Loading...
HomeMy WebLinkAbout08-29P Colonial Point Christian Church TOWN OF SOUTH WINDSOR PLANNING&ZONING COMMISSION APPLICATION FORM Application No: r2 RECEIVED Official Receipt Dater —i: Receipt No: MAY 2 0 2008 APPLICANT: Colonial Point Christian Church,Inc. SOUTH WINDSOR PL 014 DEPT. PROJECT NAME COLONIAL POINT CHRISTIAN CHURCH ADDRESS: 855 Chapel Road OWNER OF RECORD ON LAND RECORDS: Colonial Point Christian Church,Inc. ADDRESS: PO Box 1145, South Windsor,CT 06074 COMPLETE LOCATION OF PROPERTY: south of Chapel Road,across from.Betty Drive ASSESSOR'S MAP#8 PARCEL#66 ZONE RR NAME,ADDRESS,TEL&FAX#OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Galen B.Semprebon,P.E.,Design Professionals,Inc-,425 Sullivan Avenue,South Windsor, CT 06074 Tet (860)291-875S,Fax(860)291-8757 -�14 H dl&,h 19hS THIS APPLICATION IS FOR: (Check all that apply): r Zone Change to (Public Hearing required and.Certified letter to abutters required) r Subdivision/Resubdivision 1- Open Space Subdivision(Public Hearing Required) r- Subdivision r" Minor r' Major r" Resubdivision(Public Hearing Required) r" Minor f Major r' Conditional Approval F- Special Exception to Article (Public Hearing, Certified letter to abutters required r Site Plan ofDevelopment r" General Plan of Development F- Earth Filling(Sec. 15)and/or Earth Removal(Sec. 14 - Public Hearing Required) r Regulation Amendment: r zoning r Subdivision (Attach proposed amendment) r Temporary and Conditional Permit for r" Major Horne Occupation for F%-, Other(explain in detail) Site Plan Modification An Application Pending sign is required to be posted on the property for all applications ten(10)days -rior to being heard by the Commission. Signature of Applican Signature of weer LkJt P.O.BOX 1167 425 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 n PHONE:860.291.8755 .8757 ��� FAX:8onalsi c.com www.designprofessionalsinc.com 1 CIVIL & TRAFFIC ENGINEERS / PLANNERS/SURVEYORS /GIS ANALYSTS / LANDSCAPE ARCHITECTS • LETTER OF TRANSMITTAL To: Town of South Windsor P&ZC Date: 5/20/2008 DPI Project No. 2030 Re: Colonial Point Christian Church WE ARE SENDING YOU: ® Attached ❑ Under separate cover via the following items: ❑ Shop Drawings ❑ Prints ❑ Renderings ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ • COPIES DATE NO. 1 5/20/2008 2030 Application Form 3 4/30/2008 2030 Colonial Point Christian Church site plan 2 5/19/2008 2030 Site Plan Checklist 1 5/20/2008 7748 Check for application fee • These are transmitted as checked below: ® ForApproval ❑ No exceptions taken ❑ Resubmit copies for approval ❑ For your use ❑ Make corrections ❑ Submit copies for distribution ❑ As requested ❑ Revise and Submit ❑ Return corrected prints ❑ For review aqd comment ❑ For bids due ❑ Prints returned after loan to us REMARKS: The attached site plan represents the modification of a previously approved development. The previously approved development was much larger than the one currently being proposed. Please see previous application for drainage calculations and traffic report. • SIGNED: CC: Branden Bergeron PLANNING DEPARMENT IN-MOUSE REFERRAL FORM DATE: 5/27/08 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Bill Lanning,Jeff Doolittle Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, Chris Dougan, Bob Deptula Dennis Sheridan FROM: Marcia A. Banach,AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: App. 08-28P,Colonial Point Christian Church Location: South side of Chapel Road, opposite Betty Drive ® Site Plan ❑ Subdivision No. Acres 7.4+ Zone RR ❑ Industrial ❑ Commercial ® Residential No. Lots/Units Water: E Public ❑ Private Well Sewerage: (§Public ❑ Septic System Project Description: New church—approx. 8,500 sf phase 1 Future Town-owned property involved? ❑ Yes ®No ❑ new street(s) ❑ new detention area ❑new open space/recreation area ❑ active ❑passive Planning Department notes: Proposing a smaller project than originally approved Please comment by 6/6/08 and return to the Planning Department. I RECEIVED FI RALD& HALLIDAY, INC. r ' d ar Street, Hartford, Connecticut 06106 Tel.(860)247-7200 SOUTH WINDSOR PLANNING DEPT. Fax(860)247-7206 MEMORANDUM To: Pastor David Johnson Project: Colonial Point Christian Church, South Windsor, CT From: Susan VanBenschoten,PE Date: June 3, 2005 Subject: Traffic Impact Assessment At your request, FRI has conducted a traffic study for the proposed house of worship in South Windsor, Connecticut. The purpose of the study is to provide a professional assessment of the anticipated trip generation, parking needs, and traffic impacts to the surrounding roadway network. Site Environs and Access The site is located on the south side of Chapel Road in South Windsor. Chapel Road is a two- lane collector road which runs east-west from Route 5 (John Fitch Boulevard) to Clark Street at the Manchester town boundary. Further to the east, Chapel Road connects with I-291. The intersection of Chapel Road and Long Hill Road, another local two-lane collector road, is about 0.4-mile west of the site driveway. This is an all-way stop-controlled intersection. Approximately 0.9-mile to the west of the site driveway, Chapel Road intersects with Ellington Road. This is a signal-controlled intersection. At this location, Ellington Road, a north-south major arterial roadway, is also designated as Route 30. Based on available 2000 data from the Connecticut Department of Transportation (ConnDOT), this location has an average daily volume of 2,900 vehicles at a location on Chapel Road east of Ellington Road, 5,300 vehicles west of Ellington Road, and 6,800 vehicles on Ellington Road north of Chapel Road. Based on year 2000 traffic volume data from ConnDOT, Chapel Road had an average daily traffic volume of 2,600 vehicles at a location east of Long Hill Road. A traffic volume count conducted in April 2005 on Chapel Road between Gail Lane and Betty Drive showed an all-day Sunday volume of about 1,600 vehicles, with a Sunday peak hour volume of 157 vehicles. Two access driveways are proposed for the site, connected by an internal roadway. The west site driveway is located on the west end of the site, about 800 feet west of Betty Drive. The east site driveway is located on the east end of the site, about 800 feet east of Betty Drive. Along the site frontage, Chapel Road is level and has a pavement width of approximately 30 feet. The speed limit is 35 miles per hour in both directions. Travel speeds typically exceed the speed limit, with the 85`i'percentile speed equaling about 50 miles per hour. The minimum desired sight distance Planning Consultants f for this travel speed is 555 feet as recommended by ConnDOT. Because of the straight and level alignment of