Mr. Jay Ussery, P.E.
J.R. Russo &Associates
1 Shoham Road
East Windsor, CT 06088
Re: 1249 John Fitch Blvd.
Dear Mr. Ussery:
.The South Windsor Water Pollution'Control Authority, at its regular meeting of December 4, 2007,
approved the application as .presented for connection to the Town's sewerage system of a proposed
industrial building located at 1249 John Fitch-Blvd., South Windsor, CT as more specifically shown on
plans entitled "John Fitch Partners, LLC&Andre L. Charbonneau, 1249& 1265 John Fitch Boulevard,
125 Edwin Road (Mailing Address),. South Windsor, Connecticut" Prepared by J. R. Russo &
Associates,.•East Windsor, CT; Sheet No.: 3 of 9 "Situ Plan", No.: 2002-098, Dated 11-15-04 with
revision dates: 12-10-04, 2-15-05, 2/21/05, 4/22/05,.2-9-07, 11-9-07, and 11-21-07. This motion is
subject to the following conditions:
1. :•An external outlet and transfer system, and CL&P power disconnect must be supplied for the
use of an emergency generator in the event of a power outage at 1265 and/or 1249 John Fitch
Blvd.;
2. Provide an easement in favor of the Town for access to a monitoring manhole at 1265 John
Fitch Blvd.;
3. Technical approval of the Town.of South Windsor Engineering Department;
4. Final Authority approval and acceptance of the sanitary sewerage connection will be given
once the sewer line has been installed.-and inspected by the Town staff, and based upon the
written verification of the Town staff.that said sanitary sewer line was installed in substantial
conformance with the design plans approved by the Authority, and meeting all Town
regulations and appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
Joseph J. Carino, Chairman
Water Pollution Control Authority
JC:ead
cc: Michael J. Gantick, Director of Public Works
Jeff Doolittle, Town Engineer
Marcia Banach, Director of Planning
Chris Dougan, Chief Building Inspector
�._.._._ . TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
NUV 6 Z007 APPLICATION FORM
WPCA
-,ourHW*QsoP,cr Application No.
Date Received _1
Date Scheduled For 1a-tii C7�1
Applicant John Fitch Partners, LLC & Andre L. Charbonneau
AddressYdindQny, Telephone No. 528-7551
Owner of ecord on Land Records Same as above
Owners Address
Property Description:
Assessor's Map # 84 Parcel # 49 & 50 Vol. Page
Project Title: New Industrial building at 1249 John Fitch Blvd
Inquiries to be Directed to: (name, address, telephone no.)
Dana Steele, J.R. Russo & Associates 1 Shoham oad East Windsor, CT 96U-6Z3=0569—
Approvals Previously Received (Check) IWA x P & Z X ZPA N/A
Purpose of Application: (Check all that apply)
1. Sewer Extension/Connection -- Residential Use
a. Subdivision
b. Single Unit
c. Other Explain
d. Type o A pproval: Concept Final
2. Sewer Extension/Connection -- Industrial/Commercial User
a. New Connection
b. Request to Increase Flow Rate
c. Change in Nature of Waste Discharge
d. Other Explain
e. Type o Approval: Concept g Final
3. Appeal of Sewer User Charge
a. Residential
b. Industrial/Commercial
4. Sewer Assessment
a. Establish Sewer Assessment
b. Appeal of Sewer Assessment
c. Change in Use of Property
5. Regulatory Appeal ; Explain
6. Other Explain
' 11-21-07
Applicant's Signature Date
C# 11-21-07
Owner's Signature Date
(See Reverse Side for Application Submittal Procedures)
/nisso/W C41application
11/26/96
J.R. RUSSO & ASSOCIATES
Land Surveyors & Professional Engineers
RECEIVED
NUV '� 6 2007
WaCA
November 21, 2007 SOUTHWINDSOR,Cf
Fred Shaw
South Windsor Water Pollution Control Authority
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Site Plan Change Order—WPCA New Connection Application
1249 & 1265 John Fitch Boulevard
Dear Fred:
As you know, Andre Charbonneau has submitted a change order for utility connections to
the new industrial building at 1249 John Fitch Boulevard, currently under construction. These
changes include the sanitary sewer connection which is now proposed to connect to the existing
2" force main at 1265 John Fitch Boulevard. As the revised site plan indicates, these two parcels
(1249 & 1265) have been merged into a single parcel. The existing force main at 1265 exits the
pump chamber (midway down the south side of the building) and runs approximately 427 feet
under the existing floor slab until it reaches an existing manhole with gravity sewer lateral outlet
on the east side of building. The new 2" force main from 1249 will connect directly to the
existing force main between the pump station and the 1265 building slab.
