Loading...
HomeMy WebLinkAboutClark Street - WPCA Gateway Trunk Sewer <0w NrA aft -0 n ales� �• 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR.Co TELEPHONE (860) 644-2511 January 2,2003 Fuss&O'Neill 146 Hartford Rd. Manchester, CT 06040 Attn: Michelle Carlson,P.E. RE: Gateway Trunk Sewer Clark Street South Windsor,CT Dear Ms. Carlson: The South Windsor Water Pollution Control Authority,at its special meeting of December 17,2002,gave approval for the connection of a commercial property to the Town's sewerage system on Clark St., South Windsor, CT,as more specifically shown on plans entitled"Town of South Windsor Gateway Trunk Sewer-Sanitary Sewer Design"prepared by Fuss&O'Neill,Inc.,Manchester, CT,Project No. 000481.X10,Drawing No(s) 1 dated August 2002,revised 5/25/01 and 11/12/02 and subject to the following conditions: 1. Additional conditions as show in memorandum from Town staff dated 11/27/02 must be satisfied. 2. Technical approval of the Town Engineering Department. 3. Approval of South Windsor Inland/Wetlands Agency and Army Corp of Engineers. 4. Final Authority approval and acceptance of the sanitary sewerage connection will be given once the sewer line has been installed and inspected by the Town staff,and based upon the written verification of the Town staff that said sanitary sewer line was installed in substantial conformance with the design plans previously approved by the Authority,and meeting all Town regulations and appropriate technical specifications relating to sanitary sewer construction. This approval letter must be superimposed on the final approval plans. Very truly yours, seph J.Carmo, Chairman Water Pollution Control Authority JJC:dd Cc: Matthew Galligan,Town Manager Michael J. Gantick,Director of Public Works Jeff Doolittle,Town Engineer Marcia Banach,Director of Planning John Collins, Chief Building Inspector Evergreen Walk,LLC