Chapel Road in this area, sight distances in both directions from the proposed site driveways well exceed this minimum distance. Trip Generation The proposed church facility will be constructed in two phases. After the first phase of construction, the sanctuary will contain 250 seats. After the final phase of construction, the sanctuary will contain a total of 500 seats. Including auxiliary buildings, the overall size of the facility following the final phase of construction will be about 12,000 square feet. The number of vehicle trips expected during the Sunday morning peak hour was estimated using the methodology outlined in the Institute of Transportation Engineers reference, Trip Generation, 7'h edition. Trips per seat is the basis for trip generation calculation. Based on the size of the facility following the final phase of construction, a church with 500 seats would be expected to generate a total of 315 trips during a Sunday morning peak hour, consisting of 164 entering and 151 exiting. This level of traffic activity, occurring at a time with low existing traffic volumes on the surrounding roadways, will be readily accommodated by Chapel Road and the nearby intersections. Throughout the remainder of the week, vehicle trips associated with church management and small meetings will be negligible. Parking Similar to the facility itself, the parking area will be completed in two phases. The first phase will yield a total of 133 parking spaces. Following the second phase of construction, a total of 199 parking spaces will be available on-site. The Town of South Windsor Zoning Regulations require one parking space for every three seats at church facilities. For the proposed facility with 500 seats, 167 parking spaces are required. An excess of 32 parking spaces are being provided. The proposed parking supply is adequate to meet parking demand including instances when the sanctuary is filled to capacity. Roadway Network Based on the current all day and peak hour volumes on Chapel Road, the surrounding roadway network will easily support the small amount of traffic volume expected to be generated by the proposed development. Field observations of operations at the intersections of Chapel Road with Long Hill Road, Route 30 (Ellington Road), and Clark Street indicate that the existing infrastructure will adequately support the additional turning movements generated by the proposed development during the Sunday morning peak hour. A review of available accident data did not identify any pre-existing high accident trends in the area of the proposed site. Planning Consultants Conclusion and Recommendations This assessment indicates the following: • The proposed church facility is expected to generate a relatively low volume of traffic even during its highest level of trip generation, Sunday morning. • At other times of the week, the facility is expected to generate negligible traffic activity associated with church management and small meetings. • Traffic that will be generated by this proposed facility will be easily accommodated by the existing transportation network, both on Sunday mornings when traffic on the existing roadway network is very light, and at other times during the week. + The proposed site access driveways on Chapel Road provide adequate sight distances to safely accommodate traffic turning movements. • Adequate parking is proposed to meeting the parking demand of the facility including instances when the completed sanctuary is filled to capacity. In summary, the proposed church facility on Chapel Road is expected to have minimal traffic impact to the surrounding roadway network. Planning Consultants Sound Study Colonial Point Christian Church South Windsor,Connecticut The following report was prepared to address questions raised at the Planning and Zoning hearing regarding sound levels in the vicinity of the site, and projected impacts due to the development on the site. The intent of the study is to verify the existing noise levels along the frontage of the neighbors directly across the street from the site due to noise from the 1-291 highway. A Sper Scientific sound meter 840005 was used for the study. This meter allows for measurement of sound in decibels with 2 ranges,a high range from 80-120 decibels, and a low range from 40-80 decibels. The meter also has a battery check function to insure that the batteries in the unit are ok, and a calibration check. Sound readings were taken in 7 locations along the existing sidewalk on the north side of Chapel Road on June 30, 2005 from approximately 1:30 P.M. to 2:15 P.M. The locations sampled included locations where the I-291 highway traffic was directly visible,and locations where it was obscured by vegetation including the dense existing forest. The readings were taken during periods when there were no vehicles traveling along Chapel Road in the vicinity. The readings pertain to the periods when the highway noise was the pr . t -six=.. A number of observations were made dwi 1. All seven locations are approximately the same dish.from the highway (approximately 450' from the edge of the westbound lane). 2. Vehicles traveling along Chapel road are the predominant noise source dining-the periods when the vehicles are in the vicinity of the neighborhood. in parfictA , for the western most location of the survey, vehicles such as modified cars;pi - up trucks,and delivery trucks starting from as far away as the intersectionof Long Hill Road and Chapel Road had a greater impact on the sound level than the 1-291 highway. 3. Vehicles traveling along Chapel road typically exceed 80 decibels. This includes trucks and most types of automobiles traveling into and out of the neighborhood. The noise readings taken at the seven locations during the periods when the highway is the predominant noise source, and is as follows: Range of Location Reading (db) A 52-58 B 50-58 C 52-58 D 52-60 E 52-58 F 50-59 G 53-59 As can be seen from the readings taken,the decibel readings taken did not vary significantly from location to location. There was no discernable impact on the noise levels along the sidewalk across from the site due to the existing vegetation on the site. ?'hs,m%y-b& 4&+,numbe,T of fiwtors-iwIudkig the relative small Knit-44he eking woodedo vegetation, the ability of the highway noise to easily rise over the vegetation, and the pervasiveness of the highway along this area. 6 0 r •rw N•qN GAR O.A.e •...M w�.�. r.e wv.w• At mokoom iM OM •.Tw."Y.Ti—i.::TS QVY�a _mm%gq* mot^y + Y r.At sibillIT K7� '-� 9 � �D r� +�wrr�s,�•••w•s��rsw�Nraw s•s .rwiwr"�s,a"'r�M wi • Qr?f7AROTQO JARF- �Y AN Ir Nn w jw�w-i-i-� .. iY�`� ''"�.: .. �•+ I ---- -----__ _ --- moo------- --- ---------Kom - - .l I .