Loading...
HomeMy WebLinkAbout165 Rosemary Lane - WPCA Approval Letter tpylN Sf4 F GO 7-own- O-P sottm U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 203/644-2511 August 31, 1998 Ms. Kimberly A. Price 165 Rosemary Lane South Windsor, CT 06074 RE: Lot#4, 165 Rosemary Lane SOUTH WINDSOR, CT Dear Ms. Price: The South Windsor Water Pollution Control Authority,at its special meeting of August 20, 1998,gave approval for the connection to the Town's sewerage system of a residential building at 165 Rosemary Lane,as more specifically shown on plans entitled "Dependent Resurvey prepared for Kimberly A. Price-- 165 Rosemary Lane -- South Windsor,Connecticut"by Design Professionals,Inc., South Windsor,Connecticut,Job No. 98-1139 (Drawing labeled "Improvement Location Map"),Sheet No. 1 of 1,dated June 29, 1998,revised 8-13-98 (Rev. No. 1), and on plans entitled"Oak Grove III"prepared by Emil W. Lucek Associates,Project No. 78-72,Sheet No. 5 of 6 dated 8-7-78, revised 10-10-78 (Rev. 1)and 10-21-78 (Rev. 2), and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design - plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifica ons relating to sanitary sewer construction. 3. This approval letter must be superimposed on the final approval plans. Very truly yours, Th a�o`lliution n on,Chairman Water Control Authority TH:rt cc: Matthew Galligan, Town Manager Michael J. Gantick, Director of Public Works Jerry Iazzetta,Town Engineer Marcia Banach,Director of Planning John Collins, Chief Building Inspector