, Sanitary Engineer • Stela Marusin, Sanitary Engineer CDM: • Bill Meserve, Senior Project Manager • Tom Joyce, Construction Manager • Steve Kasle, Site Construction Manager • Joe Virgadula, Site Project Manager C H Nickerson (CHN): • Stan Bujalski, Executive VP/Project Manager • Peter Cesca, Site Superintendent Griffin Electric: • Larry Pantano, Project Manager • Matt Cabucio, Project Foreman Page 1 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24,.2009 • Town of South Windsor Departments: o Planning: M. Lipe pointed out that CHN and CDM must comply with all requirements of the approval letter from Planning&Zoning Commission dated 10123107(see attached), including but not limited to the following: • CDM/CHN must submit final mylar of L-3 drawing to Planning Office with approval letters from Planning &Zoning, Inland/Wetlands and WPCA incorporated into the mylar. CDM will file signed mylar in the Office of the Town Clerk No building permit will be issued until final mylars have been filed in the Town Clerk's office. • CDM/CHN must also submit four(4)sets of L drawings and civil drawings to Planning Office for"Final Plan"stamp and signature. 2 sets will be retained by Planning Department,2 sets will be sent to the field. • L-3 Drawing and civil drawings used in the field must bear the stamp "Final Plan"and authorized signature of the Town of South Windsor • Tree of significance (30"butternut)should be field located and wood retained for Town use. o Wetlands: CHN must notify J. Folger in Wetlands office after E&S controls are installed for inspection by enforcement officer. Wetlands Enforcement Officer will inspect mitigation areas in the latter stages of the project. o Engineering:J. Doolittle stated that Engineering Dept is interested in site drainage and site grading aspects of the project. CHN must submit as-built mylar of site utility installations to Engineering Department upon completion of underground installations. o Police: Requested a list of Emergency Numbers for project personnel. CHN will submit list of names and numbers to CDM. CDM will add CDM personnel and forward to Town for addition of Town personnel. CDM will issue final list to Police Dept and Town officials. • Utility Discussion: Utility company representatives did not attend. • Communication and correspondence o All communications directed to CDM contact o CDM will provide questions and inquiries to respective disciplines and Owner contacts o Fred Shaw is primary contact for Town of South Windsor. Page 2 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24, 2009 • Safety o Contractor's sole responsibility per general conditions article 6.13 o All visitors to the site must check in with CHN. CHN to provide a sign delegating such. o CHN will submit site specific safety plan per submittal requirements • Time o Contract start time is twenty days after the effective date of the Agreement (May 28, 2009). Therefore, June 17, 2009 o Contract duration is 900 calendar days. o Contract completion date is December 4, 2011, CHN will verify. o Liquidated damages are $2,000 per calendar day. o Allowable Working Hours are 7:00 AM to 6:00 PM Monday through Friday per specification section 01046 1.01.13. Town stated that no activity should occur before 7.•00 a.m. including starting of equipment. S. Bujalski noted that concrete placements over the summer months would have to start before 7.00 a.m. in order beat the summer heat. CHN will notify CDMT'own well in advance so Town can provide timely notification to local residents on Town-run website. • Schedules/Insurance o Per General Condition article 2.05 the following schedules are to be submitted within 10 days of the agreement. Preliminary Construction Schedule. Monthly updates are required per specification section 01300 paragraph 1.09. o CHN is working on preliminary construction schedule and will meet with Tim Friend after meeting to review MOPO issues. o Schedule of Shop Drawings. Submitted by CHN to CDM yesterday. o Schedule of Values for Payment Purposes. S. Bujalski will submit to CDM by the end of the week. • Permits o The contractor is required to obtain a Town of South Windsor building permit prior to commencing construction, local fees are waived per specification section 01170 paragraph 1.15. CHN has the paperwork and will submit by the end of the week. Submission should include two (2) sets of drawings and specifications. o Subsequent permits are the responsibility of the contractor (NPDES - SWPPP, NOI's per specification 01110 paragraph 1.015, electrical, plumbing etc.). CHN has filed for NPDES permit. o Per Planning Department, CHN must obtain permit for installation of project sign. o MEP subcontractors will apply for their own permits. Page 3 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24, 2009 • Payment Estimates o CHN will prepare pay estimate in AIA format with signature box for Fred Shaw. P. Grochowski noted that pay estimates must list individual bid items o Cut-off date will be the le of the month. CHN will deliver "pencil" copy to CDM by the 16th of each month. CDM will submit six(6) originals to owner by the 25th of each month. Per P. Grochowski, Town can e-mail pdf. copy of pay estimate to DEP on or before 2nd business day of the month. 