HomeMy WebLinkAbout08-09P Manneley Site Plan y TOWN OF SOUTH WINDSOR RECEIVE® PLANNING&ZONING COMMISSION �) APPLICATION FORM FEB 0 7 2008 Application No: V � � SOUTH WINDSOR PLANNINGDEPT Official Receipt Date: Receipt No: APPLICANT: Bruce A. Maneelev Real Estate, LLC PROJECT NAME: 136 Commerce Way ADDRESS: 65 Rye Street, South Windsor, CT 06074 OWNER OF RECORD ON LAND RECORDS: Rrnce A_ Maneel ey Real Estate LI-C ADDRESS: 65 Rve Street, South Windsor. CT 06074 COMPLETE LOCATION OF PROPERTY: 136 Commerce Way ASSESSOR'S MAP# 121 PARCEL#26-34 ZONE Industrial NAME, ADDRESS, TEL&FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: J.R. Russo & Associates Attn: Timothy Coon 1 Shoham Road.,East Windsor, CT 06088 Phone : 860-623-0569 Fag: 860-623-2485 Estimated presentation time: 15 min. THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certificate of Mailing) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision (Public Hearing Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certificate of Mailing) [ Site Plan of Development ❑ General Plan of Development- State Hearing per Section 14-55 for ❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑ Subdivision-Attach proposed amendment (Public Hearing Required) ❑ Temporary and Conditional Permit for (Public Hearing Required) ❑ In Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) ❑ Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. r 1 ' iv,nature of Vp-licl3t Signature o roperty O er TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED INFORMATION SITE PLANS APPLICANT Bruce A. Maneeley Real Estate, LLC PROJECT NAME 136 Commerce Way This checklist must be signed by plan preparer(P.E./L.S.)declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. 1. On each sheet for plans or maps, title block with the following information: a. Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. c. Name of Development. d. Date when drawings were made. _ 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. X b. Outline of buildings. X c. Layout of streets. d. Surrounding property boundaries-within 500 feet. X e. Names of abutting property owners. f. Proposed open spaces and recreation areas. g. Driveway cuts on abutting properties and any properties across from proposed site. WA h. Distance to and name of nearest intersection street. x 3. Architectural Elevations: See attached checklist for Architecture and Design Review. i 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18"x 24" with a 1/2" ruled margin, containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces. c. Building lines in accordance with zoning regulations. X_ d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). e. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g. below Grantor Grantee Type of Date Fited Vol/Pg Easement f. Names of abutting property owners. tVA g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. WA h. All open space or other common or public land uses shall be indicated. X_ i. A-2 certification; P.E./L.S. Seal. 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to Y the requirements of the plot plans show the following: a. All existing and proposed buildings. X b. Curb Lines and pavement width, sidewalks. c. Existing and proposed sanitary sewers. d. Existing and proposed water and-all existing utilities. 2 e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. _ f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. 9 . Regulated wetlands and 100-year floodplain or note that none are present. h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches,within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. i. Connections of all springs into proposed storm drainage system as needed. j. Location and indications of existing brook channels, and 100-year flood limits. A k. A-2 &T-2 Certification; P.E &L.S. Seals. 6. Landscaping plan 7. Drainage calculations: - Zero Runoff Increase per attached guidelines. 8. Traffic Report 9. Site Lighting Plan A10. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes. c. Sight line at driveway&street intersections. 3 WAd. Profile of roadway showing existing and finished grades. Roadway profile i will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths and CA slopes of pipes. f. Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. OAg. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. h. Profiles shall show all sanitary sewer lines and manholes, including elevations, (inverts,top of frame) sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. • Z`7•08 PLAN PREPA ER (P.E./L.S.) DATE February 2002; Rev. 4-04 4 J.R. RUSSO & ASSOCIATES 1 Shoham Road EAST WIND`60) 62T0 6,9pCUT 06088RECEIVED DATE ?' -o� JOB NO. ✓ FAX (860) 623-2485 ATTENTION �+ RE. GiG< FEB 0 7 2008 TO G SOUTH WINDSOR PLANNING DEPr, WE ARE SENDING YOU V/Attached ❑ Under separat the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of letter ❑ Change Order COPIES DATE NO. DESCRIPTION Z-7- 2-I-•0 �a , ZCoGR k vl;c� o�1S ai 'HESE ARE TRANSMITTED as checked below: For approval ❑ Approved as submitted ❑ Resubmit copies for approval For your use ❑ Approved as noted ❑ Submit copies for distribution ❑ As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE ❑ PRINTS RETURNED AFTER LOAN TO-US. :S SIGNED: l � ng service 1 800 t3i38-6327 