Loading...
HomeMy WebLinkAboutSouth Windsor Fire and Ambul (2) 05/01/2009 09:29 8606121757 TO DESIGN LLC PAGE 02/04 TOWN Or SOUTY WINDSOR. iNLAND WETLANDS, WATERCOURSES AND CONSERVATION APPLICATION Application # � `�� P _Date Ec ceivcd y`1 S"oM INSTRUCTIONS L Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set .forth in the Inland Wetlands, Watercourses and Conservation Regulations, 'Gown of South Windsor. (See Regulations, Section.ViI-X) 2, The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed witli respect to the standards and criteria for application Evaluation, (See Itegul.ations, Sections VII••-X) 3. The applicant understands that this application is to be considered complete only When all information and documents required by the Agency have been submitted. The applicant slia.11 also complete the state filing form. A. Applicant's Name: _..., Won—. � . SCy A4 16�%1 JX 1' Address: — -..1!5 o S4, k-,?, ✓e, Sav{ �r/,��foY C also 7 i� Phone: (home)_ _ (wor„l�) 64 ��f -�5/1/_(fax) r o6 �7 1^ B. Legalowner's na.rwle: _ / e U✓.� o S Address �10 �7 Phone(home) (work)6�o 6 q -,26-1I.(fax) B( D -6 qq• 7 Ai (List additional owners, addresses, and phonic numbers on back of application) C. If the applicant is not the; owner of the subject property; a letter by the oWza.er(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project.Name and Location Ate w /, -4 r S- u Alin&0- Akn loq Cgnce -74- 5' S ��i'✓'`zn Ave—, �~ 1. Contact Person (if further information is receded) /..a DPS , G (Work) 060 ~�l�-/7a�'(fax)�d-Co7a- /797 K 3L E. The geographical location of the property which is to be affected by the proposed regulated activities including a. description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. Assessor's in ap##, rr� n_ Parcel# 913 0076 6-7-one G G 7 SCwN 8t� ~ TOW 07P S-OUM ?And4at 0 Hany 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR•c0 TELEPHONE (860) 644-2511 May 27, 2009 Mr. Matthew Galligan Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Appl. #09-16P - Town of South Windsor Firehouse —765 Sullivan Avenue Dear Mr. Galligan: At the May 20, 2009 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #09-16P - Town of South Windsor Firehouse — 765 Sullivan Avenue - IWA/CC application to construct a public safety facility building, parking, stormwater structures, and associated improvements on property located southerly of Sullivan avenue and easterly of West Road. General Commercial (GC) Zone. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION cg�, a ztla,� fi, 69/ Elizabeth A. Warren, Chairperson EAW:dt cc: Chief Building Official Hap Fitts, Public Building Commission Brian Humes, Jakunski/Humes RECEIVED APR 13 2009 ,,vv I,J.,u TOWN OF SOUTH WINDSOR INLAND WE LANOSAGENCY CONSERVATION COMMISSION INLAND WETLANDS,WATERCOURSES AND CONSERVATION APPLICATION Application# 0 CI-1 'Date Received Ak/S—O INSTRUCTIONS 1. Fifteen applications (15) with map and plans (2 copies) shall be submitted together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VII-X) 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application Evaluation. (See Regulations, Sections VII-X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. The applicant shall also complete the state filing form.A. Applicant's Name: Ph rb Y" � ,`e .1 { . FI' re C h 1 G _P Address: j� � �1��no /� kAl -soi[�Li �i�n�Soi- eT oG 07y Phone: (home) to 1f 4-b(,l�; (work) (fax) B. Legal owner's name: =oujm o 4 .Soup dso r- Address j5 q0 Su/l/'V a e, X ve Soli l-y L(/i i>, :QS'e l~ C7— o6o-741 Phone (home) (work) (fax) (List additional owners, addresses, and phone numbers on back of application) C. If the applicant is not the owner of the subject property; a letter by the owner(s) authorizing the proposed regulated activity set forth in the application must accompany this form and will be part of the application. D. Project Name and Location eW I�d c,_l, T Sevo A qr W Ain bH l a n c e to S ,3`er/!r`(iQ n A w, //1. Contact Person(if further information is needed) (7 t o pi / 1 a r'¢� n (work) 860419-/7o0 (fax) 960 ' QL / 76 7 X gy E. The geographical location of the property which is to be affected by the proposed regulated activities including a description of the land in sufficient detail to allow identification of the property on the Inland Wetland and Watercourse Map. nn Assessor's map# Parcel # 0730o1G5�Zone 4 F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) see a #aC4ed G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? I'(* Ar -i abu¢f;a Pro —7 pzrl OWher5, W � �h / (you are quired to supply a copy of the'letter with the list of the names of the abu ers).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet pand types of fill and the time element involved: - 1 rb�ps2d� Gorrs�!`uG�ia� aT' a ����n�oon � a .Pen � nG[ Scr/at�� AV/2r o f 471Vh So. ( noja jT pA yemenT I'S also torv�Oo -e� iA Ae e u la led are4 . 754-ttla r o 44."Ce 41•5 , ono .r a,?,-e -Feet. a%s�urdQnce Wj'1( ba or en+;re cur /-o ®>F I. A class A-2 map of the property drawn to 1"=40', showing the area to be developed, extent of the wetlands PP'oj`e"t and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated area disturbance and types of fill (including wetlands and 80 foot Upland Re iew Area). To-(-ci� /area a,-(- G�;S�urbGtnee i n re-?" a re- 1- ± ���000 SF r:11 wil( � ncWde aSpAa If pnveme-rcf, 3� a a ✓el q.7d �Pso,•/, K. Acreage of wetlands and watercourses in regulated areas to be altered: 0 L. Acreage of wetlands and watercourses to be created: M. Lineal feet of proposed stream alteration: 0 N. Total land area of project and percentage, which is wetlands: - OTrI `Qh d aTe4_ = a 41 677 a Cres / re-a n d s 4 G 3 7. O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.) 5o (, ;nj c or P14^,6 4 Z -RIPe-ova/ tiv, lj P. The applicantt�or designated representative) hereby attests/that a sign will be posted at the following location(s) 76 r2 By�oa Name 1 e n a r�"i ✓1 on or before the following date "O 1 8 Signature: , ,„ These signs must be displayed continuously for at least ten (10) days prior to scheduled meeting (see Regulations, Section 7.3a) The undersigned hereby applies for the regulated activities listed in paragraph H above, for an Inland Wetlands, Watercourses and Conservation permit for the property described herein and confirms that: l. She/he is familiar with the currently effective Inland Wetlands, Watercourses and Conservation Regulations of the Town of South Windsor. 2. She/he understands that at any time during the review period, the Agency may require the applicant to provide more information about the wetlands and/or watercourses in question and/or any proposed activity. 3. All information submitted in the application for review shall be considered factual, or in the case of anticipated activity, binding. A knowing failure of the applicant or any of her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit under these regulations. 4. By making this application, the applicant gives permission to the Inland Wetlands, Watercourses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpose of inspection and investigation and-otherwise evaluating the merits of the application both b fore and after a final decision has been issued. f Signature of Owner of Prope Date Signature of A icant Date C4 11-f 0 9 TOWN OF SOUTH WINDSOR CHECKLIST REQUIRED �INFORMATION "SITE PLANS APPLICANT O f- J ®L4 "f h W l/���o r PROJECT NAME New ,r- 4'f7 -5o lFr js o r- �(rr- and Aw 6u a n c-e. This checklist must be signed by plan preparer (P.E./L.S.) declaring that all required information is provided. Items 1-7 are required for all applications; items 8-11 required where appropriate. Check mark for each item supplied. 1. On each sheet for plans or maps, title.block with the following information: a. Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. c. Name of Development. d. Date when drawings were made. I/ 2. Key Map: An overall map drawn to a scale of 1 inch equals either 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. b. Outline of buildings. 1� c. Layout of streets. d. Surrounding property boundaries-within 500 feet. e. Names of abutting property owners. tVA f. Proposed open spaces and recreation areas. g. Driveway cuts on abutting properties and any properties across from proposed site. h. Distance to and name of nearest intersection street. C10areet on a-F u/es� 2d � 3. Architectural Elevations: See attached checklist for Architecture and Design ,rtd`h'V'vj Review. A v e i 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces. c. Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters (on concrete pad and screened). �IA e. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g. below Grantor Grantee Type of Date Filed Vol/Pg Easement f. Names of abutting property owners. g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. WA- h. All open space or other common or public land uses shall be indicated. i. A-2 certification; P.E./L.S. Seal. %0/ 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to the requirements of the plot plans show the following: a. All existing and proposed buildings. Vol b. Curb Lines and pavement width, sidewalks. c. Existing and proposed sanitary sewers. y d. Existing and proposed water and-all existing utilities. 2 e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown. y f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land, the contours shall be one- foot intervals and spot elevations. g . Regulated wetlands and 100-year floodplain or note that none are present. t/ h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches, within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. &VA i. Connections of all springs into proposed storm drainage system as needed. '✓ j. Location and indications of existing brook channels, and 100-year flood limits. k. A-2 &T-2 Certification; P.E & L.S. Seals. 6. Landscaping plan 7. Drainage calculations: - Zero Runoff Increase per attached guidelines. 8. Traffic Report 9. Site Lighting Plan 10. Plans and Profiles: A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations (top frame and inverts), size, type, length, slopes of pipes. c. Sight line at driveway &street intersections. 3 d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths and slopes of pipes. f. Where any storm drainage line discharges into an existing brook sufficient l `"�,, profile of this brook will be shown to determine conditions. A6 g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine the accessibility of these controls. AVA h. Profiles shall show all sanitary sewer Fines and manholes, including elevations, (inverts, top of frame) sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. Gl//4 0 PW PREPARER (P.E./L.S.) DATE February 2002; Rev. 4-04 4 ABUTTING PROPERTY OWNERS PROPOSED SOUTH WINDSOR FIRE AND AMBULANCE FACILITY OWNER PROPERTY LOCATION OWNER ADDRESS OWNER ZIP CODE 15 MORGAN FARMS DRIVE ASSOCIATES LLC 0015 MORGAN FARMS DRIVE PO BOX 696 SOUTH WINDSOR, CT 06074 651 LLC 0651 SULLIVAN AVENUE 651 SULLIVAN AVE SOUTH WINDSOR, CT 06074 GILSON BARBARA E ETAL 0668 SULLIVAN AVENUE 668 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 WISNIEWSKI ADAM 0678 SULLIVAN AVENUE 678 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 M D REALTY LLC 0688 SULLIVAN AVENUE 420 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 A AND D BALIS ENTERPRISES LLC 0689 SULLIVAN AVENUE 229 STARKWEATHER RD MOOSUP, CT 06354 GOLAS KRYSTYNA 0694 SULLIVAN AVENUE 694 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 BMM SOUTH WINDSOR LLC 0706 SULLIVAN AVENUE 15 BIRCH LANE SHORT HILLS, NJ 07078 CAPITAN AMELIA J L/U & PAUL P 0720 SULLIVAN AVENUE 720 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 PRANCKUS JOHN C SR 0730 SULLIVAN AVENUE 730 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 PRANCKUS ALBERT G L/U & 0744 SULLIVAN AVENUE 744-46 SULLIVAN AVE SOUTH WINDSOR, CT 06074 ZAINO GIOVANNA B 0760 SULLIVAN AVENUE 760 SULLIVAN AVE SOUTH WINDSOR, CT 06074 A F ASSOCIATES REALTY LLC 0765 SULLIVAN AVENUE PO BOX 684 SOUTH WINDSOR, CT 06074 LOTS AND MORE LLC 0770 SULLIVAN AVENUE 770 SULLIVAN AVE SOUTH WINDSOR, CT 06074 JTF PROPERTIES LLC 0818 SULLIVAN AVENUE 818 SULLIVAN AVE SOUTH WINDSOR, CT 06074 PRESTILEO VINCENT 0828 SULLIVAN AVENUE 828 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 SHARP EDWARD F TRUSTEE 0840 SULLIVAN AVENUE 34 SCHOOL RD ANDOVER, CT 06232 STOWE PROPERTIES LLC 0845 SULLIVAN AVENUE 845 SULLIVAN AVE SOUTH WINDSOR, CT 06074 MINGUY KEVIN 0850 SULLIVAN AVENUE 850 SULLIVAN AVE SOUTH WINDSOR CT 06074 GRECO PROPERTIES LLC 0855 SULLIVAN AVENUE 855 SULLIVAN AVE SOUTH WINDSOR, CT 06074 GETTY CT LEASING INC 0856 SULLIVAN AVENUE 125 JERICHO TPKE#103 JERICHa,, NY 11753 GRECO PROPERTIES LLC 0869 SULLIVAN AVENUE 855 SULLIVAN AVENUE SOUTH WINDSOR, CT 06074 SOUTH WINDSOR TOWN OF 1165 SULLIVAN AVENUE 1540 SULLIVAN AVE SOUTH WINDSOR, CT 06074 A AND D BALIS ENTERPRISES LLC R027A SULLIVAN AVENUE 229 STARKWEATHER RD MOOSUP, CT 06354 SZEDLACSEK SAM &CRYSTAL A 0016 TROY ROAD 16 TROY ROAD SOUTH WINDSOR, CT 06074 ZAINO GIOVANNA B 0035 TROY ROAD 60 STONEGATE DR WETHERSFIELD, CT 06109 BMM SOUTH WINDSOR LLC 0042 TROY ROAD 15 BIRCH LANE SHORT HILLS, NJ 07078 WILLIAMS ARTHUR D 0175 WEST ROAD 175 WEST ROAD SOUTH WINDSOR, CT 06074 PIACENTINI CRAIG E&LORI L 0185 WEST ROAD 185 WEST ROAD SOUTH WINDSOR, CT 06074 SOUTH WINDSOR TOWN OF 0190 WEST ROAD 1540 SULLIVAN AVE SOUTH WINDSOR, CT 06074 PUDELER KENNETH J 0201 WEST ROAD 201 WEST ROAD SOUTH WINDSOR, CT 06074 DE5GNc TRANSMITTAL To: Jeffrey H. Folger Date: 4-14-09 Environmental Planner/ Conservation Officer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 From: Glen Martin TO Design, LLC Subject: Proposed Fire and Ambulance Facility 765 Sullivan Avenue # of Copies Drawing Drawing Description ) QY No. Rev. Date 2 Wetlands Submission Plans 2 Drainage Design 15 Wetlands Application Remarks Please find the above referenced items enclosed for your review. If you have any questions please contact me at(860) 612-1700 xt. 24. Signed: Enclosures Job#: 5033 �pl� ia+ t �rrrrr�wt�rw wpwoftplma I14RrarA WIte1 New irk,CT 1 P:860-612-1700 . F:860-612-1767 todedgrk,com RECEIVED Envirolm ent /�1� Environmental& (`��/JJ Water Resources Q PR 1 1332009 Engineering GE I Consultants LETTER OF TRANSMITTAL SOUTH WINDSOR PLANNING�?J.Winding Brook Drive,Suite 201 Glastonbury,CT 06033 Phone:(860)368-5300 Fax: (860)368-5307 www.geiconsultants.com To: Mr. Jeffrey Folger Date: April 14, 2009 Town of South Windsor Project No. 082560-1-1000 1540 Sullivan Avenue Wetland Impact Assessment for Re: Project Area&Best South Windsor,CT 06074 Management Practices for Stormwater Treatment We are sending you the following enclosures: No. Type Description Hard Wetland Impact Assessment for Project Area& Best Management Practices 12 for Stormwater Treatment-Proposed South Windsor Fire Department Copies Property These are transmitted as checked below: ❑ For Approval ® For Your Use ❑ For Review/Comment ❑As Requested ❑ Other Message: 'j his is Fa �c�bm;+)cd <tS tin o 0 a G.oT�lit"cat?;-icrn lbe�2xC -ram -TA,-.)n O�- 5nCA-k c.J1MSC�r IcLook WActy)ns Comyn;5S)gn a 'TLA-o c-,A�or a cy)-:(Qns a D+i;r ,� Cn -ta DRs''� Copy to: Signed: Fred Johnson If enclosures are not as noted, kindly notify us at once. HAWPROMProject\Town of South Windsor\FireDeptProperty062560\Wetlands Assessment7ransmittal Ltr Glastonbury04.14.09.doc �C m \N MVP 011 Supplemental Wetland Survey Proposed South Windsor Fire Department Property Corner of Sullivan Avenue and West Road South Windsor, CT 06074 Submitted to: Town of South Windsor Mr.Jeffery Folger 1540 Sullivan Ave. South Windsor,CT 06074 Submitted by: GEI Consultants,Inc 455 Winding Brook Drive,Suite 201 Glastonbury,CT 06033 860-368-5300 May 2009 Project082560 Frederick W.Johnson,LEP Sr.Vice President,Regional Mgr. SUPPLEMENTAL WETLAND SURVEY PROPOSED SOUTH WINDSOR FIRE DEPARTMENT PROPERTY SOUTH WINDSOR, CONNECTICUT MAY 2009 1 . Supplemental Wetland Assessment 1.1 Project Background Mr. Jeffery Folger,Environmental Planner/Conservation Officer for the Town of South Windsor, contracted GEI to conduct a supplemental survey of the narrow wetland band located in the northwest portion of the town-owned property at 765 Sullivan Avenue in South Windsor, Connecticut. The parcel was previously the location of an agricultural property including a demolished single family dwelling and agricultural fields, and a forested area in the southeastern section of the subject property and is currently undeveloped. The Town of South Windsor has intentions to develop a fire department facility on the southwest corner of the subject property, and retain 13.76 acres of the eastern portion of property including the Podunk River and associated wetlands as open space. At an Inland Wetland Commission meeting on May 6, 2009 member of the community brought up concern over a potential surface water body identified as part of the narrow band of wetlands on the northwester portion of the property prompting this supplemental assessment. 1.2 Field Survey The field survey was conducted on May 18, 2009. The survey focused on identifying ecological conditions and communities in the narrow band of wetlands on the northwester portion of the property adjacent to Sullivan Avenue. 