Loading...
HomeMy WebLinkAboutWPCA 525 Buckland Road (CVS/Town Centre) N S f4 O R T-awn oe SozdA Gz() 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•CO��`v AREA CODE 203/644-2511 November 10, 1998 Mr. Richard S. Kelley RSK-Kellco,Inc. 1744 Ellington Road South Windsor, CT 06074 RE: CVS/Town Centre Buckland Road SOUTH WINDSOR, CT Dear Mr. Kelley: 1 The South Windsor Water Pollution Control Authority,at its regular meeting of November 4, 1998,gave approval for a single connection to the sewer of a free-standing [CVS] commercial building at Town Centre shown as "Phase 1," in accordance with drawing entitled"Grading Plan - CVS - 525 Buckland Road- South Windsor, Connecticut"prepared by Fuss & O'Neill, Inc.,Job No. 85489A11, Sheet No. 2 of[2], dated 10/27/98, no revisions; and as shown on drawing entitled "Topographic Plan-Town Shopping Center-Developed by Richard S. Kelley-Tel. 644-8761 - Ellington Road- South Windsor, CT"prepared by Fuss & O'Neill, Manchester, CT, Sheet No. SD 5, Project No. 85-489A, dated 12-15-86,revised 1-9-87, [STC] 10-30-87, 4-22-88, 7-21-88, 11-4-88, 5-26-89, 7-17-89,4-11-91, and 9-11-98; and also gave approval for two laterals for two buildings shown as "Phase 2" on both of the aforementioned drawings and further on drawing entitled "Conservation Plan-Town Shopping Center-Developed by Richard S. Kelley- Tel. 644-8761 -Ellington Road-South Windsor, CT" prepared by Fuss & O'Neill, Manchester, CT, Sheet No. SD 9, Project No. 85-489A, dated 12-15-86,revised 1-9-87, 3-9-87, 3-17-87, 3-1-88, 4-22-88, 7-21-88, and 9-11-98; with the following stipulations: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. There shall be a cleanout at intervals of 100 linear feet along the length of the CVS building sewer. 4. The location, type, and configuration of cleanouts shall be subject to Town of South ` Windsor Engineering Department approval. Mr. Richard S. Kelley -2- November 10, 1998 5. The applicant shall submit final plans showing cleanout details as reviewed and approved by the Town Engineering Department. 6. This approval letter must be superimposed on the final approval plans. Very trui yours, Tfi as nqton,Chairman Water Pollution Control Authority TH:rt cc: Matthew Galligan,Town Manager Michael J. Gantick,Director of Public Works Jerry Iazzetta,Town Engineer Marcia Banach,Director of Planning John Collins,Chief Building Inspector