Loading...
HomeMy WebLinkAboutWPCA Griffin Road Homes by Guarino ��W N SF4 �� x F ��.I��t.v/ v ����i�ICE f� `�•. a 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 TELEPHONE (860) 644-2511 April 14, 2010 Jay Ussery J. R. Russo &Associates, LLC 1 Shoham Road East Windsor, CT 06088 Re: Homes by Guarino, Griffin Road WPCA Conceptual Approval Dear Mr. Ussery: The South Windsor Water Pollution Control Authority, at its regular meeting on April 6, 2010, provided conceptual approval for the option involving connection of all four proposed residential units to the existing sewer main on Griffin Road, as specifically marked in orange, on plans "Sanitary Sewer Alternatives, Guarino Subdivision, Griffin Road & Abbe Road, South Windsor, CT, Dated 4-6-2010 by J. R. Russo & Associates, LLC. This conceptual decision is subject to the following: 1. A draft of the Association Agreement that defines the responsibility for the maintenance of private sewer line must be obtained, reviewed and approved by the Town Attorney; 2. Applicant must return to the Water Pollution Control Authority for final approval. Very truly yours, Joseph J. Carino, Chairman Water Pollution Control Authority JC:ead cc: Michael J. Gantick, Director of Public Works Jeff Doolittle, Town Engineer Marcia Banach, Director of Planning Chris Dougan, Chief Building Inspector TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY RECEIVED APPLICATION FORM Application No.: APR 0 " m Date Received Date Scheduled Fof Pusuc i Applicant 44 10 W,e,$ G h i cn '' Address 25 r { ic,? C i OE,DIL', Telephone No.: P Owner of Record on Land Records A& "e PS4,4 e Owner's Address 411 Property Description: Assessor's Map # //-/6 Parcel# 2 Vol. Zog-7., Page w �j Project Title: G ci b� ` Inquiries to be Directed to: (Name,Address,Telephone No.)_ c�--�-A s so c I,Is c l Afdaa pA 8' -r a c 06 a S a S(00 -(0zz -0 516q Approvals Previously Received (Check) IWA P&Z ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection- -Residential Use a. Subdivision b. Single Unit c. Other )Q Explain JiSUUsSrOi/i He!q<Alar, �'Peye�e- �' ievaSf�v d. Type of Approval: Concept _ Final fin ` , 9 Sv!�d,vo`.1!Dvl 2. Sewer Extension/Connection- - Industrial/Commercial User a. New Connection b. Request to Increase Flow Rate c. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal , Explain 6. O r xplain Appl `a tig e Date er's Sign ure. Date (See Reverse Side for Application Submittal Procedures)