1.3 Results GEI staff ecologist, Kimberly Barber, visited the subject property to further investigate the wetland region of concern. This region of the property is dominated by emergent to shrubby vegetation with mucky soils in towards the center of the flagged wetland;although no surface water was present at the time of the survey. The center of the wetland was dominated by tussock sedge(Carex stricta)with groupings of larger blueflag iris(Iris versicolor)and sweetflag (Acornus calamus) and skunk cabbage (Symplocarpus foetidus) in the direct vicinity of the mucky soils (Photos 1-2) Goldenrod (Solidago spp.) and sensitive fern (Onoclea sensibilis) dominate the ground cover to the eastern portion of the wetland in the region leading to a small grouping of white pines (Pinus strobus) (Photo 3). The surrounding shrub and canopy cover, to the southern portion of this wetland include American pokeweed (Phytolacca Americana), multiflora rose (Rosa multiflora), and small sugar maple(Ater saccharum) and red maples (Ater rubrum) Japanese knotweed (Fallopia japonica) dominates the region between the wetland and Sullivan Avenue, and is W1 // _ E.I Consultants- - 2. - SUPPLEMENTAL WETLAND SURVEY PROPOSED SOUTH WINDSOR FIRE DEPARTMENT PROPERTY SOUTH WINDSOR, CONNECTICUT MAY 2009 beginning to grow into the adjacent portion of the property disturbed by the removal of the abandonded farm house (Photo 4). 1.4 Conclusions The wetland region of concern can be classified as an emergent wetland with some scrub/shrub surrounding features.No surface water was present at the time of the survey, and the area does not maintain surface water body features. Invasive flora management in the vicinity of this region of the wetland can benefit the overall function and value. - V E I. Consultants SUPPLEMENTAL WETLAND SURVEY PROPOSED SOUTH WIND-SOR FIRE DEPARTMENT PROPERTY SOUTH WINDSOR,'CONNECTICUT MAY 2009 Photographs a*ti Photo 1. The wetland region of concern (directed toward Sullivan Avenue) with tussock sedge and sweetflag groundcover, mulitflora rose and Japanese knotweed and red maple around the perimeter. L*�ulta LI- Consnts y` r fw y t 1 [ + # Ai z € #. :� h,Xy -. > �, -f 4 fit: y.4 "' ,•r`{�' 5 it#+,� 8 ~�of t t tWk {( y 107, •- P t,4 � -�. a .�+ l . `�`i`T^. � y��.. �'�'��' F . 'aC' { : f Y ,�4,Fir #'�8€�l.'.T ' •k 91'� !f C fi ,'Y'@`P_ y; �di .'4* � t�t1 - Y;.., � ti 1 ) fF .. �.. ggr_ 4 I _ S f cA— v s r t � _ c s �y } ' `' ���£ti� t e. ,��u � ,_ �� ter: a 'S� •-3P� r i SUPPLEMENTAL WETLAND SURVEY PROPOSED SOUTH WINDSOR FIRE DEPARTMENT PROPERTY SOUTH WINDSOR, CONNECTICUT MAY 2009 y- �r _ r.. .. 2 ;r. t. i Photo 4. Japanese knotweed dominating the edge of Sullivan Avenue and emerging in the region of the property disturbed by the removal of the house. t //^� LCeonsulta;nts VL� - - - - - 7- TO DESIGN LLC April 28, 2009 Kenneth J. Pudeler 201 West Road South Windsor, CT 06074 Dear Property Owner: RE: Location - Proposed Fire and Ambulance Facility, 765 Sullivan Ave. and West Road Owner—Town of South Windsor In accordance with Section 7.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on this property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard, please contact Jeff Folger, Environmental Planner/Conservation Officer, Planning Department, 644.2511 ext. 253. Sincerely, Glen Martin To Design, LLC (Agent for Town of South Windsor,Applicant) sophisticated sate Aesigw Old Post Office Plaza 114 West Main Street Suite 201 New Britain,CT 06051 P:860-612-1700 F:860-612-1757 todesignllc,conn Printed on Recycled Paper • Soil Map-State of Connecticut (765 SULLIVAN AVE.APPL.#09-16P) in 701240 701310 701380 701450 701520 701590 701660 701730 701800 701870 41'51,.0,E 41'50'59" 0 0 M M (D V V V / V xi,U �u'�riyp i5{ n F Y, 9 ' 1�Ar4"y� �f r��y 1• M d r fA M O t Y� 4Y p0 M M O 41'50'46" i ,m 41'50'45" 701240 701310 701380 701450 701520 701590 701660 701730 701800 701870 M Map Scale:1:3,080 if printed on A size(8.5"x 11")sheet. `O v � N Meters 0 40 80 160 240 Feet 0 150 300 600 900 USDA Natural Resources Web Soil Survey 2.2 5/19/2009 Conservation Service National Cooperative Soil Survey Page 1 of 3 Soil Map—State of Connecticut 765 SULLIVAN AVE.APPL.#09-16P Map Unit Legend - .. a , � w YIIIF.�j/ 101 3a e\ a41� t�1 A ti 2:. �81<S.ent Ofa��l r 13 Walpole sandy loam 6.4 15.1% 21A Ninigret and Tisbury soils,Ato 5 percent 17.8 42.1% slopes 28B Elmridge fine sandy loam,3 to 8 percent 3.1 7.3% slopes 36B Windsor loamy sand,3 to 8 percent slopes 4.9 11.76/6 108 Saco silt loam 4.6 11.0°/a 306 Udorthents-Urban-land complex 5.4 12.8% Totals for Area of Interest 42.3 700.0% Natural Resources Web Soil Survey 2.2 5/19/2009 Conservation Service National Cooperative Soil Survey Page 3 of 3 s: ' z { INN i Now ------------------------- AM woe aY`�- #4 t - -.s ... fie.. •_ ..•• - :t -pawn". =��• - .� ,. - �.# _= x:? ,�-- ��t�.� '� .cam _.€, ^;�-#�: €,z: ionUYIEWN _ T Hand Delivered May 27, 2009 Mr. Matthew Galligan Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Appl. #09-16P - Town of South Windsor Firehouse— 765 Sullivan Avenue Dear Mr. Galligan: At the May 20, 2009 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #09-16P - Town of South Windsor firehouse — 765 Sullivan Avenue - IWA/CC application to construct a public safety facility building, parking, stormwater structures, and associated improvements on property located southerly of Sullivan avenue and easterly of West Road. General Commercial (GC) Zone. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairperson EAW:dt cc: Chief Building Official Hap Fitts, Public Building Commission Brian Humes, Jakunski/Humes �O�N 3fq O yj To� V I S-V� d c a 9 .� �, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 J�OSoR-CO � TELEPHONE(860) 644-2511 May 27, 2009 Mr. Matthew Galligan Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Appl. #09-16P -Town of South Windsor Firehouse — 765 Sullivan Avenue Dear Mr. Galligan: At the May 20, 2009 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #09-16P - Town of South Windsor Firehouse — 765 Sullivan Avenue IWA/CC application to construct a public safety facility building, parking, stormwater structures, and associated improvements on property located southerly of Sullivan avenue and easterly of West Road. General Commercial (GC) Zone. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairperson EAW:dt cc: Chief Building Official Hap Fitts, Public Building Commission Brian Humes, Jakunski/Humes TO BE PUBLISHED IN THE JOURNAL INQUIRER LEGAL NOTICE Thursday, May 28, 2009 SOUTH WINDSOR— INLAND WETLANDS AGENCY/CONSERVATION COMMISSION At the May 20, 2009 Regular Meeting, the Commission voted to take the following actions: Approved: Appl. #09-16P Town of South Windsor Firehouse — 765 Sullivan Avenue. - IWA/CC application to construct a public safety facility building, parking, stormwater structures, and associated improvements on property located southerly of Sullivan Avenue and easterly of West Road. General Commercial (GC) Zone. Approved: Appl. #09-20W — Shepard House Lot — 45 Newberry Road — IWA/Conservation Commission application for the construction of a residential house an associated improvements on property located southerly of Newberry Road and easterly of Main street. A-40 Residential Zone. Approved with conditions: Appl. #09-23W — Town of South Windsor Ball field Renovation — Ayres Road — Conservation commission application for earth disturbance associated with the renovation of an existing ball field on property located southerly of Ayers Road and westerly of Nevers Road. Rural Residential (RR) Zone. Dated at South Windsor, CT this 20th day of May 2009 Elizabeth A. Warren, Chairperson TO DESIGN LLC Stormwater Management Summary South Windsor Fire and Ambulance Facility South Windsor, CT April 14,2009 F The site is located on the corner of Sullivan Avenue(Route 194)and West Road. The 24.87-acre } ; parcel slated for development is currently undeveloped with wetlands located to the south and east of t the property. The Podunk River runs through the easterly portion of the site. The development involves the construction of a Fire and Ambulance Facility with associated parking and drives and will t develop 4.14-acres of the 24.87-acre site. ExistingDrainage rainage The portion of the site to be developed is an open field relatively flat,and slopes to the east and to the south towards the wetlands located in the middle of the overall site. After reaching the wetlands,the runoff flows east of the proposed development to the Podunk River. Proposed Drainage The proposed development will occupy the bulk of the western portion of the site and will add 1.74 acres of impervious surface. The design will maintain existing drainage patterns and prevent increases in peak runoff rates to the Podunk River.The proposed design will sheet flow the parking lot runoff to the greatest extent possible and utilize a water quality swale to convey runoff towards the proposed detention basin.The detention basin will have a forebay to control peak rates and provide stormwater treatment. The proposed stormwater management system has been designed to comply with the 2004, Connecticut DEP, Connecticut Stormwater Quality Manual. Due to the proximity of wetlands,the following best management practices have been incorporated into the design. • • Runoff from all onsite paving will be directed to the detention basin for treatment. The forebay has been sized to hold 10%of the WQV. The basin has been designed with a six inch "wet"bottom below the lowest drain point. All catch basins will have four foot sumps to promote capture of heavy suspended solids. • All outfalls for the stormwater management system will have outlet protection. The storm sewer system proposed for this site has been developmed in accordance with the CT DOT Drainage Manual. The pre and post-development runoff comparisons were made using TR-55 Hydrographs. The site has been assigned a soil type of`B".The onsite storm sewer system is designed for a 25-year storm event. The detention basin has been designed to route up to a 100-year storm event. Attachments 1. Pre and Post Development Drainage Area and Peak Rate Summaries 2. Drainage Area Maps 3. Storm Sewer Calculations 4. Pre and Post Development TR-55 Hydrographs 5. WQV Calculation and TST Sizing 6. Rip Rap Sizing Calculation sophisticated 7, Natural Resources Conservation Service-Web Soil Survey site Desigw Old Post Office 11cm 114 West Main Street Suite 201 Mark G. Smith,P.E. 0 ew Britain,CT 51 P;860-612-1700 F;860-612-1757 todesignlic.com Printed on Recycled Paper • i Pre and Post Development Drainage Area Summaries { i. Date 4/14/2009_ Guth Windsor Fire and Ambulance Facility .__.._. ;South Windsor,CT £Cn imp _.,_. .. ......�.._ __.._ ..._.�98� ..,.N_•_.___. _._....... ....._.._ _...._�... �_. ,... _.._..,__- r -___,._.. _. ........................ _ Cn_pp grass _ 61 1 Soil Type B Yp ........... Design Storm 25 yr 'Pre Development _ _.. •_ Total Imp a Perv. Cn t "Tc ?Outfall acres; acres acres i Min ... ?Overland 1 to Podunk River 2.58 0i 2.581 61 0 16.2 Overland 2 to Podunk River 1 56 0 1.561, 61 OF 8..... 6 .................. .. (Post Development _. trOu�tfali _.... 1 .. Parking Lot Overland and Swale 1.00; 0.44. 0.56 77 3� 5 0 Building and Courtyard 0.44 0.44 0 98.0 5.0 Piped to Detention 0.94 0.71 0.23 88.9 5.0 _ I Overland to Detention 0.90 0.12 0.78 65.9 5.0 Total To Detention 3.28 1.71 1.57 _. Overland 1 to Podunk River _ 0.86 0 0 86� 61 0 8.6 _ € !. Pre and Post Development Rational Peak Rate Summa ..... _. 2 yr storm 1 Syr storm 25yr storm 100yr storm Clore . Q re Q re °, Q re To Podunk River "._. 1.041NSEM 4.060MOM 5.86 8.94 ....... d !Note Flowrates are from Hydrographs Section 3 of Drain_age Report Detention l Storm Event Max Water Elevation 2- ear .. _. _. _..... t Y _.. 8601 86.191 A-year____ 86.44 i. ..................... _. I z,100 gear 86 90= _. ....................... .. .. ... • 1L --'-----{ f � � i�� ; ----'� i t � i i��'{�iv'�"rii`mY• �_��'-9 i _! _ �-- � ! 1 ----- _ jk � � �� i �; t t j f. 1._.`.�`'l! i i_:.__f'i_I %.at�r s i � r'_�`J j i p ,,t 3 ! •—__ �! F � ! ;, -- � } '-___ � 3, w se• 1 ,at ( , /s% O t ; ..Csn aww•aais v xT ,1i-; ` ! ! ,) �. s { !m, av�-, 11 I -`t..r �i i avn nrss t ��'M• f %wwem asx f.�.. 1 �' LLL •\ = +meway» 1: ..7 , k / - __ - 1 lrwnz•r !IJ.'�aa ! t+e,o,4n•2m "' t hr-nr, nrea�xr,au 1 1 iw*.w.s •/°av`�°ii°Y K•, J - -_G ..+ , +'.._'���x 0�; !_� ?nsac x"M1S,�.( ems-' ..,,item• 'x+-»i6•;ua — \ 1 x !; k �n.ea� \nx'n''" // 7'w i 1; ) :, {1 -- `- -'- -��>.�—..��-- ^��_-'_'dd'SX�'�-��_Hr '�i� .L" �' "'L` � `t' '_i— --� a•�t /;�f 18';4 r aj'me..e+m`�a)..—-- -——— R 1 K.e�,�c f �i �s,;.�.. /%' wr"'w.m wr'" _ •'�,- �"� __� _`—�- .Fx m— --- '- _- ;. ____.___._ - :,3L _ a�_ ,1''""9iL�� � �--�..�� — s«F m� 1 .--_ �ww' w x pnc7 -�- �iN;10t_'.•`.� '� .}_73.:..-�'_'__i. ,u iwms.c=`-'.__ Yyy,= .._--.�,. __ — __ _� -i—'• W-- yi_>w�....�� r .�� ^_'*` __ _ .xy- J• 7.ew ..�-rn —.. ,..m,r pa:^ $F'� ` __4,..._,.. __ ___-s.2._ _ :nAe .. m �— -.:a-w-. _ "— _ T ,aeaw. � __�`��-- -___ oo r�.-'�.a`ri �.�,'�r--=' �a, _ '`•-t_ ____ VENVE / AKA y ,r�.:.R:'-RD � 194— ME %:- 7 `�<,,.� „ _ ,� _ � i�t f,''J,',� A 1 �1 `'`B'�`'�/�.'Il % i ` /' '�w...� .4 i t„ - --_'`•. -COMMERCIAL 1 ? a 289,729,7 SF Fc r�1 �'wa ��.�'�'��tt"-�� Y ��\r`J i ' aC',w 1//r•�,� � � �� '� '',/ �'�"'rx4snn c-�^�`3 Jtii 1; � �'•.tR'tl 1 �' + ''' °�` il f ' -_____' - /`''.i�j� � � '` � s uss � ";�qy 1: Sa i t OPEN Qn SPACE ,t p ' K'b 600,181.7 SF �' '`: p p t s ,f,J' ' ✓ 13.78Acres _a4«t ---� #F i� ,; ',, �•� ,�;,°�', 4.i �"' ; :''}� •:`1,• ,/-� ems` FIRE-AND' ;' 1^ AMBULANCEF 1 tk; .�,<�,1=AOILITYPARCE —°Y'` 1934745.6 SF 4.45 Acres `, � �n tL '� � �` ,`t `•� .J rh 'r*'..��f'r'''ifix--.-'",_•r`^'� - l�''`R �j�'� � <, �� \" l � CjJT m Y_KYt ,n ACUNSKI HiJMES AIBCHIrrECTS,ILLC � ,{ ; f 1 Ct _ • 15 MASSIRIO DRIVE ''I ! l t surPE 101 croGm - t DATA TABLE- COMMERCIAL PARCEL DATA TABLE- FIRE HOUSE PARCEL B'IT1 um,8604 1 FAX 860-828-9223 & \l MAP111PARCEL44 ZONING INFORMATION MAR111PAROM44 ZONING INFORMATION LEGEND i i t ZONE:DC-GENERAL COMME REQUIRED EXISTING PROPOSED ZONE:GC-GENERALCOMMFRC REQUIRED EXISTING PROPOSED USE WA COMMERCIAL USE WA FIRE i AM81XANCE BUILDING AREA"OTPRNT) WA BUILDING AREA(FOOTPRgn WA 94NO SF EXISTING PROPOSED FROPERTYUNE `OTA`EA 30.WDSF - 2N.M73F/B.05AC. LOTAREA 30,WOSF 193.745.53F/4A5AC. DATA TABLE-OPEN SPACE PARCEL -_- LOTCOVERAGE(BLOOS.) 3D%MAX 0% LOT COVERAGE PLDGS.) 30%MAX. 0% 12jW — YARDUNE IMPERVIOUS COVERAGE 0%MAX 0% IMPERVIOUS COVERAGE W%MAX 0% 36.4%K Yr WETLAND LUT MAP 111 PARCEL`` - EXCLUDNGWERANDSE 05%MAX 0% EXCLUDING WETLANDS 9%MAX 0% '�'0%� ® FLOODZDNEA3 - Overall Plan ZONE:GC-GENERAL COMMERCIAL PROPOSED LOT FRONTAGE 150' 9" LOT FRONTAGE 150' M4' PLODDZDNEX USE - OPEN SPACE LOT DEPTH 150' 221' LOT DEPTH 150, 29' FLOODLNE TOTALPARCELAREA 800.181.7SF/13.78AO. WETLAND AREA 364,834.2SF/S.38AC. FRONT YARD MY S0` FRONT YARD Or SIDE YARD 10. 1y SIDE YARD1p Sr 5Y UPLAND AREA - 236"ASF/6.4AC. REAR YARD 1S 1S REAR YARD 19 12Y . HEIGHT 40'MAX HEIGHT - 40'MAX. 2C-4' .. RAFeCING SPACES - PARKING SPACES ... 46 •LOT COVERAGE PURL)CALL. (24AWSF/193.74S.8SF)X100-12.5% ORAWNC NO. 3:\IDra,A(ing 033A-L-S.Windsor Fire\Dwg\5033A-L Pre and Post.dwg,4/14/2009 9:59:27 AM&e PDF • ........................ ry f. GNP s. ........... A00 .............................. gap ............ ........... . .....:-,......... ......... ....... ..•.•...... ........... .......... y \01 0 mi M " 0 bOD r :E r 0 z >= 3 rr-- 2. o 1.14 z .......... h? o 0 /0 A 0 I:,- > o m 0:) C) > > R 3 0 z ell ...... ... .............. .......... ....... ............... ............ r . lit W X V, .......... e\NN n. x \\N x On 4.1 N NX X \1 A N V x 0 C) V\X \ X N \N' 'N\ N\ p. \\ \,v N \ 1 N\\ X, VN X'�\ NX X\N < C) N, \,x N\ N N VX N\ V\ K\x N 00II v\ N\, Y \\N X\ A N �N N\ x N\ \\\X V X\\ v C) \N X\v, X\ 00 N\\ N' N\ N x,,xx� N N t N\ N�\\ N N,\\\ \,x \N N v X� V V N\ X\X C) X\V, .. ....... (D NEWE4CILITY FOR THE d I(D 0 0 SOUTH WINDSOR (D 1! 1V it lip EIREAND AMBULANCE (D 765 SVLLJ"N1JVEMYE SO4VTH WINDSOR,COAXECTICUT 3:\IDrawing 033A-L-S.Windsor Fire\Dwg\5033A-L Pre and PoI 4/14/2009 10:03:45 A&be PDF ............. A ................................................. goo ........ ...... ................ ............ ................. . .......... 1. ...... ................. ....... --------------- ......... ........................................... . . ........ > .......... 11 C) OD j�o M @ m > 0 --A > 0 > 03 0 C) 11 0 z g ­ 00 4 iq 1 3. _r� 5 > Z G) f 0-2 ......... re) ... ........... A-- z ........... Z < > 0 MM 8n : 3 cf) > z V > > Z G) m 0 T, 0 --A > 0 0 :3 0 11 m < �(3) 03 > Z F ­ _j > =3 0 0 Z Z C) .......... ...... ............ ... .......... OM FO CO M, > > 3 Z ......... ... "'N ........... .......... gX, X. _�o V N V� gA \\X\ ,K N\tM".4 "41 t 00 \A a Jr N N N N V X\N NX \\� \'�\x N \\N v V, NX\ 0 \ N Qf MI5 XNX A v v N\\ N Vv A N V\ X 1V\ 00 'X\\ N" \N\ \-N \\\N \,\ - \\ \ N\N � Z ep: X V \"\,..