Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
10-37P Optimus South Windsor
a TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION APPLICATION FORM RECEIVED , Application No: s N Official Receipt Date: `(� 12 2010 sourw wiNDsoR PtANruNe �fi, ° ' a Receipt No: f-'`;Ojt C`` APPLICANT: PROJECT NAME: © ,,_c �4e�.�Ii l✓.'r,�Sa/` ADDRESS: /4 / So y A OWNER OF RECORD ON LAND RECORDS: ADDRESS: COMPLETE LOCATION OF PROPERTY: W1 /Z3 0 Z ASSESSOR'S MAP# PARCEL# ZONE Tf' NAME, ADDRESS, TEL 8v FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: &oWt+ ez4 a6002 86-0 ZYZ-$S86 Are-ZYZ-8S87 Estimated presentation time: 11 THIS APPLICATION IS FOR: (Check all that apply): El Zone Change to (Public Hearing required and Certificate of Mailing) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required) Subdivision. ❑ Minor ❑ Major ED Resubdivision (Public Hearing Required) ❑ Minor ❑ Major Conditional Approval ❑ Special Exception to Article (Public Hearing, Certificate of Mailing) ESite Plan of Development ❑ General Plan of Development - State Hearing per Section 14-55 for El Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required) ❑ Regulation Amendment ❑ Zoning ❑Subdivision - Attach proposed amendment (Public Hearing Required) Temporary and Conditional Permit for (Public Hearing Required) In,Law apartment/Accessory Apartment (Public Hearing Required) ❑ Major Home Occupation for (Public Hearing Required) Other (explain in detail) An Application Pending sign is required to be posted on the property for all applications ten (10) days prior to being heard by the Commission. *SituAl— re of A t Signatur f Property Owner PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 7/13/10 TO: Matt Galligan, Fred Shaw,Michael Gantick, Rich Bond, Walter Summers, Jeff Doolittle Ray Favreau, Karl Reichle, Mark Owens, Chris Dougan, Bob Deptula John Caldwell, Dennis Sheridan, Ron Asselin FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: Appl 10-37P, Optimus South Windsor Location: 161 South Satellite Road ® Site Plan ❑ Subdivision No. Acres 87,000sf Zone I N Industrial ❑ Commercial ❑ Residential No. Lots/Units Water: N Public ❑ Private Well Sewerage: N Public ❑ Septic System Project Description: 12,650 sf addition Future Town-owned property involved? ❑ Yes N No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active []passive Planning Department notes: Please comment by 7/23/10 and return to the Planning Department. PERMITS/INSP PAYMENT RECPT#: 20416350 TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVENUE SOUTH WINDSOR CT 06074 DATE: 07/13/10 TIME: 08:36 CLERK: mariadace DEPT: CUSTOMER#: 0 PARCEL: CHG: DEP DEP FEE 125.00 AMOUNT PAID: 125.00 PAID BY: OPTIMUS SW PAYMENT METH: CHECK 636 REFERENCE: A AMT TENDERED: 125.00 AMT APPLIED: 125.00 CHANGE: .00 STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN PROJECT Optimus Site Plan APPL.#10-37P ENGINEER/ARCHITECT PDS Engineering PROJ.#none Submit mylars of sheets: EC-1, C-100 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 5. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 6. The building street number must be included on the final plan. 7. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 8. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 9. If a State Traffic Commission certificate is required,no building permits will be issued until the certificate has been issued(per CGS §14-311). 31F 10. Engineering comments dated 7/ /10 must be addressed to the satisfaction of the Town Engineer. 11. Any trees to be removed within the buffer area re to be marked in the field and reviewed by staff prior tot heir removal. Additional evergreen landscaping will be required if deemed necessary to meet the buffer requirement. 12. The rear yard setback must be shown in addition to the 50 foot buffer requirement. t MEMORANDUM To: Marcia Banach, Director of Planning From: Jeffrey Doolittle, P.E.,Town Engineer Date: 7/30/10 RE: App 10-37P Optimus SW Building Addition I have reviewed the Plan for the proposed building addition by Optimus South Windsor at 161 South Satellite Road and I have the following comments. 1. I like the proposed Stormtech chambers to provide stormwater detention and infiltration from part of the addition. Another set of Stormtech chambers needs to be installed for the western half of the addition to provide for stormwater infiltration, treatment and detention in accordance with the current stormwater management policies and practices. This could be located to the north of the existing rear parking area between the pavement and the earth berm. The overflow could be piped to the existing CB in the north side of the parking area. 2. A new sanitary building connection is proposed from the front yard around to the addition by the loading docks. This needs to be reviewed by Fred Shaw to determine if WPCA approval is required. A drain layers permit will be required prior to the installation of this new sanitary building connection. Please let me know if there are any questions. 