Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Site Plan - Conservation (542)
TOWN OF SOUTH WIN DSOR INLAND WETLAND, WATERCOURS 1 Z ICATION APPLICATION !. '�6 DATE RECEIVED INSTRUCTIQ�S South Windsor 1. The application, map and plans must be submieaD Erl-A LL 1M�t�Yr together with the fee se forth in the Inland Wetlands, Watercourses an'& a ations, Town of South Windsor. (See Regulations, Section VI). 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be ravished with respect to the standards and criteria for application evaluation. (See Regulations, Sections VIII - X). 3. The applicant understands that this application is to be considered complete only when a. information and documents required by the Agency° have been submitted. (See Regulations Section VII). A. APPLICANT'S NAME ADDRESS PHONE: (HOME) (WORK) B. LEGAL OWNER'S NAME: ADDRESS PHONE: (HOME) (WORK) (List additional owners, addresses, and phone numbers on back of application). C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNER'S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUSS ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. • D. PROJECT NAME: (if an n i % -W I N 1 7 1. Cont?teson (i£ r i ormation is needed)E. THE GEOGL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW IDENTIFICATION P Y ON TH THE R T I AND VAT 0 SES i PAGE 1 THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, F0� A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AN CONFIRMS THAT: 1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE •INLAND WETLAND, WATERCOURSES AND CONSERVATIO REGULATIONS OF THE TOWN OF SOUTH WINDSOR. 2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATERCOURSES IN QUESTION AND/OR ANY PROPOSED ACTIVITY. 3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THE! REGULATIONS . 4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND, WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO ENTER THE PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE PURPOSE OF INSPECTIC# AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION- BOTH BEFORE AFTEVAA FI ISION HAS BEEN ISSUED. '-gov.e 7 Signature of Applicant Date Received and filed at the office of the Planning Department this day of 19 Signature of Agent Date **�******r*•**,r***rr*****,r*�*****,r*,t*,t*�*�,t,t**,t*****rt***,t****,r******�.****t******t*****�,r*�,r* FEE RECEIVED YES_, NO_ AMOUNT DATE RECEIVED by HEARING DATE HEARING ADV. (1) (2) PERMIT GRANTED DATE PERMIT DENIED DATE PAGE 3 Auje ---------- -------------- WATERSHED TO WATERSHED ROUTING WINDSHIRE ABBE WEIR STRUCTURE SCHEMATIC FOR T R - 2 0 COMPUTER PROGRAM INFLOW HYDROGRAPH 1 STRUCTURE Of WEIR AT WINDSHIRE ABBE OUTFLOW HYDROGRAPH 2 REACH 001 CHANNEL TO NEVERS ROAD WATERSHED TO 72" R CP IN HIGH SCHOOL HYDROGRAPH 3 DRIVEWAY REACH 002 H.S. SITE CHANNEL TO WATERSHED TO 72" RCP IN HYDROGRAPH 5 72" RCP IN HIGH SCHOOL HIGH SCHOOL DRIVEWAY DRIVEWAY HYDROGRAPH 4 ADD HYDROGRAPHS HYDROGRAPH 6 INFLOW HYDROGRAPH I STRUCTURE 02 72' RCP AT HIGH SCHOOL DRIVEWAY OUTFLOW HYDROGRAPH 2 REACH 003 CHANNEL TO SAND HILL ROAD WATERSHED TO 3'X 6' BOX CULVERT SAND HILL ROAD HYDROGRAPH 3 HYDROGRAPH 4 ADD HYDROGRAPHS INFLOW HYDROGRAPH 5 STRUCTURE 03 3' X 6' BOX CULVERT SAND HILL ROAD OUTFLOW HYDROGRAPH 6 REACH 004 CHANNEL TO WATERSHED TO ELLINGTON ROAD 42" CMP ELLINGTON ROAD HYDROGRAPH 7 HYDROGRAPH I ADD HYDROGRAPHS 7 INFLOW HYDROGRAPH 2 STRUCTURE 04 42" CMP ELLINGTON ROAD WATERSHED TO 48" RCP OAKLAND ROAD OUTFLOW HYDROGRAPH 3 HYDROGRAPH 4 ADD HYDROGRAPHS INFLOW HYDROGRAPH 5 48" RCP OAKLAND ROAD a W STORM WATER HYDROLOGIC AND HYDRAULIC ANALYSIS FOR SOUTH WINDSOR HIGH SCHOOL Prepared by A-N CONSULTING ENGINEERS, INC. ' 505 Willard Avenue Newington, Connecticut 06111 UAN 10, 1989 ' TABLE OF CONTENTS page INTRODUCTION 1 ' SUMMARY 2 METHOD 3 SUMMARY TABLE 4 PLUM GULLEY BROOK WATERSHED MAP 5 WATERSHED ROUTING SCHEMATIC 6 PRE/POST DEVELOPMENT HYDROGRAPH 7-15 SOILS GROUP MAP 16 CURVE NUMBERS AND TIME OF CONCENTRATION 17-24 REACH CALCULATIONS 25-26 STAGE-DISCHARGE CALCULATIONS FOR STRUCTURES 27-28 TR-20 COMPUTER RUNS PRE DEVELOPMENT 29-45 ' POST DEVELOPMENT 46-62 STORM SEWER DESIGN 63-70 OUTLET PROTECTION CALCULATIONS 71-74 CATCH BASIN DRAINAGE AREA MAP 75 ' INTRODUCTION A-N Consulting Engineers, Inc. was retained by Evans and Chisholm Landscape Architects to prepare a drainage analysis for the proposed additions and alterations to the South Windsor High and Wapping Elementry Schools located on Ayers and Nevers Roads in South Windsor Connecticut. The improvements to the schools will consist of adding parking lots, upgrading recreation fields and construction of ' utlities and additions to the buildings. The proposed drainage system will collect and route runoff from the site improvements with combination of roof leaders, yard drains and catch basins that discharge the storm water to Plum Gulley Brook. The hydraulic analysis for this system is based on a 10 year return frequency storm in ' accordance with the Town of South Windsor' s "General Storm Drainage Design Guidelines" distributed by the South Windsor Public Works Department to design engineers. A hydrologic ' Analysis of the Plum Gulley Brook watershed was also requested by the Town of South Windsor Engineering and Public Works Departments to insure that the increased development of the school 's site would not create any adverse impact due to an increase in flow rate or water surface elevations at the downstream road crossings at Sand Hill Road, Ellington Road (Conn. Rte. 74) , and Oakland Road (Conn. Rte. 30) . ' This report consists of a gutterflow, pipe capacity, and a headwater analysis for the school drainage system. The Plum ' Gulley Brook hydrologic analysis demonstrates pre and post development flow rates and water surface elevations at the school driveway and the above mentioned road crossings for multi-frequency storms ranging from the 1 to the 100 year ' return frequency rainfall events. �l SUMMARY The subject site of the South Windsor High School on ' Nevers Road in South Windsor, Connecticut is located in the 687 acre Plum Gully Brook Watershed. The proposed improvements to' the South Windsor High School will occur on ' approximately 29 . 7 acres of this watershed. The net increase of impervious area to the site will be 7 . 6 acres from the building additions and parking lot. This increase in ' development corresponds to an increase in rainfall runoff of approximately 20 cfs for the twenty five year return frequency storm. The site storm drainage is designed for a 25 yr capacity and discharges to Plum Gully Brook The overall effect of the increase in runoff on downstream structures is diminished substantially by the position of site in the lower third of the major contributing area of the Plum Gully Brook watershed. The effect of the High School development on the flow in the Plum Gully Brook is analyzed at four major road crossings; a 72" RCP culvert in the High School driveway, a 3 ' x 6 ' box culvert in Sand Hill Road, a 42" CMP culvert in Ellington Road (Conn. RTE 74) , and a 48" RCP culvert in Oakland Road (Conn. RTE 30) . The average peak increase at all the crossings for the 1, 2, 5, 10, 25, 50 and 100 year storm events is 1. 2 cfs. The largest peak increase is 2 . 7 cfs (1. 2%) for the 25 yr storm at the 48" RCP at Oakland Road. The peak discharge for the 100 year storm at the 72" RCP culvert is decreased by 2 .2 CFS. The average increase of water depth at all formerly mentioned storms and all routed design points is 0. 02 ft with the maximum increase of 0. 07 ft at the 42" CMP at Ellington Road for the 2 year storm and the 3 ' x 6 ' box culvert in Sand Hill Road for the 10 yr storm. The depth of flow during the 100 year storm at the ' 72" RCP culvert is decreased by 0. 02 ft. A summary of all calculated flows and elevations at routed structures is included in this report. The pre-development analysis indicates that each of the ' road crossings will flood during a given storm. The 72" RCP in the High School driveway floods for the 100 yr storm, the 3 ' x 6 ' box culvert floods for the 25 yr storm and the 42" CMP floods for the 5 year storm. The storm flows were not routed through 48" RCP in Ellington Road in this analysis. Would detention of the increased peak flow on the high school site improve the situation? An analysis of the hydrographs at the High School culvert indicates that the High School storm runoff peaks approximately 2 hrs before the larger watershed peak. The early runoff response of the ' site results with only the receding limb of the site hydrograph contributing to the peak discharge for the entire watershed. A detention facility functions by holding back the water and slowly releasing it. This serves to increase the runoff volume under the receding limb of the hydrograph. Detention would increase the overall watershed peak, because ' the receding limb of the hydrograph is the only contributing element of the High School runoff to the larger watershed peak. The pre and post development hydrographs for the 25 yr return frequency storm are included in this report. METHOD ' The SCS TR-20 and TR-55 computer programs were used to analyze the pre and post development storm water flows. The contributing portion of the site is approximately 30 acres in a 687 acre watershed. This watershed was divided into six subareas analyzed at five design points with the watershed characteristics listed as shown on the map on page 5 of this report. A watershed routing schematic is included in this report on page 6. The first design point is a detention facility for the Windshire-Abbe development.The watershed runoff is routed through the weir structure of the detention facility and through a channel reach to Nevers Road. The runoff is then routed through a second reach to the second design point, a 72" RCP in the High School driveway. At the second design point three hydrographs are added; the reach routed hydrograph, a portion of the High School runoff hydrograph and the remaining watershed hydrograph. These flows are then routed through the 72" RCP culvert. The outflow hydrograph from the 72" RCP is routed through a third channel reach to the third design point which is the 31x 6 ' box culvert in Sand Hill Road. The remaining portion of the High School runoff is contained in. the watershed contributing to the flow at the box culvert. This flow is added to the reach routed hydrograph from the 72" RCP. The hydrograph is then routed through the box culvert and a fourth reach to the ' fourth design point, a 42" CMP in Ellington Road. The routed hydrograph is added to the remaining watershed and routed through the 42" CMP to the fifth and last design point, a ' 48" RCP in Oakland Road. The discharge from the 42" CMP is added to the remaining watershed hydrograph to formulate the total watershed hydrograph. The watersheds were delineated from both a U.S.G.S 2000 ' scale map and the town topographic maps which were verified with field trips to the area. The soils groups were determined by using a S.C.S soils map for Hartford County. The channel discharge-area curves and flow line elevations ' were interpolated from 100 scale town topographic maps. Flow overtopping the roads was considered broad crested weir flow. Outlet discharge-stage curves were calculated for the structures downstream of the school site. ' The site storm drainage was designed using Conn. D.O.T. Drainage Manual procedures for the 10 yr return frequency storm. Modified rip rap channels were designed from the outlets of the onsite drainage facilities to the Plum Gully Brook channel. The U.S. Dept. of Transportation Hydraulic Design Series No. 3 and No. 11 were used as a guideline for this design. The combination of steep slopes and easily eroded silty loam soils necessitated the use of rip rap channels. /ram SUMMARY TABLE 3 - DISCHARGE (CFS) AND ELEVATIONS (FT) FOR STRUCTURES FOR ALL STORMS STRUCTURE STORM NUMBERS.......... ID AND DESCRIPTION 1 2 5 10 25 50 99 STRUCTURE 5 48" RCP AT OAKLAND AVENUE ' PRE-DEVELOPMENT PEAK FLOW (CFS) 23.99 49.18 107.80 145.87 225.96 288.59 349.15 POST-DEVELOPMENT PEAK FLOW (CFS) 24.92 50.37 109.53 147.68 228.65 290.00 350.00 ----- ----- ----- ----- ----- ----- ----- ' Increase 0.93 1.19 1.73 1.81 2.69 1.41 0.85 STRUCTURE 4 4211CMP AT ELLINGTON STREET PRE-DEVELOPMENT PEAK FLOW (CFS) 23.72 48.63 106.59 144.29 223.40 285.26 345.14 POST-DEVELOPMENT PEAK FLOW (CFS) 24.65 49.82 108.31 146.09 226.07 286.67 345.99 ----- ----- ----- ----- ----- ----- ----- Increase 0.93 1.19 1.72 1.80 2.67 1.41 0.85 PRE-DEVELOPMENT PEAK ELEVATION (FT) 107.16 108.44 109.16 109.29 109.56 109.76 109.97 ' POST-DEVELOPMENT PEAK ELEVATION (FT) 107.21 108.51 109.17 109.29 109� -56 109.77- 109.97- - - Increase 0.05 0.07 0.01 0.00 0.00 0.01 0.00 -- Water overtops roadway -------------------> ' STRUCTURE 3 3,X61 BOX CULVERT AT SANDHILL ROAD PRE-DEVELOPMENT PEAK FLOW (CFS) 24.25 50.77 105.69 142.35 224.84 282.36 340.44 POST-DEVELOPMENT PEAK FLOW (CFS) 25.22 51.88 107.28 144.10 226.37 283.50 340.88 ----- ..... ..... ----- ----- ----- ----- Increase 0.97 1.11 1.59 1.75 1.53 1.14 0.44 PRE-DEVELOPMENT PEAK ELEVATION (FT) 141.08 142.17 143.8 145.16 146.13 146.25 146.37 POST-DEVELOPMENT PEAK ELEVATION (FT) 141.12 142.2 143.85 145.23 146.13 146.25 146.37 ----- ----- ----- ----- ----- ----- ----- Increase 0.04 0.03 0.05 0.07 0.00 0.00 0.00 -- Water overtops roadway ---------> ' STRUCTURE 2 72" RCP IN HIGH SCHOOL DRIVEWAY ' PRE-DEVELOPMENT PEAK FLOW (CFS) 21.79 46.39 98.43 140.86 202.90 254.14 308.18 POST-DEVELOPMENT PEAK FLOW (CFS) 22.28 46.89 98.77 140.99 202.68 253.53 306.00 ----- ----- ----- ----- ----- ----- ----- Increase 0.49 0.50 0.34 0.13 -0.22 -0.61 -2.18 PRE-DEVELOPMENT PEAK ELEVATION (FT) 163.02 163.36 164.09 164.95 166.05 167.00 168.12 ' POST-DEVELOPMENT PEAK ELEVATION (FT) 163�03 163.36 164� - -1 164.95 166� -05 166� -99 168�10- Increase 0.01 0.00 0.01 0.00 0.00 -0.01 -0.02 1-water overtops ' STRUCTURE 1 WEIR AT WINDSHIRE ABBE ' PRE/POST DEVELOPMENT PEAK FLOW (CFS) 16.57 32.40 64.06 88.68 123.00 150.46 181.31 PRE/POST DEVELOPMENT PEAK ELEV. (FT) 237.99 238.15 238.46 238.7 239.02 139.16 239.32 tA-1V SUBJECT_--___-------- Sheet No. — __ 01 —73-- CONSULTING ENGINEERS, INC. —_ Computed By—_—_ Date—_—_-- JOB NO__--_------- ------------------- Checked By .' ' WATERSHED DELINEATIONS i ) 1 iq a. stREACH 00 •I� 'J2QIOLL[�. '•/ `� l/�r� I \ ` ,�,.R,QgG�1j �C� I'1 \ �,``•Y I 7,1 _ . •••� . l ( .r l ( TemlieliehHdtel/ ;�ti / �• '°'• Q- i REACH 00 - .� y i�( 1`.'�\. `�`\ f LO 1 . I •�"• i _•r-�_ �.241 66 ` 1 7 2" RCP AT SOUTH s� hni�► c. / ��?` '/� iD FWINDSOR HIGH SCHOOL , ii r STRUCTURE 02 ; � h tt � � �, � `� ` •� 1 I' � u V�" �r /th n u. J L� -High II' � • '�+-J/-�`'la \ ��` ir.`. 1 / °�'. WEIR STRUCTURE REACH 003 _ I ' \ ',' , •� �`/. '`f' • AT WINDSHIRE—ABBE �' 'h/ •�/. `—t';�?1 t' r STRUCTURE Ol ' __ .•/ ,San a vel io�• •c / .,'ir. /� ,•\ 1� \� ,.. •� �� p'90 �. \ q •'�• 3' X 6' BOX CULVERT AT SAND HILL ROAD ' EACH 00 i/ 1`�` a i„ STRUCTURE 03 —":5andand GndDr \' 42" .CMP'AT ELLINGTON ROAD •\ —� \,\ a STRUCTURE 04 Wa in PP '`-- } �7 77' �''• i• •rJ' "Cem'-ew-WaI7n e a .. 4 Urciurd•,Iilll _ 101 05 ' \I STRUCTURE = Tt,Tc flow paths SCALE Channel Reach 1 in = 2000 ft ' WINDSHIRE-ABBE WATERSHED STRUCTURE 01 PRE/POST DEVELOPMENT CN= 65.5 AREA= 232 acres Tc= 2.04 hrs WINDSOR HIGH SCHOOL WATERSHED TO 72" RCP STRUCTURE 02 PRE DEVELOPMENT CN= 67 AREA= 18.0 acres Tc= 0.52 hrs ' POST DEVELOPMENT CN= 77 AREA= 18.7 acres Tc= 0.35 hrs WATERSHED TO 7211 RCP STRUCTURE 02 PRE DEVELOPMENT CN= 57 AREA= 243 acres Tc= 1.82 hrs ' POST DEVELOPMENT CN= 57 AREA= 240 acres Tc= 1.82 hrs WATERSHED TO 3' X 6' BOX CULVERT AT SAND HILL ROAD STRUCTURE 03 PRE DEVELOPMENT CN= 60 AREA= 133 acres Tc= 0.72 hrs POST DEVELOPMENT CN= 61 AREA-- 136.7 acres Tc= 0.72 hrs ' WATERSHED TO 4211 CMP AT ELLINGTON ROAD STRUCTURE 04 PRE/POST DEVELOPMENT CN= 59 AREA= 38.0 acres Tc= 0.57 hrs ' WATERSHED TO 4811 RCP AT OAKLAND ROAD STRUCTURE 05 PRE/POST DEVELOPMENT CN= 55 AREA= 23.0 acres Tc= 0.22 hrs PRE/PO S T ' :DEVELOPMENT :HYDROGRA.PH S 25 YR STORM SITE ONLY 45 40 35 30 0 4. U 25 W 20 U cl 15 10 5 0 8 12 16 20 24 28 TIME (HRS) PREHS POSTHS PRE -DEVELOPMENT' HYDROGRAPHS 25 YR STORM AT 72" RCP 2'10 200 190 180 170 160 150. 140 130 120 110 Q 100 V 90 N 80 70 60 50 40 30 20 10 0 8 12 16 20 24 28 TIME (HRS) SITE WATERSHED TOTAL POST DEVELOPMENT HYDROGRAPHS 25 YR STORM AT 72 RCP 210 200 190 180 170 160 150 140 130 120 110 Q 100 U 90 N 80 0 70 60 50 40 30 20 10 0 8 12 16 -20 24 28 TIME (HRS) SITE WATERSHED TOTAL - PRE/POST DEVVELORMENT HYDROGRAPHS,' .... 25 YR STORM AT 72" RCP 210 200 190. 180 -'170 160 150 140 130 120 110 100 U _ 80 70 60 50 40 30 20 10 0 8 12 16 20 24 28 TIME (HRS) PRE POST PRE/POST DEVELOPMENT HYDROGRAPH „ 25 YR STORM AT 3. X 6. BOX CULVERT 240220 200 180 160 .Ui` 140 120 Q ` U 10060 e 40 - 20 0 8 12 'k 6 20 24 28 TIME (RRS) PRE. POST �.� �r � . rt r r ,r�. ter- rr r� ,.�■.; r r �r :.: � , r� �r .�r: �r AR E%�'0 ' ' D hO :l El � I-�YDROGR.�PHS 25. YR STORM' AT 42" CMP .240 220 Zoo 180 .. - 164.: U 140 120. 100 80 40 - 8 12 1s 20 24 28 TIME (HRS PRE POST PRE/P.OST DEVELOPMENT — HYDROGRAPRS 25:YR.,STORM AT 48" RCP 240 220 200 180 160 LL U 140 w 120 Q ' U 100 yr 80 60 40. 20 g 12 1:6 20 24 28 TIME (HRS) PRE POST PRE --DEVELOPMENT HYDROGR PHS 25 YR RETURN FREQUENCY STORM 240 '' 220 .200 180 160 . � r N tL U 140 w . 120 U 100 80 60 40 20 0 . 8 12 16 20 24 28 TIME (HRS) 72RCP BOX 42CMP 48RCP POST DEVELOPMENT HYDR®GRAPHS 25 YR RETURN FREQUENCY STORM 240 220 200. . 180 160 w U 140 w 120 Q N100 o ! 80 i 60 40 20 0 8 12 16 20 24 28 TIME (HRS) 72RCP BOX 42CMP 48RCP 0 4 00 � x 0 The following summary is the soil symbols and hydrologic groups RL)qp for the watershed and all subareas discharging to the crossing of j Plum Gulley Brook at Oakland Road. Sources for data were Soil 1 Conservation Service. Soils Map for Hartford County and TR-55. SCS HYDROLOGIC tF SOIL SOIL I SYMBOL GROUP NAME Z AfB B Agawam fine sandy loam I n CsB2 B Cheshire fine sandy loam, eroded CtC B Cheshire stony fine sandy loam / EsA B Enfield silt loam a, EsB B Enfield silt loam EsB2 B Enfield silt loam, eroded EsC B Enfield silt loam I m EsC2 B Enfield silt loam, eroded < � 2 � I I 0 Ma B Made land c� — 6 I I y MgC A Manchester gravelly sandy loam �� EEC ( I 1 MhC A Manchester loamy sand NaB B Narragansett silt loam �, ►Zo,�t,6 I I I NaC B Narragansett silt loam "6f NgB B Narragansett stony silt loam SArip ►4" NgC B Narragansett stony silt loam ROq� �4�► I I I NgD B Narragansett stony silt loam NkC B Narragansett and Broadbrook very stony silt loams '� I I PkA D Peats and Mucks SbA D Saco silt loam I SeA D Scarboro loam I Tg A Terrace escarpments, sand and gravel TsA B Tisbury silt loam SCALE I ( I WcA C Walpole loam 1 in = 2000 ft I I WeA B Wapping silt loam WfA B Wapping stony silt loam .Is WhB B Watchaug stony loam WrA C Wilbraham silt loam corJu R-r3,0 ✓ V\ o o z a s o a , m I SOIL GROUP A j I icr TT t I SOIL GROUP B SOIL GROUP C n �T� SOIL GROUP D I � I i 17/73 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 ounty : HARTFORD State: CT Checked: LL5 Date: /--19 0 o ubtitle: EXISTING WATERSHED ubarea : HSSITE ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) I - - - - - ------------------------------------- --ULLY DEVELOPED URBAN AREAS (Veg Open space (Lawns,parks etc. ) Good condition; grass cover > 75% - 15.2 (61) -� - mP ervious Areas Paved parking lots, roofs, driveways - 2 .7 (98) - - total Area (by Hydrologic Soil Group) 17_9 ------------------------------4---------------------------------------------- UBAREA: HSSITE TOTAL DRAINAGE AREA: 17 .9 Acres WEIGHTED CURVE NUMBER: 67 ------------------------------------------------------------------------------- TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 ounty : HARTFORD State: CT Checked: Date: ubtitle: EXISTING WATERSHED ubarea : 72RCP --------------------------------------------------- ------ Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) --------------------------------------- --------------------------------------- ULLY DEVELOPED URBAN AREAS (Veg Estab. ) Impervious Areas RPaved parking lots, roofs, driveways - 12 . 3 (98) - - esidential districts Avg p% im ery (by average lot size) 1/3 acre 30 2 (57) 20 (72) 1/2 acre 25 3 (54) 10 (70) - - �ser defined urban (F9 to define) 1 (55) 48 (71) 5 (81) - % impervious 28% 28% 28% % unconnected impervious 15% 15% 15% ' pervious curve number 40 - 62 75 [THER AGRICULTURAL LANDS - rush brush, weed, grass mix good 75. 8 (48) 23 (65) 32 (73) foods good 8 (30) 182 (55) 23 (70) 30 (77) total Area (by Hydrologic Soil Group) 14 348 . 51 62 ------------------------------------------------------------------------------ SUBAREA: 72RCP TOTAL DRAINAGE AREA: 475. 1 Acres WEIGHTED CURVE NUMBER: 61 I------------------------------------------------------------------------------ y75, I C� I� — Z�Z 56.7/ bnSti�2rtvt� v(}srJ n,! C Z 3 1 G�r�e_ IJU✓>1�Je/' rIn�SV�t,tL - A6Y3Q LI.X�✓� ` ' f I l own o �f 0 vtn Gfi..�C✓�La�it1 r� ��l� 01 1 i'�`�-� -�o �/ CJ ��? �4 Tf'0 ✓1 V ie.r.+n ,r TiC lei/73 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 ounty : HARTFORD State: CT Checked: h:3 Date: 1 -19-9 o ubtitle: EXISTING WATERSHED ubarea : 3X6BOX ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ----------------------------------------------------------------------------- II IULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) iGood condition; grass cover > 75% - 21 (61) p - - m ervious Areas Paved parking lots, roofs, driveways 6 (98) - - - �esidential districts Avg % impery (by average lot size) 1/3 acre 30 - 5 (72) 1/2 acre 25 - 2 (70) - - gTHER AGRICULTURAL LANDS - - oods - grass combination poor 7 (57) 26 (73) Ioods good 15 (30) 51 (55) - - total Area (by Hydrologic Soil Group) 28 105 ------------------------------------------------------------------------------ SUBAREA: 3X6BOX TOTAL DRAINAGE AREA: 133 Acres WEIGHTED CURVE NUMBER: 60 '------------------------------------------------------------------------------ 201-73 TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 Iounty : HARTFORD State: CT Checked: 4� Date: l i 9 -�o ubtitle: EXISTING WATERSHED Subarea : 42CMP ------------------------------------------------------------------------------- ' Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------- ULLY DEVELOPED URBAN AREAS (Veg Estab. ) Open space (Lawns,parks etc. ) ' Good condition; grass cover > 75% 1. 0 (39) 2 . 0 (61) - - Streets and roads Paved; curbs and storm sewers 2 (98) 9 (98) - - OTHER AGRICULTURAL LANDS ,rush - brush, weed, grass mix good 8 (30) 1(48) - 5 (73) Woods good 8 (30) 2 (55) - - Total Area (by Hydrologic Soil Group) 19 14 5 , ------ ----- --------------------------------------------------- ----------- UBAREA:-42CMP--TOTAL DRAINAGE AREA: 38 Acres WEIGHTED CURVE-NUMBER: 59 ------------------------------------------------------------------------------- 21/-r ' TR-55 CURVE NUMBER COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 ounty : HARTFORD State: CT Checked: g4q Date: 1 _15 _Tc7 ubtitle: EXISTING WATERSHED ubarea : 48RCP ------------------------------------------------------------------------------- ' Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) I - - - - - ------------------------------------- --ULLY DEVELOPED URBAN AREAS (Veg Open space (Lawns,parks etc. ) Good condition; grass cover > 75% 5 (39) 3 (61) -� - mP ervious Areas Paved parking lots, roofs, driveways 1(98) - - - ilesidential districts Avg % impery (by average lot size) ' 1/2 acre 25 1 (54) 3 (70) - - THER AGRICULTURAL LANDS rush - brush, weed, grass mix ' good 1(30) 2 (48) - 3 (73) Woods good 2 (30) 2 (55) - - otal Area (by Hydrologic Soil Group) 10 10 3 --- ----- -------- ----- -- ----- -------- ----- ------ -- IIUBAREA:-48RCP--TOTAL-DRAINAGE-KREA:-23-Acres--------WEIGHTED-CURVE- UMBER•N55-- ------------------------------------------------------------------------------- TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 1111unty : HARTFORD State: CT Checked: Date: btitle: EXISTING WATERSHED ------------------------------ Subarea #1 - 72RCP ----------------------------- ow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- teet 3 .2 100 . 0043 I 1. 152 2allow Concent'd 1000 . 004 U 0.272 pen Channel 2700 . 004 . 03 450 150 0. 115 en Channel 2000 2 0.278 Time of Concentration = 1. 82* Iven Channel 3400 . 065 . 04575 110 0. 144 en Channel 1600 . 0146 . 04594 90 0. 108 Travel Time = 0. 25* ------------------------- --- Subarea #2 - 3X6BOX ----------------------------- IVow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- teet 3 . 2 100 . 06 I 0.402 allow Concent'd 1000 . 05 U 0. 077 Dpen Channel 1100 . 05 . 15 31 73 0. 243 Time of Concentration = 0_72* Open Channel 800 . 03 . 03539 25 0. 022 ' Travel Time = 0_02* -------------------------- Subarea #3 - 42CMP ----------------------------- ow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) -------------------------------------------------------------------------- te-e-t 3 2 100 . 102 I 0. 325 Shallow Concent'd 1000 . 032 U 0. 096 Iren Channel 1500 . 01 . 08656 27 0. 148 Time of Concentration = 0. 57* 1wen Channel 3210 .01 . 08654 27 0.324 Travel Time = 0. 32* - Generated for use by TABULAR method G�/j TR-55 Tc and Tt THRU SUBAREA COMPUTATION VERSION 1. 11 Project : SOUTH WINDSOR HIGH SCHOOL User: MGS Date: 11-29-89 �ounty : HARTFORD State: CT Checked: VA' Date: 1- 101 -'�o ubtitle: EXISTING WATERSHED -------- --------- --------- Subarea #4 - 48RCP ----------------------------- flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- 1heet 3 . 2 100 . 037 F 0. 186 hallow Concent'd 430 . 098 U 0. 024 Open Channel 290 . 007 . 02532 15. 3 0. 010 ' Time of Concentration = 0.22* pen Channel 670 .007 . 02532 15. 3 0. 023 Travel Time = 0_02* ---------------------------- Subarea #5 - HSSITE ----------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) -- - --- ----- ------ ------ ---------------------------------------0�--- 1h-e-e-t 3 2 100 . 0119 F 293 hallow Concent'd 968 . 0045 P 0. 197 pen Channel 605 . 0146 . 03594 90 0. 032 - Time of Concentration 0. 52* ----------------------------- Subarea #6 - WNDSHR ----------------------------- �low Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------ Sheet 3 . 2 100 . 02 I 0. 623 1hallow Concent'd 1000 . 009 U 0. 181 pen Channel 2200 . 0045 . 08 37 . 5 150 1.233 Time of Concentration = 2 . 04* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- ' B Fallow (No Res. ) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short Generated for use by TABULAR method ' A—N SUBJECT—lrr^`-11 ----- Sheet No. _2"1— of CONSULTING ENGINEERS, INC. _ P� _J.1L.� C1 .1�.V,��_ Computed B y-&�-— Do t e JOB NO.—_1L1�----__ --�L—L--- ✓LP.LL��--__ Chocked By Date r / 7 T 7 ���,�,�t1-�" �� • �1� �g. � � GQ n \ 1 ' � ' ti(.iovo+ 0�'- (,J CnYCfr f'k.CL ' \ Socl�� ��r�e� /�. z � I�• "i9 . CDow rr.cQ"/�! 97 r cz S c>. v7��> 7 v �-z -77 p 0 ,Z7Sq 7. 0 Q.7Z r 0- Z676'/ Ga o.7Z �xr� vrl: l 1tJ C) • o )5�0(0 0.7-- 13? i c�c>> _ !;�.z-S 7(,- 133q 75 - Cc — j� -7+ 1 1 z5�7� 19-Dec-89 REACH 002 FROM NEVERS ROAD TO 72" RCP AT HIGH SCHOOL DRIVEWAY S = 0. 