\\X X, v V N V\\N \'N \4 X\ \X 60 NEWF4CILIFF (D FORME o (D"a yUSOUTH WINDSOR FIREAND AMRULANCE (D :3 r�I I AfS SVLL1V4N,4VENVE S017TH WIADSOR,CONNECTICUT 0 draflow r or R Storm Sewers Extension for AutoCADO Civil 3D0 2008 Plan 5 ® 9 Outfall 8 7 4 6 3 2 1 Outfall Project File: drainage.stm Number of lines:9 Date: 04-14-2009 Hydraflow.Storm Sewers Extension v6.052 Porm Sewer Inventory Report R Page 1 Line Alignment Flow Data Physical Data Line ID No. Dnstr Line Defl Junc Known Drng Runoff Inlet Invert Line Invert Line Line N J-loss Inlet( line length angle type Q area coeff time El Dn slope El Up size shape value coeff Rim El No. (ft) (deg) (cfs) (ac) (C) (min) (ft) M (ft) (in) (n) (K) (ft) 1 End 97.100 -148.68 Comb 0.00 0.16 0.83 5.0 84.50 0.51 85.00 15 Cir 0.013 1.32 89.30 PCB1 To Det. 2 1 88.500 -31.583 Comb 0.00 0.07 0.90 5.0 85.00 0.50 85.44 12 Cir 0.013 1.43 89.30 PCB2 To PCB1 3 2 58.800 8.680 Comb 0.00 0.02 0.90 5.0 85.86 1.00 86.45 12 Cir 0.013 1.00 89.70 PC133 To PCB2 4 2 128.20 70.936 DrGrt 0.00 0.22 0.44 5.0 85.44 0.50 86.08 12 Cir 0.013 0.57 89.50 PY134 To PC132 5 4 26.900 19.071 Comb 0.00 0.30 0.82 5.0 86.08 0.63 86.25 12 Cir 0.013 1.00 89.50 PC135 To PYD4 6 1 67.600 58.923 MH 0.00 0.00 0.00 0.0 85.16 1.98 86.50 8 Cir 0.013 1.00 90.80 MH To PCB1 7 6 152.70C 89.763 None 0.00 0.13 0.90 5.0 86.50 1.05 88.10 8 Cir 0.013 1.00 91.30 Roof 1 To MH 8 6 96.200 -90.237 None 0.00 0.05 0.90 5.0 86.50 1.66 88.10 8 Cir 0.013 1.00 91.30 Roof2 To MH 9 End 88.700 180.00C MH 0.00 0.44 0.90 5.0 86.50 1.04 87.42 12 Cir 0.013 1.00 91.10 PMH7 To Swale Project File: drainage.stm Number of lines:9 Date: 04-14-2009 Hydraflow Storm Sewers Extension v6.052 i i i Storm Sewer Tabulation Page 1 Station Len Dmg Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd 1 Rim Elev Line ID coeff (I) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Dn Up Dn Up Dn Up Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ems) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 97.100 0.16 0.95 0.83 0.13 0.72 5.0 8.1 5.9 4.27 4.63 4.45 15 0.51 84.50 85.00 85.33 86.03 0.00 89.30 PCB1 To Det. 2 1 88.500 0.07 0.61 0.90 0.06 0.42 5.0 7.6 6.1 2.58 2.51 3.28 12 0.50 85.00 85.44 86.35 86.81 89..30 89.30 PC132 To PCB1 3 2 58.800 0.02 0.02 0.90 0.02 0.02 5.0 5.0 6.9 0.12 3.57 0.20 12 1.00 85.86 86.45 87.05 87.05 89.30 89.70 PCB3 To PC132 4 2 128.20C 0.22 0.52 0.44 0.10 0.34 5.0 5.2 6.8 2.34 2.52 2.99 12 0.50 85.44 86.08 87.05 87.61 89.30 89.50 PYD4 To PCB2 5 4 26.900 0.30 0.30 0.82 0.25 0.25 5.0 5.0 6.9 1.70 2.83 2.17 12 0.63 86.08 86.25 87.69 87.75 89.50 89.50 PC135 To PYD4 6 1 67.600 0.00 0.18 0.00 0.00 0.16 0.0 5.9 6.6 1.07 1.70 3.49 8 1.98 85.16 86.50 86.35 86.99 89.30 90.80 MH To PCB1 7 6 152.70 0.13 0.13 0.90 0.12 0.12 5.0 5.0 6.9 . 0.81 1.24 3.21 8 1.05 86.50 88.10 86.99 88.52 90.80 91.30 Roof 1 To MH 8 6 96.200 0.05 0.05 0.90 0.05 0.05 5.0 5.0 6.9 0.31 1.56 1.79 8 1.66 86.50 88.10 86.99 88.36 90.80 91.30 Roof2 To MH 9 End 88.700 0.44 0.44 0.90 0.40 0.40 5.0 &0 6.9 2.74 �3.63 4.62 12 1.04 86.50 87.42 87.21 88.12 0.00 91.10 PMH7 To Swale Project File: drainage.stm Number of lines:9 Run Date: 04-14-2009 NOTES:Intensity=53.16/(Inlet time+9.30)^0.77; Return period= 25 Yrs. ; c=cir e=ellip b=box Hydraflow Storm Sewers Extension v6.052 Hydraflow Table of Contents drainage.gpw Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hydrograph Return Period Recap ................................................................... 1 25 - Year SummaryReport .............................................................................................................. 2 HydrographReports ........................................................................................................ 3 Hydrograph No. 2, SCS Runoff, Pre Dev. Overland 1 ................................................... 3 TR-55 Tc Worksheet ................................................................................................. 4 Hydrograph No. 3, SCS Runoff, Pre Dev. Overland 2 ................................................... 5 TR-55 Tc Worksheet ................................................................................................. 6 Hydrograph No. 5, Combine, Pre Development To Podunk River ................................. 7 Hydrograph No. 7, SCS Runoff, Post Dev. Piped To Detention .................................... 8 Hydrograph No. 8, SCS Runoff, Post Dev. Parking lot overland and swale .................. 9 Hydrograph No. 9, SCS Runoff, Post Building and Courtyard ..................................... 10 Hydrograph No. 10, SCS Runoff, Post Dev. Overland 2 To Detention ........................ 11 Hydrograph No. 11, Combine, Post Dev. To Detention ............................................... 12 Hydrograph No. 12, Reservoir, Post Detention ............................................................ 13 PondReport - <New Pond> .................................................................................... 14 Hydrograph No. 14, SCS Runoff, Post Dev. Overland 1 ............................................. 15 TR-55 Tc Worksheet ............................................................................................... 16 Hydrograph No. 16, Combine, Post Development to Podunk River ............................ 17 • I Hydrograph Return Perioddra Reflow y ro 1y�a� y raphs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 2 SCS Runoff ----- ------- 0.697 ------- 1.668 2.622 3.746 4.644 5.659 Pre Dev.Overland 1 3 SCS Runoff ------ ------- 0.482 ------- 1.227 1.943 2.785 3.459 4.221 Pre Dev,Overland 2 5 Combine 2,3, ----- 1.039 ------- 2.558 4.055 5.856 7.300 8.936 Pre Development To Podunk River 7 SCS Runoff ------ ------- 2.026 ------- 2.830 3.464 4.138 4.641 5.185 Post Dev.Piped To Detention 8 SCS Runoff ------ ------- 1.248 ------- 2,008 2.641 3.336 3.866 4.444 Post Dev. Parking lot overland and 9 SCS Runoff ------ ------- 1.203 ------- 1.562 1.844 2.146 2.371 2.616 Post Building and Courtyard 10 SCS Runoff ---- ------- 0.502 ------- 1.028 1.498 2.038 2.462 2.936 Post Dev.Overland 2 To Detention 11 Combine 7,8,9, ------- 4.979 ------ 7.428 9.448 11.66 13.34 15.18 Post Dev.To Detention 10 12 Reservoir 11 ------- 0.235 ------- 1.263 2.575 2.897 3.157 3.415 Post Detention 14 SCS Runoff ------ ------ 0.266 ------ 0.676 1.071 1.536 1.907 2.327 Post Dev.Overland 1 16 Combine 12, 14, ------ 0.266 ------- 1.429 3.020 4.018 4.579 5.199 Post Development to Podunk River Proj. file: drainage.gpw Tuesday, Apr 14, 2009 �'� 2 Hydrograph Summary RedolrtHydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Hyd. Hydrograph Peak Time Time to Hyd. Inflow Maximum Total Hydrograph No. type flow interval peak volume hyd(s) elevation strge used description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 2 SCS Runoff 3.746 3 735 17,772 ------ ------ ----- Pre Dev.Overland 1 3 SCS Runoff 2.785 3 726 9,769 ----- ------ ----- Pre Dev.Overland 2 5 Combine 5.856 3 729 27,541 2,3, ------ ------ Pre Development To Podunk River 7 SCS Runoff 4.138 3 726 14,375 ------ ------ ------ Post Dev.Piped To Detention 8 SCS Runoff 3.336 3 726 11,100 ------ ------ ------ Post Dev.Parking lot overland and 9 SCS Runoff 2.146 3 726 8,254 ------ ------ ------ Post Building and Courtyard 10 SCS Runoff 2.038 3 726 6,912 ------ ------ ----- Post Dev.Overland 2 To Detention 11 Combine 11.66 3 726 40,640 7,8,9, ------ ------ Post Dev.To Detention 10 12 Reservoir 2.897 3 750 27,009 11 86.44 19,553 Post Detention 14 SCS Runoff 1.536 3 726 5,386 ------ ---- ------ Post Dev.Overland 1 16 Combine 4.018 3 729 32,395 12, 14, ------ ------ Post Development to Podunk River drainage.gpw Return Period: 25 Year Tuesday, Apr 14, 2009 Hydrograph Report 3 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 2 Pre Dev. Overland 1 Hydrograph type = SCS Runoff Peak discharge = 3.746 cfs Storm frequency = 25 yrs Time to peak = 735 min Time interval = 3 min Hyd. volume = 17,772 cuft Drainage area = 2.580 ac Curve number = 61* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 16.20 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)_[(2.580 x 61)]/2.580 Pre Dev. Overland-1 Q (cfs) Hyd. No. 2--25 Year Vol (%) 4.00 100 1.100 3.00 75 2.00 50 1.00 25 0.00 ZV10 0 180 360 540 720 900 1080 1260 1440 1620 - Hyd No. 2 Time (min) . - Hyd Volume TR55 Tc Worksheet 4 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Hyd. No. 2 Pre Dev. Overland 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 100.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 2.25 0.00 0.00 Travel Time (min) = 13.51 + 0.00 + 0.00 = 13.51 Shallow Concentrated Flow Flow length (ft) = 297.10 0.00 0.00 Watercourse slope (%) = 1.30 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.84 0.00 0.00 Travel Time (min) = 2.69 + 0.00 + 0.00 = 2.69 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 TotalTravel Time, Tc .............................................................................. 16.20 min Hydrograph Report 5 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 3 Pre Dev. Overland 2 Hydrograph type = SCS Runoff Peak discharge = 2.785 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 9,769 cuft Drainage area = 1.560 ac Curve number = 61* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)_[(1.560 x 61)]/1.560 Pre Dev. Overland 2 Q (cfs) Hyd. No. 3--25 Year Vol (%) 3.00 100 2.00 67 1.00 33 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 - Hyd No. 3 Time (min) Hyd Volume TR55 Tc Worksheet 6 Hydraflow Hydrographs Extension for AutoCADO Civil 3D®2008 by Autodesk, Inc.v6.052 Hyd. No. 3 Pre Dev. Overland 2 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 3.25 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 8.13 + 0.00 + 0.00 = 8.13 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 4.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 3.42 0.00 0.00 Travel Time (min) = 0.49 + 0.00 + 0.00 = 0.49 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 TotalTravel Time, Tc .............................................................................. 8.60 min Hydrograph Report 7 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 5 Pre Development To Podunk River Hydrograph type = Combine Peak discharge = 5.856 cfs Storm frequency = 25 yrs Time to peak = 729 min Time interval = 3 min Hyd. volume = 27,541 cuft Inflow hyds. = 2, 3 Contrib. drain. area= 4.140 ac Pre Development To Podunk River Q (cfs) Hyd. No. 5--25 Year Vol (%) 6.00 100 5.00 83 4.00 67 3.00 50 2.00 33 1.00 17 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 Time (min) Hyd No. 5 Hyd No. 2 — Hyd No. 3 Hyd Volume Hydrograph Report 8 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 7 Post Dev. Piped To Detention Hydrograph type = SCS Runoff Peak discharge = 4.138 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 14,375 cuft Drainage area = 0.940 ac Curve number = 89* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Composite(Area/CN)_[(0.710 x 98)+(0.230 x 61)]/0.940 Post Dev. Piped To Detention Q (cfs) Hyd. No. 7--25 Year Vol (%) 5.00 100 4.00 80 3.00 60 2.00 40 1.00 20 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 7 Time(min) Hyd Volume 9 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 31D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 8 • Post Dev. Parking lot overland and swale Hydrograph type = SCS Runoff Peak discharge = 3.336 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 11,100 cult Drainage area = 1.000 ac Curve number = 77* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 "Composite(Area/CN)_[(0.440 x 98)+(0.560 x 61)]/1.000 Post Dev. Parking lot overland and swale Q (cfs) Hyd. No. 8--25 Year Vol 4.00 100 3.00 75 2.00 50 1.00 25 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 8 Time (min) - Hyd Volume Hydrograph Report 10 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 9 Post Building and Courtyard Hydrograph type = SCS Runoff Peak discharge = 2.146 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 8,254 cuft Drainage area = 0.440 ac Curve number = 98* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)_[(0.440 x 98)]/0.440 Post Building and Courtyard Q (cfs) Hyd. No. 9--25 Year Vol (%) 3.00 100 2.00 67 1.00 33 0.00 04 0 0 180 360 540 720 900 1080 1260 1440 - Hyd No. 9 Time(min) Hyd Volume Hydrograph Report 11 Hydraflow Hydrographs Extension for AutoCAD®Civil 3DO 2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 10 Post Dev. Overland 2 To Detention Hydrograph type = SCS Runoff Peak discharge = 2.038 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 6,912 cuft Drainage area = 0.900 ac Curve number = 66* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 5.00 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)_[(0.120 x 98)+(0.780 x 61)]/0.900 Post Dev. Overland 2 To Detention Q (cfs) Hyd. No. 10--25 Year Vol (%) 3.00 100 2.00 67 1.00 33 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 Hyd No. 10 Time (min) Hyd Volume Hydrograph Report 12 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 11 Post Dev. To Detention Hydrograph type = Combine Peak discharge = 11.66 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 40,640 cuft Inflow hyds. = 7, 8, 9, 10 Contrib. drain. area= 3.280 ac Post Dev. To Detention Q (cfs) Hyd. No. 11 --25 Year Vol (%) 12.00 100 10.00 83 8.00 67 6.00 50 4.00 33 2.00 17 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 • Hyd No. 11 Hyd No. 7 - Hyd No. 8 Hyd No. 9 Time (min) Hyd Volume Hyd No. 10 Hydrograph Report 13 Hydraflow Hydrographs Extension for AutoCADO Civil 3DO 2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 12 . Post Detention Hydrograph type = Reservoir Peak discharge = 2.897 cfs Storm frequency = 25 yrs Time to peak = 750 min Time interval = 3 min Hyd. volume = 27,009 cuft Inflow hyd. No. = 11 - Post Dev. To Detention Max. Elevation = 86.44 ft Reservoir name = <New Pond> Max. Storage = 19,553 cuft Storage Indication method used. Post Detention Q (cfs) Hyd. No. 12--25 Year Vol (%) 12.00 100 10.00 00� 83 • 8.00 67 6.00 50 4.00 33 2.00 17 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 • Hyd No. 12 - Hyd No. 11 ® Total storage used = 19,553 cult Time (min) Hyd Volume Pond Report 14 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 Pond No. 1 - <New Pond> Pond Data Contours-User-defined contour areas.Conic method used for volume calculation.Begining Elevation=84.50 ft Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sqft) Incr.Storage(cuft) Total storage(cuft) 0.00 84.50 6,897 0 0 0.50 85.00 8,351 3,806 3,806 1.50 86.00 11,377 9,824 13,630 2.50 87.00 15,664 13,462 27,092 Culvert/Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise(in) = 10.00 0.00 0.00 0.00 Crest Len(ft) = 20.00 0.00 0.00 0.00 Span(in) = 10.00 0.00 0.00 0.00 Crest El.(ft) = 86.00 0.00 0.00 0.00 No.Barrels = 1 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El.(ft) = 84.50 0.00 0.00 0.00 Weir Type = Riser Rect --- --- Length(ft) = 34.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000(by Wet area) Multi-Stage = n/a No No No TW Elev.(ft) = 0.00 Note:Culvert/Orifice outflows are analyzed under inlet(ic)and outlet(oc)control. Weir risers checked for orifice conditions(ic)and submergence(s). • Stage(ft) Stage/Discharge Elev(ft) 3.00 87.50 2.00 86.50 1.00 85.50 0.00 L 84.50 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 Total Q Discharge(cfs) Hydrograph Report 15 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk,Inc.v6.052 Tuesday,Apr 14,2009 Hyd. No. 14 . Post Dev. Overland 1 Hydrograph type = SCS Runoff Peak discharge = 1.536 cfs Storm frequency = 25 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 5,386 cuft Drainage area = 0.860 ac Curve number = 61* Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 8.60 min Total precip. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 *Composite(Area/CN)_[(0.860 x 61)]/0.860 Post Dev. Overland 1 Q (Cfs) Hyd. No. 14--25 Year Vol (%) 2.00 100 • 1.00 50 0.00 0 0 180 360 540 720 900 1080 1260 1440 1620 - Hyd No. 14 Time (min) Hyd Volume TR55 Tc Worksheet 16 Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk,Inc.v6.052 Hyd. No. 14 iPost Dev. Overland 1 Description A B C Totals Sheet Flow Manning's n-value = 0.240 0.011 0.011 Flow length (ft) = 50.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 3.25 0.00 Land slope (%) = 2.00 0.00 0.00 Travel Time (min) = 8.13 + 0.00 + 0.00 = 8.13 Shallow Concentrated Flow Flow length (ft) = 100.00 0.00 0.00 Watercourse slope (%) = 4.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 3.42 0.00 0.00 Travel Time (min) = 0.49 + 0.00 + 0.00 = 0.49 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 • Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 TotalTravel Time, Tc .............................................................................. 