1 DRAINAGE CALCULATION FOR OPTIMUS SOUTH WINDSOR LLC 161 SOUTH SATELLITE ROAD SOUTH WINDSOR, CONNECTICUT PDS ENGINEERING & CONSTRUCTION, INC, 107 Old Windsor Road Bloomfield,Connecticut.06002 N � Telephone:(860)24M586 e FAX(860)242-8587 g No 2d � Site area = 87,121 sf (2.00 acres Existing.Impervious Areas Existing Building= 12,078 sf Existing Paved Area=27,614 sf Existing Sidewalk Areas = 520 sf Total impervious area=40,212 sf( 0.91 acre) Proposed Development Impervious Areas Total Building Area=24,856 sf Total Paved Area.=20,968'sf Total Sidewalk Area 845 sf Total Proposed impervious area=46,669 sf( 1.07 acre Total increased impervious area=6,457 sf (0.148 acre Proposed increase storage volume is from the proposed addition roof area. 50% of the roof area is to be:drained to Stormtech Storage Chambers to net a zero increase. in stormwater runoff. Proposed Storage Volume Design Total roof area(A) runoff to be stored=6,325 sf(.145 acres - Runoff Coefficient(C) _ .90 Time of Concentration(use 5 minute minimum Rainfall Intensity(i) = 8.4 ( 100 yr. storm Peak Rate of Runoff=(.90) (8.4) (,145) = 1.10 cfs Stormtech Storage Chamber Design Total Runoff= 1.10cfs Required storage volume ( 1.10 efs ) (60 sec) (5 min) = 330 cuJft Stormtech SC-740 with 12"stone foundation storage volume = 81.7 cu/ft 330/81.7=4.04 '( 5 Stormtech SC-740 Chambers Required DRAINAGE CALCULATION FOR OPTIMUS SOUTH WINDSOR LLC 161 SOUTH SATELLITE 'ROAD SOUTH WINDSOR, CONNECTICUT PDS ENGINEERING CONSTRUCTION INC. a�'' �� ��clf••• 107 Old Windsor Road Y • _ Bloomfield,Connecticut.06002 Telephone:(860)242-8586 FAX(860)242-8587 �fp 6 Site area = 87,121 sf (2.00 acres Existing Impervious Areas : Existing Building= 12,078 sf Existing Paved Area= 27,614 sf Existing Sidewalk Areas = 520 sf Total impervious area= 40,212 sf( 0.91 acre Proposed Development Impervious Areas Total Building Area=24,856 sf Total Paved Area= 20,968 sf Total Sidewalk Area=845 sf Total Proposed impervious area=46,669 sf( 1.07 acre Total increased impervious area = 6,457 sf ( 0.148 acre Proposed increase storage volume is from the proposed addition roof area. 50%o of the roof area is to be drained to Stormtech Storage Chambers to net a zero increase in stormwater runoff. Proposed Storage Volume Design Total roof area(A) runoff to be stored=6,325 sf( .145 acres Runoff Coefficient(C) = .90 Time of Concentration(use 5 minute minimum ) Rainfall Intensity(i) = 8.4 ( 100 yr. storm) Peak Rate of Runoff=(.90) (8.4) (.145) = 1.10 cfs Stormtech Storage Chamber Design Total Runoff= 1.1 Ocfs Required storage volume= ( 1.10 cfs ) (60 sec) (5 min) = 330 cu/ft Stormtech SC-740 with 12"stone foundation storage volume =81.7 cu/ft 330/81.7 =4.04 ( 5 Stormtech SC-740 Chambers Required pj 1�WN yt., p r �,V a / L V/ S_0� ?d&U140t ct �` .. . 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 OR-Co TELEPHONE (860) 644-2511 CERTIFIED MAIL 7008 1300 0001 4578 3245 August 2, 2010 Chris Eseppi PDS Engineering 107 Old Windsor Road Bloomfield CT 06002 Dear Mr. Eseppi: Re: Appl. 10-37P, Optimus South Windsor We are pleased to advise you that the above mentioned application was approved on July 30, 2010 for a Site Plan of Development. This approval is for a building addition on property located at 161 South Satellite Road, I zone, as shown on plans prepared by PDS Engineering dated May 17, 2010 as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 4. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 5. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. 6. The building street number must be included on the final plan. 7. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 8. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 9. If a State Traffic Commission certificate is required, no building permits will be issued until the certificate has been issued(per CGS §14-311). 10. Engineering comments dated 7/29/10 must be addressed to the satisfaction of the Town Engineer. 11. Any trees to be removed within the buffer area re to be marked in the field and reviewed by staff prior tot heir removal. Additional evergreen landscaping will be required if deemed necessary to meet the buffer requirement. 12. The rear yard setback must be shown in addition to the 50 foot buffer requirement. Black and white transparent mylars of Sheets#EC-1 &C-100 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans) must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans,a copy of the receipt must be submitted to the Planning Department. Sincerely, s jr� Patrick Kennedy, Chairman %ZC Planning and ZoningCommission -� PK/ma cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal