Loading...
HomeMy WebLinkAbout06-60P Aldis Site Plan of Development Feb 15 07 02: 02p Design Professionals BGO-291 -8757 p. 2 TOWN OF SOUTH WINJDSOR L PLANNING&ZONING CO1VtIVIISSION APPLICATION FORM Application No: Official Receipt Date: 1 Receipt No: APPLICANT:AM King Construction,Inc. PROJECT NAME:DISTRIBUTION CENTER ADDRESS:2115 Rexford Road,Suite 314,Charlotte,NC 28211 OWNER OF RECORD ON LAND RECORDS: Culbro/Shepard Associates ADDRESS:c%Griffin Land&Nurseries,Inc.204 West Newb-,rnr Road,Bloomfield,CT 06002 COMPLETE LOCATION OF PROPERTY:295 Rye Street,South Windsor,CT 06074 ASSESSOR'S MAP#122 PARCEL 41 and ASSESSOR'S AIX?#134 PARCEL#48 ZONE I NAME,ADDRESS,TEL&FAX#OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Galen Semprehon,Design Professionals,Inc.,425 Sullivan Avenue,South IFindsor,CT 06074 TeL (860)291-9755,Fax(860)291-8757 THIS APPLICATION IS FOR: (Check all that apply): I- Zone Change to (Public Hearing required ar d Certified letter to abutters required) r- Subdivision4tesubdivision F Open Space Subdivision(Pubfic Hearing Required) r Subdivision I- Manor r Major r Resubdivision(Public Hearing Required) r Minor r Major f" Conditional Approval r Special Exception to Article (Pubfic Hearing,Certified letter to abutters required W Site Plan of Development r GeneralPlan ofDevelopmert r Earth Filling(Sec, 15)and/or Earth Removal(Sec. 14-Public Hearing Required) r Regulation Amendment: r Zoning f Subdivision (Attach proposed amendment) r- Temporary and Conditional Perms for f Major Home Occupation for r Other(explain in detail) An Application Pending sign is required to be posted on th a property for all applications ten(10)days prior to being heard by the Co:mnussion. Signature of t i Property Owner � II TOWN OF SOUTH WINDSOR Ii STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: r - CHANGE ORDER CONTACT PERSON t��?� w.; �-S 4s;f�,. ,n Phone No. t r-Y 7 0 Address_ t „ S 4t sY✓ `' )c 4c� !t/ f' % Site Name A/f> P&Z No. 04—01 Owner A 1 D 1 1 „c Phone No. Contractor /�, -P1 k r N Signature of Owner �t Date: Signature of Design Engr. t} '' Date: o ` CHANGE: (Describe location and nAtilrll of change. Include Four (4 ) copies of plan/profile of Change. ) i j� j I i Reason for Change: (Why is change required) I � APPROVALS: Required) As Re ( q ) Dir. Of Planning_ '1 l !'� ) a�Yl.�i.._.,•� Date: i t Town Engineer �.. Date: Dir. of Public Work�j� Date: Other: Date: STAFF COMMENTS: I ?bite Town Engineer Yellow - Applicant ?ink - Director of Planning Goldenrod - Engineering Department i f I I 77 .: TOWN OF SOUTH WINDSOR STAFF SITE CHANGE i FOR SITE & SUBDIVISION ; 'NERAL: Phone No. L-- CHANGE ORDER CONTACT PERSON ti "^ Address P&Z No. Site Name Phone- No. '�9 I-i y f t �t II i.N wC�• t Owner A I��� - ,�4-?,v �'----r r Contractor c I . �y, P Date: Signature of Owner Date: Signature of Design Engr E Include I' RANGE: (Describe location and nature f change. Four (4 ) copies of plan/profile of Change. ) t, c � c Reason for Change: (Why is change required) ` �. ,,//t . � r Gam• / t i ,�A C �'SL • j l S �' i APPROVALS: (As Required) Date: jDir. Of Planning ✓ Jam, Date: ; u` Town Engineer Date: Dir. of Public Waics Date: Other: STAFF COMMENTS: 00000 s I Yellow - Applicant E White - Town Engineer Department Pink - Director of Planning Goldenrod Engineering p TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE &SUBDIVISION ENERAL: CHANGE ORDER CONTACT PERSON cam_-.�..; �� r �s,a}.,► Phone No. ),1 y Address Site Name_g��1 P&Z 4rAP Owner-- IX'Ir- , Phone No. Contractor a , „- Signature of Owner r : „F Date: Signature of Design Engr. (f' Date: 3ANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) G�{t4 r.�= .�,,•,1_ �� ..tiC=� !^t-� li i,t-;\" 1'r t='` t:" _ T4 F 1` t_ - 1 I I I :anon for Change: (Why is change required) PROVALS: (As Require r. Of Planning Date: wn Engineer Date. r. of Public Works Date: her• Date: IOII 71 a / AFF C N S: — r: r I ite - Town Engineer Yellow - Applicant zk - Director of Planning Goldenrod - Engineering Department wv ■ - - x.�k' "r:..r -�;,:S A��:: ' .F,: �• '^'?' *L§.!-;-,+xySy Tfipkt?si -,>•,:;.�xr�trcc',,-f""' „�+a_�a -�Y. i TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL:. I 3 CHANGE ORDER CONTACT PERSON C4� f, Phone No. Address y t� Sw ll,ya r S. y;a G G Site Name ��1 �.S{•, � Y H� P&Z No. 04— kio Owner L P i S Phone No. i Contractor Signature of Owner ` ;�, :_ . Date: 9,�!/ 7 } Signature of Design Engr. Date: 4,, CHANGE: (Describe location and nature ;of change. Include - Four (4 ) copies of plan/profile of Change. ) a Reason for Change: (Why is change required) ' .. r I ! APPROVALS: (As Require ) Dir. Of Plannin Date: 1 d Town Engineer Date: Dir. of Public Workw Date: Other: Date: STAFF COMMENTS: 6 j White - Town Engineer Yellow - Applicant Pink Director of Planning Goldenrod - Engineering Department ECK TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION. GENERAL: - rF_n1 CHANGE ORDER CONTACT PERSON h, = _ Phone No. ,► - f ., Address cj Site Name P&Z No. Owner s,L �h�, Phone No. Contractor Signature of Owner Date: Signature of Design Engr. Q Date: CHANGE: (Describe location and nature o change. Include Four (4 ) copies of plan/profile of Change. ) Reason for Change: (Why is change required) .. ��( �t I "k.11 Ti'c"�' � t ,v.t-Ti ,r.t i � 1-n � t��-. `-� -[" , �•. �„ ,--\' ��" T APPROVALS: (As Required) Dir. Of Plannin g'—Vh,.gaLa,-C.,,, ,�()— a 1�. Date: k? -f Town Engineer_ Date:— Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - ;Engineering Department P.O.BOX 1 167 425 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 PHONE: 860.291.8755 FAX: 860.291.8757 SdOmiswww.designprofessionalsinc.com CIVIL & TRAFFIC ENGINEERS ! PLANNERS / SURVEYORS/ GIS ANALYSTS 1 LANDSCAPE ARCHITECTS March 13, 2008 Ms. Marcia Banach MAP J �QQ$ Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Aldi Distribution Facility tiProposed Changes to Landscape Plans P Dear Ms. Banach: As previously discussed at a meeting at your office on February 5, 2008, we are : proposing changes to the approved landscape plans for the Aldi Distribution Facility at the request of Aldi, Inc. Attached are the Change Order request and the required four copies of the revised plans(dated 3n108). Below is a summary of the changes to the plans: • Removed the trees north of the entrance drive split to the office parking area + Removed three trees to the right of the entrance drive split to the office parking area Changed the trees flanking the entrance drive to a mix of Maple and Princeton Elm(a disease resistant variety)trees Removed median plantings past second light pole Redistributed the evergreens left of the entrance drive to achieve a more natural appearance Removed shrubs from berm plantings along Rye Street + Removed plantings in=area between existing wooded areas at north end of Rye Street i 4- More evenly distributed evergreen trees along Rye Street 4- Replaced Redbud trees with Prarifire Crabapple trees and redistributed along Rye • Street Replaced the Linden street trees with London Plane Trees (as discussed by Kevin Foley with the Tree Warden; covered under separate Change Order) 4- Reduced the street tree caliper to 2"-2 '/2" (covered under separate Change Order) + Added two street trees south of the entrance drive (covered under separate Change Order) + Added eight evergreens around the water tank and pump building for screening + Moved four Maple trees west of loop road behind office to the east side of the loop road Replaced the three Birch trees east of the office with six Maple trees Reduced and revise foundation plantings around the office • I : 4, Removed the Birch tree at the northeast comer of the parking lot % + Removed the five evergreen trees east of the parking lot + Added Myrtle to the landscape islands in the parking lot with 4' wide river rock paths + Replaced the plantings between the office and warehouse parking areas with seven evergreen trees • Hopefully you and the Town staff will find the proposed changes appropriate and approve the revised plans. Please contact me with any questions. Sincerely, DESIGN PROFESSIONALS, INC. • Benjamin P. Wheeler, RLA Director of Operations • E • • • • • • • 4=onas • • 1} j TOWN OF SOUTH WINDSOR a�0 STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSONp>rE,tt�n; PRnt tt?�., ; Phone No � t J.--%7 SS Address yJ�� Sut_�... t���•r.1 f v ,jt.tc t �� ! ' ,fh�k �3 4 --T , (CV e za� Site Name ,L,bt ���Rftrf�a,v F .I�r 7 P&Z No. Owner— -r,t �i`t Phone No. - Contractor L-18 `( I.Air G�aPiz -, � Signature of Owner Date: f Signature of Design Engr. Date: o`� CHANGE: (Describe location and nature bf change. Include Four (4 ) copies of plan/profile of Change. ) � 3 �'T r ' 1�1Ei�} �"'t t� T4z r T f ti iZ ?� 1 'J,- 3�} • ^Tc] - cl, s9�n \8fs Reason for Change: (Why is change required) L4�.J 1�'lr F]L_.1 r•..r:- ���� }-"- N�"t`I : � _.,.�-� '"��r,>hJl`C--r I l" r � —1!Al�r t`, yF t r'= 1l c { R�RL,� M; '7R� t r ' .'�`1 �.�\F.�/,L Ji�UPl 1- 1 \^ C� Tt._,� Y`1JrZl' "SR�F"" 1 t( S� ' ,TILt;t ��lC1r =JlIT1 ^F FtJ3R� t r: 08 .+� L..�U�t � I...F.r r�^ G� , r �h1 to�F'f•, t°! E ``T�.�t' � "TFzfK` � APPROVALS: (As Required) try- - Dir. Of Planning Date: Town Engineer Date: Dir. of Public Works Dater Zed# Other: Date: B STAFF COMMENTS: r� s White - Town Engineer Yellow —Applicant Pink - Director of Planning Goldenrod - Engineering Department i ® 'I 'I l TOWN OF SOUTH WINDSOR STAFF SITE CHANGE J FOR SITE &` SUBDIVISION ; i :ENERAL• CHANGE ORDER CONTACT PERSON Phone No. S j Address �1 S // T /7 !�, '� Site Name, /�/� �. _� , w ��ljr` f 1 P&Z No.• Owner_44 ; Phone No. Contractor '. /c - Signature of Owner Date: Signature of Design Engr. i Date: K' 'HANGE: (Describe location and nature of .change. Include Four (4 ) copies of plan/profile of Change. ) !-r=5-'.'�---r1 � l'rt Z7�"- rr+� !i^'•Tr'T�GG/ �f f7^!E'-! i 09 i jl eason for Change: (Why is change required) 41A. I � I' I ' PPROVALS: (As Required) ir. Of Planning , Date: own Engineer g — Date: ir. of Public Works Date: ther: Date: TAFF COMMENTS: 4 i i I i i kite - Town Engineer Yellow - Applicant j j ink - Director of Planning Goldenrod - Engineering Department j c "WA":..a'Z TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: Phone No.2bd-?eu-��KS' CHANGE ORDER CONTACT PERSON S Address p Site Name A j 4 P&Z No. ��in•.�i A P Phone Owner IoLbjC . Contractor Date: Signature of Owner Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) i I Reason for Change: (Why is change required) r I I l I i APPROVALS: (As Required) ' Dir.. Of Planning Date: u i Date: ' / Lj Town Engineer Date: Dir.. of Public Wori s ,y f ---------- Date:Other: i STAFF COMMENTS: ' { Ij i White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department i �.r TOWN OF SOUTH WINDSOR za�6 STAFF SITE CHANGE �3H FOR SITE & SUBDIVISION RERAL: CHANGE ORDER CONTACT PERSON_ 1 r tv ( Phone No.Jg EO) Z ct) -7�,)S r Address_ Site Name f_______ P&Z No.� - P _ Nam- Owner u Phone No. Contractor_ F 1 r,►� / ! Signature of Owner Date: Signature of Design Engr. Date: S NGE: (Describe location and nature f change. Include Four . (4 ) copies of plan/profile of Chhange. ) L --h atn tit ^ycCrl S 'J .r /a 7 r � S f 33 >1N „Z6 b0 OV Id 3AVH son for Change: (Why is change required) 8 38 v►'W+ r �'�v r {{ ,OVALS: (As Required) Of Planning 1 Date 1-7 Engineer Date: of Public Works Date: r: Date: F COMMENTS: I 4onG30 ,0NV Town Engineer Yellow - Applicant - Director of Plannin Goldenrod �6 g - Engineering Department 4 }6 „ 8 , •.. Il .. a 3 TQWN 0r S.O1U0H-"SOR FOR SITE So., xvfS'ION• Cj", OE. ORDER CONTACT PERSON I.�N �[����h oa Phone No..9,7/--e7 s s Addross 175 &e r f Y, Site Name P&Z'No. Owner P11pn,e No. Contractor F lisIdc « Signature of. Owner, Date: Signature of Design Engr. Date: tD S 1c CHANGE: (Describe location and nature of change. Include �p p Four (4) copies of plan/profile of Change. ) iJ\ PtdlNl3 ,S�A�ra� v�rf/tan n�u�,��,.�� drsc^���aP /iNP hf�'Q/IGIr� ar�`�r — �) ` 4��lHL ,8t�✓f �tHb �+"1MJ+1 'O d✓N ,�rl�i'H �� MEI�r - C71f1�[*'ICY/,��M -/��W�V Y�t K � /� / • / (/LI 'f- S I C? ''14 cool 5� i4/P� "J'4t ►71i Oft�T� .1T '�flC,w': �+�lt�t4l+A fJTTitP �/�•toljovS� P�/rNwL'Of Reason for Change: (Why is ch4nge required) 01 re APPROVALS: _ (As Required) Dir. Of Planning Dates _ Town Engineer .. ..'..."'._..- Date: )o d 7 4 -1 Dir. of Public W09cs Date: Others Date.: STAFF COMMENTS: G+ urn White - Town Engineer Yellow - Applicant Pink = Director of Planning Goldenrod engineering Department 7. TOWN OF SOUTH WINDSOR STAFF SITE CHANGE } FOR SITE & SUBDIVfiSIgN GENERAL: CHANGE ORDER CONTACT^ PERSON 1A�P LVo t 44a.M a4 4 Phone No. Address /3' P J /n d,.s 0 1 06 Site Name r' � . w ► f°�. <✓ P&Z No -k)'to `,fo0 12. / Owner !C! Phone No. Contractor j Signature of Owner ' Date: Signature of Design Engr. Date; CHANGE: (Describe location and nature of change. Include Pour (4 ) copies of plan /profile of/ Change. ) J n1 )r'!trVet l� f �C ll e.4.mil tt/o �/ Reason for Change: (Why is change required)`; APPROVALS: (As Requi d) Dir. Of Planning Ir Date & 7 O7 Town Engineer �. ---_..: g .•t.� �.J :r Date: Dir. of public Works Date: 0ther: Date:- STAFF C Ss A, a..SLt White Town Engineer Yellow Applicant Pink - Director of Planning Goldenrod - Engineering Department r:�1ryd aP6566Ee98 A1dd s dift �T .90 LQ0-'c-90-90 �ao"d �lbl 4r 4W U4' LAG MMTS to, ° 4 fw 4W P wa 18• SKEW 6EPT #Or 48'r1'E g• �/9a• $KEIr !P t° T-4• ib• 4' li a i�g' it MME CENTERS BASED WHEN PIPE IS CENTTE ERE p iw mS= 04B11!'CC PIPE 1L'sA!'-�SDlO Ed 512E F! W S =PC 4D° -o• I i6,-v I V-7• io•-o• a tip• rrKa•-a�me�ea WELD 1) 4000 PSI CONCRETE) MADE 60 STEEL. 2) THIS DESIGN IS T13 BE USED FUR SKEWS 15 TO 37 DEG, 3) ALL REINFaRCING STEEL. PER ASTM A615 / A497, 4) 3/4' CHAMFER ON ALL EXPGSED 90 DEG. EDGES, ALDIS DISTRIBUTI®N CENTER 4LAST 6/06/07 Rs SOUTR WINDSOR, CT BATE EW-07S-MQII421 & 481 PIPE w/ 18' SKEW REDUCED SCALE HANSOM PIPE dr PRECAST MAWM M EW-07S-MOD ROUND CB WITH •, TYPE "CL" C8 TOP STA. 1+75 TF 80.00 INV. 62.17 AZ" NAPE 0 0 5,% 2*0 0 /WAT'ER QUAL,ITC BASIN00 � iE SPIT. T7 NCRETE HEADWALLS 48" & 42" OUTLET INV. 60.00 .... . ..... SEE DETAIL) 4-00 r ROUND C8 WITH TYPE "C-" C8 TOP 0(F STA. 1+65 HDPE TF 80.00 x l2 1+00 •. 60.83 18" STANDARD RIPRAP 8 ~ � N C.D. INV. 6" C.D.a69.� APPLICANTi INV. 6" C.D.-WOO AM KING CON:2115 REXFORI \ 12" MODIFlED RIPRAP _ SUITE 314 CHARLOTTE, IN TELEX 704-36 MATCH LINE of Tel. 860.291• 8755 ` Fax 860.291.8757 mats ci�ril en-ineE.B•s " planners e surveyorsDESIGN.•GBS iaraalscaeiae architects a gis . lmps DRAWN GBS CHECKED.- GBS 425 Sullivan Avenue, PO Box 1167, South Windsor, Connecticut 06074 SOB NO.: 2282 DATE.