8.60 min JOB# DRAWN BY DATE TO CHECKED BY DATE SCALE DESIGNI.I_C __'� y"----- rcra_. _ _- SZ�a, ZMP__GoVf.2ftb�_ -- ra - -W4�_ iz�® t } �, �j-----b,1�1_a�e _ r __Iz _oc�S+pjs _!t _ - - z , - - } , t-'s -� - - - - 1 - }' T V kttsllorJ 12,�i/r� - acss/_ T)eTGrSiior� - � �r • 5 s£ [Lc?bko �kNO _tyt7lP�tEcktah� Stirc. Np �e3wL -- --�Z A---- - - - - - CC�"Ze �ri _ + —------------ 7— - - ---------- ---------` - - - - - - - - - �L t ------------ -- - , - w��n__. s�� _s� ra ��aE , p q, _cam -_---F - - --- Z� - - - -- � SN wdr a_�P_oJtOc , Zi caa � w __ �,COR�6E i - - _ sopMisti-cated Old Post Once Plaza - -- 14 West Main Street -- lWuite 201 - _ - -- -- New Britain,CT . - - - - 06051 --<-- _ - P:860-612-1700 __- _ ___-_- __ -_ F:860-612-1757 - - -- todesignllc.com __ Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 n Hyd. No. 11 -Post Dev. To Detention Hydrograph type = Combine Peak discharge = 15.18 cfs Storm frequency = 100 yrs Time to peak = 726 min Time interval = 3 min Hyd. volume = 53,055 cuft Inflow hyds 7, 8, 9, 10 Contrib. drain. area= 3.280 ac Post Dev. To Detention Q (cfs) Hyd. No. 11 -- 100 Year Vol (%) 18.00 100 5.00 � _ _ y 83 12.00 67 9.00 50 6.00 33 3.00 17 0.00 0 0 3 6 9 121j3. `15 18 21 24 27 Hyd-No. 11 Hyd No. 7 � Hyd No. 8 — Hyd Na 9 Time (hrs) • Hyd Volume Hyd No. 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD®Civil 3D®2008 by Autodesk, Inc.v6.052 Tuesday,Apr 14,2009 v Hyd. No. 12 *Post Detention Hydrograph type = Reservoir - Peak discharge = 3.415 cfs Storm frequency = 100 yrs Time to peak = 750 min Time interval = 3 min Hyd. volume = 39,425 cuft Inflow'hyd. No. = 11 - Post Dev. To Detention Max. Elevation = 86.90 ft Reservoir name = <New Pond> Max. Storage = 25,665 cuft Storage Indication method used. Post Detention Q (cfs) Vol (%) Hyd. No. 12 -- 100 Year 18.00 100 15.00 _ 83 12.00 67 9.00 50 6.00 33 3.00 17 0.00 0 0 3 6 9 12 15 18 21 24 27 Time (hrs) Hyd No. 12 Hyd No. 11 JHLLH-I Total storage used =25,665 cuft Hyd Volume JOB# DRAWN BY DATE T09 CHECKED BY DATE SCALE DESIGN u-c 2i PRq - - - -- _ -_ PCB CT, i7c�T. "DRF��eaAG _ MA r • I Tw, o3 �' - , _I 9Co�7S�� ,a ; - -- - - - - "6 �IfZ Cis - - -- - --- _-_ 7a1 t O -- --- - -` - - -- F r�t�uQe Y� R61TcrE� _ - f a+ ' - T -- - -- -- - - r � , ' f ------------------- - - -- s � I 1 t t Y:Gow A tE j 1 ft i wR= { QTd�. t,�0i lef 2 { 1 f f - - - - - -- - - - --- - - -_ __ _ s%te pes�gw` - ----- - --- - --- - ---- - - Old Post Office Plata _ *114 West Main Street Suite 201 -- New Britain,CT ------- ----- - - --- - --- - 06051 - - - - - - - - -- P:860-612-1700 F:860-612-1757 - -- - - - --'- - - todesignllc.com Culverts 8.7-17 • x Culvert 1 A End A nhS P 1 z 0.3 m (t It.)for reinforced �— concrete arNart end x I.a = CULVERT END PLAN VIEW Endwell X A A ------ ---- =1 x r----I_a---I ENDWALL PLAN VIEW • Etidwall Culvert End ` La . RP ................. .._..-I.......i._. 0%-�- f d IL 0.3 m n IL)for reinforced_„ concrete culvert end Geotwdile(separation)shotAd Sold condition warrant �� slmm`(ti+nij for stad riprap a LEGEND Max Inside pipe span ow-circular sections) �� Inside pipe diameteJr(circular sections) SECTION A—A Max Inside pipe rise (non-�sections) CULVERT END AND ENDWALL Rp Inside pipe diamaetperrr(ndradarsections) La etfd 'a°CfuNertend Sects 'f d aa,tdwadi (300 mm ry2 in: Modified nfiFed d = t 450 mm 1P8 M. ed 900 arm 36'-dn. Standard Riprap X Wi IW Type A Riprap Apron 3, 3 p 38p+0.7 La Type Riprap Apron . 3S +O.d La Figure 8-9 Type A and B Riprap Apron (to be used where there is no defined channel downstream of the outlet) October 2000 ConnDOT Drainage Manual OUTLETDIAMETER OR in- 53 71 • �.,,..,,`.x�'y°C,.,;u,-cj,�9...®®f_'c�.�.�.�."yL� _.rya€ .,�.: � .,;w- �s i � ::� • �"z��,.sr:7..� '��.-r-�.e�'��.��®�it�..-e� ��>���ti�gl,�. ._ r3�..��?..._j�'�" ei'� �..��-�� ,.;arn tp -70 IMME z 1 ITT t' s i 1 �� 91is 9..f � ,y'.:�Sa i ...=._.a.l s �a-4- • 7 ., { ,� • V �Z f dLem..c�i.K �'S� jaL�.......�u1�3. �... 5 a 5 • • • F §f tea#' t =ZZ"M 3a E5 '• .L ,.u. �'�.e..�a. 1 1 i 1 • 1 1 1 1 Hydrologic Soi roup—State of Connecticut a n 700600 700700 700800 700900 701000 701100 701200 701300 701400 701500 701600 701700 701800 701900 702000 702100 702200 41°51'9°' o 0 41°51,r, 0 0 47, 311 ypr « " O " Y � O °" • p0 1 m Yw� of �'"r".. • W � • M e� M ° . ^ a i ^ti l 4 4 xe v r a xt v,4*u.�"G� w vv �..,a >av . . ,d 1".v" .° � x; ,°." a � . ,vvv� , �^"",w• 7k � ° ^ , 700600 700700 700800 700900 701000 701100 701200 701300 701400 701500 701600 701700 701800 701900 702000 702100 702200 Map Scale:1:7,810 if printed on A size(8.5"x 11")sheet. rn � " Meters " A 0 100 200 400 600 ,ry\ Feet 0 400 800 1,600 2,400 USDA Natural Resources Web Soil Survey 2.1 4/7/2009 Conservation Service National Cooperative Soil Survey Page 1 of 4 • Hydrologic Soup—State of Connecticut • MAP LEGEND MAP INFORMATION Area of Interest(AOI) Map Scale:1:7,810 if printed on A size(8.5"X 11")sheet. F7 Area of Interest(AOI) The soil surveys that comprise your AOI were mapped at 1:12,000. Soils Please rely on the bar scale on each map sheet for accurate map 0 Soil Map Units measurements. Soil Ratings Source of Map: Natural Resources Conservation Service A Web Soil Survey LIRL: http://websoilsurvey.nres.usda.gov ® A/D Coordinate System: UTM Zone 18N NAD83 ® g This product is generated from the USDA-NRCS certified data as of B/D the version date(s)listed below. Soil Survey Area: State of Connecticut C Survey Area Data: Version 6,Mar 22,2007 C/D Date(s)aerial images were photographed: 8/14/2006 D The orthophoto or other base map on which the soil lines were Not rated or not available compiled and digitized probably differs from the background 4j imagery displayed on these maps.As a result,some minor shifting Political Features of map unit boundaries may be evident. 0 Cities Water Features . Oceans Streams and Canals Transportation Rails / Interstate Highways US Routes Major Roads Local Roads USDA Natural Resources Web Soil Survey 2.1 4/7/2009 211110 Conservation Service National.Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group-State of Connecticut Hydrologic Soil Group Hydrologic Soli Growp=Summary by Map Unrt `°State of onnect`icut Map unit symbol Map unit name Rating Acres in AOI Percent of AOI' 9 Scitico,Shaker,and Maybid soils D 14.0 5.2% 13 Walpole sandy loam D 66.7 24.7% 15 Scarboro muck D 9.3 3.4% 17 Timakwa and Natchaug soils D 1.2 0.4% I21A Ninigret and Tisbury soils,0 to 5 B 89.6 33.2% percent slopes I28A Elmridge fine sandy loam,0 to C 5.1 1.9% percent slopes 28B Elmridge fine sandy loam,3 to 8 C 23.3 8.6% percent slopes 36A Windsor loamy sand,0 to 3 percent A 2.1 0.8% slopes 36B Windsor loamy sand,3 to 8 percent A 15.6 5.8% slopes 9 108 Saco silt loam D 11.9 4.4% 306 Udorthents-Urban land complex B 22.2 8.2% 307 Urban land 9.1 3.4% • Totals for Area of Interest 270.1 100.0% 9 • USDA Natural Resources Web Soil Survey 2.1 4/7/2009 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group-State of Connecticut Description Hydrologic soil groups are based on estimates of runoff potential. Soils are g g p assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long-duration storms. The soils in the United States are assigned to four groups (A, B, C, and D)and three dual classes (A/D, B/D,and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential)when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission.' Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture.These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate(high runoff potential)when thoroughly wet. These consist chiefly of clays that have a high shrink-swell • potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. 9 Rating Options Aggregation Method. Dominant Condition Component Percent Cutoff. None Specified Tie-break Rule: Lower 9 USDA Natural Resources Web Soil Survey 2.1 4/7/2009 Conservation Service National Cooperative Soil Survey Page 4 of 4 rMpvPLANT SCHEDULE So-Up REWE LAND Sym.No. Deddum sTrName Common Name Size Root Comments WAREA Dedtluous Trees AC 4 Amelanchler canaderMs Shadblow Servloebemy 8-10'HT S&B Full&Derlse AS 6 Acer 58cchamm'Green Mountain' Green Mountain Super maple 3-31/2'C81. B&B FuA&Dense '•�" AA 2 Ane nubrum'Armstrong' Armstrong.Red Maple p 3-31/2"C &B Ful&Dense ti c ' AR 2 Acer mbrum'Red Sunset Red Sunset Red Maple 3-3 1/Y Clal. B&B FUN&Dense CONSERVATION ( »\ PC 4 PyruscalMryana'Chanticleef ChanBcleer Flawerirlg Pear 3-31/2-Cal. B&B Full&Dense SEED MIX ON -.A,,: l t1c BN 1 Belula nlgra'Hedlage' Heritage River Birch 10-12'HT B&B Multi-stem(3) SLOPES(TYP.) Shrubs 9 TOPSOIL/LAWN CA 20 Comus amomum Sifky Dogwootl 2.5'3'HT B&B Full&Dense CS 26 Comus sedoea Redosier Da L-5 (TYPJ gd 2.5'-3'HT B&B Full&Dense ( 11 IC 6 Ilex crenstat HeCg Helzll Holly 2.T3 HT B&S FuN&Dense 7 IG 45 Ilex gWbra'Shamradc• Shamrock Inkberry 2.5'3 HT B 8 B Full&Dense _ IV 40 Ilex verNClNala Winterberry 2.5'3 HT B&B Full&Dames.1 male per duster of 7 1 CS MP 18 Myri a pennsyNanka Northern Bayberry 2.5'3'HT B&e Fu9&Dense Pi 10 Pierls)apanira Mounfaln Flre' Mountain Flre Andromeda 2.5'3'HT B&B Full&Dense 'it _ —„ �- ,Q 5 VC 15 Vacdnlum carymbosum Highbush Blueberry 2.5'3'HT B&B Full&Dense _ VD 37 Vlt, dentatum Artowwaotl Viburnum 2.fV T HT B&B Full$Dense � Perennials CV o 140 Co—psis veri'cillala'Moonbeam' Moonbeam Mckseed 1GW 18•Spadng Co _ HS 200 Ham calls'Slele-0e-Oro' Stele de Om DaylMy 1 Gal. 18'Spacing WL SA 25 Sedum'Autumn Fire' Autumn Fire Sedum 1 G.J. 18"Spacing , I it VD - S,phist✓.ncM S:L—400 BASIN BOTTOM AND SWALE-WETLAND SEED MIX LendacapeAmhBeclare 7 Civil Engineering '. Mp New EndaM Welmlx 18 lbs/acre i ' - LAWN 6' - MOW STRIP ` ANsma plentago-aquatics Mud Plantain 114 wem wk,s1.swln zo1 (rvPJ 5 Ascleplas incarnate Swamp Milkweed ra p�,croasa ri IV Aster noel-beigo New York Aster FeWale•Tl5/ •• TOPSOIL/LAWN 9 L ' Eiders cernua Nodding But MadOold w,rotlaelgnlle.eom Carex connsa Bristly/Cosmos Sedge CO (TYP.) L-5 CA Cam crinita Fringed Sedge(Nodding) Carex IuPuNna Hop Sedge D Carex ludda Lurid Sedge(Shallow) !� i WETLAND SEE MIX Carex scopada Blunt Broom Sedge `V ' 4 Pi IN DETENTION Carex vulpinokfea Fox Sedge V SWALE(TYP.) i Eupalodu maculalum Spotted Joe Pye Weed i`; PC CO m Eupatodum panollalum son sat V i1 IG Gtyceria moderate Rattlesnake Grass Gv ' 2 I �. Gtyceria striate Fowl Mannegrass jun.. AR 100 \ \ Juns eilusus Soh Rush O HS \ Mknulue ringers Square Stemmed Monkey Flower Orlo usatnovirberNis Greeenne Inrsn ' �l .Z Sclrpus calklus s Wool Grass QC SclrpusvaNtlus Soft Stem Bulrush Q 5 2 Verbena hastens Blue Vervaln C `�i" V \ BASIN SIDE SLOPES-CONSERVATION SEED MIX O t5 5 1 New Enalard Conservati-WIMNfe Mix 51bWacre VC 11 AndropogongerarcN Big Blueslem Asdeplae isaca Common Milkweed ;I`��\'I U, 4 Aster novae- fillae New England Aster �. :i ur Pi Chamaocdsla fasdculata(Cassia L) Partridge Pea r\ l Q Desmodlum canadense Showy Tick Trefoli • 5 ` -\ Elymusvirginkus Soothe Joe Joel Rye O 1 Euthamiuoua g macrllatum On—Leaved G Weed .'i AA Eelhamlagramkdfoila(Soiltlago gJ Oness. R Goldenrod • 1 Fastuce rubs Creeping Red Fescue O v 2 HeNopels heilamholdes Ox Eye Sunflower Panicum dandeatinum Deer Tongue _ HS Panitum*gatm Swituch Grass RudbG"Ladnlala TaIlKi een Head Coneflowe rN r Schizachyrlum scopadum Little Bluestem SoNdago Juncea Early Goldenrod L.. Sorghaslmin means Indian Grass O W TOPSOIL/LAWN 9 5 2 AS r VG NOTES (TYPJ L-5 PJ IC \ \ 1.Seed Mix Source:New England Welland Plants(NEW P)Amherst,MA Ph.14131548-8000 www.newp.crom . 4 SA CV 50 1 IC IG C IV qC 5 i 2.Detention Basin to be planted under the direction and t 11 CV IC ' supervlslon of a licensed soil scientist. _ 3.Entire basin area to be seeded with wetland and mix as noted on plan. t 1 i IC IG � 'ti IC AS 7V tx� LEGEND a i EXISTING PROPOSED f PROPERTY LINE YARD LWE --- .... .. .. 3 ;ti4 r �—V— WETLAND LIMIT .i i ..� .\ '^t ..' t1 , r \,,. f - - Y .-. ...-: AREA \ 1 Y Y WETLAND REVIEW Y ' - 'IN _ BUILDING — j TOPSOIL a P411, LAN 5' VDY f/LAWN •• _TVPJOW STflIP 1 ... .. t WL Ud CURB JACiUNS'KI �'rS' .' TYP.> s BN `\�t`S LIGHT �a AIl$(C'iI[IIu'll'IE2i'll'.s's ii c 7 BOLLARD LIGHT N UPLIGHTS ► 15 MA.45IRI0 DRIVE As WL :3- SUITE 101 a i 5 -. y', BEH IN,CCT05087 IV i I DECIDUOUSTREES + 'j'�.[.860.82"221 125 CONSERVATION I FAXI%0.82" IV. AC 5 SEED MIX ON VD }_ 5 WL. T ; IV SLOPES(TYPJ i ;! sra•� .,.,,-S �` 7 CS 5 7 5 WETLAND SEED MIX I I �w) SMALL FLOWERING TREE O VD VC IV CA IN DETENTION BASIN _X.--z•A,' 47.ii3 -- �. SHRUBS 0000 PERENNIALS C. ,i TREECANOPV ..------ Planting Plan ! LANDSCAPING FOR PARKING NOTE: WETLAND SEED MIX 1.PRIOR TO THE PROPOSED SEEDING AND SHRUB PLANTINGS IN THE WETLANDS AND IN THE UPLAND AREA ADJACENT TO THE WETLANDS ALL INVASIVE PLANTS SHALL BE CUT CONSERVATION SEED MIX PROPOSED PARKING:46 PARKING.SPACES - DOWN AND SPRAYED WITH HERBICIDES.ONLY EPA APPROVED HERBICIDES SHALL BE LAWN SEEDING USED AND APPLIED BY A LICENSEDAPPICATOR.ALL INVASIVE REMOVALS AND REQUIREMENTS FOR PARKING AREAS WITH MORE THAN 30 PARKING SPACES: PROPOSED PLANTINGS SHALL BE SUPERVISEDBY THE TOWN ENVIRONMENTAL 10%OF INTERIOR PARKING SPACES AND ONE TREE FOR EACH 10 SPACES. PLANNER/CONSERVATION OFFICER. - CALCULATIONS: FERTILIZE ACCORDING TO SOIL TEST OR AT THE RATE OF 1000 LBS.PER ACRE 15.600 SF(TOTAL AREA OF PARKING)X.10.1560 SF OF LANDSCAPING AREA REQUIRED WITH 10-10-10 FERTILIZER.40%OF THE NITROGEN TO BE A SLOW RELEASE FORM. SURVEY REFERENCE LIME TO A.PHOF 6.5 AT A RATE OF 100 MS.PER 1000 SF. 0 46 SPACES/1 TREE PER IO SPACES.4.6 TREES REQUIRED HIME TO AR'N TEAR MIX RATE OF 100 M 4ff-NO. DRAWING NO. PROPOSED LANDSCAPING AREA:1578 SF PROPOSED SHADE TREES:10 35%KENTUCKY BLUEGRASS SURVEY INFORMATION FROM PLAN ENTITLED:'BOUNDARY/ 5033A-L PROPOSED LANDSCAPING AREA INCLUDES INTERIOR ISLANDS AND TERMINAL PLANTING AREAS. 35%CREEPING RED FESCUE TOPOGRAPHIC SURVEY"PREPARED FOR THE TOWN OF SOUTH THE PROJECT ADDRESS JS 7655ULLIVAN AVENUE. SCALE 1'-JO �_� ALLPROPOSED LANDSCAPING PARKING ISLANDS AND TERMINAL PLANTING AREAS ARE A 20%FIESTA 3 PERENNIAL RYEGRASS WINDSOR WEST ROAD AND SULLIVAN AVENUE,SOUTH 30 0 30 60 MINIMUM OF B'WIDE AND CONTAIN AT LEAST ONE TREE. 10%EXPRESS PERENNIAL RYEGRASS WINDSOR,CT,SCALE I".50',DATED 3130/09,BY GARDNER+ APPLICANTS NAME:TOWN OF SOUTH WINDSOR, TOLLAND.PETERSO CT.ASSOCIATES I.I.C.178 HARTFORD TURNPIKE, 1540 SULLIVAN AVE,SOUTH WINDSOR CT 06074 DATE: OLLAND. PHONE:860-644-2511 1-30, NEW NAY 5,•2005 APRIL 14,2009 Stormwater Management Summary DESIGN LLC 625 Sullivan Avenue South Windsor, CT December 14,2006 Rev: January 12, 2007 The site is located on the southwest side of Sullivan Avenue (Route 194). The 7.6- acre parcel slated for development is currently undeveloped, primarily wooded, with multiple wetlands. The development involves the construction of a Fire and Ambulance Facility with associated parking and drives. Existing Drainage The site is relatively flat. Site topography generally falls between Elev 86 and Elev 88. Several wetlands are identified onsite, the primary ones occupying the northwest and southwest corners of the site. A drainage ditch, also identified as wetlands, runs from the southeast corner of the site, along the east property line to Sullivan Avenue. The most elevated area (Elev 88) in the central portion of the site drains to the a _' perimeter wetlands. The site is characterized by thick vegetation, depressions, and permeable soils that encourage onsite ponding and recharge. With the exception of larger storm events very little runoff generated on the property would be expected to exit the site. Groundwater is expected to be encountered between 3 and 6 feet below grade. Proposed Drainage and Stormwater Management The proposed development will occupy the bulk of the northern portion of the site and will add 1.94 acres of impervious surface. The ditch along the east side of the property, the southern wetlands, and over half the northern wetlands will be preserved. Wetlands mitigation areas are proposed to offset any remove wetlands. The design intent is to maintain existing drainage patterns, including the high degree of infiltration, and to prevent significant increases in peak runoff rates to the property lines. A detention basin with forebay will be used to control peak rates, provide water stormwater treatment, and allow stormwater infiltration. Where onsite drainage areas near wetlands have been reduced, roof runoff will be used to ensure recharge. The proposed stormwater management system has been designed to comply with the site pest sophisticaw ted 2004, Connecticut DEP, Connecticut Stormwater Quality Manual. Due to the ��■ proximity of wetlands, the following concepts have been incorporated into the design. Old Post Office Plaza 114 West Main Street Suite 201 New Britain,CT 06051 P:860-612-1700 F:860-612-1757 todesignlic.com Printed on Recycled Paper TO • With the exception of approximately 0.3 AC, runoff from all onsite paving DESIGNu-c will be directed to the detention basin for treatment. The forebay has been sized to hold 25% of the WQV. The basin has been designed with a six inch "wet" bottom below the lowest drain point. All catchbasins will have four foot sumps to promote capture of heavy suspended solids. The 0.3 AC of paving that is not routed through the detention basin is routed throughhooded, deep sump catch basins. • All outfalls for the stormwater management system will have outlet protection, either in the form of rip-rap aprons or vegetated plunge-pool level-spreaders. The storm sewer system proposed for this site has been developed in accordance with the CT DOT Drainage Manual. The pre and post-development runoff comparisons were made using TR-55 Hydrographs. The site has been assigned a soil type of"A". The onsite storm sewer system is designed for a 25-year storm event. The detention basin has been designed to route up to a 100-year storm event. Please find the following attachments: . 