�"• r.•� : r I �W ��� •fir � �. � . W .tip, J• 0 • � AJLA Rp IN r wr•• �f ''�- _ • '~• .�w M1 - _ --....v_•_-- -<- - -- --- ..... I - t u _ —'t/--`— �� �.r - �a #`i 'i It,,, .. 9',,"'.L_�� __yrawtV'r i • �"e • W,�� 00 I� `�'''/, N,•.MM,Mor,,,•M,,,.A---- .•` 'pOt AA*`0 AM.17" aMa•v+no r MSIOfIWM10t7tl .. IF V aM uMIr1U MUM=�� MO MW r Ynt 714 M A"WIM!YMMM M W pIIOP/0"MNOw MI YOM•1 Mum r Am l UMIAK wr0 7•MN7WW Ofn RAM/SMW M 1 r t AZM LW'&"It IS" M-.1 VWW A•••TM A*="wpM ww MOMwas"T ONN*m" VAN Im"A MY" on 9MID CCA CM ww$^Wc r MOIM MS WAN T W A...MaMM71A MftpY�� $Im""avow MN At ♦r♦WIN tM-C tl ALI rMI'A OMMI ta" NII•HIC AIC1A 11M1MNMN COMIWC •• Atl•1 MKS H YOCMM MM10C Aal{aMCCYI/Y ATOIM�f{fIW M110W CMCII 1M0 40 AM r AMry T . � 1 A••t A7f1M CM ap A@-.I 3w" AM-RN umm 7M Mttl YOIM1SM11 704 tl ATSIA'A OIMT/IO/MW/NNIOf INOM/ AMMTM w•ONCr CM'IS1H MM171 MMM•A Wft r . avum wm SWAM MMOA MITI AM r AI/M-NgWYDIMMAY r IMIYiMOt LO147!•IOi r Ywf A"*AN r#MM AM MON Y NOW W&N.O•I—T 1g1CAIMYM MI . - - YTYV11tl1N1_•_ ' IOMJI rM.�IF_ '1MI4 MCI'A!1 Mapi MIM OMC7 7t tl POOIMtM AMM•nT It m tvw M Mal lair emu"••_•• -mm AN IMM smam U Ol awC T M AMIMrM sw r1M mm umMom ML an ON CMM AM CM IN NOW.T am aw 7IMMMN AMr••M CMMMNW..¢- 'r WA M M19 M-TAMS r V MI 1VAtl ' ar CM 7TMMC AI Mw$rWY:= im"Aw'"m Miumm; tlr•mom NOW"7.1MMN ItIIMIi NMr•1 VWd AAMCM W MA 00 W w1w COOL wm-Ml OISCYIC 7tOf r/•ap SV M-%a.a7 COMP A r YOMC T • aY rM am al"Of /Mo"Vo al a•••M ImJ avo smMuSO RYIMNIMAN r OMM sot C71OYb r MOMML7= AMMAN MANS • 'M M MMAN WAN 10 IMAM NMaYAIOCMCM W'A .W Item Arms MMW O 4 y s �v I 4 �ry AC p x a t, a, b � i w i r. A � l � X � { ei V (�O I o ay 3S D c�a m 3 iD CL cr WW( � 13) 0- 77 m c0 2 7 =? v � w Colonial Point Christian Church//Signage Exhibits 0 R �a plainjm ®'° a Architectural Relief Panel South Windsor, T 9 gm n n S t U d i O S 1 q q< G ^ O-P So� a s � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSOR•c° TELEPHONE(860) 644 2511 CERTIFIED MAIL 7007 1490 3753 3012 June 26, 2008 Galen B. Semprebon 425 Sullivan Avenue South Windsor CT 06074 Dear Mr. Semprebon: Re: Appl # 08-28P, Colonial Point Christian Church Please be advised that the Public Hearing of the Planning & Zoning Commission in the above referenced matter has been scheduled for Tuesday, July 8, 2008 at 7:30 in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. One sign advertising the hearing must be posted on the property for ten (10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have one sign posted on 855 Chapel Road by Friday June 21, 2008. Signs can be obtained in the Planning Department. Sincerely, Maria D. Acevedo Administrative Secretary �GW N gfq CZPY co • �C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OSOR•c� TELEPHONE (860) 644-2511 CERTIFIED MAIL 1007 1490 0000 3753 7782 June 9, 2008 Galen B. Semprebon 425 Sullivan Avenue South-Windsor CT 06074 Dear Mr. Semprebon: Re: Appl # 08-28P, Colonial Point Christian Church Please be advised that the Public Hearing of the Planning & Zoning Commission in the above referenced matter has been scheduled for Tuesday, June 24, 2008 at 7:30 in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. One sign advertising. the hearing must be posted on the property for ten (10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have one sign posted on 855 Chapel Road by Friday June 13, 2008. Signs can be obtained in the Planning Department. Sincerely, Maria D. Acevedo Administrative Secretary PERMITS/INSP PAYMENT RECPT#: 20259401 TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 05/20/08 TIME: 15:59 CLERK: mariadace DEPT: CUSTOMER#: 0 PARCEL: CHG: PZ PLANNING AND ZO 325.00 AMOUNT PAID: 325.00 PAID BY: PAYMENT H:=CHECK/REF:TY:T: METH: CH CHECK/REF: 7749 QTY: 1 ADD'L REF: AMT: 230.00 REFERENCE: A AMT TENDERED: 325.00 AMT APPLIED: 325.00 CHANGE: .00 O N tC 7 d fD tD N N a • i` k v' f sq A Y [ x aria;+��� Q � " ""0 z, 4 Colonial Point Christian Church//Signage Exhibits Monument Sign B plainjoeek n s t u d i o s O to 7 d t� N D m m w N a i - Y3 A w Colonial Point Christian Church H Signage Exhibits Monument Sign A plainjoe s t u d i o s Colonial Point CI RISTIAN CHURCH RECEIVED APR 0 3 2006 April 3, 2006 ree Marcia A. Banach Director of Planning g Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 5. / Dear Marcia, I .want to thank you again for meeting with me on March 31, 2006 and answering my questions pertaining to the .ongoing development of our Chapel Road property. Following is a summation of our immediate plans that you requested I put into writing for the Planning and Zoning Commission. We continue to work with our architects and planners so we can present the final drawings that were called for in the approval letter dated July 19, 2005. At this point in time, I do not have a specific date as to when they will be available for submission. Consequently,we have yet to set a target date to actually begin construction. Our immediate plans are to remove all the garbage from the site and create the walking trails planned for the west end of the property. The trails were a part of the conceptual plans approved by the Planning and Zoning Commission and part of our desire to preserve the.natural beauty of the site. We have named the trails, Life Trails, and are making them available not only to our church members but also to the local neighborhoods. Po Box 1145 South Windsor,CT Weather permitting we will begin the clean up process and work on Life Trails the 06074-1145 weekend of April 7-8, 2006. Please note we will not be removing any living trees, P(860)432-3511 simply trimming existing low lying branches and the dead wood in close proximity to the F(860)432-3512 trails. We have rented a large commercial chipper to make the wood chips that will be www.colonialpoint.com used as the base of the trails. We will not grind any stumps or do any digging to create the trails. Our hope is to have the trails completed by the end of the month. Dave Johnson Also during the weekend we will distribute an informational flyer about the trails.to the Lead Minister surrounding neighborhoods. It will include our invitation to them to use the trails at their Mike Houle convenience. We want to add immediate value to the community by providing a place Associate Minister for exercise and nature enjoyment even before the construction process begins. We are excited to be able to provide this opportunity to the town of South Windsor. Meeting for Sunday Worship Services at Timothy Edwards Middle School 100 Arnold Way South Windsor, CT 9:00am ft 10:45am Marcia Banach April 3, 2006 Page 2 We also hope to use the site for occasional congregational gatherings such as a short Sunrise Service on