015 SIDE SLOPE = 21 TO 1 n = 0. 045 BOTTOM WIDTH = 4 ' ELEV WP A-- -------------------------------------------- 0 4 0 0 ' 0. 5 25 7. 25 12 . 88119 1 46 25 67 . 51716 1.5 67 53 . 25 185.2829 2 88 92 384 . 3061 2 . 5 109 141. 25 680.8464 3 130 201 1089 .893 ' 3 . 5 151 271.25 1625. 490 4 172 352 2300.937 4 . 5 193 443 .25 3128.929 5 214 545 4121. 649 t I A-N SU8JECT_ �h _—_-- Shoat No. _ 2�_ o/ CONSULTING ENGINEERS, INC /r�IJS��r /� cGi � %r)� Computed By221ZSDate!;C_`��_ V JOB NO.—_. LE _--__ _--------_--------_ Checked By J'A--:3Date_ -1--P,- zb RencA-1 0 0.3 L _ 800 ' s ' 4 •D3 II Ll o 73 �Z =o.a6o Z�S n n=0 Q3 0,5 y ' � 2D ' 1 rc r v rj�`�� Q C9 o y � loo �2ow, 3 � = 3ZCc7 2S A 7I.0. .� O 1 C I-Ey ,� b 2 .0 3y i 6 1 '° y l7. 6 /D zip 1 - 72" RCP GROOVE END W/ HEADWALL LENGTH HEAD 9 z AIR PIPE OF TAIL SUBMERGED DEPTH STORAGE WATER (CFS) SIZE PIPE MANNINGS STRUCTURE WATER IINLET CONTROL!------- OUTLET CONTROL ---------1 CONTROL WEIR TOTAL VOLUME ELEV. SYSTEM 9 (IN) (FEET) SLOPE "n" TYPE ELEV, HW/D HW Ke H do " (dc+D)/2 LS HW HEAD FLOW WIDTH FLOW FLOW ACRE-FT ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 160.34 0.00 0.00 0,00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 163.00 20.00 72 80.0 1.17% 0.012 groove end w/headwall 1.20 0.25 1.51 0.20 0.01 14.10 3.59 0.94 2.66 2.66 20.00 0.31 164.00 94.00 72 80.0 1.17% 0.012 groove end w/headwall 2.93 0.61 3.66 0.20 0.24 31.30 4.30 0.94 3.60 3.66 94.00 0.61 165.00 143.50 72 80.0 1.17% 0.012 groove end w/headwall 3.73 0.78 4.66 0.20 0.56 39.00 4.63 0.94 4.24 4.66 1,43.50 1.05 166.00 200.00 72 80.0 1.17% 0.012 groove end w/headwall 4.53 0.94 5.66 0.20 1.08 46.40 4,93 0.94 5.08 5.66 200.00 1.69 167.00 254.00 72 80,0 1.17% 0.012 groove end w/headwall 5.33 1.11 6.66 0.20 1.75 56.90 3.37 0.94 6.18 6.66 254.00 2,52 168.00 301.00 72 80.0 1.17% 0,012 groove end w/headwall 6.13 1.28 7.66 0.20 2.45 56.90 5.37 0.94 6,89 7.66 301.00 3.56 169.10 305.50 72 80.0 1.17% 0.012 oroove end w/headwall 6.21 1.29 7.76 0.20 2.53 57.30 5.39 0.94 6,98 7.76 305.50 3.68 169.00 342.75 72 80.0 1.17% 0.012 groove end w/headwall 6.93 1.44 8.66 0,20 3.18 60.30 5.51 0.94 7.76 8.66 0.90 52.11 118,03 460.78 5.04 170.00 379.75 72 80.0 1.17% 0.012 oroove end w/headwall 7.73 1.61 9.66 0.20 3.91 62.80 5.62 0.94 8.58 9.66 1.90 110.00 760.26 1140.01 7.20 3'r6' box culvert normal headwall and 1.1 bevels LENGTH BOX BOX OF TAIL SUBMERGED DEPTH R WIDTH DEPTH PIPE MANNINGS STRUCTURE WATER !INLET CONTROL!------- OUTLET CONTROL ---------!CONTROL WEIR TOTAL VOLUME elev (CFS) (FT) (FT) (FT) SLOPE "no TYPE ELEV, HW/D HW Ke H do " (dc+D)12 LS HW HEAD FLOW WIDTH FLOW FLOW ACRE-FT ----------------------------------------------------------------------------------------------------------------------------------------------------------------- 140.0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0100 142.0 45.00 6 3.00 80.0 1.00% 0.015 WINGWALLS 0 FLARE 1.60 0.67 2.00 0.70 O.OB 1.21 0.30 0.80 0.00 2.00 45.00 0.83 144.0 112.30 6 3.00 80.0 1.00% 0.015 WINGWALLS 0 FLARE 3.20 1.33 4.00 0.70 0.04 2.22 0,34 0.80 0.00 4.00 112.30 3.05 145.5 151.20 6 3.00 BO.0 1.00% 0.015 WINGWALLS 0 FLARE 4.40 1.83 5.50 0.70 0.03 2.71 0.36 0.80 0.00 5.50 0.00 151.20 5.54 146.0 162.30 6 3.00 BO.0 1,00% 0.015 WINGWALLS 0 FLARE 4.80 2.00 6.00 0.70 0.03 2.84 0.37 030 0.00 6.00 0.50 60.00 43.23 205.53 6.64 148.0 200,00 6 3.00 80.0 1.00% 0.015 WINGWALLS 0 FLARE 6.40 2.67 8,00 0.70 0.02 3.26 0.39 0.80 0.00 8.00 2.50 118.00 937.30 1137.30 13.35 r� J V 42" CMP MITERED LENGTH PIPE . OF TAIL SUBMERGED HEIGHT 0 SITE PIPE MANNINGS STRUCTURE WATER INLET CONTROL------------------------ OUTLET COCONTROL WEIR TOTAL VOLUME elev (CFS) (IN) (FEET)SLOPE 'n" TYPE ELEV. HW/D HW Ke H do ' (dc+D)/2 LS HW HEAD FLOW WIDTH FLOW FLOW ACRE-FT ------------------------------------------------------------------------------------------------------------------------------------------------------------- 105.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.00000 107.0 20.4 42 250.0 4.80% 0.024 MITERED 1.6 0.6 2.0 0.2 0.4 31.3 3.1 12.0 0.0 2.0 20.4 0.40185 108.0 40.8 42 250.0 4.80% 0.024 MITERED 2.4 0.1 3.0 0.2 1.7 39.0 3.4 12.0 0.0 3.0 40.8 0.97762 107.0 58.7 42 250.0 4.80% 0.024 MITERED 3.2 1.1 4.0 0.2 3.6 46.4 3.7 -12.0 0.0 4.0 58.7 1.95728 110.0 72.5 42 250.0 4.80% 0.024 MITERED 4.0 1.4 5.0 0.2 5.5 56.9 4.1 12.0 0.0 -5.0 1.0 213.8 282.5 355.0 3.39813 111.0 84.0 42 250.0 4,80% 0,024 MITERED 4.8 1.7 6.0 0.2 7.3 56.9 4.1 12.0 0.0 6.0 2.0 258.8 2747.1 2831.1 5.07505 z (�i k*****************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 SUMMARY NOPLOTS TITLE 000 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 5 RAINFL 1 .25 8 0.0 .0025 .005 .0075 .010 8 .0125 .015 .0175 .020 .023 8 .026 .0285 .031 .034 .037 8 .040 .043 .0465 .050 .0535 8 .057 .0605 .064 .068 .072 8 .076 .080 .084 .089 .094 8 .1 .107 .115 .122 .130 8 .139 .148 .157 .167 .178 8 .189 .202 .216 .231 .250 8 .271 .298 .345 .500 .655 8 .702 .729 .751 .769 .785 8 .798 .811 .823 .834 .844 8 .853 .862 .870 .878 .886 8 .893 .900 .906 .911 .916 8 .920 .924 .928 .932 .936 8 .940 .944 .9475 .951 .954 8 .957 .960 .963 :966 .969 8 .972 .975 .978 .981 .9835 8 .986 .9885 .991 .9935 .996 8 .998 1.0 1.0 1.0 1.0 9 ENDTBL 3 STRUCT 01 8 237.00 0.0 0.00 8 237.50 1.0 0.028 8 238.00 17.0 0.179 8 239.00 120.0 2.433 8 240.00 311.0 10.606 8 240.20 360.0 13.590 9 ENDTBL 3 STRUCT 02 8 160.34 0.00 0.00 8 163.00 20.00 0.31 8 164.00 94.00 0.61 8 165.00 143.50 1.05 N S 8 166.00 200.00 1.69 8 167.00 254.00 2.52 l� m m m m m m m m m m m m m m m m 8 168.00 301.00 3.56 8 168.10 305.50 3.68 8 169.00 460.78 5.04 8 170.00 1140.01 7.20 9 ENDTBL 3 STRUCT 03 8 140.00 0.00 0.00 **********************80-80 LIST OF INPUT DATA (CONTINUED)********************** 8 142.00 45.00 0.83 8 144.00 112.30 3.05 8 145.50 151.20 5.54 8 146.00 162.30 6.64 8 148.00 1137.3 13.35 9 ENDTBL 3 STRUCT 04 8 105.00 0.00 '0.00000 8 - 107.00 20.40 0.40185 8 108.00 40.75 0.97762 8 109.00 58.70 1.95728 8 110.00 354.99 3.39813 8 111.00 2831..14 5.07505 9 ENDTBL 2 XSECTN 001 1.0 1.0 8 0.0 0.0 0.0 8 0.25 6.98 2.08 8 0.5 53.40 8.33 8 1.0 123.8 17.0 8 1.5 193.1 25.50 8 2.0 416.27 70.50 8 2.5 641.13 135.5 9 ENDTBL 2 XSECTN 002 1.0 1.0 8 0.0 0.0 0.0 8 0.5 8.7556 4.625 8 1.0 40.895 14.5 8 1.5 106.49 29.625 8 2.0 214.35 50.0 8 2.5 372.47 75.625 CIA 8 3.0 588.24 106.5 p 8 3.5 868.58 142.625 � 9 ENDTBL 2 XSECTN 004 1.0 1.0 8 0.0 0.0 0.0 8 0.5 8.500 3.0 8 2.0 116.0 34. 8 4.0 417.0 104.0 8 6.0 929.0 214.0 9 ENDTBL 2 XSECTN 005 1.0 1.0 8 0.0 0.0 0.0 8 1.0 17.0 5.0 8 2.0 58.0 12.0 8 3.0 124.0 21.0 8 4.0 218.0 32.0 **********************80-80 LIST OF INPUT DATA (CONTINUED)********************** 8 5.0 344.0 45.0 8 6.0 504.0 60.0 8 7.0 702.0 77.0 9 ENDTBL 6 RUNOFF 1 01 1 0.3625 65.5 2.04 6 RESVOR 2 01 1 2 237.0 6 REACH 3 001 2 3 3400 6 REACH 3 002 3 4 1200 6 RUNOFF 1 02 5 0.37984 57.0 1.82 6 RUNOFF 1 02 6 0.02797 67.0 0.52 6 ADDHYD 4 02 4 5 7 6 ADDHYD 4 02 7 6 1 6 RESVOR 2 02 1 2 160.34 6 REACH 3 003 2 3 1980.0 1.9679 1.20 6 RUNOFF 1 03 4 0.20781 60. .72 6 ADDHYD 4 03 4 3 5 6 RESVOR 2 03 5 6 140.0 6 REACH 3 004 6 7 3210.0 6 RUNOFF 1 04 1 0.05938 59. .57 6 ADDHYD 4 04 1 7 2 6 RESVOR 2 04 2 3 105.00 6 RUNOFF 1 05 4 0.03594 55. .22 6 ADDHYD 4 05 3 4 5 LQ ENDATA 7 INCREM 6 .1 1.sl m m m m m r m m m m m m m m m r m m m 7 COMPUT 7 01 05 0.0 2.6 1.00 1 2 01 01 ENDCMP 1 7 COMPUT 7 01 05 0.0 3.2 1.00 1 2 01 02 ENDCMP 1 7 COMPUT 7 01 05 0.0 4.1 1.00 1 2 01 05 ENDCMP 1 7 COMPUT 7 01 05 0.0 4.7 1.00 1 2 01 10 ENDCMP 1 7 COMPUT 7 01 05 0.0 5.5 1.00 1 2 01 25 ENDCMP 1 7 COMPUT 7 01 05 0.0 6.2 1.00 1 2 01 50 ENDCMP 1 7 COMPUT 7 01 05 0.0 6.9 1.00 1 2 01 99 ENDCMP 1 ENDJOB 2 ***,r*,t***,t*********************END OF 80-80 EXECUTIVE CONTROL OPERATION INCREM RECORD ID MAIN TIME INCREMENT = .10 HOURS EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 2.60 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 1 MAIN TIME INCREMENT = .10 HOURS *** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .12 CFS. EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 1 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 3.20 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .10 HOURS • lsl - N *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT lv EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 2 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE .5 STARTING TIME = .00 RAIN DEPTH = 4.10 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM .NO.= 5 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 3 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 4.70 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=10 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 1 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 PASS 5 REV PC 09/83(.2) PAGE 1 EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 4 (� w EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 5.50 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=25 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 1 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** ** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 5 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 • TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 6.20 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=50 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 6 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID r FROM STRUCTURE 1 r TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 6.90 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=99 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** l�l EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID F COMPUTATIONS COMPLETED FOR PASS 7 m m m m = = m = = = = = = m m EXECUTIVE CONTROL OPERATION ENDJOB RECORD ID TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 2 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (1N) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 1 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 2.60 24.00 .35 --- 13.86 16.68 46.0 STRUCTURE 1 RESVOR .36 1 2 .10 .0 2.60 24.00 .35 237.99 13.98 16.57 45.7 XSECTION 1 REACH .36 1 2 .10 .0 2.60 24.00 .35*********** 14.18 16.41 45.3 XSECTION 2 REACH .36 1 2 .10 .0 2.60 24.00 .35 .00 14.34 16.32 45.0 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 2.60 24.00 .14 --- 14.40 4.69 12.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 2.60 24.00 .40 --- 12.51 3.41 122.0 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 2.60 24.00 .24 163.01 14.35 21.01 28.3 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 2.60 24.00 .25 163.02 14.34 21.81 28.3 STRUCTURE 2 RESVOR .77 1 2 .10 .0 2.60 24.00 .25 163.02 14.39 21.79 28.3 XSECTION 3 REACH .77 1 2 .10 .0 2.60 24.00 .25 --- 14.65 21.46 27.9 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 2.60 24.00 .20 --- 12.82 6.85 33.0 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 2.60 24.00 .24 141.10 14.62 24.84 25.4 STRUCTURE 3 RESVOR .98 1 2 .10 .0 2.60 24.00 .24 141.08 14.87 24.25 24.8 XSECTION 4 REACH .98 1 2 .10 .0 2.60 24.00 .24*********** 15.24 23.61 24.1 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 2.60 24.00 .18 --- 12.72 1,72 29.0 (r STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 2.60 24.00 .23 107.19 15.23 24.36 23.5 rr rr r� �r rr � r r r s r rr r rr r r � r r STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 2.60 24.00 .23 107.16 15.60 23.72 22.9 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 2.60 24.00 .10 --- 12.60 .36 10.0 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 2.60 24.00 .23 --- 15.60 23.99 22.3 ALTERNATE 1 STORM 2 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 3.20 24.00 .62 --- 13.72 33.70 93.0 STRUCTURE 1 RESVOR .36 1 2 .10 .0 3.20 24.00 .62 238.15 13.99 32.40 89.4 (SECTION 1 REACH .36 1 2 .10 .0 3.20 24.00 .62 .00 14.16 32.20 88.8 (SECTION 2 REACH .36 1 2 .10 .0 3.20 24.00 .62*********** 14.31 32.10 88.5 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 3.20 24.00 .31 --- 13.81 14.21 37.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 3.20 24.00 .69 --- 12.47 6.72 240.3 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 3.20 24.00 .46 163.34 14.20 45.13 60.8 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 3.20 24.00 .47 163.36 14.19 46.43 60.3 STRUCTURE 2 RESVOR .77 1 2 .10 .0 3.20 24.00 .47 163.36 14.24 46.39 60.2 (SECTION 3 REACH .77 1 2 .10 .0 3.20 24.00 .47 --- 14.44 46.08 59.8 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 3.20 24.00 .41 --- 12.69 19.72 94.9 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 3.20 24.00 .46 142.23 14.39 52.61 53.8 FR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 3 ;UMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARKO) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) ;ECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE ;TRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND 1NCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SO MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 ;TRUCTURE 3 RESVOR .98 1 2 .10 .0 3.20 24.00 .46 142.17 14.73 50.77 51.9 (SECTION 4 REACH .98 1 2 .10 .0 3.20 24.00 .46 .00 15.03 50,02 51.1 ;TRUCTURE 4 RUNOFF .06 1 2 .10 .0 3.20 24.00 .37 --- 12.59 5.54 93.2 ;TRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 3.20 24.00 .45 108.60 15.01 51.46 49.6 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 3.20 24.00 .45 108.44 15.55 48.63 46.9 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 3.20 24.00 .25 --- 12.36 2.39 66.5 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 3.20 24.00 .45 --- 15.55 49.18 45.8 ALTERNATE 1 STORM 5 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 4.10 24.00 1.12 --- 13.61 66.95 184.7 STRUCTURE 1 RESVOR .36 1 2 .10 .0 4.10 24.00 1.12 238.46 13.89 64.06 176.7 XSECTION 1 REACH .36 1 2 .10 .0 4.10 24.00 1.12*********** 14.05 63.78 175.9 XSECTION 2 REACH .36 1 2 .10 .0 4.10 24.00 1.12 .00 14.18 63.63 175.5 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 4.10 24.00 .66 --- 13.59 37.86 99.7 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 4.10 24.00 1.21 --- 12.44 12.86 459.8 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 4.10 24.00 .88 164.05 13.98 96.69 130.3 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 4.10 24.00 .90 164.10 13.97 98.92 128.4 STRUCTURE 2 RESVOR .77 1 2 .10 .0 4.10 24.00 .90 164.09 14.08 98.43 127.8 XSECTION 3 REACH .77 1 2 .10 .0 4.10 24.00 .90 --- 14.25 97.94 127.1 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 4.10 24.00 .81 --- 12.62 48.39 232.9 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 4.10 24.00 .88 143.94 14.19 110.39 112.9 STRUCTURE 3 RESVOR .98 1 2 .10 .0 4.10 24.00 .88 143.80 14.56 105.69 108.1 XSECTION 4 REACH .98 1 2 .10 .0 4.10 24.00 .88*********** 14.84 103.96 106.3 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 4.10 24.00 .76 --- 12.52 14.31 241.0 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 4.10 24.00 .87 109.16 14.83 106.69 102.8 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 4.10 24.00 .87 109.16 14.88 106.59 102.7 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 4.10 24.00 .57 --- 12.31 8.73 242.8 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 4.10 24.00 .86 --- 14.88 107.80 100.4 ALTERNATE 1 STORM 10 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 4.70 24.00 1.49 --- 13.58 92.75 255.9 STRUCTURE 1 RESVOR .36 1 2 .10 .0 4.70 24.00 1.49 238.70 13.85 88.68 244.6 XSECTION 1 REACH .36 1 2 .10 .0 4.70 24.00 1.49*********** 14.01 88.28 243.5 XSECTION 2 REACH .36 1 2 .10 .0 4.70 24.00 1.49 .00 14.13 88.14 243.1 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 4.70 24.00 .95 --- 13.52 58.74 154.7 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 4.70 24.00 1.60 --- 12.43 17.43 623.2 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 4.70 24.00 1.21 164.91 13.91 138.80 187.0 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 4.70 24.00 1.23 164.96 13.90 141.73 184.0 to U1 rr rr rr r rr r■ rr rr rr rr r r r r� r r r �r r TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 4 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 10 STRUCTURE 2 RESVOR .77 1 2 .10 .0 4.70 24.00 1.23 164.95 14.01 140.86 182.9 XSECTION 3 REACH .77 1 2 .10 .0 4.70 24.00 1.23 --- 14.18 140.07 181.8 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 4.70 24.00 1.13 --- 12.60 71.97 346.3 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 4.70 24.00 1.21 145.76 14.13 157.08 160.6 STRUCTURE 3 RESVOR .98 1 2 .10 .0 4.70 24.00 1.21 145.16 14.67 142.35 145.5 XSECTION 4 REACH .98 1 2 .10 .0 4.70 24.00 1.21 .00 14.95 140.88 144.0 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 4.70 24.00 1.07 --- 12.50 21.59 363.6 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 4.70 24.00 1.20 109.29 14.93 144.38 139.2 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 4.70 24.00 1.20 109.29 14.99 144.29 139.1 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 4.70 24.00 .83 --- 12.30 13.94 387.8 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 4.70 24.00 1.19 --- 14.98 145.87 135.9 ALTERNATE 1 STORM 25 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 5.50 24.00 2.04 --- 13.54 130.36 359.6 STRUCTURE 1 RESVOR .36 1 2 .10 .0 5.50 24.00 2.04 239.02 13.85 123.00 339.3 XSECTION 1 REACH .36 1 2 .10 .0 5.50 24.00 2.04*********** 14.01 122.67 338.4 XSECTION 2 REACH .36 1 2 .10 .0 5.50 24.00 2.04 .00 14.12 122.58 338.2 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 5.50 24.00 1.38 --- 13.46 91.56 241.1 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 5.50 24.00 2.16 --- 12.42 23.97 856.9 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 5.50 24.00 1.70 166.03 13.81 201.85 271.9 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 5.50 24.00 1.72 166.11 13.80 205.86 267.2 STRUCTURE 2 RESVOR .77 1 2 .10 .0 5.50 24.00 1.72 166.05 13.96 202.90 263.4 XSECTION 3 REACH .77 1 2 .10 .0 5.50 24.00 1.72 --- 14.13 202.08 262.3 LV = m m = m r r = = m = m = r = = m m = STRUCTURE 3 RUNOFF .21 1 2 .10 .0 5.50 24.00 1.60 --- 12.57 107.32 516.4 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 5.50 24.00 1.69 146.13 14.06 225.65 230.7 STRUCTURE 3 RESVOR .98 1 2 .10 .0 5.50 24.00 1.69 146.13 14.17 224.84 229.9 (SECTION 4 REACH .98 1 2 .10 .0 5.50 24.00 1.69 .00 14.51 218.41 223.3 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 5.50 24.00 1.53 --- 12.48 32.55 548.2 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 5.50 24.00 1.68 109.56 14.50 223.77 215.7 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 5.50 24.00 1.68 109.56 14.56 223.40 215.3 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 5.50 24.00 1.24 --- 12.29 21.82 607.2 STRUCTURE 5 ADDHYD. 1.07 1 2 .10 .0 5.50 24.00 1.67 --- 14.56 225.96 210.5 ALTERNATE 1 STORM 50 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 6.20 24.00 2.54 --- 13.52 165.54 456.7 STRUCTURE 1 RESVOR .36 1 2 .10 .0 6.20 24.00 2.54 239.16 13.92 150.46 415.1 KSECTION 1 REACH .36 1 2 .10 .0 6.20 24.00 2.54 .00 14.08 149.98 413.7 KSECTION 2 REACH .36 1 2 .10 .0 6.20 24.00 2.54 -.71 14.19 149.88 413.5 TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 5 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 50 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 6.20 24.00 1.80 --- 13.42 123.94 326.3 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 6.20 24.00 2.68 --- 12.41 30.00 1072.7 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 6.20 24.00 2.16 166.98 13.76 252.91 340.7 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 6.20 24.00 2.18 167.08 13.74 257.97 334.9 STRUCTURE 2 RESVOR .77 1 2 .10 .0 6.20 24.00 2.18 167.00 13.95 254,14 329.9 _p XSECTION 3 REACH .77 1 2 .10 .0 6.20 24.00 2.18 --- 14.11 253.34 328.9 ;TRUCTURE 3 RUNOFF .21 1 2 .10 .0 6.20 24.00 2.05 --- 12.56 141.05 678.7 'TRUCTURE 3 ADDHYD .98 1 2 .10 .0 6.20 24.00 2.15 146.25 14.02 282.96 289.3 STRUCTURE 3 RESVOR .98 1 2 .10 .0 6.20 24.00 2.15 146.25 14.11 282.36 288.7 (SECTION 4 REACH .98 1 2 .10 .0 6.20 24.00 2.15 .00 14.39 278.65 284.9 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 6.20 24.00 1.97 --- 12.46 43.04 724.9 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 6.20 24.00 2.14 109.77 14.37 285.52 275.2 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 6.20 24.00 2.14 109.76 14.43 285.26 274.9 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 6.20 24.00 1.63 --- 12.28 29.41 818.3 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 6.20 24.00 2.13 --- 14.43 288.59 268.8 ALTERNATE 1 STORM 99 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 6.90 24.00 3.08 --- 13.50 202.34 558.2 STRUCTURE 1 RESVOR .36 1 2 .10 .0 6.90 24.00 3.08 239.32 13.94 181.31 500.2 (SECTION 1 REACH .36 1 2 .10 .0 6.90 24.00 3.08 .00 14.09 180.66 498.4 KSECTION 2 REACH .36 1 2 .10 .0 6.90 24.00 3.08*********** 14.20 180.57 498.1 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 6.90 24.00 2.25 --- 13.39 158.94 418.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 6.90 24.00 3.22 --- 12.41 36.26 1296.3 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 6.90 24.00 2.65 168.12 13.77 309.37 416.8 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 6.90 24.00 2.67 168.16 13.75 315.27 409.3 STRUCTURE 2 RESVOR .77 1 2 .10 .0 6.90 24.00 2.67 168.12 14.01 308.18 400.1 KSECTION 3 REACH .77 1 2 .10 .0 6.90 24.00 2.67 --- 14.15 306.64 398.1 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 6.90 24.00 2.53 --- 12.55 177.31 853.2 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 6.90 24.00 2.64 146.37 14.10 341.30 348.9 STRUCTURE 3 RESVOR .98 1 2 .10 .0 6.90 24.00 2.64 146.37 14.17 340.44 348.1 KSECTION 4 REACH .98 1 2 .10 .0 6.90 24.00 2.64 .00 14.41 337.25 344.8 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 6.90 24.00 2.43 --- 12.45 54.21 912.9 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 6.90 24.00 2.63 109.97 14.40 345.42 332.9 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 6.90 24.00 2.63 109.97 14.46 345.14 332.7 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 6.90 24.00 2.06 --- 12.28 37.52 1043.9 STRUCTURE 5 ADDHYD 1.07 1 2 .10 .0 6.90 24.00 2.61 --- 14.45 349.15 325.3 TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 6 SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS v w (A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDING BASE + 10% OF PEAK A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS) HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK OUTFLOW+ VOLUME MAIN ITER- Q AND A PEAK S/Q ATT- TRAVEL TIME XSEC REACH INFLOW OUTFLOW INTERV.AREA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO @PEAK KIN STOR- KINE- ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC (FT) (CFS) (HR) (CFS) (HR) (CFS) (HR) (CFS) (IN) (HR) (X) (M) (K*) (Q*) (SEC) (C) (HR) (HR) ALTERNATE 1 STORM 1 2.38 1 3400 17 14.0 16 14.2 0 .35 .10 1 1.47 .010 .990 525 .51 .20 .15 1.11 2 1200 16 14.2 16 14.3 0 .35 .10 1 1.35 .009 .994 400 .62 .10 .11 1.97 3 1980 22 14.4 21 14.6 0 .25 .10 1 1.20 .017 .984 562 .49 .20 .16 2.60 4 3210 24 14.9 24 15.2 0 .24 .10 1 1.08 .037 .974 977 .31 .30 .27 ALTERNATE 1 STORM 2 2.38 1 3400 32 14.0 32 14.2 0 .62 .10 1 1.47 .008 .993 424 .60 .20 .12 1.11 2 1200 32 14.2 32 14.3 0 .62 .10 1 1.35 .008 .997 336 .70? .10 .09 1.97 3 1980 46 14.2 46 14.4 0 .47 .10 1 1.20 .017 .993 495 .53 .20 .14 2.60 4 3210 51 14.7 50 15.0 0 .46 .10 1 1.08 .039 .985 927 .33 .30 .26 ALTERNATE 1 STORM 5 r G) 2.48 1 3400 64 13.9 64 14.0 0 1.12 .10 1 1.43 .008 .994 361 .67 .10 .10 1.12 2 1200 64 14.0 64 14.2 0 1.12 .10 1 1.35 .007 .999 282 .78? .20 .08 1.97 3 1980 98 14.1 98 14.3 0 .90 .10 1 1.20 .016 .994 437 .58 .20 .12 2.60 4 3210 106 14.6 104 14.8 0 .88 .10 1 1.08 .040 .984 880 .34 .20 .24 ALTERNATE 1 STORM 10 2.72 1 3400 89 13.9 88 14.0 0 1.49 .10 1 1.37 .010 .997 360 .67? .10 .10 1.12 2 1200 88 14.0 88 14.1 0 1.49 .10 1 1.34 .007 .998 260 .82? .10 .07 1.97 3 1980 141 14.0 140 14.2 0 1.23 .10 1 1.20 .016 .994 411 .61 .20 .11 2.56 4 3210 142 14.7 141 15.0 0 1.21 .10 1 1.08 .037 .989 846 .35 .30 .24 ALTERNATE 1 STORM 25 3.08 1 3400 123 13.9 123 14.0 0 2.04 .10 1 1.30 .012 .998 358 .67? .10 .10 1.13 2 1200 123 14.0 123 14.1 0 2.04 .10 1 1.34 .006 .999 240 .86? .10 .07 1.97 3 1980 203 14.0 202 14.1 0 1.72 .10 1 1.20 .015 .996 387 .63 .10 .11 2.44 4 3210 225 14.2 218 14.5 0 1.69 .10 1 1.10 .037 .972 786 .37 .30 .22 ALTERNATE 1 STORM 50 P` 3.29 F 1 3400 150 13.9 150 14.1 0 2.54 .10 1 1.27 .013 .997 361 .66 .20 .10 1.13 2 1200 150 14.1 150 14.2 0 2.54 .10 1 1.34 .006 1.000 228 .88? .10 .06 1.97 3 1980 254 14.0 253 14.1 0 2.18 .10 1 1.20 .014 .998 373 .65 .10 .10 2.37 4 3210 282 14.1 279 14.4 0 2.15 .10 1 1.11 .035 .987 757 .38 .30 .21 ALTERNATE 1 STORM 99 3.52 1 3400 181 13.9 181 14.1 0 3.08 .10 1 1.24 .014 .997 364 .66 .20 .10 1.13 2 1200 181 14.1 181 14.2 0 3.08 .10 1 1.34 .005 1.000 218 .90? .10 .06 TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 7 SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS (A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDING BASE + 10% OF PEAK A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS) HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK OUTFLOW+ VOLUME MAIN ITER- Q AND A PEAK S/Q ATT- TRAVEL TIME XSEC REACH INFLOW OUTFLOW INTERV.AREA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO @PEAK KIN STOR- KINE- ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC (FT) (CFS) (HR) (CFS) (HR) (CFS) (HR) (CFS) (IN) (HR) (X) (M) (K*) (Q*) (SEC) (C) (HR) (HR) --C ALTERNATE 1 STORM 99 �v 1.97 3 1980 308 14.0 306 14.2 0 2.67 .10 1 1.20 .014 .994 361 .67 .20 .10 2.31 4 3210 340 14.2 337 14.4 0 2.64 .10 1 1.12 .032 .991 735 .39 .20 .20 TR20 XEQ 01-04-90 13:55 PRE DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 8 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SQ MI) 1 2 5 10 25 50 99 STRUCTURE 5 1.07 ALTERNATE 1 23.99 49.18 107.80 145.87 225.96 '288.59 349.15 STRUCTURE 4 1.04 ALTERNATE 1 23.72 48.63 106.59 144.29 223.40 285.26 345.14 STRUCTURE 3 .98 ALTERNATE 1 24.25 50.77 105.69 142.35 224.84 282.36 340.44 STRUCTURE 2 .77 ALTERNATE 1 21.79 46.39 98.43 140.86 202.90 254.14 308.18 STRUCTURE 1 .36 ALTERNATE 1 16.57 32.40 64.06 88.68 123.00 150.46 181.31 XSECTION 1 .36 ALTERNATE 1 16.41 32.20 63.78 88.28 122.67 149.98 180.66 XSECTION 2 .36 ALTERNATE 1 16.32 32.10 63.63 88.14 122.58 149.88 180.57 XSECTION 3 .77 -z ALTERNATE 1 21.46 46.08 97.94 140.07 202.08 253.34 306.64 XSECTION 4 .98 ALTERNATE 1 23.61 50.02 103.96 140.88 218.41 278.65 337.25 END OF 1 JOBS IN THIS RUN Ln ******************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 SUMMARY NOPLOTS TITLE 000 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 5 RAINFL 1 .25 8 0.0 .0025 .005 .0075 .010 8 .0125 .015 .0175 .020 .023 8 .026 .0285 .031 .034 .037 8 .040 .043 .0465 .050 .0535 8 .057 .0605 .064 .068 .072 8 .076 .080 .084 .089 .094 8 .1 .107 .115 .122 .130 8 .139 .148 .157 .167 .178 8 .189 .202 .216 .231 .250 8 .271 .298 .345 .500 .655 8 .702 .729 .751 .769 .785 8 .798 .811 .823 .834 .844 8 .853 .862 .870 .878 .886 8 .893 .900 .906 .911 .916 8 .920 .924 .928 .932 .936 8 .940 .944 .9475 .951 .954 8 .957 .960 .963 .966 .969 8 .972 .975 .978 .981 .9835 8 .986 .9885 .991 .9935 .996 8 .998 1.0 1.0 1.0 1.0 9 ENDTBL 3 STRUCT 01 8 237.00 0.0 0.00 8 237.50 1.0 0.028 8 238.00 17.0 0.179 8 239.00 120.0 2.433 8 240.00 311.0 10.606 8 240.20 360.0 13.590 9 ENDTBL 3 STRUCT 02 8 160.34 0.00 0.00 8 163.00 20.00 0.31 8 164.00 94.00 0.61 8 165.00 143.50 1.05 -� 8 166.00 200.00 1.69 T 8 167.00 254.00 2.52 �.