• 11122106 DRAWING NO.: 'obs 27.82 2282_T1—T5.d� SOUTH �J { f Av FQ 2 TTIE & Stmb-ivTSION 3. Phone No.G�Ct'ORDER ,CONTACT q/-6' 7 ss Address. f;a� � S!/j� /�I //� �Y 1, k1.-Jr, 1. Sit Name A- 4i>,r /✓i$T ri�{4 Thy. I�-o r�1/.X„ - � p&Z Na, Owner I -Q, Phone No. Contractor. 'I"ignature. of Owner Date: Signature of Design Engr, Date: fr. CHANGE: (Describe locations . nature of Ichange Include Four (4) copies .of plan/profile of Change. ) ' 41 4,0 r � f .a Reason for Change: (Why is change required) ell 44 op T1, V r APPROVALS: (As Requir d) Dir. Of Planning Date: -1 J'P h Town Engineer Date: 7 Dir. of Public aorks p Date: Other: ;, /d�Lfi+�n,, �i rr� Date: STAFF COMMENTS: i # White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod Engineering Department jY TOWN .OF" $00 WINDSOR STAFF SITE. OEANGE FOR. SITE� & -SUBDIVISION GENERAL: CHANGE ORDER CONTACT PEtON _�„ i Phone No S' S�" Address Zi 5' 4 w..w t • t r✓� G`1' D C+D .Site Name /l I. D t� r. Y� ? x�•� r c r /t y P&Z. To to t� P Owner 14 1. D mod. Phone No. Contractors r s s Signature of Owner Date`s Signature of Design Engr. Date: 1 'a. ja - - CHANGE: (Describe location and nature .. f change'. Include Four .t (4 ) copies of Plan/Profile of Change. ) ,t CAmlP_Y4l,e. wr� '� CY4sS � ..t�.�rt �r.. t► �' .r[ Reasorrfor Change (Why is change required ` +a tt y'n a C� :J �► e' ` [.v1 Tic t S � f+�r S �.4 C s APPROVALS: (As Required) Dir. Of Planning. Date: . Town Engineer Date: tv/._.31.v Dir. of Public rks Date: Other: Date: STAFF COMMENTSi: White - Town Engineer Yellow - 'Applicant Pink Director of Planning Goldenrod - Engineering Department � � � � �• - ,� _ `` � 1 1 \ alb - RIPRAP PLUNGE POOL, I I r I (SEE DETAIL) - • ` I 1 I STATE OF 5 PG. 469) - ^- VMPQRARY�IMIT� OF COI�STRU (VOL 625 PG. 489} - ' (TO PE MARKED 4N`FIELD`PRIOR 1 k�9 3 , I A ONSTRUC71ON "N ^ 1` I I ' CONSTI2UOoM �NL N� LD PRIOR TO TYPE "C" CS STORM MH OIA WSTRUC110N) STA: 19+43 (15' LEFT) TF 56.0+-INV INV. 80.53 (42 I ` 1O k 5' 73.45 52.75 (1 8p•6 ` LF 15" RCP CL V • #�6g?�•F� \``` \ �``427 .27xx \ \ \ 1 � � STORMCEPTOR STC 900 fy `+ `` At !�� \ STA 19+57(18' LEFT) W., 77.80 GRADING EASEMENT INV.70.20 •� ass s�o\� spa \ ` 8 LF 15" RCP N7551'0 O 0.5x 5� 127. 70 6 72 6 N 74 76 OR - _ _78 - I 83 66' aa 9+00 78 11 TF:7&41 _ — WATER B.C.LC. _ EXISTING R.O.W. 72 X 79.2 N � 6 26 LF 15 RCP Rkoc� r s8 °br,•• +" s O 1.DOx KATHLEEN MAURA, ZELAZEWICZ 83 PG. 25} TYPE "C" CB I v SSS�13 2r57"W STA: 19+43 (15' RIGHT) 150 LF 42" .12' TF: 78.95 03.601 INSTALL , INV. 70.30 RCCE EACH END SET MONUMENT(TYP.) INV. O 55 0.1 50 INV. OUT 60 LAND ACQUISITION LINE TEMPORARY LIMITS OF CONSTRUCTION DRAINAGE EA: (TO BE MARKED IN FIELD PRIOR TO CONSTRUCTION) ND LANDSCAPING FOR RYE STREET CULVERT ON SHEET CU1 -=C EXCAVA TEST PITS O DETERMIN EXIST. DEP OF WA ER do GAS UNE TOM OF'. �OUti'�I`: Wxf�i'A60R roil SIn & 5U)3Lil'VISZON ORDER CONTACT :Pt O. � �� ,.,D.t t�,v K Phone No. Y/- 7 5 Site Name P&Z No. Owner �0,v. c �P.tlr tu:.,,/�s- Phone No. Contractor �s ••. Signature of owner Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) Reason for Change: (Why is change required.} i y t A / et ' / r 6 1v APPROVALS: (As Required) { Dir.. Qf .Planning Date: l l bir")o Town Engineer �'`%�.�r�t.t _ �77 � _ Date: l/ yy' l� Dir. of Public rks Date: Other: Date: STAFF. COMMENTS: White - Town Engineer . Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department T : WINASO TOWN OF SOUTH ., STAFF SITE GHTGE FOR SITE :& -SUBDIVISION GENERAL: / CHANGE ORDER CONTACT PERSON Gk �� SR�.,,� p�a� Phone No. firt-k "7 Address Site Name , P&Z No. 6- GO Owner %.o ct.w �r� �ar,'�� k.-J,a ss Phone No. Contractors Signature of Owner Date Signature of Design Engr. Date: 1-, Vic.3 CHANGE: (Describe location and nature oi change. Include Four (4 ) copies: of plan/profile of Change. ) aie_u f,4,/r (''-uSS ttkrvJsrr.e,+ 4 f(Ut� f Gfi lS tF tC�`f� d i �v GiSr�a-�i✓ I�IJO u-� U :✓urf� i Reason for Change: (Why is change required) / To 4,e I/f 4e al e W o/ wa APPROVALS: Re quired) e uired ( q ) Dir. Of Plannin A Date: ( 7 Town Engineer J .. Date: / 1 o 7 Dir. of Public rks Date Other: Date: STAFF COMMENTS: i - i t .ar. 4 White - Town Engineer Yellow - Applicant Pink - Director 'of Planning Goldenrod - Engineering Department '.Add I L F Is ,IRe&, 6ovele SAP 4', )L: I . p/vol't / w i/ it s4AP j wr 1"A S : a. 3 ENT Of PERM NEN� R 1NP�E EPSEM A G A5 REPLACE" GDp 0�CN GRADE DR� p, S.F•� S-�DRB PNCE N EX15�1N�N 1N�ET WE��PNDS D NGE P GG` 101 • M p,�E 10 SGv P PLv R M PNN Op?'PR pM f P1�� 15 27 .� SI N Sp•61 X IFS. �5•95 CPS \N -�1•21�P\L F el GO MONITORIN Sf ED Gl- 15 C' 1N5�P PE S T 5„ NO O SMN pE 35p LF GR - cbyd ga OR s s ro �N/ -- Spot bit 4 79.0 S"......... 75-'3 3 A 5 G ... .G•L'C' _.. i S "_. 5. 8 s b d - „;-..,. �5o b9t 3 clo --p gas p . - _ 16 c Y _ 3934 GAS spot bit. Xa0 o AS pp a t G 9 15 0 8 S .wad, .._ .... a i X3904 it 178, r —15; RCP EX, EE s �s, 8� op4 26 �.F 15 RCP gad INV: 75,691 oil :EE TOWN OF SOUTH WINDS.OR STAFF SITE CHAAi(;E �. GENNRAL: FOR ITN & SUBDIVISION iANGE ORDER CONTACT PER S Lr ON '.Phone No. 7 _s Address . Site Name Owner raw„ c9v�lj r✓c rd P&Z No. 46 -(Ord Phone No. Contractor H�j®r a jJ Signature of Owner Signature of Design Engr. Date: CAGE (Describe locat oin and natur of change. Date: /fl4c7� Four g Include (4j copies of plan/profile of change. ) a N R Ale .��., ,v 6s ReasoK/n� for ChJange: (Why is change required FLI u ai -Q / ICJ or APPROVALS: rti i s,A As Requir dj wrr Dir. Of Planning Town Engineer � �t,, +.; ✓ Date <! U +7 Dir. of ,Publis W ks y "� Date: Other: Date: STAFF COI`MENTS: Date,: White - Town Engineer Fink Yellow .- Applicant- Director of Planning Goldenrod Engineering Department j TOWN OF SOUTH WINDSOR S' AF ` SITE CHANGE vOR.SITE & SUBDIVISION 'GENERAL: - CHANGE ORDER CONTACT VERSON .ao rr a-► Phone No. Address S /� ' {� l r S. Jl r6 " o T 0 l� Site Name & aL D,��•-. �_ te P&Z No. (¢� /3 Owner, 1 D [! T'vo Phone No. Contractor Signaturg of Owner Date: Signature of Design Engr. Date: 9A CHANGE: (Describe location and nature o change. Include Four` (4 ) copies of plan arofile of Change. ) n itfL fy--j _ �Je1�it' l ,C�",:r�trA r F rtLdZf?•s��Ras R r Reason for Change: (Why is change required) 70 s` t APPROVALS: (As Required) Dir.. Of Planning-/�Jr�= �dl Date: Town Engineer ,4 `}.1 ; ; , Date: Dir. of Publ' rks Date: Other: Date: - !; 7 STAFF CO ENTS: White - Town Engineer Yellow- Applicant Pink - Director of Planning Goldenrod - Engineering Department C AMKing C O N S T R U C T 1 0 N March 27, 2007 Town of South Windsor Planning and Zoning Commission Re: Aldi Distribution Facility 295 Rye Street A M King Construction Company, LLC, and ALDI, Inc, thank you for your time and attention in hearing and reviewing our proposal for the Aldi Regional Headquarters and Distribution Facility Development proposed for 295 Rye Street in South Windsor, CT. We come before you today to formally ask that you approve this project as it has been proposed to this Commission. We have made every effort to provide for your review a submittal package that is complete, provides a clear understanding of the project, and allows you to make a competent decision regarding this project. In light of this request, we would like to take the opportunity to reiterate and summarize the facts of this development. These are as follows: 1. The site is zoned Industrial, thereby allowing a facility of this nature, size and activity to be developed as proposed. This site does not abut to any residential zoned areas, and Aldi has contracted to purchase the sole residence (presently zoned industrial) adjacent to the south of the site. 2. This building will be wholly owned and operated by Aldi. This will provide one point of contact and responsibility to the town. 3. The applicant has fully complied with all requirements, standards, engineering practices and regulations required by the Town and its staff. 4. Improvements to Rye Street and to the intersection of Rye Street and Sullivan Avenue, in accordance with Town standards and the requirements of the State Traffic Commission, will be provided the Town as part of this development. Rye Street, in its present condition, is in a state of disrepair and is in need of improvements given the amount of truck traffic and auto traffic that exists today. 5. Aldi has committed that it will create a policy that will not allow trucks to turn left out of its facility and head north on Rye Street. All trucking to and from the facility will be limited to the section of Rye Street extending south of the site down to Sullivan Avenue. Any trucks that deviate from this policy will do so without the advance knowledge and consent of Aldi. Aldi will regularly apprise its vendors of the truck routing policy, and will diligently monitor compliance by all truck vendors. 2115 Rexford Road•Suite 314•Charlotte,North Carolina 28211 704 365 3160 telephone•704 365 3101 facsimile www.amkingconstruction.com lel AMKingC O N S T R U C T 1 0 N March 27, 2007 Town of South Windsor Planning and Zoning Commission Re: Aldi Distribution Facility 295 Rye Street A M King Construction Company, LLC, and ALDI, Inc, thank you for your time and attention in hearing and reviewing our proposal for the Aldi Regional Headquarters and Distribution Facility Development proposed for 295 Rye Street in South Windsor, CT. We come before you today to formally ask that you approve this project as it has been proposed to this Commission. We have made every effort to provide for your review a submittal package that is complete, provides a clear understanding of the project, and allows you to make a competent decision regarding this project. In light of this request, we would like to take the opportunity to reiterate and summarize the facts of this development. These are as follows: 1. The site is zoned Industrial, thereby allowing a facility of this nature, size and activity to be developed as proposed. This site does not abut to any residential zoned areas, and Aldi has contracted to purchase the sole residence (presently zoned industrial) adjacent to the south of the site. 2. This building will be wholly owned and operated by Aldi. This will provide one point of contact and responsibility to the town. 3. The applicant has fully complied with all requirements, standards, engineering practices and regulations required by the Town and its staff. 4. Improvements to Rye Street and to the intersection of Rye Street and Sullivan Avenue, in accordance with Town standards and the requirements of the State Traffic Commission, will be provided the Town as part of this development. Rye Street, in its present condition, is in a state of disrepair and is in need of improvements given the amount of truck traffic and auto traffic that exists today. 5. Aldi has committed that it will create a policy that will not allow trucks to turn left out of its facility and head north on Rye Street. All trucking to and from the facility will be limited to the section of Rye Street extending south of the site down to Sullivan Avenue. Any trucks that deviate from this policy will do so without the advance knowledge and consent of Aldi. Aldi will regularly apprise its vendors of the truck routing policy, and will diligently monitor compliance by all truck vendors. 2115 Rexford Road •Suite 314•Charlotte,North Carolina 28211 704 365 3160 telephone•704 365 3101 facsimile www.amkingconstruction.com 6. The development has the full support of Town's Economic Development Committee, the Town's Chamber of Commerce, The Town Manager, businesses located along Rye Street, businesses within the community of South Windsor and numerous residents who are knowledgeable of the development. These supporters have indicated their support either verbally in both Planning and Zoning Commission meetings, Town Council meetings, and in letters submitted to both the Commission and to Council. 7. The present design of the facility has incorporated numerous measures to insure that residential zones north of the development are not impacted by the operations of this facility. These measures include truck traffic routing and monitoring, the placement of the building on the site, locating equipment inside of the building, extensive landscaping and landscape berm construction, and utilizing black sky light fixtures. 8. Due to the development of this property, tax revenues to the Town of South Windsor will be an approximate amount of $1.4 million over a seven year period. Without this development, tax revenues over a seven year period will be an approximate amount of $7,700.00. In year eight, tax revenues will increase to an approximate amount of $1.2 million per year. 9. The economic impact to the community will be a combination of both the immediate impact due to the construction costs and the long term impact of newly created jobs and increased property values of the Rye Street industrial corridor. 