HomeMy WebLinkAboutTerra Technologies Subdivision TOWN OF SOUTH WINDSOR
PLANNING& ZONING COMMISSION
APPLICATION FORM
RECEIVED , "
[Receipt
tion No: C1,3 -3/� f ,
Receipt Date:
MAY 2 3 2003
No:
SOUTH WINDSOR PLANNING DEPT. r
r
APPLICANT: Terra Technolocries Grou LLC & Chapel Road Group, LLC c/o Mark Zweifler
PROJECT NAME: Chapel Road Subdivision
ADDRESS: 17 Rose Avenuet West Hartford CT 06110
OWNER OF RECORD ON LAND RECORDS: Estate of Evelyn F. Johnson, c% Gary N. Johnson, Executor
ADDRESS: 770 Burnham Street, South Windsor, CT 06074
COMPLETE LOCATION OF PROPERTY: Chapel Road near the intersection of Chapel Road and Ruaby
ASSESSOR'S MAP# Lane
�$_ PARCEL#- 4q ZONE_gg./gR_0
NAME, ADDRESS, TEL& FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED:
Judy Schuler { Project Engineer. Design Professionals Inc. 165 South Satellite Road
South Winrlsnr. CT 06074 Al 8759, Fax 291 8757
Estimated presentation time:
THIS APPLICATION IS FOR: (Check all that apply):
❑ Zone Change to (Public Hearing required and Certified letter to abutters required)
❑ Subdivision/Resubdivision ❑ Open Space Subdivision (Public Hearing Required)
9 Subdivision Dd Minor ❑ Major
❑ Resubdivision (Public Hearing Required)
❑ Minor❑ Major
❑ Conditional Approval
❑ Special Exception to Article (Public Hearing, Certified letter to abutters required)
❑ Site Plan of Development
❑ General Plan of Development
❑ Earth Filling (Sec. 15) and/or Earth Removal (Sec. 14 - Public Hearing Required)
❑ Regulation Amendment ❑ Zoning ❑ Subdivision
(Attach proposed amendment) (Public Hearing Required)
❑ Temporary and Conditional Permit for (Public Hearing Required)
❑ In Law apartment/Accessory Apartment (Public Hearing Required)
❑ Major Home Occupation for (Public Hearing Required)
❑ Other (explain in detail)
An Application Pending sign is required to be posted on the property for all applications ten (10) days
prior to being heard by the Commission.
Si a of icant Si
operty Owner
66
��0
DESIGN PROFESSIONALS, INC. RECEIVED
civil engineers ♦ planners ♦ surveyors MAY 2 3 2003
gis ♦ gps ♦ landscape architects
SOUTH WINDSOR PLANNING DOT
Transmitted via certified mail
May 23, 2003
Dear Current Abutting Property Owner
Re: Terra Technologies Group, LLC DPI Project No. 02-1701
Chapel Road
South Windsor, Connecticut
In accordance with regulations of the Inland Wetlands Agency and the Planning&
Zoning Commission, we are required to notify you that an application has been filed on the
property abutting yours and is subject to a hearing(s) by the Inland Wetlands Agency and
Planning&Zoning Commission. The applications and plans are on file with the South Windsor
Planning Department in the Town Hall.
As an abutting property owner you are invited to the hearing(s)to ask questions and/or
give comments, however, you are not required to attend. You may also submit written comments
regarding the application(s)prior to the meeting if you so desire. For further information
regarding the specific date this application will be heard,please contact Kelli Holmes,
Administrative Secretary, Michele Lipe,Deputy Planning Director, or Jeffrey Folger,
Environmental Planner, at the South Windsor Planning Department at 644-2511, ext. 253, 252 or
229,respectively. Thank you.
Sincerely,
DESIGN P FESSIONALS, INC.
By:
Peter . DeMallie
Principal
cc: Jeffrey Folger
Marcia Banach
Mark Zweifler
165 South Satellite Road, South Windsor,Connecticut 06074
Tel:(860)291-8755•Fax:(860)291-8757
Email:dpicivil@aol.com
Country Homes RECEIVED
Chapel Road MAY 2 3 2003
South Windsor, Connecticut
DPI Project No. 02-1701 SOUTH WINDSOR PLANNING DEPT,
Direct Abutting Property Owners
Ma /Lot No. Property Owner Mailing Address
8/60 Barbara.C. Murray 712 North King St.