Easter Sunday, April 16th. These gatherings will not create any disruption_to the neighborhood. The April 16th gathering will be a simple, quiet, meditative celebration of the foundation of our faith— Easter. Other similar gatherings may take place periodically as the weather and mosquitoes allow. During the summer months we hope to also host events like a large barbeque for not only the church but the neighborhood as well. As we shared in the public hearings, our desire is to add value to this wonderful community and feel we can do so even prior to the construction of our wonderful building. I hope this letter conveys our heart and desires. Please feel free to contact me if you have any questions. Sincerely yours, oe vid S. Johnson Lead Minister 40Y1N Sf4 C� w 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•Co AREA CODE 860/644-2511 September 19,2005 Design Professionals,Ina 165 South Satellite Road South Windsor,CT 06074 Attn: Galen B. Semprebron Re: Colonial Point Christian Church—Chapel Road. South Windsor,CT Dear-Mr. Semprebron: The South Windsor Water Pollution Control Authority, at its regular meeting of September 6, 2005,gave approval for the connection to the Town's sewerage system for Colonial Point Christian Church located at Chapel Road, South Windsor,CT,as more specifically shown on plans entitled"Colonial Point,Christian Church, Site Plan — Special Exception, Chapel.-Road, South Windsor, CT, Prepared by Design Professionals, Inc., South Windsor, CT, Job No. 2030, Drawing No. Jobs/2030/2030 — TOPO — PHl.DWG, Sheet No. 5/9, Dated 05/31/05, with revision dates: 6/24/05; and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, looseph J.Carino,Chairman Water Pollution Control Authority JC:ead Cc: Michael J.Gantick,Director of Public Works Jeffrey Doolittle,Town Engineer VMarcia Banach,Director of Planning Christopher Dougan,Chief Building Inspector Colonial Point Christian Church . tQy1N 8F� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 �OSOA.c° TELEPHONE(860) 644-2511 July 21, 2005 Certified #70020460000197444217 Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 RE: Appl. #05-3713— Colonial Point Christian Church Dear Ms. Schuler: At the July 6, 2005 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #05-37P—Colonial Point Christian Church — 160 Chapel Road— IWA/CC application for the construction of a church building, parking lots, grading, utilities, and associated improvements on property located south of Chapel Road. RR Rual Residential zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning & Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on July 6, 2010. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. We recommend a bond in the amount of$10,000 be submitted to the Planning & Zoning Commission to ensure compliance with the erosion and sediment control measures. Colonial Point Christian Church July 21, 2005 Page 2 7. We recommend a bond in the amount of$5,000 be submitted to the Planning& Zoning Commission to ensure installation and establishment of the stormwater structures. 8. An infiltration plan to be developed to address roof and yard runoff to the extent possible. To be approved by the Town Engineer. Very truly yours, ` Elizabeth Warren, Chairperson INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr cc: Chief Building Official Colonial Point Christian Church SOW N Sfq Sou� vbll� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 �OSOR•CO TELEPHONE (860) 644-2511 CERTIFIED MAIL July 19,2005 Mr. Galen Semprebon Design Professionals, Inc. .165 South Satellite Road South Windsor, CT 06074 Dear Mr. Semprebon: Re: Appl#05-37P, Colonial Point Christian Church We are pleased to advise you that the Planning&Zoning Commission voted on July 12, 2005,to approve with modifications the above referenced application for a special exception to Article 4.1.8b and a Site Plan of Development. This approval is for the construction of a church on property located on the south side of Chapel Road, RR zone, as shown on plans prepared by Design Professionals,Job No 2030 dated 5-31-05, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2.. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of$5;000 for erosion and sediment control, and$5,000 for establishment of stormwater structures. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. Footing drains are required if the building has a basement. 6. A landscape bond in the amount of$5,000 is required and must be submitted prior to filing of mylars. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 9. If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). 10. The building street number must be included on the final plan. 11. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 12. Outdoor pavilion speakers must be directed toward the south(toward 1-29 1)and away from Chapel Road. . Sound system must be designed by a professional sound engineer. Black and white transparent mylars of Sheet#3 and#4 with the above modifications,together with three blueprint copies of the entire set of plans(including architectural elevations and landscaping plans)must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. The attached special exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Sincerely, Timothy H. Wentzell, Chairman Planning and Zoning Commission THW/rfs cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal J TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Phone No.1k 4 a 2 Si Itj Address c.& tA/$, AL6 Cr C: Site Name��Q e�=l C: .a \ P&Z No. j!A Owner- -�b�. Phone No. Contractor Signature of Owner Date: Signature of Design Engr. Date:,. Ito CHANGE: (Describe location and natu a of change. Include (� Four r (4 ) copies of plan/profile of Change. ) Reason for Change: (Why is change required) 4 F4_ 1-_..rx.i �'�c.+�-tJ—�.s" APPROVALS: (As -Re ured) Dir. Of Plannin� Town Engineer i or e Date: /U�Zk� J/J `1 z,i� f ..�'"""r Date: ;Zt , . ,-� ,r Dir. of-Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department F ►5" A D-5 . s ! o Tf", Ct-1 r--U 103, 60 _ - �.\ _ _ Ale- _ _ _ _ i r � 1 r \ r PCB 8 C fi 1'F• I "I• 8.6005 , MU�Qv OR s v 106. GRADtTN)DRAIN \ 110 1�2 CA \ 112 106 1�8 a \ 10 o 24 3 i IN` W = C S09 t�NN Sf4 7DWn 074C SIOU� ?d&U&Ot s � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR-CO TELEPHONE (860) 644-2511 November 15, 2010 Colonial Point Christian Church David Johnson PO Box 1145 South Windsor CT 06074 Dear Mr. Johnson: Re: Appl. 08-28P, Colonial Point Christian Church Bond Release This is to advise you that the Planning and Zoning Commission voted on November 9, 2010 to release the above mentioned bond in the total amount of$5,000 A check will be mailed to you from the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, Patrick Kennedy, Chairman PLANNING&ZONING COMMISSION PK/ma cc: Town Engineer BOND TRANSMITTAL DATE: APPLICANT NAME y �-on a.,� 'Poi � }- CA v,s�-, ,„ c -ADDRESS PROJECT LOCATION/ADDRESS w5 uv y SUBDIVISION P&Z OR IWA/CC APPLICATION NUMBER-' P ( Oh i t� l a p J �WiIF�L` .AMOUNT OF BOND CHECK NUMBER DEPARTMENT �fl SUBMITTED BY DATE RECEIVED BY FINANCE--( � NAME. ---- DATE SUB ACCOUNT NUMBER \kown6iU d\vo(1tPianning Der IVrtessiuoForms\Pamirs BaadsVtOND TRANSMITTAL 08-27-0I.