10. Approximately 75% of the entire site that Aldi will purchase will remain as pervious to rainfall. This is in excess of 75 acres of land, much of which will be entirely undisturbed from its present state. During the submittal and review process, there have been many questions and comments from both the Commission, and from the residents of South Windsor. We appreciate these insightful and knowledgeable questions, and we have therefore made every effort to respond accordingly. It is our hope that we have accomplished this to your satisfaction. At the completion of this project, we are confident that the Town of South Windsor, and its residents, will see a development that is economically beneficial to the community, is architectually pleasing, and is a good corporate neighbor. We therefore respectfully request that you fully approve this development as proposed. Sincerely, King Construction Brian T. King FIDELITY ENGINEERING CORPORATION KOHLER GENERATOR DIVISION -25 Loveton Circle-P.0"Box 2500-Sparks,Maryland 21152,Telephone 1.800.767.6000•Pax 410.771.9412 Date: March 31,2006 Project: ALDi Distribution Center-Reviser] KOHLER POWER SYSTEM Model: l000RE0T_DB klV: 1000 Voltage: 277/480 Plinse:3 Wire:4 1lertz: 60 Fuel: Diesel Cooling: Radiator Configuration: Indoor • UL 22001-isted design and construction • _875 gallon sub-base iuel tank UL Listed double-wall construction equippedvith:;fuel level gauge,low level"alanll,iuel4n-rupture- "b75111`alanll" a- ■ Radiator duct flange • Flexible fuel connections between the base tank and engine fuel pump • DEC 550 Control Panel containing microprocessor logic and control with digital display of'20 various inputs/oulputs,Shutdowns for high coolant temperature,high oil lemperature,low coolant level,low oil pressure,over crank,over speed.Warning functions far 20 various cralditions,Common fault and status outputs for 39 various conditions • Engine bloclr heater • Critical mut'ller • Electronic isochronous engine governor • Main line circuit breaker,2000 amp • 12 vole engine starting battery lead-acid type • flatlery rack and cables ■ Kohler battery charger,float type with alarms • IG Light Remote Annunciator • Steel skirl base equipped with lube oil drain extension • Lube oil and antifreeze ■ Three(3)Operations&Maintenance Manuals • One(1) Kohler Automatic Transfer Switch,Model ICCT-AN-i7'A-0400S Amps:400 Voltage:277/480,Pole:3,Wire:4,Enclosure:NEMA I Accessories:UL 1008 Listed,Microprocessor based,Position and Source Available Indications,Time Delay Remaining Indication, Pre/Post'fransf'cr Load Control and Load Shed from Emergency,Service Required Indication,Lamp Test,Real-Tine Clock,Exerciser (Loaded/Unloaded),Over/Under Voltage and Frequency Sensing,In phase monitor,Anti-single Phasing Protection, Phase Rotation Sensing,Sollivtlre settable Time Delays and other Parameters,Prog1aninnable 1111)t11/011tpntS, Mod bus CatT1111 an scat ions • Initial startup and custonier demonstration-during rtorinal business flours • Jobslte load test with building load • F.O.f3.jobsite delivered on it flutbed truck-offloading and rigging by Others • Kohler two year basic lvarranly Exceplions:No fuel,no anchor bolls,no mechanical or electrical installation. No high-lemperature insulation an the exhatist. independent It-'sting arranged by others. PLEASE REFER TO THIS BILL OF MATERIALS FOR SPECIFIC RATINGS, cm_ VOLTAGE AND ACCESSORIES ;V;C'-rldetnV 1_11gince'ring reserves the right to substitute accessory nerTls of equal ar gTCntCY gUalitV INIn thM submitted on 1rt case's of extended delivery Application Data Cooling Operation Requirements i Radiator System 60 Hz Air Requirements 60 HZ Ambient temperature,standbyrating, Radiator-cooled cooling air, i °C (IF) 40 (104) M3/min. (scion)t 1161 (41000) Ambient temperature,prints rating, High ambient radiator-cooled cooling air, °C (°9 45(113) m /min.tscfirn)t 1404(49600) Engine water capacity,L(gaL) 130(34) Cooling air required for generator set Radiator system capacity,including when equipped with city water cooling or engine, L(gal.) 257(68) remote radiator,based on 14°C(25^F) Engine jacket water flow, Lpm (gpm) 967(255) rise,m-lmin.(scim)t 391 (13800) Charge cooler water flow,Lpm (gpm) 283(75) Combustion air, m3/min. (clm) 87(3072) Neat rejected to cooling water at rated Heat rejected to ambient air: kW,dry exhaust,kW(Btu/min.) 480(27297) Engine,kW(Btu/min.) 45 (2559) Heat rejected to charge cooling water at Alternator,kW(Btu/min.) 64(3640) rated kW,dry exhaust;kW(Btu/min.) 290(16492) Air density=1.20 kg/m3 (0.075 Ibm/ft3) Water pump type Centrifugal Fan diameter,including blades,mm (in.) 1372(54) Fuel Consumption S0 Fain,f<Wm(HP) 51 (68) Diesel,Lph (gph)at load Standby Rating`::'` Max. restriction of cooling air,intake and =.1pD% 267.2 7D: discharge side of radiator,kPa(in. H2O) 0.125(0.5) - {..... I High Ambient Radiator System 60 Hz 5D% 138.2 (36 25°J° 75.7 (20.0) Ambient temperature, °C(IF) 50(122) Engine water capacity,L(gal.) 130 (34) 4 Radiator system capacity,including engine, L(gal.) 322(85) S Engine jacket water flow,Lpm (gpm) 967(255) Charge cooler water flour,Lpm(gpm) 283(75) Heat rejected to cooling water at rated j kW,dry exhaust,kW(Btu/min.) 480 (27297) Controllers Heat rejected to charge cooling water at E rated kW,dry exhaust,kW(Btu/min.) 290(16492) ( -�- C t Water pump type Centrifugal Fan diameter,including blades,mm (in.) 1524 (60) * Fan,kWm(HP) 70(94) � Max.restriction of cooling air,intake and discharge side of radiator,kPa(in. H2O) 0.125(0.5) pecision-14ilaker" 550 Controller 4 t Audiovisual annunciation with NFPA 110 Level 1 capability. Remote Radiator System" 60 Hz j Programmable microprocessor logic and digital display features. l Exhaust manifold type Dry Alternator safeguard circuit protection. j Connection sizes: 12-or 24-volt engine electrical system capability. Water inlet/ouflet,mm(in.) 77(3) Remote start,remote annunciation.acid remote communication options Intercooler inlet/outlet,mm(n.) 51 (2) Refer to G6-46 for additional controller features and accessories. j Static head allowable above engine,kPa(it.H2O) 149(50) *Contact your local distributor for cooling system options and j specifications based on your specific requirements. y L t. t e t i i t t( t Cd5.2d'F {rit^.{�i•11�gZCi3t t2ii15e 1 OW N Sf4 y x 70� O-P slou . � o G U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �f�OSox•co`'� TELEPHONE (860) 644-2511 July 26, 2007 Design Professionals Inc Peter DeMallie PO Box 1167 South Windsor, CT 06074 Dear Mr. DeMallie Re: App106-60P,Aldi's Distribution Center This is to advise you that the Planning and Zoning Commission voted on 7/24/07 to set the site bond at$1,364,600 for the required improvements. A bond or letter of credit in this amount must be posted prior to the issuance of building permits. Sincerely, Patrick Kennedy, Chairman PLANNING &ZONING COMMISSION PK/dma Enclosure cc: Town Engineer Chief Building Official MEMORANDUM To: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer Date: 7/20/07 RE: App 06-60P Aldi, Rye Street Improvements Bond The Engineering Division recommends establishment of a bond in the amount of $1,364,600 for the required improvements to Rye Street associated with the Aldi Site Plan on Rye Street. Please call me if you have any questions. s - • AMKing C O N S T R U C T 1 0 N March 27, 2007 Town of South Windsor Planning and Zoning Commission Re: Aldi Distribution Facility 295 Rye Street A M King Construction Company, LLC, and ALDI, Inc, thank you for your time and attention in hearing and reviewing our proposal for the Aldi Regional Headquarters and Distribution Facility Development proposed for 295 Rye Street in South Windsor, CT. We come before you today to formally ask that you approve this project as it has been proposed to this Commission. We have made every effort to provide for your review a submittal package that is complete, provides a clear understanding of the project, and allows you to make a competent decision regarding this project. In light of this request, we would like to take the opportunity to reiterate and summarize the facts of this development. These are as follows: 1. The site is zoned Industrial, thereby allowing a facility of this nature, size and activity to be developed as proposed. This site does not abut to any residential zoned areas, and Aldi has contracted to purchase the sole residence (presently zoned industrial) adjacent to the south of the site. 2. This building will be wholly owned and operated by Aldi. This will provide one point of contact and responsibility to the town. 3. The applicant has fully complied with all requirements, standards, engineering practices and regulations required by the Town and its staff. 4. Improvements to Rye Street and to the intersection of Rye Street and Sullivan Avenue, in accordance with Town standards and the requirements of the State Traffic Commission, will be provided the Town as part of this development. Rye Street, in its present condition, is in a state of disrepair and is in need of improvements given the amount of truck traffic and auto traffic that exists today. 5. Aldi has committed that it will create a policy that will not allow trucks to turn left out of its facility and head north on Rye Street. All trucking to and from the facility will be limited to the section of Rye Street extending south of the site down to Sullivan Avenue. Any trucks that deviate from this policy will do so without the advance knowledge and consent of Aldi. Aldi will regularly apprise its vendors of the truck routing policy, and will diligently monitor compliance by all truck vendors. 2115 Rexford Road•Suite 314•Charlotte,North Carolina 28211 704 365 3160 telephone•704 365 3101 facsimile www.amkingconstruction.com 6. The development has the full support of Town's Economic Development Committee, the Town's Chamber of Commerce, The Town Manager, businesses located along Rye Street, businesses within the community of South Windsor and numerous residents who are knowledgeable of the development. These supporters have indicated their support either verbally in both Planning and Zoning Commission meetings, Town Council meetings, and in letters submitted to both the Commission and to Council. 7. The present design of the facility has incorporated numerous measures to insure that residential zones north of the development are not impacted b the operations of this p p Y P facility. These measures include truck traffic routing and monitoring, the placement of Y g g� the building on the site, locating equipment inside of the building, extensive landscaping and landscape berm construction, and utilizing black sky light fixtures. 8. Due to the development of this property, tax revenues to the Town of South Windsor will be an approximate amount of $1.4 million over a seven year period. Without this development, tax revenues over a seven year period will be an approximate amount of $7,700.00. In year eight, tax revenues will increase to an approximate amount of $1.2 million per year. 9. The economic impact to the community will be a combination of both the immediate impact due to the construction costs and the long term impact of newly created jobs and increased property values of the Rye Street industrial corridor. 10. Approximately 75% of the entire site that Aldi will purchase will remain as pervious to rainfall. This is in excess of 75 acres of land, much of which will be entirely undisturbed from its present state. During the submittal and review process, there have been many questions and comments from both the Commission, and from the residents of South Windsor. We appreciate these insightful and knowledgeable questions, and we have therefore made every effort to respond accordingly. It is our hope that we have accomplished this to your satisfaction. At the completion of this project, we are confident that the Town of South Windsor, and its residents, will see a development that is economically beneficial to the community, is architectually pleasing, and is a good corporate neighbor. We therefore respectfully request that you fully approve this development as proposed. Sincerely, King Construction Brian T. King P.O.BOX 1167 425 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 "mn PHONE: 860.291.8755 FAX:8onalsi .8757 c.com www.desgnprofessionalsi nc.com CIVIL & TRAFFIC ENGINEERS / PLANNERS / SURVEYORS / GIS ANALYSTS ! LANDSCAPE ARCHITECTS February 14, 2007 Ms. Marcia Banach RECEIVED Town of South Windsor 1540 Sullivan Avenue : South Windsor, CT 06074 FFR 15 2007 • RE: Aldi Distribution Facility SQUiHMMSORPLffiaDEPT, Dear Marcia We have revised the plans and drainage analysis to address your review comments dated : 12/28/06, Jeff Doolittle's comments dated 1/3/07, and Jeff Folgers comments up through 12/26/06. Our replies to the comments are as follows: : Your comments dated 12/26/06: 1. The zoning data block has been revised as requested. 2. The pins have been shown to be installed where noted to be missing on the plot plan sheets P 1-P5, and a note to the same effect has been added to these plans. The monuments along the street frontage are shown on the Rye Street widening plans. 3. We understand that Aldi's prefers to have the 10' x 20' parking spaces. 4. The Rye Street road improvement plans are presently being prepared, and will be submitted prior to the Planning and Zoning Hearing. : 5. The floodlights have been removed from the elevation plans, and are no longer proposed. 6. The water tank has been show on the plans near the dispatch building. 7. The cross sections have been revised to reflect a 3.5' viewing height. • Jeff Doolittle's Comments dated 1/03/07: 1. All proposed curbing on site is concrete curb. The plans have been revised to reflect this. 2. The hatched areas on the plans reflect a striped off area. The plans have been : revised to reflect this. 3. The appropriate reference notes have been added to the plans, and the drainage stationing has been shown on the topographic sheets. 4. The applicable scales have been added. 5. The drainage structures have been labeled with the unique station number. 6. The drainage pipe materials have been labeled. 7. The roof drainage piping has been revised,and labeled to address the comments. : 8. The retaining walls have been reduced in scope and the utilities in this area have been moved to be located under the proposed pavement. The site owner is very • • • • • much against removing the proposed pavement in this area. The ability to operate effectively and as cost effective as possible would be diminished with the removal of pavement in this area and moving the truck storage spaces to the west past the end of the building. The moving of these spaces would result in the need to travel further on average to move trailers into position, and would result in an overall increase in impervious coverage on the site. Our client operates numerous similar facilities throughout the country and understands the amount of room necessary for the proper and safe operation of the facility. The proposed retaining walls have been significantly reduced in size and scope (max 6' in height), and are proposed over 20' from the nearest wetland boundary. We have contacted Clarence Welti regarding the stability of the proposed retaining walls, and Clarence Welti has determined that there are no issues with stability in constructing the proposed walls. We have included an additional sequence of operations to work to address concerns regarding possible impacts from the construction on the wetlands. We believe with the reduction in the size and extent of the retaining walls, and the additional safeguards that we have included in the design,that these walls can be constructed with no impact on the wetlands. 