The pump station coordinator, F.J. Smith (Blake Equipment Co., Inc.) has reviewed the
proposed configuration and determined that both pump stations can utilize the same force main
effectively. If preferred, the pumps could also be coordinated to pump at different times.
Enclosed are correspondence from F.J. Smith and calculations demonstrating performance of
both pumps working simultaneously. We have also enclosed a WPCA application form and two
revised copies of sheets 3 of 9 (site plan) and 9 of 9 (pump station detail) for your review and
processing.
If you have any questions, or require further information, please call our office at (860)
623-0569.
Sincerely,
Dana Steele, P.E.
J.R. Russo &Associates
cc: Andre Charbonneau
File#2002-098
1 Shoham Road • East Windsor, CT 06088 • TEL: (860) 623-0569 • FAX: (860) 623-2485
J.R. RUSSO & ASSOCIATES RECEIVED
Land Surveyors & Professional Engineers NOV 2 62007
W PCA
SOUTH WINDSOR,CT
November 21, 2007
Fred Shaw
South Windsor Water Pollution Control Authority
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Force Main Analysis
1249 & 1265 John Fitch Boulevard
South Windsor, CT
Dear Mr. Shaw:
As requested, I have completed an analysis of the existing 2-inch force main serving 1249 & 1265
John Fitch Boulevard. A schematic of the existing force main showing pump locations and
elevations is attached. The existing pump at 1249 John Fitch Boulevard is a Myers WG20, 2 hp
grinder pump. The pump performance curve provided by Blake Equipment is attached. The
proposed pump at 1265 John Fitch Boulevard will be a HOMA GRP26/3 grinder pump. Its pump
performance curve is also attached.
When pumping alone, the new HOMA pump will have to overcome the friction of the entire 594 feet
of 2-inch force main and an elevation head of 17 feet. A pump system curve for these parameters is
attached. When plotted on the pump performance curve for the HOMA pump, it indicates that the
pump will run at 43.5 gallons per minute (gpm) at a total dynamic head (TDH) of approximately 39
feet.
When pumping at the same time as the existing pump, a portion of the force main will be subject to a
higher combined flow rate producing larger friction losses. The second 427 foot section of force
main will be subject to the combined flow, while the first 167' section of force main will only be
subject to the flow of the first pump. As a result of the higher flow rates in the second section of
force main, both pumps will be subject to higher heads. The actual pumping rates of each pump
under these conditions were determined by trial and error.
The resulting pump rates for the existing pump and new pumps pumping together are approximately
43.5 gpm and 39.5 gpm, respectively. The first branch of the force main will be subject to the 39.5
gpm flow while the second branch of the force main will be subject to a combined flow of 88 gpm.
To verify these rates,we calculate the friction loss in each section of pipe and check that the expected
flow rates match their.respective pump curves. The friction loss in the first section of pipe will equal
to approximately 3.7 feet (0.0222 ft/ft loss at 39.5 gpm x 167 ft). The friction loss in the second
branch of pipe will be approximately 36.7 feet (0.0859 ft/ft loss at 88 gpm x 427 ft). Thus, the
existing pump will see a TDH of 40.7 feet (36.7 ft friction loss in second branch + 4 ft of elevation
head). From the pump curve, this results in a flow of approximately 43.5 gpm. The new pump will
1 Shoham Road - East Windsor, CT 06088 - TEL: (860) 623-0569 - FAX: (860) 623-2485
be subject to a TDH of 57.3 feet (36.7 feet of friction loss in second branch+ 3.7 feet friction loss in
I"branch+ 17 feet of elevation head). A quick check of the pump curve shows that this corresponds
to a flow rate of 39.5 gpm.
In conclusion, both pumps are capable of pumping at these flow rates and the force main and pumps
will be able to work adequately when the two pumps are pumping alone or together. I hope this
information satisfactorily address your concerns. If there are any questions, or you require further
information,please call our office at(860) 623-0569.
Since ly,
't
Timothy A. Coon, P.E.