South Windsor, CT 06074
Connecticut Light&Power Co. P. O. Box 270
Hartford, CT 06141
State of Connecticut State of Connecticut
Department of Transportation
Office of the Commissioner
2800 Berlin Turnpike
P.O. Box 317546
Newington, CT 06131-7546
14:36 FAX sso 953 1209 cELEBRATION HOMES
Z oos
RECEIW
MAY 2 3u
Seller: Estate of Evelyn F. Johnson SOUTH MNDSDR PLANNING t)cWT
Buyer: Terra Technologies Group, LLC
Property: ,Approximately 3.8 Acres located on the
south side of Chapel Rd. at the intersection of
Rugby Ln in South Windsor, CT
Map _ _-Block_-Loty
The undersigned hereby agrees that Buyer may sign as
undersigneds agent for purposes of filing and pursuing land use
approvals in the Town of South Windsor.
Estate of - 1 F. Johnson
By: Date: °v at---,
Ga Johnson, Executor -~-
--__------__, __ -------------
VVJ 00'VT rJ1T 7nn7 OT 17T
NN Se
C: Z;) 70� O-P sioa� V&U&ot
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R.
• ��
r�OSOR•Co AREA CODE 860/644-2511
May 30, 2003 7002 3150 0002 0356 2734
CERTIFIED MAIL
Town Clerk
Town of East Hartford
740 Main Street
East Hartford, CT 06108
Dear Madam/Sir:
Re: Notice to Adjoining Municipalities—Appl 03-31P, Chapel Road Subdivision
In accordance with Connecticut General Statutes concerning notification to municipalities regarding
Planning&Zoning Commission applications that could affect the abutting town,we hereby notify you
of the application submitted by Terra Technologies Group, LLC &Chapel Road Group, LLC.
This application is tentatively scheduled to be heard by the Planning&Zoning Commission on
June 24, 2003, at 7:00 p.m. in the Madden Room of the Town Hall. If you have any question,please
feel free to contact the Planning Department at 644-2511, ext. 253.
Very truly yours,
Michele R. Lipe,AICP
Assistant Director of Planning
MRL/kah
SOWN SF4
Town 0-Ye Soum
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
Soe•co AREA CODE 860/644-2511
May 30, 2003 7002 3150 OOD2 0356 2727
CERTIFIED MAIL
Town Clerk
Town of Manchester
41 Center Street
Manchester, CT 06040
Dear Madam/Sir:
Re: Notice to Adjoining Municipalities—Appl 03-31P, Chapel Road Subdivision
In accordance with Connecticut General Statutes concerning notification to municipalities regarding
Planning&Zoning Commission applications that could affect the abutting town,we hereby notify you
of the application submitted by Terra Technologies Group, LLC &Chapel Road Group, LLC.
This application is tentatively scheduled to be heard by the Planning&Zoning Commission on
June 24, 2003, at 7:00 p.m. in the Madden Room of the Town Hall. If you have any question,please
feel free to contact the Planning Department at 644-2511, ext. 253.
Very truly yours
Michele R. Lipe,AICP
Assistant Director of Planning
MRL/kah
e: In-house referral Appl_03-31 P, Cha el Road Resubdivision
From: Fred Shaw
To: Holmes, Kelli
Date: 6/5/03 2:20PM
Subject: Re: In-house referral Appl 03-31 P, Chapel Road Resubdivision
WPCA approval is required
>>> Kelli Holmes 06/02/03 03:15PM >>>
Please find attached the in house referral for the above application. Thanks-Kelli
CC: Doolittle, Jeff
South • •
Planning Department
Memo
To: Judy Schulyer
From: Michele R. Lipe,Assistant Director of Planning
Date: 06/11/03
Re: Appl#03-31 P, Chapel Road Subdivision
Please be advised of the following comments on the above referenced application.
1. Driveway shown on Lot#3 should be shown outside of the State Drainage Easement.
2. Chapel Road is considered a collector street—shared driveway should be provided for the new lots
as provided in Chapter 4, Section B.4.a of the Subdivision regulations.
3. WPCA approval is required.
I will forward any additional engineering comments and/or landscaping comments as I receive them.
Thanks,
Michele
1540 Sullivan Avenue,South Windsor,CT 06074 PH 860-644-2511,ext.253 Fax 860-644-7280
e-mail lipe cDsouthwindsor.org
0 Page 1
MEMORANDUM RECEIVED
To: Marcia Banach, Director of Planning JUN 1 7 2003
From: Jeffrey B. Doolittle, P.E., Town Engineer SOUTH WINDSOR PLANNING DEPT,
Date: 6/17/03
RE: App 03-31 P, Terra Technologies Group
I have reviewed the Subdivision Plan for 3 lots on Chapel Road by Terra Technologies Group dated
May 20, 2003. 1 have the following comments:
1. Additional spot grades need to be shown to indicate the slope of the driveways. At a minimum
spot elevations need to be shown where the driveways meet the road and at any change in
grade in the driveways. The driveways need to be constructed so water flows out to the road. If
the driveway slopes toward the buildings, there needs to be a 4"-6" hump near the road to keep
road water out of the driveway.