9. The size of the detention basin was governed by water quality requirements. Due to the depth of the storm drainage on site,the detention basin needed to be deep in order to accept runoff from the on-site drainage. Due to this extra depth,there is an ability to detain runoff on site and discharge at rates much less than under existing conditions. Environmentally,this would appear to be a good option. The extended detention of the storm water during larger events would allow for better settling of solids within the basin,better contact time with vegetation,and would also allow for lower discharge rates into the river during the periods when higher flows are causing erosion within the river corridor etc. We do not believe that for the infrequent larger storm events,the water backed up into the storm pipes for a few days will have any impact on the storm structures, and certainly the benefits to the environment far exceed any potential impact to the storm drainage structures. The basin has been redesigned slightly to increase the 100 year storm discharge to 5.14 CFS,with a maximum elevation within the pipes of 71.40. This elevation is still approximately 7 ft. below the storm drainage within the pavement which is generally set at an elevation of 78.35. 10. See comments under#9 above. 11. The detention basin outlet detail has been revised to correspond with the revised detention basin design. 12.Additional design detail has been added to the detention basin outlet pipes. In addition, Class V concrete pipe has been indicated for the steeper pipe sections. 13. We added additional detail regarding the outlet construction to the erosion control plan including an additional sequence of construction for this area. In general, along the steeper slopes,the pipe is fairly shallow. Near the top,the pipe starts getting deeper, and this is the area where there will need to be additional care. 14. The last piece of outlet pipe has been adjusted accordingly. 15. The appropriate changes have been made to the plans. 16. We do not anticipate any significant adverse impacts due to the discharge of the storm runoff from the site directly into the river and not into the ravine to the south of the site that drains into the river. The wetlands in this area appear to be from subsurface breakout,and as such the redirection of the surface runoff would 4onah • : have little impact on these wetlands. See also response#3 to Jeff Folgers comments below. 17. We proposed the curtain drain around the detention basin in large part to address anticipated issues with the construction of the basin. The groundwater must be controlled during the excavation of the basin in order to allow for the excavation of the clay material. The clay extends up to approximately 68-72 across the basin. As such, only storms in excess of a 25 year storm will pond to depths reaching into the sand. Even during a 100 year storm event, water will pond above elevation 68 for less than 24 hours. With the curtain drains, and the relatively short ponding within the sand layer,we do not anticipate any substantial seepage into the sand layer that could cause issues with the embankments. 18. The details have been added to the plans. 19. The detention basin does not have a berm. The basin is a fully excavated basin. The lowest elevation along the top of bank of the basin is approximately 77.0. The 100 year design storm reaches an elevation of 71.40,thereby providing almost 6' of freeboard. The overflow structure set at elevation 71.50 provides the required overflow protection, and as such an emergency spillway would not be required. 20. The details have been revised accordingly. 21. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 22. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 23. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 24. WPCA approval will be requested. 25. The plans have been revised accordingly. 26. The landscape plan has been checked. 27. The Rye Street improvement plans are included separately. 28. The Rye Street improvement plans are included separately. 29. The Rye Street improvement plans are included separately. Jeff Folgers comments dated 12/22/06: 1. A larger scale plan of the area of the retaining walls has been included. 2. Additional detail of the outlet pipe from the detention basin is included. Jeff Folgers comments dated 1/03/07: 1. Rye Street road widening plans are being completed for submission. Jeff Folgers comments dated 12/26/06: • 1. We looked at the erosion scars on the site. In general,the erosion scars appear to be caused as much by subsurface breakout as surface runoff. In the rear of the site,beyond the limits of improvements,we did not note any locations with concentrated flow. Within the limits of the proposed improvements, both surface : : and subsurface flows will be decreased;therefore,we do not expect a decrease or abatement in the erosion presently occurring. 2. We have included dewatering/pump notes with details etc. to cover the dewatering on the site. 3. We reviewed the drainage area to the western gully to determine the percentage of site contribution to this area. Drainage area boundaries were marked on the : USGS map included herein. The drainage limits were confirmed in the field with the aid of larger scale town topographic mapping. The total drainage area as shown is 148 acres. The downstream limits of the drainage area were defined as the downstream limits of the proposed development. Of this 148 acre drainage area, approximately 39 Acres(portion of the site development)will be directed into the river. This amounts to approximately 26.4%of the drainage area. In reviewing the drainage area in the field we noted that even after a period of days with no precipitation,there was substantial flow within this wetland system at the : road crossing, and there was running water within the ditches adjacent to the railroad that drain into this wetland system. As can be seen on the map included, : the wetland system consists of a substantial ravine that extends up to the railroad, and the subsurface area draining to this ravine most likely extends well beyond the limits of the surface drainage area. 4. The retaining walls have been reduced in scope and the utilities in this area have been moved to be located under the proposed pavement. The site owner is very much against removing the proposed pavement in this area. The ability to operate effectively and as cost effective as possible would be diminished with the removal of pavement in this area and moving the truck storage spaces to the west past the : end of the building. The moving of these spaces would result in the need to travel further on average to move trailers into position,and would result in an overall increase in impervious coverage on the site. Our client operates numerous similar facilities throughout the country and understands the amount of room necessary for the proper and safe operation of the facility. The proposed retaining walls have been significantly reduced in size and scope(max 6' in height), and are proposed over 20' from the nearest wetland boundary. We have contacted Clarence Welti regarding the stability of the proposed retaining walls, and Clarence Welti has determined that there are no issues with stability in : constructing the proposed walls. We have included an additional sequence of operations to work to address concerns regarding possible impacts from the construction on the wetlands. We believe with the reduction in the size and extent : of the retaining walls,and the additional safeguards that we have included in the design,that these walls can be constructed with no impact on the wetlands. 5. The amount of impervious area draining into each catch basin is large (approximately 1 acre into many of the catch basins). Installation of trap hoods is not recommended for such large flow rates as will occur through this drainage system. As an alternative,we have proposed to install a water quality structure on the outlet side of the basin to catch any floatable material that drain through the : basin. The installation on the outlet side will allow for the ample treatment of relatively low flows compared to the inlet pipes, which carry high flows. 6. We have not proposed to install a high efficiency gross particle separator. The : basin as designed fully meets the 2004 CT Water Quality standards, and is expected on its own to remove over 80%Total suspended solids. The concrete • A=oneh pavement on the site throughout the trucking areas has been designed to be between 1 and 1.5%in grade. These very minimal grades along with the southern exposure of the truck areas and office parking areas will result in minimal need for sanding of the pavement areas. The large fore-bay along with the catch basin sumps and the deep low discharge basin will provide for ample settling of any solids. As a final measure, a water quality structure has been included on the : outlet primarily to prevent floatable material from being discharged from the site. 7. The limits of tree clearing have been adjusted on the plan. Thank you in advance for your consideration of the above, and please feel free to call with any questions or comments. Sincerely, Galen Semprebon,t.E. Executive Vice President Enclosures: TOWN OF SOUTH WINDSOR CHECKLIST RECEIVED REQUIRED INFORMATION SITE PLANS DEL 012006 APPLICANT , c� c � PLANNING DEPT. PROJECT NAME_af-,D,j, This checklist mu signed by plan preparer(P.E./L.S.)declaring that all required information is provided. Items 1-7 are required for all applications; items 0-11 required where appropriate. Check mark for each item supplied. 1. On each sheet for plans or maps, title block with the following information: — a. Name, address and telephone of applicant. b. Name, address and telephone number of Land Surveyor or Professional Engineer. c: Name of Development. d. Date when drawings were made. 2. Key Map: An overall map drawn to a scale of 1 inch equals either eq 100 feet or 200 feet. This map will show the overall design of the Development and surrounding property within 500 feet. a. Data block which gives needed zoning information such lot coverage, acreage of tract, number of apartment units, percentage of requirements, etc. b. Outline of buildings. — _ c. Layout of streets. d. Surrounding property boundaries-within 500 feet e. Names of abutting property owners. f Proposed open spaces and recreation areas. g. Driveway cuts on abutting properties and any ro rties a proposed site. p cross from -I h. Distance to and name of nearest inte rsection street. 1 s w k 3. Architectural Elevations: See attached checklist for Architecture and Design Review. g 4. Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: (1) 24" x 36" with a 3/4" ruled margin; (2) 18" x 24" with a 1/2" ruled margin, containing the following data: P a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. b. Proposed streets and street lines with center line station, curve data, and parking spaces_ c. Building lines in accordance with zoning regulatioris. d. Proposed buildings and other structures, including signs, outside lighting, and dumpsters(on concrete pad and screened). e.. Easements, noting grantors, grantees, and purpose must be shown in table format, e.g, below . Grantor Grantee Type of Date Fled Vol/Pg Easement f. Names of abutting property owners. g. Monuments will be indicated at comers and angles of all streets and at all points of curvature and tangency. The monumented points within proposed site shall be.coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these CGS points shall be determined by the Town Engineer. h. All open space or other common or public land uses shall be indicated. i. A-2 certification; P.E./LS. Seal. 5. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches, including ruled margins shall in addition to / the requirements of the plot plans show the following: a. All existing and proposed buildings. b._ Curb lines and pavement width, sidewalks. c. Existing-and proposed sanitary sewers. Po rY 2 d. Existing and proposed water and-all existing utilities. e. Present wooded area indicated by foliage lines. Any trees to be saved should be shown.. f. Existing and proposed contours shall be shown in not less than two-foot intervals, but in cases of relatively level land,the contours shall be one- foot intervals and spot elevations. 9 . Regulated wetlands and 100-year floodplain or note that none are present. h. Proposed storm drainage system, showing all catch basins, endwalls, manholes, lengths and sizes of pipes and elevations of structures. (Maximum distance between catch basins shall be 300 feet and minimum size.of storm drain lines shall be 15 inches,within Town ROW.) If plan/profile sheet is provided all of this does not need to be shown. Only top of frame elevations and inverts of open discharge pipe shall be shown on this plan. i. Connections of all springs into proposed storm drainage stem as needed. g j. Location and indications of existing brook channels, and 100-year flood limits. k. A-2&T-2 Certification; P.E &L.S. Seals. 6. - Landscaping plan 7. Drainage calculations: -Zero Runoff Increase per attached guidelines. 8. Traffic Report 9. Site Lighting Plan !L[7 10. Plans and Profiles: A plan and profile of the streets draw proposed non plan/profile paper of scales 1 inch to 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. . Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways, drainage, sanitary sewer (including house sewer), foundation drains, lot lines, buildings including all utilities with elevations(top frame and inverts), size, type, length, slopes of pipes. 3 ho � c. Sight line at driveway&street intersections. _ d. Profile of roadway showing existing and finished grades. Roadway profile will show all tangent grade and all vertical curve information. - 14 e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations, sizes, lengths and slopes of pipes. f. Where any storm drainage line discharges"into an existing brook sufficient profile of this brook will be shown to determine conditions. g. CGS datum shall be used on all sites accessible to these controls. The Town Engineer shall, based on standard engineering practices, determine .the accessibility of these controls. .1A h. Profiles shall show all sanitary sewer lines and manholes, including elevations, (inverts, top of frame) sizes, lengths, and slopes of pipes. Top of foundation elevations for building shall be shown. 11. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces, a plan which contains data for site improvement may be required. This map shall be drawn to a scale of 1 inch equals 40 feet. - 12. Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual systems. 