J.R.Russo &Associates
Attachments
Cc: Andre Charbonneau
File#2002-098
J.R.,RUSSO &ASSOCIATES JOB Z002-s ®qS
Land Surveyors&Professional Engineers SHEET No._ of
1 Shoham Road CALCULATED BY 1 r`� DATE
EAST WINDSOR,CONNECTICUT 06088
TEL:(860)623-0569 CHECKED BY DATE
Fax:(860)623-2485 SCALE
_,_
TN
-------__----0-_ ____________ _ ;_ _ °__ tip__ _ - ____ ____P�j _1
____
--------------
___ __--___ __ __ -
_
_ _
________ ___ __________ __
- - „ - _
_t�_,___ --------
________
- - -_- r - - - _ - - _ __ e
___U'__ -------_____________ _ ______- _
_- ____-____ -____------------ - - _ __-------------- ' __
-------------
-------------
Ar
- - - _ _ __
t.e:>:dE±r-,or„ 4E85� s'� ag'ie3$i {�52iV3C@ 5-EQQ-86.3-n 27 �fEizS{;tc.�aroion,tit`i Quit sa:aw.neUs.cam Ret NO:,,35�9t5t:ns
Nov, 21. 2007 1:23PM No. 2525 P. 3
Ho
PERFORMANCE CUR11E5 ;,,,0�
2—poles : 3450 qm" ,/ 0paa it Tww OWX 3(FY) '
2'Non�irsl alma► K saK-wa inpelr
Ur $ON ON 50 N=
120
100
so 80
tt
70
6o — — — — —�- 80
X
L — — — — so
� I
40 hL 40
30
I �
20 20
F4�
0 12 24 36 45 50
W/ExtS;r '?okf o0 ?qJX GPI°, A,.oNE 43.E GPM f �t
6561 FLOW[u•s.cw)
5
4
11
� 2
b�
0
Daly aca Sent.or 0) hM it
Nov, 20. 2007 12,21PM No. 2484 P. 3
?,WWI S Tw"O,-d
PUMP PERFORMAMC£ i
Capacity Liters Per Minute i
50 100 i50 200 250 300
45
140 SUBMERSIBLE GRINDER PUMPS
MODEL: WGIWGX Series 40
120 SPEED: 3450 RPM
35
Wt320
ioo 30 f! I
a 80 25'�
zoo
1
60 WG20F
i5 r
40
- - - -
I t0 l
f;
20
10 20 30 40 50 60 70 60 '
Capacity Gallons Per Minute
` WA VWAF o!J
j
43.E &VtA CZV Wt T't,>kA 1
Available Models Motor Electrical Data
NEC
EVWlon start Run Run Start Run Code Service
Standard Proof HP Volts Phase Hertz Amps Amps KW KVA KVA Letter Factor
WG20-01-15 WGX20.01-15 2 200 1 60 60.0 15.0 2.8 10.0 3.0 F 1.25 '
WG20-21.15 WGX20.21.15 2 230 1 60 44.0 12.0 2.8 10.1 2.8 F 1.25
.� W020-03-15 WGX20-03-15 2 200 3 60 30.0 8.5 2.9 10.4 3.3 F 1.25
W020.23-15 WGX20.23.15 2 230 3 60 27.5 8.4 2.9 11.0 3.3 F 1.25 i
W620-43-15 WGX20-43-15 2 460 3 60 13.8 4.2 2.9 11.0 3.3 F 1.25 i
WG20-53-15 WGX20-53.15 2 575 3 60 1 11.0 3.4 1 2.9 11.0 3.3 F 1 1.25
Wa20F 01-15 WGX20E-01.15 2 200 1 60 500.0 15.0 2.8 10.0 3.0 F 1.25
WG20F 21-15 WGX20E-21-15 2 230 1 80 44.0 12.0 2.8 10.1 2.8 F 1.25
W020E-03-15 WGX20E-03-15 2 200 3 60 $0.0 9.5 2.9 •10.4 3.3 F. 1.25
WG20E-23.15 WGX20F 23-15 2 230 3 60 27.5 8.4 2.9 11.0 3.3 F 1.25
W02OF-43-15 WGX2OF-43-15 2 460 3 60 1&$ 4.2 2.9 11.0 3.3 F 1.26
WG20E-53-15 WGX20E-53.15 2 575 3 60 11.0 3.4 2.9 11.0 3.3 F 1.25
NOTE: Minimum impeller diameter available is W.