� 0i 8 168.00 301.00 3.56 8 168.10 305.50 3.68 8 169.00 460.78 5.04 8 170.00 1140.01 7.20 9 ENDTBL 3 STRUCT 03 8 140.00 0.00 0.00 **********************80-80 LIST OF INPUT DATA(CONTINUED)********************** 8 142.00 45.00 0.83 8 144.00 112.30 3.05 8 145.50 151.20 5.54 8 146.00 162.30 6.64 8 148.00 1137.3 13.35 9 ENDTBL 3 STRUCT 04 8 105.00 0.00 0.00000 8 107.00 20.40 0.40185 8 108.00 40.75 0.97762 8 109.00 58.70 1.95728 8 110.00 354.99 3.39813 8 111.00 2831.14 5.07505 9 ENDTBL 2 XSECTN 001 1.0 1.0 8 0.0 0.0 0.0 8 0.25 6.98 2.08 8 0.5 53.40 8.33 8 1.0 123.8 17.0 8 1.5 193.1 25.50 8 2.0 416.27 70.50 8 2.5 641.13 135.5 9 ENDTBL 2 XSECTN 002 1.0 1.0 8 0.0 0.0 0.0 8 0.5 8.7556 4.625 8 1.0 40.895 14.5 8 1.5 106.49 29.625 8 2.0 214.35 50.0 8 2.5 372.47 75.625 8 3.0 588.24 106.5 r 8 3.5 868.58 142.625 9 ENDTBL 2 XSECTN 004 1.0 1.0 8 0.0 0.0 0.0 8 0.5 8.500 3.0 8 2.0 116.0 34. 8 4.0 417.0 104.0 8 6.0 929.0 214.0 9 ENDTBL 2 XSECTN 005 1.0 1.0 8 0.0 0.0 0.0 8 1.0 17.0 5.0 8 2.0 58.0 12.0 8 3.0 124.0 21.0 8 4.0 218.0 32.0 **********************80-80 LIST OF INPUT DATA (CONTINUED)********************** 8 5.0 344.0 45.0 8 6.0 504.0 60.0 8 7.0 702.0 77.0 9 ENDTBL 6 RUNOFF 1 01 1 0.3625 65.5 2.04 6 RESVOR 2 01 1 2 237.0 6 REACH 3 001 2 3 3400 6 REACH 3 002 3 4 1200 6 RUNOFF 1 02 5 0.3754 57.0 1.82 6 RUNOFF 1 02 6 0.02920 77.0 0.35 6 ADDHYD 4 02 4 5 7 6 ADDHYD 4 02 7 6 1 6 RESVOR 2 02 1 2 160.34 6 REACH 3 003 2 3 1980.0 1.9679 1.20 6 RUNOFF 1 03 4 0.21366 61. .72 6 ADDHYD 4 03 4 3 5 6 RESVOR 2 03 5 6 140.0 6 REACH 3 004 6 7 3210.0 6 RUNOFF 1 04 1 0.05938 59. .57 6 ADDHYD 4 04 1 7 2 6 RESVOR 2 04 2 3 105.00 6 RUNOFF 1 05 4 0.03594 55. .22 6 ADDHYD 4 05 3 4 5 ENDATA 7 INCREM 6 .1 c� 7 COMPUT 7 01 05 0.0 2.6 1.00 1 2 01 01 ENDCMP 1 7 COMPUT 7 01 05 0.0 3.2 1.00 1 2 01 02 ENDCMP 1 7 COMPUT 7 01 05 0.0 4.1 1.00 1 2 01 05 ENDCMP 1 7 COMPUT 7 01 05 0.0 4.7 1.00 1 2 01 10 ENDCMP 1 7 COMPUT 7 01 05 0.0 5.5 1.00 1 2 01 25 ENDCMP 1 7 COMPUT 7 01 05 0.0 6.2 1.00 1 2 01 50 ENDCMP 1 7 COMPUT 7 01 05 0.0 6.9 1.00 1 2 01 99 ENDCMP 1 ENDJOB 2 OF 80-80 LIST******************************** EXECUTIVE CONTROL OPERATION 1NCREM RECORD ID MAIN TIME INCREMENT = .10 HOURS EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 2.60 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 1 MAIN TIME INCREMENT = .10 HOURS t** WARNING-NO PEAK FOUND, MAXIMUM DISCHARGE _ .12 CFS. EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 1 :XECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 3.20 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT m m m m m r m m m m m m m m m m m m m EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 2 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 4.10 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 5 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 3 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 4.70 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=10 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 1 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 PASS 5 REV PC 09/83(.2) PAGE 1 EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 4 m m m m r m m m m m m r m m m EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 5.50 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=25 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 1 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 5 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 6.20 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=50 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 6 EXECUTIVE CONTROL OPERATION COMPUT RECORD ID FROM STRUCTURE 1 TO STRUCTURE 5 STARTING TIME = .00 RAIN DEPTH = 6.90 RAIN DURATION= 1.00 RAIN TABLE NO.= 1 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.=99 MAIN TIME INCREMENT = .10 HOURS *** WARNING REACH 2 ATT-KIN COEFF.(C) GREATER THAN 0.667, CONSIDER REDUCING MAIN TIME INCREMENT *** EXECUTIVE CONTROL OPERATION ENDCMP RECORD ID COMPUTATIONS COMPLETED FOR PASS 7 w rr r r� r rr rr � r r r rr r rr rr rr r r r r EXECUTIVE CONTROL OPERATION ENDJOB RECORD ID fR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 2 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 1 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 2.60 24.00 .35 --- 13.86 16.68 46.0 STRUCTURE 1 RESVOR .36 1 2 .10 .0 2.60 24.00 .35 237.99 13.98 16.57 45.7 (SECTION 1 REACH .36 1 2 .10 .0 2.60 24.00 .35*********** 14.18 16.41 45.3 KSECTION 2 REACH .36 1 2 .10 .0 2.60 24.00 .35 .00 14.34 16.32 45.0 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 2.60 24.00 .14 --- 14.40 4.64 12.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 2.60 24.00 .80 --- 12.34 10.41 356.6 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 2.60 24.00 .24 163.01 14.35 20.96 28.4 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 2.60 24.00 .26 163.03 14.33 22.30 29.1 STRUCTURE 2 RESVOR .77 1 2 .10 .0 2.60 24.00 .26 163.03 14.38 22.28 29.0 KSECTION 3 REACH .77 1 2 .10 .0 2.60 24.00 .26 --- 14.63 21.97 28.6 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 2.60 24.00 .23 --- 12.78 8.65 40.5 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 2.60 24.00 .26 141.15 14.59 25.81 26.3 STRUCTURE 3 RESVOR .98 1 2 .10 .0 2.60 24.00 .26 141.12 14.84 25.22 25.7 XSECTION 4 REACH .98 1 2 .10 .0 2.60 24.00 .26*********** 15.19 24.58 25.1 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 2.60 24.00 .18 --- 12.72 1.72 29.0 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 2.60 24.00 .25 107.24 15.18 25.33 24.4 m STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 2.60 24.00 .25 107.21 15.55 24.65 23.7 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 2.60 24.00 .10 --- 12.60 .36 10.0 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 2.60 24.00 .25 --- 15.54 24.92 23.2 ALTERNATE 1 STORM 2 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 3.20 24.00 .62 --- 13.72 33.70 93.0 STRUCTURE 1 RESVOR .36 1 2 .10 .0 3.20 24.00 .62 238.15 13.99 32.40 89.4 XSECTION 1 REACH .36 1 2 .10 .0 3.20 24.00 .62 .00 14.16 32.20 88.8 XSECTION 2 REACH .36 1 2 .10 .0 3.20 24.00 .62*********** 14.31 32.10 88.5 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 3.20 24.00 .31 --- 13.81 14.05 37.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 3.20 24.00 1.21 --- 12.33 16.02 548.5 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 3.20 24.00 .46 163.34 14.20 44.97 60.9 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 3.20 24.00 .49 163.36 14.19 46.93 61.2 STRUCTURE 2 RESVOR .77 1 2 .10 .0 3.20 24.00 - .49 163.36 14.24 46.89 61.1 XSECTION 3 REACH .77 1 2 .10 .0 3.20 24.00 .49 --- 14.43 46.58 60.7 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 3.20 24.00 .44 --- 12.68 23.07 108.0 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 3.20 24.00 .48 142.26 14.38 53.76 54.8 TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 3 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 r STRUCTURE 3 RESVOR .98 1 2 .10 .0 3.20 24.00 .48 142.20 14.72 51.88 52.9 XSECTION 4 REACH .98 1 2 .10 .0 3.20 24.00 .48 .00 15.02 51,.15 52.2 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 3.20 24.00 .37 --- 12.59 5.54 93.2 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 3.20 24.00 .47 108.66 15.00 52.60 50.6 W = = r = m r m m = = = m = = = = = = = STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 3.20 24.00 .47 108.51 15.53 49.82 47.9 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 3.20 24.00 .25 --- 12.36 2.39 66.5 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 3.20 24.00 .47 --- 15.52 50.37 46.8 ALTERNATE 1 STORM 5 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 4.10 24.00 1.12 --- 13.61 66.95 184.7 STRUCTURE 1 RESVOR .36 1 2 .10 .0 4.10 24.00 1.12 238.46 13.89 64.06 176.7 KSECTION 1 REACH .36 1 2 .10 .0 4.10 24.00 1.12*********** 14.05 63.78 175.9 KSECTION 2 REACH .36 1 2 .10 .0 4.10 24.00 1.12 .00 14.18 63.63 175.5 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 4.10 24.00 .66 --- 13.59 37.41 99.7 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 4.10 24.00 1.89 --- 12.32 25.20 863.0 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 4.10 24.00 .89 164.05 13.99 96.29 130.5 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 4.10 24.00 .92 164.11 13.98 99.26 129.4 STRUCTURE 2 RESVOR .77 1 2 .10 .0 4.10 24.00 .92 164.10 14.09 98.77 128.8 KSECTION 3 REACH .77 1 2 .10 .0 4.10 24.00 .92 --- 14.26 98.27 128.1 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 4.10 24.00 .86 --- 12.61 54.20 253.7 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 4.10 24.00 .91 143.98 14.19 111.69 113.9 STRUCTURE 3 RESVOR .98 1 2 .10 .0 4.10 24.00 .91 143.85 14.55 107.28 109.4 KSECTION 4 REACH .98 1 2 .10 .0 4.10 24.00 .91 .00 14.82 105.66 107.7 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 4.10 24.00 .76 --- 12.52 14.31 241.0 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 4.10 24.00 .90 109.17 14.81 108.41 104.2 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 4.10 24.00 .90 109.17 14.87 108.31 104.1 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 4.10 24.00 .57 --- 12.31 8.73 242.8 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 4.10 24.00 .89 --- 14.86 109.53 101.8 ALTERNATE 1 STORM 10 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 4.70 24.00 1.49 --- 13.58 92.75 255.9 STRUCTURE 1 RESVOR .36 1 2 .10 .0 4.70 24.00 1.49 238.70 13.85 88.68 244.6 KSECTION 1 REACH .36 1 2 .10 .0 4.70 24.00 1.49*********** 14.01 88.28 243.5 KSECTION 2 REACH .36 1 2 .10 .0 4.70 24.00 1.49 .00 14.13 88.14 243.1 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 4.70 24.00 .95 --- 13.52 58.06 154.7 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 4.70 24.00 2.37 --- 12.31 31.65 1083.9 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 4.70 24.00 1.22 164.89 13.91 138.18 187.3 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 4.70 24.00 1.26 164.97 13.90 141.83 184.9 TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 4 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 10 STRUCTURE 2 RESVOR .77 1 2 .10 .0 4.70 24.00 1.26 164.95 14.02 140.99 183.8 XSECTION 3 REACH .77 1 2 .10 .0 4.70 24.00 1.26 --- 14.19 140.22 182.8 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 4.70 24.00 1.19 --- 12.59 79.35 371.4 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 4.70 24.00 1.24 145.83 14.12 158.42 161.5 STRUCTURE 3 RESVOR .98 1 2 .10 .0 4.70 24.00 1.24 145.23 14.66 144.10 146.9 XSECTION 4 REACH .98 1 2 .10 .0 4.70 24.00 1.24*********** 14.94 142.67 145.5 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 4.70 24.00 1.07 --- 12.50 21.59 363.6 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 4.70 24.00 1.23 109.30 14.92 146.18 140.5 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 4.70 24.00 1.23 109.29 14.98 146.09 140.4 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 4.70 24.00 .83 --- 12.30 13.94 387.8 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 4.70 24.00 1.22 --- 14.97 147.68 137.2 ALTERNATE 1 STORM 25 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 5.50 24.00 2.04 --- 13.54 130.36 359.6 STRUCTURE 1 RESVOR .36 1 2 .10 .0 5.50 24.00 2.04 239.02 13.85 123.00 339.3 XSECTION 1 REACH .36 1 2 .10 .0 5.50 24.00 2.04*********** 14.01 122.67 338.4 XSECTION 2 REACH .36 1 2 .10 .0 5.50 24.00 2.04 .00 14.12 122.58 338.2 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 5.50 24.00 1.38 --- 13.46 90.49 241.1 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 5.50 24.00 3.04 --- 12.31 40.50 1387.1 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 5.50 24.00 1.70 166.02 13.81 200.87 272.2 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 5.50 24.00 1.75 166.10 13.80 205.57 268.0 STRUCTURE 2 RESVOR .77 1 2 .10 .0 5.50 24.00 1.75 166.05 13.97 202,68 264.2 XSECTION 3 REACH .77 1 2 .10 .0 5.50 24.00 1.75 --- 14.13 201.88 263.2 ON STRUCTURE 3 RUNOFF .21 1 2 .10 .0 5.50 24.00 1.68 --- 12.57 116.73 546.3 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 5.50 24.00 1.74 146.13 14.05 226.95 231.4 STRUCTURE 3 RESVOR .98 1 2 .10 .0 5.50 24.00 1.74 146.13. 14.15 226.37 230.8 (SECTION 4 REACH .98 1 2 .10 .0 5.50 24.00 1.74 .00 14.48 220.95 225.3 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 5.50 24.00 1.53 --- 12.48 32.55 548.2 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 5.50 24.00 1.72 109.57 14.47 226.36 217.6 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 5.50 24.00 1.72 109.56 14.53 226.07 217.3 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 5.50 24.00 1.24 --- 12.29 21.82 607.2 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 5.50 24.00 1.71 --- 14.53 228.65 212.5 ALTERNATE 1 STORM 50 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 6.20 24.00 2.54 --- 13.52 165.54 456.7 STRUCTURE 1 RESVOR .36 1 2 .10 .0 6.20 24.00 2.54 239.16 13.92 150.46 415.1 (SECTION 1 REACH .36 1 2 .10 .0 6.20 24.00 2.54 .00 14.08 149.98 413.7 (SECTION 2 REACH .36 1 2 .10 .0 6.20 24.00 2.54 -.71 14.19 149.88 413.5 IR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 5 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SO MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 50 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 6.20 24.00 1.80 --- 13.42 122.49 326.3 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 6.20 24.00 3.65 --- 12.30 48.40 1657.7 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 6.20 24.00 2.16 166.96 13.76 251.58 340.9 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 6.20 24.00 2.22 167.07 13.74 257.32 335.4 STRUCTURE 2 RESVOR .77 1 2 .10 .0 6.20 24.00 2.22 166.99 13.96 253.53 330.5 lh KSECTION 3 REACH .77 1 2 .10 .0 6.20 24.00 2.22 --- 14.12 252.74 329.5 w m = r m = m = = m = = = m = m r STRUCTURE 3 RUNOFF .21 1 2 .10 .0 6.20 24.00 2.14 --- 12.55 152.22 712.4 STRUCTURE 3 ADDHYD .98 1 2 .10 .0 6.20 24.00 2.20 146.25 14.02 284.09 289.7 STRUCTURE 3 RESVOR .98 1 2 .10 .0 6.20 24.00 2.20 146.25 14.11 283.50 289.1 XSECTION 4 REACH .98 1 2 .10 .0 6.20 24.00 2.20 -22.84 14.38 280.04 285.5 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 6.20 24.00 1.97 --- 12.46 43.04 724.9 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 6.20 24.00 2.19 109.77 14.37 286.92 275.8 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 6.20 24.00 2.19 109.77 14.43 286.67 275.6 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 6.20 24.00 1.63 --- 12.28 29.41 818.3 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 6.20 24.00 2.17 --- 14.42 290.00 269.5 ALTERNATE 1 STORM 99 STRUCTURE 1 RUNOFF .36 1 2 .10 .0 6.90 24.00 3.08 --- 13.50 202.34 558.2 STRUCTURE 1 RESVOR .36 1 2 .10 .0 6.90 24.00 3.08 239.32 13.94 181.31 500.2 XSECTION 1 REACH .36 1 2 .10 .0 6.90 24.00 3.08 .00 14.09 180.66 498.4 XSECTION 2 REACH .36 1 2 .10 .0 6.90 24.00 3.08*********** 14.20 180.57 498.1 STRUCTURE 2 RUNOFF .38 1 2 .10 .0 6.90 24.00 2.25 --- 13.39 157.08 418.4 STRUCTURE 2 RUNOFF .03 1 2 .10 .0 6.90 24.00 4.27 --- 12.30 56.40 1931.4 STRUCTURE 2 ADDHYD .74 1 2 .10 .0 6.90 24.00 2.65 168.11 13.77 307.69 417.0 STRUCTURE 2 ADDHYD .77 1 2 .10 .0 6.90 24.00 2.72 168.15 13.75 314.17 409.6 STRUCTURE 2 RESVOR .77 1 2 .10 .0 6.90 24.00 2.72 168.10 14.03 306.00 398.9 XSECTION 3 REACH .77 1 2 .10 .0 6.90 24.00 2.72 --- 14.19 305.15 397.8 STRUCTURE 3 RUNOFF .21 1 2 .10 .0 6.90 24.00 2.63 --- 12.54 190.26 890.5 STRUCTURE 3 ADDHYD .98 1 2. .10 .0 6.90 24.00 2.70 146.37 14.08 341.44 348.1 STRUCTURE 3 RESVOR .98 1 2 .10 .0 6.90 24.00 2.70 146.37 14.16 340.88 347.6 XSECTION 4 REACH .98 1 2 .10 .0 6.90 24.00 2.70*********** 14.42 338.07 344.7 STRUCTURE 4 RUNOFF .06 1 2 .10 .0 6.90 24.00 2.43 --- 12.45 54.21 912.9 STRUCTURE 4 ADDHYD 1.04 1 2 .10 .0 6.90 24.00 2.68 109.97 14.40 346.23 332.9 STRUCTURE 4 RESVOR 1.04 1 2 .10 .0 6.90 24.00 2.68 109.97 14.46 345.99 332.6 STRUCTURE 5 RUNOFF .04 1 2 .10 .0 6.90 24.00 2.06 --- 12.28 37.52 1043.9 STRUCTURE 5 ADDHYD 1.08 1 2 .10 .0 6.90 24.00 2.66 --- 14.45 350.00 325.3 I TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 6 SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS (A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDING BASE + 10% OF PEAK A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS) HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK OUTFLOW+ VOLUME MAIN ITER- Q AND A PEAK S/Q ATT- TRAVEL TIME (SEC REACH INFLOW OUTFLOW INTERV.AREA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO @PEAK KIN STOR- KINE- ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC (FT) (CFS) (HR) (CFS) (HR) (CFS) (HR) (CFS) (IN) (HR) (X) (M) (K*) (Q*) (SEC) (C) (HR) (HR) ALTERNATE 1 STORM 1 2.38 1 3400 17 14.0 16 14.2 0 .35 .10 1 1.47 .010 .990 525 .51 .20 .15 1.11 2 1200 16 14.2 16 14.3 0 .35 .10 1 1.35 .009 .994 400 .62 .10 .11 1.97 3 1980 22 14.4 22 14.6 0 .26 .10 1 1.20 .016 .986 560 .49 .20 .16 2.60 4 3210 25 14.8 25 15.2 0 .26 .10 1 1.08 .036 .975 974 .31 .40 .27 ALTERNATE 1 STORM 2 2.38 1 3400 32 14.0 32 14.2 0 .62 .10 1 1.47 .008 .993 424 .60 .20 .12 1.11 2 1200 32 14.2 32 14.3 0 .62 .10 1 1.35 .008 .997 336 .70? .10 .09 1.97 3 1980 47 14.2 47 14.4 0 .49 .10 1 1.20 .016 .993 494 .53 .20 .14 2.60 4 3210 52 14.7 51 15.0 0 .48 .10 1 1.08 .037 .986 925 .33 .30 .26 ALTERNATE 1 STORM 5 W 2.48 1 3400 64 13.9 64 14.0 0 1.12 .10 1 1.43 .008 .994 361 .67 .10 .10 1.12 2 1200 64 14.0 64 14.2 0 1.12 .10 1 1.35 .007 .999 282 .78? .20 .08 1.97 3 1980 99 14.1 98 14.3 0 .92 .10 1 1.20 .016 .994 437 .58 .20 .12 2.60 4 3210 107 14.5 106 14.8 0 .91 .10 1 1.08 .039 .985 879 .34 .30 .24 ALTERNATE 1 STORM 10 2.72 1 3400 89 13.9 88 14.0 0 1.49 .10 1 1.37 .010 .997 360 .67? .10 .10 1.12 2 1200 88 14.0 88 14.1 0 1.49 .10 1 1.34 .007 .998 260 .82? .10 .07 1.97 3 1980 141 14.0 140 14.2 0 1.26 .10 1 1.20 .015 .995 411 .61 .20 .11 2.56 4 3210 144 14.7 143 14.9 0 1.24 .10 1 1.08 .036 .990 844 .35 .20 .23 ALTERNATE 1 STORM 25 3.08 1 3400 123 13.9 123 14.0 0 2.04 .10 1 1.30 .012 .998 358 .67? .10 .10 1.13 2 1200 123 14.0 123 14.1 0 2.04 .10 1 1.34 .006 .999 240 .86? .10 .07 1.97 3 1980 203 14.0 202 14.1 0 1.75 .10 1 1.20 .015 .996 387 .63 .10 .11 2.44 4 3210 226 14.1 221 14.5 0 1.74 .10 1 1.10 .036 .977 785 .37 .40 .22 ALTERNATE 1 STORM 50 l3� f� W 3.29 1 3400 150 13.9 150 14.1 0 2.54 .10 1 1.27 .013 .997 361 .66 .20 .10 1.13 2 1200 150 14.1 150 14.2 0 2.54 .10 1 1.34 .006 1.000 228 .88? .10 .06 1.97 3 1980 253 14.0 253 14.1 0 2.22 .10 1 1.20 .014 .997 373 .65 .10 .10 2.37 4 3210 283 14.1 280 14.4 0 2.20 .10 1 1.11 .034 .988 757 .38 .30 .21 ALTERNATE 1 STORM 99 3.52 1 3400 181 13.9 181 14.1 0 3.08 .10 1 1.24 .014 .997 364 .66 .20 .10 1.13 2 1200 181 14.1 181 14.2 0 3.08 .10 1 1.34 .005 1.000 218 .90? .10 .06 TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 7 SUMMARY TABLE 2 - SELECTED MODIFIED ATT-KIN REACH ROUTINGS IN ORDER OF STANDARD EXECUTIVE CONTROL INSTRUCTIONS (A STAR(*) AFTER VOLUME ABOVE BASE(IN) INDICATES A HYDROGRAPH TRUNCATED AT A VALUE EXCEEDING BASE + 10% OF PEAK A QUESTION MARK(?) AFTER COEFF.(C) INDICATES PARAMETERS OUTSIDE ACCEPTABLE LIMITS, SEE PREVIOUS WARNINGS) HYDROGRAPH INFORMATION ROUTING PARAMETERS PEAK OUTFLOW+ VOLUME MAIN ITER- Q AND A PEAK S/Q ATT- TRAVEL TIME XSEC REACH INFLOW OUTFLOW INTERV.AREA BASE- ABOVE TIME ATION EQUATION LENGTH RATIO @PEAK KIN STOR- KINE- ID LENGTH PEAK TIME PEAK TIME PEAK TIME FLOW BASE INCR # COEFF POWER FACTOR 0/I (K) COEFF AGE MATIC (FT) (CFS) (HR) (CFS) (HR) (CFS) (HR) (CFS) (1N) (HR) (X) (M) (K*) (Q*) (SEC) (C) (HR) (HR) ALTERNATE 1 STORM 99 •� 1.97 3 1980 306 14.0 305 14.2 0 2.72 .10 1 1.20 .013 .997 362 .66 .20 .10 2.31 4 3210 341 14.2 338 14.4 0 2.70 .10 1 1.12 .032 .992 735 .39 .20 .20 TR20 XEQ 01-04-90 13:59 POST DEVELOPMENT HYDROGRAPHS FOR JOB 1180-04 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 8 SUMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (SQ MI) 1 2 5 10 25 50 99 STRUCTURE 5 1.08 ALTERNATE 1 24.92 50.37 109.53 147.68 228.65 290.00 350.00 STRUCTURE 4 1.04 ALTERNATE 1 24.65 49.82 108.31 146.09 226.07 286.67 345.99 STRUCTURE 3 .98 ALTERNATE 1 25.22 51.88 107.28 144.10 226.37 283.50 340.88 STRUCTURE 2 .77 ALTERNATE 1 22.28 46.89 98.77 140.99 202.68 253.53 306.00 STRUCTURE 1 .36 ALTERNATE 1 16.57 32.40 64.06 88.68 123.00 150.46 181.31 XSECTION 1 .36 ALTERNATE 1 16.41 32.20 63.78 88.28 122.67 149.98 180.66 XSECTION 2 .36 ALTERNATE 1 16.32 32.10 63.63 88.14 122.58 149.88 180.57 XSECTION 3 .77 m = m r = = m = = = = = = = ALTERNATE 1 21.97 46.58 98.27 140.22 201.88 252.74 305.15 1 XSECTION 4 .98 ALTERNATE 1 24.58 51.15 105.66 142.67 220.95 280.04 338.07 END OF 1 JOBS IN THIS RUN N W SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 CATCH TO DRAINAGE SUM G TO OF SLOPE OF FLOW AT OF BYPASSING Al ENTERING BYPASS BASIN INLET AREA RUNOFF OF TOTAL RAINFALL INLET GUTTER SHOULDER GUTTER FLOW INLET BYPASSING CATCH TO NUMBER (MIN) (ACRES) COEFFICIENT Al Al Al INTENSITY (CFS) (%) (%) (FT) (FT) (CFS) INLET BASIN STATION CATCH BASIN TYPE ---------------------------------------------------------------------------------------------------------------------------------------------------- ------------------�� 1 11 0.24 0.50 0.12 0.00 0.12 4.50 0.54 1.50% 1.50% 0.12 8.13 0.00 0.00 0.12 SAG TYPE 'C-L' 2 11 0.25 0.52 0.13 0.00 0.13 4.50 0.59 1.50% 1.50% 0.13 8.58 0.00 0.00 0.13 SAG TYPE 'C-L' 3 13 1.04 0.41 0.43 0.00 0.43 4.30 1.83 1.50% 1.50% 0.28 18.37 0.00 0.00 0.43 SAG TYPE -C-L' (� 4 13 1.04 0.41 0.43 0.00 0.43 4.30 1.83 1.50% 1.50% 0.28" 18.37 0.00 0.00 0.43 SAG TYPE -C-L' 5 10 0.12 0.50 0.06 0.00 0.06 4.70 0.28 1.50% 1.50% 0.08 5.27 0.00 0.00 0.06 SAG TYPE -C-L' 6 11 0.14 0.54 0.08 0.00 0.08 4.50 0.34 1.50% 1.50% 0.09 5.97 0.00 0.00 0.08 SAG TYPE 'C-L' 7 5 0.30 0.81 0.24 0.00 0.24 6.20 1.51 1.00% 1.00% 0.24 24.18 0.00 0.00 0.24 SAG TYPE -C-L' �) 8 5 0.66 0.66 0.44 0.00 0.44 6.20 2.70 1.67% 1.33% 0.26 19.36 0.00 0.00 0.44 SAG I'C-L' DBL TYPE II 9 10 0.35 0.61 0.21 0.00 0.21 4.70 1.00 1.33% 2.22% 0.15 6.74 0.00 0.00 0.21 SAG ( TYPE 'Cl 10 12 0.59 0.53 0.31 0.00 0.31 4.40 1.38 2.00% 1.33% 0.12 8.99 0.79 0.18 0.13 13 TYPE -Cl 11 14 0.40 0.57 0.23 0.00 0.23 4.10 0.93 2.00% 1.33% 0.10 7.77 0.49 0.12 0.11 13 TYPE 'Cl 12 17 1.03 0.30 0.31 0.00 0.31 3.80 1.17 1.33% 1.60% 0.20 12.80 0.00 0.00 0.31 SAG TYPE 'C-L' 13 17 0.75 0.54 0.41 0.30 0.70 3.80 2.68 1.50% 2.00% 0.29 14.39 0.00 0.00 0.70 SAG TYPE 'Cl 14 5 0.33 0.72 0.24 0.00 0.24 6.20 1.47 1.00% 1.50% 0.19 12.89 0.00 0.00 0.24 SAG TYPE 'Cl (� 15 14 0.69 0.68 0.47 0.00 0.47 4.10 1.92 2.00% 1.00% 0.23 23.10 0.00 0.00 0.47 SAG TYPE 'Cl 16 9 0.49 0.74 0.36 0.00 0.36 5.00 1.81 2.00% 2.00% 0.22 11.10 0.00 0.00 0.36 SAG TYPE 'Cl 17 13 0.25 0.78 0.20 0.00 0.20 4.30 0.84 2.00% 2.00% 0.13 6.64 0.00 0.00 0.20 SAG TYPE 'Cl 18A 21 1.46 0.30 0.44 0.00 0.44 3.30 1.45 1.70% 1.70% 0.24 13.83 0.00 0.00 0.44 SAG TYPE 'C-L' 18B 20 1.07 0.30 0.32 0.00 0.32 3.40 1.09 1.70% 1.70% 0.19 11.47 0.00 0.00 0.32 SAG TYPE 'C-L' 18C 17 0.71 0.30 0.21 0.00 0.21 3.80 0.81 1.30% 1.30% 0.16 12.29 0.00 0.00 0.21 SAG TYPE 'C-L' 19 5 0.05 0.90 0.05 0.00 0.05 6.20 0.28 1.00% 1.30% 0.07 5.71 0.11 0.02 0.03 25 TYPE 'Cl 20 8 0.29 0.69 0.20 0.00 0.20 5.30 1.06 2.80% 1.10% 0.16 14.11 0.00 0.00 0.20 SAG TYPE 'Cl 21 6 0.56 0.69 0.39 0.18 0.57 5.60 3.17 1.50% 2.00% 0.32 16.11 0.00 0.00 0.57 SAG TYPE 'Cl 22 5 0.32 0.88 0.28 0.00 0.28 6.20 1.75 1.30% 1.30% 0.14 10.81 1.11 0.18 0.10 21 TYPE 'Cl �) 23 11 0.27 0.30 0.08 0.00 0.08 4.50 0.36 8.80% 8.80% 0.09 1.07 0.00 0.00 0.08 SAG ( TYPE 'C-L' 24 5 0.07 0.90 0.06 0.00 0.06 6.20 0.39 9.00% 2.00% 0.07 3.28 0.06 0.01 0.05 26 TYPE 'Cl 25 12 0.45 0.77 0.35 0.10 0.45 4.40 1.99 1.00% 1.30% 0.24 18.15 0.00 0.00 0.45 SAG TYPE 'Cl �� SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 BASIN INLET AREA RUNOFF OF TOTAL RAINFALL INLET GUTTER SHOULDER GUTTER FLOW INLET BYPASSING CATCH TO (� NUMBER (MIN) (ACRES) COEFFICIENT• Al Al Al INTENSITY (CFS) (%) (%) (FT) (FT) (CFS) INLET BASIN STATION CATCH BASIN TYPE ----------------------------------------------------------•----------------------------------------------------------------------------------------- ------------------�� 26 5 0.08 0.90 0.07 0.01 0.08 6.20 0.50 1.00% 1.30% 0.09 7.27 0.00 0.00 0.08 SAG TYPE 'C' 27 9 0.28 0.66 0.18 0.00 0.18 5.00 0.92 1.00% 2.00% 0.14 6.83 0.44 0.09 0.10 25 ( TYPE 'C' 28 12 0.40 0.69 0.28 0.00 0.28 4.40 1.21 1.00% 2.00% 0.21 10.47 0.00 0.00 0.28 SAG TYPE 'C-L' (� 29 15 0.17 0.30 0.05 0.00 0.05 4.00 0.20 1.00% 1.00% 0.06 6.37 0.00 0.00 0.05 SAG TYPE 'C-L' (� 30 5 0.34 0.90 0.31 0.00 0.31 6.20 1.90 2.00% 2.00% 0.23 ' 11.44 0.00 0.00 0.31 SAG ROOF LEADER (� 31 5 0.28 0.90 0.25 0.00 0.25 6.20 1.56 2.00% 2.00% 0.20 10.05 0.00 0.00 0.25 SAG ROOF LEADER 32 5 0.35 0.90 0.32 0.00 0.32 6.20 1.95 2.00% 2.00% 0.23 11.66 0.00 0.00 0.32 SAG ROOF LEADER �) 33 5 0.49 0.90 0.44 0.00 0.44 6.20 2.73 2.00% 2.00% 0.29 14.60 0.00 0.00 0.44 SAG ROOF LEADER 34 5 0.06 0.90 0.05 0.00 0.05 6.20 0.33 2.00% 2.00% 0.07 3.60 0.00 0.00 0.05 SAG ROOF LEADER 35 5 0.05 0.90 0.05 0.00 0.05 6.20 0.28 2.00% 2.00% 0.06 3.19 0.00 0.00 0.05 SAG ROOF LEADER 36 5 0.34 0.90 0.31 0.00 0.31 6.20 1.90 2.00% 2.00% 0.23 11.44 0.00 0.00 0.31 SAG ROOF LEADER 37 5 0.41 0.90 0.37 0.00 0.37 6.20 2.29 2.00% 2.00% 0.26 12.96 0.00 0.00 0.37 SAG ROOF LEADER 38 5 0.44 0.90 0.40 0.00 0.40 6.20 2.46 2.00% 2.00% 0.27 13.59 0.00 0.00 0.40 SAG ROOF LEADER 39 5 0.59 0.90 0.53 0.00 0.53 6.20 3.29 2.00% 2.00% 0.33 16.52 0.00 0.00 0.53 SAG ROOF LEADER 40 5 0.37 0.90 0.33 0.00 0.33 6.20 2.06 2.00% 2.00% 0.24 12.11 0.00 0.00 0.33 SAG ROOF LEADER 41 5 0.54 0.90 0.49 0.00 0.49 6.20 3.01 2.00% 2.00% 0.31 15.58 0.00 0.00 0.49 SAG ROOF LEADER 42 5 0.37 0.90 0.33 0.00 0.33 6.20 2.06 2.00% 2.00% 0.24 12.11 0.00 0.00 0.33 SAG ROOF LEADER (� 44 12 2.06 0.69 1.42 0.00 1.42 4.40 6.25 1.00% 2.00% 0.45 22.54 0.00 0.00 1.42 SAG I'C-L' DBL TYPE II �) 45 12 0.79 0.53 0.42 0.00 0.42 4.40 1.84 1.00% 5.00% 0.28 5.53 0.00 0.00 0.42 SAG TYPE 'C-L' �) 46 5 0.11 0.30 0.03 0.00 0.03 6.20 0.20 1.50% 1.50% 0.06 4.26 0.00 0.00 0.03 SAG TYPE -C-L' 47 5 0.32 0.70 0.22 0.00 0.22 6.20 1.39 3.00% 2.00% 0.23 11.45 0.00 0.00 0.22 SAG TYPE -C-L' 48 5 0.45 0.90 0.41 0.00 0.41 6.20 2.51 1.00% 1.00% 0.25 24.52 0.00 0.00 0.41 SAG j'C-L' DBL TYPE II 49 5 0.18 0.90 0.16 0.00 0.16 6.20 1.00 1.00% 1.00% 0.15 14.97 0.00 0.00 0.16 SAG TYPE 'C' 50 5 0.06 0.90 0.05 0.00 0.05 6.20 0.33 1.00% 1.00% 0.07 7.20 0.00 0.00 0.05 SAG TYPE 'C' 51 10 0.25 0.30 0.08 0.00 0.08 4.70 0.35 1.00% 1.00% 0.09 9.18 0.00 0.00 0.08 SAG TYPE 'C-L' �� SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 LINE (MIN) (MIN) TIME ENTERING OF RAINFALL Q = AIR PIPE OF AVERAGE FULL HEADWATER SYSTEM Q SEGMENT TO IN CATCH Al INTENSITY (CFS) SIZE PIPE VELOCITY CAPACITY AVAILABLE MANNINGS OVER PIPE ck FROM TO INLET PIPE (MIN) BASIN SYSTEM R SYSTEM Q (IN) (FEET) SLOPE FT/SEC (CFS) (FT) "n" CAPACITY? ------------------------------------------------------------------------------------------------------------------------------------------- 44 8 12.00 0.95 12.00 1.42 1.42 4.40 6.25 18 330.0 0.50% 5.81 9.71 2.46 0.010 NO 8 MH 5.00 0.57 12.95 0.44 2.62 4.30 11.26 24 230.0 0.50% 6.74 20.92 5.86 0.010 NO MH 13 0.00 0.29 18.02 0.00 3.95 3.70 14.63 24 124.0 0.50% 7.17 20.92 8.66 0.010 NO 13 14 17.00 0.21 18.31 0.70 4.66 3.70 17.24 24 94.0 0.50% 7.40 20.92 7.63 0.010 NO 14 15 5.00 0.11 18.52 0.24 5.38 3.50 18.84 24 64.0 1.00% 9.93 29.59 8.10 0.010 NO 15 20 14.00 0.05 18.63 0.47 6.41 3.50 22.43 24 38.0 2.00% 13.47 41.84 7.64 0.010 NO 8 20 OUT 8.00 0.17 18.67 0.20 6.61 3.50 23.13 30 80.0 0.50% 8.06 37.93 8.90 0.010 NO 9 8 10.00 0.18 10.00 0.21 0.21 4.70 1.00 15 82.0 4.00% 7.52 16.90 1.77 0.010 NO �5 40 8 5.00 0.07 5.00 0.33 0.33 6.20 2.06 8 48.0 6.00% 11.20 3.87 1.29 0.010 NO iv 49 50 5.00 0.34 5.00 0.16 0.16 6.20 1.00 15 93.0 1.00% 4.61 8.45 2.30 0.010 NO 50 8 5.00 0.71 5.34 0.05 0.22 6.20 1.34 15 212.0 1.00% 5.01 8.45 3.13 0.010 NO 42 44 11 I t 45 12 12.00 0.27 12.00 0.42 0.42 4.40 1.84 15 138.0 3.50% 8.57 15.81 1.92 0.010 NO 46 12 5.00 0.56 5.00 0.03 0.03 6.20 0.20 15 150.0 3.50% 4.46 15.81 2.00 0.010 NO /4 3 12 11 17.00 0.79 17.00 0.31 0.76 3.80 2.89 15 294.0 1.00% 6.21 8.45 2.35 0.010 NO 11 MH 14.00 0.23 17.79 0.11 1.00 3.70 3.71 15 118.0 2.00% 8.55 11.95 3.44 0.010 NO i to 10 11 12.00 0.12 12.00 0.13 0.13 4.40 0.58 15 28.0 1.00% 3.93 8.45 3.41 0.010 NO 42 MH 5.00 0.10 5.00 0.33 0.33 6.20 2.06 10 44.0 2.00% 7.42 4.05 1.80 0.010 NO2 0 41 14 5.00 0.13 5.00 0.49 0.49 6.20 3.01 10 64.0 2.00% 8.10 4.05 3.05 0.010 NO OUT 17 16 13.00 0.21 13.00 0.20 0.20 4.30 0.84 15 82.0 3.00% 6.44 14.63 1.71 0.010 NO 16 15 9.00 0.04 13.21 0.36 0.56 4.30 2.40 15 22.0 4.00% 9.70 16.90 1.72 0.010 NO ------------------------------------------------------------------------------------------------------------------------------------------- m = = r m = = m = m = m m = m m SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 TIME TIME ACCUMULATED Al SUM LENGTH MAX IS LINE (MIN) (MIN) TIME ENTERING OF RAINFALL Q = AIR PIPE OF AVERAGE FULL HEADWATER SYSTEM Q SEGMENT TO IN CATCH Al INTENSITY (CFS) SIZE PIPE VELOCITY CAPACITY AVAILABLE MANNINGS OVER PIPE FROM TO INLET PIPE (MIN) BASIN SYSTEM R SYSTEM Q (IN) (FEET) SLOPE FT/SEC (CFS) (FT) "n" CAPACITY? ------------------------------------------------------------------------------------------------------------------------------------------- 3 3A 13.00 0.98 13.00 0.43 0.43 4.30 1.83 10 300.0 0.80% 5.09 2.56 0.99 0.010 NO 3A 1 0.00 0.19 13.98 0.00 0.43 4.10 1.75 10 62.0 1.00% 5.48 2.87 3.39 0.010 NO 1 2 11.00 0.50 14.17 0.12 0.55 4.10 2.24 10 172.0 1.00% 5.79 2.87 3.96 0.010 NO 2 MH4 11.00 0.41 14.67 0.13 1.31 4.00 5.25 15 176.0 1.00% 7.22 8.45 6.10 0.010 NO MH4 47 0.00 0.33 15.07 0.00 3.42 4.00 13.67 18 277.0 3.00% 13.85 23.80 4.76 0.010 NO 3 47 OUT 5.00 0.29 15.43 0.22 4.02 4.00 16.06 24 168.0 1.00% 9.56 29.59 3.57 0.010 NO 3P• i 51 6 10.00 0.32 10.00 0.08 0.08 4.70 0.35 8 55.0 0.50% 2.82 1.12 2.01 0.010 NO SI 5 6 10.00 0.71 10.00 0.06 0.06 4.70 0.28 8 113.0 0.50% 2.66 1.12 0.72 0.010 NO 2 �4 6 4 11.00 0.55 11.00 0.08 0.21 4.50 0.95 10 120.0 0.50% 3.64 2.03 1.45 0.010 NO (A 4 4A 13.00 0.81 13.00 0.43 0.64 4.30 2.74 12 300.0 1.00% 6.14 4.66 2.27 0.010 NO 4A 2 0.00 0.17 13.81 0.00 0.64 4.10 2.61 12 63.0 1.00% 6.07 4.66 5.27 0.010 NO 38 48 5.00 0.20 5.00 0.40 0.40 6.20 2.46 12 55.0 0.50% 4.58 3.29 2.97 0.010 NO 48 7 5.00 0.34 5.20 0.41 1.24 6.20 7.70 18 123.0 0.50% 6.07 9.71 2.34 0.010 NO '77 MH3 5.00 0.16 5.54 0.24 1.49 5.60 8.32 18 77.0 1.00% 8.10 13.74 3.26 0.010 NO 48 MH3 MH4 0.00 0.42 5.70 0.00 1.80 5.60 10.08 18 212.0 1.00% 8.46 13.74 4.73 0.010 NO 3Z 3 33 48 5.00 0.23 5.00 0.44 0.44 6.20 2.73 12 83.0 1.00% 6.14 4.66 2.41 0.010 NO �®2°I 32 MH3 5.00 0.04 5.00 0.32 0.32 6.20 1.95 8 22.0 4.00% 9.48 3.16 1.19 0.010 NO 29 31 15.00 0.28 15.00 0.05 0.05 4.00 0.20 15 55.0 2.00% 3.22 9.96 2.30 0.012 NO 41 Z 31 MH4 5.00 0.15 15.28 0.25 0.30 4.00 1.21 15 55.0 2.00% 6.23 11.95 4.40 0.010 NO 34 35 5.00 0.18 5.00 0.05 0.05 6.20 0.33 6 40.0 1.00% 3.63 0.73 5.95 0.010 NO 35 37 5.00 0.27 5.18 0.05 0.10 6.20 0.61 6 126.0 5.00% 7.72 1.64 6.35 0.010 NO o u T 28 47 12.00 0.32 12.00 0.28 0.38 4.40 1.65 15 130.0 2.00% 6.81 11.95 2.55 0.010 NO ------------------------------------------------------------------------------------------------------------------------------------------- SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 TIME TIME ACCUMULATED Al SUM LENGTH MAX IS LINE (MIN) (MIN) TIME ENTERING OF RAINFALL Q = AIR PIPE OF AVERAGE FULL HEADWATER SYSTEM Q SEGMENT TO IN CATCH Al INTENSITY (CFS) SIZE PIPE VELOCITY CAPACITY AVAILABLE MANNINGS OVER PIPE FROM TO INLET PIPE (MIN) BASIN SYSTEM R SYSTEM Q (IN) (FEET) SLOPE FT/SEC (CFS) (FT) fins' CAPACITY? -------------------------------------------------------------------------------------------------------------------------------------------- 3Co 1q 30 27 5.00 0.18 5.00 0.31 0.31 6.20 1.90 10 60.0 1.00% 5.59 2.87 2.09 0.010 NO 27 23 9.00 0.16 9.00 0.10 0.40 5.00 2.02 15 92.0 4.50% 9.62 17.92 2.51 0.010 NO 2�' 1r�' 23 MH2 11.00 0.07 11.00 0.08 0.79 4.50 3.56 12 44.0 5.64% 10.93 9.22 3.00 0.012 NO MH2 OUT 0.00 0.06 11.07 0.00 0.87 4.50 3.92 12 44.0 7.00% 12.15 10.27 4.48 0.012 NO Z 7 36 23 5.00 0.11 5.00 0.31 0.31 6.20 1.90 8 82.0 8.00% 12.24 • 4.47 5.11 0.010 NO 2 MH2 LC�1S} 19 MH2 5.00 0.48 5.20 0.03 0.03 6.20 0.17 12 140.0 7.00% 4.87 10.27 4.48 0.012 NO ou'T 24 MH2 5.00 0.07 5.00 0.05 0.05 6.20 0.33 12 24.0 6.70% 5.87 10.05 2.87 0.012 NO S I-tiS�• , ------------------------------------------------------------------------------------------------------------------------------------------- 37 22 5.00 0.10 5.00 0.37 0.37 6.20 2.29 10 62.0 4.00% 9.87 5.73 2.66 0.010 NO 22 21 5.00 0.10 5.10 0.10 1.00 6.20 6.21 15 76.0 4.00% 12.66 16.90 2.96 0.010 NO 21 OUT 6.00 0.08 5.20 0.57 1.57 6.20 9.72 24 30.0 0.50% 6.51 20.92 3.55 0.010 ' NO 37 's9 39 22 5.00 0.21 5.00 0.53 0.53 6.20 3.29 10 120.0 3.00% 9.68 4.96 2.00 0.010 NO ------------------------------------------------------------------------------------------------------------------------------------------- ZZ 18C 18B 17.00 1.22 17.00 0.21 0.21 3.80 0.81 15 264.0 0.60% 3.61 6.54 1.76 0.010 NO 188 18A 20.00 1.11 20.00 0.32 0.53 3.40 1.82 15 282.0 0.50% 4.25 5.97 1.39 0.010 NO Zl 18A OUT 21.00 0.12 21.00 0.44 0.97 3.30 3.21 15 35.0 0.50% 4.93 5.97 4.32 0.010 NO ------------------------------------------------------------------------------------------------------------------------------------------- ouT �SG SSA its ou T SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 LINE 0 = AIR PIPE OF TOP OF TAIL SEGMENT (CFS) SIZE PIPE FRAME FLOW LINE FLOW LINE WATER ---------------- OUTLET CONTROL ----------------I CONTROL HEADWATER FROM TO SYSTEM 0 (IN) (FEET) SLOPE FROM FROM TO ELEV. 0/(D-2.5) HW Ke H do (dc+D)/2 TW ho LS HW HEAD ELEVATION ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 44 8 6.25 18 330.0 0.50%11 181.25 177.79 176.14 179.67 2.27 1.51 0.50 0.98 0.97 1.23 3.53 3.53 1.65 2.86 2.86 180.65 8 MH 11.26 24 230.0 0.50%11 182.50 175.64 174.49 179.04 1.99 1.84 0.50 0.63 1.15 1.58 4.55 4.55 1.15 4.03 4.03 179.67 MH 13 14.63 24 124.0 0.50%11 184.15 174.49 173.87 178.23 2.59 2.22 0.50 0.81 1.28 1.64 4.36 4.36 0.62 4.55 4.55 179.04 13 14 17.24 24 94.0 0.50%11 182.50 173.87 173.40 177.21 3.05 2.54 0.50 1.02 1.43 1.71 3.81 3.81 0.47 4.36 4.36 178.23 14 15 18.84 24 64.0 1.00%11 182.50 173.40 172.76 176.11 3.33 2.77 0.50 1.10 1.56 1.78 3.35 3.35 0.64 3.81 3.81 177.21 15 20 22.43 24 38.0 2.00%11 181.40 172.76 172.00 173.97 3.97 3.35 0.50 1.41 1.67 1.83 1.97 1.97 0.76 2.62 3.35 176.11 20 OUT 23.13 30 80.0 0.50%11 181.30 171.40 171.00 171.00 2.34 2.57 0.50 0.67 1.61 2.05 0.00 2.05 0.40 2.32 2.57 173.97 9 8 1.00 15 82.0 4.00%11 184.80 182.03 178.75 179.67 0.57 0.53 0.50 0.03 0.39 0.82 0.92 0.92 3.28 0.00 0.53 182.56 40 8 2.06 8 48.0 6.00%11 185.00 182.71 179.83 179.67 5.69 1.84 0.50 1.63- 0.63 0.65 0.00 0.65 2.88 0.00 1.84 184.55 49 50 1.00 15 93.0 1.00%11 183.60 180.30 179.37 180.01 0.57 0.53 0.50 0.03 0.63 0.94 0.64 0.94 0.93 0.04 0.53 180.83 50 8 1.34 15 212.0 1.00%11 183.50 179.37 177.25 179.67 0.77 0.64 0.50 0.08 0.63 0.94 2.42 2.42 2.12 0.39 0.64 180.01 45 .12 1.84 15 138.0 3.50%11 193.00 190.08 185.25 186.27 1.05 0.78 0.50 0.12 0.63 0.94 1.02 1.02 4.83 0.00 0.T8 190.86 46 12 0.20 15 150.0 3.50%11 193.50 190.50 185.25 186.27 0.12 0.21 0.50 0.00 0.63 0.94 1.02 1.02 5.25 0.00 0.21 190.71 12 11 2.89 15 294.0 1.00%11 188.60 185.25 182.31 183.51 1.65 1.02 0.50 0.47 0.43 0.84 1.20 1.20 2.94 0.00 1.02 186.27 11 MH 3.71 15 118.0 2.00%11 186.75 182.31 179.95 179.04 2.12 1.20 0.50 0.44 0.63 0.94 0.00 0.94 2.36 0.00 1.20 183.51 10 11 0.58 15 28.0 1.00%11 187.00 182.59 182.31 183.51 0.33 0.37 0.50 0.01 0.40 0.83 1.20 1.20 0.28 0.93 0.93 183.52 42 MH 2.06 10 44.0 2.00%11 185.00 182.20 181.32 179.04 3.26 1.13 0.50 0.56 0.63 0.73 0.00 0.73 0.88 0.42 1.13 183.32 41 14 3.01 10 64.0 2.00%11 185.00 180.95 179.67 177.21 4.75 1.76 0.50 1.42 0.63 0.73 0.00 0.73 1.28 0.87 1.76 182.71 17 16 0.84 15 82.0 3.00%11 184.20 181.49 179.03 179.94 0.48 0.47 0.50 0.02 0.36 0.80 0.91 0.91 2.46 0.00 0.47 181.96 16 15 2.40 15 22.0 4.00%11 181.75 179.03 178.15 176.11 1.37 0.91 0.50 0.11 0.62 0.93 0.00 0.93 0.88 0.16 0.91 179.94 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- r r � r r r � r r r r r r � r r■i � � r SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 LENGTH LINE Q = AIR PIPE OF TOP OF TAIL SEGMENT (CFS) SIZE PIPE FRAME FLOW LINE FLOW LINE WATER ---------------- OUTLET CONTROL ----------------I CONTROL HEADWATER FROM TO SYSTEM Q (IN) (FEET) SLOPE FROM FROM TO ELEV. Q/(D-2.5) HW Ke H do (dc+D)/2 TW ho LS HW HEAD ELEVATION ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 3 3A 1.83 10 300.0 0.80%11 184.65 182.66 180.26 181.89 2.89 1.01 0.50 1.49 0.68 0.75 1.63 1.63 2.40 0.72 1.01 183.67 3A 1 1.75 10 62.0 1.00%11 184.65 180.26 179.64 181.41 2.76 0.97 0.50 0.47 0.66 0.75 1.78 1.78 0.62 1.63 1.63 181.89 1 2 2.24 10 172.0 1*.00%11 184.60 179.64 177.92 179.97 3.53 1.23 0.50 1.45 0.73 0.78 2.05 2.05 1.72 1.78 1.78 181.41 2 MH4 5.25 15 176.0 1.00%11 184.60 177.50 175.74 178.86 3.01 1.57 0.50 1.11 0.96 1.10 3.12 3.12 1.76 2.47 2.47 179.97 MH4 47 13.67 18 277.0 3.00%11 181.25 175.49 167.18 169.07 4.96 3.37 0.50 4.14 1.36 1.43 1.89 1.89 8.31 0.00 3.37 178.86 47 OUT 16.06 24 168.0 1.00%11 171.25 166.68 165.00 165.00 2.84 2.39 0.50 1.11 1.46 1.73 0.00 1.73 1.68 1.16 2.39 169.07 51 6 0.35 8 55.0 0.50%11 184.60 181.59 181.31 182.79 0.97 0.39 0.50 0.05 0.38 0.53 1.47 1.47 0.28 1.25 1.25 182.84 5 6 0.28 8 113.0 0.50%11 184.60 182.88 182.31 182.79 0.78 0.34 0.50 0.05 0.38 0.53 0.47 0.53 0.57 0.01 0.34 183.22. 6 4 0.95 10 120.0 0.50%11 184.60 182.15 181.55 182.54 1.49 0.64 0.50 0.20 0.38 0.61 0.99 0.99 0.60 0.59 0.64 182.79 4 4A 2.74 12 300.0 1.00%11 184.65 181.38 178.38 180.43 2.74 1.16 0.50 1.32 0.68 0.84 2.05 2.05 3.00 0.37 1.16 182.54 4A 2 2.61 12 63.0 1.00%11 184.65 178.38 177.75 179.97 2.61 1.12 0.50 0.46 0.66 0.83 2.22 2.22 0.63 2.05 2.05 180.43 38 48 2.46 12 55.0 0.50%11 185.00 181.03 180.76 182.79 2.46 1.06 0.50 0.38 0.70 0.85 2.03 2.03 0.28 2.14 2.14 183.17 48 7 7.70 18 123.0 0.50%11 183.60 180.26 179.64 181.96 2.79 1.77 0.50 0.83 0.70 1.10 2.32 2.32 0.62 2.53 2.53 182.79 7 MH3 8.32 18 77.0 1.00%11 183.90 179.64 178.87 181.16 3.02 1.89 0.50 0.80 1.23 1.36 2.29 2.29 0.77 2.32 2.32 181.96 MH3 MH4 10.08 18 212.0 1.00%11 184.60 178.87 176.75 178.86 3.66 2.29 0.50 1.90 1.32 1.41 2.11 2.11 2.12 1.89 2.29 181.16 -33 48 2.73 12 83.0 1.00%11 185.00 181.59 180.76 182.79 2.73 1.16 0.50 0.57 0.73 0.86 2.03 2.03 0.83 1.77 1.77 183.36 32 MH3 1.95 8 22.0 4.00%11 185.00 182.81 181.93 181.16 5.38 1.69 0.50 1.07 0.63 0.65 0.00 0.65 0.88 0.83 1.69 184.50 29 31 0.20 15 55.0 2.00%11 184.00 180.70 179.60 180.20 0.12 0.21 0.50 0.00 0.18 0.71 0.60 0.71 1.10 0.00 0.21 180.91 31 MH4 1.21 15 55.0 2.00%11 185.00 179.60 178.50 178.86 0.69 0.60 0.50 0.03 0.43 0.84 0.36 0.84 1.10 0.00 0.60 180.20 34 35 0.33 6 40.0 1.00%11 185.00 178.05 177.65 178.37 1.89 0.45 0.50 0.15 0.29 0.40 0.72 0.72 0.40 0.47 0.47 178.52 35 37 0.61 6 126.0 5.00%11 185.00 177.65 171.35 171.33 3.47 0.72 0.50 1.11 0.40 0.45 0.00 0.45 6.30 0.00 0.72 178.37 28 47 1.65 15 130.0 2.00%11 174.15 170.60 168.00 169.07 0.94 0.73 0.50 0.09 0.43 0.84 1.07 1.07 2.60 0.00 0.73 171.33 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- m SOUTH WINDSOR HIGH SCHOOL STORM SEWER 27-Mar-90 LENGTH LINE Q = AIR PIPE OE TOP OF TAIL SEGMENT (CFS) SIZE PIPE FRAME FLOW LINE FLOW LINE WATER ---------------- OUTLET CONTROL ----------------I CONTROL HEADWATER FROM TO SYSTEM Q (IN) (FEET) SLOPE FROM FROM TO ELEV. 0/(D-2.5) HW Ke H do (dc+D)/2 TW ho LS HW HEAD ELEVATION ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 30 27 1.90 10 60.0 1.00%11 175.00 171.91 171.31 171.71 2.99 1.04 0.50 0.55 0.72 0.78 0.41 0.78 0.60 0.72 1.04 172.95 27 23 2.02 15 92.0 4.50%11 174.40 170.89 166.75 168.48 1.16 0.82 0.50 0.12 0.65 0.95 1.73 1.73 4.14 0.00 0.82 171.71 23 MH2 3.56 12 44.0 5.64%11 171.00 167.00 164.52 166.17 3.56 1.48 0.50 0.85 0.86 0.93 1.65 1.65 2.48 0.02 1.48 168.48 MH2 OUT 3.92 12 44.0 7.00%11 170.00 164.52 161.44 163.00 3.92 1.65 0.50 1.03 0.88 0.94 1.56 1.56 3.08 0.00 1.65 166.17 36 23 1.90 8 82.0 8.00%11 180.00 173.89 167.33 168.48 5.23 1.62 0.50 1.87 0.50 0.58 1.15 1.15 6.56 0.00 1.62 175.51 19 MH2 O.17 12 140.0 7.00%11 179.80 174.32 164.52 166.17 0.17 0.20 0.50 0.00 0.16 0.58 1.65 1.65 9.80 0.00 0.20 174.52 24 MH2 O.33 12 24.0 6.70%11 170.00 166.13 164.52 166.17 0.33 0.30 0.50 0.01 0.23 0.62 1.65 1.65 1.61 0.05 0.30 166.43 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 37 22 2.29 10 62.0 4.00%11 185.00 181.34 178.86 180.29 3.61 1.25 0.50 0.81 0.72 0.78 1.43 1.43 2.48 0.00 1.25 182.59 22 21 6.21 15 76.0 4.00%11 182.40 178.44 175.40 176.33 3.56 1.85 0.50 1.01 1.00 1.13 0.93 1.13 3.04 0.00 1.85 180.29 21 OUT 9.72 24 30.0 0.50%11 179.20 174.65 174.50 174.50 1.72 1.68 0.50 0.26 1.09 1.55 0.00 1.55 0.15 1.65 1.68 176.33 39 22 3.29 10 120.0 3.00%11 185.00 182.00 178.40 180.29 5.19 2.00 0.50 2.43 0.78 0.80 1.89 1.89 3.60 0.73 2.00 184.00 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- 18C 188 0.81 15 264.0 0.60%11 188.15 185.39 183.81 184.58 0.46 0.46 0.50 0.03 0.35 0.80 0.77 0.80 1.58 0.00 0.46 185.85 188 18A 1.82 15 282.0 0.50%11 186.20 183.81 182.40 181.27 1.04 0.77 0.50 0.18 0.53 0.89 0.00 0.89 1.41 0.00 0.77 184.58 18A OUT 3.21 15 35.0 0.50%11 185.50 180.18 180.00 178.00 1.84 1.09 0.50 0.21 0.73 0.99 0.00 0.99 0.18 1.02 1.09 181.27 ------------------------------------------------------------------------------------------------------------------------------------------------------------------- ' A—N SUBJECT ,&5 Sheet No• _ _ of _ /�/3 1 CONSULTING ENGINEERS, INC. Computed Byes Date_l3/Aa_ JOB NO_Z�_______ Checked By Date !!!!!__— � Ouf le - /84 Dtsc-k&r5e_ pot^- �730 ' -,If s-�r- ,,,_. G /y � V'� fC,� Culve�� d� PA."., �Cmo �^ l PaP C-�Gtnr1e, Iof.c Z �D{1�Urn GJ��1`Lt Ghc�r¢ IS Pse ZS Qn = 13.Z1� 03y)= O • /o � V= s / d - o. Zs Z o - o.zs �- /.6 8 �S ' Du f/ef z en �U����,�s �o / 6&11fy rod �o G (JQ j�1 L'c.syL v 7 7 "' AC//- ' Q X�= Z S R; R c�c.,nn2� 2:1 S1 6lope y ' hod ,�, �� del, slope /7 i b Sf i Qn 0�76s •S� 17 /o Vq = 0.32 V= 9. y i -D.Js .v VS = A—N SUBJECT_ drol — Sheet No, �2 of —� CONSULTING ENGINEERS INC. / _ J � -------__----___—__ Computed By�f'�� Date��L4 �a JOB NO_— r Ie�----__ --- _--_—__--__— Checked By ----Dafe-----_ ' oollel 72,21I1601 s of 72 "ACP PI),�-, 6i,/ J r06L- y!Yr o n� i5t; arS[S (�rPC� C-�tfinn{�� G '� �la�'biOpL L-� � bC �jl?� G✓iu/"'1 Jso ' D, Yz �. O.3 Vri d- z6 V= 7.65 ' NFc-�� F l k= o•�+z d = � ? k = D.� v' l v s 6 sz a = o . Y ► 4c) ` 'Z w�A v' 72' FCcP QZs - �t• Ks ao =- l ' v= IZ. (Z' T-'�s `DSO 4r r��. 1 c_� ;: 6,C)? t�U ik li'es t-ro5cc r. 0. CjCt� � Con��o( PG G161, N`f 7z"RC/'e� i-9, vp Q = c07-. 7 U= �.Z s 7tJ = e. 1 + /5s.go = 1(,2•yy y vz rr Ado 3•f2 4.yS p .Oy7ZZ 1 7Z'� )60 - Off- = f 2� Urr SnJGrC 1-1� r ' A—N SU8JECT_��Dul4v _(�Q/9/ __ Sheet No. —a_ of CONSULTING ENGINEERS, INC. ___---------------_ Computed By22K Date_VZV-nD JOB NO_ ----------_-----__— Checked By ----Date_—_--_ ooil°!' L) C— �JOt`✓17 2� l��L)wv���/Cc.� o47 . 7Z" lqCP Gvl✓er /�/v�i G�/� ��vnvti o /s _ / O U G�'�-v�nL� ?�� 5,J•e sl��o�s y w«�� to a�-�a� Vn ffEG 11 6' i = D• 56 VS _ 6.3 �'S 2 )60- 1 ' A—N SUBJECT______—_--__—_ Sheet No, _--__ of _----_ CONSULTING ENGINEERS, INC. _ _______ __ Computed y�(rS Z�z/90 om uted B Dats_ ' // RR ------- ! --- JOB NO_—Izgo SOt�3f✓1 �iJtnrjsoP `J1C✓1 G31'JU� Checked By —Date_—_--- J tOrT tt_ F0P- PtPR)i--2 Cg q VrVCL t wtak'%. G-s Show✓ r r 6 ,1 W Ilk " qS SNo�.IrJ . o•� �-k�o,at, -""T P L A rJ o T= 1.5�mG..X�v✓w�^n S�-ohe C%tAWle%��r al'H'1�W1L� 11vLHivi! WG1L[11vL a rieilratt�.VVn�rr n�.ttY.a.t nurvnita��i ryiu•a (See instructions on back) n accordance with the requirements-of -Section 22a-.39-14 of the Regulations of Connecticut State Agencies, this form is to be completed for each action. Completed forms for. all reportable actions during a calendar month shall be mailed to the Commissioner by the local agency no later than the 15th day of the month following the month in which the action was taken. 1. TOWN: 2. A. LOCATION: (Attach an 8J by: ll 'inch photocopy at the original scale of the appropriate USGS Quad Map wit4 the roject site outlined. B. USGS QUAD MAP NAME OR UNIT: jN yiWoSm 3. APPLICANT'S OR VIOLATOR'S NAME:-� 5f` M 1Wbg!)r 00M?or �UIC'A?ld�l 4. PROJECT NAME (If any) : 41��WH W1114MCE flICAM -- 5. ACTIVITY TYPE CODE (See list of codes--in instructions) : . . :. . . . . . . [ If Type Code is 13 "other," describe the type of activity: 6. ACTIVITY PURPOSE CODE (See list of codes. in instructions) : . . . . . . . . . . . [ I 7. ACREAGE OF WETLANDS AND WATERCOURSES. ALTERED (or proposed to be altered) : ( for all agency—actions; permits, denials and enforcement)Aw1: 1.01 At. �►l�A- . 3 3 o�c A. Soil type(s) (If Available) . . . ACRES] B. Only if soil type is not available specify area altered as follows: Swamp. . . . . . . . . . . [ ACRES] Marsh. . . . . . . . . . . [ ACRES] Bog. . . . . . . . . . . . . [ ACRES] Open water. . . . . . [ ACRES] 8. ACREAGE OF WETLANDS OR WATERCOURSES CREATED: . . . . . . . . . . . . . . . . [ 0 ACRES] 9 . LINEAR FEET OF STREAM ALTERATION: . . . . . . . . . . . . . . . . . . . . . . . . . . . [ FEET] 10. TOTAL ACREAGE OF PROJECT SITE: . . . . . . . . . . . . . . . . . ACRES] * * For Local Wetland Agency Use Only * For State Use Only * 11 . REPORTING MONTH: * GIS CODE: 12 . PUBLIC HEARING HELD: YES NO 13 . ACTION: (Circle. only one action) * . A. permit issued B. permit denied C. permit extension/amendment * '� D. map amendment E. enforcement F. jurisdictional ruling 14 . AGENT: * DATE RECEIVED * y Rev. 4/89 SEED MIXTURES 3- 0 Figure 6-1 - Temporary Seeding Rates and Dates DATE OPTIMUM SEEDING OPTIMUM SEED SEEDING RATES (Poundsa DATE193 DEPTH2 yry N • - ,: 4 f b SPECIES er•. cre er S s t. (inches) 7 ' "Annual ryegrass �" ►J l 40 1.0 3/1 - 6/15 0.5 8/1 - 10/1 ; Perenn.ia1 r3regrags 40 '1.0 3/15 - 6/15 0.5 ^, " 10/1 8/1 .. j, r yb 'Winter Frye 120 3.0 4/15 - 6/15 1.0 8/15 - 10/1 y Ts Oats 86 2.0 3/1 - 6/15 1.o ELl es, 8/1 - 9/15 Wheat 120 3.0 4/1 - 6/15 1.0 1 sr• 8/15 10/1 SO Millet* 20 0:5 6/1 - 7/1 1.0 i 5/15 - 8/'15 Sudangrass. SOUT 30 0.7 5/15 - 8/15 1.0 Buckwheat 15 0.4 4/1 - 9/15 1.0 Wep'ing lovegrass 5' 0.2 6/1 - 7/1 0.25 1/ May be planted.throughout summer if soil moisture is adequate or can be irrigated. 1/. Seed at twice the indicated depth for sandy soils. / . The. fall seeding dates may be extended 15 days. in the coastal towns of New London, Middlesex, New Haven and Fairfield Counties. '4 Source: U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. '? 4 Ber 'CONSTRUCTION SEQUENCE SCHEDULE :f Environmental Resource Associates Formerly Frank Indorf Associates Soil&Environmental Consultants Frank Indorf Roy Shook,Jr. Marc Beroz CERTIFIED 236 Reservoir Ave. 441 Geraldine Drive RR#2,Box 130 SOIL Meriden,CT 06450 Coventry,CT 06238 Durham,CT 06422 SCIENTIST (203)235-2796 (203)742-7283 (203)349.3334 July 23, 1989 Job No. 9G21S1 Mr. Dennis Evans Evans and Chisholm Landscape Architects 4 Beech Street Farmington, CT 06032 �.2s South l or Dear Mr. Evans: 4 00WERY co RE: WETLAND DELINEATION SOUTH WINDSOR HIGH SCHOOL TRACT NEVERS ROAD SOUTH WINDSOR, CONNECTICUT At your request, I made an on-site investigation of the South Windsor High School tract of Nevers Road in South Windsor, Connecticut. The purpose of my visit was to identify the inland wetland boundaries. The fieldwork was done on July 21, 1989. The wetland boundaries are marked with blue flagging numbered WL-1 through WL-71. Please refer to the enclosed sketch for the approximate location of the inland wetland boundaries and key wetland flag numbers. The soil map and narrative are a refinement of data contained in the Soil Survey of Hartford County, Connecticut. The symbols on the map identify map units. Each map unit has a unique combination of soils. Areas with the same symbol have similar composition. The following map unit descriptions are based on the data collected at this particular site. For this reason, there may be some differences between these descriptions and those provided in the Soil Survey of Hartford County, Connecticut. The identification of the wetlands was based on my field observations of the soils on this site and the guidelines of the National Cooperative Soil Survey Program. The non-wetland soils were not studied in detail . Observations were made of these soils only in the process of identifying the wetland sites. The following descriptions do not constitute a detailed soil survey, but may be used as an aid in site planning. WETLAND SOILS Map Unit Am e m complex map unit consists primarily of poorly and very poorly drained, loamy alluvial soils and moderately well , and well drained loamy alluvial soils on 0 to 3 to percent slopes. These very deep soils formed in recent alluvial sediments on floodplains. Typically, they have silt loam, loam, fine 'sandy loam, or sandy loam textures. The poorly and-very poorly drained soils (FTuvaquents) have a seasonal watertable at a depth of 0 to 1.5 feet. The moderately well drained and well drained (Udifluvents) have a seasonal watertable at a depth greater than 1.5 feet. These soils are subject to frequent or very frequent flooding. They are inland wetland soils. Map Unit WcA The WcA map unit consists primarily of Raypol soils on 2 to 5 percent slopes. Raypol soils are very deep, poorly drained soils, formed in loamy over sandy and gravelly glacial outwash deposits. These soils have a watertable within 1.5 feet of the surface much of the year. Typically they have a silt loam, very fine sandy loam, or fine sandy loam surface layer and subsoil over a stratified sand and gravel substratum that extends to a depth of 60 inches or more. They are inland wetland soils. NON-WETLAND SOILS Map Unit EsA fiFe—Es map unit consists primarily of Haven soils on 2 to 8 percent slopes. These very deep well drained soils formed in loamy over sandy and gravelly glacial fluvial deposits. Typically they have a silt loam, loam or very fine sandy loam surface layer and subsoil over a stratified sand and gravel substratum. Map Unit NnA 7H_e_lTn7 map unit is composed of Ninigret soils on 0 to 3 percent slopes. These soils are very deep and modertely well drained. Ninigret soils formed in glacial outwash. Typically, they have a fine sandy loam surface and subsoil layer, overlying sand and gravel to a depth of 60 inches or more. Ninigret soils have low chroma mottles within a depth of 24 inches. These soils have a seasonally high watertable at 1.5 to 2.5 feet from late fall to early spring. Map Unit UDB 7Fe__M map unit consists primarily of man-made cut and/or fill areas. Slopes range from 0 to 8 percent. The fill is mostly earthy materials with minor amounts of non-earthy materials such as pieces of concrete, bricks, wood, metals and glass. In cut areas the natural soil has been excavated and the unconsolidated loamy glacial deposit is exposed. F' Map Unit UDC e UDC map unit consists primarily of man-made cut and/or fill areas. Slopes range from 8 to 15 percent. The fill is mostly earthy materials with minor amounts of non-earthy materials such as pieces of concrete, bricks, wood, metals and glass. In cut areas the natural soil has been excavated and the unconsolidated loamy glacial deposit is exposed. Map gnit UDD e UUD map unit consists primarily of man-made cut and/or fill areas. Slopes range from 15 to 25 percent. The fill is mostly earthy materials with minor amounts of non-earthy materials such as pieces of concrete, bricks, wood, metals and glass. In cut areas the natural soil has been excavated and the unconsolidated loamy glacial deposit is exposed. A narrow intermittent watercourse was flagged with red flagging numbered 1 through 4. It is shown on the sketch map. Please contact me if you have any questions or if I can be of further assistance. Respectfully ,,yours, Roy A. Shook, Jr. Soil Scientist �. sowM ate+ cm apsiot� V&U&01t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•co AREA CODE 203/644-2511 March 23, 1990 Mr. Howard E. Fitts, Chairman Public Building Commission 239 Oak Street South Windsor, CT 06074 Dear Mr. Fitts: Re: South Windsor High School Addition As clarification to meetings which Town staff have attended with the high school design consultants, I would like to offer the following comments and information. It is my understanding that the Public Building Commission is anticipating construction on the above-referenced project this spring. To that end, I would like the Public Building Commission to be aware of -the various regulatory agency schedules and procedures so this important project can be expedited through the system. As there are regulated wetlands on site, the application must be approved by the Inland Wetlands Agency/Conservation Commission prior to action by the Planning and Zoning Commission. (This is mandated by State Statute, therefore out of our control. ) The Inland Wetlands Agency/Conservation Commission meets twice monthly, on the second and third Mondays of the month. Applications must be submitted fourteen (14) working days in advance- of the first monthly meeting in order to be officially received by that Agency. The Planning and Zoning Commission meets generally every - Tuesday but officially receives applications on the fourth Tuesday of each month. Application should be submitted two weeks prior to the fourth Tuesday of the month in which the application is to be officially received. The application to the Planning and Zoning Commission is a Special Exception application,._and--therefore requires a public hearing (again, statutorily mandated) . Public hearings take about three weeks to schedule, due to legal notice advertising time frames . While the Planning and Zoning Commission cannot take action on your application until Inland Wetlands Agency/Conservation Mr. Howard E. Fitts Page Two March 23, 1990 Commission acts, Planning and Zoning can hold the public hearing while the Inland Wetlands Agency/Conservation Commission application is pending, thereby allowing the Planning and Zoning Commission to act expeditiously upon receipt of the Inland Wetlands Agency/Conservation Commission's decision. Upcoming application receipt dates and submission dates are: Inland Wetlands Commission April meeting: Application submission by March 23; officially received April 16; action subsequent to April 16 . May meeting: Application submission by April 24; officially received May 14 Planning and Zoning Commission April: Application submission by April 10: Officially received April 24; public hearing, action subsequent to April 24 May: Application submission by May 8; officially received May 22 You should also be aware that, in a public project as large as this one, a substantial amount of town staff review time- is required, with particular emphasis on p project engineering. our ability to perform timely reviews is controlled completely by the timing and content of plans submitted to us. To date, our involvement in the engineering aspects of the project has been very limited because of the general (rather than detailed) nature of the information submitted to us . A further complication is introduced via the arrangement whereby our main consultant contact is the project architect rather than the project engineer. Finally, our ability to expedite an application through the regulatory system is greatly increased when an application is complete in accordance with the zoning- and inland wetlands regulations. If sections of the regulations are not adhered to, particularly with respect to items required to be shown on plans or documents to be submitted with the application, staff review time may be interrupted while waiting for the necessary information to be submitted. Therefore we urge careful attention to the regulations when the regulatory applications are being prepared. Y- Mr. Howard E. Pitts Page Three March 23, 1990 Our objective for the high school addition is to work with you as closely as possible, And to give you our full cooperation to ensure that this project is able to be constructed in a timely manner. We thank you for your assistance in helping us to achieve this objective. Very truly yours, Marcia A. Banach Director of Planning MAB/pmm - - cc: Jean E. Zurbrigen, Town Manager Michael J. Gantick, Director of Public Works John Stewart, Architect 41 O-Ps ?v s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 Co� AREA CODE 203/644-2511 April 3, 1990 Joseph D. and Nancy S. Rice 50 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Rice: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by -the Commission on the second and third Mondays of the month at 7:30 P.M. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs • �tOMN ,e, - - . p r 710� 0se �u 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN.•06074 ���OSOR•c°� AREA CODE 203/644-2511 April 3, 1990 Ernest J. and Virginia C. Turek -62 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Turek: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs �4011" "4 - 70- 0-ye 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074'coN AREA CODE 203/644-2511 April 3, 1990 Giovanni and Laura Longo 70 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Longo: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs `owM ff� r e /,ap qs1� ?1 • s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 :��O�oe•c�'�� AREA CODE 203/644-2511 April 3, 1990 Dorthy Eleanor Krivickas -90 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Ms. Krivickas: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs . tOrIM 11, 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 ��~�oaa•co�'� AREA CODE 203/644-2511 April 3, 1990 Theodore W. and Rose B. Ostrowski 104 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Ostrowski: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs 404096 1t+ - 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 �f~�oe•co�� AREA CODE 203/644-2511 April 3, 1990 Kevin K. and Gary E. Waterhouse 116 Ayers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Messrs. Waterhouse: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs � Y Town o-P Sthu;t�2 V&U&04 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN.•06074 AREA CODE 203/644-2511 April 3, 1990 Nelson F. and Hazel C. Strong 6 Graham Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Strong: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs <a~" +�N � � `rlau�rt o�stx�ct�i ��• �► u 6 1540 SULLIVAN AVENUE SOUTH WINDSOR• CONN. 06074 AREA CODE 203/644-2511 April 3, 1990 Epifanio and Maria Colon -14 Graham Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Colon: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p,m. in the Town Hall. For further information regarding the specific date this will heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs 40YIN a 4 C r %Wn 0-ye Sgf ?40&U1460j 1540 SULLIVAN.AVENUE - SOUTH WINDSOR, CONN. 06074 ��asot•co�'�� AREA CODE 203/644-2511 April 3, 1990 John K. and Ida J. Cutler .36 Graham Road - South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Cutler: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 C�N� AREA CODE 203/644-2511 April 3, 1990 Martin Riester Mountain View Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. Riester: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs 40MN ft, 70-Wn oye S5;0� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 .CO�� AREA CODE 203/644-2511 April 3, 1990 David H. and Lynn L. Johnson 6 Mountain View Road ` South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Johnson: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs <R 7vwn 0-ye lsaaA ?V 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN..06074 o 'coe AREA CODE 203/644-2511 April 3, 1990 Gary and Willa G. Bulkley 18 Mountain View Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Bulkley: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs tow" •e4 - 7own O-P SOW% 4,~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074'�o��� AREA CODE 203/644-2511 April 3, 1990 Lawrence W. and Pamela H. Beaudry 26 Mountain View Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. and Mrs. Beaudry: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs tOMN "4 C r AVENUE 4y 1540 SULLIVAN. SOUTH WINDSOR. CONN. 06074 c AREA CODE 203/644-2511 April 3, 1990 Naanne M. Hill 36 Mountain View Road South Windsor, CT 06074 CERTIFIED MAIL Dear Ms. Hill: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs r• `W 01 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 April 3, 1990 Julius and Anne M. Sluzkanis -167 Nevers Road South Windsor; CT 06074 CERTIFIED MAIL Dear Mr, and Mrs. Sluzkanis: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs 40M■ fit+ - Town opgsquA ?1&d4Jgj vQ 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 April 3, 1990 Brian K. Edwards 184 Nevers Road South Windsor, CT 06074 CERTIFIED MAIL Dear Mr. Edwards: Re: South Windsor High School Additions 6 Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m, in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs j 7own 0-P S;aUA ?0 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN: 06074 mot AREA CODE 203/644.2511 April 3, 1990 Laura H. Collins and Hola C. Johannes . 1224 Sullivan Ave. South Windsor, CT 06074 CERTIFIED MAIL Dear Ms. Collins and Ms. Johannes: Re: South Windsor High School Additions & Renovations In accordance with Section 6.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. The project involves additions and renovations to the High School and the Wapping Annex in accordance with the referendum approved November, 1988. As an abutting property owner, you are invited to the hearing to ask questions and/or provide comments. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall. For further information regarding the specific date this will be heard, please contact Phyllis Mann, Recording Secretary or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511. Sincerely, Howard E. Fitts, Chairman Public Building Commission HEF/srs ENI IF 0 T R I B 3, 1 m I arc bite'tnrar SCHEDULE Lrl-b GD XKY .RUNE SEP ;AN '—t K=) cbcr W.'v QTT MLY AUG S� OCT DEC CIA GATTITT! IfTh TT M 7P Tri T7 F, I � AS MEME 0 1' ";XTX OPR1 977f .[V.L in d p IfT t7 Ei W t7c] TF _7 iT T F 71- 57 5 5 Tj FF' TF 5 OT Intl P Y f"A i _T L Tlnk! T 0[ T-'i 7 T T 7-17 T J 17—. F i.iLU I N Fj, ,1j r TIr T 1 jJ1 D_ ij JL! 2_J !_!_L 1_1_L 'd U AT rri c _LL1L1. M _ _ IIS 7 M TELI 11 L E It Tj 7_rr__ j I T7 7 UIC. wmm _01 nF 1 T -M 7 iTTF77I._- ' 1 JIL I EE TF T, T T-T YAJ 41 • 7 41 1 i Ti TFi TT'T J-1 Ll E TI'l 11-0 111 .111 1 LLI 1, jMj L 11 Ti i 1-11,11. LLf f —F ! I ! 1 1 1 1 1 i Ill I j ' I ! I FF Will 1. 1 —T&T —'r" —jfew 9 — 777 I J I i'i T ILI o 1 - -- , I i F T 71 del f --7 Lf jJ K ------- SCS yr ture die G INDUSTRIES, INC.- owner, r I of 'Ik)mkil 41mlsor FRELMMART PROGRESS SCHEDULE Co. DaLra. av ri jmz SeP orr "aw Orl. JAN FEE -AR A-rp� -'Ay _ttrmn wc sv acT am nix. jAm cT.:R �!,L!t —1— -7 dais 1 4.,r% T' ....... _FT7_ o 12 ......I_— J ! I _TT CIJ TF r tit Ti . tf C> .41-7- j- T_ 2 Li I 7 _'T:7 1 1 1 IFTI _LL Ada i 1.m T-1 1, Pack _ELI T "TT & fla i's M F A �-rtc e T1_"TT T F It I -gn I I 'TTT I I TT T CL --"-T TT Uo Afea�; 0 Ca Ji. ------ IT. il; Lf i _7 T Ti Ti LE �J L . ...... ..... WI.V 4� 9. A?nt-a IF 7 L - ' T, LL F f 'F J` I i J ..r.. _FT T FF L W, r"We JI s F: I F'( v � W12-L I Ju T L t -na r i A I b i F F, J) T! J _-L 11 A 9 3 _L! Fl T 'F 11,17--11 IN r, 17_J E-1 LIL] i C A Al--OMFONS -& ALTERAT IONS TO THE SOU77M WINDSOR H-LGH SCHOOL AND WAVPT,� Lr NTARY SCHOOL P-22ASE SITE HO X & BU7-1rQ11k;G S.T.RUTC T R-El UUCTION NARRATIVE CONSTL' This Narrative is intended tO 'supplemant the PrelLmin-"v ConStructin--j. S-Che4ule which is also Dart of the Contract Doctmenta�-For *U4 0 P-m-je Neither the Preliminary Constructi n Schedule nor th ct. is Narr' tive 446nntifV every wOrk item. Both documents are i -ntended to identify thn v.A4— wnrk iteMA &hd the tire period which the work is 44. to be perfo.cried. item that Pkrly work is not sP6cJf1C&lly identified ig to be performed i�l Itorrsal sequence of Construction as it rela -'4 t1hat- are tog to the work tjk.,4tic-- identiflad in the Schedule and/or Narratj,%re. .T .1.his PzOJGct consists Of Work on two schools, the SOUth Win,7sor High 'School, the Wapping EleMentary School and oxten--94ue sj'4-eWor�, e%�, *UQ !� �4i �A.� campus where both these schools are located. There 4a*Z- -t - v I , TnQ Avork and new additions being addad to both schools- The souf--h wlndso- Figh School is being �:Onstructsd in two phases, The approxLnj ,e"ji7 f.3 Of these two phases are shown an shoot hoot R-4 of the Contract Do--=E its. Phase I - Sitework and Building Structure, consist for the ent-re pro jec* Of all of the Sitework Which includes the excavation for the founda*ions in the Phdfie I area and also the concrete work and structural steel in the pnasa 76 area, it &ISO includes the folundationS. fl-Or slab -4 an structural steel for the weppinq School addition. For puQse- --4 idsAtityling Work areas whi iLll PIJUS9 1. th(j ArlInirea rp ZUVAi and At-Uc,-uraj Drawings for the high school have been divided into Areas A thrL�l P' r r PUYPOSez of identifying the athletic fields paved Areas and the tw- courtyards wir-hin Phase 1, a drmwinq has been repargd w hich is part c'.f this narrative that iden*Ufies tblese areas. it is intended that during the summer':Of 1990, &11 of the stkz= sewtrs and sanitary sewera, which are part of this contract, and "he hater lille, which is being installed by the Town of South Windsor, will be L Led before school opens in Septer=er. it is further intended that areas A, A M1 C and F be cOnLPlsted with the binder course only of agpi-alt so that they can be used by construction personnel and by U jj � the schoo! when 0 it reopens in September F 1990. Areas HSI and S1 are smm 9 I to b- Nethe purpo Und 14tplgOPBOil betweonthe suffner of 1990 19f 9During theuer and gall of 191, _he Howl or1 field and track are to be constructed. The owner will use the track in the sprjn� ' 9 Of 1992 and will use the new football field in seutember wh 1992= PdT-Alli the use of the eximi-1r),; fcotb�&-jj p V will .�, W-d in sr thk by the fall_ of -1991. Theme fields will be used by the nwnex spring of 1992. Areas H$4, .uS;z and HHS7 will become avai'able Lc the site ;�cntraetor is the spring of 1992. All work ob theses fieldu is bo be completed by urune of 1992. These fiefs wi11 notbe used bv i-mp Q€;'•ner 4ntil Septem er of 1.993., If Alternate fives. 1. the 1nstallaticn of wo new tersn15 Cou='ts, is accepted by the owner, it will be done dur',ncy _he summa O'f 1991. Phase l - Suilding Construction, is scheduled to start ,late in the Nall Of 1990 and is t0 be completed by may of i992; For this portion of the construction project, all deliveries and conStruction personnel shall enter and exit the site from Avevs 1Zoad, {40 one will be allowed to use the Nevers Road entrance way w:�ile school, is in bs iM1aos b9twsen a 4 go a.- and 3 S U a asmc or between Izoo p.m. and 2tOo p.m. while school is in session. As ;tart Qf this narrative, the 1990-1991 school calendar is attached f�_:. infc���egti�,r► ora .. Area A, shown on i'he Site Identification Draw-J nq: which is ;art of :his n&rrati7e, is to be used for construction job trailers and for - ccsrstruct:Lon personnel parking after September 1, 199o. During the ' summer of 1990, construction personnel will be allowed to park r, .they areas can the site. The sown of South Windsor will be installing a new water servine for the hire: school and a fire loop around the building of the high School , All contractors under this Phase I portion of the project are to cooperate with, and coordinate their work with, the sepa:ate contractor which has been hired by th�a Town of South Windsor to install the water .line; Emergency access out of existing exterior doorways in new constructing, areas will use maintained at all times unless other arranae�rients have been Specifically agreed uvOn with the' local Pyre Marshall. .Aar ,�yr C: .Y�- __ a �'• � ._. a O � y ... 'a"�y.3:i�.W. �' ., IF-r—�"',"....���y«�•y �• -� W" iW�+F® dp�4fIWwM6fkM4AP1ftYp4 V 19 ji .. 41 21 A ,yr 4 a.:.ia:. r Y,,f? ti i. 1 *tt, 7 4w7 .t -71 r "� ;tS 7 rr � p I It y 0:Mn C_.r.' �= Ll CY"e ti F•-.a a. Y � .N 'a ,,� `yG�4y��ryay:"9 J� °G,. S y •� d' y,..._,�_ } t ?d tiC A"g_: ttVC, ....� .._...:..-: ,,...,,.+ �( \ k 5.. ... �� d ! �1a 11CC.ixnb , 05 La CO ."-'ram ate.. :�• ° ��.�'- � a�� � • _ ASSMWTM CLM IM► t I!N Df�'► disqualifying 505 Willard Avenue Newington,Connecticut 0 11 APR 3 � J (.f � CONSULTING (203)666-3366 TOM of S:tik;l, ;Mfi ENGINEERS z FAX(203)666-5163 South Windsor Z� U4,. o ]NtJ1ND WETLANDS A69NONI ' Letter of Transmittal CONSERVATION COMMIGSK0 - �/ % I-Nr To: %�", �n 1'✓t�i n�l�r Date: -v4 b)t n.[�SC)r- l oc.L+n Job Title: S c hari jccsy�cJ S U M Vek-n AV(j.n�►� Job No: /,[�C% _ JO " �,t�i n f,o.r LT Q C;C)7 q Re: �;��IE '0,,C-C1 oU ELl- Attn: Z'erry Gentlemen: i We are sending you attached/under separate cover via the following items: ❑ Shop Drawings ❑ Prints ❑ Plans ❑ Samples ❑ Copy of Letter ❑ Change Order ❑ Specifications 1XOther COPIES DATE (DENT.NO. DESCRIPTION 40 c These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ For instruction ❑ For your use ❑ Approved as noted ❑ Resubmit copies for approval ❑ As requested ❑ .Returned for corrections ❑ Return corrected prints For review &comment ❑ , Remarks. 04_1� Signed: l popY to: � , A-N SUBJECT_—___________ Sheet No. Of _ CONSULTING ENGINEERS, INC. �v/rcF;_ 1Z0TEG7-7(Jrt/____ Computed Byln Data _ JOB NO_ _°Y -_ _PrP_!n�{vr�+,) scour_I Chocked By !� _ Date - C s;��. CT-1 P) A FLow� �{ ZE a , FL,4�t k0 Sovrce: "'W�e. �x Conn. OOT Onm'u�e. I �N� Sa,., . 14p,6 . O 59,C-,-rt0rQ A . 1.333 (,00t3ZC�Z/"iW {Q/Da'SpSv ( .otz5 10o /7W) (Q/ po s ) t _ • S Op pr G" F_ _ Do - Z 060 a Z• oo +-6 C 3 po + F cam) CUT 0 r Op Q 1/ TGJ F G C'-Q,< OSdG F=.SQ �•b �� ,1,5 /8 1.25 3.2 �;8 Ql.go- 4.35 , J 7.S !•S .7.0 g.D p05 21 !.� 20 Z Z3 /.9.3 Z,oS z 2.S /ts l r� 20 b.og �,� ' /• Z/ Z q.-4- 17 I,SS 2 ? l,S i� 18 0 •nor ' o•o�- Z 6 2•l N}" Z /� /3,«9 /•7, / Z /S �� 8 IZ 0.076 — 0.IZ C rr rr 1 ' �c Y�J V ov e. WC��' 'C�or,! C /�S�v�r7�t� C 'v� Secxrr . V;��'�,.�•�C. — ///Gi.r�h/�.Y'�fmu��. G.�/ /1= D:• /S ��� 2 r�c..l(5ctss Q��=_ f )�a A—N SUBJECT-----------_-- Sheet No. _—//}}L//�CC— °t ---- CONSULTING ENGINEERS, INC. _-(,2nce_Pal ���✓�---_ Computed ByL2l( Date_ I�� n� O()7'L� Checked 8y L— — Date 41L JOB NO_ ------- -- �—------�-- f l •/ l) � � . � fir . ) it Iil / ' \ i 1 \� I a � -- - t-75 1-70 A lt/=y 0 Roar A—N SUBJELjT—__________—__ Shoot No. CONSULTING ENGINEERS, INC. __e� Poo L Oes rGi.. __ Computed (�S Ds t e_1 u By JOB NO__/! O _ _ Z0 Checked By 2U_ Dste� IL vmr Itt=KO Yogi- n �p5 �� o1a F 17►. 1-70 • L� 1 L/ � A—N SUBJECT_________--- Shoot No. __!__ CONSULTING ENGINEERS, INC. _�Iv _P6----rc�✓) ___- Computed ByA�L DeteJ!_ o L aV -� JOB NO_. / `� __________ Chocked By / I LT COt c � 1 f 1 1 � 1 •, � 1t I � t ( I Ir SIuQ� � 175 i Y T 0 It I6K,Zg. _ - ----- 160. �� r A-N SUBJECT-----_------ - Shesf No, --�- o l � CONSULTING ENGINEERS INC. �LUIyLL(/r>`/�OOL_DFS/G-�'✓ —_ ComputedByA�s Do to JOB NO-1Lgo------- --: J _—_—__----_— Checked By N ol 17 —� el t . If le Zip Zv0 Isd /ao 50 � •/ T � I I -- _ T--IN'-'—p — F PO _ 2`1 _f . � .. -.._ 1`t-4 ► vkgr --_r---- /� r . 9 town 8E, 70-U-";n aP S-OUt.4 `d w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �!~�SOR•co�� AREA CODE 203/644-2511 April 12, 1990 TO: James A. Lombardi, Chairman, Inland Wetlands Agency/Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: Application #90-24P, South Windsor High School DOCUMENTS REVIEWED: Application form, plans for Additions and Alterations to the South Windsor High School and Wapping Elementary School, and Storm Water Hydrologic and Hydraulic Analysis. COMMENTS: 1 . This review was started based on plans with the latest revision date 3/30/90. The plans as revised 4/11/90 were also reviewed and the following comments still apply. The revisions of 4/11/90 included adding riprapped plunge pools and reduced the size of topsoil storage area #2. Sheet L- 10 was not submitted as part of the revision. This should be included. 2. The wetlands have been field located by Roy A. Shook, Jr. , of Environmental Resource Associates . A report of his findings should be submitted and he should verify the limits as shown on the plans. The area is part of the Plum Gulley Brook. One of the wetlands soils is identified as WcA. They indicated that this is "Raypol" . This should be modified to read Walpole. 3. At the time of my review the application form did not indicate that abutters had been notified. I contacted the applicant and he stated it was done and a copy of the letter and proof of notification will be submitted. 4. The total percentage of impervious area should be identified on the plans. 5 . Sheet L-4 contains three portions of the total site. Match lines have been provided on the plans but they are difficult to interpret. James A. Lombardi Page Two April 11, 1990 Application #90-24P 6 . The plans submitted are not on standard size sheets. The final plans, once approved by Planning & Zoning, will have to be converted so they can be filed with the Town Clerk. This does not necessarily affect the review and approval by IWA/CC for the regulated activities requested on this application. 7 . The application form indicates the total project area is 46 .45 acres, 2.9% is wetlands. There is approximately 114 cubic yards of excavation within the wetlands and the 40 foot buffer and 466 cubic yards of fill within the 40 foot buffer. 8 . There are two areas near the northern end of the Plum Gully Brook where there is no siltation control shown at the toe of the proposed grades near the brook itself. There are also proposed grades along the westerly property line which need siltation control shown at the toe of the slope along the property line. 9 . Erosion and sedimentation control measures should be shown for the proposed riprapped plunge pools to protect the Plum Gulley Brook. 10. The permanent stabilization of the four outlets should be evaluated based on the discharge rates to ensure adequate protection from erosion. It is unclear whether or not the table for plunge pools on sheet L-8 discharge considers discharge rates . The outlet protection should be done based on Connecticut Guidelines for Erosion and Sedimentation Control. Considering that these outlet directly into wetlands they should be dimensioned and detailed clearly on the plans. 11 . There are proposed grades on sheet L-3, easterly of the northern end of Plum Gulley Brook, which. do not show up on the matching section on sheet L-4. 12. The definition of clean fill, as found in section 2.1t in the Regulations, should be included on the plans. The areas near the Plum Gulley Brook should be clearly labeled "clean fill only" . James A. Lombardi Page Three Application #90-24P April 11, 1990 13 . There are no temporary or permanent seeding schedules or seeding types identified on the plans . These should be established in accordance with Connecticut Guidelines for Erosion and Sedimentation Control, and should take into account the steep slopes and soil types . 14. The Schedule of Activities for Construction, item #4 addresses stockpiled topsoil. This note should be modified to include seeding of the stockpiles. The topsoil storage area #1, according to the plans, will be in place for a full year. Topsoil storage area #2, according to the plans, will be in place for over two years. Topsoil storage area #3 is to be in place for- only about four months . Topsoil storage area #2 is to be split with a driveway through the middle. I would recommend that this be consolidated and also moved further away from the road as it may cause visibility problems. 15. Hooded catch basins should be shown for the basins nearest the discharges . A detail for hooded basins should be included on the plans . 16 . An overall phasing plan should be developed to limit the amount of area disturbed at one time. 17 . These comments should be addressed prior to any approval by the Commission. JEM/pmm �/� Environmental Resource Associates T1 Formerly Frank lndorf Associates Soil&Environmental Consultants CERTIFIED STATEMENT Remit To: SOIL 236 Reservoir Ave. SCIENTIST Meriden,CT 06450 (203)235-2796 3 APR 26 1990 South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION I certify that the wetlands as presented on the South Windsor High School and the Wapping Elementary School site plan, drawings number L-3 and L-4, were delineated by field inspection and are substantially correct. Roy A. Shook, Jr. 24 April 1990 Certified Soil Scientist TERMS: After 30 Days,11/2 percent per month will be added to the unpaid balance of your account,which is an Annual Percentage Rate of 18%. �towM SC, O E" a u 70� - �� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 PC AREA AREA CODE 203/644-2511 April 26, 1990 TO: James A. Lombardi, Chairman, Inland Wetlands Agency/Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer Y.r �If RE: Application #90-24P, South Windsor High School Please accept this as a follow-up to my letter dated April 12, 1990. Consideration has been given to documents, correspondence, and plans submitted up to this date. COMMENTS: 1 . There are proposed grades along the westerly property line which need siltation control shown at the toe of the slope along the property line. 2. The definition of clean fill, as found in section 2 . 1t of the Regulations, should be included on the plans . In the modified plans they included a definition of clean fill based on "State Construction Criteria" . The areas near the Plum Gulley Brook have been clearly labeled "clean fill only" . 3. I would still recommend that topsoil storage area #2 be consolidated into one area and also relocated further away from Ayers Road. 4. There were concerns expressed by the Commission during the presentation as to whether or not the hooded catch basins, as shown on modified plans, are adequate_ protection to filter out grease, oil, and siltation. These should be evaluated to determine if deeper sumps or perhaps siltation chamber(s) are necessary. 5. Comprehensive dust control measures should be added to the plans. 6• There is still a need to develop an overall phasing plan to limit the amount of area disturbed at time. If this is to be controlled by the "construction manager" perhaps that person, if already determined, should address the Commission. James A. Lombardi Page Two April 26, 1990 Application #90-24P 7 . If a temporary turning radius is going to be utilized near the southerly end of the building, near the existing brook crossing, this should be shown on the plans. If construction vehicles will utilize this area a construction entrance should be provided. 8. If there are plans to tie into proposed sewer lines along Nevers Road, this should be shown on the plans . 9. The plans should identify a temporary seeding schedule and seed type(s) for quick stabilization of disturbed areas. This should be established in accordance with Connecticut Guidelines for Erosion and Sedimentation control. 10. These comments ' should be addressed prior to any approval by the Commission. CHISHOLM Landscape Architects April 30, 1990 D �� Mr. John E. McCahill MAY S Zoning/Wetlands Enforcement Officer South Town of South Windsor INLAND WET SAGWindsor' 1540 Sullivan Avenue CONSERVATION CO AGE D/ South Windsor, Connecticut 06074 or�Miss RE: Application A90-24P, South Windsor Fligh School, . Dear Mr. McCahill: Responding to your comments of April 26, 1990: 1. Will comply. 2. Will comply. 3. Will comply. 4. Conversations with Town staff indicated that the hooded catch basins indicated on the plans would be satisfactory. We will provide an engineering evaluation of the same. 5. Dust control measures will be the responsibility of the Construction Manager 0 & G Industries, Inc. 0 & G to respond. 6. 0 & G to respond. 7. Will comply. 8. Sewer will be revised to indicate a connection to Nevers Road when the design of the Nevers Road sewer line is available. 