NEBS,Inc.Groton,MIA 01471 www.nebs.com Re4.No:G 112300035 PERMITS/INSP PAYMENT RECPT#: 20297785 TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 08/04/08 TIME: 12:10 CLERK: michelerl DEPT: CUSTOMER#: 0 PARCEL: CHG: BONDBL BOND FEE - BUIL 5000.00 AMOUNT PAID: 5000.00 PAID BY: BRUCE A MANEELEY REA PAYMENT METH: CHECK 635997472 REFERENCE: A AMT TENDERED: 5000.00 AMT APPLIED: 5000.00 CHANGE: .00 i lU/2U/ZUUS MuN 1V:Z3 trAA bou u44 -izav aoutn n1nasor Town nail ivjUV.L VV1 TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Mike Covensky Phone No. 250-0821 Address 90 BreAtleld St. South in sor. CT 06064 Site Name__ 136 Gommer�e Wav P&Z No. 08-09P Owner Bruce A. Maneeley Real Estate, LLG phone NO. 527-2789 Contractor Environmental Se es, Inc. Signature of Owner A Date: Signature of Design Enqr. Date: 10-20=Q8 CHANGE: (Describe location and nat of change. Include Four (4) copies of plan/profile of Change.) Eliminate driveway- connection to abutting property and add paved area at rear of buildi e. -Reason for Change: (Why is change required) 1. To eliminate connection to other parcel. To Provide future access to the building from the rear. i S APPROVALS: (As R• uir ) � sf Dir. Of Planning Date: Ig�aa:L71 Town Engineer Date:_ JU�z, /� Dir. of Public JW3:jk Date Others Date: STAFF COMMENTS: ' I i i White - Town Engineer Q Pink - Director of Planning OCT 21 Ruud SOUTH WINDSOR ENGINEERING DEPT. BOND RELEASE TRANSMITTAL DATE:- to '2 L9 CONTRACTOR/DEVELOPER ._ � vl r) I.( NAME & ADDRESS , MJ+ i nJJ,,7 r C 6 PROJECT LOCATION/ADDRESS r-r tr XILOT P&Z' OR .IWA/CC APPLICATION NUMBER S- ®qP SUB ACCOUNT NUMBER So C) ORIGINAL BOND AMOUNT Please release the bond indicated above as all of the required work has been completed. DATE BY CHECK # ISSUED DATE Ss\ENGINEER\FORMS\Office Forms\BOND RELEASE TRANSMITTAL.doc BOND TRANSMITTAL DATE: APPLICANT NAME BrVo ADDRESS S' . w_+� I , PROJECT LOCATION/ADDRESS LOT SUBDIVISION P&Z OR IWA/CC APPLICATION NUMBER` ( ' o� ,5 ,/�,.,_I .AMOUNT OF BOND 0 - `t'� CHECK NUMBER_ n DEPARTMENT SUBMITTED BY ^ lit, NAME DATE RECEIVED BY FINANCE 816106 J NAME DATE SUB ACCOUNT NUMBER 5 o O ! y 6 %\towahalldc\w111Phnn'ag DVutmcatU=ino\FOM\Pcua-Boa&\DONDTELANSMITTAL08-27-01.doc .8 20 ASST.TOWN CLERK IF YOU ARE UNABLE TO MAKE THIS MEETING PLEASE CALL ETHER DIAZ 644-2511 EXT.243 ON OR BEFORE 4:30 P.M. ON THE DAY OF THE MEETING WATER POLLUTION CONTROL AUTHORITY TOWN OF SOUTH WINDSOR REGULAR MEETING AGENDA 7:00 P.M. SPRENKEL ROOM MARCH 4, 2008 A. ROLL CALL B. ACCEPTANCE OF MINUTES OF PREVIOUS MEETING I. February 5,2008 C. NEW BUSINESS 1. Bruce A. Maneeley Real Estate, LLC., 136 Commerce Way(Approval to connect) 2." Industrial/Commercial Sewer Billing-List for FY2007/2008(Approval to bill) 3. Pollution Control Budget for FY2008/2009 (Approval) D. COMMUNICATIONS AND REPORTS E. PUBLIC PARTICIPATION(Items not on the agenda) F. BILLS, CHANGE ORDERS,DISBURSEMENTS G. UNFINISHED BUSINESS 1. 1333 and 1343 Sullivan Avenue-sewer connection report 2. FOG Status Report 3. Election of Officers H. MOTION TO GO INTO EXECUTIVE SESSION TO DISCUSS PENDING CLAIMS I. ADJOURNMENT PERMITS/INSP PAYMENT RECPT#: 20254140 TOWN OF SOUTH WINDSOR h (,✓ 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 V _C DATE: 02/07/08 TIME: 16:08 1 r CLERK: dacevedo DEPT: (� CUSTOMER#: 0 �, A PARCEL: v` CHG: PZ PLANNING AND ZO 95.00 AMOUNT PAID: 95.00 PAID BY: BRUCE MANEELEY PAYMENT METH: CHECK 2669 REFERENCE: A AMT TENDERED: 95.00 AMT APPLIED: 95.00 CHANGE: .00 G � � 4 e w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 r�OSoe•co TELEPHONE (860) 644-2511 March 17, 2008 Mr. Tim Coon J. R. Russo&Associates 1 Shoham Road East Windsor, CT 06088 Re: Bruce A. Maneeley Real Estate, LLC., 136 Commerce Way Dear Mr. Coon: The South Windsor Water Pollution Control Authority, at its regular meeting of March 4, 2008, approved the application as presented for connection to the Town's sewerage system of property located at 136 Commerce Way, South Windsor, CT as more specifically shown on plans entitled"Bruce A. Maneeley Real Estate, LLC, 136 Commerce Way, South Windsor, Connecticut"; Prepared by J.R. Russo & Associates, East Windsor, CT; Sheet No.: 3 of. 7, "Site Plan", No. 2007-105, Dated 2-05-08; Revision Date: 2-05-08. This approval is subject to the following conditions: 1. A final document of a private easement between the two lots must be reviewed and approved by the Town Attorney; 2. Technical approval of the Town of South Windsor Engineering Department; 3. Final Authority approval and acceptance of the sanitary sewerage connection will be conditional upon the sewer line having been installed and inspected by the Town staff, and upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans-approved by the Authority,_and_meeting_all Town regulations and appropriate technical.specifications relating to sanitary sewer construction; 4. The sewer connection charge will be $3,282.00. This approval letter must be superimposed on the final approval plans. Very truly yours, Joseph J. Carino, Chairman Water Pollution Control Authority JC:ead cc: Michael J. Gantick, Director of Public Works Jeff Doolittle,Town Engineer Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN PROJECT Maneeley's Real Estate LLC APPL.#08-09P ENGINEER/ARCHITECT JR Russo&Associates PROJ.