1. Pre and Post Development Drainage Area Summaries 2. Drainage Area Maps 3. Storm Sewer Calculations } 4. Pre and Post Development TR-55 Calculations 5. WQV Calculation and TST Sizing Calculation 6. Erosion Mat Specifications (level spreader) and Calculations 7. Rip Rap Sizing Calculation 8. Exfiltration Rate Calculation 9. Soils Map 10. Geotechnical Study for Proposed Fire and Ambulance Building, 4/5/06, Dr. Clarence Welti, P.E.,P.C. C � Mark G. Smith, P.E. soph%st%cated site Des%gw Old Post Office Plaza 114 West Main Street •Suite 201 New Britain,CT 06051 P:860-612-1700 F:860-612-1757 toclesignllc.com Printed on Recycled Paper Pre and Post-Development Drainage Area Summaries Date 1/12/2007 625 Sullivan Avenue South Windsor, CT Design Storm 25 yr C imp 0.9 C pery 0.2 Existing Conditions Total Impervious Pervious Tc Intensity Outfall acres acres acres Cava Min in/hr Pre Development South Wetlands 2.66 0 2.66 0.2 104.00 1.50 Pre Development North Wetlands 3.67 0 3.67 0.2 112.40 1.50 Pre Development to Eastern Ditch 1.26 0 1.26 0.2 89.30 1.70 Proposed Conditions Outfall PCB#2 0.05 0.05 0.00 0.90 5.00 6.70 PCB#3 0.38 0.38 0.00 0.90 5.00 6.70 PCB#4 0.13 0.13 0.00 0.90 5.00 6.70 • PCB#5 0.23 0.23 0.00 0.90 5.00 6.70 PCB#6 0.18 0.18 0.00 0.90 5.00 6.70 DETENTION 0.41 0.00 0.41 0.20 5.00 6.70 PYD#3 0.48 0.00 0.48 0.20 32.30 3.20 PYD#2 0.10 0.10 0.00 0.90 5.00 6.70 ROOF 1 0.36 0.36 0.00 0.90 5.00 6.70 PCB#1 0.22 0.22 0.00 0.90 5.00 6.70 PYD#1 0.23 0.05 0.18 0.20 5.00 6.70 PCB#7 0.08 0.08 0.00 0.90 5.00 6.70 ROOF 2 0.16 0.16 0.00 0.90 5.00 6.70 NORTH WETLANDS 1.67 0.00 1.67 0.20 92.70 1.70 SOUTH WETLANDS 2.30 0.00 2.30 0.20 93.60 1.64 EASTERN DITCH 0.61 0.00 0.61 0.20 72.70 1.90 KA • PRE AND POST-DEVELOPMENT HYDROGRAPH SUMMARY (CFS) Q 2-YR Q 10-YR Q 25-YR Q 100-YR OUTFALL PRE POST PRE POST PRE POST PRE POST SOUTH 0.02 0.02 0.18 0.17 0.32 0.30 0.60 0.57 WETLANDS NORTH 0.03 0.07 0.25 0.35 0.44 0.56 0.83 0.95 WETLANDS EASTERN 0.01 *0.045 0.09 *0.12 0.16 *0.23 0.31 *1.25 DITCH TOTAL 0.06 0.135 0.52 0.64 0.92 1.09 1.74 2.77 SITE *THIS IS CALCULATED BY SUBTRACTING THE DETENTION BASIN EXFILTRATION RATE FROM THE TOTAL FLOW OUT OF THE BASIN(HYDROGRAPH 7). THE EXFILTRATION RATE IS DETERMINED BY ENTERING THE STAGE VS DISCHARGE TABLE OF THE HYDROFLOW MODEL AT THE MAXIMUM WATER SURFACE ELEVATION(MWS EL)AND READING THE EXFILTRATION RATE. MAXIMUM WATER SURFACE ELEVATION STORM BASIN MWS EL EVENT (FT) Q 2-YR 86.06 Q 10-YR 86.91 Q 25-YR 87.31 Q 100-YR 87.63 70 kjoi3 � .. _ a tna ..� 280.18' 1" ••r•• S 53wiT E S 50 8'24 E 32w 3"aoMgr 31►- i SOUTH WETLANDS t ! ® t � t 12 f ' e�ow PVF RDOC PROPERi1E3.LI.0 HYD I CU (VM4.PAM M OENERALCOMMERCULLZONE CL vt / / - --- NVPlrANmoSRos..uc (V.1096,P.208) GENERAL f06EAERCYLL ZONE CD OR Ln .��.- M EASTERN DITCH �" � New Facitily for the South ,, �^ HY03 Windsor Fire and - �" Ambulance a g, SOUTH WINDSOR,CT 69 66 I 1' plpe fnd S 47.24'22' W Q .09' from corner W 1611ANEELEY b NORTH DS ,n g - (VARP-10 ' Pre Drainage do@BIALCOMMEAGm ALNE ___._— f • 69 - Map NA=CAaKiaO BROS.LLC (V.10w P.147) Date: JAN.7 . Scale: Not to Scale 'AIt GEN�MLCOA LZONE Checked Drawn By: RGS By: P ro' Ne: File: 5033A-L•Sfteplarl.DVJG W tQ ��� ��,, -.► a y+� �\ d' CIL y,, f� 3 ertrw41 y All j.. ' Ot c L° i 70 2sD.iB' tc 3/ mbar.. r fialD�011tr S 50'38'24"E 3a are esur S 53'33'17" E / S0LMfWETIA� j Yk — yt y" �L�► a2 CUTH W D 6t iM. tcA9N - I� EASTERN er i► / Er J� I Sn I DITCH ,Dw as s84 0 '� as A t to \ DETENTIONOR #+ 91 e, TH WETLA ko o+ t , PD#3 � PD#3 I �yD �� piLL N PCB New Facitily for the South Windsor Fire and It PCB#3 �11 Ambulance 09 °� y9 ROOF / 1' pipe fnd S 47'24'22' W SOUTH WINDSOR,CT C - / .09' from corner PYD#2 30' r Ci B#6 et PYD#2 - R Post Drainage g C p Map I / ROOF ROOF ROOF u a. Dare: JAN.1 . r NNot to C - �� 1 - \ n B. RGS scab[LT. I Chocked By. Project No: J PCB / - ® I - - Flre: 5033A-LSitW=I.DWG - r #7 M9 PCB#1 t r I Q 3P v rn c roa Ex Hekrwil.L`�� HyAflow Plan View Outfall *PET {a Outfall DET r- PC6S ,r. Pcl33,t� - - �4 +s 3 Roof- -Z pcgZ RaoF i PLO i 13 •t .■ Pcko yNaifall 'z'rN �,•10 12 9 Outfall were ►�s pce) N o e- R w�tR s Project File: drainage.stm _ No. Lines: 13 01-12-2007 Hydraflow Storm Sewers 2005 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor HGL Dns No. rate size length EL Dn EL Up slope down up loss Junct line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) (ft) No. • 1 PCB4 to Det. 5.61 18 c 59.7 86.13 86.43 0.503 87.27 87.43 0.47 87.90 End 2 PCB3 to PC134 4.46 15 c 148.0 86.64 87.38 0.500 88.00* 88.71* 0.21 88.92 1 3 PC132 to PC63 2.40 15 c 103.2 87.38 87.90 0.504 89.06* 89.21* 0.09 89.30 2 4 PYD2 to PC63 0.60 10 c 104.0 87.42 87.96 0.519 89.10* 89.18* 0.02 89.20 2 5 ROOF1 TO PC132 2.17 12 c 14.5 87.90 88.13 1.591 89.30* 89.35* 0.12 89.47 3 6 PYD3 to Det. 1.50 12 c 79.2 85.54 85.93 0.492 86.06 86.52 0.07 86.60 End 7 PC65 to PYD3 2.38 12 c 107.2 85.93 86.47 0.504 86.70 87.24 0.31 87.55 6 8 PC136 to PC65 1.09 12 c 152.4 86.47 87.23 0.499 87.73 87.89 0.06 87.95 7 9 PC137 to N.Wetland 2.41 12 c 14.2 86.00 86.10 0.704 86.68 86.78 0.29 87.68 End 10 PYD1 to PC137 0.70 8 c 29.4 86.43 86.57 0.476 87.29* 87.39* 0.03 87.42 9 11 PAD1 to PYD1 0.42 8 c 66.8 86.57 86.91 0.509 87.46 87.54 0.02 87.56 10 12 PCB1 to PCB7 1.33 12 c 129.6 86.10 86.73 0.486 87.31 87.48 0.07 87.55 9 13 Roof2 to N.Wetland 0.96 10 c 132.3 87.00 88.55 1.172 87.44 88.99 n/a 88.99 j End I a Project File: drainage.stm Number of lines: 13 Run Date:01-12-2007 NOTES: c=cir; e=ellip; b=box; Return period=25 Yrs. ;*Surcharged(HGL above crown). ;j-Line contains hyd.jump. Hydraflow Storm Sewers 2005 Page 1 St h Sewer Tabulation Station Len Drng Area Rnoff Area x C Tc Rain Total Cap Vel Pipe Invert Elev HGL Elev Grnd/Rim Elev Line ID coeff (1) flow full Line To Incr Total Incr Total Inlet Syst Size Slope Up Dn Up Dn Up Dn Line (ft) (ac) (ac) (C) (min) (min) (in/hr) (cfs) (cfs) (ft/s) (in) (%) (ft) (ft) (ft) (ft) (ft) (ft) 1 End 59.7 0.23 1.02 0.90 0.21 0.92 5.0 7.2 6.1 5.61 7.44 4.18 18 0.50 86.43 86.13 87.43 87.27 90.50 0.00 PCB4 to Det. 2 1 148.0 0.29 0.79 0.90 0.26 0.71 5.0 6.6 6.3 4.46 4.57 3.64 15 0.50 87.38 86.64 88.71 88.00 90.10 90.50 PC133 to PCB4 3 2 103.2 0.04 0.40 0.90 0.04 0.36 5.0 5.1 6.7 2.40 4.58 1.96 15 0.50 87.90 87.38 89.21 89.06 90.50 90.10 PCB2 to PCB3 4 2 104.0 0.10 0.10 0.90 0.09 0.09 5.0 5.0 6.7 0.60 1.58 1.11 10 0.52 87.96 87.42 89.18 89.10 90.30 90.10 PYD2 to PCB3 5 3 14.5 0.36 0.36 0.90 0.32 0.32 5.0 5.0 6.7 2.17 4.49 2.76 12 1.59 88.13 87.90 89.35 89.30 90.80 90.50 ROOF1 TO PCB 6 End 79.2 0.47 0.89 0.20 0.09 0.47 32.0 32.0 3.2 1.50 2.50 3.36 12 0.49 85.93 85.54 86.52 86.06 89.00 0.00 PYD3 to Det. 7 6 107.2 0.24 0.42 0.90 0.22 0.38 5.0 6.5 6.3 2.38 2.53 3.66 12 0.50 86.47 85.93 87.24 86.70 89.70 89.00 PC65 to PYD3 8 7 152.4 0.18 0.18 0.90 0.16 0.16 5.0 5.0 6.7 1.09 2.51 1.68 12 0.50 87.23 86.47 87.89 87.73 89.90 89.70 PCB6 to PC65 9 End 14.2 0.08 0.53 0.90 0.07 0.38 5.0 6.2 6.4 2.41 2.99 4.23 12 0.70 86.10 86.00 86.78 86.68 88.77 0.00 PCB7 to N.Wetla 10 9 29.4 0.05 0.23 0.90 0.05 0.11 5.0 5.9 6.4 0.70 0.83 2.00 8 0.48 86.57 86.43 87.39 87.29 88.50 88.77 PYD1 to PCB7 11 10 66.8 0.18 0.18 0.35 0.06 0.06 5.0 5.0 6.7 0.42 0.86 1.23 8 0.51 86.91 86.57 87.54 87.46 91.19 88.50 PAD1 to PYD1 12 9 129.6 0.22 0.22 0.90 0.20 0.20 5.0 5.0 6.7 1.33 2.48 1.89 12 0.49 86.73 86.10 87.48 87.31 88.90 88.77 PCB1 to PC137 13 End 132.3 0.16 0.16 0.90 0.14 0.14 5.0 5.0 6.7 0.96 2.37 3.32 10 1.17 88.55 87.00 88.99 87.44 90.90 0.00 Roof2 to N.Wetla Project File: drainage.stm _ Number of lines: 13 Run Date: 01-12-2007 NOTES:Intensity=101.98/(Inlet time+15.80)^0.90; Return period= 25 Yrs. Hydraflow Storm Sewers 2005 S&m Sewer Profile Piole: drainage.stm Elev. (ft) 99.00 Sta +00.00 Outf8la +59.69 Ln: 1 Sta +07.67- Ln: 2_ . _ _ _. Sta 3SM L34 8 Ln: 5 F . El. 90: 3- Rim El. 90.5 _ Rim I: 90.10 _ _ Ri I rt�9- 90.80 I. 86.13 In Inv. El.86.43 Out " Inv. L 87.38 ut Inv. 8hVIM �1t3 Out I Inv. El. 86.64 In _ __- Inv. L 87.38 n Inv. El. 87.9 In 96.00 93.00 90.00 103.21 L f-15"@ 0 50% 14. 6L 12"@D 1.59% .147.98 -15"@ 0 50% . 87.00 . ° 84.00 - — - --- ------ 0 25 50 75 100 125 150 175 200 225 250 275 300 325 ' 350 Reach (ft) Roo T-- I -ro OF I Hydraflow Storm Sewers 2005 S&m Sewer Profile Piele: drainage.stm Elev. (ft) 99.00 Sta. +00.00 Ouffafflta +59.69--Ln: 1 _ _ Sta 07.67- n: 2 - Sta 3+11.67- Ln:4 rn . El. 90.6 - Rim EL-90.50 - Rim I: 90.10 - Ri El. 90.30 D.86.13 n Inv. 1. 86.43. Out-. 1nv. 1. 87.38 Out Inv. El. 87.96 Out Inv. L 86.64 n _ - _. Iriv. A. 87.42 1 96.00 93.00 90.00 oe 104.0 -10"@0. 2% _ 147.98 f-15"@ 0. 0%. . ._ 87.00 . 84.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 Reach (ft) Hydraflow Storm Sewers 2005 S40rm Sewer Profile P le: drainage.stm Elev. (ft) 98.00 Sta +00.00 Outfall Sta 0 79.20 n: 6 Sta 1+86.4 - Ln:7 •- _ .St 3+38.85-Ln: 8 Grnd. El. 89. 4 - RimE I. 89:00 - - Ri El. 89. 0 - Ri El. 89.90 Inv. El. 85.5 In Inv. E.85.93 Out Inv El. 86.4 Out Inv. El. 87.23 Out Inv. E. 85.93 I Inv El. 86.47 In 95.00 92.00 89.00 I 152.4 Lf-12"@ 0.50% 86.00 ° 83.00 0 25 50 75 100 125 150 175 200 225 250 275 300 325 350 Reach (ft) PCt3 C Hydraflow Storm Sewers 2005 S-&m Sewer Profile • P le: drainage.stm Elev. (ft) 100.00 Sta + - Oulfall +32.30 - Ln: 1 Gr d. El. 90.83 Grn . El. 90.90 __. Inv. I. 88.55 Out In ..El. 87.00 In _ - 97.00 94.00 91.00 88.00 85.00 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 Reach (ft) Rood Z —ms N • WE—TL.AN05 Hydraflow Storm Sewers 2005 Sigm Sewer Profile • Pr : drainage.stm Elev. (ft) 99.00 Sta 0 00.00B:t .20- n: 9. Sta 0 43.60- 1- :10 _ Sta 1+1 .40-Ln: 11 - Grnd. El. OE116i 1. 88.77 Rim I. 88-50 _ _ ._ _ _ . _ Rim El. 1.19 Inv. E. 86 Olen 1. 86.10 Cut. Inv. El 86:57 O t__-- _ _ Inv.-EI. 8 .91 Out Inv. I. 86.43 Ir Inv. I. 86.57 In 93.00 90.00 87.00 ° 84.00 0 10 20 30 40 50 60 70 80 90 100 110 120 Reach (ft) P�fl 1 TO N- WE-FLAN DS- Hydraflow Storm Sewers 2005 S&m Sewer Profile P*e: drainage.stm Elev. (ft) 99.00 Sta 0+0 0£1 - Ln: 9 Sta 1+43.80--Ln: 12 FInrnd. Lf8 ®: 88. 7 _ RiEL 88.90 -EI. 8f h 86.10 Out _____ __ __ _ _ Inv: El. 86.73 Out Inv. El. 86.10In 96.00 93.00 90.00 87.00 14. .70 0 - _ 84.00 - — ---- - - -— 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 Reach (ft) Hydraflow Storm Sewers 2005 Table of Contents drainage.gpw Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:34 AM Hydrograph Return Period Recap ...................................................................... 1 25 - Year SummaryReport ................................................................................................................. 2 HydrographReports ........... ............................................................................................... 3 Hydrograph No. 1, SCS Runoff, Pre Development South Wetlands ................................ 3 TR-55 Tc Worksheet .................................................................................................... 4 Hydrograph No. 2, SCS Runoff, Pre Development North Wetlands ................................. 5 TR-55 Tc Worksheet ..................................... .......................... 6 . ..................................... Hydrograph No. 3, SCS Runoff, Pre Development to Eastern Ditch ................................ 7 TR-55 Tc Worksheet .................................................................................................... 8 Hydrograph No. 5, SCS Runoff, Post Dev. to Detention .................................................. 9 Hydrograph No. 7, Reservoir, Post Detention ................................................................ 10 PondReport ............................................................................................................... 11 Hydrograph No. 8, SCS Runoff, Post Development to Eastern Ditch ............................ 12 TR-55 Tc Worksheet .................................................................... ..... 13 ......................... Hydrograph No. 10, SCS Runoff, Post Development to South Wetlands ...................... 14 TR-55 Tc Worksheet .................................................................................................. 15 Hydrograph No. 11, SCS Runoff, Post Developement to North Wetlands ..................... 16 TR-55 Tc Worksheet .................................................................................................. 17 Hydrograph No. 13, Combine, Pre Development to Southwest Corner .......................... 18 Hydrograph No. 14, SCS Runoff, Pre Development to Eastern Ditch ............................ 19 TR-55 Tc Worksheet .................................................................................................. 20 . Hydrograph No. 16, Combine, Post Development to Southwest Corner ........................ 21 Hydrograph No. 17, Combine, Post Development to Eastern Ditch Final ...................... 22 I 1 Hydrograph Return Period Recap Hyd. Hydrograph Inflow Peak Outflow(cfs) Hydrograph No. type Hyd(s) description (origin) 1-Yr 2-Yr 3-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1 SCS Runoff ------- -------- 0.02 ----- 0.09 0.18 0.32 0.44 0.60 Pre Development South Wetlands 2 SCS Runoff ------ ------- 0.03 ------ 0.12 0.25 0.44 0.61 0.83 Pre Development North Wetlands 3 SCS Runoff ------- ------- 0.01 ------- 0.04 0.09 0.16 0.23 0.31 Pre Development to Eastern Ditch 5 SCS Runoff ------ ----- 2.61 ------- 4.31 5.75 7.34 8.55 9.88 Post Dev.to Detention 7 Reservoir 5 ------- 0.31 ----- 0.34 0.37 0.46 0.69 1.40 Post Detention 8 SCS Runoff ----- ------ 0.00 ----- 0.02 0.05 0.09 0.13 0.18 Post Development to Eastern Ditch 10 SCS Runoff ------- ------ 0.02 ------- 0.08 0.17 0.30 0.42 0.57 Post Development to South Wetlands 11 SCS Runoff ------ ----- 0.07 ------- 0.20 0.35 0.56 0.74 0.95 Post Developement to North Wetland 13 Combine 1,2, ------- 0.05 ------- 0.21 0.43 0.75 1.05 1.43 Pre Development to Southwest Come 14 SCS Runoff ------ ----- 0.01 ------- 0.04 0.09 0.16 0.23 0.31 Pre Development to Eastern Ditch 16 Combine 10, 11, ------ 0.08 -- -- 0.27 0.52 0.85 1.15 1.52 Post Development to Southwest Corn 17 Combine 7,8, ------- 0.31 ------- 0.36 0.42 0.54 0.82 1.54 Post Development to Eastern Ditch R S _ �' H(c ct 5 ►fxr:u ES xf,1LTa 1otN I '' o QE Pik E VOQ EKr-1L-r ATA CVS Q 12" Q,IN cFs SEA PEE I -I FD FCa,u 1S I X-)K POST OLVELONEKri �jz'' + potlr DaejbfMWT TO 6A VQ 3 O CrcK To elks- em 'MLq FINAL ,ICI r �9 'T flis c MPAP S TD U,1 PkE �ilecvP E� 01,7k eP 0 zr cxti�s is 1 �►br�llr A� 1proj. file: drainage.gpw Friday, Jan 12 2007, 11:33 AM Hydraflow Hydrographs by Intelisolve 2 Hydrograph Summary Report Hyd. Hydrograph Peak Time Time to Volume Inflow Maximum Maximum Hydrograph No. type flow interval peak hyd(s) elevation storage description (origin) (cfs) (min) (min) (cuft) (ft) (cuft) 1 SCS Runoff 0.32 10 870 7,340 --- ----- ------ Pre Development South Wetlands 2 SCS Runoff 0.44 10 870 10,127 ---- ------ ------ Pre Development North Wetlands 3 SCS Runoff 0.16 10 850 3,516 ---- ----- ------ Pre Development to Eastern Ditch 5 SCS Runoff 7.34 3 726 24,389 ---- ------ ----- Post Dev.to Detention 7 Reservoir 0.46 3 867 24,378 5 87.31 13,502 Post Detention 8 SCS Runoff 0.09 3 816 1,705 ---- ------ ------ Post Development to Eastern Ditch 10 SCS Runoff 0.30 10 850 6,417. --- ----- ------ Post Development to South Wetlands 11 SCS Runoff 0.56 10 820 10,494 --- ------ ------ Post Developement to North Wetland 13 Combine 0.75 10 870 17,467 1,2, ------ ----- Pre Development to Southwest Come 14 SCS Runoff 0.16 10 850 3,516 ---- ------ ----- Pre Development to Eastern Ditch 16 Combine 0.85 10 830 16,911 10, 11, ------ ----- Post Development to Southwest Corn 17 Combine 0.54 3 846 26,083 7,8, ----- ------ Post Development to Eastern Ditch Fi I drainage.gpw Return Period: 25 Year Friday, Jan 12 2007, 11:33 AM Hydraflow Hydrographs by Intelisolve Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007. 11:33 AM Hyd. No. 1 OPre Development South Wetlands Hydrograph type = SCS Runoff Peak discharge = 0.32 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 2.66 ac Curve number = 46 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 103.9996 min Total precip.: = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor . = 300 Hydrograph Volume=7,340 cult Pre Development South Wetlands Q (cfs) Hyd. No. 1 --25 Yr Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 7 10 13 17 20 23 27 30 Hyd No. 1 Time(hrs) TR55 Tc Worksheet 4 Hydraflow Hydrographs by Intelisolve Hyd. No. 1 l Pre Development South Wetlands Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 89.34 + 0.00 + 0.00 = 89.34 Shallow Concentrated Flow Flow length (ft) = 634.50 0.00 0.00 Watercourse slope (%) = •.0.20 0.00 0.00 Surface description = Unpaved Unpaved Paved Average velocity (ft/s) = 0.72 0.00 0.00 Travel Time (min) = 14.66 + 0.00 + 0.00 = 14.66 Channel Flow X sectional flow area (sqft) = 0.00 0:00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I Total Travel Time, Tc .............................................................................. 