&C toW" Se4 Town O-P SOUZA M. 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO AREA CODE 860/644-2511 September 19,2005 Design Professionals,Inc. 165 South Satellite Road South Windsor,CT 06074 Attn: Galen B. Semprebron Re: Colonial Point Christian Church—Chapel Road. South Windsor,CT Dear Mr. Semprebron: The South Windsor Water Pollution Control Authority, at its regular meeting of September 6, 2005,gave approval for the connection to the Town's sewerage system for Colonial Point Christian Church located at Chapel Road, South Windsor,CT,as more specifically shown on plans entitled"Colonial Point,Christian Church, Site Plan — Special Exception, Chapel_.Road, South Windsor, CT, Prepared by Design Professionals, Inc., South Windsor, CT, Job No. 2030, Drawing No. Jobs/2030/2030 — TOPO — PHI.DWG, Sheet No, 5/9, Dated 05131105, with revision dates: 6/24/05; and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2._ Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, loseph J.Carino,Chairman Water Pollution Control Authority JC:ead Cc: Michael J.Gantick,Director of Public Works Jeffrey Doolittle,Town Engineer VIMarcia Banach,Director of Planning Christopher Dougan,Chief Building Inspector Colonial Point Christian Church PERMITS/INSP PAYMENT RECPT#: 20402031 TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 02/08/10 TIME: 15:26 CLERK: michelerl DEPT: CUSTOMER#: 0 PARCEL: CHG: BONDPL BOND FEE - PLAN 15000.00 AMOUNT PAID: 15000.00 PAID BY: COLONIAL POINT CHRIS PAYMENT METH: CHECK 1019 REFERENCE: A AMT TENDERED: 15000.00 AMT APPLIED: 15000.00 CHANGE: .00 lot coo 4,6)taoj WWO56APPOB1190 W N SF C�OC.1 LJ t� q� .7 U co 5 • w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SoR.00 TELEPHONE(860) 644-2511 CERTIFIED MAIL 7007 1490 0000 3753 3081 July 8, 2008 Galen B. Semprebon 425 Sullivan Avenue South Windsor CT 06074 Dear Mr. Semprebon: Re: Appl # 08-28P, Colonial Point Christian Church Please be advised that the Public Hearing of the Planning & Zoning Commission in the above referenced matter has been scheduled for Tuesday, July 22, 2008 at 7:30 in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. One sign advertising the hearing must be posted on the property for ten (10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have one sign posted on 855 Chapel Road by Friday June 27, 2008. Signs can be obtained in the Planning Department. Sincerely, Maria D. Acevedo Administrative Secretary ARCHITECTURAL & DESIGN REVIEW COMMITTEE MINUTES September 20,2007,5:45 p.m. Members present: Sue Larsen, Charles Regalbuto, Dave Schwabe, Rob Clapper, Terri Parrot Staff present: Michele R. Lipe,Assistant Director of Planning 1. Appl 07-54P, Mill on the River—request for site plan modification for 853 sf expansion on property located at 989 Ellington Road, A-20 zone Matt Montana, architect with Montana Associates,presented the application. The applicant is proposing an 856 sf addition(sunroom)to be added to the front of the building. It will be built on pylons, set in concrete piers, and the color of which will match the building. Montana presented a picture of the existing greenhouse to be reused. Three will be a deck added with metal stairs(painted black)to provide for a needed second means of egress out of the building. There will be an awing over the stairs that will match the building. There is no new landscaping or lighting proposed. The Committee discussed the proposal The ADRC questioned whether there would be any rooftop units. The architect indicated that if any were added they would be screened from view. 2. Colonial Point Christian Church Change Order Tim Mulchahy from PDS Engineering was present to discuss changes to the architecture and the approved site plan. He indicated that the size of the building had not changed,however they are proposing to change the phasing of the project. In the first phase,the footprint of the building closest to Chapel Road will expand. They intend to use the same window treatments,tower, green space that was shown on the original plan—just not incorporated into the first phase. The Committee discussed the proposal The ADRC questioned whether there would be any rooftop units. The engineer indicated that any units would be appropriately screened. The ADRC was pleased with proposal presented. They indicated that the revised site plan showing the phasing of the landscaping and buildings would be required to be completed as a part of the change order. Respectfully submitted: Michele R. Lipe,AICP Assistant Director of Planning W N S CO[FD%7 q0 fq� _-? r1GVtM0_P SIO� 6 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 S R•co TELEPHONE(860) 644-2511 CERTIFIED MAIL 7007 1490 0000 3753 3180 Design Professionals Inc Galen Semprebon 425 Sullivan Ave South Windsor CT 06074 Dear Mr. Semprebon: Re: Appl. 08-28P, Colonial Point Christian Church We are pleased to advise you that the Planning& Zoning Commission voted on July 22, 2008 to approve with modifications the above referenced application for a special exception to Article 3.1 and a Site Plan of Development. This approval is for the construction of a church complex on property located on 855 Chapel Road RR and RR/OZ zones, as shown on plans prepared by Design Professionals, Inc. Job No 2030 dated 4/30/08,as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of$ 10,000. 4. A landscape bond in the amount of$5,000 is required and must be submitted prior to filing of mylars. 5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 9. The building street number must be included on the final plan. 10. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 11. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 12. If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). 13. Plan must be labeled Special Exception/Site Plan(not site plan modification) since the original plan was never filed and the phasing of the project has changed. 14. The topographic plan must be modified to reflect only one sign. The enclosed special exception from must be filed in the Town Clerks office. Black and white transparent mylars of Sheet# [31 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans,a copy of the receipt must be submitted to the Planning Department. The attached special exception form must be completed and filed in the Town Clerk's office. The special exception will take effect upon filing. Sincerely, Patrick Kennedy, Chairman Planning and Zoning Commission PK/bmm cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal F I, Patrick Kennedy, Chairman of the South Windsor Planning & Zoning Commission, hereby certify that on July 22, 2008 the Planning and Zoning Commission granted to Colonial Point Christian Church a special exception to Article 3.1 of the Zoning Regulations for the construction of church complex located at 855 Church Street, RR/OZ zone. Assessor's Map and Parcel Number: Map# 8 Parcel#60 More particularly bounded and described as follows: NORTH by the highway,known as Chapel Road; EAST by the land now or formerly of Henry M.Johnson; SOUTH by land now or formerly of Henry M. Johnson and by land now or formerly of A.E. Burnham,partly on each; WEST by land now or formerly of A.E. Burnham Containing 10 acres, more or less, being the First Piece in a Warranty Deed from Jame_ s Murray to Robert L. Murray and recorded in Vol.37,Pg. 328 of the South Windsor Land Records. OWNER OF RECORD: Barbara C. Murray Dated at South Windsor, Connecticut this day of , 20 06,at In accordance with CGS Section 8-3d Ct Patrick Kennedy, Chairman Planning&Zoning Commission Received for record this day of ,20_, at South Windsor, Connecticut ATTEST: f V STATE OF CONNECTICUT ECTJCGj DEPARTMENT OF TRANSPORTATION DISTRICT I 1107 Cromwell Avenue yr os TS Rocky Hill, Connecticut 06067 Phone: RECEIVED March 5, 2010 MAR rl 2010 SOUTH WINDSOR PMNGDEn. P.D.S. Engineering & Construction, Inc. 107 Old Windsor Road Bloomfield, CT 06002 Attn: Mr. Pete Filanda Dear Mr. Filanda: Subject: Colonial Point Christian Church Adjacent to 1-291 South Windsor, CT We have reviewed your submittal for the above-noted subject entitled, "Colonial Point Christian Church" plans dated April 30, 2008. The following are the Department's comments: 1. The Department's Property Management Division determined that a break in the non-access line is not required for the above proposal, as, the work in the right of way will be temporary. However, the outlet for the proposed detention basin, on site, outlets through the non-access line fence. In accordance with the submitted stormwater management plan for the site, the detention pond structures shall be cleaned annually and will be inspected monthly or after major rain events. To assure the proper functioning of the detention pond outlet, the outlet pipe discharging within the State's non-access line will also need to be inspected and cleaned in accordance with the above schedule. This will require regular access within the State's right of way by the church's appointed personnel. 2. In order to verify the validity of the hydrologic analysis, the supporting drainage area maps illustrating how the curve numbers and time of concentration values were obtained for both the existing and proposed condition models should be submitted. An Equal Opportunity Employer 0 Printed on recycled or recovered paper h Mr Mr. Pete Filanda Page 2 March 5, 2010 3. A detail of the proposed detention basin's outlet structure should be supplied in the plans. The plans provide a detail for the temporary siltation basin and for sedimentation basins adjacent to catch basins. If the detail for the temporary siltation basin is the same as that for the permanent detention basin, the proposed hydrologic analysis should be revised so that the reservoir routing in the model agrees with the plans. Please revise and submit three sets of approved plans, 40-scale or larger, reflecting the above-noted comments. Should you have any questions, Mr. Andrew S. Morrill, District Services Agent is available to discuss them with you. He can be reached at (860)258-4540. Very my yours, gRonald P. Cormier Transportation Maintenance Director Bureau of Highway Operations cc: Town Planning and Zoning BOND RELEASE TRANSMITTAL DATE: 11-15-10 APPLICANT NAME Colonial Point Christian Church ADDRESS PO Box 1145 South Windsor CT 06074 PROJECT LOCATION/ADDRESS 855 Chapel Road LOT P&Z OR IWA/CC APPLICATION NUMBER 08-28P Colonial Point SUB ACCOUNT NUMBER 500160 ORIGINAL BOND AMOUNT $50±.-90 15�000 .0 0 Please Release $�000.00 \ .1-nt Q G, 1010 eo . b0 Please release the bond indicated above as all of the required work has been completed. Morita Acevedo 11-15-10 NAME DATE S/ S 11116110 BY CHECK # ISSUED DATE W.-TI ring Admin\PZC\Bonds\BOND RELEASE TRANSMITTAL 09-20-10.doc WNsf oGp o 7-0� 074c s� J ° 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�dSox co TELEPHONE(860) 644-2511 March 2, 2010 PDS Engineering& Construction, Inc. Serafino Calafiore 107 Old Windsor Road Bloomfield CT 06002 Dear Mr. Calafiore: Re: Preconstruction Meeting for Appl. 08-28P-Colonial Point Christian Church 2/23/2010 IN ATTENDANCE Name Company Address Phone number Marcia A. Banach TOSW 644-2511 x250 Walter Summers TOSW 644-2511 x217 Jeffrey Fol er TOSW 644-2511 x229 Jeffrey Doolittle TOSW 644-2511 x245 Bernie Drabek TOSW 644-2511 x241 Rick Hill Gerber Construction Inc. (860)875-6684 1 Nutmeg Drive Ellington CT 06029 Steve Gerber Gerber Construction Inc 860-875-6684 Pete Filanda PDS Engineering 860-242-8586 107 Old Windsor Road peterfo,pdsee.com Bloomfield CT 06002 Scot Deluca AT&T 860-725-4504 40 Brainard Road scott.deluca&att.com Harford CT 06114 e Dave Johnson 1 Colonial Point Christian Church 860-833-3431 Serafino Calafiore PDS Engineering 860-242-8587 Mike Miler PDS Engineering 860-690-6662 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). I. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Chapel Road Calcium chloride or water is to be used for dust control as required: Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work in West Road with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work c. Preparation of subgrade, compaction tests as per Developer's checklist d. Placement of bituminous concrete, two (2)inch layers maximum 3. Certification of_gravel used as subbase and processed stone for.base will be required from an approved testing company 4. Certification of all products used-- storm pipe, structures, pavement, oil/grit separator and sewer grinder pump system.shall be presented to the Town Engineer prior to installation. 5. Two (2) weeks' notice must be given prior to placing the finish pavement course. This is to allow for inspection and correction measures (of necessary) of the infrastructure, prior to final pavement. 6. The contractor should be aware that the inspection of the infrastructure improvements may result in the replacement of structure tops and/or structures prior to final paving if found to be deficient. 7. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 8. Progress As Built Plans are to be submitted to the Town Engineer for approval prior to paving and after subgrade formation. Show elevations and location of all storm drainage and sanitary sewer. 9. An as built plan will be required for the improvements to [Road]. A separate asbuilt plan will be required 10. As built plans are to include horizontal and vertical location of all underdrains, footing drains, - and sanitary sewers and house service laterals located as per revised as-built checklist. 11. All pipe and structures to be backfilled with free draining material compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 12. Any problems and/or questions regarding construction of this project will be directed to Serafino Calafiore in the field at phone 860-202-3461. 13. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 14.Job meetings will be held as needed, and can be called by the developer or Town. 15. Seventy-two (72) hours' notice needed for certificate of occupancy inspection and a $35 C.O. inspection fee is due at that time. lb. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 17. Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday. 18. DOT permit needed for all work within state road. Copy must be given to the Engineering Department. 19.No paving after October 15 or before April 15 without,written approval from Director of Public Works. 20. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future. due to settling, therefore; the town staff/inspectors will be requesting additional compaction tests in these areas. 21. Inspection of gravel access road required prior to placement of topsoil. 22. Sanitary lateral locations should be tied down to existing structures and shown on the progress as built. 23.For concrete sidewalks, 8" depth with reinforcements is required at driveway crossing. If the sidewalk is constructed before lot development, the locations must be indicated on the as-built plans. If a proposed driveway location is moved, the sidewalk must be removed to the nearest expansion joint and rebuilt to the proper depth with reinforcement. 24. If a concrete monument is located within a driveway, a cast iron frame and cover must be provided for town public improvements specifications. 25. During construction of individual sanitary sewer house laterals,the contractor shall prepare an as built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form. 26. During construction for individual house lots, lot to lot drainage must be addressed with drainage swales as necessary. For lawn establishment, town staff will be requiring erosion control measures to be installed prior to the issue of the certificate of occupancy to ensure soil stabilization. A detailed erosion control plan must be implemented and depicted on the plot plan for review prior to the issuance of the building permit—most particularly on lots with extensive grading. Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. Bonds have been received;mylar to go on file prior to issuance of building-permit. Mylar is ready to.file. 3. All easements must be submitted for review prior to filing of mylars. . 4. Sign permits are required for both temporary and permanent signs. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal(Commercial Facilities 1) Documents-Complete set of stamped plans with the following: a. Plan review paid b. Code information sheet c. Exiting plans with travel distances d. Wall types e. Door schedule f. Mechanical, Electrical,reflected ceiling g. Fire alarm h. Basic sprinkler layout i. No building permit will be approved by the fire marshal till plans are approved j. Exits need,to be tied into concrete sidewalks ** PLAN REVIEW COULD TAKE 30 DAYS FOR APPROVALS ** 2) Inspections: a. Above ceiling b. Penetrations and separations C. Sprinkler system A. Hydraulic calculations and cut sheets B. Underground flush and hydrostatic test C. System hydrostatic test D. Main drain test/inspectors test E. Outside bell t F. NFPA 13 paperwork d. Fire Alarm e. Emergency lighting test f. Final Inspection ** PLEASE NOTE THE FOLLOWING 1. Consulting inspection will be welcomed 2. Multiple inspections can be done on the same day 3. Stocking/addition of fixtures to occupancy will only be allowed if the life safety systems are on line. 4. New hydrant at crosswalk. Use MDC hydrant specs: Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns,garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building-Department 1 Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. K Very truly yours, e Michele R. Lipe,AICP Assistant Director of Planning MRL/ma cc: Jeffrey Doolittle, Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle,Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal SBC/SNET l Appl #08-32P, Colonial Point Christian Church 7/22/08 Planning Department Report 1. Request for a special exception to Table 3.1 and site plan approval for the construction of a church for property at 855 Chapel Road, across from Betty Drive, RR/RRO zone. The applicant has applied the criteria for a RR zone, as churches are permitted by special exception in that zone. 2. The site size is 7.4 acres. Some of the Commission members may recall that the PZC had approved a multi-phased church project in 2005. That original project included as Phase I a 5600 sf worship hall with 250 seats; 2400 sf lobby, 4200 sf classrooms, a covered patio, a 2400 sf outdoor chapel and a multi-purpose field, walking trails and 2 parking lots with about 130 parking spaces. The original proposal included a Phase II expansion of the worship hall, classrooms and addition of a covered bridge as a "drop-off' entry and patio expansion At this time the project has been scaled back and this request is approval for just one 8,500 +sf building, 72 parking spaces and associated landscaping. Any additions would require further approval from this Commission. 3. Maximum impervious coverage allowed is 50%; 16.7% shown. Proposed building height is 30 feet; 30 feet allowed. Frontage is 1,064 ft; minimum required is 175. Front yard setback is 54.8 feet, 50 feet required. 