I
PUMP SYSTEM CURVE CALCULATIONS
2"PVC SDR-21
PROJECT: Andre Charbonneau, 1249&1265 John Fitch Blvd. JOB NO: 2002-098
ELEVATION HEAD 17
LENGTH OF FORCE MAIN (FT) 167
PIPE INSIDE DIA. (IN) 2.13
TOTAL TOTAL
FLOW VELOCITY FRICTION FITTING FRICTION STATIC DYNAMIC
(gpm) (fps) LOSS/FT LOSS HEAD(ft) HEAD(ft) HEAD(ft
10 0.90 0.0017 0.924686 1.21 17 18.21
15 1.35 0.0036 2.080543 2.68 17 19.68
20 1.80 0.0062 3.698743 4.73 17 21.73
25 2.25 0.0093 5.779287 7.33 17 24.33
30 2.70 0.0131 8.322173 10.50 17 27.50
39.5 3.56 0.0217 14.4 7741 18.06 17 35.06
40 3.60 0.0222 14.7 4497 18.51 17 35.51
43.5 3.92 0.0260 17.49737 21.83 17 38.83
50 4.50 0.0336 23.11715 28.73 17 45.73
60 5.41 0.0471 33.28869 41.16 17 58.16
70 6.31 0.0627 45.30961 55.78 17 72.78
_801 803 59.17989 72.59 17 89.59
83 7.48 0.0859 63.70161 78.05 17 95.05
MINOR LOSSES
Kvalue Total K
Fitting Type 2" # Value
short radius,90 elbow 0.21 3 0.63
long radius,90 elbow 0.14 0 0
regular 45 elbow 0.24 1 0.24
22-1/2 bend 0.07 0 0
tee,flow through line 0.60 1 0.6
tee,flow through stem 1.80 2 3.6
180 return 0.38 0 0
plug valve 0.77 0 0
globe valve 10.00 0 0
gate valve 0.19 2 0.38
ball check valve 65.00 1 65
angle valve 5.00 0 0
sudden contraction(d/D=1/2) 0.42 1 0.42
swing check valve 2.50 1 2.5
73.37
"taken from Table 3.9, Civil Engineering Reference Manual for PE Exam
6th Edition, Lindeburg, 1997.
Pagel
Nov. 20. 200712:21PM No. 2484 P. 2
F. J. Smith
a division of Blake Equipment Co.,Inc.
41 Commerce Way
South Windsor,Cann ten 06074
860-5284623 Fax 960.528-8057
November 20,2007
J.R. Russo&Associates
i Shoham Road
East Windsor, CT 060$8
ATIN:Dana Steele
RE: 1265 South John Fitch Boulevard Pump Station
Dear Dana:
The new pump station at 1265 South John Fitch Boulevard:
Pump sizing was based on your calculations of 40 GPM @ 50'TDH
Grinder pumps were selected for this application with an 11/" discharge.
The existing pump station at 1265 John Fitch Boulevard has Myers WG20 Grinder
pumps installed with a maximum flow rate of 40 GPM and a maximum 100 `shutoff
head.These are also rnaximm figures.The existing pumps could have an impeller
trim further reducing the flow rate to match the existing head condition. The existing
head condition was not stated in the old file. (Please see attached curve) These pumps
have an 11/4" discharge increasing in size to a 2" force main outside of the old pump
station.
The thinking is to share the existing 2" force main for both pump stations with
isolation valves for future service considerations. If operation of both pump stations
simultaneously is a concern it is possible to interlock the new pump station so that it
does not pump till the older pump station is finished.The new station has more
capacity than the old one.
If you have any further questions please feel free to give us a call at anytime.
Sincerely,
F.J.Smith Equipment Co.
Robert Klybas
Nov, 19. 2007 11 . 22AM No. 2439 P. 2
F. J. Smith
a division of Blake Equipment Co.,Inc.
41 Commerce Way
South Windsor, Connecticut 06074
860-528-6623 Pax 860-528-8057
November 19, 2007
Andre' Charbonneau &Sons
125 Edwin.Road
South Windsor, CT 06074
ATIN Mr Andre' Charbonneau
RE: 1265 South John Fitch Boulevard Pump Station
Dear Mr. Charbonneau:
At a recent job meeting it was suggested that the existing 2" force main be utilized at
1265 John Fitch Boulevard to accept the flow from the 1265 South John Fitch
Boulevard Pump Station. From an equipment manufacturers perspective there is no
problem doing this due to the size of the pumps and associated flow rates. From a
maintenance perspective we do recommend that an underground curb valve be
installed to isolate both systems in the event service is required