Loading...
HomeMy WebLinkAboutCutler Ridge - WPCA Application, Approval Letter =i t (OWN se4 O G f U -i olle S-0� ?1)&1d61at ti 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR.CO AREA CODE 860/644-2511 September 11, 1997 Mr. Robert Mannarino Mannarino Builders, Inc. 1169 Ellington Road South Windsor, CT 06074 RE: Cutler Ridge Avery Street SOUTH WINDSOR,CT Dear Mr. Mannarino: The South Windsor Water Pollution Control Authority, at its regular meeting of September 2, 1997, gave approval for the connection to the Town's sewerage system of a 26-lot residential subdivision at the easterly side of Avery Street, as more specifically shown on plans entitled "Cutler Ridge - Open Space Subdivision - RR Zone - Prepared for Mannarino Builders, Inc. - 860 Avery Street, South Windsor, CT" by Alford Associates, Inc., Windsor, CT, Drawings No. 2 of 11, labeled "Topographic Map and Conservation Plan," dated June 3, 1997, revised 7-11-97, 8-1- 97, and 8-11-97; No. 9 of 11, labeled "Plan/Profile," dated June 3, 1997, revised 6-24- 97, 7-11-97, 8-1-97, and 8-11-97; and No. 10 of 11, labeled "Plan/Profile," dated June 24, 1997, revised 7-11-97 and 8-11-97, and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. An agreement between the developer, Mannarino Builders, Inc., and Town of South Windsor engineering staff that two manholes, #7 and #1, and the pipes entering the manholes are satisfactorily located for proper function of the system. If this agreement cannot be made, the developer agrees to add two manholes at a reasonable distance to reduce the number of connections per manhole. a Mr. Robert Mannarino -2- September 11, 1997 4. Properties requiring pumping systems will have minimum 250-gallon holding tanks and electrical connections to provide auxiliary power if required. 5. The easement ending on Avery Street has a tree close to, or on, the easement right-of-way; it is understood that the Town shall have the right to remove the tree in the event that it interferes with Town access to the right-of-way. 6. Cleanouts must be provided. 7. This approval letter must be superimposed on the final approval plans. Very truly yours, Jos*h J. Carino, Chairman Water Pollution Control Authority JJC:rt cc: Matthew Galligan, Town Manager Michael J. Gantick, Director of Public Works Jerry Iazzetta, Town Engineer Marcia Banach, Director of Planning John Collins, Chief Building Inspector f :t t! TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY g APPLICATION FORM Application No. Date Received Date Scheduled For q�h� Applicant MANNARINO BUILDERS, INC. pgrX Z$q*�l.titi Address Telephone No. R 6 n �R A 7 n S� Owner of Record on Land Records Owners Address Property Description: Assessor's Map # 00 Parcel # 4 Vol. Page Project Title: CUTLER I Inquiries to be uect to: (name, address, to ep one no.)8 _ _ 0 155 169 ELLINGTON* RD. S. WINDSOR CT. 289 Approvals Previously Received (Check) IWA X P & Z X ZEA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection ae Residential Use f a. Subdivision X b. Single Unit c. Other amain d. Type o Approval: Concept X 2. Sewer Extension/Connection -- :Industrial/Commercial User a. New Connection - b. Request to Increase ow to c. Change in Nature of Waste Disc arge d. Other Explain e. Type o Approval: Concept 9 3. Appeal of Sewer User Charge a. Residential b. IndusUial/Comm�ae lrciarc 4. Sewer Assessment a. Establi;* Sewer Assessment b. Appeal'of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal ®; Explain 6. Other ® Explain Ap cants tgnature ate ac—, Z_Z lc(6. ner ignature c ate (See Reverse Side for Application Submittal Procedures) Imssompwappacation 11/26/96