#2007-105 Submit mylars of sheets: 3 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be'issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. A landscape bond in the amount of$5,000 is required and must be submitted prior to filing of mylars. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 8. The building street number must be included on the final plan. 9. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10. A note must be added to the plans that there are no floor drains inside the building or near the garage doors. Z) C�Co p - S�y1N Sf4 o• « r s w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�dsoR•co TELEPHONE (860) 644-2511 CERTIFIED MAIL 7007 1490 0000 3753 7270 February 13, 2008 J R Russo & Associates Attn: Timothy Coon 1 Shoham Road East Windsor CT 06088 Dear Mr. Coon Re: Appl # 08-09 Maneeley Real Estate Site Plan Please be advised that the Regular Hearing of the Planning Zoning Commission in the above referenced matter has been scheduled for Tuesday, February 26, 2008 at 7:30 in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. One sign advertising the hearing must be posted on the property for ten (10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have one sign posted on 136 Commerce Way by February 15, 2008. Signs can be obtained in the Planning Department. Sincerely, Maria D. Acevedo Administrative Secretary PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 2/8/08 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond,Walter Summers, Jeff Doolittle Ray Favreau, Karl Reichle, Mark Owens, Steve Lavigueur, Chris Dougan, Bob Deptula John Caldwell, Dennis Sheridan,Ron Asselin FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: Appl#08-09P, Maneeley Real Estate Location: 136 Commerce Way ® Site Plan ❑ Subdivision No. Acres .6 Zone I ® Industrial ❑ Commercial ❑ Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ® Public ❑ Septic System Project Description: 7,080 sf industrial building Future Town-owned property involved? ❑ Yes Z No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: Please comment by 2/21/08 and return to the Planning Department. Page 1 of 1 Acevedo, Maria From: Doolittle, Jeffrey Sent: Friday, February 15, 2008 8:51 AM To: Acevedo, Maria Subject: RE: RE:Appl#08-09 Maneelly Real Estate Maria, My only comment on this application are to add a note to the plans that there are no floor drains inside the building, or near the garage doors. This will need WPCA review and approval. Thanks Jeff Doolittle, P.E. Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06095 (860)644-2511 ext. 245 jeffrey.doolittle@southwindsor.org From: Acevedo, Maria Sent: Monday, February 11, 2008 4:01 PM To: Asselin, Ronald; Bond, Richard; Caldwell, John; Depula, Robert; Doolittle, Jeffrey; Dougan, Christopher; Favreau, Raymond; Galligan, Matthew; Gantick, Michael; Lavigueur, Stephan; Owens, Mark; Reichle, Karl; Shaw, Fred; Summers, Walter Subject: RE: Appl # 08-09 Maneelly Real Estate Please forward any comments on the above mentioned application. 2/19/2008 PRECONSTRUCTION MEETING SIGN-IN SHEET 77 47e�riL �rc J D S K T t l U 5 Li ,` Jc Z� w Developer's Checklist for Roadway Construction Prior to any construction, all sedimentation and erosion control measures will be in place. No construction will commence, nor will the developer be allowed to proceed with the next phase until all erosion and sedimentation control facilities are in place and properly maintained and inspected by the Town. The Town is to be notified at least 48 hours in advance of each phase of construction The developer will not proceed to the next phase of construction until the Town has inspected and approved the preceding phase The site developer will take particular notice to all conditions of the Planning and Zoning Commission, Inland Wetlands Agency/Conservation Commission and the Water Pollution Control Authority approvals and all terms of the pre-construction meeting. All permits that are necessary for each phase of construction will be acquired prior to commencing on that particular phase. This shall include all Town, State and Federal permits. Copies of permits shall be submitted to the Engineering Division. 1. Clearing and grubbing —set up limits of immediate construction and install erosion and sedimentation control measures. Method of Construction — ConnDOT Form 816 2.01.03. 2. Sanitary Sewers - South Windsor Public Improvement Specifications, ConnDOT Form 816 and Connecticut Public Health Code. Method of Construction - trenching and backfilling as per Form 816 Section 2.05 - maximum backfill in layers of 6 inches in depth after compaction. Tests - air tests, vacuum tests and deflection testing shall be performed in accordance with the Town of South Windsor Public Improvement Specifications Section 3.4 and appendix to Section III. Material certification of structures must be provided to Town Engineer prior to installing. Structures must be cured for seven days or reach at least 3000 psi strength prior to shipping. A camera inspection of new sewer mains may be required by the Town. 3. Storm Sewers - South Windsor Public Improvement Specifications and ConnDOT Form 816 Method of Construction - trenching and backfilling as per Form 816 Section 2.05 - maximum backfill in layers of 6 inches in depth after compaction. Tests - material certification of structures and pipes utilized must be given to the Town Engineer prior to installing. Precast structures and pipes must have seven days curing or reach at least 3000 psi strength prior to shipping to jobsite. A standard deflection (mandrel) test may be required for all plastic pipe (CPP, ABS, PVC, etc.) installed. A camera inspection of new storm sewers may be required by the Town. Page 2 4. Utility Coordination - to be the responsibility of the developer. There shall be no pavement cuts after any pavement has been installed. All trenching and backfilling as per Section 2.05 of ConnDOT Form 816 maximum backfill in layers of 6 inches in depth after compaction. 