4. This Special Exception use can be approved by the Commission only when the Commission has determined that: ♦ Traffic impacts will not be detrimental to the residential character of the neighborhood; ♦ There will be minimal adverse effects on existing uses in the area; ♦ Surrounding property values will be conserved and the character of the neighborhood will not be unduly disrupted; ♦ Impacts will not be detrimental to the capacity of present and proposed utilities, streets, drainage systems, sidewalks, and other infrastructure; ♦ The land is physically suited to the proposed use and minimal adverse environmental impacts are created; and, ♦ Due consideration to preservation of historic factors has been demonstrated. The Special Exception regulation also allows the Commission to impose additional conditions on the application. i 5. The parking requirement for places of worship is based on the number of seats provided. The proposed building will accommodate 200 seats, requiring 67 spaces; 72 spaces have been provided. 6. The applicant provided a traffic study with the original proposal. Chapel Road is a collector road and carries in excess of 2,600 cars on a daily basis. The 2005 study provided an actual count of approximately 1,600 vehicles for Sunday traffic and a Sunday peak volume of 167 cars. The original traffic analysis was based on a full- build scenario of 500 seats. At full build, it was estimated that a total of 315 trips would be generated to and from the site during Sunday morning peak (164 entering and 151 exiting). The report concluded that this additional traffic during a low traffic usage time would be easily accommodated by the existing road network. At this time the project is being built with 200 seats rather than the 500 seats originally projected. 7. Only one driveway entrance is proposed at this time. The posted speed limit is 35 mph; however the 85 h percentile iso50 m h. Sitite�dui stances looking east and west exceed requir9d distances. Staff e driveway on Chapel Road d3t enter directly into the parking lot rather than traversing the perimeter of the future sports fiel� there would be a large reduction in the cost of paving. 8. Architectural and Design Review Committee reviewed the revised architectural plan on 9/20/2007. The committee had no concerns with the proposed architecture, but the proposed landscaping was rather sparse when ADRC reviewed the plan. Since that time the landscaping plan has been modified to more closely resemble the originally-approved landscaping plan. 9. The lighting plan calls for 15 lights with 14 foot poles, with full cutoff fixtures. The average lighting level throughout the parking area is approx. 3 fc. The applicant had indicated that not all lights would remain lit when there are no evening activities. They are also proposing some bollard lighting along the interior walkways that lead to the parking areas. 10.White fir and white spruce trees are proposed for screening trees along the eastern boundary to screen the residential property. There is a dense area of existing evergreen trees along the western boundary that is not being disturbed. 1 l.The applicant is allowed one free standing sign, 32 sq ft, at the main entrance. A secondary sign of 16 sf. would be allowed if a second entrance was added. Building signage is also allowed, with V2 sq ft of sign area for each linear foot of building frontage. We note that this site has building frontage on both Chapel Road and I-291; signage area cannot be transferred from one side of the building to the other; e.g., the applicant cannot combine the building frontage for I-291 and Chapel Road to obtain a larger sign area on the Chapel Road side of the building. 2 r + 12.There are no regulated wetlands on the property, however the applicant is an existing detention basin adjacent to I-291 that has become a regulated wetlands. There is an existing IWA/CC approval in place for this project requiring a $10,000 bond. 13.There is public water and sewer available to the site. Water Pollution Control Authority approval has been granted. 14.There is a dumpster shown on a concrete pad and screened. 15.If this application is approved, the topographic plan should be modified to reflect only one free-standing sign. 3 y I, Timothy H. Wentzell, Chairman of the South Windsor Planning&Zoning Commission,hereby certify that on July 12, 2005, the-Planning and Zoning Commission granted to Colonial Point Christian Church a special exception to Article=43.8.b of the Zoning Regulations for the construction of church complex located on the southerly side of Chapel Road, across from Betty Drive, R032 Chapel Road, RR and RR/OZ. Assessor's Map and Parcel Number: Map#8 Parcel#60 More particularly bounded and described as follows: THIRD PIECE: Situated on Chapel Road. NORTH by the highway,known as Chapel Road; EAST by the land now or formerly of Henry M.Johnson; SOUTH by land now or formerly of Henry M.Johnson and by land now or formerly of A.E. Burnham,partly on each; WEST by land now or formerly of A.E.Burnham Containing 10 acres,more or less,being the First Piece in a Warranty Deed from James Murray to Robert L. Murray and recorded in Vol.37, Pg. 328 of the South Windsor Land Records. OWNER OF RECORD: Barbara C. Murray Dated at South Windsor, Connecticut this M day of 20 05 at In accordance with CGS Section 8-3d Timothy H.Wentzell,Chairman Planning&Zoning Commission Received for record this day of ,20 , at South Windsor, Connecticut ATTEST: BOND RELEASE TRANSMITTAL DATE: 5-11-11 APPLICANT NAME Colonial Point Christian Church ADDRESS PO Box 1145 South Windsor CT 06074 PROJECT LOCATION/ADDRESS 855 Chapel Road LOT P&Z OR IWA/CC APPLICATION NUMBER 08-28P SUB ACCOUNT NUMBER 500160 ORIGINAL BOND AMOUNT $10,000 Please Release $10,000 plus int. Please release the bond indicated above as all of the required work has been completed. 91fat&Acevedo 9Kay 1Z 2011 NAME DATE Sot `d Jr // t / // BY CHECK # ISSUED DATE W:\P1aaningAdmin\PZC\Bonds\B0ND RELEASE TRANSMITTAL 09-20-10.doc �QW N 3fq O a w� To� 0-p sloa� ?()&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 SOR. 0 TELEPHONE (860) 644-2511 May 12, 2011 Colonial Point Christian Church David Johnson PO Box 1145 South Windsor CT 06074 Dear Mr. Johnson: Re: Appl. 08-28P, Colonial Point Christian Church Bond Release This is to advise you that the Planning and Zoning Commission voted on May10, 2011 to release the above mentioned bond in the total amount of$10,000 A check will be mailed to you from the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, Patrick Kennedy, Chairman PLANNING&ZONING COMMISSION PK/ma cc: Town Engineer BOND RELEASE TRANSMITTAL DATE: 5-11-11 APPLICANT NAME Colonial Point Christian Church ADDRESS PO Box 1145 South Windsor CT 06074 PROJECT LOCATION/ADDRESS 855 Chapel Road LOT P&Z OR IWA/CC APPLICATION NUMBER 08-28P SUB ACCOUNT NUMBER 500160 ORIGINAL BOND AMOUNT $10 000 Please Release $10 000 plus int. Please release the bond indicated above as all of the required work has been completed. Mafia-Acevedo' 9Kay 12, 2011 NAME DATE SoZ Sl f l ! BY CHECK # ISSUED DATE W:\Planning Admin\PZC\Bonds\BOND RELEASE TRANSMITTAL 09-20-10.doc