9. The need for temporary seeding is not anticipated at this time. If deemed necessary by the Construction Manager or the South Windsor Wetlands Enforcement Officer. Temporary vegetative cover will be per Chapter 6 Connecticut Guidelines for Soil and Erosion and Sediment Control. Yours truly, Dennis J. Evans Evans & Chisholm cc: Mr. Alan Daninhirsch, Kaestle Boos Associates, Inc. - Architects Mr. Bruce Walpole, 0 & G Industries, Inc. 203-677-5301 4 BEECH STREET-FARMINGTON,CT. 06032 t INDUSTRIES, Owner: PROGRESS1 rr_am ir,..IIIIl1111111 IIIIII11t11II1unni tlnnl�lnlufniltltntnlwlill'11IQIIIIn111111t1uw1ml�l IIIIIIIIIinlfl11ll1allQll Ili#IIAIIIillllllllllB111I1InlIl my inl=Il111mi1111®nliul11 - tAI111111Ht�ililml©tI IiIlllnn111�QnIiIIQDIQI�IQIrallllQ1111 ltIDt®Qnll - IIDIiu��QliDpHI1 ®�IililiSl1111HnnnnIIlI�1IQ1nnC011111HIQn1Hitl [lull �ofl��gnu alit1111111IDIlID1nl11IlQ#1111IQ1I®1imintim11mmiDHmin Qt1 QBIffi�iiln�llllDllllllli11II1111II1�t.1I11n1�IIQII�Dnn ®IlIimIN== t1n IEtIi�ItIllliltQllllll 8nti11tlnlmtIIlIII1�eItImMill ®fInl® �1nI1IIII�minnQi1Q�I11n n1im11�III1tI�11i11QIDQIwtI tfl1�n1�Dt1011t1111I11In11S1iI11I1lIQI1Ql QIItIIinllll11111 lln�tmnlln lnDiAlti ® ®inumli mi�illliln." IM IQQii 1�®I®®®Run nllnlllflltllltulUDmIDnMI III VIIIlilltllllnl111111 I1Qi111111RI1lIl®®mina Iln m1i1I111I1tinQII1111A1II1Qm1IIiI1Il11III1111I1i nunlinl1II11nnon�/I�I�iQl1IQ®III [ill1�Q�DiIII11®IIME IIQIIIIIIIIIinI11111IiII 11Il [in 1111 11111" tmllulll'=11DIIn0SIB in 1 nIl111in1111II11III lIiI111IlIDliiltln1111 1in11 IIDI/)I®1 al IN IinlnillIn II11IllitiQUltTnIllllll11®1It1In1Al1lnt1iQt1111I [QiIlnIIllllll�®®I iInlIIiIIIIIiII11I11 MIR im11n1111nA� Itllliminn®II�nitllQlillQll�Itlilll�iQ�Initlil®�ltSlBnn / I ®11n1® M11 1II111ll1m®llQInnlln®�Qlnilllnt1111111tn1®fHi�i®Htln [Ql l�n�u�BiI�I lUl lilt MR l 11 111 nil 1111111II lln tln llil®1 tIQ QQ® ®Qnui�tl�n®i1III1liullltt III mllln111i11vIIIiiID1111t1i1nI11 III nn11I111ntIl11Il1n1ltl ®nn1IIi litlltiQlIII nilTI[IlII111111 111I1111llllnniWllilII11M8n1i tiDilI1®Hit1a 1unin1IH11n11H1 nil 1III IiI111111m1tillI1I1111iIwiQ111I1D111IDfillll Ii8I1i11W®BTIr�QIl®IInI®inliln flu 11I1�11 miII1u1IItI11[I�tInI1HII11IIlIImMill - ®I11IHn nil 1n1in]IIHI11 itiPllln min 11I1iIBlltm tilllnll:I1tl111I11numlimi11111I11IItIfI11IIt1II1 Holm iIlltlillllltlilliQMill [in Bl®1 13 --IimmlirllllllI/i11I111]tlInitillIIII11Ii1111QIlliniII1tIHlQitll I n111i111I1 tIi111I tlil till l In 1I11 111111i 1 iI111 i 1 t[I111D I I In 1111 11In t III m i mi tin 11 n Qu m.I®11O111ii�mi Ilnllot 11Q111II1m11IlIlllllllf l;;;mllllull,III11il11I111t Ulm IIIItLnLilllll 1AIUIl11a�l11111I11itl 1111[L1ImitJ11I11Ii111I1i11HiI1Ii Ulm "I QnIn1lIQ�l111mitin D1111n1�1®un 1111EnlM11111ItQ111SIin I®I®1nlflllQl H11®11�®Imm Iin 1InllnmI IIIIII QOIIIi alm�Qli�QIltI8jMm1tQlim mDnto11it Iw�lllnlmmlt�l® Kum llmn mliil Ii t11In� t II nuImIIQalit1m1nII®iIIi1Ql1Im1®ICnI11111111!nIIIII1Inliniti1ni1III rINRIUSTRIJES, PROGRESS ULE Date: J"C I•••• 1IiI1IIII1t®1l�Wltl.©I.Il�ilnMlIIi®[ _ �®�®��li®llil�®[QI®IIII�IIHIitID�i� HII[�[��m� mar®tlli®��m��[Imur�r�u�Em� �®nr®l8������+Qila � i��® �®Iliil�i®IIi1�fll �p II®[®ID��® HIT mu�®�®IQII�I�$IID�I�II�! _ IBM"�II[iill�fllll�il�l�l •• morm��an®r�nm�uII�r��rml �m°®°Q�_._.° ��rm��=�rmuQ �sn®n8e�n®r�n®ten®il�r �� mnrr®®ter®®ri AQ��iI�ILD>�i�IIQIBII�IDIIImIIilli����l�IIll�llll�t®IiQ� �®'=�-�IIiIQQmIIiR�1i��IIIiQ�p �l�QIIII�I�IQi®iII�� ����®�itIiYII[1Ii8�Qilt'I ' IIIBH. im Ml�Ril®�SII®�IiIII®BII�IIQ� �1����11ffiII�HiI��IHIQIt�I1III1���iIi�Q�D��®��I1I1 [�i3IIVIIHH��1�flDIIQ1i�i1�1iII1QI1QiiI�illil®II Di,iliIII1I1®A�III1�®Ql itllil�i®Q��QIH1�QtQ1�i1'I�Hi1���ll��p�lllll��Il�iil��I�Hii��IIQ EIQCUi®�B�A�/�QIi®l��I�Q�I�IIQQ�mI�'il Qi�1��Iili!®�I �Q1 oniEp1� I1�����Qi1�8IIfd1 �aa�sin �rnu��a�m owl M ADDITIONS & ALTERATIONS TO THE SOUTH WINDSOR HIGH SCHOOL AND WAPPING ELEMENTARY SCHOOL PHASE I - SITE WORK & BUILDING STRUCTURE CONSTRUCTION NARRATIVE This Narrative is intended to supplement the Preliminary Construction Schedule which is also part of the Contract Documents for this project. Neither the Preliminary Construction Schedule nor this Narrative identify every work item: Both documents are intended to identify the majnr wnrk itaMl Aid the time period which the work is to be performed. Any work item that is not specifically identified 1S tO be _performed in the normal sequence of construction as it relates td the work activities that are identified in the Schedule and/or Narrative. This project consists of work on two schools, the South Windsor High 'School, the Wapping Elementary School and extensive sitework on the campus where both these schools are located. There !R hmth 'glndvat. awn work and new additions being added to both schools. The South Windsor High School is bein constructed in two ,...es, th - The aAproximate limits ese tw c phases are soon Sheet R-4 of the Contract Docume to s.. - (Phase I - $itewoxlc�and Euilding SG�uature, cons��"�8`�pf the sitework ��tafe Zi ,J for the entire ro Ss which includes the ex �"'�-��� is the PYtasevl lea and also the concrete work and ions ststru uraX Steel twork in th_e Phase I area. It also includes the foui5datioris. f oor s aand structural steel for the Wapping School addition. For s of '"Atifying work areas witJ1111 p111A S I, tha Ardnit8dZlli�#lua�ds tructurai-- Drawings for the high school have•been divided into Areas A thru E. For purposes of identifying the athletic fields paved areas and the two courtyards within Phase I, a drawing has been prepared which is part of this narrative that identifies these areas. It is intended that during the summer:of 1990, all of the $to= sewers and sanitary sewers, which are part of this contract, and the water line, which is being installed by the Town of South Windsor, will be installed before school opens in September. It is further intended that paved areas A, B, C and F be completed with the binder course Only of asphalt so that they can be used by construction personnel and by the school when it reopens in 9aptembe r o ggr.--Areas HS2 and HS3 are to be used for the purpose of stockpiling topsoil between the summer of 1990 and 1991. During the summer and fall of 1991, the new football field and..track are to be constructed. The Owner will use the track in the spring of 1992 and will use the new football field in September of la92. Ths nw.,4�r wily ratAlh the use Of the existing football field in Area HS1 until after the 1990 football season. At that time, the Sit0 contractor can take over area HS1 and is to complete the new baseball fields and practice fields N-1 SOUTH WINDSOR HIGH SCHOOL by the fall of 1991. These fields will be used by the Owner in the spring of 1992. Areas H$4, •H35 and HS7 will become available to the site contractor in the spring of 1992. All work, on these fields is to be completed by June of 1992. These fields will not be used by the Owner until September of 1993. If Alternate No. 1, the installation of two new tennis a*urta, is accepted by the Owner, it will be done during the summer of 1991. Phase 11 - Building construction, is scheduled to start late in the fall of 1990 and is to be completed by May of 1992. For this portion of the construction project, all deliveries and construction personnel shall enter and exit the site from Ayers Road. No one will be allowed to use the Nevers Road entrance way while school is in xmmmi m"r Nn laliviriee Sr* tv be madS between 740 a.m. and $00 aim, or between 1:00 p.m. and 200 p.m. while school is in session. As part of this narrative, the 199071991. school calendar is attached for information only. Area A, shown on the site Identification Drawing, which is part p x of this narrative, is to be used for construction fob trailers and for construction personnel parking after September 1, 1990. During the ' summer of 1990, construction personnel will be allowed to park in other areas on the site. The Town of South Windsor will be installing a new water service for the high school and a fare loop around the building of the high school.. All contractors under this Phase I portion of. the project are to cooperate with, and, coordinate their work with, the separate contractor which has been hired by the Town of south Windsor to instal, the water line. Emergency access out of existing exterior doorways in new construction zxea�s will be maintained at all times unless other arrangements-have been specifically agreed upon with the local Fire Marshall. N-2 3OtTtH WINDSOR HIGH SCHOOL wur +wart " . .''•• •�`� - -' r -�'�• - •r.rrw.ceawwi":.:..sue- :r• .•a.. t M+w.o arwnwsrrw, •� - � it t_!:' - -47 - _ • . .. �. _ 7: -M - _ _i• - -tom' `• 4 This drawing, is 3nteaded for identifying site I areas only. fill •1+ _: HSI thru HS7 represent - Athletic Fields, Track and - existing Tennis Courts. - o '•A ahru "Fer represent - � -Y,� �• - - � - bituminous concrete :paved - HIGH areas. �' y: •rf • Drava "�'wiN- •" . "1Kr' and "Y" represent the Ea two new court yards in the x Area I . Phase a.. � / PROJECT NAME/LOCATION APPLICATION # DATE NOTE TO THE FILE: Re: I v J LJ �1�i►t I U r D C7 i L,1„tL0 "L-C- -Soo aLlu� fa 1 . Corti,n� qy� Sig a re y S $�hOSOR CO�r'v 1540 SULLIVAN AVENUE SOUTH WINOSOR. CONN. 06074 AREA CODE 203/644.25u Fax. 8 203-644-3781 FACSIMILE MESSAGE TRANSMITTAL FORM Date: PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: erur e ADDRESS: FAX. : 4Rto - MESSAGE FROM: NAME: 4. M c Ck k, I l ADDRESS: �w� Zon•y� �S c - d� MESSAGE ' CA �-�'✓Lo b�1 �r-s+c',-A �br�w�isstvv� L,4�,i11 6 e (ool< NUMBER OF PAGES TO FOLLOW: 2 A , CONSTRUCTION SEQUENCE SCHEDULE SEQUENCE NO. 1 CONSTRUCTION SEQUENCE N0. 1 WILL INCLUDE DEMOLITION OF STRUCTURES ALONG SULLIVAN AVENUE, . GROUND PREPARATION OF TOPSOIL STOCKPILE AREAS, AND CONSTRUCTION OF DETENTION BASIN BERM AND OUTLET STRUCTURE. STORM DETENTION/SEDIMENT CONTROL BASIN WILL BE STABILIZED PRIOR TO• USAGE. AREA DISTURBED: 5.89 AC +. SEQUENCE NO. 2 CONSTRUCTION SEQUENCE NO. 2 WILL CONSIST OF STRIPPING TOPSOIL IN EMPLOYEE PARKING AREA AND PAVEMENT SUBGRADE INSTALLED FOR TEMPORARY USE AS i CONSTRUCTION STAGING AREA. STORM SEWER WILL BE } INSTALLED ONCE DETENTION BASIN IS STABILIZED. PARKING AREA TO BE STABILIZED WITH CRUSHED ROCK AND PERIMETER SEEDED.' AREA DISTURBED: 3.86 AC +. SEQUENCE NO. 3 CONSTRUCTION SEQUENCE NO. 3 WILL CONSIST OF STRIPPING TOPSOIL.IN BUILDING ENVELOPE AND „t BRINGING AREA UP TO PROPOSED FINISH SUBGRADE ELEVATION FOR BUILDING FOUNDATION AND l COMMENCM,a= OF BUILDING CONSTRUCTION. I INSTALLATION OF STORM SEWER BETWEEN MANHOLE 13 AND 14 WILL TAKE PLACE. i AREA DISTURBED: 7.27 AC +. SEQUENCE NO. 4 CONSTRUCTION SEQUENCE.NO. 4 WILL CONSIST OF STRIPPING TOPSOIL IN OFF—LOADING AREA AND f BRINGING AREA UP TO PROPOSED FINISH SUBGRADE ELEVATION. STORM SEWER WILL BE INSTALLED FROM DETENTION BASIN TO MANHOLE NO. 13. PAVEMENT I SUBBASE WILL BE PLACED FOR GRADE STABILIZATION I DURING AREA USE FOR CONSTRUCTION STAGING OF BUILDING. AREA DISTURBED: ''. 5.57 AC +. s SEQUENCE NO. 5 CONSTRUCTION SEQUENCE NO. 5 WILL CONSIST OF STRIPPING TOPSOIL OF ON—LOADING AREA AND BRINGING 'I AREA UP TO PROPOSED FINISH SUBGRADE ELEVATIONS. I STORM SEWER WILL BE INSTALLED FOR THIS PORTION OF WORK. PAVEMENT SUBBASE WILL BE PLACED FOR GRADE STABILIZATION DURING USE FOR CONSTRUCTION STAGING / OF BUILDING. AREA DISTURBED: 2.67 AC +. SEQUENCE NO. 6 CONSTRUCTION SEQUENCE NO. 6 WILL CONSIST OF STRIPPING TOPSOIL IN OUT—BOUND AREA BRINGING AREA t UP TO PROPOSED FINISH SUBGRADE ELEVATION. STORM SEWER WILL BE INSTALLED FOR THIS PORTION OF WORK. PAVEMENT SUBBASE WILL BE PLACED FOR GRADE STABILIZATION AND DRAINAGE SWALE SEEDED. .AREA DISTURBED: 3.64 AC +. i —�— i r I i • i r SEQUENCE NO. 7 CONSTRUCTION SEQUENCE NO. 7 WILL CONSIST OF STRIPPING TOPSOIL IN GARAGE AREA AND RAISING GRADES TO PROPOSED FINISH SUBGRADE ELEVATION FOR FOUNDATION PLACEMENT OF GARAGE AND ITS CONSTRUCTION. STORM DRAINAGE WILL BE PLACED. PAVEMENT SUBBASE WILL BE PLACED FOR GRADE STABILIZATION. AREA DISTURBED: 2.02 AC +. SEQUENCE NO. 8 CONSTRUCTION SEQUENCE NO. 8 WILL CONSIST OF STRIPPING TOPSOIL IN REMAINING ON—LOADING AREA AND RAISING GRADES TO PROPOSED FINISH SUBGRADE ELEVATION AND PREPARATION OF DRAINAGE SWALE. UPON PLACEMENT OF WING *Bo FOUNDATION PLACEMENT, ALL AREAS TO BE PAVED WILL BE STABILIZED. SWALE AREA SHALL BE SEEDED.' AREA DISTURBED: 4.37 AC +. SEQUENCE NO. 9 CONSTRUCTION SEQUENCE NO. 9 WILL CONSIST OF STRIPPING TOPSOIL AND RAISING GRADES FOR EXIT ROAD AND FUELING AREA FOR INSTALLATION OF. REMAINING UTILITIES, EXTERIOR LIGHTING AND MISCELLANEOUS STRUCTURES. (REMOVAL OF TEMPORARY FACIUTYI AREA DISTURBED: 1.31 AC +. SEQUENCE NO. 10 CONSTRUCTION SEQUENCE NO. 10 WILL CONSIST OF PLACEMENT OF ALL ROAD PAVEMENT, PEDESTRIAN CIRCULATION'ANO FINALIZING SEEDING AND LANDSCAPE PLANTINGS PRIOR TO COMPLETION OF PROJECT. NOTE: 1. THE ABOVE SEQUENCE REPRESENTS THE GENERAL PLAN OF CONSTRUCTION. ANY MODIFICATIONS OR IMPROVEMENTS TO CONSTRUCTION SEQUENCING SHALL BE REVIEWED BY TOWN STAFF PRIOR TO IMPLEMENTATION. 2. TREES AND STUMPS IN NORTHEAST CORNER OF PROJECT WILL BE REMOVED IN CONSTRUCTION SEQUENCE NO. 1 OR CONSTRUCTION SEQUENCE NO. 3. EXISTING GRADE WILL BE STABILIZED WITH TEMPORARY SEEDING. THE SEQUENCE OF REMOVAL WILL BE COORDINATED WITH TOWN STAFF PRIOR TO REMOVAL OF TREES. l KAHAN, KERENSKY, CAPOSSELA, LEVINE 8 BRESLAU ATTORNEYS AT LAW JURIS CENTRE 45 HARTFORD TURNPIKE SOLOMON KERENSKY BOX K JOSEPH P. CAPOSSELA VERNON, CONNECTICUT 06066 PETER C. PALMER* JEROMMAUREEN A. CHMIELECKI WILLIA M E. BRESLAU D. LEVINE TELEPHONE (203) 646-1974 EDWARD C. TAIMAN, JR. ILLIA JOEL M. FAIN TELECOPIER (203) 647-8302 BRUCE P. FADER MICHAEL A. BARS JAY A. GABRIEL* WILLIAM J. DAKIN SUZANNE E. CARONDEAN W. HUMMEL OF COUNSEL MICHAEL J. KOPSICK** ROBERT F. KAHAN May 11, 1990 GARY W. HOHENTHAL COLLEEN M. MCCARTHY * ALSO MASSACHUSETTS BAR **ALSO NEW YORK BAR South Windsor Inland Wetland Agency/Conservation Commission c/o Mr. John McCahill Zoning/Wetland Enforcement Officer 1540 Sullivan Avenue rt South Windsor, CT 06074 Re: South Windsor High School Addition Project MNAY- 1 1"'.ft Dear Mr. McCahill: IN South •WWWor � �i►A�rro�t �01�N On behalf of my clients, Verne and Naanne Hill, 36 Mountain View Road, I would appreciate that the Conservation Commission consider recommending the installation of a drywell or similar structure in the area designated on the attached map. The purpose of the structure is to minimize runoff from the project site onto my clients ' property. The runoff situation was created at the time that the Town developed the original school property. According to my clients, the site work included regrading of the track area which caused an increase in runoff in the direction of the Hill property. In an effort to try to correct the runoff, the Hills planted several rows of trees along the length of the property boundary. I recognize that the current proposal will redirect a portion of the previously created runoff away from the Hill property. However, considering that the town is in the process of redeveloping the entire site, the current application process is the appropriate time to adequately rectify the original runoff. If you have any questions, please do not hesitate to contact me. Thank you for your consideration. Respectfully, Bruce Fader BF/sd cc: Mr. and Mrs. Hill (w/enclosure) ri 4- *MATCH LINE-C See D76, wg.L-4 ' �✓-lL'r�'(1C�-.! _ ; , ��°1 too ,..- t�i ;74 r171 - ,' - _SAn T 1;= INV.= Z ,ter t v- e3y j f 1gti.L� �► r' ,' i C.B. Do ' ♦ r' � L.D. # 1 is}' ♦ Q��' ; •NV.-1�1. 44 O ♦ ' It I r 18" CPP ♦ r j 5=0.72% 0 ' 184 r r�s.4o C.B. # 3 SAN MH #3A ♦� / -`rl" F 'G' I Ti = I�Z 'gO ♦ 18� 1 f t e 7 rNv-= t17•a , C.B. # % INV i78. 17L.47- 5w San '83.3o � '15�.�0�� + x tOaO INv'` I�G' 1�- W 8" PVC 183.75 183.15 los• S=0.50 I9+ �� �� �s5®pP if3.1� 18 O 1 John E. McCahill Page 2 May 11, 1990 The above will be incorporated onto the final plans after the Commission's review. ;Very tr yo 4/ n G. S vans & Chisholm JGS:ftp cc: Mr. Alan Daninhirsch, Kaestle Boos Associates, Inc. , Architects Mr. Bruce Walpole, 0 & G Industries, Inc. Attachment No. 1 2.1t "Clean Fill" means uncontaminated natural soil or rock which is inert in terms of leaching and poses no threat, present or future, of pollution to surface waters or groundwaters . Moreover, clean fill typically excludes, but is not limited to the exclusion of: demolition or construction waste materials or debris, combustible or non-combustible, including concrete, asphalt, paving materials or by-products; yard wastes, including branches, limbs, brush, shrubs, trees, _ arts of trees, tree stumps and similar materials grown on or emanating from land; nonputresible solid wastes, combustible. or non- combustible; and bulky rubbish or refuse, including putresible solids, semi solids or liquids . Attachment No. 2 -Lit d N 1 Vk u z T•y• `• i w � •M� V" L D Arvo Attachment No. 3 Construction Sequence Schedule This schedule is intended to show the approximate areas and corresponding times in which portions of the site will be disturbed. Sequence No. 1: During the summer of 1990, the existing parking and paving in Areas B and C will be removed and new paving will be placed in Areas A, B, C and F. Sequence No. 2: New building construction at the south end of the existing high school building will start in June of 1990 and will be complete by September 1991. Area E, indicated on the Site Identification Drawing, represents the construction roadway during the course of the building construction. After the building addition is completed, the Area E roadway will become a finish paved surface. Sequence No. 3: Area HS2 and HS3 represent the existing football field and running track. From June of 1990 until the spring of 1991, this area will be used to stockpile the topsoil which is. removed from the building construction area. From the spring of 1991 until the fall of 1991, this area will be regraded and a new football field and running track will be installed. Sequence No. 4: Area HS1, which is presently the existing high school football field, will not be disturbed until after the 1990 football season. Between November of 1990 and the fall of 1991, this area will be regraded and the practice baseball field and soccer field will be installed. Topsoil that is removed from Parking Area C and Roadway F during the summer of 1990 will be stored between Roadway F and the existing football field fence until the HS1 area is regraded. Sequence No. 5: Areas HS4, HS6 and HS7 will not be disturbed until the spring of 1992 at which time fields HS4 and HS7 will be regraded and reseeded and Area HS6, which is presently the student parking lot, will be regraded and seeded as a new softball field. O&G INOUSTRIES INC. 1 112 WALL 8T.I P.O. BOX 907 1 TORRINGTON, CT 08780-0807 1 PHONE 1203) 4BB-9281 Sequence No. 6: The finished paving course for Areas A, B, C, D and F will be installed during the summer of 1991. Area G, which is the existing parking lot for the elementary school, will also be resurfaced during the summer of 1991. Sequence No. 7: A sanitary sewer line will be installed during the summer of 1990 which will disturb the grass area on the east and south sides of the Wapping Elementary School. Sequence No. 8: Two new tennis courts may be added to the project by Add Alternate No. 1. If the alternate is accepted, the two new tennis courts would be added to Area HS5 during the summer of 1991. If the add alternate is not accepted, Area HS5 will not be disturbed at all during the course of the project. At us •eAr J 7• ';: This drawing is intended for identifying site areas only. 'I HSI thru HS7 represent Athletic Fields, Track and ••. existing Tennis Courts. cn "All thru 1p2� represent :�'� 2c �Q••• .:r/ o 2 NIGH y bituminous concrete :paved SCHOOL x areas. f. FA "X" and "Y" represent the O 0. O two new court yards in the Phase I Area. H '� .,.. .. ' .�•`J o Cj Y, '.� ••,•••• F,• Waall • . ' :: . . . . . is. •i�� z Figure 6-1 - Temporary Seeding Rates and Dates OPTIMUM SEEDING OPTIMUM SEED SEEDING RATES (pounds) DATE1,3 DEPTH SPECIES Per Acre Per-F,000 sq. ft. (inches) Annual ryegrass 40 1.0 3/1 _ 6/15 0.5 vCL 8/1 - 10/1 Perennial ryegrass 40 1.0 3/15 - 6/15 0.5 0 8/1 = 10/1 y �+ " m W Winter rye 120 3.0 4/15 - 6/15 .1.0 CL 8/15 - 10/1 - o, Oats 86 2.0 3/1 - 6/15 1.0 .� 8/1 - 9/15 0 (� 0 Wheat 120 3.0 4/1 - 6/15 1.0 8/15 10/1 0. a Zh Millet 20 - 0.5 6/1 - 7/1 1.0 0 5/15 - 8/15 H ■ Sudangrass 30 0.7 5/15 - 8/15 1.0 'p! J. Buckwheat 15 0.4 4/1 - 9/15 1.0 Weeping lovegrass 5 0.2 6/1 - 7/1 0.25 Q, 1/ May be planted throughout summer if soil moisture is adequate or can be irrigated. Cr 2/ Seed at twice the indicated depth for sandy soils. o / The fall seeding dates may be extended 15 days in the coastal towns of New London, Middlesex, { _ New Haven and Fairfield Counties. Source: U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. i S0wN $f4 ?&U&at L y 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R'C0 AREA CODE 203/644.2511 May 14, 1990 TO: James A. Lombardi, Chairman, Inland Wetlands Agency/Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: Application #90-24P - South Windsor High School Please accept this as a follow-up to my letters dated April 12, 1990 and April 26, 1990. Consideration has been given to documents, correspondence, and plans submitted up to this date. IF APPROVAL IS CONSIDERED SUGGESTED APPROVAL CONDITIONS INCLIIDE: 1 • Silt fence shall be shown at the toe of the slope for the grades along the westerly property line. 2. The definition of clean fill, as found_ in section 2.1t of the Regulations, shall be included on the plans. 3 . Topsoil storage area #2 shall be consolidated in one area on the east side of the entrance road. The toe of the storage area shall be terminated 50, from the southern edge of Ayers Road. 4 . o Catch basin in paved areas (CB #14, 18, and 21) shown with hoods shall be replaced with sedimentation structures. 5• A note shall be added to the plans stating, "dust control will maintain throughout the entire duration of the project and is the responsibility of the Construction Manager" . 6 . The Construction Sequence Schedule (sequence #1 through 8) 1�and the drawing identifying the areas, as prepared by 0 & G Industries, Inc. , shall- be added to the plans. 7 • The plans shall show the temporary turning radius near the �3 southerly end of the building, near the existing brook. This shall be done at grade, with no fill of the wetlands in that area. 8. A construction entrance shall be shown near the southern edge of the building at the point where existing paved area is cut. a s James A. Lombardi Page Two May 14, 1990 Application #90-24P 9 . The plans shall be revised to indicate the sewer connection 1tj to Nevers Road. This is to be placed in the area of the existing driveway entrance and shall cross over the existing 72" pipe. 10. Temporary Seeding Rates and Dates, figure 6 .1 of the. Connecticut Guidelines for Erosion and Sedimentation Control, shall be added to the plans. Disturbed areas shall be stabilized with temporary seed mix. �S0.0N af,(� U 70� O-P s.C� ?&U&ot wc, 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �IosoR•co AREA CODE 203/644-2511 May 23, 1990 MEMORANDUM TO: Louise Evans, Chairperson, Planning & Zoning Commission FROM: Betty A. Warren, Vice Chairperson, .IWA/CC RE: Application #90-24P, South Windsor High School During public participation on the application referenced above Attorney Bruce Fader, on behalf of his clients Verne and Naanne Hill of 36 Mountain View Road, requested that the Conservation Commission consider recommending the installation of a dry well or similar structure in the area designated on, the attached map. The purpose of the structure is to minimize runoff from the project site onto his clients ' property. Although the Commission is concerned about the situation, they would respectfully request that the Planning & Zoning Commission consider and address the concerns of Attorney Bruce Fader. It would also seem that the Town Engineer may be of some assistance to resolve the situation and determine what is necessary in the area of concern. Thank you for your consideration. cc: Attorney Bruce Fader Jerry C. Iazzetta, Town Engineer Marcia A. Banach, Director of Planning t� O_PsC� V&U140t m 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 $�~�oR•co��� AREA CODE 203/644-2511 22 June 1990 Mr. Howard Fitts, Chairman South Windsor School Building Committee 239 Oak Street South Windsor, CT 06074 Dear Sir: re: Appl. #90-24P, South Windsor High School Special Exception Article 4.2.8.b.1 We are pleased to advise that the Planning and Zoning Commission voted on 19 June 1990 to approve the above-referenced application for a Special Exception to Article 4 .2. 8.b.1 and site plan of development in accordance with maps prepared by Raestle Boos Associates, drawing of key map, SD1, M-1,10 dated 3/l/90 (revised 5/1/90) with the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars and Special Exception Form have been filed in the Town Clerks Office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4. 13. 10 of the Zoning Regulations. 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Any dumpster proposed on the site must be screened. 8. Applicant must work with the Superintendent of Parks and Grounds to address his concerns in his memo dated 5124/90. 9 . Driveway cuts of surrounding properties must be shown on the key map. South Windsor High School -2- 22 June 1990 10. The final topographic maps require an original seal and signature. 11. Waterline which is to be relocated around the tennis courts must be shown on the plans. 12. Record map filed in the Town Clerk's Office must be at a scale of 1"=401 , and on 24" X 36" sheets. 13. The Commission recommends the Police Department review the feasibility of relocating the utilities poles on the western side of Nevers Road for safety reasons. 14. A waiver of 747 parking spaces has been granted and these spaces are approved to be 9' X 18, in size. 15. The installation of a drywell (or some other drainage structure determined by the engineers) is required in the vicinity -of Verne and Naanne Hill's property to correct the existing drainage problem. Black and white transparent mylars of Sheets L1 and L2 with the above modifications, together with four blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: /Inland Wetlands Agency/Conservation Commission M. Banach, Planning Director J. Collins, Chief Building Official J. Iazzetta, Town Engineer F. Shaw, Supt. of Pollution Control . E. Belleville, Assessor W. Lanning, Fire Marshal Registrar of Voters Sgt. Hart, South Windsor Police Department Alan Doninhirsch, Raestle Boos Associates John Stewart, Evans & Chisholm PZC File .10WN a C 0,ye S;C� V&U&Ot �� wo 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074 R•c°N� AREA CODE 203/644-2511 May 23, 1990 John G. Stewart Evans & Chisholm, Landscape Architects 4 Beech Street Farmington, CT 06032 Dear Mr. Stewart: Re: Application #90-24P - South Windsor High School At the May 21, 1990 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #90-24P - IWA/CC permit for the construction of an addition to the high school on property located on the westerly side of Nevers Road and southerly side of Ayers Road, RR zone, as shown on plans prepared by Kaestle Boos Associates, project #88073, dated March 23, 1990 and revised March 30, 1990, April 11, 1990 and April 19, 1990. 1 • Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval and prior to any construction activity on the site. 2• Construction activities shall be subject to the approval of the Town Engineer. 3• The application shall indemnify and hold harmless the Town Of South Windsor against any liability which might result from the proposed operation or use. 4 • The permit is valid for one year and shall expire on May 21, 1991. 