2. To the east side of the houses on Lots 1 and 3 additional spot grades or contours need to be
shown to indicate a drainage swale and where and how the surface water drains around these
houses.
3. The front yards of these lots need to have more spot grades to show how the water will drain
around to the sides and back. Lot 3 has a potential flat spot in the front yard. Lot 2 shows much
of the front draining across the driveway which is not desirable.
4. Provide details and elevations for the sump pump connections from these houses to the catch
basins. The drain pipe from each sump pumps needs to have a check valve and be sloped
toward the catch basins for most of the way. This is to insure the pipes will drain when the sump
pumps are off and water does not flows back into the basements.
5. The 24' dia. drainage pipe on Lot 3 needs to be shown. According to our records, this pipe runs
334 feet south from the CB in front of Lot 3 and ends at a rip rap channel. The outlet is on Lot 3.
6. If the driveway entrance for Lot 3 is to be within the existing curb cut and State DROW, written
authorization needs to be obtained from the State. I suggest the driveway leave this DROW in as
short as distance as possible after entering this lot.
7. A street cut permit with a permanent patch fee will be required for the installation of the water line,
sanitary sewer line and foundation drains in the street ROW.
8. A drain layers permit will be required for the connection of the sanitary sewers for each lot.
9. An application must be submitted to the WPCA for their review and approval.
Please call me(x 245)if you have any questions.
INC.
DESIGN pROFES
civil engin SIO7�7
eers ♦Planners s GALS. INC'.
gis * gPs • IandscaPe architectsfive
To: Ms.Michele R. MEMORANDUM
•Lipe,Assistant Dir
Frorn: ector of planning
Galen R Sem � g
Judy A. Sch prebon,P.E.
uler,Project Engineer RECEIVED
Date: June 20 2003
SUN � 0 2003
Re:
Chapel Road Subdivision SOUTH WINDSDR P
The followinlike-numbered
PLANNING DEPT.
comments-fromare like numbed responses to
JeffDoolittie,P.E. dated J Your
co
ur►e 17,20o3. rents dated June l I, 2003 and E
Planning Department Seven(7)sets of revi
sed 1 The proposed driveway Plans are attached for our use.
lot. Theposed Y takes advantage
Rugby Lie �veway location alsOf the existing curb cut and
and Chapel aximizes paved
Thomas O pel Road,thereby reducing
the distance from �a at the north
State Drainage
of the Connecticut DOT g potential co the drivewayeast corner of the
ainage Easement is acre who con I nflicts at the inte to
file inter documentation acceptable Furthe rsection. We intersection of
O'Connor can b is not required for rmore, �that placement of the have spoken to Mr.
contacted at 860-58 construction . O'Connor stated ciriVewaY over the e
-4504. of the driveway. Should that a permit av v xisting
2, We recognizeYou need fii Y other
on collector at,where feasible, shay izlier information,Mr.
streets-
We feel a • driveways for Conti
With the intersection of Chapel
driveway between contiguous
lots should be
not prudent for the followin pel Road and Ru Lot#2 and Lot#3 is not Provided for subdivision
g reasons: gby Lane. We also feel J prudent because lots
1) A shared a joint driveway for Lot#1 of the Conflict
driveway for Lot#1 and Lot#2 and Lot#2 is
wetlands upland review would increase the
anar►imousI � At the
disturban Y in favor of keeping the jve va meeting on Junes ance to the regulated 2) The The IWAJCC indicated driveways separate to ,2003, the Co inland
Wide lots Proposed that they would remmize the UPI mmission was n
a naturalp sed allow for the preservation p and review area
buffer be the prepare a letter to the PZC
291 corridor. In re subdivision lots and °f existing Vegetation betty
between the ro response to this, the IW between the resider between lot ihsumatter.
3) The
distance p Posed lots, thereby precluAlCC Voted on J ,2003 across Cha adpro��ng awn
ding the con line 18 to include Chapel
RO and are much greater veen the proposed dr, construction of shared drives. 'vegetative bufferthe
I
than what is required b Ys and the si
y town regulations stances for 3. A WPCA application kill be �lations for safe vehicle file proposed drive submitted a hide movements. ways
Engineering Comment Upon subdivision approval.
