Loading...
HomeMy WebLinkAboutApplication Deming Street, Mancheste t0W N SFq a 7DWn OP sot� ?d&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO` AREA CODE 860/644-2511 September 19, 2005 Mr. Dereck Pacheco 56 Congress Street Manchester, CT 06040 Re: Dunkin Donuts, 210 Deming Street Manchester, CT Dear Mr. Pacheco: The South Windsor Water Pollution Control Authority, at its regular meeting of September 6, 2005, gave approval for the connection to the Town's sewerage system for the Dunkin Donuts located at 210 Deming Street, Manchester, CT as more specifically shown on plans entitled "Dunkin Donuts, Special Exception Site Plan, Special Design Commercial Business Zone, 210 Deming Street (S.R. 30), Manchester, Connecticut", Page No.: CS 1.1, Project No.: 89-110P11, Dated: 03/12/04, with revision dates: 03/18/04, 04/28/04, 05/10/04, 06/10/04, 11/23/04, 02/16/05; also, Page No.: CS 1.2, Project No.: 89-110 P11, Dated: 03/12/04, with revision dates: 03/18/04, 04/28/04, 05/10104, 06/10/04, 02/16/05, 05/26/05, 05/31/05; and subject to the following conditions: 1. Connections to be made to the existing manhole at station 4+100. 2. A general permit for the grease separator must be obtained from the State of Connecticut Department of Environmental Protection. 3. Technical approval of the Town Engineering Department. 4. Final Authority approval and acceptance of the.sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 5. The sewer connection charge will be $3,108.00. This approval letter must be superimposed on the final approval plans. Very truly yours, 2 �Gz2 seph J.Carino, Chairman Water Pollution Control Authority JC:ead Cc: Michael J. Gantick, Director of Public Works Jeffrey Doolittle, Town Engineer Marcia Banach, Director of Planning Christopher Dougan, Chief Building Inspector TOWN OF SOUTH WINDSOR �► ♦ WATER POLLUTION CONTROL AUTHORITY AUG 4 2005 APPLICATION FORM s Application No. to" Date Received `r Date Scheduled For q1 in los- larvi ✓ res (o Telephone (1 9 • 79a5 Owner of Record on L nd Records Owners Address Property Description: Assessor's Map# Parcel# Vol. Page Project Title: V[I , Inquiries to be directed to: (Name, Address, Phone) 51, CQNcess sk mcirr. Approvals Previously Received: (Check) IWA -✓ P &Z ZBA Purpose of Application: (Check all that apply) 1. Sewer Extension/Connection—Residential Use a. Subdivision b. Single Unit c. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connecti n—Industrial/Commercial User a. New Connection ki b. Request to Increase F ow Rate c. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment c. Change in Use of Property 5. Regulatory Appeal : Explain 6. Other xplain %J410S plic nt' i a Date Owner's Signature Date (See Reverse side for Application Submittal Procedures)