Loading...
HomeMy WebLinkAbout08-43P Blanco Garage Addition avwa• yr ►vvan W1JJ.UzivK PLANNING &ZONING COMMISSION x a APPLICATI k Application No: Official Receipt Date: OCT 2 , r 2008 s. p Receipt No: ° SOUTH WINDSOR PLANNING DEPT. APPLICANT: PROJECT NAME: ADDRESS: '9-1(o Pieria-,+ �al��, �d • �o I.y o��Sor' L."T ®too'1� 3428 OWNER OF RECORD ON LAND RECORDS: S 0 ,e. ADDRESS: COMPLETE LOCATION OF PROPERTY: ASSESSOR'S MAP# 33 PARCEL# I ZONE - NAME, ADDRESS, TEL&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 1.-ou iQ x.e 3-7(n Pleasor'+ vct[l Pd. So_ i C--r Otcca� - yZ8 Estimated presentation time: THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor ❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) Site Plan of Development ❑ General Plan of Development ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision (Attach proposed amendment) (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all appli ations ten (10) days prior to being heard b the C mis S1 ure ant Signature operty Owner s So. .1 ti • w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�dSOR.co TELEPHONE (860) 644-2511 November 17, 2008 Mr. Louis J. Blanco 376 Pleasant Valley Road 7008 0150 0002 6256 2693 South Windsor, CT 06074 Re: Appl#08-43P, Blanco Site Plan Modification Dear Mr. Blanco: We are pleased to advise you that your request for a modification to the existing Site Plan of Development has been approved. This approval is for the construction of an additional 600+ square foot addition on property located at 376 Pleasant Valley Road, I zone as shown on plans prepared by Aeschliman Land Surveying, PC, dated 10/21/08, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 4. Footing drains are required if the building has a basement. 5. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 6. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. • 7. The building street number must be included on the final plan. y 8. Pavement markings must be maintained in good condition throughout the site drives and parking areas. y 9. Any dumpsters on site must be screened. Black and white transparent mylars of Sheet#1 with the above modifications,together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to this Commission to be stamped and signed. The letter of approval of this Commission as well must be reproduced on the mylars. tOWN Sfq ?()• c a � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR.co TELEPHONE (860) 644-2511 December 9, 2008 Mr. Louis Blanco 376 Pleasant Valley Road South Windsor, CT 06074 RE: 376 Pleasant Valley Road Approval to Connect Dear Mr. Blanco: The South Windsor Water Pollution Control Authority, at its regular meeting of December 2, 2008, approved the application as presented for connection of the garage bathroom to the existing building sewer, located at 376 Pleasant Valley Road, South Windsor, CT; as more specifically shown on plans entitled``Site Plan, #376 Pleasant Valley Road, Prepared for Louis Blanco, South Windsor, CT; Prepared by Aeschliman Land Surveying, PC, East Hartford, CT, Map No.: 208081-2, Dated 10-21-08, Revised Dates: 11-18-08 and 11-4-09. This approval is subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer Fine has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, U Joseph J. Carino, Chairman Water Pollution Control Authority JC:ead Cc: Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector LBM Engineering, LLC PO Box 44 TEL 860-633-9401 Colchester,CT 06415-0044 FAX 860-633-8851 CIVIL ENGINEERING-LAND DEVELOPMENT-SITE PLANS-STORMWATER MANAGEMENT October 23, 2008 Drainage Summary for Proposed Building Addition 376 Pleasant Valley Road, South Windsor, Connecticut Refer to a site plan titled, "Site Plan #376 Pleasant Valley Road Prepared for Louis Blanco, South Windsor, Conn" by Aeschliman Land Surveying, PC, Date: 10-21-08. The proposed building addition will replace a portion of the existing paved driveway. The proposal also includes the removal of some existing pavement behind the proposed addition. There will be a net decrease of impervious area of approximately 170 SF. Therefore, the peak rate and volume of stormwater runoff from the property will be slightly decreased after the proposal is implemented. CONCLUSION - This proposal as designed should have no impact on the surrounding properties and Town drainage system. Submitted by, 0609N"N"N" LLC ••• C0NN M Engineering, 40 �,�„MA 2/ t s�e�0 �ozn 44 R. Martucci, P.E. a* a 11-A No. 19494 41 CE Sip o• �i s PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 10/27/08 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Walter Summers, Jeff Doolittle Ray Favreau, Karl Reichle, Mark Owens, Steve Lavigueur, Chris Dougan, Bob DeVito John Caldwell, Dennis Sheridan, Ron Asselin FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: Appl 08-43P, Blanco DBA Ultimate Sign Company Location: 376 Pleasant Valley Road ® Site Plan ❑ Subdivision No. Acres .5 ac Zone I Industrial ❑ Commercial ® Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: 600+ sf garage addition Future Town-owned property involved? ❑ Yes ®No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Addition will include new water, sewer hook up to garage Please comment by 11/14/08 and return to the Planning Department. PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 10/27/08 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Walter Summers, Jeff Doolittle Ray Favreau, Karl Reichle, Mark Owens, Steve Lavigueur, Chris Dougan, Bob DeVito John Caldwell, Dennis Sheridan, Ron Asselin FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: Appl 08-43P, Blanco DBA Ultimate Sign Company Location: 376 Pleasant Valley Road ® Site Plan ❑ Subdivision No. Acres .5 ac Zone I ® Industrial ❑ Commercial ® Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: E Public ❑ Septic System Project Description: 600+ sf garage addition Future Town-owned property involved? ❑ Yes ®No new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Addition will include new water, sewer hook up to garage Please comment by 11/14/08 and return to the Planning Department. PERMITS/INSP PAYMENT RECPT#: 20310657 TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 10/31/08 TIME: 15:05 CLERK: mariadace DEPT: CUSTOMER#: 0 PARCEL: CHG: PZ PLANNING AND ZO 80.00 AMOUNT PAID: 80.00 PAID BY: TUSC PAYMENT METH: CHECK 6669 REFERENCE: A AMT TENDERED: 80.00 AMT APPLIED: 80.00 CHANGE: .00 !! P dry s''"��'�.','+���� f •� , M rwT : i w;. I s ` J ,: rr �• /ff P r� r �/'i y ->l+•.,�.;,—«,...... �� ! 1 1 w' � 1. ,O f '� r� �I�a�',^��M�Iy��,� \•.`"^.,.w, ``� �� ,u �,,,,,�� r, Lk'.µ f.{ w,My v �„� d�,�,�f '�'�+�n-^ rvn' evy f a „ f fix.,.,:.'^..,.,,.w .1..._..,...,... - .,... :. ..�., ,.__....._ a .t, ^Mr+nun„u�r.1M.M � ' +e+a„+wnwpen k r 1 ,.y r } Z&Z&� IOxi7I o o �O V vV V 1 0.5u. l T 5.5xo° restoo TOWN OF SOUTH­WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Jet c t' / � l h/ Pho a No. U / 611/0 Address /7 Site Na/me �) ` P&Z No. Owner L- Gw t,�lGr)!t,� Phone No Contractor Signature of Owne =' 9m � �.�F Date: 1,2/,�.,�-Z Signature of Design ngr�`M -� Date: CHANGE: (Describe location and nature of change. Include Four (4) copies of plan/profile of Change. ) l , . r- - i ;r Reason for Change: (Why is change required) APPROVALS: (As Required) Dir.. Of Planning Date:_ Town Engineer Date: Dir. of Public Works . Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department