1. The proposed driveways
added at thedrivewayslope toward
Ilestorm entrance for each o�of the lots. Per your
runoff within the road from entering the three driveW ys°create a 4"-6� A T This
elevations
2• or
de were
houses. tails Were added to the sib will prevent
This is a conceptual plan to planshow dicate the direction of flow
on the required Plot Plan• show
the houses could be built. away and around
Additional details�,illle propoSed
be provided
165 South Satellite Road
Tel: ' South Windsor, Connecticut 06074
(860)291-8755.Fax.(860)Connecticut
Memorandum
To: Kevin McCann, Chair- South Windsor Planning and Zoning Commission
CC: IWA/CC, Town Engineer
From: Elizabeth A. Warren - Chair, South Windsor Inland Wetland/Conservation
Commission
Date: June 23, 2003
Re: Appl. 03-31 P, Terra Technologies, Chapel Road subdivision
The IWA/CC, at its June 18t" meeting, approved the proposed three-lot subdivision. One of
the approval conditions was to include a landscaping easement between lots 1 and 2, and
lots 2 and 3, that would preserve the woody vegetation between the lots; and preserve a
drainage way that directs surface runoff to the wetland in the rear of lot#2.
We understand that the PZC would prefer a shared driveway in this area. However, we felt
that accepting an easement in these areas was a mitigating factor to clearing the properties
and reducing the available wildlife habitat in the area, while maintaining existing drainage
patterns and providing a natural, visual buffer.
1
Pt0y1N Sf4
FO
7-own V/ Soabl C� V&-?.,dL�Ot
C •�
9 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
f�dSOR.CO AREA CODE 860/644-2511
CERTIFIED MAIL
June 30, 2003
Ms.Judy Schuler
Design Professionals, Inc.
165 South Satellite Road
South Windsor, CT 06074
Re: 03-31P, Terra Technologies Group, LLC &Chapel Road Group, LLC
Dear Mrs. Schuler:
We are pleased to advise you that the Planning & Zoning Commission at its June 24, 2003,
meeting approved with modifications application #03-31P, Terra Technologies Group, LLC &
Chapel Road Group, LLC to create 3 lots on 3.7+ acres to be know as Chapel Road Subdivision
property located on the southerly side of Chapel Road, across from Rugby Lane, RR/RR-0 zone
as shown on plans prepared by Design Professionals, Inc., project #1701 and dated June 20,
2003, as revised. This approval is subject to the following modifications:
1. This approval is for 3 lots, numbered 1-3.
2. Drainage and construction for this subdivision is subject to the approval of the Town
Engineer.
3. All lots shall be serviced by the Town of South Windsor sanitary sewer system and are
subject to the approval of the Water Pollution Control Authority.
4. Water shall be supplied to this subdivision by public water.
5. This application is subject to the conditions of approval of the Inland Wetlands
Agency/Conservation Commission, including a bond in the amount of$1000 for wetland
plantings and conservation easement monumentation.
6. Prior to commencement of any site work, a meeting must be held with Town Staff.
7. All plans used in the field by the developer must bear the stamp and authorized signature of
the Town of South Windsor.
8. All easements for conservation purposes, drainage or utilities, that may be required in
connection with the approval of this subdivision, must be submitted on standard Town
easement form where appropriate, to this Commission prior to filing the mylars and issuance
of building permits. All deeds for open space,public improvements and roadways must be
submitted prior to request for Town acceptance; all deeds must be in accordance with the
policy for accepting deeds and must be approved by the Engineering Department and Town
Attorney.
9. Footing drains are required for each house. Prior to the building of any structure on a lot, a
topographic map, drawn to a scale of 1" =40', shall be submitted for each lot in the
subdivision, showing proposed contours, elevations and the location of the footing drains. No
building permits will be issued until the proposed contours, floor elevations and location of
footing drains have been approved by the Town Engineer.
10. If, for any reason, finished grading and other individual lot site work is not completed, the
Town Engineer shall determine the amount of a cash bond to ensure final grading and site
work. This cash bond must be submitted prior to issuance of a Certificate of Occupancy.
11. Quantity estimates must be submitted to the Town Engineer(on the enclosed form) for the
purpose of determining subdivision bonding. All bonds shall conform to the enclosed bond
policy and shall be posted prior to filing the final plans in the Town Clerk's office.
If the developer chooses to submit a Letter of Credit for a one-year term, said Letter of Credit
must be renewed on a yearly basis until completion of the development. If a new Letter of Credit
has not been received within 30 days before the expiration date, the Commission may, at its
option, call the Letter it is holding.
12. A drainage assessment fee in the amount of$150 shall be submitted to this Commission.
13. The Town Engineer's review comments dated June 17, 2003, must be addressed to the Town
Engineer's satisfaction.
14. A Street Trees Easement is required along Chapel Road frontage. Trees to be preserved
and/or planted within the easement are to be finalized with the Tree Warden.
15. The 90' x 90' buildable square for Lot 2 must be shown outside of the easement area.
16. The conservation easement must be monumented as required by IWA/CC regulations.
17. The applicant must submit documentation that a driveway can be constructed on the State
DOT'S drainage right-of-way.