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans. 7 • Silt fence shall be shown at the toe of the slope for the grades .along the westerly line. 8. The definition of clean fill, as found in section 2. 1t of the Regulations, shall be included on the plans . John G. Stewart Page # May 23, 1990' Application #90-24P 9 . Topsoil storage area #2 shall be consolidated in one area on the east side of the entrance road. 10. Catch basin in paved areas (CB #14, 18, and 21) shown with hoods shall be replaced with sedimentation structures. 11 . A note shall be added to the plans stating, "dust control will be maintained throughout the entire duration of the project and is the responsibility of the Construction Manager" . 12. The Construction Sequence Schedule (sequence #1 through 8) and the drawing identifying the areas, as prepared by 0 & G Industries, Inc. , shall be added to the plans . 13. The plans shall show the temporary turning radius near the southerly end of the building, near the existing brook. This shall be done at grade, with no fill of the wetlands in that area. 14 . A construction entrance shall be shown near the southern edge of the building at the point where existing paved area is cut. 15 . The plans shall be revised to indicate the sewer connection to Nevers Road. This is to be placed in the area of the existing driveway entrance and shall cross over the existing 72" pipe. 16 . Temporary Seeding Rates and Dates, figure 6 . 1 of the Connecticut Guidelines for Erosion and Sedimentation Control, shall be added to the plans. Disturbed areas shall be stabilized with temporary seed mix. Very truly yours, E*zt`AAZ.�eWarWrena, &Vic4e Chairperson, IWA/CC EAW/pmm cc: Jerry C. _Iazzetta, Town Engineer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission x x �for M a��� i`•.��_r�'� 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 June 28, 1990 RE: Preconstruction Meeting p0 IN ATTENDANCE � 6Yy• lv9�' t� NAME COMPANY/ADDRESS TELEPHONE _ Chip Martin East Hartford Welding Al Chiulli, III ADC Construction Company Al CTrensk, Jr. ADC Construction Company ev Wa Joe y Borys Waterbury Concrete Fnd's O� @�e.4 e r Henry Borysewicz Waterbury Concrete Fnd's Jack Korowotn ► -$oo- 31Z ' �gsl y Waterbury Concrete Fnd's L� �cBruce Walpole 0 & G Industries 044- " 4 Sylvia Chisholm Evans & Chisholm � . S1�9Z61 Alan Daninhirsch Kaestle Boos Architects Hal Clisby CL&P Ted Pastva CL&P mmm : , Chris Wojciak Connecticut Water Company Brad Gardener 0 & G Industries Edd Wilcox 0 & G Industries Michael J. Gantick Town of South Windsor 644-2511 Jerry C. Iazzetta Town of South Windsor 644-2511 John E. McCahill Town of South Windsor 644-2511 Mel Stead Town of South Windsor 644-2511 Karl Reichle Town of South Windsor 644-2511 Marcia A. Banach Town of South Windsor 644-2511 The following is a brief summary of points discussed during the meeting. Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained cleaned out durin construction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 1 r 2• All topsoil stockpile areas to be protected (ringed with r haybales or equal) . 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Ayers Road and Nevers Road. Calcium chloride or water is to be used for dust control as required. Public Works 1. Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by.Plannj,ng Department along with plans developer needs. Only 'apprbV6d plans are to be used on jobsite. 2. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist requested for the following: a) After site is staked out ' b) All drainage work c) Preparation of subgrade, compaction tests as requested by the Town d) Preparation of subbase, six (6) inch lifts e) .-1`. -Placement of bituminous concrete, 2 inch layers 3• 'Certification of gravel used as subbase will be required by an approved testing company. 4 . No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 5. As built plans -are to include horizontal and vertical location .of all underdrains, footing drains, and sanitary sewers located as per revised as-built checklist. 6• All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 7• Any problems and/or questions regarding construction of this project will be directed to Edd Wilcox of 0 & G Industries in the field. i 8. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 9. Job meetings will be held bi-weekly to start and may be weekly after project is fully underway. 10. Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy and Building Permit. 11. Any proposed changes are to be presented to the Engineering 2 or Planning Department prior to implementation on change sheet in triplicate. Town will attempt to turn around within 24 hours. 12. No paving after October 15 without written approval from Director of Public Works. 13 . Normal hours of operation 7:00 A.M. - 5:00 P.M. , no work on Sunday. 14 . Waterline conflict with tennis court must be resolved with Town Engineer prior to construction of the tennis court. 15. The catch basins and manhole top of frame elevations will be such that they will be level with the binder pavement through the winter and will be raised when finish pavement course is placed. 16 . The Architect will coordinate with Mr: Karl Reichle to implement Mr. Reichle's landscape concerns into the work being done. 17 . The contractor will need to keep the streets clean by periodically sweeping. SNET/NU 1• Contact utilities for coordination of utilities connection. IWA/CC 1. Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted' to this. Commission. Plans to be submitted by.Monday, July 2, 1990. a f 2. All soil and erosion control measures shall be installed and maintained during the duration of the project to ensure protection of• the Plum Gulley Brook. Fire Marshall 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Department 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building(s) after construction emergency numbers must be provided to the Police Department. Buildings Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. 2. The Chief Building Official should be contacted to discuss inspection of underground electrical services. Very truly yours, Marcia A. Banach Director of Planning MAB/pmm cc: Jerry C: .Iazzetta, Town Engineer Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Hal Clisby, CL&P Minh V. Le, SNET John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning/Wetlands Enforcement Officer PROJECT NAME/LOCATION �o„�L yyr ,�✓ l,�,h, �c,Lu�� APPLICATION # A- DATE NOTE TO TEE FILE: Re: 45 2 �c 04 -s v�byn�e o y-, SAL,csf 1 C 1 G T Signature ,ke SBA O,r d%sue sue or SteAt-., du Ga d. Erosion and Sediment Control Measures 1. All erosion and sedimentation control measures and 'hay bale filter barriers shall be inspected by the contractor daily and immediately after period of rainfall. Repair and/or replacement of erosion and sedimentation control measures will be made as soon as the 'need is known.. The contractor will be responsible for the implementation and ma:.ntenance of erosion and sedimentation control measures on the site. It is intended that all erosion and sedimentation control measures shall con orm to ui a roes or Soil Erosion and Sediment Control" as re red of Soil and Water Conserv<�tion, January 1 9IIN b the Connecticut Council 2. Land disturbance will be '. ke t to a minimun, restabilization wi mm l sc e u e iediate after disturbance. 1 be 3. Hay bale filter barriers will `be installed along the toe of cut and fill slopes. .all critical 4• Catch basins will be protected with hay bale filter barriers throughout construction period and until ''all disturbed areas are toroughle . stabilized. y 5. Erosion and sediment control measures will be installed construction whenever possible. prior to 6• Additional control measures will be installed during the const period if necessary or required. ruction 7. Fabric filter barrier of Fibretex 150 grade as manufactured Zellerback, or approved equal may be used in Plate of hay bales, by Crown 8. Sediment removed from control structures shall be disposed of in a ma which is consistent with the intent of the plan. nner Schedule of Activities for Construction 1. Install erosion and sedimentation control measures as per plan. 2. Clear trees in areas proposed for construction. 3. Grub tree stumps and brush. 4• Stock ile to soil anchor with ha mulch and rin with harrier. hay bale filter 5. Rough grade areas proposed for construction. 6. Construct site utilities -, barriers. .. , Protect catch basins with hay bale filter 7. Finish grade site areas. 8. Pave parking lots, drives, and walks. Loam and seed or sod or stab directed areas disturbed by construction. ilize as a 9. Remove erosion and sedimentation control measures. U. DUST CONTROL (DC) z .. z I; 'DEFINITION The control of dust on construction sites and 'roads. 2. PURPOSE To prevent blowing and movement of dust from exposed soil surfaces, and reduce the presence of dust which may cause off-site damage, be a health hazard to humans, wildlife and plantlife, or reduce traffic safety hazard. 3. APPLICABILITY This measure is applicable to areas subject to dust blowing and soil movement where on- and off-site damage is likely to occur if preventive measures are not taken. - 4. PLANNING CONSIDERATIONS Use traffic control to restrict traffic to predetermined routes. Maintain as much natural vegetation as is practicable. Use phasing of construction to reduce the area of land disturbed at any one time. The use-of temporary mulching, permanent mulching, temporary V vegetative cover, permanent vegetative cover, or sodding will reduce" the need for dust control . ' Use mechanical sweepers on paved surfaces - where necessary to prevent dust build up. Stationary sources of - -' C dust, i.e. , rock crushers, should utilize fine water sprays to ' control dust. 5. INSTALLATION REQUIREMENTS a. Spray-On Adhesives G„Wdtkl,e c - ,� So, l Anionic or cationic asphalt emulsion, latex emulsion and resin in water are acceptable. For application rates and dilutions E2S►ti n c. on specific sites, refer to manufacturer's guidelines. - $��.,�. b. Water _ The exposed soil surface should be moistened periodically Adequate water to control dust. P ically with C. Calcium Chloride Shall be either loose dr - _ y granules or flakes fine enough to " —feed through a_.sp-rea_ d„ er_at a rate that will keep surface moist ti but not cause polluon o—"-j ant damage. To reduce potential for environmental degradation, use only when other methods are not practical. ----� d. Stone Cover surface with crushed stone or coarse gravel. In areas adjacent to waterways use chemically stable aggregate. 6. MAINTENANCE When temporary dust control measures are used, repetitive treatment l shall be applied as needed to accomplish control . �- ---�" D. TOPSOILING (TO) C � S" f I. DEFINITION C � The spreading of topsoil of a suitable quality over an area to be stabilized by establishing vegetation. 2. PURPOSE To provide a suitable growth medium for final site stabilization with vegetation. 3. APPLICABILITY a. Where the use of topsoil is determined to be the most effective method of providing a suitable growth medium. b. Where the subsoil or existing soil present the following problems: (1) The texture, pH, or nutrient balance of the available soil cannot be modified by reasonable means to provide an adequate growth medium (,ands, gravels, clays). (2) The soil material is too shallow to provide an adequate root zone and to supply necessary moisture and nutrients for plant growth. ( (3) The soil contains substances potentially toxic to plant growth. p t C. Where high quality- turf is desirable to withstand intensive use or meet aesthetic requirements. . d. Where ornamental plants will be established. e. To be used on slopes that are 2 to 1 (2 horizontally to l vertically) or flatter. 4. PLANNING CONSIDERATIONS Topsoil is the surface layer of they natural soil profile, generally characterized as being darker than the subsoil due to the presence of organic matter. It is the major zone of root development, containing much of the nutrients available to plants, and supplying a large amount of the water used by plants. Topsoil provides an excellent growth medium is high in organic matter content and has a fr1a-b+e-consistency, high water-holding capacity and nutrient content. Vegetative growth is more rapid on sites with at least 4 inches of topsoil , and health and quality of vegetation is better than on sites with little or no topsoil. However, stripping, stockpiling, and reapplying topsoil , or importing topsoil is expensive. The need to topsoil can delay 7-13 seeding or sodding operations, increasing the exposure time of critical areas. Most topsoil contains some weed seeds, and weeds may compete with desirable species. that of preparing a see In site planning, the option of topsoiling should be compared with dbed in subsoil (See measures for Permanent Vegetative Cover [page 6-5], Soddin Vines and Ground Cover 9 [page 6-131, and Trees, Shrubs, with proper seedbed preparationlma)� Limed and fertilized subsoils medium if moisture is not limitingY provide an adequate growth Topsoiling is strongly recommended where ornamental plants or high-maintenance turf will be grown. Topsoiling is a required procedure when establishing vegetation on shall containing potentially toxic materials, and soi ow soils, soils Is with a pH of 4 or below (high acid). If topsoiling is to be done, the following items should be considered: a. Determine whether or not an adequate volume of topsoil exists ' on the site. Topsoil will be spread at a minimum compacted depth of 4 inches. b. —Stockpile topsoil so that it meets specifications and does interfere with work on the site. not C. Allow sufficient time in scheduling for topsoil to be spread and bonded with the subsoil prior to seeding, sodding, or planting. d. Care must Gi be taken when a 1 in to soil to subsoil if the two soi s ave contrastin textures or stron contrastin ensit �•e• ar an opsoi over compacte su soi1 is a particu ar y poor combination, as water creeps along the junction between the soil layers and causes the topsoil to slough. The hardpan must be scarified prior to spreading topsoil to ensure adequate bonding. e. If topsoil and subsoil are not properly bonded, water will not infiltrate the soil profile evenly and it may be difficult to establish vegetation. 5. INSTALLATION REQUIREMENTS a. Materials Site investigations--sh-a4--T- -made to determine if there is sufficient topsoil of good quality to justify stripping. High quality topsoil shall be friable and loamy (loam, sandy loam, silt loam, sandy clay loam, clay loam). Other soil types with high organic content may be found suitable after testing. It shall be free of debris, trash, stumps, rocks, roots, and noxious weeds. It shall give evidence of being able to support healthy vegetation. It shall contain no substance that is i Potentially toxic to plant growth. 7-14 All topsoil shall be tested by a recognized laboratory for the following and shall meet the requirements given: / Organic matter content shall be not less tha n 1.5% by weig t. H ran a shall be 6.0-7.5. If pH is less than 6.0, lime shall be added in accordance with soil test results or in accordance with the recommendations of the vegetative establishment practice being used. Soluble salts shall not exceed 500 ppm. If additional off-site topsoil is needed, it must meet the standards stated above. b. Stripping Stripping shall be confined to the immediate construction area. A 4 to 6 inch stripping depth is common, but depth may vary depending on the particular soil . All perimeter dikes, basins, and other sediment controls shall be in place prior to stripping. C. Stockpiling Topsoil shall be stockpiled in such a manner that natural drainage is not obstructed and no off-site sediment damage shall result. d. Side Slopes Side slopes of the. stockpile shall not exceed 2 to 1 (2 horizontally to 1 vertically). e. Sediment Barrier A sediment barrier shall surround all topsoil stockpiles. f. Temporary Seeding Temporary seeding of stockpiles shall be completed within 15 days of the formation of the stockpile, in accordance with the Temporary Vegetative Cover measure (page 6-1). g. Site Preparation Before topsoiling, establish needed erosion and sediment control measures such as diversions, grade stabilization structures, waterways,—sediment_basins, etc. These measures must be maintained during topsoiling. h. Grading Previously established grades on the areas to be topsoiled shall be maintained according to the approved plan. 7-15 i mig O-P saa� vzn� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-25n -1990 �. _August .91 4 a 0 & G-Industries; Inc 112.Wall Street -- -- - - --- -- - a >P.O:°--Box 907 Torrington, CT 06790-0902. - Attention Brad Gardiner Dear Mr. Gardiner Re:, South Windsor High School Additions and -Renovations At the August 9, 1990 Coordination Meeting you briefly discussed item 3.02, Dust. You indicated that A.D.C. Construction Company is still . reviewing options for stabilizing the stockpiles. Dust_control, �and the stabilization of the stockpiles, has been 'a concern for a few weeks now. In my conversation with James A. Lombardi, Chairman of Inland Wetlands Agency/Conservation Commission today, he was very concerned and indicated that a deadline must be stated and adhered to. By August 20, 1990 the stockpiles are to be stabilized or he has indicated that a special meeting will be called to discuss the possibility of revoking the permit for this site. Thank you for your attention to this matter.: very truly yours, )6hn E. McCahill, Zoning/Wetlan Enforcement Officer JEM/pmm cc: Bruce Walpole, 0 & G Industries, Inc. Michael J. Gantick, Director of Public Works Jerry C. Iazzetta, Town Engineer Marcia A. Banach, Director of Planning Al Chiulli, A.D.C. Construction Inc. •.- .. J ,. - tom- . ti!,,�� . If y 0r1 N it t t� q;,Kl•���./��L�f/rI t/ 'W •y` _ .:r �tla.n-' - x . 1540 SULLIVAN rANUE SOUTH WtNDSOR;CONN: 06074 soR co AREA CODE 203/644-25U �c� � •``� ,'mot 4 = ,, 42911st9, 1990 r Y r :O & Gi.Industries, Inc.". ' Z12Wall � y w Street ; x Y x P.0. .Box 5907 rf r P AMU Torrington, CT 06790 0902�'= ` Attention: Brad Gardiner 4 [I DearJ Mr Gardiner: Re: South Windsor High` School'Additions and Renovations ". At the August 9, ' 1990 Coordination Meeting you briefly discussed item'' ' 3 02, Dust. You indicated that A.D.C. Construction Company is still- reviewing options for Stabilizing the stockpiles. Dust'control, and the stabilization. of the stockpiles, has been a concern for a few weeks now. In my conversation with James A. Lombardi, Chairman of Inland Wetlands Agency/Conservation Commission today; he was very concerned and indicated that a deadline must be stated and adhered _to.' By August. 20, 1990' the stockpiles are to be stabilized Or he has indicated that .a special meeting will be called to discuss the possibility of revoking`_the permit for this site. Thank you for your attention to this matter. - Very truly yours, hn E; McCahill, Zoning/Wetlan Enforcement Officer JEM/pmm cc: Bruce Walpole, 0 & G Industries, Inc. Michael J. Gantick, Director of Public Works Jerry C. Iazzetta, Town Engineer Marcia A. Banach, Director of Planning Al Chiulli, A.D.C. Construction Inc. � _ �"'Y •� �M.{ -may. t. � � _ I " 01 `P �c t� j 9L QAOLj TOWN of SOUTH WINDSOR, PUBLIC WORKS DEPT. Priority REQUEST FOR INVESTIGATION WORK REQUEST Date No. To J-0 A't L^ (individual, Division, Bureau, Department) (•Requested by �k TM.• O A7 `- ,v Caller l! Address Phonez T ��3 Instructions ��l.�fT 6,0127 0 k-f- r /D i9-P c( J 1"O 1 — S q41f VV �f �1 • REPORT YGb V �b JG w ; COX 0I q�/3 co83o) w I I 4,9-I J 4 o C 4 s h, ,-,- 4�'4 4- s Bureau Chief or Date Completed Department Head S C A LED t tvk--as r 2 79- TO A --'ME AM _� C- C. Nur.18�R lk -i-i L, J �AGV"Gllt _A�C Y_ SIGNED (�. f—DCALLI rETUPNED- WANTS TC SbiLL CALL —O :JAS!,. URGENT I BACK CALL --I SEE YCU - �AGAIN AIGPJER FORM NO.53-176 0 -- _ AM pM! •� I FROMAREA CODE NUMBER `'• F EYTENSICN s --— j G - SIGNED i A --- f CALL I RETURNED.---I WANTS TO r WILL CALL ^!+,'lASIN I URGENT --. PHONED_ SACK —= CALL —I SEE YOU —I AGAI: — } —-- Ai( NER FORM NO.50-176 s,'le- logy (3;y5 ) � (/o:,o)-. Qrr,,c( Gc,«<e.,« "wj of Sir eL Vl L) � S fv�o �i-� c� in o V`e�rt o..�.f� v��'( rN�-�*-„')•�, - �r,G Lt j t vYjd✓;tea I I ` ,/ / 3) Neea r^,e Co Vier +e SlvC,�;`e, V /-A n sf,4- L7 , CHISHOLM Landscape Architects April 16, 1991 D icily APR 18 101 South Windsor INLAND WETLANDS AGENCY/ Kaestle BOOS Associates �WNSERYATIDN COMMISSIOM Architects 416 Slater Road P.O. Box 2590 New Britain, Connecticut 06050-2590 Attention: Alan Daninhirsch RE: Additions and Alterations South Windsor High School South Windsor, CT Dear Al: April 16, as requested, I visited the above-referenced project and reviewed the soil erosion and sediment control measures. It appears that these control measures have been installed as specified and are being maintained. If you have any questions or comments, please call. Sincerely, �quj I L...* Sylvia M. Chisholm Evans & Chisholm SMC:f tp 203-677-5301 4 BEECH STREET-FARMINGTON,CT. 06032 PROJECT NAME/LOCATION APPLICATION # DATE /S or-7 90 NOTE TO THE FILE: Re: W e�f au s;�e o IL /l 3 d TA e r e a�c Ci rt•�.S w/i erc c�! kzo S•T� .ice rvHd�►�cl 0v tr C*u flo Sao �G/c� W.'/�,o� U f�CT is s�,;cl wuvl�l 4c Carc o f Z?,'F 36S$ 4l U` 1 rJ ,i► i �7c rt tn/n; wrctit Cti l/ e /Iv Ct�l� ci•� 3:SO 4 " �` WI n� • /9 o C?' 90 Wr,•►-� 5:�t a 74 //�3 0 %l..crc a�•c a�ea.� w .-e.r o "/f -recCl AAj wa E4 l wj,14!z :12 Signat r APR 18 1991 KAESTLE BOOS ASSOCIATES,INC. South Windsor A R C H I T E C T S INLAND WETLANDS AGENCY CONSERVATION COMMISSION John A.Kaestle Charles W.Boos T.J.Stoutenberg Alan 1.Daninhirsch David W.King Mark J.Weisman Rita C.Hazen Bryan P.Berthold Brian W.Humes W.Albert Jacunski Brian A.Solywoda Lynette M.Sroka Am'r Rusty Malik April 17, 1991 Ms. Elizabeth Warren, Chairperson IWA Conservation Commission South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Re: Additions and Alterations South Windsor High School Wapping Elementary School South Windsor, CT KB #88073 Dear Ms. Warren: We hereby request extension of Permit 90-24P for the above referenced projects. Enclosed please find one (1) copy of a letter from Evans & Chisholm Landscape Architects for the above referenced project, confirming that control measures are installed and are being maintained in accordance with approved plans. Very truly yours, Alan Daninhirsch, AIA KAESTLE BOOS ASSOCIATES, INC. AD:jms Enclosure cc: Howard Fitts (w/enc. ) Bruce Walpole - 0 & G, Industries (w/enc.) Brad Gardiner - 0 & G, Industries (w/enc. 416 Slater Road,P.O.Box 2590, New Britain,CT 06050-2590 (203)229-0361 Fax: 229-5303 APR 18 1931 KAESTLE BOOS South Windsor ASSOCIATES,INC. A R C H I T E C T S INLAND WETLANDS AGEf�CY1 CONSERVATION C01 M#SSIQti John A.Kaestle Charles W.Boos T.J.Stoutenberg Alan I.Daninhirsch David W.King Mark J.Weisman Rita C.Hazen Bryan P.Berthold Brian W.Humes W.Albert Jacunski Brian A.Solywoda Lynette M.Sroka Am'r Rusty Malik April 17, 1991 Ms. Elizabeth Warren, Chairperson IWA Conservation Commission South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Re: Additions and Alterations South Windsor High School Wapping Elementary School South Windsor, CT KB #88073 Dear Ms. Warren: We hereby request extension of Permit 90-24P for the above referenced projects. Enclosed please find one (1) copy of a letter from Evans & Chisholm Landscape Architects for the above referenced project, confirming that control measures are installed and are being maintained in accordance with approved plans. Very truly yours, Alan Daninhirsch, AIA KAESTLE BOOS ASSOCIATES, INC. AD:jms Enclosure cc: Howard Fitts (w/enc. ) Bruce Walpole - 0 & G, Industries (w/enc. ) Brad Gardiner - 0 & G, Industries (w/enc. 416 Slater Road,P.O.Box 2590,New Britain,CT 06050-2590 (203)229-0361 Fax: 229-5303 A a 4 0 Town O-P SOULIII ?A�1� �i 9 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e•co� AREA CODE 203/644-2511 April 25, 1991 Howard E. Fitts 239 Oak Street South Windsor, CT 06074 Dear Mr. Fitts: Re: Application #90-24P, South Windsor High School As you recall on April 18, 1991 I attended the biweekly coordination meeting and questioned when seeding of the disturbed areas would take place and indicated a concern with future potential dust problems (item #18-5 ) . Mr. Gardiner responded by stating that ADC was not expected back on site for another few weeks, the date was very uncertain. It did not sound as though seeding of the disturbed areas was even being considered. I would like to bring your attention to sheet L-10 of the approved plans . Item #2 of the Erosion and Sediment Control Measures states, "Land disturbance will be kept to a minimum, restabilization will be scheduled immediately after disturbance" . The optimum seeding date, in a general sense, is mid April through mid June. Taking advantage of the optimum growing season can reduce costs and prevent ongoing routine maintenance associated with soil erosion and sediment control . In addition, this project is tentatively scheduled on the May 13, 1991 Inland Wetlands Agency/Conservation Commission agenda for an extension of the permit. It would seem that seeding of the site should be resolved prior to that meeting. I would also recommend that someone familiar with the overall site work be present at the May 13th meeting to answer any questions that may arise from either the Agency or the public. If you have questions, feel free to call me at 644-2511 . Very truly yours, <Y. rmCC" J�ofin E. McCahill, Zoning/Wetlands Enforcement Officer JEM/pmm cc: Brad Gardiner, 0 & G Industries Sylvia M. Chisholm, Evans & Chisholm Al Chiulli, Jr. , A.D.C. Construction Elizabeth A. Warren, Chairman, IWA/CC Jerry C. Iazzetta, Town Engineer A CTION C01 INC. 45 EVANS ROAD P.O. BOX 408 ROCKY HILL, CT 06067 PHONE: (203)529-3926 FAX: (203)257-3876 April 30, 1991 John E. McCahill Town of South Windsor Zoning/Wetlands Enforcement Officer 1540 Sullivan Avenue. South Windsor, CT 06074 Dear John: We are in receipt of a letter from your office dated April 25, 1991 with reference to "Disturbed Areas", South Windsor High School. The only disturbed areas presently, are areas under on going construction such as the perimeter of the school on the west and south sides. On the west side is the road to be installed and the present, existing track. Both these areas presently are on hold, do nothing, per request of 0 & G Industries, Inc. This also pertains to the south side. Areas disturbed in front of the school (the easterly side) is activity from another contractor. Any other areas on the site have established a growth of grass as well as still being protected by silt fence. If you have any questions please feel free to contact meat 529-3926. Very Truly Yours, Sebastian A. Guerriero, Manager-Operations c.c. Brad Gardiner, 0 & G Industries, Inc. Silvia Chisholm, Evans and Chisholm Elizabeth A. Warren, Chairman, IWA/CC Jerry C. Iazetta, Town Engineer W. B. E.