2S 4 PLAN PRE-PAR (P.E./LS.); DA-11 February 2002; Rev. 4-04 4 r Sanitary Sewer Design Report Aldi Distribution Facility 295 Rye Street RECEIVED South Windsor,CT DEC 0 .1 2006 SOUGH W�NDSOR PLANNING DEPT. f 1 it Prepared by Design Professionals,Inc. 425 Sullivan Avenue South Windsor,CT 06074 DPI Project No. 06-2282 November 30,2006 t The proposed Aldi Distribution Facility consists of the construction of a 500,000+ S.F. warehouse facility with associated loading docks,office,parking,and truck storage areas. The site contains 106.6 acres of land and is located on the west side of Rye Street approximately 2,300 feet north of the Rye Street/Route 194(Sullivan Avenue) intersection. Rye Street is a local road, and Sullivan Avenue is a state road. The site consists of a plateau of land that abuts Rye Street on the east,and is flanked by steeper slopes and wetlands on the north, south and west sides. The site is relatively flat within the plateau. There is an existing sanitary sewer within Rye Street that runs north to south. Due to the grades of the site, and the depth of the sanitary sewer within Rye Street,the design of the sanitary sewer within the will need to have minimal grades. The design of the sanitary sewer is based on the following information: 1. Based on the ASCE manuals and reports on Engineering Practice no. 37"Design and Construction of Sanitary and Storm Sewers" 1979 page 88-89, a velocity of 2'per second is sufficient for self cleansing velocity. 2. Design of sanitary sewer based on Manning's formula: 2/3 1/2 V= 1.486 R S N 3. For determination of Full flow within pipe: Q=VA 4. Partial flow values based on Figure 1 Taking N=0.010, and solving Manning's formula for required slope based on a full flow velocity of 2'/sec. results in the following: For 8"pipe R=D/4=0.165 S=0.002 ft/ft. Q(full)=VA=0.705 CFS=316 GPM For 6"pipe R=D/4=0.125 S=0.0029 ft/ft. Q(full)=VA=0.3927 CFS=176 GPM The following table is based on the above full flow calculations, and figure 9.23 8"Pipe Q(GPM) %Full d/D v/v(full) V(req'd)* S(req'd)* 156 49.6 - - 2'/sec. 0.002 ft./ft. 63 19.9 .30 .78 2.56 0.0033 ft./ft. 38 12 .22 .70 2.86 0.0041 ft./ft. 93 29.43 .38 .90 2.22 0.0025 ft./ft. 89 28.16 .37 .89 2.25 0.0025 ft./ft 12 3.80 .12 .42 4.76 0.011 ft./ft. 6"Pipe 38 21.59 .34 .84 2.38 0.0041 ft./ft. 4 2.27 .14 .49 4.08 0.0121 ft./ft. 52 29.55 .39 .89 2.25 0.0037 ft./ft. 25 14.20 .27 .75 2.67 0.0052 ft./ft. 12 6.82 .16 .50 4.00 0.012 ft./ft. *The velocity required and slope required are based on increasing the slope of the pipe and velocity for partial flow conditions to provide a minimum of 2'/sec. under full flow conditions. The velocity was increased based on the percentage of v/v(full),and the slope was calculated using the Manning's formula with the increased velocity. Based on the required minimum slopes,there will be two runs of sanitary sewer pipe on the site that will be at less than the required minimum slope. The run from the north side of the building carrying 12 GPM should be at a minimum of 0.011 ft./ft.,but is designed at 0.0078 ft./ft. We do not anticipate an issue with this discharge. The discharge consists of floor drains, sand trap and service sink that go thru an oil separator,so there should be minimal solids in this discharge. The other discharge is the 4 GPM that discharges from the southeast corner of the building. According to the calculations,this should be at 0.0121 ft./ft. The pipe is designed at 0.0117 ft./ft.,which is very close to the required slope. We have included within this report,a summary map of the discharge locations with flows,and pipe sizes and slopes as designed. Also included in the rear of this report,is a copy of Figure 1 used for the partial flow calculations. .. ■/.Mumma a... soma ■//■■■i■/./.........MI.../&.:�\Z...E.E. soon 0 MEN NONE WIRM ....■an ENSUE■S NEON .EO/E.■■..N...SEEE��.R..../J■\NEW MENEM an ARM, ./i. ..Mumma.Room....won.■/■/■/.■ ■/%iN..I,■..11..1 E■N■N/ 1..■ i.■.11■//t//ti.IEmom ............WIFIGI .i../%H.i 1..11N/ N�ttIN..Emass■■Et/■■■■E■ ■/./....►'v i%■Rt■IIti11RtR C...■■........won.............■....../rid...Ci�......11..1/Ol.■ ........................NEW....►.....C.1�.►IEEE... ' ■0 NEON man a MEN iiiiiiiiiiiiiiiiiiimiii�iiiii ii ion go NONE EMEMENEREN MONI'Miiiiiiii iiiii ■■t�!■N/■ Emma am mom mosommimmmnrdrAm Ems /.■■■■N//■■■N/G./■■son E■/.�■■/■//%%NIN.i..■ ■.....i.■■.O.NONE ■E�i■.......ENE.'■//■i'/,/mN■N...N■ • ■...■■■/■E.t.■E■N..e�i.■■/■.E■NE...sr....r......�....■ ■...��. .■...■�1E..►.�1.■■.NOI..........NE■�iEN/■......am ■/NNINtt■■!/■Nr■■/%%■■■■■NN■.Somme.N..�%CNN/...ENNUNN EON ■..■■■N■■.■■!I%Si.■...N■/mom.N■..eme2ona..........noun ' ■..■N.■■.■■■M/vN.ENE■■EN. ■■.N/N■/owns ■..NUNN■..■■NRw%R%■■o■■ M■.E0����lOi%�i�■�l RESUME NEON ■RtR■ /�G■■Nt■■/■■t■■/lRNRlit/.%/no■■/N■E.■/■.MEN■■ ' ■OI.an % .i.GOIN.N.//N■N■/./.P./N .i.N..OwrdMmM .//■i/■i■Ni/NO■ AMEMOMEMMEW Oman ■.../ .i!...■..■NNE.NIIS�i/..Nii`IN. N■N.....Mason ■./J/iN.O..NNNN0 Moslem Nunn ENE ��■■■•CNN■■..ENE..■■■■■N.i■■■■■/■■ MENOMONIE ■% /.N/■.■■/i/EENl %■.■.......N.NEN...N..E..E.mommonso ....oE.■ IJI/■OI./ %O�! i/E.E..O..i....O.someone./..i.N/EMAMMONISM DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors landscape architects ♦ gis ♦ gps LETTER OF TRANSMITTAL RECEIVED DEC 0 12006 December 1,2006 SOUTH WINDSOR PLANNING DEPT. Ms.Marcia Banach,Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: PZC Application DPI Project No. 06-2282 AM King Construction 295 Rye Street South Windsor, Connecticut WE ARE SENDING YOU: ❑ for your use ❑ at your request ® for PZC approval ❑ for your files ® for review ❑ for your payment THE FOLLOWING: • One(1) copy of the application • Eight (8) sets of plans • Two (2) sets of drainage computations • Two (2) copies of the checklist • Eight (8) copies of the traffic study • The application fee in the amount of$95.00 (DPI check#6778) Please contact us with any questions and/or comments. Thank you. Sincerely, DESIGN PROFESSIONALS, INC. By: RJz Galen B. S prebon, P.E. Principal CC: AM King Construction 425 Sullivan Avenue,South Windsor,Connecticut 06074 Tel: (860)291-8755•Fax: (860)291-8757 www.designprofessionalsinc.com i' Stormwater Management Plan Aldi Distribution Facility 295 Rye Street South Windsor, Connecticut RECEIVED `FEB 15 2007 SOUTH WINDSOR PLANNING DEPT. Jul 2I t �c l.! . � r nna� Prepared by Design Professionals,Inc. 425 Sullivan Avenue South Windsor,CT 06074 DPI Project No.06-2282 November 9,2006 Rev. 1/30/07 Table of Contents: Page# Introduction 1 Existing Conditions 1 Proposed Development 1 Erosion/Sedimentation Control Systems 1 Stormwater Runoff Quality 1 Conveyance System 2 Maintenance and Operation 2 Topographic Contour Maps 2 Floodplain Boundaries 2 Drainage Design 2 Water Quality Calculations 5 Storm Drainage Calculations 5 Conclusions 5 Appendices TR 55 Analysis-Existing Conditions A TR-55 Analysis-Developed Conditions B Detention Basin Design Tables C Hydroflow Routings D Water Quality Calculations E Storm Drainage Calculations F Introduction: The proposed Aldi Distribution Facility will be located on two parcels of land on the northwest side of Rye Street in South Windsor Ct. The facility will consist of a large warehouse building with associated paved areas,office support,dispatch office, and associated parking areas. Existing Conditions: The site contains 106.6 acres of land and is located on the west side of Rye Street approximately 2,300 feet north of the Rye Street/Route 194 (Sullivan Avenue)intersection. Rye Street is a local road,and Sullivan Avenue is a state road. The site consists of a plateau of land that abuts Rye Street on the east,and is flanked by steeper slopes and wetlands on the north, south and west sides. The wetlands on the north and south sides of the site drain to the west, and the wetlands along the west side of the site contain the Scantic River. Ultimately the entire site except for a small strip of land immediately adjacent to Rye Street drains directly to the Scantic River. The small strip of land(within the existing right of way)that drains to Rye Street drains to a small cross culvert approximately 200' north of the south property line. The site contains farm fields that are used either for hay or silage. Proposed Development: The proposed development of the site consists of the construction of a 500 000+ S.F.warehouse facility with associated loading docks — h' g , office,parking,and truck storage areas. The site will drain to a single large on-site water quality/detention basin that will discharge directly to the Scantic River. The water quality/detention basin will be designed in accordance with the 2004 CT Stormwater Quality Manual for wet extended detention ponds. The soils on the site are sands overlaying clay,and due to the depths of the storm drainage on site,the basins will be constructed with the permanent pools within the clay layer. With the size of the site,and the associated length of piping,the basins will be approximately 15-20' deep. As such, there will be tremendous volume for detention. Erosion/Sedimentation Control Systems: An extensive erosion/sedimentation control plan has been developed as part of the site design. These measures include the following: 1. Installation of silt fence down-slope of disturbed areas. 2. Installation of silt fence around stockpiled materials. 3. Use of the proposed water quality/detention basin as a sediment basin during construction. 4. Use of temporary berms during construction to control runoff and direct runoff to on-site sediment basins. 5. Use of sediment basins during construction. 6. Seeding and mulching disturbed areas as soon as practical during construction. 7. Limiting the areas of disturbance during construction. 8. Installation of construction entrance pads. 9. Maintenance of the above measures. Stormwater Runoff Quality: Water quality will be addressed through a number of measures. The sumps within the catch basins will collect sand and silt from the paved areas. The detention/water quality basin will further treat the runoff from the site. Conveyance System: The on-site conveyance system consists of catch basins and associated pipes that will convey the storm water to the proposed water quality/detention basin. A swale is proposed to pick up runoff from Rye Street,and convey it to the proposed storm drainage system. Maintenance and Operation: The following maintenance operations will be required to ensure the proper and efficient operation of the Storm Water System. The following maintenance schedule is intended to be a minimum guide,and additional inspections and maintenance measures may be required following large storm events that could cause the deposition of excess debris in the system. Catch Basins: The catch basins should be inspected annually. The catch basin sumps should be cleaned when the depth of material within the sumps reaches 1'. Pipe Outlet Locations: The pipe outlets and associated riprap shall be inspected annually and cleaned of silt and or debris. The riprap shall be re-shaped and replenished as required. Pavement Sweeping: The parking lots within each lot shall be swept at a P g P minimum of twice per year. Once in the spring shortly after the end of the snow season,and once in the fall after the leaves have fallen. Basin Spillway: The stone spillway shall be inspected twice yearly. All large woody growth that may affect the flow of water or the stability of the spillway shall be removed. The spillway shall also be inspected after any flow passes through it. The riprap shall be re-arranged and added to as required to maintain the design as per the design plans. Topographic Contour Map: Topographic contour maps have been provided showing the drainage areas for the site. The maps showing the existing and developed conditions are included in the rear of this report. Floodplain Boundaries: The site contains a floodplain that is associated with the Scantic River. None of the proposed development is within the floodplain except for the proposed pipe outlet from the detention basin. No filling of the floodplain will occur in order to construct this outlet. Drainage Design: The drainage design of the site has been completed utilizing a number of computer programs and generally accepted design methods. The runoff from the site under existing and developed conditions was developed utilizing the TR-55 computer program. The flood routing and basin modeling was completed utilizing the Hydroflow Hydrographs for Windows computer program by Intelisolve. The drainage piping on site was designed using the rational formula,and sized for a 10-year design storm. The site was analyzed under existing and developed conditions. Only the portion of the site to be impacted from the proposed development was analyzed. A drainage area map for the existing conditions is included in the rear of this report. Under existing conditions,the drainage area was subdivided into three sub-areas. Drainage area lE consists of the portion of the proposed developed site that drains to the south to a large ravine off-site on the abutting property to the south. There are a number of fingers from this large ravine that extend up to and into the site. The ravine drains to the west to the Scantic River. Drainage area 2E consists of the portion of the proposed developed site that drains directly to the Scantic River via a number of eroded channels. Drainage area 3E consists of the portion of the proposed developed site that drains to the north to a large ravine off-site on the abutting property to the north. There are a number of fingers from this large ravine that extend up to and into the site. The ravine drains to the west to the Scantic River. The TR-55 analyses were completed for all three sub-drainage areas under existing conditions. The results are included in Appendix A. A summary of the results are as follows: Design Storm Drainage area 2 10 25 50 100 lE 20 43 58 71 85 2E 2 4 5 6 7 3E 1 5 8 11 14 Total 23 52 71 88 106 (Note all flows are CFS) The site under developed conditions will drain to a proposed water quality/detention basin. All three areas under existing conditions make up the proposed drainage area to the proposed water quality/detention basin. The total area draining to the water quality/detention basin is 57.49 acres. The TR-55 analysis is included in appendix B and summarized below: Design Storm 2 10 25 50 100 Developed 36 80 106 131 156 (To Basin) The proposed water quality/detention basin will be constructed in the rear of the site. Due to the depths of the drainage system, and the minimal grade across the top of the plateau of land that the development is occurring on, the basin will be a totally below grade excavated basin, and will be fairly deep. According to the soil borings done in this area,there is generally a 1' topsoil layer,with 8-9' of sand below the topsoil. Underlying the sand is gray varved clay that extends below the deepest borings completed on the site (51.5'). The proposed basin is to be constructed in an area with surface elevations of 78- 82. The Bottom of the basin will be at elevation 