18. No building permits will be issued until all modifications have been complied with, and the
final plans have been filed in the Town Clerk's office.
pppop-
Black and white transparent mylars of Sheets#2 with the above modifications, together with
three blueprint copies of the entire set of plans must be submitted to this Commission within 30
days to be stamped and signed. The letters of approval of this Commission, as well as the Inland
Wetlands Agency/Conservation Commission, must be reproduced on the mylars.
After mylars have been signed by the Commission, they will be returned to you for filing in the
Office of the Town Clerk by October 11, 2003. After filing these plans, a copy of the receipt
must be submitted to the Planning Department.
Sincerely,
kg'-L'c /w
Kevin McCann, Chairman
Planning and Zoning Commission
Enclosures
cc: Town Engineer
Chief Building Official
Assessor
Superintendent of Pollution Control
Fire Marshal
Mark Zweifler
DESIGN PROFESSIONALS, INC.
civil engineers ♦ planners ♦ surveyors
gis ♦ gps ♦ landscape architects
July 15, 2003
Ms. Marcia Banach, Director of Planning RECEIVED
Town of South Windsor
1540 Sullivan Avenue J U L 16 2003
South Windsor, CT 06074
SOUTH WINDSOR PLANNING DEPT.
Re: App103-31P
Terra Technologies Group,LLC &Chapel Road Group, LLC
Chapel Road
South Windsor, Connecticut
DPI Project No. 02-1701
On behalf of our client,Terra Technologies Group,LLC and Chapel Road Group, LLC, I
hereby request a 90-day extension from the original filing date for recording the subdivision
mylars in the office of the Town Clerk. Thank you.
DESIGN PROFESSIONALS,INC.
By:
ud c r
ect Engin r
cc: Mark Zweifler
165 South Satellite Road,South Windsor,Connecticut 06074
Tel:(860)291-8755•Fax:(860)291-8757
Email:dpicivil@aol.com
DESIGN PROFESSIONALS, INC.
civil engineers ♦ planners ♦ surveyors
gis ♦ gps ♦ landscape architects
July 16,2003
Ms. Marcia Banach, Director of Planning
Town of South Windsor RECEIVED
1540 Sullivan Avenue
JUL1 7 2003
South Windsor, CT 06074
SOUTH WINDSOR RLANNING,DDpT
Re: App103-31P
Terra Technologies Group, LLC&Chapel Road Group,LLC
Chapel Road
South Windsor, Connecticut
DPI Project No. 02-1701
On behalf of our client,Terra Technologies Group,LLC and Chapel Road Group, LLC,I
hereby request a second 90-day extension from the original filing date for recording the
subdivision mylars in the office of the Town Clerk. Thank you.
DESIGN PROFESSIONALS,INC.
B?ZAVUEngfieegr
cc: Mark Zweifler
165 South Satellite Road,South Windsor,Connecticut 06074
Tel:(860)291-8755•Fax:(860)291-8757
Email:dpicivil@aol.com
�0-$N Sf4 ®
O
x F Town O-P SotZ44 Vi�
6 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
sOR.CO AREA CODE 860/644-2511
July 29, 2003
Mr. Peter DeMallie
Design Professionals, Inc..
165 South Satellite Road
South Windsor, CT 06074
ke: Appl 03-31P, Terra Technologies Group, LLC
Dear Mr. DeMallie:
Please be advised that the Planning&Zoning Commission voted on July 22,2003, to grant a 90-
day and a second 90-day extension to file mylars for the above-referenced subdivision in the
Town Clerk's office. The original filing deadline was October 11, 2003 the new filing deadline
is April 8, 2004.
These extensions are the final extensions permitted under Connecticut General § 8-25.
Sincerely,
Kevin McCann, Chairman
Planning&Zoning Commission
KMcC/kah
cc: Town Engineer
Chief Building Official
N`to*N 8
- . r �-V W n Ole Soum
o �
a u
Z �
c 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
'�OsoR•co TELEPHONE (860) 644-2511
July 31, 2003
Design Professionals,Inc.
165 South Satellite Road RECEIVED
South Windsor,CT 06074
Attn: Judy Schuler AUG 0 4 2003
RE: Terra Technologies Group SOUTH WINDSOR PLANNING DEPT.