30 day review cycle for payment by Owner per Article 14.02.C. of the special conditions. o Retainage (per Part If of the`supplemental conditions) is 5% of the work up to 50%, 2% after 50% completion until Substantial Completion. The 5% may be reinstated after 50% complete if the contractor falls behind schedule. o CHN plans to submit first pay estimate for period ending 7115109. o P. Grochowski expected agreement between Town and DEP to be finalized after 4th of July holiday. • Specifications o CHN must provide erosion control per specifications 02270. Contractor is notified of erosion control provisions per 01110 paragraph 1.01.E. CHN must notify Inland/Wetland office after silt fence is installed to allow for inspection by Wetland Enforcement Officer. o Water for construction purposes can be used without charge providing it is metered per specification section 1046 paragraph 1.09. o Contractor shall abide by article 4.06 of the general conditions and as revised by the supplemental conditions when dealing with hazardous environmental conditions as identified in the contract. o A Heath and Safety plan is required per specification section 13740. • Submittals o All shop drawings, RFI's, etc shall be clearly identified using an approved numbering system as specified in section 01300. o CHN will provide up to ten (10) copies as requested by CDM, with one (1) copy to Fred Shaw and 9 copies to CDM. Allow up to 30 days for review & reply, time sensitive submittals may be expedited. Tom Joyce, CDM is contact for submittals. o MOPO schedule is required with 60 days of contract start per specification 01810 paragraph 1.03.A. o Per special conditions article 6.17 DA Efficiency Guarantee Bonds need to be executed for those pieces of equipment that require it. Page 4 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24, 2009 o Contractor is required to take construction photographs per specification section 01300 paragraph 1.08. • As-Builts o CHN must maintain a current set on site at all times for review by CDM per general conditions article 6.12. • Project Sign o Contractor shall erect a project sign per Part II of the supplemental conditions. CHN will have sign made up with current dollar values listed. CHN can modify values later, if necessary. M. Lipe requested that CHN fill out permit request with Planning Dept to erect sign. • MBENVBE Goals o Reporting per Part II of the supplemental conditions. CHN to send compliance reports to Steve Kasle for the field files, 2.0 - MBE; 3.0% -WBE. Two executed Subcontracts to Owner within 10 days of agreement signing per CWFM-1-Revised that was supplied with the bid documents. CHN expects to have unsigned subcontracts out to Marquis Masonry and Malcolm Arnold(Plumbing) later this week. Per S. Bujalski all MBE/WBE subs have CT certifications. P. Grochowski stated that executed MBEIWBE subcontracts must be on file with DEP before processing of first pay estimate, or CHN must show evidence of good faith effort of complying with MBE/WBE requirements. • Certified Payrolls (See Part II of the supplemental conditions) o Contractor to complete "Contracting Agency Certification Form" o Contractor to send 1 copy of payrolls to Steve Kasle for the field files. • Taxes o Contractor is relieved of paying sales and use taxes per article 6.10.A of the general conditions as modified by the supplemental conditions. o Contractor's "Exempt Purchase Certificate" is located near the back of Part II of the supplemental conditions. • E-Room o CDM will develop an E-room for contract use. F. Shaw asked that Drew Guild in lT Dept be added to E-room. CDM will reinvite Stan Bujalski, Stela Marusin, Ivonne Hall& Tim Friend. • Construction Meetings o Coordination meetings held at a minimum monthly to resolve coordination problems. The first construction progress meeting will be Page 5 of 6 Town of South Windsor Water Pollution Control Facility Upgrade Pre-construction Meeting Minutes June 24, 2009 held on Tuesday, July 14, 2009 at 10.00 a.m. in the garage of the Water Pollution Control Facility at 1 Vibert Road in South Windsor. • Discussion and Q&A 1. Preliminary Schedule: CHN plans to begin excavation in the next few days and to haul out material on a daily basis over the next month. 4-5 triaxles will be running 50-60 loads per day. Town will notify public on website. M. Gantick asked that CHN use Pleasant Valley as main access route. Town will look into trimming of low hanging branches on Vibert Road. 2. Field Office: CHN will set up office trailers within the next 2 weeks. Utility installation will follow. 3. Site Security&Access: Main gate is secured by a single padlock. T. Friend will issue keys to CHN and to CDM. S. Kasle requested key to building for work after hours. CHN will install temporary fence around staging area and trailers. CHN will ask CL&P to install temporary street lights to illuminate staging area. 4. Traffic Control: CHN and CDM will contact Police Department to discuss wording and locations of temporary traffic signs on Vibert Road. Permit will not be required for traffic signage. 5. Informational Website: M. Gantick will maintain informational website to notify public of project developments and public impacts. CDM will provide M. Gantick with regular project updates. 