5. Subgrade Preparation - prior to subgrade establishment, the roadway will be staked to give vertical and horizontal control. Spacing will be a maximum of 50 feet and the developer will insure that all stakes are preserved or replaced throughout the roadway construction. The staking shall be close enough to be of adequate use but at the same time at an adequate offset so as not to interfere with construction. Method of Construction - as per Section 2.09 of ConnDOT Form 816. Tests - dry density compaction equal to or greater than 95%. Laboratory compaction test and sieve analysis of native material is required. Frequency of testing to be determined by the Town. A grade check must be performed prior to proceeding further. 6. After Subgrade & Prior to Paving — a progress as-built drawing shall be submitted, reviewed and approved. Also all structures, mainlines and laterals shall be field verified as to compliance with proposed location, profile and cross section slope. Progress as-built shall be certified by licensed surveyor. 7. Subbase Method of Construction - as per ConnDOT Form 816 Section 3.04 and Town of South Windsor Public Improvement Specifications. Materials - a minimum of 6 inches bank run gravel as per Town of South Windsor Public Improvement Specifications and ConnDOT Form 816 Section M02-02 & M02.06 gradation B. As an alternate, a total of 12 inches of processed aggregate base may be installed in lieu of 6 inches gravel / 6 inches processed aggregate (see Base Materials). Tests - sieve analysis as per ConnDOT Form 816 M.02.06 gradation B. Dry density compaction equal to or greater than 95%. Frequency of testing, maximum 100 foot intervals or as directed by the Town Engineer/Inspector. A grade check must be performed prior to proceeding further. 8. Base Method of Construction - as per ConnDOT Form 816 Section 3.04 and Town of South Windsor Public Improvement Specifications. Materials - a minimum of 6 inches processed aggregate as per Town of South Windsor Public Improvement Specifications and ConnDOT Form 816 Section M.05.01. Page 3 Tests -sieve analysis as per ConnDOT Form 816 M.05.01-1. Dry density compaction equal to or greater than 95%. Frequency of testing, maximum 100 foot intervals or as directed by the Town Engineer/Inspector. A grade check must be performed prior to proceeding further. 9. Pavement Method of Construction - as per ConnDOT Form 816 Section 4.06.03 and Town of South Windsor Public Improvement Specifications. The laying of pavement between the dates of October 15 and April 15 requires written permission from the Director of Public Works. Materials - 2" Class 1, 1 1/2" Class 2 for local roads and 3" Class 1, 2" Class 2 for collector roads with tack coats between layers of pavement and at structures. (See approved pavement detail). Tests - compaction — ConnDOT Form 816 4.06.03-5; surface test—ConnDOT Form 816 4.06-03-6; materials test- mixture, source of supply, formula for mix, mix tolerances as per Section M.04 of ConnDOT Form 816. A copy of the weight tickets for each load must be retained for the Town. 10. Bituminous Curbing Method of Construction - machine formed, Class 3 mixture as per ConnDOT Form 816 Section 8.15.03 and Town of South Windsor Public Improvement Specifications. Materials - shall be as per ConnDOT Form 816 Section M.04, Bituminous Class 3. Tests - all tests required of Sections 8.15.03 and M.04 of ConnDOT Form 816 shall apply. 11. Portland Cement Concrete Sidewalks - as per Town of South Windsor Public Improvement Specifications, Section I. Method of Construction - 5 inches of 4000 psi (Class F) concrete over 8 inches of prepared processed gravel; and at driveways, 8" of concrete with 6" x 6" x 10/10 wire mesh over 8 inches of prepared processed gravel. Expansion joints at 15 feet on center maximum. Materials — materials shall meet Section M.03 of ConnDOT Form 816 as amended, with the exception of admixtures. Admixtures must be approved by the Town Engineer prior to mix being made. Page 4 Materials Certificate and Testing — Certification and testing shall conform to Section 1.06 of ConnDOT Form 816, as amended. The contractor/developer shall furnish certificates signed and dated by a person in responsible charge of the source of materials furnished that the materials meet the specification requirements. Certification of gradation for processed aggregate and mix requirements for Portland cement concrete shall be provided prior to or at the time of delivery of the materials. A copy of