Chapel Road Subdivision, South Windsor, CT
Dear Ms. Schuler:
The South Windsor Water Pollution Control Authority,at its special meeting of July 22,2003,gave approval for
the connection to the Town's sewerage system of a residential subdivision,as more specifically shown on plans
entitled"Topographic Plan—Terra Technologies Group,LLC&Chapel Group,LLC"prepared by Design
Professionals,Inc.,Project No. 1701,Drawing No(s)3,dated 5-20-03,revised 6-20-03,and subject to the
following conditions:
1. Technical approval of the Town Engineering Department.
2. Final Authority approval and acceptance of the sanitary sewerage connection will be given once
The sewer line has been installed and inspected by the Town staff,and based upon the written
Verification of the Town staff that said sanitary sewer line was installed in substantial
conformance with the design plans previously approved by the Authority,and meeting all Town
regulations and appropriate technical specifications relating to sanitary sewer construction.
This approval letter must be superimposed on the final approval plans.
Very truly yours,
at4-,j1-/ �Lf/t c-✓�o
Jos' h J. Carino,Chairman
Water Pollution Control Authority
JJC:dd
Cc: Matthew Galligan,Town Manager
Michael J.Gantick,Director of Public Works
Jeff Doolittle,Town Engineer /
Marcia Banach,Director of Planning V
John Collins, Chief Building Inspector
Terra Technologies Group, LLC
STATE OF CONNECTICUT `�'NECri,
DEPARTMENT OF TRANSPORTATION Z°
DISTRICT I 3 a=
w 1107 Cromwell Avenue OF TaP�'y¢
Ir Rocky Hill. Connecticut 06067
Phone:
August 8, 2003
Ms. Judy Schuler
Design Professionals, Inc.
165 South Satellite Road
South Windsor, CT 06074
Dear Ms. Schuler:
Subject: Proposed new driveway for residence on Chapel Road
Town of South Windsor
This letter is to confirm a conversation between our District Drainage Engineer,
Mr. Thomas J. O'Connor and you concerning the possibility of constructing a residential
driveway over an existing State of Connecticut drainage easement.
The proposed work is allowed with one stipulation; provide Mr. O'Connor with a
copy of an "as-built" plan of the lot, along with proof of its recording in the Town Land
Records for his records.
Should you have any further questions regarding this matter, please contact Mr.
O'Connor at 860-258-4504.
Very truly yours,
onald P. Cormier
Transportation Maintenance Director(Act.)
Bureau of Engineering
and Highway Operations
An Equal Opportunity Employer
Printed on recycled or reoovereo paper
BOND TRANSMITTAL
DATE: ZR't�J
APPLICANT NAMES( � '+ I..,, LC,
ADDRESS
PROJECT LOCATION/ADDRESS C 7aj2e Gtd LOT
SUBDIVISION 03
P&Z OR IWA/CC APPLICATION NUMBER t�-L-)�'Sle
AMOUNT OF BOND 02, goo
CHECK NUMBER 1 GP 6
DEPARTMENT
SUBMITTED BY 1_1 d C- 1 �f 1 I Z 01 10 `J
NAME DATE
RECEIVED BY FINANCE g ja-,&lp-3
NAME DATE
SUB ACCOUNT NUMBER 56 d p 3 �1
N:\Planning Departrnent\PZC Secretary\forrrs\BOND TRANSMITTAL 08-27-01.doc
BOND TRANSMITTAL
DATE: lzci Qs
APPLICANT NAME ka o-4 ��� L, LC
ADDRESS 1-1 n
PROJECT LOCATION/ADDRESS LOT
SUBDIVISION
P&Z OR IWA/CC APPLICATION NUMBER
UJ
AMOUNT OF BOND v ;
CHECK NUMBER `�(p
DEPARTMENT. h I n
SUBMITTED BY11t r 0�
NAME u
DATE
RECEIVED BY FINANCE ��„� \ .(� .& ,� Q /a-,o a�3
NAME DATE
SUB ACCOUNT NUMBER 5 O o O a
HAPlanning DepartmenOW Secretary\forms\BOND TRANSMITTAL 08-27-0Ldoc
�0•N N Se
O
F Town O-P SotdA Vi��
9 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
> w
SOR-CO � AREA CODE 860/644-2511
October 2, 2003
Mr. Peter DeMallie
Design Professionals, Inc.
165 South Satellite Road
South Windsor, CT 06074
Re: Preconstruction Meeting—Appl 03-31P, Terra Technologies Group, LLC
Dear Mr. DeMallie:
IN ATTENDANCE
Jeff Doolittle - 1540 Sullivan Ave TOSW 860 644-2511 x245
Karen Isherwood - 165 S. Satellite Rd Design Professionals 860 291-8755
Greg Lehman _ 17 Rose Ave, WH 06117 Celebration Homes 860 883-6199
Reinhard H. von Hollander 17 Rose Ave,WH 06117 Celebration Homes 860 883-6201
Michele Lipe 1540 Sullivan Ave TOSW 860 644-2511 x252
Jeff Folger 1540 Sullivan Ave TOSW 860 644-2511 x229
The following is a brief summary of points discussed during the meeting:
Erosion and Sedimentation Control
1: All erosion and sedimentation control measures are to be in place prior to earth moving operations in
each area -and maintained/cleaned out during construction. Call Jeffrey Folger, Zoning/Wetlands
Enforcement.Officer for inspection when measures are in place, prior to commencement of site work or
if any problems/concerns arise during construction.