104.00 min Hydrograph Plot s Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 2 4)Pre Development North Wetlands Hydrograph type = SCS Runoff Peak discharge = 0.44 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 3.67 ac Curve number = 46 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 112.4 min Total precip.: = 5.75 in Distribution = Type Ill Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=10,127 cuft Pre Development North Wetlands Q (cfs) Hyd. No. 2--25 Yr Q (cfs) 0.50 0.50 0.45 0.45 0 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 7 10 13 17 20 23 27 30 Hyd No. 2 Time (hrs) 6 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Pre Development North Wetlands Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 89.34 + 0.00 + 0.00 = 89.34 Shallow Concentrated Flow Flow length (ft) = 998.25 0.00 0.00 Watercourse slope (%) = 0.20 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.72 0.00 0.00 Travel Time (min) = 23.06 + 0.00 + 0.00 = 23.06 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = ,0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I TotalTravel Time, Tc .............................................................................. 112.40 min Hydrograph Plot 7 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 3 OPre Development to Eastern Ditch Hydrograph type = SCS Runoff Peak discharge = 0.16 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 1.26 ac Curve number = 46 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 89.3 min Total precip.: = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=3,516 cult Pre Development to Eastern Ditch Q (cfs) Hyd. No. 3--25 Yr Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 7 10 13 17 20 23 27 30 0 — Hyd No. 3 Time(hrs) TR55 Tc Worksheet 8 Hydraflow Hydrographs by Intelisolve Hyd. No. 3 is Pre Development to Eastern Ditch Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 89.34 + 0.00 + 0.00 = 89.34 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 1 Total Travel Time, Tc................................................................................ 89.30 min Hydrograph Plot 9 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007. 11:33 AM Hyd. No. 5 Post Dev. to Detention Hydrograph type = SCS Runoff Peak discharge = 7.34 cfs Storm frequency = 25 yrs Time interval = 3 min Drainage area = 2.32 ac Curve number = 75.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of cone. (Tc) = 6 min Total precip.; = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=24,389 cult Post Dev. to Detention Q (cfs) Hyd. No. 5--25 Yr Q (cfs) 8.00 8.00 6.00 6.00 4.00 A.00 2.00 2.00 0.00 0.00 0 3 5 8 10 13 15 18 20 23 25 Hyd No. 5 Time(hrs) `Hydrograph Plot 10 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 7 Post Detention Hydrograph type = Reservoir Peak discharge = 0.46 cfs Storm frequency = 25 yrs Time interval = 3 min Inflow hyd. No. = 5 Max. Elevation = 87.31 ft Reservoir name = Detention 2 Max. Storage = 13,502 cuft Storage Indication method used., Hydrograph Volume=24,378 cult Post Detention Q (cfs) Hyd. No. 7--25 Yr Q (cfs) 8.00 8.00 6.00 6.00 4.00 14.00 2.00 2.00 0.00 - 0.00 0 4 8 12 16 20 24 28 32 36 40 Time(hrs) 10 - Hyd No. 7 Hyd No. 5 Pond Report Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:54 AM Pond No. 5 - Detention 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cult) Total storage(cult) 0.00 85.50 6.434 0 0 0.50 86.00 6,945 3,345 3,345 1.49 86.99 8,010 7,403 10,747 2.50 88.00 9,131 8,656 19,404 Culvert/Orifice Structures Weir Structures [A] [B] IC] ID] [A] [B] ICI [D] Rise(in) = 12.00 1.50 0.00 0.00 Crest Len(ft) = 4.00 0.33 0.00 0.00 Span(in) = 12.00 1.50 0.00 0.00 Crest El.(ft) = 87.50 87.17 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El.(ft) = 85.50 85.50 0.00 0*00 Weir Type = Riser Rect --- --- Length(ft) = 80.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 OHL Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes No No Exfiltration= 1.650 in/hr(Contour) Tailwater Elev.= 0.00 ft Note:Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage/Storage/Discharge Table Stage Storage Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 85.50 0.00 0.00 -- 0.00 0.00 _ 0.000 0.00 0.50 3,345 86.00 0.04 0.04 0.00 0.00 0.265 0.30 1.49 10,747 86.99 0.07 0.07 --- --- 0.00 0.00 --- --- 0.306 0.37 2.50 19,404 88.00 4.14 0.03 --- --- 3.59 0.53 --- --- 0.349 4.49 KIV b F W RTeit. IJQ �ET�►.S'�'I brJ I Pond Report Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Pond No. 5 - Detention 2 Pond Data Pond storage is based on known contour areas. Average end area method used. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cuft) Total storage(cult) 0.00 85.50 6,434 0 0 0.50 86.00 6,945 3,345 3,345 1.49 86.99 8,010 7,403 10,747 2.50 88.00 9,131 8,656 19,404 Culvert/Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise(in) = 12.00 1.50 0.00 0.00 Crest Len(ft) = 4.00 0.33 0.00 0.00 Span(in) = 12.00 1.50 0.00 0.00 Crest El.(ft) = 87.50 87.17 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El.(ft) = 85.50 :85.50 0.00 0.00 Weir Type = Riser Rect --- --- Length(ft) = 80.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope(%) = 0.50 0.00 0.00 0.00 N-Value = .013 .013 .013 .000 Orif.Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes No No Exfiltration= 1.650 in/hr(Contour) Tailwater Elev.= 0.00 ft Note:Culvert/Orifice outflows have been analyzed under inlet and outlet control. I Stage(ft) Stage/Discharge Stage(ft) 3.00 3.00 2.00 2.00 1.00 1.00 y 0.00 0.00 0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 Total Q Discharge(cfs) Hydrograph Plot 12 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 8 Post Development to Eastern Ditch. Hydrograph type = SCS Runoff Peak discharge = 0.09 cfs Storm frequency = 25 yrs Time interval = 3 min Drainage area = 0.61 ac Curve number = 46 Basin Slope 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 72.7 min Total precip.1 = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=1,705 cuft Post Development to Eastern Ditch Q (cfs) Hyd. No. 8--25 Yr Q (cfs) 0.10 0.10 0.09 0.09 0.08 0.08 0.07 0.07 0.06 0.06 0.05 ►0.05 0.04 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.00 0.00 0 3 5 8 1.0 13 15 18 20 23 25 28 Hyd No. 8 Time(hrs) TR55 Tc Worksheet 13 Hydraflow Hydrographs by Intelisolve Hyd. No. 8 fil Post Development to Eastern Ditch - Description `A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 116.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 72.74 + 0.00 + 0.00 = 72.74 Shallow Concentrated Flow Flow length (ft) = 0.00 0.00 0.00 Watercourse slope (%) = 0.00 0.00 0.00 Surface description' = Unpaved Paved Paved Average velocity (ft/s) = 0.00 0.00 0.00 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I Total Travel Time, Tc............................................................................... 72.70 min Hydrograph Plot 14 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 10 OPost Development to South Wetlands Hydrograph type = SCS Runoff Peak discharge = 0.30 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 2.30 ac Curve number = 46 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 93.6 min Total precip.. = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=6,417 cuft Post Development to South Wetlands Q (cfs) Hyd. No. 10--25 Yr Q (cfs) 0.50 0.50 0.45 0.45 0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 7 10 13 17 20 23 27 30 Hyd No. 10 Time(hrs) 0 TR55 Tc Worksheet 15 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Post Development to South Wetlands Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = :150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 89.34 + 0.00 + 0.00 = 89.34 Shallow Concentrated Flow Flow length (ft) = 289.40 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.14 0.00 0.00 Travel Time (min) = 4.23 + 0.00 + 0.00 = 4.23 Channel Flow X sectional flow area (sgft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 .Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I Total Travel Time, Tc .............................................................................. 93.60 min • ti Hydrograph Plot 16 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 11 *Post Developement to North Wetlands Hydrograph type = SCS Runoff Peak discharge = 0.56 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 2.36 ac Curve number = 52.8 Basin Slope . = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 92.7 min Total precip.: = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=10,494 cuft Post Developement to North Wetlands Q (cfs) Hyd. No. 11 --25 Yr Q (cfs) 1.00 1.00 0.90 0.90 10 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 3 7 10 13 17 20 23 27 30 • Hyd No. 11 Time(hrs) TR55 Tc Worksheet 17 Hydraflow Hydrographs by Intelisolve Hyd. No. 11 iPost Developement to North Wetlands Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.67 0.00 0.00 Travel Time (min) = '79.47 + 0.00 + 0.00 = 79.47 Shallow Concentrated Flow Flow length (ft) = 572.80 0.00 0.00 Watercourse slope (%) = 0.20 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 0.72 0.00 0.00 Travel Time (min) = 13.23 + 0.00 + 0.00 = 13.23 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) , = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I Total Travel Time, Tc............................................................................... 92.70 min Hydrograph Plot 18 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 13 SoPre Development to Southwest Corner Hydrograph type = Combine Peak discharge = 0.75 cfs Storm frequency = 25 yrs Time interval = 10 min Inflow hyds. = 1,_2 Hydrograph Volume=17,467 cult t Pre Development to Southwest Corner Q (cfs) Hyd. No. 13 --25 Yr Q (cfs) 1.00 1.00 0.90 0.90 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 3 7 10 13 17 20 23 27 30 Time (hrs) Hyd No. 13 Hyd No. 1 Hyd No. 2 Hydrograph Plot 19 Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:33 AM Hyd. No. 14 *Pre Development to Eastern Ditch Hydrograph type = SCS Runoff Peak discharge = 0.16 cfs Storm frequency = 25 yrs Time interval = 10 min Drainage area = 1.26 ac Curve number = 46 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = TR55 Time of conc. (Tc) = 97.3 min Total precip.; = 5.75 in Distribution = Type III Storm duration = 24 hrs Shape factor = 300 Hydrograph Volume=3,516 cuft Pre Development to Eastern Ditch Q (cfs) Hyd. No. 14--25 Yr Q (cfs) 0.50 0.50 0.45 0.45 i0.40 0.40 0.35 0.35 0.30 0.30 0.25 0.25 0.20 0.20 0.15 0.15 0.10 0.10 0.05 0.05 0.00 0.00 0 3 7 10 13 17 20 23 27 30 Hyd No. 14 Time(hrs) • 20 TR55 Tc Worksheet Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Pre Development to Eastern Ditch Description A B C Totals Sheet Flow Manning's n-value = 0.800 0.011 0.011 Flow length (ft) = 150.0 0.0 0.0 Two-year 24-hr precip. (in) = 3.25 0.00 0.00 Land slope (%) = 0.50 0.00 0.00 Travel Time (min) = 89.34 + 0.00 + 0.00 = 89.34 Shallow Concentrated Flow Flow length (ft) = 547.50 0.00 0.00 Watercourse slope (%) = 0.50 0.00 0.00 Surface description = Unpaved Paved Paved Average velocity (ft/s) = 1.14 0.00 0.00 Travel Time (min) = 8.00 + 0.00 + 0.00 = 8.00 Channel Flow X sectional flow area (sqft) = 0.00 0.00 0.00 Wetted perimeter (ft) = 0.00 0.00 0.00 Channel slope (%) = 0.00 0.00 0.00 Manning's n-value = 0.015 0.015 0.015 Velocity (ft/s) = 0.00 0.00 0.00 Flow length (ft) = 0.0 0.0 0.0 Travel Time (min) = 0.00 + 0.00 + 0.00 = 0.00 I Total Travel Time, Tc .............................................................................. 97.30 min • 21 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:34 AM Hyd. No. 16 Post Development to Southwest Corner Hydrograph type = Combine Peak discharge = 0.85 cfs Storm frequency = 25 yrs Time interval = 10 min Inflow hyds. = 10, 11 Hydrograph Volume=16,911 cuft Post Development to Southwest Corner Q (cfs) Hyd. No. 16--25 Yr Q (cfs) 1.00 1.00 0.90 0.90 • 0.80 0.80 0.70 0.70 0.60 0.60 0.50 10.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 - 0.00 0 3 7 10 13 17 20 23 27 30 Hyd No. 16 Hyd No. 10 Hyd No. 11 Time(hrs) ti 22 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 11:34 AM Hyd. No. 17 Post Development to Eastern Ditch Final Hydrograph type = Combine Peak discharge = 0.54 cfs Storm frequency = 25 yrs Time interval = 3 min Inflow hyds. = 7, 8 Hydrograph Volume=26,083 cuft Post Development to Eastern Ditch Final Q (cfs) Hyd. No. 17--25 Yr Q (cfs) 1.00 1.00 0.90 0.90 • 0.80 0.80 0.70 0.70 0.60 0.60 0.50 0.50 0.40 0.40 0.30 0.30 0.20 0.20 0.10 0.10 0.00 0.00 0 4 8 12 16 20 24 28 32 36 40 Time(hrs) • Hyd No. 17 Hyd No. 7 Hyd No. 8 JOB# DRAWN BY DATE CHECKED BY DATE SCALE DESIGN«c r - I f /1k/NfA-4 ; FRAM ;1N PE/lvi ou s____ScskFY _OF RR N,rAt:c �N 3 pcRE 6CSiN� /NTOIde ,R _ - -- � a 3 l,`l3 x y35c�e s �f t (orZZ�o , , f s 1Z�W X CcZZ ti - -t . s I"o2>r�iRy lo7a Lip 1 T W t1 STo,QM pa SN �f I&A( !? Ci;Atu6u�cAP-• - � o� t3E ' �1��T2►�T�O TNQn,�H ;- N�. NOj ,D_�_s�c�-1�42 _ti_ l �-- ;-- yK ' 04 �asT--PE7`acnrr��•�1='18,5��' ' _-�-- 5 C 4 �4t1!}Cif EO �1 yDRntti2�Pf1r� ti t EQ65/GNU /4NQ 3E01ti4E►v3�,f toN _ ,j c�(ATr: CgKAM" _ 1 3� cYl�ca 1 c l W ITH i s _ 1? Q Flcw' j- s-- - __ sophisticated p ti .- _;-_i i + i s siteAes%gw ANQ PEC.Foe�4T6N AT _!3(..ZS _SAStN . wiL� ' NPOV Va _ Old Post Otnce Plaza y— West Main Street o I�V { { i �T` v+LAbCr ! - r elte201 New Britain,CT 06051 -- --- -- — s P:860-612-1700 F:860-612-1757 todesignllc.com s Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 12:8 PM yd. No. 7 *PH ost Detention Hydrograph type = Reservoir Peak discharge = 0.34 cfs Storm frequency = 5 yrs Time interval = 3 min Inflow hyd. No. = 5 Max. Elevation = 86.50 ft Reservoir name = Detention 2 Max. Storage = 7,093 cuft Storage Indication method used. Hydrograph Volume=14,461 cuft I Post Detention 0 Q (cfs) Hyd. No. 7--5 Yr Vol (/o) 5.00 100 • 4.00 80 3.00 60 ZI 2.00 40 1.00 20 0.00 0 0 4 7 11 14 184-Sy,, 21 25 28 32 35 39 • Hyd No. 7 Hyd No. 5 �S'1 Req. Sfor=7,093 cult Time(hrs) Hyd Volume Hydrograph Plot Hydraflow Hydrographs by Intelisolve Friday,Jan 12 2007, 12:8 PM Hyd. No. 5 Wost Dev. to Detention Hydrograph type = SCS Runoff Peak discharge = 4.31 cfs Storm frequency = 5 yrs Time interval = 3 min Drainage area = 2.32 ac Curve number = 75.2 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 4.20 in Distribution = Type III Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume=14,472 cult I Post Dev. to Detention Q (cfs) Hyd. No. 5--5 Yr Vol (%) 5.00 100 104.00 80 3.00 60 2.00 40 1.00 20 0.00 0 0 3 5 8 10 1:PyW 15 18 20 23 25 Hyd No. 5 Time (hrs) Hyd Volume RooF Z io Nofzrtl w m-ANK North American Green-EECMDS Version 4.3 1/12 00007 0129 PM COM_PUTED BY: FIGS PROJECT NAME: South Windsor Fire and Ambulance �+PROJECT NO.: 5033A•L ROM STATION/REACH: ITO STATION/REACH: DRAINAGE AREA: DESIGN FREQUENCY: 100 yr HYDRAULIC RESULTS Discharge Peak Flow Velocity(fps Area(sq.ft) Hydraulic Normal DS_5(n=o.055 cfs Period hrs Radus ft De th fl Ir 1.1 0.5 1.63 0.61 0.06 0.06 S=0.2000 1 L B ttom J 1 3.0 Widt�i=10.00 It 3.0 I LINER RESULTS Not to Scale Matting Type Vegetation Characteristics Reach Stabi5tyAnalysis Permissible Calculated Safety Factor Remarks Staple Pattern Phase Class TyperDensOy Shear Stress Shear Stress (psn (psf) Straight DS75 Unvegetated 1.55 0.75 2.07 STABLE Staple D • Back to Input Screen 6 • • pca � -ra Nc�� t ��r���►os� North American Green•ECMDS Version 4.3 1/12/2007 12:28 PM COMPUTED BY: FIGS PROJECT NAME: South Windsor Fire and Ambulance PROJECT NO.: 5033A•L IFROM STATION/REACH: ITO STATION/REACH: IDRAINAGE AREA: IDESIGN FREQUENCY: 100 yr HYDRAULIC RESULTS Discharge Peak Flow Velocity(fps Area(so(t) Hydraulic Normal DS75(n=0.055) cfs Period his RY, ft Depth ft 3.0 0.5 1 2.68 1.12 0.10 0.11 S=0:2000 'L Bottom J 1 3.0 Width=10.00 It 3.0 1 LINER RESULTS Not to Scale Matting Type Vegetation Characteristics Reach StabiltyAnalysis Permissible Calculated Safety Factor Remarks Staple Pattern Phase Class Type Density Shear Stress Shear Stress (psf) (psf) Straight DS75 Unvegetated 1.55 1.35 1.15 STABLE Staple D • Back to Input Screen • JOB# DRAWN BY DATE CHECKED BY DATE SCALE DESIGN u.0 L-0(- to C-A C- < dvFQ CVC e AIM • ii E _T'b N. WCTL/4N0S - _ (QooF 1 i I G•' s � E r(rTiN ro f • SS1)M ' ►� �n wRr�Q � {- , -fi-- 1 Y 2 cb C F - tjLf 5 + 1 EyrhoL 3/4 i f s i 1 , 7 I i f1 , 7 t , t � I r { 1 i site Aesigw .f _.J,- _ ._ • -._t-__� _ _ _ _- '-`�-_ i + 1_ Old Post Office Plaza AftWest Main Street - ---a— e 201 - -f - — Rew Britain,CT ;- L 06051 P:860-612-1700 - F:860-612-1757 i todesignlic.com i JOB# DRAWN BY DATE TO CHECKED BY DATE SCALE { DESIGN LLC Rip Ra P CALeWOTioS -{ FQbM CT ba ARAJAA6e MAtJV4L 7Z)66 RIP RAP AP90r� { - PLQ '-1 'Tb O tTE Nr►o1J F i --- _ --� 1 RJLr�hT k Peto = J.1!1 r , a`F -- 4 4 I — -- - u5E Tyf c ,B 1 ! i 4 5;�t cFS f Few -M UC' S 7 t iT�kU It 4 I i 1 Z= Lg , LjL {__ __. _—----- TYPE l3 • QiP ,4Al�' �4 ,CoN' !5 3,� DSO f l I f- - - _ _ I Y uu i l C e t + so hast%cated ` ! Old Post Office Plaza , West Main Street �te 201 F - - , I E �_ . .. New Britain,CT I P860-612-1700 r_ t- T -- , F:860-612-1757 - -` todesignllc.com { ; Culverts 8.7-17 1 x Cutverf 1 r A Errs A I f— f l l 0.3 m 0 ft.)for reiM� I ncr (-- coefe etAaat end x La—=9 ]2 CULVERT END PLAN VIEW Endwall x ti A A t Wt � W2 —J L x r—L a—� ENDWALL PLAN VIEW r • Endwan ILI j GDvert End `.' d /'•,' . 