all concrete trip tickets shall be given to the Town Engineer. The Town Engineer may require testing of portland cement concrete for all new sidewalks. The following is a list of tests to be performed by a certified testing laboratory: Slump at time of delivery, one (1) test per truckload. (4 inches max) Air entrainment at time of delivery, one (1) test per truckload. (5-7%) Strength test, 7-day and 28-day (4000 psi min), one (1) set of cylinders per 500 feet of sidewalk. Test reports shall be provided to the Town Engineer as soon as they are available. If the concrete fails any of these tests, the load may be rejected and/or the concrete removed and repoured. New tests shall be required of replacement concrete. Note: All materials, pipes, structure sections, manhole covers and frames, catch basin tops, sumps and all other manufactured articles will be certified by the manufacturer as they pertain to either the Town of South Windsor Public Improvement Specifications or ConnDOT Form 816 as amended. Any precast concrete structures or pipe must have 7 days curing or have attained 3000 psi strength prior to shipping to the job site, as per Town of South Windsor Public Improvement Specifications. All tests are the responsibility of the developer. The developer shall make all necessary provisions to accommodate the Town regarding testing. The developer will supply all materials and bear the costs for all tests required by the Town. Form 816 - State of Connecticut, Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction - 2004 as amended. Town of South Windsor Public Improvement Specifications as of latest revision. Revised June 2006 JOBJ.R.RUSSO &ASSOCIATESpp 2flo�^ Land Surveyors&Professional Engineers ECEIVED BHEETNO. of Z 1 Shoham Road EAST WINDSOR,CONNECTICUT 06Q B CALCULATED BY-- ( �C- DATE 21 0-40-4TEL:(860)623-0569 � 7 7n�� CHECKED BY DATE Fax:(860)623-2485 ALE S —t:P-� _ 1 L_ I j I wL__ # aaL —4 = i Wt t°� oCwtc a . not _ _ } f - CX _ 4 3 y , ppI� RooniePFromNEBSCt35TMM'"pdntitlgservice 1•00498IIb327. NEBS,Inc.Groton,MA61477 -wervo.nebs.com Stormceptor Stormceptor Design Summary PCSWMM for Stormceptor Project Information Rainfall Date 2/5/2008 Name HARTFORD WSO AIRPORT Project Name 136 Commerce Way State CT Project Number 2007-105 Location South Windsor,CT ID 3456 Designer Information Years of Records 1954 to 2005 F mpany J.R.Russo&Associates Latitude 41°56'17"N ntact Tim Coon Longitude 72°40'57"W Notes Water Quality Objective N/A - TSS Removal(%) 80 WQ Flow Rate (cfs) 0.354 Drainage Area Upstream Ztorage Total Area(ac) 0.68: Storage Discharge Imperviousness(%) 60.3 _ (ac-ft) (cfs) 0 0 The Stormceptor System model STC 450i achieves the water quality objective removing 85%TSS for a Fine , (organics,silts and sand)particle size distribution; providing continuous positive treatment for a stormwater quality flow rate of 0.354 cfs. Stormceptor Sizing Summary Stormceptor Model TSS Removal �:=STC 900 90 .,,. STC,1200 90 STC 1800 91 STC 2400 93 STC 3600 93 _STC 4800 95 STC 6000 95' STC 7200 96 STC 11000 97 STC 13000 97 STC 16000 98 Stormceptor Design Summary- 1/2 Rjnkgr : MATERIALSTM i Stormceptor Particle Size Distribution Removing silt particles from runoff ensures that the majority of the pollutants,such as hydrocarbons and heavy Metals that adhere to tine particles,are not discharged into our natural water courses. The table below lists the particle size distribution used to define the annual TSS removal. Fine or anics silts and sand Specific Settling Specific Settling Particle Size Distribution Gravity Velocity Particle Size Distribution Gravity Velocity m % ft/s PM % ft/s 20 20 1.3 0.0013 60 20 1.8 0.0051 150 20 2.2 0.0354 400 20 2.65 0.2123 2000 20 2.65 0.9417 Stormceptor Design Notes + Stormceptor perforrnance estimates are based on simulations using PCSWMM for Stormceptor. • Design estimates listed are only representative of specific project requirements based on total suspended solids(TSS)removal. • Only the STC 450i is adaptable to function with a catch basin inlet and/or,inline pipes: • Only the Stormceptor models STC 450i to STC 7200 may accommodate multiple inlet pipes. • `Inlet and outlet invert elevation differences are as follows: Inlet and Outlet Pipe Invert Elevations Differences' Inlet Pipe Configuration STC 4501 STC 900 to STC STC 11000 to 7200 STC 16000 Single inlet pipe 3 in 1 in. 3 in. Multiple inlet pipes .3 in. 3 in. Only one inlet Pipe., • Design estimates are based on stable site conditions only,after construction is completed. • Design estimates assume that the storm drain is not submerged.during zero flows. For submerged„ applications,please contact your local Stormceptor representative. • Design estimates may be modified for specific spills controls. Please contact your local Stormceptor representative for further assistance. • For pricing inquiries or assistance,please contact Rinker Materials 1 (800)909-7763 www.dnkerstormceptor.com Stormceptor Design Summary-2/2 MATERIFILS��"�'"'•. NAME: Bruce A. Maneeley Real Estate LLC LOCATION: 136 Commerce Way TYPE OF PROJECT: Commercial Building ARCHITECTURAL AND DESIGN REVIEW COMMITTEE CHECKLIST The following items must be submitted, in accordance with Section 9.1 of the Zoning Regulations at the time of a site plan