2. All topsoil stockpile areas to be protected(ringed with haybales or equal).
3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to
minimize tracking of dirt/gravel on to Chapel Road. Calcium chloride or water is to be used for dust
control as required.
4: -A conservation easement needs to be monumented prior to issuance of a certificate of occupancy.
Public Works
1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction.
They will. be stamped by the.Planning Department along with plans developer needs. Only approved
plans are to be used on the job site.
2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major
construction work with inspections and.testing per Developers Checklist (requested, required) for the
following:
a. After site is staked out
b. All drainage work
c. Preparation of subgrade, compaction tests as per Developer's checklist
d. Preparation of subbase, six(6)inch lifts
e. Placement of bituminous concrete, two (2) inch layers maximum
3. Certification of gravel used as subbase and processed stone for base will be required from an approved
testing company. No recycled or reclaimed base material is allowed.
4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town
Engineer prior to installation.
5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation.
6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and
sanitary sewers and house service laterals located as per revised as-built checklist.
7. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts
with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or
structure work requires inspection prior to backfilling.
8. Any problems and/or questions regarding construction of this project will be directed to Greg Lehman in
the field at phone 860 883-6199.
9. Job meetings will be held as needed, and can be called by the developer or Town.
10. Seventy-two - (72)hours' notice needed for certificate of occupancy inspection.
11. Any proposed changes are to be presented to the Engineering.:or. Planning Department prior to
implementation on change order form in quadruplicate with 4 copies of.the drawing. Town will attempt
to turn around within 24 hours.
12. Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday-.
13. No paving after October 15 or before April 15 without written approval from Director of Public Works.
14. Sanitary lateral locations should be tied down to existing structures and shown on the progress as-builts.
15. During construction of individual sanitary sewer house laterals,the contractor shall prepare an-as-built
sketch on standard form provided by the Engineering Department. This form should be submitted to the
design engineer/surveyor for their use in preparing the as-built plan. The Engineering Department
suggests that the contractor also show locations of foundation drains and water laterals on this form.
16. During construction for individual house lots, lot to lot drainage must be addressed with drainage swales
as necessary. For lawn establishment, town staff will be requiring erosion control measures to be
installed prior to the issue of the certificate of occupancy to ensure soil stabilization.. A detailed erosion
control plan must be implemented and depicted on the plot plan for review prior to the issuance of the
building permit—most particularly on lots with extensive grading.
Planning De artment
1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes
required, contact the Planning Dept. Additional landscaping installed on one part of a site will not
preclude planting all of the remaining items shown on the landscaping plan.
SNET/NU
1. Contact utilities for coordination of utilities connection.
Fire Marshal
1. Blasting(if required)to be coordinated with the Fire Marshal.
Police Services
1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a
company letterhead. If the developer occupies or owns the building after construction emergency
numbers must be provided to Police Services.
2. All buildings located on property that abuts a public highway must be numbered and visible from the
street. All numbering shall comply with Town Ordinance 6-800 through 6-802.
Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are
excluded.
3. Erect temporary sign on the site during construction identifying the project.
4. If an alarm is to be installed contact Police Services.
Building Department
1. Plan review with Building Official/Fire Marshal required prior to application for building permit.
Coordinate with Chief Building Official.
Sincerely,
A4�1 4jv-
Michele R. Lipe, AICP
Assistant Director of Planning
MRL/kah
cc: Jeff Doolittle, Town Engineer
Karl Reichle, Public Works
Mel Stead, Public Works
Chris Dougan, Acting Chief Building Official
Fred Shaw, Superintendent of Pollution Control
CL&P
SNET
�3 -31P
TOWN O� SOUTH WINDSOR
STAFF SITE CHANGE -
FOR SITE & SUBDIVISION
GENERAL: +
CHANGE ORDER CONTACT PERSON , Phone No. ftoo 1A j«$"
Address IL,r Samna CAMSLt_#= 19 0i SO I LITO klINDSOR,CT 6
Site Name P&Z No.
Owner �► �t. R.�A � #,� f-Lt Cos Phone No. 8 $_,? ' lqq
Contractor '
Signature of Owner Date: Z -09
Signature of Design Engr. Date: J •'"2 "G '..'