6. S. Kasle requested current list of equipment and labor rates from CHN Above were the minutes as I understood them to be. Please contact me with any additions, omissions or corrections. Sincerely, e Virgadula Site Project Manager Attached: Planning Department Approval Letter 10/23/07 Attendance Sheet cc: Meeting Attendees Chris Dougan,Town of South Windsor Tim Dupuis,CDM Page 6 of 6 S�YIN Sfq` Oy . F^ Town O-P Sou� ?d&U&0_t G � w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 lMOS R.Ca TELEPHONE(860)644-2511 October 23,2007 Hand Delivered Mr.Matthew Galligan,Town Manager Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Galligan: Re: Appl#07-58P,Town of South Windsor Water Pollution Control Facility We are pleased to advise you that the Planning Department approved with modifications the above referenced application for a Site Plan of Development. This approval is for site plan modifications for building additions and site improvements to property located at 1 Vibbert Road,A-40 and FP Zone as shown on plans prepared by Camp Dresser&McKee, Inc.; Job No. 1806-44466, dated July, 2006- as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. • 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands ---Agency/Conservation Commission dated 10/17/07. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 6. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. -7. The building street number must be included on the final plan. 8. Pavement markings must be maintained in good condition throughout the site drives and parking areas. . 9. Trees of significance that will be removed should be field located and wood retained for town use. Black and white transparent mylar of Sheet #L3 with the above modifications, together with three blueprint copies of the entire set of plans must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Patrick Kennedy, Chairman Planning and Zoning Commission PK/mrl cc: Town.Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal c TOWN OF SOUTH WINDSOR, CONNECTICUT WATER POLLUTION CONTROL FACILITY UPGRADE PRE-CONSTRUCTION ATTENDANCE SHEET June 24, 2006 Name Company Phone/Email `3 604r ram- m<3gusl" CT �4 roc,•- 2���Z sr�.�. N O. S.(J, �G,c7 G��E-zrrr x f2 ak a focc «eefvr.o' p R)b' 3c6 5Z1 ��cttN7"G/t/Cl�`lt/1 f mil,fcs IW,4 CAI Alee C�j Rol lvo 3- ZZZ,- 3OZ SLNtw`W Tn Al) �!L r. �C SEA✓& J ( / D c� � e ofurz,(!l e "Lglf �soabra: b�� a TOWN OF SOUTH WINDSOR, CONNECTICUT WATER POLLUTION CONTROL FACILITY UPGRADE PRE-CONSTRUCTION ATTENDANCE SHEET June 24, 2006 Name Company Phone/Email 4,05 Z V4 DM K,�sc.�so � ry�fl�t /t'�- Irec( ( �L w rvw�, v ,fo�}�,l� I Sri/ [off-'LSDI�P �Z�{7 �yed,Sl�W�so�#tn WiN.C�So/a Of� � �� �' ►ter• �:J �rt,C-R- Lj nzs x `10 W o 1 p « r 5 r. Gory K. Tyier �r,��SOR•CO a Chief of Police Police Services SOUTH WIND OR POLICE SERV CES N CONSTRUCTIO REOUIREME S • Developer is responsible for the purchase and installation of all street and traffic signs.All signs under the control of the Town of South Windsor must conform to standards as published by the Town of South Windsor,Department of Public Works.All signs under the control of the State of Connecticut must conform to standards developed by the State of Connecticut,Department of Transportation.All-signs will conform to the MaauaLQn IJniform Tr ffic ontrol Devicpt. Street sign material may be purchased through the Town of South Windsor.All other traffic signs shall be purchased from an outside vendor. + Developer will submit three(3)8 1/2 x 11 or 8 1/2 x 14 maps of the proposed project for the purpose of identifying and positioning all traffic and/or street signs.Any changes in roadway design will require new maps. • When the developer is ready to erect all required signs,contact should be made with the Department of Public Works,Street Services Division,who will arrange for a supervisor to locate each sign position.Each such sign position shall be located by use of a wooden stake. It will be the responsibility of the developer to have the sign(s)erected as required and to -- ensure that any and all underground utilities are identified so as not to injure an y person during installation and maintenance or interfer with sign placement or future maintenance. • Developer is responsible for the purchase of all street lighting through Northeast Utilities (NU).NU will review plans with the developer and suggest placement of all street lighting. Location, fixture and pole type,along with lumen output(watt size)are all subject to approval by the Town Traffic Authority(the Chief of Police or his designee). The developer is responsible for payment of all applicable fees to guarantee the minimum overhead rate to the Town.Once these fees have been paid,the Town will assume the normal monthly charge for each light. • Any and all work to be conducted within the limits of a public highway,or so close there to, shall require review by the Town Traffic Authority(the Chief of Police or his designee), prior to the work taking place,for the purpose of identifying necessary traffic control and safety measures. • Developer is required to erect and maintain,throughout the project,a sign identifying the name and/or title of the project. Such sign shall be clearly visible from the public highway. 151 Sand Hill Rood • South Windsor, Connecticut 06074 • (203) 644.2551 2 • Developer is responsible to erect and maintain temporary street sign(s)throughout the project. • Developer must provide emergency 24 hour telephone numbers for the duration of the project. • Developer shall ensure that all buildings located on property which abutt(s)a public highway are numbered.Barns,garages and outbuildings which are located on the same premises as a numbered structure are excluded. 9/20/95