application for an industrial or commercial building, or high-density housing. X 1. Site plan of the property(per Section 8 of the Zoning Regulations) X 2. Architectural elevations of the proposed building(s) X 3. Types, styles and colors of building materials, exterior facades and facing, and fenestrations (samples suggested) >L 4. Special architectural features(if applicable) �- 5. Colors,materials, and location of lighting X 6. Design of signs g -7. Mechanical hardware proposed on or around the building and roof, including trash compactor, and auxiliary storage areas X 8. Landscape plan indicating location, types, sizes, and quantities of proposed plant materials X 9. Lighting plans (including an isolux diagram) All of t 'Aaboe-required information/materials have been provided. A. Signature Date Please be aware that missing information or incomplete information may result in a delay in action by the Committee on this application. November 16,2000 DESCRIPTION MCGRAW-EDISON The Cirrus Wall Sconce cutoff wall luminaire makes an ideal complement to site design.U.L.Listed and CSA Certified for wet locations in down mount catalog applications and damp locations in up mounted applications. Rugged construction and full cutoff classified optics provide facade and Project security lighting for light restricted zones surrounding schools,office r complexes,apartments,and recreational facilities. Comments "6. 4 SPECIFICATION FEATURES A...Housing D...Ballast F...Finish The housing is a two-piece design HID luminaires supplied with high Durable polyester powder coat of die-cast aluminum for precise power factor ballast with Class H finish.Standard color is bronze. control of tolerances and insulation.Minimum starting Optional white and black colors repeatability. temperatures are-40°C(-40°F)for available.Other finish colors HPS and-30°C(-22°F)for MH. available.Consult your Cooper B...Mounting Compact Fluorescent luminaires Lighting Representative asketed and zinc plated rigid steel feature electronic universal concerning special color --. mounting attachment fits directly 120-277V high efficient 50/60Hz requirements. — -. to 4"J-Box or wall with i ballast with-18°C(0°F)minimum "Hook-N-Lock"mechanism for starting. quick installation.Secured with two(2)captive corrosion resistant E...Door black oxide coated allen head set Die-cast door features,1/8"heat- screws concealed but accessible and impact-resistant clear riWs from bottom, tempered glass lens mounted with internal plated steel clips and CIRRUS C...Optical Modules sealed with EPDM gasketing. All optical modules utilizes high Hinged door secured in place via WALL SCONCE performance 95%reflective sheet. two(2)captive fasteners. Strong Type II optical module is standard. 50-175W A B C D E F High Pressure Sodium Metal Halide 26.52 W Compact Fluorescent FULL CUTOFF WALL MOUNT LUMINAIRE I f .. i 7" 1178mml TECHNICAL DATA 25`C Maximum Ambient Temperature External Supply Wiring 90"C Minimum Down Mounted—Wet Location Location 18'4571nm1— l�9"1229mm1 Up Mounted—Damp Lotion � ENERGY DATA II High Reactance Ballast Input Watts � t�` 50W HPS HPF(66 Watts) CROMPLIANT FIC o 50W MH HPF(72 Watts) 70W HPS HPF(91 Watts) In downlight applications only. 70W MH HPF(90 Watts) HOOK-N-LOCK MOUNTING(Mounting attachment included.J-Box not included.) 10OW HPS HPF(130 watts) 100W MH HPF(129 Watts) 150W HPS HPF(190 Watts) 150W MH HPF(185 Watts) CWA Ballast Input Watts 175W MH HPF(210 Watts) 00 0 Electronic Ballast input Watts I�L i 26W PL HPF(29 Watts) Pit 0 0 32W PL HPF(36 Watts) 0 0 42W PL HPF(46 Wafts) 52W PL HPF(55 Watts) d 0 0 SHIPPING DATA ysrsy+ Approximate Not Weight: ` 18 lbs.i8 kgs.) r '` °6aTo 1130111irm Lighting Specifications and Dimensions subject to change without notice. ADHO60833 www.cooperlighting.com Consult your representative for additional options and finishes. 03/27/2007.2:19:45 PM as PHOTOMETRICS(Complete IES files available at www.cooperlighting.com) CWS CIRRUS WALL SCONCE 8 8 Footcandle Table 7 7 Select mounting height and read across for footcandle values of each isofootcandle line.Distance in units of 6 6 mounting height. Mounting Fotrtcandle Values for _Height Isofootcancle Lines A B C D E 10, 4.50 2.25 1.13 0.45 0.23 4 4 15 2.00 1.00 0.50 0.20 0.10 20' 1.12 0.56 0.28 0.11 0.06 3 3 2 2 1 t A BC D E 0 ABC D E 0 4 3 2 1 0 1 2 3 4 4 3 2 1 0 1 2 3 4 CWS-175-MH-MT CWS-150-HPS-MT 175-Watt MH 150-Watt HPS 14,000-Lumen Clear Lamp 16,000-Lumen Clear Lamp ORDERING INFORMATION Sample Number:CWS-150-MH-MT-2S-BK _ �;__] I L 1 11 , =1 I I Product Family Lamp Wattage Lamp Type Distribution Options° CWS-Cirrus Wall Sconce HM 1 MH-Metal Halide 2S°Type II Segmented F-Single Fuse(120,277 or 347V) 80.50W2 HPS-High Pressure Sodium UPL10.10%Uplight FF-Double Fuse(208,240 or 480V) 70.70W3 CF-Compact Fluorescent UPL50.50%Uplight p-Button Type Photocontrol(Specify Voltage) 100-100W TR-Tamper Resistant Screw(Door and Mounting Plate) 150.150W Voltage° Color L-Lamp Includede 175.175W 120.120V - Ap-Grey Q-Quartz Restrike T4 Lamp10,1'.12,13 Cortmeat Fluorescent 208-208V BZ-Bronze EM-Emergency Quartz Restrike T4 Lamp w/Time Delay Relayto,11,12.13 26.26W 240.240V BK-Black EMI40-XXX-CFL Cold Weather Emergency Battery Pack(Must 14,1s,a 32.32W 277.277V WH-White Specify 120V or 277V) 42.42W 480.480V DP-Dark Platinum CF/EM-XXX-Emergency Battery Pack(Must Specify 120V or 277V)14.te,s 52-(2)26W4.6 DT-Dual-Taps GM-Graphite Metallic QMR-Quartz Restrike MR16 Lamp12.13.17 MT-Multi-Tap7 EMMR-Emergency Quartz Restrike MR16 Lamp w/Time Delay 12.13•17 TT-Triple-Tap7 Relay EM/SC-Emergency Separate Circuit T4 Lamp'1.Is,16 MC/MR:Emergency Separate Circuit MR16 Lampm 1s EM/SC/12V-Emergency Separate Circuit(12V)16 2EM/SC/12V-(2)Emergency Separate Circuit MR16 Lamps(12V)16 Not":i All lamps am msdium-base. 2 Available only in 120 or 277V and Dual-Tap. 3 Not available in 480V. 4 (2)26W quad tube lamps only. 5 Not available with upright option. 