CHANGE: (Describe location and natur of change. Include
q ,
Four (4 ) copies of plan/profile of Change. )
P
Reason for Changes (Why is change required)
t'.1APIL LOAD-
APPROVALS: (As Requ
Dir.. Of Planning ired Dater 144j,
Town Engineer Date: x./f /�-p
Dir. of Public jrks Date:
Other: Date:
STAFF COMMENTS: I
74 ,e
0n #^cis
White - Town. Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod ,- Engineering Department
SOW N Sf4
O
TO� 074C Sa� ?d&U&Ot
C U
a
9 �
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
SoR.c° TELEPHONE(860) 644 2511
September 22, 2010
Chapel Road LLC
17 Rose Ave
West Hartford Ct 06110
Dear Sirs:
Re: Appl#03-31P, Terra Technologies Wetlands bond
This is to advise you that the Planning and Zoning Commission voted on September 14, 2010 to release
the above mentioned bond in the total amount of$1,000.
A check will be mailed to you from the Town of South Windsor. If you have any further questions
contact the Planning Department at 644-2511, ext. 252. Thank you.
Very truly yours,
l�
Patrick Kennedy, Chairman
PLANNING&ZONING COMMISSION
PK/ma
cc: Jeff Doolittle,Town Engineer
RA.sox It 187
2I P
M 0074
191 Ans
FAX 00291.$757
CML S T�tC WOMIMM 1 LA14D SU*Vgyoft f pL^UUIM J LAMMOCAP6 1
Serves Mas3acE�,!E
#
i
i
#
Mr.Jefliey Doolittle March 25,2€l19
Ms.Michele Lipe
Town of South Windsor
1540 Sullivan Avg
!
South Windsor,CT 06074
#
Jeff&Michele:
Re:M€tnumentation Installs
Chapel Road
South Windsor,C utecticut
DPI Project No. 1701
Please be advised that Design Professionab,Inc.has Installed all gins and monuments
with the Terra Technologies Group&Cal Roil Group tlivt subdivmon on Chapel Road
opposite Rugby Lane,inducting the movamentation assmated with the conservation easenteut
This was identified as PZC Application 03-31P.
With respect to issuing a Town check to return the outstanding bond,our client,Mark Zwoi�,
informs us that the check should be mate payable to J. Matthew Group,LLC,P.D.Box 270754,
West Hartford,CT 06127-0754 att.Mark Zweeifler.
s
All the best,
!
DESIGN PROFESSIONALSjNC.
!
By: Rif.A
Phis R.DeAaallie
!
President
!
Cc:Mark Zweifler,J.Matthew Group
Lawrence `sale;*,L.S.
Barry Clime,L.S.
Benjamin Wheeler,R.L.A.
S0.NN Sf4
h F
C U
-o�� ap Sot� Vt��
S �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
f~OSoR.c° TELEPHONE (860) 644 2511
March 28, 2019
J Matthew Group
C/O Mark Zweifler
17 Rose Avenue
West Hartford, CT 06110
Re: Appl. 03-31P, Chapel Road Subdivision Pins and Monuments Bond Release
Dear Mr. Zweifler:
This is to advise you that the Planning and Zoning Commission voted on March 28, 2019 to release the
following bond as follows:
Appl. 03-31P, Chapel Road Subdivision $2,800 Pins & Monuments Bond reduced by $2,800 to leave a
balance of-0-
In order for a check to be mailed to you from the Town of South Windsor an updated W-9 form is
required by the bank holding the bond. A W-9 form is enclosed and must include a street address. If you
have any further questions, please contact the Planning Department at 860-644-2511, ext. 253.
Sincerely,
Bart Pacekonis, Chairman
PLANNING & ZONING COMMISSION
Enclosure
BP/llz
cc: Jeff Doolittle, Town Engineer
Jeff Folger, Senior Environmental Planner
BOND RELEASE TRANSMITTAL
DATE: April 1, 2019
APPLICANT NAME J. Matthew Group, LLC
ADDRESS 11 Bassette Lane
West Hartford, CT 06117
PROJECT LOCATION/ADDRESS LOT Chapel Road Subdivision /
Terra Technologies
P&Z OR IWA/CC APPLICATION NUMBER Appl. 03-31P
MUNIS APPLICATION NUMBER N/A
SUB ACCOUNT NUMBER 3550 (5000319) 16007
ORIGINAL BOND AMOUNT $ 2 ,800 Pins & Monuments Bond
CHECK NUMBER 5960
Please Release $ 2,800
Please release the bond indicated above as all of the required
work has been completed.
Lauren L Zaram6o _411119
NAME DATE
f 0 0 l y/3 1 1 9 BY �� 2
CHECK # ISSUED DATE
S 31 i s, 05-
WAPlanning Admin\PZC\13onds\2019 Bonds\03-31P ChapelRd Subdivision BondReleaseTrans.doc