Loading...
HomeMy WebLinkAboutWPCA 124 Commerce Way r �aW N sf4 T-491wn 0-le / SotdA ?A a w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Soe•ca AREA CODE 203/644-2511 October 22, 1999 Mr. Peter DeMallie Design Professionals, Inc. 165 South Satellite Road South Windsor, CT 06074 RE: Windsor Steel Headquarters 124 Commerce Way SOUTH WINDSOR, CT Dear Mr. DeMallie: The South Windsor Water Pollution Control Authority, at its special meeting of October 19 1999, gave approval for the connection to the Town's sewerage system of a commercial building at 124 Commerce Way, as more specifically shown on plans entitled "Windsor Steel Corporate Headquarters - 124 Commerce Way - South Windsor- Connecticut" prepared by Design Professionals, Inc., South Windsor, CT, Job No. 98-1127, as follows: Sheet 1, Cover Sheet — Key Map dated July 28, 1999, rev. September 17, 1999; Sheet 2/5, Resurvey Plot Plan dated July 6, 1999, rev. 8/9/1999, 9/8/1999, and 9/17/99; Sheet 3/5, Resurvey Topographic Map dated July 6, 1999, rev. 8/9/1999 and 9/8/1999; Sheet 4/5, Sediment and Erosion Control Plans dated July 6, 1999, rev. 8/9/1999 and 9/8/1999; Sheet 5/5, Details dated July 6, 1999, no rev.; Sheet L1/L1 (Planimetrics), Planting Plan dated 8/17/99, no rev.; and Sheets A-1 and A-2 (The Lawrence Associates, Project No. 99-0026), Floor Plan and Exterior Elevations, respectively, dated 8/13/99, no revisions; and subject to the following conditions: 1. Technical approval of the Town Engineering Department. 2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff, and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority, and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. 3. Town staff will examine the company's operations to ensure that all other fluids used in the manufacturing process will be adequately controlled and kept clear of sewers. 4. Due to the close proximity of the manhole in the street, the requirement for a manhole on the property will be waived. Mr. Peter DeMallie 2 October 22, 1999 5. The connection charge will be based on 1.8 acres of developed acreage. 6. This approval letter must be superimposed on the final approval plans. Very truly yours, Thomas Mindson, Chairman Water Pollution Control Authority TH:rt cc: Matthew Galligan, Town Manager Michael J. Gantick,Director.of Public Works Jerry Iazzetta, Town Engineer Marcia Banach, Director of Planning John Collins, Chief Building Inspector i I i i A DESIGN PROFESSIONALS, INC. civil engineers * planners * surveyors * gis LETTER OF TRANSMITTAL TO: Mr. Fred Shaw DATE: 10/8/99 Town.Hall-- 1540 Sullivan Avenue South Windsor, CT RE: Windsor.Steel Headquarters.. ...... DPI PROD. NO.: 9&-1127 1.24-Commer South Windsor, Connecticut WE ARE SENDING YOU: El for your use ❑ at your request 0 for approval by WPCA El for your files Z for review and comment El other THE FOLLOWING: Completed WPCA application form and two (2) blueprint sets of plans for the Windsor Steel Headquarters project on Commerce Way. Inland Wetlands Agency approval was granted last Wednesday and Planning&Zoning Commission approval is expected on Tuesday, October 12th. We are hereby requesting that this application be placed on the next WPCA agenda which is I believe on October 19th. Please advise if this is possible. Thank you. DES17GNP FESSIONALS, INC. By: Peter* R. DeMallie cc: Joanne Patenaude Principal Rich Adams Bob Arsenault, P.E. Matthew Galligan 105 South Satellite Road, South Windsor, Connecticut 06074 Tel: (860)291-8755 *Fax: (860)291,8757 TOWN OF SOUTH WINDSOR WATER POLLUTION CONTROL AUTHORITY APPLICATION FORM Application No. Date Received 1 (7-1 q cl Date Scheduled For Applicant Lot Lot 31-32 Commerce Way,LLC c/o Windsor Steel Address 38 Edwin Road, South Windsor CT 06074 Telephone No. (work)289-1529 Owner of Record on Land Records Lot 31-32 Commerce Way,LLC Owner's Address 38 Edwin Road, South Windsor,CT 06074 Property Description: Assessor's Map# 121 Parcel# 24 Vol. 1099 Page 60 Project Title: Windsor Steel Headquarters, 124 Commerce Way Inquiries to be Directed to: (name,address,telephone no.) Peter R.DeMallie,Principal, Design Professionals,Inc., 165 South Satellite Road, South Windsor,CT 06074 Approvals Previously Received(Check) IWA P&Z 4* ZBA Purpose of Application: (Check all that apply) *Expected 10/12/99 1. Sewer Extension/Connection—Residential Use a. Subdivision b. Single Unit C. Other Explain d. Type of Approval: Concept Final 2. Sewer Extension/Connection—Industrial/Commercial User a. New Connection J b. Request to Increase Flow Rate C. Change in Nature of Waste Discharge d. Other Explain e. Type of Approval: Concept Final 3. Appeal of Sewer User Charge a. Residential b. Industrial/Commercial 4. Sewer Assessment a. Establish Sewer Assessment b. Appeal of Sewer Assessment C. Change in Use of Property 5. Regulatory Appeal ;Explain 6. Other Explain )4 07 App t's St ture Date o w r' Signature Date (See Reverse Side for Application Submittal Procedures) /rwsomMlapplicadon 111261%