5 Product also available In non-US voltages and 60Hz for international markets.Consult factory for availability and ordering Information. 7 Dual-Tap ballast is 120/277V wired 277V.Multi-Tap ballast is 120/208/240/277V wired 277V.Triple-Tap ballast Is 120/277/347V wired 347V. 9 Add as suffix in the order shown. 9 Lamp is shipped separate fromluminaire.Lamp is Cooper designated product based on luminaire requirements.Specified lamps must be ordered as aseparate line item. 10 The power might need to cycle and allow HID lamp to cool in warm climates.Available up to 176W HID. 11 For use with T4 double contact bayonet base,100W maximum,120V halogen lamp by others. 12 Lamps wired to quartz restrike relay. 13 Not available with CFL. - 14 Battery will operate up to 52W CFL lamp for 90 minutes. 15 CF lamps only,rated for minimum temperature of 0°F(.18-C),52W CFL maximum,heater rated for 30OW with thermostat control. 16 CF lamps only,rated for minimum temperature of 32-F(WC),52W CFL maximum. 17 For use withMRt6,GU10 base,60W maximum,120V halogen lamp by others. 1s Leads run out back for connection to auxiliary 120V circuit. 19 Supplied with 12V Bi-pin socket for connection to emergency battery pack(supplied by others).For use with MR16,GUM base,35W maximum,12V halogen lamp by others. COOPER Lighting Specifications and Dimensions subject to change without notice. ADH060833 www.cooperlighting.com McGraw-Edison 4 Customer First Center a 1121 Highway 74 South 4 Peachtree City,GA 30269 4 TEL 770.486.4800•FAX 770.486.4601 03/27/2007 2:19:45 PM Coo P%7 SOW N Sf4 V/ slou� V&U&ot e a 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR•C0 TELEPHONE (860) 644-2511 March 30,2008 JR Russo &Associates Timothy Coon 1 Shoham Road East Windsor CT 06088 To Whom It May Concern: Re:. Preconstruction Meeting-Appl#08-09P,Maneeley's Real Estate March 25,2008 IN ATTENDANCE Michele Lipe TOSW 644-2511 x253 Bernie Drabeck TOSW 644-2511 x 241 Jeff Folger TOSW 644-2511 x 229 Jeff boo flit. TOSW 644-2511 x 245 Everette Skinner The Barn Yard860-896-0636 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving Merations in each area and maintained/cleaned out during construction. Call Jeffrey Folger,Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Commerce Way Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company 4. An As-built must be submitted with a $ 35 certificate of occupancy inspection fee to engineer prior to installation. 5. Certification of all products used-- storm pipe, structures, pavement, oil/grit separator and sewer grinder pump system shall be presented to the Town Engineer prior to installation. 6. Two (2) weeks' notice must be given prior to placing the finish pavement course. This is to allow.for inspection and correction measures (of necessary) of the infrastructure, prior to final pavement. 7. Applicant/developer should be aware that the inspection of the infrastructure improvements may result in the replacement of structure tops and/or structures prior to final paving if found to be deficient. 8. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 9. Progress As Built Plans may be submitted to the Town Engineer for approval prior to paving and after subgrade formation. 10.As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 11. All pipe and structures to be backflled with free draining material compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 12. Any problems and/or questions regarding construction of this project will be directed to Everett Skinner in the field at phone 896-0636. 13. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 14. Job meetings will be held as needed, and can be called by the developer or Town. 15. Seventy-two (72)hours' notice needed for certificate of occupancy inspection. r 16. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 17.Normal hours of operation 7:00 a.m.—5:00 p.m., no work on Sunday. 18.No paving after October 15 or before April 15 without written approval from Director of Public Works. 19.Any unfinished site work will be bonded with the Town prior to issuance of a certificate of occupancy. 20. A street cut permit is needed for the new driveway and water line installation and storm disconnection. 21.A drain layers permit is needed to install the sewer lateral and man how in the street. 22. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. 23. Sanitary lateral locations should be tied down to existing structures and shown on the as builts. 