0.3 m OIL)for rehfomed conaefe c~end tae V.9(separetlon)shotAd �g field oonrxuon wmrant ammand 300 mm"((112 n.)fors rand r omediste LEGEND Sp- IMM de ripe sW serm ons)) SECTION A—A `"dhrndw(draft�er�) Rp - max plpeaft (oiroUm se)dons) CULVERT END AND ENDWALL -La ap La' 'end 'of a�Avert'�'epend °"aeon �endr�ia0 d - {30o450 mm fe mm 2 h. h. titodfied f �k neaaf.rp 900 mm fn.SWXWd RO* _ X W 10�7 ype A prep Aeon 3` 3 p 33pLa ype S, 1a Figure 8-9 Type A and B Riprap Apron (to be used where there is no defined channel downstream of the butlet) l_ • October 2000 ConnDOT Drainage Manual Culverts 8.7-9 OUTLET PROTECTION-OUTLET VELOCITY< 14 feetlsec OUTLET PIPE DIAMETER OR SPAN in DISCHARGE 12 15 18 1 24 30 36 42 48 54 60 cfs 0-5 10 10 USE 5.5 12 11 6 12 12 MINIMUM 7 14 13 12 8 15 13 8.5 16 14 LENGTH 9 14 ►� 10 15 14 11 16 15 12 17 15 14 OUTLINED 13 18 16 15 14 17 15 14 16 18 16 15 14 18 48 16 15 20 19 17 16 �!: • 22 20 18 16 24 19 17 16 26 20 18 17 16 28 21 19 17 16 30 21 19 18 17 32 22 20 18 17 35 21 19 18 40 23 21 19 45 25 23 21 48 26 24 22 50 24 22 55 26 23 60 27 25 63 28 26 65 26 75 29 80 30 Table 8-7.1-Length- L,(feet) Type B or C Riprap Apron Notes: 1.Bold face outlined boxes indicate minimum 1.,to be used for a given pipe diameter or span. 2. Rounding and interpolating are acceptable. October 2000 ConnDOT Drainage Manual JOB a 5633"R--L DRAWN BY 4 DATE CHECKED BY DATE SCALE 7ESIGNu.0 �b EXFiLVINOW 2ATE 1 'PEf M£TC-ALF t EOPY WAST60AW ENr:.ImmCwc TA-8 LE I`A- ►� �'(�h1C�cNr✓p) 4N4 EY,fF. 4 561L ?TOES DES ��orcrlu«� STvoy "s 14 CLlkf2CNCE WEtTI' P.E/ PC, (REFER, 73 T4.B /0) 14 tit— Frf�E SDtuq �. _ F 1 f , • j • 11 i 1 i t � 1 ' 1 i 7 f : 1 sophisticated `• F � - si"tt 1 Post Ohice Plaza , West Man Street ite 201 New Britain,CT 06051 P:860-612-1700 {. F:860-612-1757 todesignllc.com 1 Q A TABLE 14-10 Approximate coefficients of permeability and the corresponding vertical percolation and assimilation rates for various soils based on soil texture Approximate Vertical percolation rate Vertical assimilation rate coefficient of corresponding to the corresponding to the permeability, K coefficient of permeability' coefficient of permeability' Soli texture ftld m/d min/in minh02mm gaUft2 d Um2 d Gravel,coarse sand 330-3,300 102-103 0.364-0.0364 1.5-0.15 2,470-24,700 105-106 Coarse to medium sand 33-330 10'-102 3.64-0.364 15-1.5 247-2.470 104-105 Fine sand,loamy sand 3.3-33 100-10, 36.4-3.6e 150-15 24.7—W 103-104 �—Sandy loam,loam 0.33-3.3 10`1-100 364-36.4 1,500-150 2.4 —24.7 102-103 Loam, porous sift loam 0.033-3.3 10-2-100 3,640-36.4 15,000-150 0.247-24.7 10'—103 Silty clay loam,clay loam 0.0033-0.33 10-3-10—' 36,460-364 15 x 104-15 x 102 0.0247-2.47 100-102 Clays.colloidal clays s0.0033 s10-3 >36,400 >15 x 104 :50.0247 :5100 *Computed values based on approximate coefficients of permeability assuming a unit hydraulic gradient(see Eq. 14-3). Note: it x 0.3048 - m gaUlf•d x 40.7458 - Lim'-d y/ y � C� o DESIGN un 11/O 2a0.18' r >: S 50 24'E m m dada S 5=17'E i 13 40 60 WADPOLE SANDY LOAM(13).THIS SERIES CONSISTS OF .9 0 DEEP,POORLY DRAINED SOILS FORMED IN SANDY 21A WATER DEPOSITED GLACIAL OUTWASH MATERIALS. � + �,► THEY ARE NEARLY LEVEL TO GENTLYfSLOPING SOILS ON GLACIOFLUVIAL LANDFORMS,TYPICALLY IN SHALLOW �, ,►�' �- DRAINAGE WAYS AND LOW-LYING POSITIONS ON �` '''� STREAM TERRACES AND OUTWASH PLAINS. THE SOILS d1 a FORMED IN LOAMY OVER STRATIFIED SAND AND o, c GRAVELLY OUTWASH DERIVED FROM A VARIETY OF �'" �► ACID ROCKS. TYPICALLY THESE SOILS HAVE A VERY DARK BROWN SANDY LOAM SURFACE LAYER 6 INCHES � THICK. THE SUBSOIL FROM 6 TO 23 INCHES IS MOTTLED, 13a a GREYISH BROWN SANDY LOAM. THE SUBSTRATUM (D �0 27A v �'" FROM 23 TO 60 INCHES IS MOTTLED,LIGHT BROWNISH GREY,GRAVELLY LOAMY SAND AND GRAVELLY SAND. " arm= p, NUF RAW PtiOPER'1�S,LLc 0 ' aa�1 ID N.W P.181) GENERAL C'"LZONE '" ,N TISBURY SILT LOAM(21A) THIS SERIES CONSISTS OF �_ 417v DEEP, MODERATELY WELL DRAINED SOILS FORMED IN A � - NYF D91NGE1.0 BRGS.,LLC COARSE-SILTY MANTLE UNDERLAIN BY SANDY WATER OR (V.10ftPM5) DEPOSITED GLACIAL OUTWASH MATERIALS. THEY ARE 00 LEVEL TO GENTLY SLOPING SOILS IN BROAD DRAINAGE Fd 40 SWALES AND LOW LYING POSITIONS ON OUTWASH I PLAINS AND TERRACES. THE SOILS FORMED IN LOAMY OVER STRATIFIED SANDY AND GRAVELLY GLACIAL { OUTWASH DERIVED MAINLY FROM AN ACID CRYSTALLINE ROCKS(GRANITE,GNEISS AND SCHIST). New Facitil for . 13 TYPICALLY THESE SOILS HAVE A VERY DARK GREYISH Y a. BROWN SILT LOAM SURFACE LAYER 81NCHES THICK. the South too. �. 13 THE SUBSOIL FROM 8 TO 26 INCHES IS YELLOWISH Windsor Fire and (0 BROWN AND BROWNISH YELLOW SILT LOAM,WITH E +� )" �'" Ambulance MOTTLES COMMON BELOW 16 INCHES. THE '1901 SUBSTRATUM FROM 26 TO 60 INCHES IS GREYISH BROWN,MOTTLED STRATIFIED SAND AND GRAVEL. SOUTH WINDSOR,CT q� 11 pot fnd S 471E41W V o13 J W fron corner C CL r 1 NVFNANEE1.EY 400- IC) CUM P.12M - o GEN+rRw. ouLZONE 13=WADPOLE SANDY LOAM Soil Map w U. NFDWIGELOBRMLLc 21A=TISBURY SILT LOAM o 01 (V taaa P.147) Data: July 14.2006 GENERA.COM ERCUL BONE - Drawn Ito Scale Cheated Br, (A 1iN�� if. pwim Na: O Fla: SO=-LSWplanl.DWG MA SL Raw c _ ¢ 13 ,N,in LL 3� .,, 0 3N N M7.49' V N 51 .. .. ••w! 6' --- /oat A 119x99 3� r DR. CLARENCE WELTI, P.E., P.C. rr GEOTECHNICAL ENGINEERING F'. 227 Williams Street • P.O. Box 397 Glastonbury,CT 06033 (860)633-4623/FAX(860)657-2514 April 5, 2006 Mr. Hap Fitts South Windsor Public Building Commission 1540 Sullivan Avenue South Windsor, CT 06074 Re: Geotechnical Study for Proposed Fire and Ambulance Building 625 Sullivan Avenue,South Windsor, CT Dear Mr. Fitts: 1.0 Herewith are boring data pertaining to the above. Nine borings were taken at the site. Six borings were taken at the proposed Fire Station structure to maximum depth of 51.5 feet,one boring was drilled at the future Training Tower to 21.5 feet, and two in proposed pavement areas to 11.5 feet. The borings were located in the field by Design Professionals.The locations are shown on the attached plan. The borings were drilled by Clarence Welti Associates, Inc. and sampling was conducted by this firm solely to obtain indications of subsurface;conditions as part of a geotechnical exploration program.No services were performed to evaluate subsurface environmental conditions. 2.0 The Subject Project will include the construction of a one to two story slab on grade Fire and Ambulance building with a footprint of 22,800 sf. There will be new pavements for parking and access to station by fire apparatus.The finished site grading or floor elevation were not available at the time of this report.The existing site grades in the area of the proposed development are generally at about Elev.88,with a few localized low spots down to about Elev.86.Sullivan Avenue is at about Elev.89.5. 3.0 The Geologic origin of the natural soils at the site and environs is from glacial lake depositsrhe deposits consist generally of fine to medium Sand with trace to little Silt ta:12�1 ' et grade, overlying a varved Clay stratum which extends to at least 100 feet 3.1 .The Soils Cross Section from the borings is generally as follows:, Topsoil to 2" to 6" Locally Subsoils; SILT and fine SAND to about 2 feet, loose frost disturbed soils Fine to Fine to medium SAND, trace to little Silt to 12 to 16 feet below grade, loose to medium compact Varved CLAY and SILT to 100+ feet, soft to medium stiff 3.2 The Water Table was at 3 to 6 feet below the below the existing grades at the completion of the borings. 4.0 The Criteria for Foundation Type and Loading are normally as follows: 1. The maximum total settlement shall not exceed V and the maximum differential settlement shall not exceed '/z the maximum settlement. .2.The foundation and structure design must address seismic requirements of the building code. 3. The Slab on Grade must not settle differentially more than 1/z" in excess of the structure subsidence. These criteria are those normally applied to structure of similar character.If the,structural engineer or owner has other criteria, the writer should be notified for possible suppleental input. 4.1 Regarding item 2 (above) the IBC site soils classification is "B". The mapped MCE spectral accelerations for the site are Ss=0.273 for a short period, and S 1=0.085 for a 1 second period. For transfer of ground shear into the soils the friction factor between the concrete and the soil can be 0.55. 5.0 Regarding Foundation Type the logical type will be spread footings.The footings can be placed on the natural soils at least 3.5 feet below final grades (required frost depth), and at least 2.5 feet below existing grades, or on a controlled fill placed after the removal of any existing fills, topsoil, and frost disturbed subsoils(assumed at least 2.5 feet below existing grades).Controlled fills should conform to section 6.0 below and should extend outside of foundations for a distance equal to at least the depth of fill beneath foundations. There should be a minimum 6" layer of 3/8" crushed stone beneath footings and beneath controlled fills where on a wet sub grade. The stone will provide a stable base and a medium for temporary dewatering of the footing sub grade. The stone sho e placed immediately after the excavation to sub grade is made with flat bladed bucket. AdaioTlal stone thickness may be required where foundations extend below the watet iAle:,.: k 5.1.The allowable net bearing pressure for spread footings placed either on the crushed stone over the natural soils or on the controlled fill can be 1.5 Tons/sf. The minimum footing width for walls footings shall be 2.0 feet and the minimum column footing shall be 3 feet x 3 feet. 2 5.2 The Frost Protection Depth (by code) is 3.5 feet below%finish grades in areas, which are exposed to weather. 5.3 The lateral loading on retaining walls (if any) which are a part of the structure shall be with at rest pressure using the pressure coefficient cited in section 5.4 below. 5.4 The following is the design parameter summary: it Soil Weight (Backfill) * 125 pcf At Rest Coefficient 0.45 Active Coefficient 0.28 Allowable Bearing Pressure 3,000 psf Frost Protection Depth 3.5 feet Sliding Coefficient 0.55 MC Site Soil Classification "E" Mapped MCE Spectral Acceleration SS 0.273 ` (for a short period) Mapped MCE Spectral Acceleration S p ' 0.085 (for a 1 second period) * Based on gradation cited below 6.0 Regarding Controlled Compacted Structural Fill,Slab Underlayment(to within 4"of slab), and Backfill of Excavations the material shall conform to the following gradation or be 3/8" crushed stone. 100 3.5" 50 - 100 3/4" 25 -75 No.4 The fraction, passing the No.4 sieve shall have less than 10%,passing the No. 200 sieve. 6.1 All backfill and fill must be compacted to at least 95% of modified optimum density. 3 6.2 There should be a minimum 16" layer controlled fill conforming to section 6.0 above beneath the floor slab. The 4" layer directly beneath the slab on grade in the office and living space shall be with 3/8" crushed stone. In the truck bay areas there should be a minimum 8" layer of processed aggregate base directly beneath the floor. 7.0 Regarding Earthwork the soils are in OSHA Class C and all excavations deeper than 5 feet, which are unshored, must be cut back to slopes less than 34°. e ,� r�... 31� '' � - •.+.- , •. t.� r 8.0 Regarding Pavement Construction there fit' �east;lb gt`ai+eltibbdsb ath (3avement seeticl�ns.The gravel subbase should be material which conforms to section 6.0 above.�he initial preparation for pavement construction will include stripping of topsoil and subsoils and ,compacting the sub grade with at least 6 passes of a vibratory roller with a minimum,static.,weight Q„of-15 Tiros. It is presumed the pavement grades will be at or above the existing grades and the•high water table would be at least 3 feet below the finished pavement grades. i 8.1 The recommended pavement sections atop the gravel subbase are as follows: For.passenger car parking: 2.5" Bituminous Concrete on 6" Processed Stone Base For Fire Truck Access areas: 5.0" Bituminous Concrete on 8" of Processed Stone Base i 8.2 For the design of concrete pavements the sub grade modulus atop the 8"of processed base would i be at least 250 pci. The required concrete thickness in areas used by Fire Apparatus would typically be about T'. 9.0 Regarding the effects of areal loading on the deep clay stratum, the clay has been pre- consolidated in past geologic history. This pre-consolidation reduces (but does not eliminate) the propensity to consolidation. With an areal loading from 3 feet of filling (about 400 psf or 0.20 Ton/sf) the estimated maximum settlement due to clay consolidation would be about 1". This settlement would occur at the center of the filled area (center of building). The settlements at the edge of the filled area would be about t/x of the above amount.The additional stresses within the clay stratum from structural footings loadings would be minimal. The above settlements would be in addition to the normal elastic settlements which will occur in the sand.The settlements in the sand would be less than 3/4" and would occur as the loading is placed. About 90% of the clay consolidation would be over a period 18 months. While the total settlements (sand + clay consolidation), with the 3 feet of fill on the site, may exceed the above criteria the differential settlement between columns would probably not exceed '/z" (i.e.<VY' in 50 feet). The estimated settlements are not untypical of many nearby structures,which have been elevated above the existing grades. The performance of such buildings has generally not been affected, either functionally or aesthetically. With the actual floor slab elevation and site grading within 2 feet of the existing grades the foundation and floor slab settlements would be within the performance criteria cited in section 4.0 above. 4 10.0 This report has been prepared for specific application to the subject project in accordance with generally accepted soil and foundation engineering practices. No other warranty,express or implied, is made. In the event that any changes in the nature, design and location of structures are planned, the conclusions and recommendations contained in this report should not be considered valid unless the changes are reviewed and conclusions of this report modified or verified in writing. The analyses and recommendations submitted in this report are based in part upon data obtained from referenced explorations.The extent of variations between explorations may not become evident until construction. If variations then appear evident, it will be necessary to re-evaluate the recommendations of this report. Dr.Clarence Welti,P.E.,P.C.,should perform a general review of the final design and specifications in order that geotechnical design recommendations may be properly interpreted and implemented as they were intended. i If you have any questions please call me. Very truly your Clarence Weld Ph.D., P. E. President, Dr. Clarence Weld P.E.; P.C. 5 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY GLASTONBURY,CONN 06033 LOCATION625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR CT AUGER CASING SAMPLER CORE BAR. OFFSET SURFACE ELEV. HOLE NO. B-1 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START SIZE I.D. 3.75" 1.375" N.COORDINATE AT 4.0 FT.AFTER 0 HOURS DATE. 3/20/06 HAMMER WT. 1401bs E.COORDINATE AT FT.AFtER HOURS DALE 3/20/06 HAMMER FALL 30" SAMPLE STRATUM DESCRIPTION DEPTH NO. BLOWS/6" DEPTH A +REMARKS ELEV, 1 1-0-2-2 0.00'-2.00' TOPSOIL .25 BR.FINE-MED.SAND,LITTLE SILT 2 34-4-4 2.00'4.00' r3 4-4-6-6 4.00'-6.00' i 10 4 3-3-6 10.00'-11.50' GRAY VARVED CLAY AND''S1LT 13.5 15 • 5 1-2-2 15.00'-16.50' 20 6 1-2-2 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 ,i LEGEND:COL.A: DRILLER: GRAVES 7SANlPLETVPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE_=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 H OLE NO. B-'1 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC.P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY GLASTONBURY, CONN 06033 LOCATION625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR.CT AUGER CASING SAMPLER CURE BAR. OFFSET SURFACE ELEV. HOLE NO. B_2 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START SIZE I.D. 3.75" 1.375" DATE 3/21/06 N.COORDINATE AT 6.0 FT.AFTER O HOURS HAMMER WT.. 140lbs E.COORDINATE AT FT.AFTER HOURS FINISH 3/21/06 HAMMER FALL 30" DATE SAMPLE STRATUM DESCRIPTION DEPTH NO. BLOWS/6" DEPTH A +REMARKS ELEV. 0 1 1-0-1-0 0.00'-2.00' TOPSOIL .17 BR.FINE-MED.SAND,LITTLE SILT 2 1-0-1-3 2.00'-4.00' 3 3-5-6-6 4.00'-6.00' 5 . 10 4 2-3-4 10.00'-11.50' ' i .. 