Loading...
HomeMy WebLinkAboutWPCA John Fitch Blvd Fitch Meadow Development fvt•c1 Y g/Sp.NN Se, O 7 F 70wn apsouA Vf• �� C 5 � 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 IOSOR.co AREA CODE 203/644-2511 May 15 , 1993 Mr . Bruce Kelley RSK-KELLCO, Inc. 1744 Ellington Road South Windsor, CT 06074 RE : Fitch Meadow Development John Fitch Boulevard, South Windsor Dear Mr . Kelley: The South Windsor Water Pollution Control Authority, at its regular meeting of March 16 , 1993, approved the Fitch Meadow Development as detailed on plans entitled "Fitch Meadow, 62 John Fitch Boulevard, prepared by Torres Engineering, Dated 6/21/91 , Last Revision 1/23/92" , subject to the following conditions : 1 . .Town Engineering technical approval obtained ; 2 . Developer shall either install manhole 145 feet north of existing manhole identified on plans for Sanitary Sewer Construction, Sewer Contract A Asbuilt Drawings , dated 10/3/72 , Drawing #3-A, Station 13+32 . 5, perpendicularly crossing Route 5 to connect to existing sewer line; or if possible, the contractor has the option of connecting directly into said manhole at Station 13+32 . 5 , running perpendicularly across Route 5 and ending at the existing manhole 118 feet east of proposed John Fitch Meadow Lane; - 3. A 20 foot permanent easement for sewer maintenance is required across all private property within cluster develop- ment if the final plan approved establishes Fitch Meadow Lane as a public road. Said permanent easement shall be documented in the property records of properties involved . 4. All manholes will be placed in the middle of the blacktopped roadway and manhole covers shall be no deeper than or. raised by any more than one-quarter inch . 5 . Final Authority approval and acceptance of the sanitary sewerage system will be given once sewer has been installed and inspected by the Town staff , and based upon the written verification of the Town staff that said sanitary sewer was installed by the developer in r Mr. Bruce Kelley May 15, 1993 Page 2 substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction ; and 6 . This approval letter must be superimposed into the final approval plans . Very truly yours , .... .... ................ ........-..............1fLf `_a......... ..._._.........._............................. .. J sep� Ca ino, Chairman Water Pollution Control Authority Town of South Windsor cc: Jean E . Zurbrigen , Town Manager Michael J. Gantick , Director of Public Works Jerry lazetta, Town Engineer Marcia Banach , Director of Planning John Collins, Chief Building Inspector John McCahill , Zoning Enforcement Officer