24. During construction of individual sanitary sewer laterals, the contractor shall prepare an as-built sketch on standard form provided by the Engineering Department. This form should be submitted to the design engineer/surveyor for their use in preparing the as-built plan. Engineering Department suggests that the contractor also show locations of foundation drains and water laterals on this form Planning_Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. All bonds required; mylar to go on file prior to issuance of building permit. 3. All easements must be submitted for review prior to filing of mylars. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. r Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5: If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, Michele R. Lipe,AICP Assistant Director of Planning MRL/ma cc: Jeffrey Doolittle,Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal CL&P AT&T C n �� t��N Sf4 J T-0� O-P siou� ?d&U&10�t 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 SOR co � TELEPHONE (860) 644-2511 CERTIFIED MAIL 7007 1490 0000 3753 7355 February 28, 2008 JR Russo &Associates Timothy Coon 1 Shoham Road East Windsor Ct Dear Mr. Coon: Re: Appl 08-09 Maneeley Real Estate Site Plan We are pleased to advise you that the Planning & Zoning Commission voted on February 26, 2008 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for an industrial building on property located at 136 Commerce Way, I zone, as shown on plans prepared by JR Russo & Associates, dated 2/5/08, as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. A landscape bond in the amount of$5,000 is required and must be submitted prior to filing of mylars. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 8. The building street number must be included on the final plan. 9. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 10. A note must be added to the plans that there are no floor drains inside the building or near the garage doors. Black and white transparent mylars of Sheet 3 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, Patrick Kennedy, Chairm Planning and Zoning Commission PK/dma cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal COPY S0*N Sf4 � cam-- �- x F /ICI►T.111'L ��t�L[.�2 G C ' _. we 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSOR-co TELEPHONE (860) 644-2511 August 1, 2008 JR Russo&Associates Timothy Coon 1 Shoham Road East Windsor CT 06088 To Whom It May Concern: Re: Preconstruction Meeting—Appl. #08-09P,Maneeley's Real Estate July 31,2008 IN ATTENDANCE Michele Lipe TOSW 644-2511 x253 Bernie Drabeck TOSW 644-2511 x 241 Jeff Folger TOSW 644-2511 x 229 Jeff Forger TOSW 644-2511 x 245 Tim Starr New England Building 209-0890 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth movin�berations in each area and maintained/cleaned out during construction. Call Jeffrey Folger,Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to Commerce Way Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company 4. An As-built must be submitted with a $ 35 certificate of occupancy inspection fee to engineer prior to installation. 5. Certification of all products used --storm pipe, structures, pavement, oil/grit separator and sewer grinder pump system shall be presented to the Town Engineer prior to installation. 6. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 7. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 8. All pipe and structures to be backfilled with free draining material compacted in maximum one foot.lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 9. Any problems and/or questions regarding construction of this project will be directed to Timothy Starr in the field at phone 209-0890. 10. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 11. Job meetings will be held as needed, and can be called by the developer or Town. 12. Seventy-two (72)hours' notice needed for certificate of occupancy inspection. 13. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 14.Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday. 15.No paving after October 15 or before April 15 without written approval from Director of Public Works. 16.Any unfinished site work will be bonded with the Town prior to issuance of a certificate of occupancy. 17. A street cut permit is needed for the new driveway and water line installation and storm connection. 18.A drain layers permit is needed to install the sewer lateral and man hole in the street. 19. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. 20. Sanitary lateral locations should be tied down to existing structures and shown on the as builts. 21 During construction for individual house lots, lot to lot drainage must be addressed with drainage swales as necessary. For lawn establishment, town staff will be requiring erosion control measures to be installed prior to the issue of the certificate of occupancy to ensure soil stabilization. A detailed erosion control plan must be implemented and depicted on the plot plan for review prior to the issuance of the building permit—most particularly on lots with extensive grading Planning Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings,which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, JCL Michele R. Lipe,AICP Assistant Director of Planning MRL/ma cc: Jeffrey Doolittle,Town Engineer Bernie Drabek,Engineering Inspector Karl Reichle, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal CL&P AT&T