15 5 3-3-3 15.00'-16.50' : GRAY VARVED CLAY AND SILT 16.0 20 6 2-1-2 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 HOLE NO. 6-2 5 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. NEW FIRE&AMBULANCE FACILITY ( P.O. BOX 397 LOCATION GLASTONBURY, CONN 06033 625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR CT AUGER CASING SAMPLER CORE BAR. OFFSET SURFACEELEv. HOLE NO. B-3 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START SIZE I.D. 3.75" 1.375" DATE 3/20/06 N.COORDINATE AT 4.0 FT.AFTER 0 HOURS HAMMER WT. 1401bs AT FT.AFTER HOURS FINISH HAMMER FALL 30" E.COORDINATE DATE 3/20/06 DEPTH SAMPLE A STRATUM DESCRIPTION ELEV. NO. BLOWS/6" DEPTH +REMARKS 1 2-2-3-3 0.00'-2.00' ... TOPSOIL .33 BR.FINE-MED.SAND,LITTLE SILT 2 5-6-6-8 2.00'-4.00' 3 5-6-6-7 4.00'-6.00' 5 11 i0 4 4-3-3 10.001-11.50' • 4 GRAY VARVED CLAY AND SILT 14.0 15 5 2-3-3 15.00'-16.50' • 20 :.: 6 1-1-1 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 i LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPOIRTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 HOLE NO. 8-3 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. NEW FIRE&AMBULANCE FACILITY P.O. BOX 397 LOCATION GLASTONBURY,CONN 06033 625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR CT AUGER CASING SAMPLER CORE BAR. OFI'SET a SURFACE ELEV. IIOLF.NO. B-4 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START SIZE I.D. 3.75" 1.375" DATE 3/20106 N.COORDINATE AT 4.0 FT.AFTER 0 HOURS HAMMER WT. 1401bs AT FT.AFTER HOURS FINISH HAMMER FALL SAMPLE STRATUM DESCRIPTION 30" E COORDINATE AT3/20/06 DEPTH NO. BLOWS/G" DEPTI I A +REMARKS ELEV. 0 1 1-1-3-3 0.00'-2.00' TOPSOIL 50 BR.SILT AND FINE SAND BR.FINE-MED.SAND,LITTLE SILT 2.0 2 4-4-7-7 2.00'-4.00' , 3 8-8-9-8 4.00'-6.00' 5 ... I 10 4 4-5-6 10.001-11.50, GRAY VARVED CLAY AND SILT 12.0 15 . 5 1-2-2 15.00'-16.50' 20 :. 6 2-1-1 20.00'-21.50' 25 7 2-2-1 25.00'-26.50' 30 8 1-1-2 30.00'-31.50' e LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 2 HOLE NO. B-4 i CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC.P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY LOCATION GLASTONBURY, CONN 06033 625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR CT SAMPLE STRATUM DESCRIPTION DEPTH NO. BLOWS/6" DEPTH A +REMARKS ELEV. 9 2-1-2 35.00'-36.50' 40 10 1-2-2 40.00'-41.50' 45 I 11 2-1-2 45.00'-46.50' , 50 12 1-2-2 50.00'-51.50' BOTTOM OF BORING @ 51.5' 51.5 i 55 60 65 70 LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 2 OF 2 HOLE NO. B-4 6 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY LOCATION GLASTONBURY,CONN 06033 625 SULLIVAN AVENUE TOWN 0F SOUTH WINDSOR SOUTH WINDS OR,CT SURFACE ELEV. AUGER CASING SAMPLER CORE BAR. OFFSET HOLE NO. B-5 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START 3/21/06 SIZE I.D. 3.75" 1.375" N.COORDINATE AT 5.0 FT.AFTER 0 IjouRs DATE HAMMER WT. 1401bs E.COORDINATE AT FT.AFTER FiOURS FINISH 3/21/06 . HAMMER FALL 30" DATE DEPTH SAMPLE A STRATUM DESCRIPTION ELEV. NO. BLOWS/6" DEPTH +REMARKS 0 1 1-0-1-1 0.00'-2.00' TOPSOIL .33 BR.FINE-MED.SAND,LITTLE SILT 2 2-2-2-4 2.00'-4.00' 3 4-3-4-4 4.00'-6.00' 5 . II 10 4 6-4-4 10.00'-11.50' i GRAY VARVED CLAY AND SILT 13.0 1 15 5 2-4-5 15.00'-16.50' 20 6 1-2-1 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 as IN PF LEGEND:COL.A: DRILLER: GRAVES INSPECTOR: SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 17 HOLE NO. B-5 CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. NEW FIRE&AMBULANCE FACILITY P.O. BOX 397 LOCATION GLASTONBURY, CONN 06033 625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR OFFSET SURFACE ELEV. CT AUGER CASING SAMPLER CORE BAR. HOLE NO. B-6 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START 3/2O/06 SIZE I.D. 3.75" 1.375" N.COORDINATE AT 4.0 FT.AFTER 0 HOURS DATE HAMMER WT. 1401bs E.COORDINATE AT FT.AFTER HOURS FINISH 3/20106 HAMMER FALL 30" DATE SAMPLE STRATUM DESCRIPTION DEPTH NO. BLOWS/6" DEPTH A +REMARKS ELEV. 1 1-1-3-4 0.00'-2.00' TOPSOIL ,42 BR.FINE-MED.SAND,LITTLE SILT 2 6-4-54 2.00'-4.00' 3 5-5-5-5 4.00'-6.00' 10 4 4-5-5 10.001-11.50, 1 13.5 GRAY VARVED CLAY AND SILT 15 5 1-2-2 15.00'-16.50' 20 6 1-1-1 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 i LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-501/0 SHEET 1 OF 1 HOLENO. B-S i ' CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY t LOCATION GLASTONBURY,CONN 06033 625 SULLIVAN AVENUE y TOWN OF SOUTH WINDSOR OFFSET SURFACE ELEV. SOUTH WINDSOR CT AUGER CASING SAMPLER CORE BAR. HOLE NO. B-7 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START 3/21/O6 SIZE I.D. 3.75" 1.375" N.COORDINATE AT 3.0 FT.AFTER 0 HOURS HAMMER WT. 1401bs E.COORDINATE AT FT.AFTER HouRs FiN►sH 3121/06 HAMMER FALL 30" DATE DEPTH SAMPLE A STRATUM DESCRIPTION ELEV. NO. BLOWS/6" DEPTH +REMARKS 0 1 1-1-1-1 0.00'-2.00' TOPSOIL .06 BR.FINE-MED.SAND,LITTLE SILT 2 3-3-4-4 2.00'-4.00' 3 6-5-6-7 4.00'-6.00' 5 . tl 10 4 6-5-6-7 10.00'-11.50' 15 5 1-1-2 15.00'-16.50' GRAY VARVED CLAY AND SILT 16.0 20 6 1-1-1 20.00'-21.50' BOTTOM OF BORING @ 21.5' 21.5 25 30 35 LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 HOLE NO. B-7 f I CLIENT PROJECT NAME CLARENCE WELTI ASSOC., INC. P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY LOCATION. GLASTONBURY,CONN 06033 625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR CT AUGER CASING SAMPLER CORE BAR. HOLE NO. B-$ TYPE OFFSET SURFACE ELEV. HSA SS LINE&STA. GROUND WATER OBSERVATIONS START 3/21IO6 SIZE I.D. 3.75" 1.375" N.COORDINATE AT 4.0 FT.AFTER 0 HOURS DATE HAMMER WT. 1401bs E COORDINATE D AT FT.AFTER HOURS 3/21I06 . HAMMER FALL 30" DATETE DEPTH SAMPLE A STRATUM DESCRIPTION ELEV. NO. BLOWS/6" DEPTH +REMARKS 1 1-1-2-4 0.00'-2.00' TOPSOIL .50 BR.FINE-MED.SAND,LITTLE SILT 2 4-5-6-7 2.00'-4.00' 3 8-8-7-8 4.00'-6.00' 5 � , it 10 4 5-5-6 10.00'-11.50' BOTTOM OF BORING @ 11.5' 11.5 15 20 25 30 LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR: PROPORTIONS USED: TRACE=0-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 HOLE NO. B-8 CLIENT PROJECT NAME CLARENCE WELT[ASSOC., INC. P.O. BOX 397 NEW FIRE&AMBULANCE FACILITY GLASTONBURY,CONN 06033 LOCATION625 SULLIVAN AVENUE TOWN OF SOUTH WINDSOR SOUTH WINDSOR C AUGER CASING SAMPLER CORE BAR. OFFSET SURFACE ELEV. (.TOLE NO. B-9 TYPE HSA SS LINE&STA. GROUND WATER OBSERVATIONS START �T 3/2O/06 SIZE I.D. 3.75" 1.375" N.COORDINATE AT 4.0 FT.AFTER 0 HOURS HAMMER WT. 1401bs AT FT.AFTER HOURS FINISH HAMMER FALL 30" E.COORDINATE DATE 3/20/06 DEPTH SAMPLE A STRATUM DESCRIPTION ; ELEV. NO. BLOWS/6" DEPTH +REMARKS 1 1-1-3-4 0.00'-2.00' . TOPSOIL 42 BR.SILT AND FINE SAND 2 4-5-5-8 2.00'-4.00' SR.FINE-MED.SAND,LITTLE SILT 2.0 3 5-5-5-7 4.00'-6.00' 5 it GRAY VARVED CLAY AND SILT 9.0 10 . 4 3-3-3 10.001-11.50, BOTTOM OF BORING @ 11.5' 11.5 15 20 25 30 Amk Is LEGEND:COL.A: DRILLER: GRAVES SAMPLE TYPE: D=DRY A=AUGER C=CORE U=UNDISTURBED PISTON S=SPLIT SPOON INSPECTOR:' PROPORTIONS USED: TRACE=6-10% LITTLE=10-20% SOME=20-35% AND=35-50% SHEET 1 OF 1 HOLE NO. B-9 • • •. ,� • r • ` `` �� �� , �� �� .ram �.r� . y . r� r v � • • e` SULLIVANAw TAM PROPOSED TEST BORING LOCATIONS NEW FACILITY FOR FIRE & AMBULANCE AVENUE, SOUTH 1 , r SCALE I. e • r 2006 DR. . r 1 P.C. RECEIVED PQ -1 3 2000 LCOones�ultanls SOUTH WINDSOR PLANNING DEPT. G `( Geotechnical Environmental and Water Resources Engineering Wetland Impact Assessment for Project Area&Best Management Practices for Stormwater Treatment ' Proposed South Windsor Fire Department Property 735 Sullivan Avenue South Windsor, CT 06074 Submitted to: Town of South Windsor ' Mr.Jeffery Folger 1540 Sullivan Ave. South Windsor,CT 06074 1 Submitted by: ' GEI Consultants,Inc 455 Winding Brook Drive,Suite 201 Glastonbury,CT 06033 ' 860-368-5300 April 2009 ' Pro ect 082560 W ohnsn LFdeik o , Sr.Vice President,Regi al Mgr. XP a t a WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT APRIL 2009 Table of Contents ' 1. Introduction 1 2. Existing Conditions 2 ' 2.1 Wetlands 2 2.2 Uplands 3 3. Proposed Conditions 4 ' 4. Conclusions 6 KUPROC1ProjechTown of South Windsor\FireDeptProperty082560\Wetlands Assessment\Wetland Impact Assessment for Project Area.docx 1 G E I Consultants j WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT APRIL 2009 1 . Introduction At the request of Jeffrey Folger, Conservation Officer/Environmental Planner for the Town of South Windsor, and TO Design, LLC; GEI Consultants, Inc. (GEI) conducted a focused ' wetland assessment addressing potential direct and indirect impacts to town regulated wetlands in the vicinity of the proposed fire and ambulance complex located at 765 Sullivan Avenue, South Windsor, CT. This report is to be submitted as part of an application before the Town of South Windsor's Inland Wetlands Commission pursuant to the provisions of the Inland Wetland and Watercourses Act(the "IWWA"), Connecticut General Statutes Section 22a-36 Et. Seq., and Inland Wetlands and Watercourse Regulations(the"Regulations") promulgated by the IWWA of the Town of South Windsor. 1 The Town of South Windsor is proposing to construct a fire and ambulance complex with a 22,800 square foot building and 1.82 acres of impervious surface on a 26.4 acre parcel located at 765 Sullivan Avenue. The proposed complex is located on the southwestern corner of the property, with West Road to the west,the property boundary and wetland swale to the south, an agricultural ditch wetland to the east, and open farmland to the north. The proposal ' for this public safety facility is depicted on the grading and planting plans prepared by TO Design, LLC of New Britain, Connecticut, dated April 14, 2009. GEI Consultants submitted a Phase I Environmental Site Assessment and Surface Soil Screening, Threatened& ' Endangered Species Assessment, and Wetlands Function&Values Assessment Report dated December 2008 which included an ecological inventory and wetlands assessment of the entire parcel.1This document evaluates the portion of the parcel directly impacted by the ' proposed public safety complex with reference to the December 2008 report. LCoQ*nsuit�ants /^VFI 1 WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT ' APRIL 2009 2. Existing Conditions 1 ' The western portion of the subject property, where the development of the public safety complex is planned, maintains an agricultural field habitat. To the east is a historic ' agricultural drainage ditch wetland, which provides limited wetland conditions and successional vegetative growth with an early successional forested wetland edge habitat toward the southern property boundary. ' 2.1 Wetlands ' A narrow wetland region(a result of successional growth over a historical drainage ditch) is adjacent to the eastern edge of the agricultural field. This region of the subject property is ' dominated by shrubby vegetation including silky dogwood,American pokeweed(Phytolacca Americana),Japanese knotweed(Fallopia japonica)with intermittent white pine,red oak, and maple trees. There was no surface water observed during field surveys. This wetland has low functional value due to disturbance from prior agricultural uses. It ' provides limited wildlife habitat Many invasive flora were observed in and near the wetland drainage ditch. ' The wetland located on the southern border of the property includes a wooded edge habitat dominated by grasses and herbaceous species leading into a region dominated by goldenrod, blue vervain(Verbena hastata), joe-pye weed(Eupatorium maculatum/purpureum), and ' jewelweed(Impatiens capensis) followed by a shrub/understory edge dominated by silky dogwood(Cornus amomum) and canopy dominated by maples (Acer spp) and oaks ' (Quercus spp.). This wetland has no principal function other then providing limited wildlife habitat as an ' edge community and the potential for pollution attenuation. The mucky soils at the bottom of the ditch can attenuate any pollutants that may enter stormwater, enhance sedimentation, and aid in denitrification and nutrient uptake by plants present. This area has been disturbed due ' to previous agricultural uses. ' It is important to note that high function wetlands are located near the Podunk River in the central to eastern portion of the parcel. The portion of the parcel chosen for this development in distant from these areas preventing impacts to these valuable wetlands and avoids direct ' impacts to any wetlands. ' �ns 1GL( Coultants 2 1 WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM 1 SOUTH WINDSOR, CONNECTICUT APRIL 2009 2.2 Uplands 1 The western section of the subject property is primarily a recently cultivated agricultural 1 field. Grasses and herbaceous plants dominate this region, including rabbit's foot clover (Trifolium arvense), switchgrass (Panicum virgatum),purple lovegrass (Eragrostis spectabilis), Goldenrod(Solidago spp) field bindweed(Convolvulus arvensis), and yellow 1 foxtail (Setaria glauca). The southwestern corner of the subject property contains an area of poorly drained soil indicated by the presence of straw-colored flatsedge (Cyperus strigosus), and common rush(Juncus effusus). The proposed location of the public safety complex will minimize impacts to ecology, because any disturbance proposed at the site is in previously disturbed agricultural areas. i 1 1 1 1 1 1 1 L@swu—It GLIConants 3 1 ' WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT ' APRIL 2009 3. Proposed Conditions ' Proposed activities will include the construction of the public safety complex including indoor parking bays and two entry/egress roadways; one for fire vehicles and one for ambulances. No direct impacts to wetlands are proposed. The construction activities in the southern and ' western portions of the complex plan, including a portion of the paved parking lot and the stormwater management system, fall within the 80-foot wide town delineated upland review ' area. The wetlands on this portion of the parcel have a lower degree of function compared to the wetlands located adjacent to the Podunk River on the eastern portion of the parcel. ' The proposed stormwater management system will convey stormwater runoff from the site to a detention and infiltration basin on the southeast of the site. A vegetated drainage swale on eastern side of the site and two on-site stormwater systems, consisting of piping connecting ' roof drains, catch basins, and yard drains,will carry the runoff to the basin. The stormwater system on the southern portion of the site will collect flow from the western and southern ' paved and vegetated areas and part of the building roof. This system drains directly into the basin. The stormwater system on the eastern portion of the site conveys flow from a portion of the roof and a building courtyard. This system flows into the drainage Swale. Paved and ' vegetated areas on the northern and eastern portions of the site enter the drainage swale via overland flow. ' This system is designed to minimize structural components (catch basins,piping etc.) and to treat stormwater runoff in an above ground primary treatment system. In addition, outlet ' protection is proposed at the site stormwater system outlets to minimize erosion and vegetation damage during intense storm events. It is suggested that an apron of modified riprap be placed at each outlet according to CT DOT recommendations for the sizing of ' aprons. The basin should be designed with a wet-bottom forebay sized per the CT DEP 2004 ' Stormwater Quality Manual to treat storm water quality volume. The basin should include a normal pool up to 1.5 feet in depth below the primary outlet structure to hold and treat ' runoff. Since this stormwater system is discharging within 60 feet of the wetland boundary, biofiltration should be considered at the point of an overflow wier. ' The soils underlying the basin, according to the USDA Web Soil Survey,primarily consist of Ninigret fine sandy loams over gravelly course sand to Tisbury loamy fine sand(moderately well drained) and a portion of Walpole fine sandy loam(poorly drained). Future borings in ' �on 1G �I Csultants 4 WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT 1 APRIL 2009 the location of the planned basin will provide further detail concerning the hydrology of the ' soil and groundwater elevations. Previous borings completed on the site indicate the grading plan will provide year-round wet conditions in the basin. ' Wetland vegetation in the stormwater basin is important for improved take-up of nutrients and other soluble stormwater pollutants,to provide additional substrate(plant surfaces) for microbial degradation of stormwater pollutants, and as sedimentation controls. GEI suggests planting emergent species at the bottom of the basin to supplement species found in the surrounding area that will establish themselves in this disturbed area(i.e. cattail,umbrella sedge, and soft rush). Wool grass (Scirpus cyperinus),three square (Dulichium arundinceum), and knotted rush(Juncus nodosus) could be used. Other disturbed areas including the swale leading to the basin,basin walls,the basin floor, and the overflow region should be seeded with wetland seed mix, or properly managed/maintained to ensure native vegetative re-colonization(proliferation of dense wet meadow community). ' L�#nsujwlta);nt GEI Cos 5 WETLANDS FUNCTION & VALUE ASSESSMENT OF PROJECT AREA & BEST MANAGEMENT PRACTICES FOR STORMWATER SYSTEM SOUTH WINDSOR, CONNECTICUT ' APRIL 2009 4. Conclusions No direct impacts to wetlands in the vicinity of the proposed construction are planned, and the proper development of a stormwater management system will minimize the potential for ' indirect adverse impacts to wetlands. Mitigation for construction activity in the 80-ft. review area can occur through an invasive flora management plan worked into the landscaping design of the public safety complex. TO Design, LLC has provided an acceptable stormwater ' basin planting design plans. GEI can provide an invasive flora management plans to the Town of South Windsor by request. t 1 1 ' �on 1GEICsultants 6