-GENERAL CONTRACTORS-SITE WORK New haven unc, 7 a l I ,1, Source• U.S. De artment of A riculture Soii.Eonservation Service, Storrs, Connecticut i p 9 eta_ CONSTRUCTION SEQUENCE SCHEDULE x construction Sequence Schedule nw •e•r. f This schedule is intended to show the epproximeta arena and corresponding ,• r•' C. times in which portions of the site will be disturbed. - ? Sequence No. In 0 _ During the summer of 1990. the existing parking and paving in Areas s and C will be removed and now paving will be placed in Areas A, Be C and F. x` .. �� Sequence No. 2a s ELEMEill New building construction at the south end of the existing.high..school - salool. . building will stem in June of 1990 and rill be complete by September 1991. yl� �: r"'�•" Area R, indicated on the Site Identification Drawing, represents the h..iLLUJJ `; ! •' " ' construction roadway during the course of the building construction. After '"•'"• ,,;`�•.', the building addition ie,eompleted, the Area E roadway will become a finishn .:" '�''�'�• •ci -t: paved surface. Sequ.nee No. 32 Area HS2 andRS3 represent the existing football field and running track. _ _ '•.a• .._ _ , •�� t Prue Jana of 1990 until the spring of 1991, this area will be used to stockpile the topsoil which is removed from the building construction area. '•i_1�� _j, 1 Frog the spring of Y991-untU the fall of 1991, this area will be regraded and a now football field and running track will,be installed. •. ? q Sequence ft. 63 ''.'... A � -"• � I Area HSI,which is presently the existing high school football field, will Tb18 drawing iS intended �- ` ' :a v ' not be disturbed until after the 10 football season, Between November of for identi€.yinA site 1990 and the fall of 1991, this area will be regraded and the practice areas only. 99 O O a �I T `' •# baseball field and socgse field will be installed, Topsoil the! is removed. •^ from Parking Area C and Roadway r during the summer of 1990 will be stored.. HSI thru NO represent between Roadway r and the existing football field fence until the HSI era is Athletic Fields, Track and .., • u .•'.i � '"•t': regraded. . r. L existing Tennis Courts. . . Wt x :. Sequence No. St .. •:ter "A^ tfiru "F" represenC }Fp(3N O� t Areas HS/, Rs6 and NS7 will.not be disturbed Until the spring of 1992 at bituminous coge,Iete:paved g - SCHOOL" - 17 which time fields H36 and R37 will be regraded and reseeded and Area H56. _ Y which is presently ti!:student parking lot, will be regsad•d:ani seeded a a areas. - • our „.'. new softball li•la; .. - text$ and "Y". represent the •t• •. •;. Sequence Na. 6g. two new court yards in the Phase I Area, The finished paving course for Areas A a, C, D and,F will be installed during the summer of 1991. Area c, which is the existing parking lot for the elementary school, will also be resurfaced during the sumnar.of 1991. ' •+1•+ •• ' Sagnence No. 7n - e• 1 ,. w. �. �. A sanitary sewer line will be installed during the a was ar of 1990 which will * F. '' �""•"v...` disturb the grass era on the scat and south sides of the Napping Elementary school. _ 'I- '1 - •�`. I sequence No—at .. d" Two new tennis courts may be,added to the project by Add Alternate No. I. If the alternate is acceptsd. the,two new tennis courts would be added to Area -::x- HSS during the.summer of-1991. -If the add alterneto'is not accepted, Area �. Rod will not be diaturbedat all&WIng.ther course of the,project .... ... .. .. .. : .. ... ��.�,•• F �.r P ..G .".rat;.. .a;' 'r'r d.'':, 'yerl + . �' � �'-0' a Hand Delivered May 2, 1991 Coordination meeting MEMORANDUM: TO: Brad Gardiner, 0 & G Industries FROM: John E. McCahill, Zoning/Wetlands Enforcement Officerf/fl DATE: May 1, 1991 RE: Letter dated April 25, 1991 regarding "Land Disturbance. . . " As you requested, Edd Wilcox and I walked the site today. I indicated to Edd during our walk that there were a few areas where - -'-- temporary vegetative cover should be established. This would include: 1) the area southerly of the existing school (along Plum Gully Brook) , 2) the area northerly of the existing Nevers Road exit (where waterlines were installed) and, 3) the entire area northerly of the existing school (where the future addition will be built in the fall) . Establishing temporary vegetation will help reduce maintenance associated with soil erosion and sedimentation control and aid in controlling dust problems . During our walk there were also areas at the southerly end of the school where the silt fence was washed over and catch basins were unprotected. The roadway in that area should also have some cross- slope protection (i.e. , staked haybales) and the plunge pool should be cleaned out. I have attached information from the approved plans and the "Guidelines for Soil Erosion and Sediment Control" to justify the request for temporary vegetative cover. If you have any questions feel free to call me at 644-2511 . Pm Enclosures FRc�n S H EET L- 1 O or- Erosion and Sed meat "Control Wasures 1. All erosion and sedimentation control measures and hay bale filter barriers shall be inspected by the contractor daily and immediately after period of rainfall. Repair and/or replacement of erosion and sedimentation control measures will be made as :soon as the need is known. The contractor will be responsible for the implementation and ma:ntenance of erosion and sedimentation control measures on the site. It is intended that all erosion and sedimentation control measures sha conform to 'Guidelines for Soil Erosion and Sediment Control as 2repared by the Connecticut Council of Soil-an Water nservltion, anuary 2. Land disturbance will be kept to a minimum., restabilization will be scheduled immediately after disturbance. 3. Hay bale filter barriers will be installed along the toe of all critical cut and fill slopes. 4. Catch basins will be protected with hay bale filter barriers throughout the construction period and until all disturbed areas are thoroughly stabilized. 5. Erosion and sediment control measures will be installed prior to construction whenever possible. 6. Additional control measures will be installed during the construction period if necessary or required. 7. Fabric filter barrier of Fibretex 150 grade as manufactured by Crown Zellerback, or approved equal may be used in pIx:e of hay bales. 8. Sediment removed from control structures shall be disposed of in a manner which is consistent with the intent of the plan. rocks, logs, stumps, building debris, and other objectionable material that would interfere with, or prevent construction of, satisfactory fills. It should be free of stones over • two (2) inches in diameter where compacted by hand or mech- anical tampers or over six, (6) inches in diameter where compacted by rollers or other equipment. Frozen material shall not be placed in the fill nor shall the fill material be placed on a frozen foundation. h. Stockpiles, borrow areas and spoil areas shall be shown on the plans and shall be subject to the provisions of this measure. i. All disturbed areas shall be stabilized. 6. INSTALLATION REQUIREMENTS a. All graded or disturbed areas including slopes shall be protected during clearing and construction in accordance with the approved sediment control plan until they are permanently stabilized. b. All sediment control practices and measures shall be constructed, applied and maintained in accordance with the approved sediment control plan. C. Topsoil required for the establishment of vegetation shall be stockpiled in amount necessary to complete finished grading of all exposed areas. d. Areas to be filled shall be cleared, grubbed and stripped of • topsoil to remove trees, vegetation, roots or other objectionable material. e. Areas are to be topsoiled according to the measure for Topsoiling (page 7-13). f. All fills shall be compacted as required to reduce erosion, slippage, settlement, subsidence or other related problems. Fill intended to support buildings, structures and conduits, etc. , shall be compacted in accordance with local requirements or codes. g. All fill shall be placed and compacted in layers not to exceed eight inches in thickness. h. Fill material shall be free of brush, rubbish, rocks, logs, stumps, building debris and other objectionable materials that would interfere with or prevent construction of satisfactory fills. i. Frozen material or soft, mucky or highly compressible materials shall not be incorporated into fills. j. Fill shall not be placed on a frozen foundation. k. All benches shall be kept free of sediment during all phases. of • development. 7-20 l rTNVrv1 L2WA-W% 6AJvr* a TnK Vvi� CKVaL�+W RAW SEQI11IeA#T ca&rl(ZOti 10 1 . Seeps or springs encountered during construction shall be handled in accordance with the measure for Subsurface Drainage or other approved methods. M. All graded areas shall be permanently stabilized immediately following finished grading. (See the Permanent Vegetative Cover measure (page 6-5), Sodding measure (page 6-13) and the Trees, Shrubs, Vines and Ground Cover measure (page 6-15). If final grading is to -be d n 30 days after land r ante activities cease teMDorary soil stabilization measure shall be a lied immediatel see the emporary Vegetative Cover measure [page 6-1 and the Temporary Mulching measure [page 7-1]). n. Stockpiles, borrow areas, and spoil areas shall be shown on the plans and shall be subject to the provisions of this measure. 7. MAINTENANCE All structural , nonstructural and vegetative sediment and erosion control practices implemented during land grading operations shall be maintained according to requirements outlined in their respective measures. i 7-21 Chapter 6 - VEGETATIVE MEASURES A. TEMPORARY VEGETATIVE COVER (TV) 1. DEFINITION Establishment of temporary vegetative cover on soils exposed for periods of up to 12 months. 2. PURPOSE To temporarily stabilize the soil and reduce damage from wind and/or water erosion and sediment deposits until permanent stabilization is accomplished. 3. APPLICABILITY On exposed soils that have the potential for producing sediment and causing on- or off-site damages. 4. INSTALLATION REQUIREMENTS a. Site Preparation (1) Grade as needed and feasible to permit the use of equipment for seedbed preparation, seeding, mulch application, and mulch anchoring. All grading should be done in accordance with the measure for Land Grading (page 7-17). (2) Install needed erosion control measures such as diversions, grade stabilization structures, sediment basins and grassed waterways. b. Seedbed Preparation Apply limestone and fertilizer according to soil test recommendations such as those offered by the University of Connecticut Soil Testing Laboratory. Soil sample mailers are available from the local Cooperative Extension Service office. If soil testing is not feasible on small or variable sites, or where timing is critical , fertilizer may be applied at the rate of 300 pounds per acre or 7.5 pounds per 1,000 square feet of 10-10-10 or equivalent. Apply limestone (equivalent to 50 percent calcium plus magnesium oxide) as follows: Soil Texture Tons/Ac. Lbs/1000 sq. ft. Clay, clay loam and high 3 135 organic soil Sandy loam, loam, silt loam 2 90 Loamy sand, sand 1 45 Refer to county soil survey report for soil textures at the site. 6-1 Figure 6-1 - Temporary Seeding Rates and Oates OPTIMUM SEEDING OPTIMUM SEED SEEDING RATES (pounds) DATE1,3 DEPTH 0 SPECIES Per Acre Per ft. (inches) Ul Annual ryegrass 40 1.0 3/1 - 6/15 0.5 v a; 8/1 - 10/1 La Perennial ryegrass 40 1.0 3/15 - 6/15 0.5 8/1 - 10/1 C Winter rye 120 3.0 4/15 - 6/15 1.0 8/15 - 10/1 0 Oats 86 2.0 3/1 - 6/15 1.0 rn � ro 8/1 - 9/15 m 0 Wheat 120 3.0 4/1 - 6/15 1.0 8/15 - 10/1 a Millet 20 0.5 6/1 - 7/1 1.0 0 5/15 - 8/15 N Sudangrass 30 0.7 5/15 - 8/15 1.0 Buckwheat 15 0.4 4/1 - 9/15 1.0 -s Weeping lovegrass 5 0.2 6/1 - 7/1 0.25 0, 1/ May be planted throughout summer if soil moisture is adequate or can be irrigated. Seed at twice the indicated depth for sandy soils. o / The fall seeding dates may be extended 15 days in the coastal towns of New London, Middlesex, X New Haven and Fairfield Counties. Source: U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. (2) Where the soil has been compacted by construction opera- tions, loosen soil to a depth of 2 inches before applying fertilizer lime and seed. (3) Apply seed uniformly by hand, cyclone seeder, drill , cultipacker type seeder or hydroseeder (slurry including seed and fertilizer). Hydroseedings, which include mulch, may be left on soil surface. Seeding rates must be increased 10 percent when hydroseeding. d. Mulching See guidelines in the Temporary Mulching measure (page 7-1). 6-3 PROJECT NAME/LOCATION iv W"�lSo:t -�cil„ Sr� c7 t APPLICATION # DATE NOTE TO THE FILE: Re: i G CJ r r-e , G „tit v�, Li "L-c 3 Arc, 0� -42u b Sig a re Jar"S _ - v��,r,,� � , �/ - Obi► t -t Z "� �,�i�:.0 � s (DB. PERMANENT VEGETATIVE COVER (PV) 1. DEFINITION Establishment of permanent vegetative cover on exposed soils where perennial vegetation is needed for long term protection. 2. PURPOSE To permanently stabilize the soil , to reduce damages from sediment and runoff and to enhance the environment. 3. APPLICABILITY On exposed soils that have a potential for producing sediment and causing on or off-site damages. 4. PLANNING CONSIDERATIONS Provisions shall be made for surface and subsurface drainage, as needed, and for disposal of runoff without causing erosion. . Facili- ties may include diversions, grade stabilization structures, stream- bank stabilization or waterways. Consider establishing permanent seeding in stages. For example, establish vegetation on cut or fill slopes every 15 feet vertically or 30 feet horizontally. 5. INSTALLATION REQUIREMENTS a. Site Preparation Grade as needed and feasible to permit the use of conventional equipment for seedbed preparation, seeding, mulch application and anchoring, and maintenance. All grading should be done in accordance with the measure for Land Grading (page 7-17). b. Seedbed Preparation (1) Apply limestone and fertilizer according to soil tests such as those offered by the University of Connecticut Soil Testing Laboratory. Soil sample mailers are available from the local Cooperative Extension Service Office. If soil testing is not feasible on small or variable sites, or where timing is critical , fertilizer may be applied at the rate of 300 pounds per acre or 7.5 pounds per 1,000 square feet using 10-10-10 or equivalent. In addition, 300 pounds of 38-0-0 per acre or equivalent of slow release nitrogen may be used for topdressing. Apply ground limestone (equivalent to 50 percent calcium plus magnesium oxide) as follows: Soil Texture Tons/Ac. Lbs/1000 sq. ft. Clay, clay loam and high 4 180 organic soil Sandy loam, loam, silt loam 3 135 Loamy sand, sand 2 90 6-5 a- r Refer to county soil survey report for soil textures at the site. (2) Work lime and fertilizer into the soil as nearly as practical to a depth of 4 inches with a disc, spring tooth harrow or other suitable equipment. The final harrowing or discing operation should be on the general contour. Continue tillage until a reasonably uniform, fine seedbed is prepared. All but clay or silty soils and coarse sands should be rolled to firm the seedbed wherever feasible. (3) Remove from the surface all stones two inches or larger in any dimension. Remove all other debris, such as wire, cable, tree roots, pieces of concrete, clods, lumps or other unsuitable material. (4) Inspect seedbed just before seeding. If traffic has left the soil compacted, the area must be retilled and firmed as above. C. Seeding Dates Spring seedings usually give the best results. Spring seedings of all seed mixes with legumes is recommended, however late summer seedings prior to September l can be made. When crown vetch is seeded in late summer at least 35 percent of the seed should be hard seed (unscarified). The recommended seeding dates are: April 1 through June 1 * August 15 through September 1 With the exception of crown vetch, the final seeding date may be extended 15 days in the coastal towns of New London, Middlesex, New Haven and Fairfield counties. d. Seeding (1) Select a mixture from Figures 6-2 or 6-3 or use mixture recommended by the Soil Conservation Service. Inoculate all legume seed with the correct type and amount of inoculant. (2) Apply seed uniformly by hand, cyclone seeder, drill , cultipacker type seeder or hydroseeder (slurry including seed and fertilizer). Normal seeding depth is from 1/4 to 1/2 inch. Hydroseedings which are mulched may be left on soil surface. (3) Where feasible, except where either a cultipacker type seeder or hydroseeder is used, the seedbed should be firmed following seeding operations with a roller, or light drag. Seeding operations should be on the contour. 6-6 �l '1OwN 8 4 c �� • ° w� 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. �dsoe•coN� 06074 AREA CODE 203/644-2511 Howard E. Pitts May 21, 1991 2.39 Oak Street South Windsor, CT 06074 Dear Hap: Re. APP&adon 490-24P - SOL%* Winds- M-8h Sdiaa At the May 20, 1991 meeting, Commissionha South Windsor Inland Wetlands Application #90-24P with all Original and nd standard extension of . The three areas of concern must be stabilized b conditions. APPli cation Y June 15, 1991 . May 21 #90-24P becomes effective May 21, 1991 and expires o Y , 1992. n Ve tru y yours, —/ Phyllis Mann, Recording Inland Wetlands Agency/ Secretary Conservation Commission cc: Marcia A. Banach, Director of Planning Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure I PRODUCT D8807-S - - _ FOLD AT(1)TO FrT DE7=ENVELOPE II 'S DATE: '/ �J l PRIORITY n� o VCfyT�/ �/ 4W EI URGENTI 0 0 & G INDUSTRIES, INC. VV��-- °- �� FILE NO. 11 SOON AS POSSIBLE LL. 112 Wail St., P.O.. Box 907 �y7 ❑NO REPLY NEEDED TORRINGTON, CT 06790 iIISSVVJJ NN\\II ATTENTION: SUBJECT: - o Z 3 9 s �SLZSriJdG� TG-�7,.:/G >�2 II - - 3 ' _W I r, wv o z � S i W t << ' t3 Wiac..4ri c3 SIGNED: DATE OF REPLY: REPLY TO: - } J (L W 0: SIGNED: SENDER: MAIL RECIPIENT WHITE AND PINK SHEETS. � `- REM PIENTTWRIT IwPL�Y RETUR�i'W�f IttF�6 i'1�18; ? DR,S CONSULTANts, INC i U ChclthUi TMA!-Till Road aittord,Ct 660d Auguit 2o, 1991 (103)086•469S ,RECEIVED AUG 2 1 1991 Mr; Brad Gardiner Project ISO 0 & G xndustriee t Inc,P.G. A S� W�.tidsof:� High School South �i BOX Cf607$ V bi Attfry Compaction . PURPOSE The purpose of thie study was to establish -Vibration intensities surroundinq the South W'indgor High Sch661 Ptojaot, slid the ptiaaible sff6dt ti fiousas whidh abut the k► `o j&ot site s PROQrkpU 2E A SXopa Indicator p� fttabld vibratioij seismo rsph iWas plsoe ad jacant to the property line th frbht o rich hduse And en 1fi +�f�anil ; �tafld ten t�fi coi�tp�totdf (sp�SS Wald started acid df:�ivah tiff the t �b t peat the Aebphohaa A hialogtaM .wr�a %add to atabii!bW'NA9 h'Z+ihAc1ha `vibration is j shd then. a aedw 'teat at oddh �l ft utiii2dd •to a tabliah ff;agti+r�ioy ldVdl§ bf the Vibrations, ' Aaau ta- 06 .Kash ift-�►ppabd 9 ` �ISCt16SI0�t - ReadihIa were tsk&h Very close to the adtual cdmpaction aita although th6 homes are furth6t AWayi The hoighb6ta art* Kdatiie td this projaot, &hd wa did riot want to further a AVAta thet�� Won vote batvdah twarity-hies to thibtyafbur foot troth tha�dpmpaotdt Tanta eight thtoulh tah here meaaueAd, oris hufidtad- feat fiabf4 the . crmpAatorp dialdhally froifi sits thiAar� The §"Ufidf:waa vary aatursted from a gfeat deal Of tditt tthich had fklGh kOdght-ly, This ;May have cbhtributed to the k6t6fdinJ Of f u ri iota w i3oh t ( f`a if efs h$fi antir�ipatad, bureau of Mihad RKporf;af bf tivesti atib is . 0007 a Stktdtufa Rdspofiaa and basaga produdad Ay Gfftf d Vibfati6fi a ib based on short duration, iffiPUldiVa saidiftid waVeft, &iflde the. dahvaotidti Of materials for d tuhhifig tram is of A idh er dukati6ft &hd friar►hdcdeaery wa Should ma .ntain la�vela ahid inay be low r than �ru 13611868 by Chid study, CONCLUSION I faal that thO Vibration reading9 should be maintained at iatrel a ificft to Aitt�aad , , Condia6kifig that the readih4d tak6h at the cxaaaat jifncst and d -fiot 6xc6ad s : ;ttiaec, f•( �idifi + , that Wdinio Vi katiaha will a proadh the Koof titand d. ava , t of peot poaeibility for dtftdturai dam gc�a froi saiainio VibrKt�of~K ;tb thasa homda is axtremaly kaiirt�te at thi.a site R*spaotfu�.l.y submit - DoUgla R. Simms President Page 2 0 & G industries, Inc, South Windsor kigh School - Proj-ect 250 Aogugt 201 1991 Vibratory compaction APPENDIX A TIM BITE bxB�14�iCE EtGgEgT READI1dQ 9!35 Hausa i 34 ' to fence 71 it J,�sc 9.37 " gams z31: �i/s�sos 9140 Same 305 "?ciao& 20 Hz 9 50 House 2 31, to f whoa 6291 11/1 80 6 91.52 of . gaze .327 11/9604 31 Hz 96959 Houge 3 291 to fence 1264 #!/sec, 10:00 game &221 "/900& 21 Hz 10+ 07 House 3 1001 to compactor �203 i0/adoo 22 Hz 10. 10 sate � 215 i1/96-Cs 22 Hz These tests were taken at the roject roperty Tina, The 46o hone was, firmly oauplod to the earth with a spA6 and a sandbag+ tibutliag R, simma was the techhidian of records WNP -� AOM -4 Pao 7rrTrT Tr HIM H MM r 1 N �eN M if IRIOU ANMI 11 Q " M= Q z r+ � n 1t'�uau ry-m �����-- 46. N r}t i rl rq it. ! to xen � n M Fill H � ' -" F- �M r � 6 .. s^0 'd ^+C9tpeee Insuo:-r ' Oi4'rr-, I DRS COHAU i t dht t f I hG: Hee4e3�� r a �or MUM. ut 1 H N r "aVIhi7'�KW�ck+� LiL M il�lt r � �,, cn I..f "3 1,n O 1 A F aj _ W t? r F , LC 11 Qr% Vr i f1MIII QITO 1 I 1 nIm ` X a PLANNING DEPARTMENT _ TOWN OF SOUTH WINDSOR ' 1540 SULLIVAN AVE- SOUTH SOUTH WINDSOR, CT 06074 (203) 644-2511 Date �� �� TO: 2 3 9 101( 4- f- SCy-/ �t-','��cl�o C i 0607 z/ WE ARE SENDING YOU: M P&Z initial plans 0 Drainage comps r-1 P&Z final plans 0 Bond estimate requests O Inland Wetlands plans O Bond reduction requests O Final plans for filing O Change order form ® Other w --es rr +tpla; nos 0 Correspondence Copies App. No. Project THESE ARE TRANSMITTED as checked below: O For review and comment ® For your file M For your use 0 Returned with revisions O As requested 0 Other PLEASE RETURN/COMMENT BY: COMMENTS: a A4 - t z- q h0`t I ,M e�i �Vievt�1»e c� -L'I.e -�ac� •i-k-J C;C;r�+D�tii+✓�T'�. kc� LIE'n C'4Ce�V�C1 �:� � �i^it'irh2C•_��Ytc, Quo"} y C•�,e4<'— Cvr<cerns -1'ko,� -�;w1 T b A tz p-yea 62 Copy to: From: A TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS COMPLAINT FORM Date ;?7 C' Taken By Name Verne g. Naanne Hill Address 36 1`Tountain Viety Road Phone 644-6?86 Time 9� A. M '� P. M. Complaint—(Please be clear, but brief) We are concerned about damage to our house foundation, plaster walls , inground pool and to our well.The extreme ground vibrations during the earth compaction process for the installation of t'ie high school field track, which abutts our property, is .the cause of our concern. Since this work began we have had a drop in our well level on 3 separate occasions causing us to be without water. Additionally our well water now contains a fine grit that is evident by the stains to our plumbing fixtures. Route To Final Action Date ;`ji - r✓ 1540 SULLIVAN AVENUE SOUTH WINDSOR. C R coT' AREA CODE 203/644-2 a� o�S� AX ti March 24, 1992 r � JJJ Mr--. Brad Gardiner , Project Manager f1 ?; G Industries 112 Wall Street Torrington , Ot. 06790-0907 Dear Ecr,ad: F e: Ath.1eztie Fields l F-ecent.l y I ].ool::ed at the field south of Ayers Road a.nd east of the H:i ral•r School 's main driveway. There are some concerns about this .Id. The field is uneven acid needs to have the grading finished. The cakioris call for• the surf. a to be approved by the Architect tyefr'�r fa seec:l:inct. If ttre area- was seeded for winter, cover as an erosion control method , what is the time table for the upcoming cie- asor`I as fair as:i finish grading , seeding , etc. Mome of the trees planted still have ropes around the tree trunk , wl-ien will these be removed. Sincerely, k::ar l R. Rei chl e F;LAper•intenderA of Parks and Grounds cc: Jerry lazzetta, Town Engineer / Michael Gantick , Director of Public Works Patrick Hankar•d , Director• of Buildings & Grounds EVANS CHISHOLM Landscape Architects April 20, 1992 Kaestle Boos Associates Architects 416 Slater Road P.O. Box 2590 New Britain, Connecticut 06050-2590 Attention: Charles W. Boos RE: Additions and Alterations South Windsor High School South Windsor, CT Dear Chuck: April 20, 1992, as requested, we visited the above-referenced project and reviawod the sflii Arnsinn and saelimcnt r_nntrol m€�a i1r _ Tt rDpars that these control measures have been installed as specified and are being maixitni.nari. If you have any questions or corcamtts, please call. Sincerely, Sy�M. isho]rn Evans & Chisholm SMC:ftp 203-677-53..1 4 BEECH STREET•FARMINGTON CT QE1032 APR 30 W2 KAESTLE BOOS South WindsorASSOCIATES,INC. INLAND WETLANDS AGENCIt1 A R C H I T E C T S CONSERVATION COMIMISSM John A.Kaestle Charles W.Boos David W.King Mark J.Weisman Bryan P.Berthold Brian W.Humes W.Albert Jacunski Brian A.Solywoda Lynette M.Sroka Am'r Rusty Malik April 27, 1992 Ms. Phyllis M. Mann Inland Wetlands Agency, Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Additions and Alterations South Windsor High School Phase I South Windsor, CT KB #88073 Dear Ms. Mann: We are requesting an extension for Application 90-24P-South Windsor High School and for the associated progress report. The reason that the authorized activities were not completed within the time specified was because of the size of the project. Very truly yours, Laura Gilliam-Piersall KAESTLE BOOS ASSOCIATES, INC. LGP:jms cc: Howard Fitts 416 Slater Road,P.O.Box 2590, New Britain,CT 06050-2590 (203)229-0361 Fax: 229-5303 40*" $f4 a ?40&U&Ot w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOB•coN� AREA CODE 203/644-2511 May 12, 1992 Mr. Howard E. Fitts 239 Oak Street South Windsor, CT 06074 Dear Mr. Fitts: ,Re: Application 490-24P, South Windsor High School At the May 11, 1992 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of Application #90-24P with all original and standard conditions. Application #90-24P expires on May 21, 1995. V Y truly yours, tliz2eth A. Warren, Chairman Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Director of Planning Planning & Zoning Commission Town Engineer TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON M it KA61- C;-AWt-j C j< Phone No. (A4-7,�1/ Address I S llo S01-LJ VAr4 AVE-_ Site Name aSoOTH WjA(DSor, P&Z No. qo- 7-4 Owner TDQ Al ®r Sdt4Th Wi N og < $Qe Phone No. (0 VK'-Z'yl/ Contractor Signature of Owner °O Date: 51,VO — Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) 71 e c h a.,i.-i e is 4,r �t� r-►S{u.�t��z�l�G� � � PC-Z� he L�Cec� 4WIct ceO-f" /0 7 -,e Bode if /td®ham+ Reason for Change: (Why is change required) %he 7-ewti h45 reeew-a c greeif X-vi" Ale C1e&t 0 Y A.? /05-1rl(4,/-Z , C- a awkw rum 4� p I& /ItS/i f-4.ov 5 mac® ar t �ebi"el e-$e bpw�et J'�i �f{e� i*rrl fL-s, APPROVALS: (As Req fired) Dir. Of Planning D (( Xr Date: U 2- Town Engineer Date: - Dir. of Public Wor zs Date: 2W 4)--- Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department