Loading...
HomeMy WebLinkAboutNutmeg Road South - WPCA Application, Approval Letter �SpWN •�, �Wn ofes� �• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �OSOR'co � TELEPHONE(860) 644-2511 January 16,2001 Mr.Wayne Wright Hale Realty,LLC Nutmeg Road,South South Windsor,CT 060 RE: Constitution Landing—extension of sewer line Nutmeg Road,South South Windsor,CT Dear Mr.Wright: The South Windsor Water Pollution Control Authority,at a special meeting of January 9,2001,gave approval for the connection to the Towns sewerage system of a commercial subdivision located on Nutmeg Road,South,as more specifically shown on plans entitled"Proposed Sanitary Sewer installation", prepared by Messier&Associates,Inc.,Project No.99-129,Drawing No(s). 1 dated 12/00,with no revisions,and subject to the following conditions: 1. This approval is for change in ownership of the main line sewer from a private line to a public line with an easement in favor of the Town of South Windsor. 2. Technical approval of the Town Engineering Department. 3. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff,and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, Tho HiRson,Chairman Water Pollution Control Authority TH:dd CC:Matthew Galligan,Town Manager Michael J.Gantick,Director of Public Works Jerry Iazzetta,Town Engineer Marcia Banach,Director of Planning John Collins,Chief Building Inspector _ James Aldrich,Aldrich Construction Co. TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No. Date Received !2''2i 10 A Date Scheduled For /oil101 Applicant i d-r-&)h . Address LJg �4oQIS P lckz Mangy 1ptjy Telephone No. gzpf). LP L{7- 5 y Owner of Record on Land Records )oaf. Rt-a l±4 L L C Owners Address P.Q. B erX 30 y M a,,%e)n f� j-1c - C T &L-D04-5) --63 00 Property Description: Assessor's Map # Parcel # Vol. Page Project Title: ' n 1- i of) Inquiries to be Directed to: (name, address, telep one no.) 091 ch E�,,ri5 f-Uc+ice CDInc - flaxx zx)F4, e(- YGeb I047. 7-t�E4L4 Approvals Previously Received (Check) IWA _,_ P & Z _ ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection -- Residential Use a. Subdivision b. Single Unit c. Other Ex�p in d. Type o Approval: Concept_ Final 2. Sewer Extension/Connection -- Industrial/Commercial User a. New Connection b. Request to Increase ow ITate c. Change in Nature of Waste Discharge d. Other X Explain F�ci,4 d .S¢.we, �o. /o>ts y,S,6 44 d 7 e. Type o Approval: Concept Final x 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commerc al 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal ; Explain 6. Other Explain AL--o41 G�v1TCutTlov ca, /vim ;ignature ate ner' ignature Dale (See Reverse Side for Application_Submittal Procedures) /rwol"CAlapplicxwn 111261% Aldrich Construction Company, Inc. 48 Stock Place Manchester, CT. 860.647.7544 860.645.0138 (fax) 21 December 2000 Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Attention: Mr. Fred Shaw Re: Constitution Landing Dear Fred, Attached to this letter of transmittal are the following documents: 1. Original WPCA application form 2. Two sets of drawings entitled Proposed Sanitary Sewer Installation as prepared by Messier and Associates and dated 12/00 and received by Aldrich Construction on 11 December 2000. I am requesting to have the construction of this new sewer added to the docket for the January meeting of the Water Pollution Control Authority Commission. We are requesting to extend the existing sewer to provide new sewer service for lots 4, 5, 6 and 7. If you have any questions or comments with this request or this submission,please feel free to call at any time. With regards, Aldrich Construction Co., Inc. James D. Aldrich,President