54+-. The permanent pool for water quality will be between elevation 54 and 60. The detention outlet structure will be set at elevation 60,and the volume provided for detention is between elevation 60 and 78. The water quality portion of the basin will be within the varved clay layer, and as such is expected to maintain a wet pool throughout the year. A portion of the detention volume will be within the clay layer also. Seepage is expected to occur within the basin during the course of the year. The basin was analyzed utilizing the Hydroflow Hydrographs for Windows computer program by Intelisolve. Under developed conditions due to the extremely large amount of volume that is available for detention, the design flows can be reduced significantly below existing peak flow rates. The stage/storage table, outlet structure design and stage/storage/discharge tables are included in appendix C. The hydraulic routing reports for the 2-100 year storm events are included in appendix D. A summary of the existing and developed peak flow rates are as follows: Design Storm Drainage area 2 10 25 50 100 Total Existing 23 52 71 88 106 Flows(Areas IE,2E,and 3E) Developed Flows 2.61 3.93 4.41 4.80 5.14 (Exiting Proposed Detention Basin) (Note all flows are CFS) Water Quality Calculations: The detention/water quality basin has been designed to provide water quality in conformance with the 2004 Connecticut Stormwater Quality Manual. The basin has been designed as a Wet extended detention pond. There will be a permanent pool depth of 6', a 10' aquatic bench around the entire permanent pool depth, a safety bench above this depth, sufficient depth to accommodate over a 100 year storm event,access to the inlet and outlet for maintenance, and a fore-bay with over 101%of the required total water quality volume. The required water quality volume calculations are included in appendix E. Storm Drainage Calculations: The on-site storm drainage system has been designed for a 10 year design storm utilizing the Rational method. The calculations for the piping size, and gutter flow are included in appendix F. Conclusions: The on-site stormwater system with the detention basin will mitigate any potential storm-water quantity impacts from the development of the site. The proposed storm-water quality measures will mitigate water quality impacts from the proposed development. APPENDIX A RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA lE ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Impervious Areas Paved parking lots, roofs, driveways .05(98) .53(98) - - CULTIVATED AGRICULTURAL LANDS Row crops C + Crop residue good 2.35(64) 36.6(74) - - OTHER AGRICULTURAL LANDS Woods good .54 (30) 1.38(55) - - Total Area (by Hydrologic Soil Group) 2.94 38.5 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 41.45 Acres WEIGHTED CURVE NUMBER: 73* ------------------------------------------------------------------------------- - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA lE ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 200 .0047 D 0.561 Shallow Concent'd 800 .0057 U 0.182 Open Channel 80 2 0.011 Time of Concentration = 0.75* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method I GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 1E Data: Drainage Area 41.45 * Acres Runoff Curve Number 73 * Time of Concentration: 0.75 * Hours Rainfall Type III Pond and Swamp Area NONE Storm Number 1 1 1 2 l 3 1 4 1 5 1 i----------------------i------(------i------(------1------1 Frequency (yrs) ( 2 1 10 ( 25 ( 50 ( 100 I I I I i I I i 24-Hr Rainfall (in) ( 3.2 ( 4.7 ( 5.5 ► 6.2 1 6.9 1 I I I I I 1 I ( Ia/P Ratio ( 0.23 l 0.16 l 0.13 ( 0.12 ( 0.11 1 I I I 1 I I I Runoff (in) ( 0.98 ( 2.05 i 2.68 1 3.26 ( 3.85 1 I I I I I 1 I Unit Peak Discharge 10.479 10.511 10.521 10.528 10.533 1 ( (cfs/acre/in) I I ( I I I I I I I I I ( Pond and Swamp Factorl 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1 0.0% Ponds Used I 1 I I I I 1----------------------1------1------I------1------1------1 1 Peak Discharge (cfs) 1 20 1 43 ► 58 1 71 ► 85 1 * - Value(s) provided from TR-55 system routines RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 2E ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- CULTIVATED AGRICULTURAL LANDS Row crops C + Crop residue good - 3.06(74) - - Total Area (by Hydrologic Soil Group) 3.06 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 3.06 Acres WEIGHTED CURVE NUMBER: 74* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 2E ----------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 200 .005 D 0.547 Shallow Concent'd 250 .005 U 0.061 Time of Concentration = 0.61* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 2E Data: Drainage Area 3.06 * Acres Runoff Curve Number 74 * Time of Concentration: 0.61 * Hours Rainfall Type III Pond and Swamp.Area NONE 1 Storm _Number { 1 1 2 1 3 { 4 1 5 1 1----------------------1------{------{------{------{------1 1 Frequency (yrs) { 2 { 10 1 25 { 50 { 100 { { 24-Hr Rainfall (in) i 3.2 { 4.7 { 5.5 { 6.2 { 6.9 1 I I I I I I I I Ia/P Ratio { 0.22 1 0.15 1 0.13 { 0.11 { 0.10 { I I I I I I I { Runoff (in) 1 1.04 1 2.13 1 2.77 ( 3.35 13.96 I I I I i { Unit Peak Discharge 10.532 10.566 10.576 10.583 10.589 1 I (cfs/acre/in) I I I I I I I I i I I I I 1 Pond and Swamp Factor) 1.00 1 1.00 1 1.00 1 1.00 1 1.00 1 1 0.0% Ponds Used I I I I I I 1----------------------1------I------I---=--1------1------I 1 Peak Discharge (cfs) 1 2 1 4 1 5 1 6 1 7 1 * - Value(s) provided from TR-55 system routines RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 3E ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Impervious Areas Paved parking lots, roofs, driveways .12(98) - - - CULTIVATED AGRICULTURAL LANDS Row crops C + Crop residue good 5.91(64) 2.47 (74) - - OTHER AGRICULTURAL LANDS Woods good 4.03(30) .35(55) - - Total Area (by Hydrologic Soil Group) 10.0 2.82 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 12.88 Acres WEIGHTED CURVE NUMBER: 55* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date Subtitle: EXISTING CONDITIONS AREA 3E ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 200 .005 D 0.547 Shallow Concent'd 300 .005 U 0.073 Shallow Concent'd 100 .04 U 0.009 Time of Concentration = 0.63* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated < 20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : ALDI-RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: EXISTING CONDITIONS AREA 3E Data: Drainage Area 12.88 * Acres Runoff Curve Number 55, * Time of Concentration: 0.63 * Hours Rainfall Type III Pond and .Swamp Area NONE 1mStorm Number I 1 1 2 1 3 1 4 1 5 1 1----------------------i------I------1------1------1------1 1 Frequency (yrs) I 2 1 10 l 25 1 50 1 100 1 1 I I I i I I 1 24-Hr Rainfall (in) 1 3.2 I 4.7 1 5.5 1 6.2 1 6.9 1 I I I f I I I 1 Ia/P Ratio 10.51 1 0.35 10.30 10.26 ( 0.24 1 I 1 I I I I I 1 Used 10.50 1 0.35 1 0.30 1 0.26 1 0.24. 1 I I I I I I I 1 Runoff (in) 1 0.25 ( 0.83 1 1.24 i 1.63 i 2.06 1 I I I I I I I I Unit Peak Discharge 10.276 10.442 10.488 10.504 10.517 1 1 (cfs/acre/in) I I I I I I i 1 Pond and Swamp Factorl 1.00 1 1.00 1 1.00 1 1.00 1 1.00 I 1 0.0% Ponds Used I I I I I i 1----------------------1------1------1------1------i------I 1 Peak Discharge (cfs) ► 1 1 5 1 8 1 11 1 14 1 * - Value(s) provided from TR-55 system routines APPENDIX B RUNOFF CURVE NUMBER COMPUTATION Version 2.00 Project : ALDI RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: DEVELOPED CONDITIONS ------------------------------------------------------------------------------- Hydrologic Soil Group COVER DESCRIPTION A B C D Acres (CN) ------------------------------------------------------------------------------- FULLY DEVELOPED URBAN AREAS (Veg Estab.) Open space (Lawns,parks etc.) Good condition; grass cover > 75% 7.19(39) 23.8(61) - - Impervious Areas Paved parking lots, roofs, driveways 3.71(98) 20.7(98) - - OTHER AGRICULTURAL LANDS Woods good 2.09(30) - - - Total Area (by Hydrologic Soil Group) 12.9 44.5 ------------------------------------------------------------------------------- TOTAL DRAINAGE AREA: 57.49 Acres WEIGHTED CURVE NUMBER: 73* ------------------------------------------------------------------------------- * - Generated for use by GRAPHIC method TIME OF CONCENTRATION AND TRAVEL TIME Version 2.00 Project : ALDI RYE STREET User: GBS Date: 11/07/99 County : HARTFORD State: CT Checked: Date: Subtitle: DEVELOPED CONDITIONS ------------------------------------------------------------------------------- Flow Type 2 year Length Slope Surface n Area Wp Velocity Time rain (ft) (ft/ft) code (sq/ft) (ft) (ft/sec) (hr) ------------------------------------------------------------------------------- Sheet 3.2 75 .01 F 0.249 Shallow Concent'd 200 .01 U 0.034 Open Channel 1200 3 0.111 Time of Concentration = 0.39* --- Sheet Flow Surface Codes --- A Smooth Surface F Grass, Dense --- Shallow Concentrated --- B Fallow (No Res.) G Grass, Burmuda --- Surface Codes --- C Cultivated <.20 % Res. H Woods, Light P Paved D Cultivated > 20 % Res. I Woods, Dense U Unpaved E Grass-Range, Short J Range, Natural * - Generated for use by GRAPHIC method GRAPHICAL PEAK DISCHARGE METHOD Version 2.00 Project : ALDI RYE STREET User: GBS Date: 11/07/99 County :. HARTFORD State: CT Checked: Date: Subtitle: DEVELOPED CONDITIONS Data: Drainage Area 57.49 * Acres Runoff Curve Number 73 * Time of Concentration: 0.39 * Hours Rainfall Type III Pond and Swamp Area NONE { ----------- Storm Number ( 1 { 2 1 3 i 4 { 5 1 {----------------------{------{------i------{-------i------{ I Frequency (yrs) { 2 { 10 { 25 { .50 { 100 { I I I I I I I { 24-Hr Rainfall (in) { 3.2 { 4.7 I 5.5 { 6.2 1 6.9 1 I I I I I i Ia/P Ratio 1 .0.23 1 0.16 1 0.13 1 0.12 1 0.11 1 I 1 I I I I I { Runoff (in) ( 0.98 { 2.05 { 2.68 { 3.26 ( 3.85 { I I I I I I I { Unit Peak Discharge 10.637 10.677 10.690 10.698 10.705 { (cfs/acre/in) I I I I I I 1 I i I I I I { Pond and Swamp Factor{ 1.00 1 1.00 { 1.00 1 1.00 1 1.00 1 { 0.0% Ponds Used I I I I I I {----------------------{------{------{------(------{------{ { Peak Discharge (cfs) { 36 I 80 { 106 I 131 { 156 { * - Value(s) provided from TR-55 system routines APPENDIX C Reservoir Report Page 1 Reservoir No. 1 - single basin Hydrallow Hydrographs by Intelisolve Pond Data Pond storage is based on known contour areas.Average end area method used. Stage/Storage Table Stage(ft) Elevation(ft) Contour area(sgft) Incr.Storage(cult) Total storage(cult) 0.00 60.00 30,870 0 0 2.00 62.00 39,380 70,250 70,250 4.00 64.00 48,770 88,150 158,400 6.00 66.00 54,710 103,480 261,880 8.00 68.00 59,832 114,542 376,422 10.00 70.00 67,004 126,836 503,258 12.00 72.00 73,055 140,059 643,317 14.00 74.00 80,990 154,045 797,362 16.00 76.00 88,898 169,W8 967,250 Culvert/Orifice Structures Weir Structures [A] [B] [Cl [D] [A] [B] [C] [D] Rise in = 15.0 8.0 0.0 0.0 Crest Len ft = 0.00 0.00 0.00 0.00 Span in = 15.0 8.0 0.0 0.0 Crest El.ft = 0.00 0.00 0.00 0.00 No.Barrels = 1 1 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El.ft = 60.00 60.00 0.00 0.00 Weir Type = - - - - Length ft = 300.0 1.0 0.0 0.0 Multistage = No No No No Slope% = 0.50 1.00 0.00 0.00 N-Value = .013 .013 .000 .000 Orif.Coeff. = 0.60 0.60 0.00 0.00 Multistage = n/a Yes No No Exfiltration Rate = 0.00 in/hr/sgft Tailwater Elev.= 0.00 It Stage Storage/Discharge Table Note:All outflows have been analyzed under inlet and outlet control. / Stage Storage Elevation Clv A Chr B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Total ft cuft ft cis cis cis cis cis cis cis cis cis cis 0.00 0 60.00 0.00 0.00 - - - - - - - 0.00 2.00 70,250 62.00 1.97 1.94 - - - - - - - 1.94 4.00 158,400 64.00 2.97 2.97 - - - - - - - 2.97 6.00 261,880 66.00 3.80 3.75 - - - - - - - 3.75 8.00 376,422 68.00 4.39 4.39 - - - - - - - 4.39 10.00 503,258 70.00 4.82 4.82 - - - - - - - 4.82 12.00 643,317 72.00 5.27 5.27 - - - - - - - 5.27 14.00 797,362 74.00 5.69 5.69 - - - - - - - 5.69 16.00 967,250 76.00 6.07 6.07 - - - - - - - 6.07 APPENDIX D Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 2.61 cfs Storm frequency = 2 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 63.22 ft Max. Storage = 124,013 cuft Storage Indication method used. Outflow hydrograph volume=197,705 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.17 28.77 60.55 0.66 0.65 - - - - - - - 0.65 12.20 31.97 60.65 0.81 0.81 - - - - - - 0.81 12.23 34.39 60.77 0.95 0.94 - - - - - - - 0.94 12.27 35.89 60.88 1.07 1.07 - - - - - - - 1.07 12.30 36.66 61.00 1.19 1.19 - - - - - - - 1.19 12.33 36.95<< 61.12 1.32 1.29 - - - - - - - 1.29 12.37 36.91 61.24 1.42 1.39 - - - - - - - 1.39 12.40 36.53 61.37 1.50 1.49 - - - - - - - 1.49 12.43 35.83 61.48 1.61 1.58 - - - - - - - 1.58 12.47 34.80 61.60 1.73 1.66 - - - - - - - 1.66 12.50 33.47 61.71 1.80 1.74 - - - - - - - 1.74 12.53 31.85 61.82 1.86 1.81 - - - - - - - 1.81 12.57 30.00 61.91 1.92 1.88 - - - - - - - 1.88 12.60 27.97 62.01 1.97 1.94 - - - - - - - 1.94 12.63 25.80 62.07 2.02 1.98 - - - - - - - 1.98 12.67 23.56 62.14 2.05 2.02 -- - - - - - - 2.02 12.70 21.34 62.19 2.09 2.05 - - - ---- - - - 2.05 12.73 19.27 62.24 2.12 2.08 - - - - - - - 2.08 12.77 17.47 62.28 2.14 2.11 - - - - - - - 2.11 12.80 15.98 62.32 2.17 2.13 - - - - - - - 2.13 12.83 14.75 62.36 2.19 2.15 - - - ----- - - - 2.15 12.87 13.68 62.39 2.21 2.17 - - - - - - - 2.17 12.90 12.73 62.42 2.23 2.19 - - - - - -- - 2.19 12.93 11.89 62.45 2.25 2.20 - - - ----- - - - 2.20 12.97 11.15 62.48 2.26 2.22 - - - - - - - 2.22 13.00 10.51 62.50 2.28 2.23 - - - - - - - 2.23 13.03 9.95 62.52 2.29 2.24 - - - - - - -- 2.24 13.07 9.48 62.54 2.30 2.26 - - - - - - - 2.26 13.10 9.07 62.56 2.31 2.27 - - - - - - - 2.27 13.13 8.73 62.58 2.32 2.28 - - - - - - - 2.28 13.17 8.44 62.60 2.33 2.29 - ----- - - - - - 2.29 13.20 8.20 62.61 2.34 2.29 - - - - - - - 2.29 13.23 7.99 62.63 2.35 2.30 - - - - - - - 2.30 13.27 7.80 62.64 2.36 2.31 - - - - - - - 2.31 13.30 7.63 62.66 2.37 2.32 - - - - - - - 2.32 13.33 7.47 62.67 2.38 2.33 - - ---- - - - - 2.33 13.37 7.33 62.69 2.39 2.33 ----- - - - - - - 2.33 13.40 7.20 62.70 2.40 2.34 - - - - - - - 2.34 Continues on next page... Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow Mrs) cfs ft cfs cfs cfs cis cfs cfs cis cfs cfs cfs 13.43 7.08 62.71 2.41 2.35 - - - - - - - 2.35 13.47 6.97 62.73 2.41 2.35 - - - - - - - 2.35 13.50 6.87 62.74 2.42 2.36 - - - - - - - 2.36 13.53 6.78 62.75 2.43 2.37 - - - - - - - 2.37 13.57 6.69 62.76 2.44 2.37 - - ----- - - - - 2.37 13.60 6.61 62.77 2.44 2.38 - - - - - - - 2.38 13.63 6.54 62.78 2.45 2.39 - - - - - - - 2.39 13.67 6.47 62.80 2.46 2.39 - - - - - - - 2.39 13.70 6.40 62.81 2.46 2.40 - - - - - - - 2.40 13.73 6.33 62.82 2.46 2.40 - - - - - - - 2.40 13.77 6.26 62.83 2.47 2.41 - - - - - - - 2.41 13.80 6.20 62.84 2.47 2.41 - - - - - - - 2.41 13.83 6.13 62.85 2.47 2.42 - - - - - - - 2.42 13.87 6.06 62.86 2.47 2.42 - - - . - - - - 2.42 13.90 5.99 62.87 2.47 2.43 - - - - - - - 2.43 13.93 5.92 62.88 2.47 2.43 - - - - - - - 2.43 13.97 5.85 62.89 2.48 2.44 - - - - - - - 2.44 14.00 5.78 62.90 2.48 2.44 - - - - - - - 2.44 14.03 5.71 62.91 2.48 2.45 - - - - - - - 2.45 14.07 5.64 62.91 2.48 2.45 - - - - - - - 2.45 14.10 5.57 62.92 2.48 2.46 - - - - - - - 2.46 14.13 5.50 62.93 2.48 2.46 - - - - - - - 2.46 14.17 5.43 62.94 2.49 2.47 - - - - - - - 2.47 14.20 5.37 62.95 2.49 2.47 - - - - - - - 2.47 14.23 5.31 62.96 2.49 2.47 - - - - - - - 2.47 14.27 5.25 62.96 2.49 2.48 - - - - - - - 2.48 14.30 5.20 62.97 2.49 2.48 - - - - - - - 2.48 14.33 5.14 62.98 2.49 2.49 - - - - - - - 2.49 14.37 5.09 62.99 2.49 2.49 - - - - - - - 2.49 14.40 5.05 62.99 2.49 2.49 - - - - - - - 2.49 14.43 5.00 63.00 2.50 2.50 - - - - - - - 2.50 14.47 4:96 63.01 2.50 2.50 - - - - - - - 2.50 14.50 4.92 63.01 2.50 2.50 - - - - - - - 2.50 14.53 4.88 63.02 2.51 2.51 - - - - - - - 2.51 14.57 4.84 63.03 2.51 2.51 - - - - - - - 2.51 14.60 4.81 63.03 2.51 2.51 - - - - - - - 2.51 14.63 4.77 63.04 2.52 2.52 - - - - - - - 2.52 14.67 4.74 63.04 2.52 2.52 - - - - - - - 2.52 14.70 4.70 63.05 2.52 2.52 - - - - - - - 2.52 14.73 4.67 63.06 2.53 2.53 - - - - - - - 2.53 14.77 4.63 63.06 2.53 2.53 - - - - - - - 2.53 14.80 4.60 63.07 2.53 2.53 - - - - - - - 2.53 14.83 4.56 63.07 2.53 2.53 - - - - - - - 2.53 14.87 4.53 63.08 2.54 2.54 - - - - - - - 2.54 14.90 4.49 63.08 2.54 2.54 - - - - - - - 2.54 14.93 4.46 63.09 2.54 2.54 - - - - - - - 2.54 14.97 4.42 63.09 2.55 2.55 - - - - - - - 2.55 15.00 4.39 63.10 2.55 2.55 - - - - - - - 2.55 15.03 4.35 63.10 2.55 2.55 - - - - - - - 2.55 15.07 4.32 63.11 2.55 2.55 - - - - - - - 2.55 15.10 4.28 63.11 2.56 2.56 - - - - - - - 2.56 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 15.13 4.24 63.12 2.56 2.56 - - -- - - -_-_ _____ 2.56 15.17 4.21 63.12 2.56 2.56 - - - - - ---- - 2.56 15.20 4.17 63.13 2.56 2.56 - - - - - - - 2.56 15.23 4.13 63.13 2.57 2.56 - - - -_ - - - 2.56 15.27 4.10 63.14 2.57 2.57 - - - - - - - 2.57 15.30 4.06 63.14 2.57 2.57 - - - - - - --- 2.57 15.33 4.02 63.14 2.57 2.57 - - - - - ____ - 2.57 15.37 3.98 63.15 2.57 2.57 - - - - - - - 2.57 15.40 3.95 63.15 2.58 2.58 - - - ____ ____ ____ 2_58 15.43 3.91 63.16 2.58 2.58 - - - - - ____ - 2.58 15.47 3.87 63.16 2.58 2.58 - - - - - -- - 2.58 15.50 3.83 63.16 2.58 2.58 - - - - - ____ - 2 58 15.53 3.80 63.17 2.58 2.58 ---- - - - - - - 2.58 15.57 3.76 63.17 2.58 2.58 - - - - - - - 2.58 15.60 3.72 63.17 2.59 2.59 - - - - - - - 2.59 15.63 3.68 63.18 2.59 2.59 - - - - - - - 2.59 15.67 3.64 63.18 2.59 2.59 - - - - - - - 2.59 15.70 3.60 63.18 2.59 2.59 - - - - - - - 2.59 15.73 3.57 63.18 2.59 2.59 - - - - - - - 2.59 15.77 3.53 63.19 2.59 2.59 - - - - - - - 2.59 15.80 3.49 63.19 2.59 2.59 - - - - - - - 2.59 15.83 3.45 63.19 2.60 2.60 - - - - - - - 2.60 15.87 3.41 63.19 2.60 2.60 - - - - - - - 2.60 16.90 3.37 63.20 2.60 2.60 - - - - - - - 2.60 15.93 3.33 63.20 2.60 2.60 - - - - - - - 2.60 15.97 3.29 63.20 2.60 2.60 ---- - - - - - - 2.60 16.00 3.25 63.20 2.60 2.60 - - - - - - - 2.60 16.03 3.21 63.20 2.60 2.60 - - - - - - - 2.60 16.07 3.17 63.20 2.60 2.60 ----- - - - - - - 2.60 16.10 3.14 63.21 2.60 2.60 - - - - - - - 2.60 16.13 3.10 63.21 2.60 2.60 - - - - - - - 2.60 16.17 3.06 63.21 2.61 2.61 - - - - - - - 2.61 16.20 3.03 63.21 2.61 2.61 - - -- - - - - 2.61 16.23 2.99 63.21 2.61 2.61 - - - - - - - 2.61 16.27 2.96 63.21 2.61 2.61 - - - - - - - 2.61 16.30 2.93 63.21 2.61 2.61 - - - - - - - 2.61 16.33 2.91 63.21 2.61 2.61 - - - - - - - 2.61 16.37 2.88 63.21 2.61 2.61 - - - - - - 2.61 16.40 2.86 63.22 2.61 2.61 - - - - - - - 2.61 16.43 2.83 63.22 2.61 2.61 - - - - - - - 2.61 16.47 2.81 63.22 2.61 2.61 - - - - - - - 2.61 16.50 2.79 63.22 2.61 2.61 - - - - - - - 2.61 16.53 2.77 63.22 2.61 2.61 - - - - - - - 2.61 16.57 2.75 63.22 2.61 2.61 - - - - - - - 2.61 16.60 2.73 63.22 2.61 2.61 - - - - - - - 2.61 16.63 2.72 63.22 2.61 2.61 - - - - - - - 2.61 16.67 2.70 63.22 2.61 2.61 - - - - - - - 2.61 16.70 2.68 63.22 2.61 2.61 - - - - - - - 2.61 16.73 2.66 63.22 2.61 2.61 - - - - - - - 2.61 16.77 2.65 63.22 2.61 2.61 - - - -- - - - 2.61 16.80 2.63 63.22 2.61 2.61 - - - - - 2.61 Continues on next page... Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) eft ft cfs cfs cis ds ds cfs cfs cfs cfs cfs 16.83 2.61 63.22<< 2.61 2.6 1 - - - - - ____ - 2.61 « 16.87 2.60 63.22 2.61 2.61 - - - - - - - 2.61 16.90 2.58 63.22 2.61 2.61 - - - - - - 2.61 16.93 2.56 63.22 2.61 2.61 - - - - - - - 2.61 16.97 2.54 63.22 2.61 2.61 - - - - - - - 2.61 17.00 2.53 63.22 2.61 2.61 - - - - - - - 2.61 17.03 2.51 63.22 2.61 2.61 - - - - - - - 2.61 17.07 2.49 63.22 2.61 2.61 - - - - - - - 2.61 17.10 2.47 63.22 2.61 2.61 - - - - - - - 2.61 17.13 2.46 63.22 2.61 2.61 - - - - - - - 2.61 17.17 2.44 63.22 2.61 2.61 - - - - - - - 2.61 17.20 2.42 63.22 2.61 2.61 - - - - - - - 2.61 17.23 2.41 63.22 2.61 2.61 - - - - - - - 2.61 17.27 2.39 63.22 2.61 2.61 - - - - - - -- 2.61 17.30 2.37 63.22 2.61 2.61 - - - - - - - 2.61 17.33 2.35 63.21 2.61 2.61 - - - - - - - 2.61 17.37 2.33 63.21 2.61 2.61 - - - - - - - 2.61 17.40 2.32 63.21 2.61 2.61 - - - - - - - 2.61 17.43 2.30 63.21 2.61 2.61 - - - - - - - 2.61 17.47 2.28 63.21 2.61 2.61 - - - - - - - 2.61 17.50 2.26 63.21 2.61 2.61 - - - - - - - 2.61 17.53 2.25 63.21 2.61 2.61 - - - - - - - 2.61 17.57 2.23 63.21 2.61 2.60 - - - - - - - 2.60 17.60 2.21 63.21 2.60 2.60 - - - - - - - 2.60 17.63 2.19 63.21 2.60 2.60 - - - - - - - 2.60 17.67 2.18 63.21 2.60 2.60 - - - - - - - 2.60 17.70 2.16 63.20 2.60 2.60 - - - - - - - 2.60 17.73 2.14 63.20 2.60 2.60 - - - - - - - 2.60 17.77 2.12 63.20 2.60 2.60 - - - - - - - 2.60 17.80 2.10 63.20 2.60 2.60 - - - - - - - 2.60 17.83 2.09 63.20 2.60 2.60 - - - - - - - 2.60 17.87 2.07 63.20 2.60 2.60 - - - - - - - 2.60 17.90 2.05 63.20 2.60 2.60 - - - - - - - 2.60 17.93 2.03 63.19 2.60 2.60 - - - - - - - 2.60 17.97 2.01 63.19 2.60 2.60 - - - - - - - 2.60 18.00 2.00 63.19 2.60 2.60 - - - - - - - 2.60 18.03 1.98 63.19 2.60 2.60 - - - - - - - 2.60 18.07 1.96 63.19 2.59 2.59 - - - - - - - 2.59 18.10 1.94 63.19 2.59 2.59 - - - - - - - 2.59 18.13 1.93 63.18 2.59 2.59 - - - - - - - 2.59 18.17 1.91 63.18 2.59 2.59 - - - - - - - 2.59 18.20 1.89 63.18 2.59 2.59 - - - - - - 2.59 18.23 1.88 63.18 2.59 2.59 - - - - - - - 2.59 18.27 1.87 63.18 2.59 2.59 - - - - - - - 2.59 18.30 1.85 63.17 2.59 2.59 - - - - - - - 2.59 18.33 1.84 63.17 -2.59 2.59 - - - - - - - 2.59 18.37 1.83 63.17 2.59 2.59 - - - - - - - 2.59 18.40 1.82 63.17 2.58 2.58 - - - - - - - 2.58 18.43 1.82 63.17 2.58 2.58 - - - - - - 2.58 18.47 1.81 63.16 2.58 2.58 - - - - - - - 2.58 18.50 1.80 63.16 2.58 2.58 - - - - - - - 2.58 Continues on next page... Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C Clv D Wr A Wr B Wr C Wr D ExHi Outflow (hrs) cfs It cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 18.53 1.79 63.16 2.58 2.58 - - - - - - --_- 2.58 18.57 1.79 63.16 2.58 2.58 - - - - - - - 2.58 18.60 1.78 63.16 2.58 2.58 - - - - - - - 2.58 18.63 1.78 63.15 2.58 2.58 - - - - - - - 2.58 18.67 1.77 63.15 2.58 2.58 - - - - - - - 2.58 18.70 1.76 63.15 2.57 2.57 - - - - - - - 2.57 18.73 1.76 63.15 2.57 2.57 - - - - - - - 2.57 18.77 1.75 63.15 2.57 2.57 - - - - - - - 2.57 18.80 1.75 63.14 2.57 2.57 - - - - -=- - - 2.57 18.83 1.74 63.14 2.57 2.57 - - - - - - - 2.57 18.87 1.74 63.14 2.57 2.57 - - - - - - - 2.57 18.90 1.73 63.14 2.57 2.57 - - - - - - -- 2.57 18.93 1.73 63.13 2.57 2.57 - - - - - - - 2.57 18.97 1.72 63.13 2.56 2.56 - - - - - - - 2.56 19.00 1.72 63.13 2.56 2.56 - - - - - - - 2.56 19.03 1.71 63.13 2.56 2.56 - - - - - - - 2.56 19.07 1.71 63.12 2.56 2.56 - - - - -- - - 2.56 19.10 1.70 63.12 2.56 2.56 - - - - - - 2.56 19.13 1.70 63.12 2.56 2.56 - - - - - - - 2.56 19.17 1.69 63.12 2.56 2.56 - - - - - - - 2.56 19.20 1.69 63.12 2.56 2.56 - - ----- - - - - 2.56 19.23 1.68 63.11 2.56 2.56 - - - - - - - 2.56 19.27 1.68 63.11 2.55 2.55 - - - - - - - 2.55 19.30 1.67 63.11 2.55 2.55 - - - - - - - 2.55 19.33 1.67 63.11 2.55 2.55 - --- - - - - - 2.55 19.37 1.66 63.10 2.55 2.55 - - ---- - - - - 2.55 19.40 1.66 63.10 2.55 2.55 - - - - - - - 2.55 19.43 1.65 63.10 2.55 2.55 - - - - - - - 2.55 19.47 1.65 63.10 2.55 2.55 - - - - - - - 2.55 19.50 1.64 63.09 2.55 2.54 - - - - - - - 2.54 19.53 1.64 63.09 2.54 2.54 - - - - - - - 2.54 19.57 1.63 63.09 2.54 2.54 - - - - - - - 2.54 19.60 1.62 63.09 2.54 2.54 - - - - - - - 2.54 19.63 1.62 63.08 2.54 2.54 - - - - - - - 2.54 19.67 1.61 63.08 2.54 2.54 - - - - - - -- 2.54 19.70 1.61 63.08 2.54 2.54 - - - - - - - 2.54 19.73 1.60 63.08 2.54 2.54 - - - - - - - 2.54 19.77 1.60 63.07 2.53 2.53 - - - - - - - 2.53 19.80 1.59 63.07 2.53 2.53 - - - - - - - 2.53 19.83 1.59 63.07 2.53 2.53 - - - - - - - 2.53 19.87 1.58 63.07 2.53 2.53 - - - - - - - 2.53 19.90 1.58 63.06 2.53 2.53 - - - - - - ---- 2.53 19.93 1.57 63.06 2.53 2.53 - - - - - - - 2.53 19.97 1.57 63.06 2.53 2.53 - - - - - - - 2.53 20.00 1.56 63.06 2.53 2.53 - - - - - - - 2.53 20.03 1.56 63.05 2.52 2.52 - - - - - - - 2.52 20.07 1.55 63.05 2.52 2.52 - - - - - - - 2.52 20.10 1.54 63.05 2.52 2.52 - - - - - - - 2.52 20.13 1.54 63.04 2.52 2.52 - - - - - - 2.52 20.17 1.53 63.04 2.52 2.52 - - - - - - - 2.52 20.20 1.53 63.04 2.52 2.52 - - - - - --- - 2.52 Continues on next page... Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D ExH1 Outflow (hrs) cfs ft cfs cfs cis cfs cfs cfs cfs cfs cis cfs 20.23 1.52 63.04 2.52 2.52 - - - - -- - - 2.52 20.27 1.52 63.03 2.51 2.51 - - - - - - - 2.51 20.30 1.51 63.03 2.51 2.51 - - - - - - - 2.51 20.33 1.51 63.03 2.51 2.51 - - - - - - - 2.51 20.37 1.50 63.03 2.51 2.51 - - - - - - - 2.51 20.40 1.50 63.02 2.51 2.51 - - - - - - - 2.51 20.43 1.49 63.02 2.51 2.51 - - - - - - - 2.51 20.47 1.49 63.02 2.51 2.51 - - - - - - - 2.51 20.50 1.48 63.01 2.50 2.50 - - - - - - - 2.50 20.53 1.47 63.01 2.50 2.50 - - - - - - - 2.50 20.57 1.47 63.01 2.50 2.50 - - - - - - - 2.50 20.60 1.46 63.01 2.50 2.50 - - - - - - - 2.50 20.63 1.46 63.00 2.50 2.50 - - - - - - - 2.50 20.67 1.45 63.00 2.50 2.50 - - - - - - - 2.50 20.70 1.45 63.00 2.50 2.50 - - - - ---= - - 2.50 20.73 1.44 62.99 2.50 2.49 - - - - - - - 2.49 20.77 1.44 62.99 2.49 2.49 - - - - - - - 2.49 20.80 1.43 62.99 2.49 2.49 - - - - - - - 2.49 20.83 1.43 62.99 2.49 2.49 - - - - - - - 2.49 20.87 1.42 62.98 2.49 2.49 - - - - - - - 2.49 20.90 1.41 62.98 2.49 2.49 - - - - - - 2.49 20.93 1.41 62.98 2.49 2.48 - - - - - - - 2.48 20.97 1.40 62.97 2.49 2.48 - - - - - - - 2.48 21.00 1.40 62.97 2.49 2.48 - - - - - - - 2.48 21.03 1.39 62.97 2.49 2.48 - - - - - - - 2.48 21.07 1.39 62.97 2.49 2.48 - - - - - - - 2.48 21.10 1.38 62.96 2.49 2.48 - - - - - - - 2.48 21.13 1.38 62.96 2.49 2.48 - - - - - - - 2.48 21.17 1.37 62.96 2.49 2.47 - - - - - - - 2_47 21.20 1.37 62.95 2.49 2.47 - - - - - - - 2.47 21.23 1.36 62.95 2.49 2.47 - - - - - - - 2.47 21.27 1.35 62.95 2.49 2.47 - - - - - - - 2.47 21.30 1.35 62.94 2.49 2.47 - - - - - - - 2.47 21.33 1.34 62.94 2.49 2.47 - - - - - - - 2.47 21.37 1.34 62.94 2.49 2.46 - - - - - - - 2.46 21.40 1.33 62.94 2.48 2.46 - - - - - - - 2.46 21.43 1.33 62.93 2.48 2.46 - - - - - - - 2.46 21.47 1.32 62.93 2.48 2.46 - - - - - - 2.46 21.50 1.32 62.93 2.48 2.46 - - - - - - 2.46 21.53 1.31 62.92 2.48 2.46 - - - - - - - 2.46 21.57 1.30 62.92 2.48 2.46 - - - - - - 2.46 21.60 1.30 62.92 2.48 2.45 - - - - - - - 2.45 21.63 1.29 62.91 2.48 2.45 - - - - - - - 2.45 21.67 1.29 62.91 2.48 2.45 - - - - - - - 2.45 21.70 1:28 62.91 2.48 2.45 - - - - - - - 2.45 21.73 1.28 62.90 2.48 2.45 - - - - - - - 2.45 21.77 1.27 62.90 2.48 2.45 - - - - - - - 2.45 21.80 1.27 62.90 2.48 2.44 - - - - - - - 2.44 21.83 1.26 62.89 2.48 2.44 - - - - - - - 2.44. 21.87 1.25 62.89 2.48 2.44 - - - - - - - 2.44 21.90 1.25 62.89 2.48 2.44 - - - - - - - 2.44 Continues on next page... Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B CIv C Clv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) ds ft ds ds cfs ds ds ds cfs cfs ds ds 21.93 1.24 62.88 2.48 2.44 - - - - - - - 2.44 21.97 1.24 62.88 2.48 2.44 - - - - - - - 2.44 22.00 1.23 62.88 2.47 2.43 - - - - -- - - 2.43 22.03 1.26 62.88 2.47 2.43 - - - - - --- - 2.43 22.07 1.29 62.87 2.47 2.43 - - - - - - - 2.43 22.10 1.32 62.87 2.47 2.43 - - - - - - - 2.43 22.13 1.35 62.87 2.47 2.43 - - - - - - - 2.43 22.17 1.39 62.86 2.47 2.43 - - - - - - - 2.43 22.20 1.42 62.86 2.47 2.42 - - - - - - - 2.42 22.23 1.46 62.86 2.47 2.42 - - - - - - - 2.42 22.27 1.44 62.85 2.47 2.42 - - - - - - - 2.42 22.30 1.43 62.85 2.47 2.42 - - - - - - - 2.42 22.33 1.42 62.85 2.47 2.42 -- - - ----- - - - 2.42 22.37 1.40 62.85 2.47 2.42 - - - - - - - 2.42 22.40 1.39 62.84 2.47 2.42 - - - - - - 2.42 22.43 1.38 62.84 2.47 2.41 - - - - - - - 2.41 22.47 1.36 62.84 2.47 2.41 - - - - - - - 2.41 22.50 1.35 62.84 2.47 2.41 - - --- - - ---- - 2.41 22.53 1.33 62.83 2.47 2.41 - - - - - - - 2.41 22.57 1.32 62.83 2.47 2.41 - - - - - - - 2.41 22.60 1.30 62.83 2.47 2.41 - - - - - - - 2.41 22.63 1.28 62.82 2.46 2.41 - - - - - - - 2.41 22.67 1.27 62.82 2.46 2.40 - - - - - - - 2.40 22.70 1.25 62.82 2.46 2.40 - - - - - - - 2.40 22.73 1.23 62.81 2.46 2.40 - - - - - - - 2.40 22.77 1.21 62.81 2.46 2.40 - - - - - - - 2.40 22.80 1.21 62.81 2.46 2.40 - - - - - - - 2.40 22.83 1.20 62.80 2.46 2.40 - - - - - - - 2.40 22.87 1.20 62.80 2.46 2.39 - - - - - - - 2.39 22.90 1.19 62.80 2.46 2.39 - - - - - - - 2.39 22.93 1.19 62.79 2.46 2.39 - - - - - - - 2.39 22.97 1.19 62.79 2.46 2.39 - - - - - - - 2.39 23.00 1.18 62.79 2.45 2.39 - - - - - - - 2.39 23.03 1.18 62.78 2.45 2.39 -- - - - - - - 2.39 23.07 1.17 62.78 2.45 2.38 - - - - - - - 2.38 23.10 1.17 62.78 2.45 2.38 - - - - - - - 2.38 23.13 1.16 62.78 2.44 2.38 - - - - - - - 2.38 23.17 1.16 62.77 2.44 2.38 - - - - - - 2.38 23.20 1.16 62.77 2.44 2.38 - ----- - - - - - 2.38 23.23 1.15 62.77 2.44 2.38 - - - - - - - 2.38 23.27 1.15 62.76 2.44 2.37 - - - - - - - 2.37 23.30 1.14 62.76 2.43 2.37 - - - - - - - 2.37 23.33 1.14 62.76 2.43 2.37 - - - - - - 2_37 23.37 1.14 62.75 2.43 2.37 ---- - - - - - - 2.37 23.40 1.13 62.75 2.43 2.37 - - - - - - - 2.37 23.43 1.13 62.74 2.43 2.36 - - - - - - 2.36 23.47 1.12 62.74 2.42 2.36 - - - - - - - 2.36 23.50 1.12 62.74 2.42 2.36 - - - - - - - 2.36 23.53 1.11 62.73 2.42 2.36 - - - - - - - 2.36 23.57 1.11 62.73 2.42 2.36 - - - - - - --- 2.36 23.60 1.11 62.73 2.42 2.36 - - - - - - 2.36 Continues on next page... Page 8 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 23.63 1.10 62.72 2.41 2.35 - - - - - - - 2.35 23.67 1.10 62.72 2.41 2.35 - - - - - - - 2.35 23.70 1.09 62.72 2.41 2.35 - - - - - - - 2.35 23.73 1.09 62.71 2.41 2.35 - - - - - - - 2.35 23.77 1.08 62.71 2.41 2.35 - - - - - - - 2.35 23.80 1.08 62.71 2.40 2.34 - - - - - - - 2.34 23.83 1.08 62.70 2.40 2.34 - - - - - - - 2.34 23.87 1.07 62.70 2.40 2.34 - - - - - - - 2.34 23.90 1.07 62.70 2.40 2.34 - - - - - - - 2.34 23.93 1.06 62.69 2.39 2.34 - - - - - - - 2.34 23.97 1.06 62.69 2.39 2.34 - - - - - - - 2.34 24.00 1.05 62.69 2.39 2.33 - - - - - - - 2.33 24.03 1.04 62.68 2.39 2.33 - - - - - - - 2.33 24.07 1.01 62.68 2.39 2.33 - - - - - - - 2.33 24.10 0.97 62.68 2.38 2.33 - - - - - - - 2.33 24.13 0.91 62.67 2.38 2.33 - - - - - - - 2.33 24.17 0.85 62.67 2.38 2.32 - - - - - - - 2.32 24.20 0.77 62.66 2.38 2.32 - - - - - --- - 2.32 24.23 0.68 62.66 2.37 2.32 - - - - - - - 2.32 24.27 0.59 62.66 2.37 2.32 - - - - - - - 2.32 24.30 0.51 62.65 2.37 2.31 - - - - - - - 2.31 24.33 0.44 62.65 2.37 2.31 - - - - - - - 2.31 24.37 0.37 62.64 2.36 2.31 - - - - - - - 2.31 24.40 0.31 62.63 2.36 2.31 - - - - - - - 2.31 24.43 0.25 62.63 2.36 2.30 - - - - - - - 2.30 24.47 0.20 62.62 2.35 2.30 - - - - - - - 2.30 24.50 0.16 62.62 2.35 2.30 - - - - - - - 2.30 24.53 0.12 62.61 2.34 2.29 - - - - - - - 2.29 24.57 0.08 62.61 2.34 2.29 - - - - - - - 2.29 24.60 0.06 62.60 2.34 2.29 - - - - - - - 2.29 24.63 0.03 62.59 2.33 2.28 - - - - - - 2.28 24.67 0.02 62.59 2.33 2.28 - - - - - - - 2.28 24.70 0.01 62.58 2.33 2.28 - - - - - - - 2.28 24.73 0.00 62.58 2.32 2.27 - - - - - - - 2.27 24.77 0.00 62.57 2.32 2.27 - - - - - - - 2.27 24.80 0.00 62.56 2.31 2.27 - - - - - - - 2.27 24.83 0.00 62.56 2.31 2.26 ---- - - - - - - 2.26 24.87 0.00 62.55 2.31 2.26 - - - - - - - 2.26 24.90 0.00 62.54 2.30 2.26 - - - - - - - 2.26 24.93 0.00 62.54 2.30 2.25 - - - - - - - 2.25 24.97 0.00 62.53 2.30 2.25 - - - - - - - 2.25 25.00 0.00 62.53 2.29 2.25 - - - - - - - 2.25 25.03 0.00 62.52 2.29 2.24 - - - - - - - 2.24 25.07 0.00 62.51 2.28 2.24 - - - - - - - 2.24 25.10 0.00 62.51 2.28 2.24 - - - ---- - - - 2.24 25.13 0.00 62.50 2.28 2.23 - - - - - - - 2.23 25.17 0.00 62.50 2.27 2.23 - - - - - - - 2.23 25.20 0.00 62.49 2.27 2.23 - - - - - - - 2.23 25.23 0.00 62.48 2.27 2.22 - - - - - - - 2.22 25.27 0.00 62.48 2.26 2.22 - - - - - - - 2.22 25.30 0.00 62.47 2.26 2.22 - - - - - - - 2.22 Continues on next page... Page 9 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 25.33 0.00 62.47 2.25 2.21 - - - - - - - 2.21 25.37 0.00 62.46 2.25 2.21 - - - - - - - 2.21 25.40 0.00 62.45 2.25 2.21 - - - - - - - 2.21 25.43 0.00 62.45 2.24 2.20 - - - - - - - 2.20 25.47 0.00 62.44 2.24 2.20 - - - - - - - 2.20 25.50 0.00 62.44 2.24 2.20 - - - - - - - 2.20 25.53 0.00 62.43 2.23 2.19 - - - - - - - 2.19 25.57 0.00 62.42 2.23 2.19 - - - - - - - 2.19 25.60 0.00 62.42 2.23 2.19 - - - - - - - 2.19 25.63 0.00 62.41 2.22 2.18 - - - - - - - 2.18 25.67 0.00 62.41 2.22 2.18 - - - - - - - 2.18 25.70 0.00 62.40 2.21 2.18 - - - - - - - 2.18 25.73 0.00 62.39 2.21 2.17 - - - - - - - 2.17 25.77 0.00 62.39 2.21 2.17 - - - - - - - 2.17 25.80 0.00 62.38 2.20 2.17 - - - - - - - 2.17 25.83 0.00 62.38 2.20 2.16 - - - - - - - 2.16 25.87 0.00 62.37 2.20 2.16 - - - - - - - 2.16 25.90 0.00 62.36 2.19 2.16 - - - - - - - 2.16 25.93 0.00 62.36 2.19 2.15 - - - - - - - 2.15 25.97 0.00 62.35 2.19 2.15 - - - - - - - 2.15 26.00 0.00 62.35 2.18 2.15 - - - - - - - 2.15 26.03 0.00 62.34 2.18 2.14 - - - - - - - 2.14 26.07 0.00 62.34 2.17 2.14 - - - - - - - 2.14 26.10 0.00 62.33 2.17 2.13 - - - - - - - 2.13 26.13 0.00 62.32 2.17 2.13 - - - - - - - 2.13 26.17 0.00 62.32 2.16 2.13 - - - - - - - 2.13 26.20 0.00 62.31 2.16 2.12 - - - - - - - 2.12 26.23 0.00 62.31 2.16 2.12 - - - - - - - 2.12 26.27 0.00 62.30 2.15 2.12 - - - - - - - 2.12 26.30 0.00 62.29 2.15 2.11 - - - - - - - 2.11 26.33 0.00 62.29 2.15 2.11 - - - - - - - 2.11 26.37 0.00 62.28 2.14 2.11 - - - - - - - 2.11 26.40 0.00 62.28 2.14 2.10 - - - - - - - 2.10 26.43 0.00 62.27 2.14 2.10 - - - - - - - 2.10 26.47 0.00 62.27 2.13 2.10 - - - - - - - 2.10 26.50 0.00 62.26 2.13 2.09 - - - - - - - 2.09 26.53 0.00 62.25 2.13 2.09 - - - - ----- - - 2.09 26.57 0.00 62.25 2.12 2.09 - - - - - - - 2.09 26.60 0.00 62.24 2.12 2.08 - - - - - - - 2.08 26.63 0.00 62.24 2.12 2.08 - - - - - - - 2.08 26.67 0.00 62.23 2.11 2.08 - - - - - - - 2.08 26.70 0.00 62.23 2.11 2.07 - - --- - - 2.07 26.73 0.00 62.22 2.10 2.07 ---- - - - - - - 2.07 26.77 0.00 62.21 2.10 2.07 - - - - - - - 2.07 26.80 0.00 62.21 2.10 2.06 - - - - - - - 2.06 26.83 0.00 62.20 2.09 2.06 - - - - - - - 2.06 26.87 0.00 62.20 2.09 2.06 - - - - - - - 2.06 26.90 0.00 62.19 2.09 2.05 - ----- - - - - - 2.05 26.93 0.00 62.19 2.08 2.05 - - - - - - - 2.05 26.97 0.00 62.18 2.08 2.05 - - - - - - - 2.05 27.00 0.00 62.18 2.08 2.04 - - - - - - 2.04 Continues on next page... Page 10 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 27.03 0.00 62.17 2.07 2.04 - - - - - - - 2.04 27.07 0.00 62.16 2.07 2.04 - - - - - - - 2.04 27.10 0.00 62.16 2.07 2.03 - - - - - - - 2.03 27.13 0.00 62.15 2.06 2.03 - - - - - - - 2.03 27.17 0.00 62.15 2.06 2.03 - - - - - - ---- 2.03 27.20 0.00 62.14 2.06 2.02 - - - - - - - 2.02 27.23 0.00 62.14 2.05 2.02 - - - - - - - 2.02 27.27 0.00 62.13 2.05 2.02 - - - - - - - 2.02 27.30 0.00 62.13 2.05 2.01 - - - - - - - 2.01 27.33 0.00 62.12 2.04 2.01 - - - - - - - 2.01 27.37 0.00 62.12 2.04 2.01 - - - - - - - 2.01 27.40 0.00 62.11 2.04 2.00 - - - - - - - 2.00 27.43 0.00 62.10 2.03 2.00 - - - - - - - 2.00 27.47 0.00 62.10 2.03 2.00 - - - - - - - 2.00 27.50 0.00 62.09 2.03 1.99 - - - - - - - 1.99 27.53 0.00 62.09 2.02 1.99 - - - - - - - 1.99 27.57 0.00 62.08 2.02 1.99 - - - - - - - 1.99 27.60 0.00 62.08 2.02 1.98 - - - - - - - 1.98 27.63 0.00 62.07 2.01 1.98 - - - - - - - 1.98 27.67 0.00 62.07 2.01 1.98 - - - - - - - 1.98 27.70 0.00 62.06 2.01 1.97 - - - - - - - 1.97 27.73 0.00 62.06 2.00 1.97 - - - - - - - 1.97 27.77 0.00 62.05 2.00 1.97 - - - - - - - 1.97 27.80 0.00 62.04 2.00 1.96 - - - - - - - 1.96 27.83 0.00 62.04 2.00 1.96 - - - - - - - 1.96 27.87 0.00 62.03 1.99 1.96 - - - - - - - 1.96 27.90 0.00 62.03 1.99 1.95 - - - - - - - 1.95 27.93 0.00 62.02 1.99 1.95 - - - - - - - 1.95 27.97 0.00 62.02 1.98 1.95 - - - - - - - 1.95 28.00 0.00 62.01 1.98 1.94 - - - - - - - 1.94 28.03 0.00 62.01 1.98 1.94 - - - - - - - 1.94 28.07 0.00 62.00 1.97 1.94 - - - - - - - 1.94 28.10 0.00 62.00 1.97 1.93 - - - - - - - 1.93 28.13 0.00 61.99 1.97 1.93 - - - - - - - 1.93 28.17 0.00 61.98 1.96 1.92 - - - - - - - 1.92 28.20 0.00 61.98 1.96 1.92 - - - - - - - 1.92 28.23 0.00 61.97 1.95 1.92 - - - - - - - 1.92 28.27 0.00 61.96 1.95 1.91 - - - - - - - 1.91 28.30 0.00 61.96 1.95 1.91 - - - - - - - 1.91 28.33 0.00 61.95 1.94 1.90 - - - - - - - 1.90 28.37 0.00 61.94 1.94 1.90 - - - - - - - 1.90 28.40 0.00 61.94 1.93 1.89 - - - - - - - 1.89 28.43 0.00 61.93 1.93 1.89 - - - - - - - 1.89 28.47 0.00 61.92 1.93 1.89 - - - - - - - 1.89 28.50 0.00 61.92 1.92 1.88 - - - - - - - 1.88 28.53 0.00 61.91 1.92 1.88 - - - - - - 1.88 28.57 0.00 61.91 1.91 1.87 - - - - - - - 1.87 28.60 0.00 61.90 1.91 1.87 - - - - - - - 1.87 28.63 0.00 61.89 1.91 1.86 ----- - - - - -- - 1.86 28.67 0.00 61.89 1.90 1.86 - - - - - - 1.86 28.70 0.00 61.88 1.90 1.86 - - - - - - - 1.86 Continues on next page... Page 11 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs 28.73 0.00 61.87 1.90 1.85 - - - - - - - 1.85 28.77 0.00 61.87 1.89 1.85 - - - - - - - 1.85 28.80 0.00 61.86 1.89 1.84 - - - - - - - 1.84 28.83 0.00 61.85 1.88 1.84 - - - - - - 1.84 28.87 0.00 61.85 1.88 1.83 - - - - - - - 1.83 28.90 0.00 61.84 1.88 1.83 - - - - - - - 1.83 28.93 0.00 61.84 1.87 1.83 - - - - - - - 1.83 28.97 0.00 61.83 1.87 1.82 - - - - - - - 1.82 29.00 0.00 61.82 1.87 1.82 - - - - - - - 1.82 29.03 0.00 61.82 1.86 1.81 - - - - - - - 1.81 29.07 0.00 61.81 1.86 1.81 - - - - - - - 1.81 29.10 0.00 61.80 1.85 1.81 - - - - --- - - 1.81 29.13 0.00 61.80 1.85 1.80 - - - - - - - 1.80 29.17 0.00 61.79 1.85 1.80 - - - - - - - 1.80 29.20 0.00 61.79 1.84 1.79 - - - - - - - 1.79 29.23 0.00 61.78 1.84 1.79 - - - - - - - 1.79 29.27 0.00 61.77 1.84 1.78 - - - - - - - 1.78 29.30 0.00 61.77 1.83 1.78 - - - - - - - 1.78 29.33 0.00 61.76 1.83 1.78 - - - - - - - 1.78 29.37 0.00 61.76 1.83 1.77 - - - - - - - 1.77 29.40 0.00 61.75 1.82 1.77 - - - - - - - 1.77 29.43 0.00 61.74 1.82 1.76 - - - - - - - 1.76 29.47 0.00 61.74 1.82 1.76 - - - - - - - 1.76 29.50 0.00 61.73 1.81 1.75 - - - - - - - 1.75 29.53 0.00 61.73 1.81 1.75 - - - - - - 1.75 29.57 0.00 61.72 1.80 1.75 - - - - - - - 1.75 29.60 0.00 61.71 1.80 1.74 ---- - - - - - - 1.74 29.63 0.00 61.71 1.80 1.74 - - - - - - - 1.74 29.67 0.00 61.70 1.79 1.73 - - - - - - - 1.73 29.70 0.00 61.70 1.79 1.73 - - - - - - - 1.73 29.73 0.00 61.69 1.79 1.72 - - - - - - - 1.72 29.77 0.00 61.68 1.78 1.72 - - - - - - - 1.72 29.80 0.00 61.68 1.78 1.72 - - - - - - - 1.72 29.83 0.00 61.67 1.78 1.71 --- - - - - - - 1.71 29.87 0.00 61.67 1.77 1.71 - - - - - - - 1.71 29.90 0.00 61.66 1.77 1.70 - - - - - - - 1.70 29.93 0.00 61.66 1.77 1.70 - - --- - ----- - - 1.70 29.97 0.00 61.65 1.76 1.69 - - - - - - 1.69 30.00 0.00 61.64 1.76 1.69 - - - - - - - 1.69 30.03 0.00 61.64 1.76 1.69 - - - - - - - 1.69 30.07 0.00 61.63 1.75 1.68 - - - - - - - 1.68 30.10 0.00 61.63 1.75 1.68 - - - - - - - 1.68 30.13 0.00 61.62 1.75 1.67 - - - - - - - 1.67 30.17 0.00 61.61 1.74 1.67 - - - - - - - 1.67 30.20 0.00 61.61 1.74 1.67 - - - - - - - 1.67 30.23 0.00 61.60 1.74 1.66 - - - - - - - 1.66 30.27 0.00 61.60 1.73 1.66 - - - - ---- - - 1.66 30.30 0.00 61.59 1.73 1.65 - - - - - - - 1.65 30.33 0.00 61.59 1.72 1.65 - - - - - - - 1.65 30.37 0.00 61.58 1.71 1.65 - - - - - - - 1.65 30.40 0.00 61.58 1.71 1.64 - - - - - - - 1.64 Continues on next page... Page 12 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) eft ft cfs cfs cfs cfs efs cfs cfs ds cfs ds 30.43 0.00 61.57 1.70 1.64 - - - - - - - 1.64 30.47 0.00 61.56 1.70 1.63 - - - - - - - 1.63 30.50 0.00 61.56 1.69 1.63 - - - - - - - 1.63 30.53 0.00 61.55 1.68 1.63 - - - - - - - 1.63 30.57 0.00 61.65 1.68 1.62 - - - - - - - 1.62 30.60 0.00 61.54 1.67 1.62 - - - - - - - 1.62 30.63 0.00 61.54 1.67 1.61 - - - - - - - 1.61 30.67 0.00 61.53 1.66 1.61 - - - - - - - 1.61 30.70 0.00 61.53 1.65 1.61 - - - - - - - 1.61 30.73 0.00 61.52 1.65 1.60 - - - - - - 1.60 30.77 0.00 61.51 1.64 1.60 - - - - - - - 1.60 30.80 0.00 61.51 1.64 1.59 - - - - - - - 1.59 30.83 0.00 61.50 1.63 1.59 --- - - - - - - 1.59 30.87 0.00 61.50 1.62 1.59 - - - - - - - 1.59 30.90 0.00 61.49 1.62 1.58 - - - - - - --- 1.58 30.93 0.00 61.49 1.61 1.58 - - - - - - - 1.58 30.97 0.00 61.48 1.61 1.58 - - - - - - - 1.58 31.00 0.00 61.48 1.60 1.57 - - - - - - - 1.57 31.03 0.00 61.47 1.59 1.57 - - - - - - - 1.57 31.07 0.00 61.47 1.59 1.56 - - - - - - - 1.56 31.10 0.00 61.46 1.58 1.56 - - - - - - - 1.56 31.13 0.00 61.46 1.58 1.56 - - - - - - - 1.56 31.17 0.00 61.45 1.57 1.55 - - - - - - - 1.55 31.20 0.00 61.44 1.57 1.55 - - - - - - - 1.55 31.23 0.00 61.44 1.56 1.55 - - - - - - - 1.55 31.27 0.00 61.43 1.55 1.54 - - - - - - - 1.54 31.30 0.00 61.43 1.55 1.54 - - - - - - - 1.54 31.33 0.00 61.42 1.54 1.53 - - - - - - - 1.53 31.37 0.00 61.42 1.54 1.53 - - - - - - - 1.53 31.40 0.00 61.41 1.53 1.53 - - - - - - - 1.53 31.43 0.00 61.41 1.53 1.52 - - - - - - - 1.52 31.47 0.00 61.40 1.52 1.52 - - - - - - - 1.52 31.50 0.00 61.40 1.52 1.52 - - - - - - - 1.52 31.53 0.00 61.39 1.51 1.51 - - - - - - - 1.51 31.57 0.00 61.39 1.51 1.51 - - - - - - - 1.51 31.60 0.00 61.38 1.51 1.50 - - - - - - - 1.50 31.63 0.00 61.38 1.50 1.50 - - - - - - - 1.50 31.67 0.00 61.37 1.50 1.49 - - - - - - - 1.49 31.70 0.00 61.37 1.50 1.49 - - - ---- - - - 1.49 31.73 0.00 61.36 1.49 1.49 - - - - - - - 1.49 31.77 0.00 61.36 1.49 1.48 - - - - - - - 1.48 31.80 0.00 61.35 1.49 1.48 - - - ----- - - - 1.48 31.83 0.00 61.35 1.49 1.47 - ---- - - - - - 1.47 31.87 0.00 61.34 1.48 1.47 - - - - - - 1.47 31.90 0.00 61.34 1.48 - 1.47 - ---- - - - - - 1.47 31.93 0.00 61.33 1.48 1.46 - - ----- - - - - 1.46 31.97 0.00 61.33 1.47 1.46 - - - - - - - 1.46 32.00 0.00 61.32 1.47 1.45 - - - - - - - 1.45 32.03 0.00 61.32 1.47 1.45 - - - - - - - 1.45 32.07 0.00 61.31 1.46 1.44 - - - - - - - 1.44 32.10 0.00 61.31 1.46 1.44 - - - - - - - 1.44 Continues on next page... Page 13 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Civ C Civ D Wr A Wr B Wr C Wr D ExflI Outflow (hrs) cfs ft cfs cfs cfs cis cfs cfs cfs cfs cis cfs 32.13 0.00 61.30 1.46 1.44 - - - - - - - 1.44 32.17 0.00 61.30 1.46 1.43 - - - - - - - 1.43 32.20 0.00 61.29 1.45 1.43 - - - - - - - 1.43 32.23 0.00 61.29 1.45 1.42 - - - - - - - 1.42 32.27 0.00 61.28 1.45 1.42 - - - - - - - 1.42 32.30 0.00 61.28 1.44 1.42 - - - - - - - 1.42 32.33 0.00 61.27 1.44 1.41 - - - - - - - 1.41 32.37 0.00 61.27 1.44 1.41 - - - - - - - 1.41 32.40 0.00 61.26 1.43 1.40 - - - - - - - 1.40 32.43 0.00 61.26 1.43 1.40 - - - - - - - 1.40 32.47 0.00 61.25 1.43 1.40 - - - - - - - 1.40 32.50 0.00 61.25 1.43 1.39 - - - - - - - 1.39 32.53 0.00 61.24 1.42 1.39 - - - - - - - 1.39 32.57 0.00 61.24 1.42 1.39 - - - - - - - 1.39 32.60 0.00 61.23 1.42 1.38 - - - - - - - 1.38 32.63 0.00 61.23 1.41 1.38 - - - - - - - 1.38 32.67 0.00 61.22 1.41 1.37 - - - - - - - 1.37 32.70 0.00 61.22 1.41 1.37 - - - - - - - 1.37 32.73 0.00 61.22 1.41 1.37 - - - - - - - 1.37 32.77 0.00 61.21 1.40 1.36 - - - - - - - 1.36 32.80 0.00 61.21 1.40 1.36 - - - - - - - 1.36 32.83 0.00 61.20 1.40 1.35 - - - - - - 1.35 32.87 0.00 61.20 1.39 1.35 - - - - - - - 1.35 32.90 0.00 61.19 1.39 1.35 - - - - - - - 1.35 32.93 0.00 61.19 1.38 1.34 - - - - - - - 1.34 32.97 0.00 61.18 1.38 1.34 - - - - - - - 1.34 33.00 0.00 61.18 1.37 1.34 - - - - - - - 1.34 33.03 0.00 61.17 1.37 1.33 - - - - - - - 1.33 33.07 0.00 61.17 1.36 1.33 - - - - - - - 1.33 33.10 0.00 61.16 1.36 1.32 - - - - - - - 1.32 33.13 0.00 61.16 1.36 1.32 - - - - - - - 1.32 33.17 0.00 61.16 1.35 1.32 - - - - - - - 1.32 33.20 0.00 61.15 1.35 1.31 - - - - - - - 1.31 33.23 0.00 61.15 1.34 1.31 - - - - - - - 1.31 33.27 0.00 61.14 1.34 1.30 - - - - - - - 1.30 33.30 0.00 61.14 1.33 1.30 - - - - - - 1.30 33.33 0.00 61.13 1.33 1.30 ---- - - - - - - 1.30 33.37 0.00 61.13 1.32 1.29 - - - - - - - 1.29 33.40 0.00 61.12 1.32 1.29 - - -- - - - - 1.29 33.43 0.00 61.12 1.31 1.29 - - - - - - - 1.29 33.47 0.00 61.12 1.31 1.28 - - - - - - - 1.28 33.50 0.00 61.11 1.30 1.28 - - - - - - - 1.28 33.53 0.00 61.11 1.30 1.28 - - - - - - 1.28 33.57 0.00 61.10 1.30 1.27 - - - - - - - 1.27 33.60 0.00 61.10 1.29 1.27 -- - - - - - - 1.27 33.63 0.00 61.09 1.29 1.26 - - - - ---- - - 1.26 33.67 0.00 61.09 1.28 1.26 - - - - - - - 1.26 33.70 0.00 61.09 1.28 1.26 - - - - - - - 1.26 33.73 0.00 61.08 1.27 1.25 - - - - - - - 1.25 33.77 0.00 61.08 1.27 1.25 - - - - - - - 1.25 33.80 0.00 61.07 1.26 1.25 - - - - - - - 1.25 Continues on next page... Page 14 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfl1 Outflow (hrs) ds ft cfs cfs cfs cfs cfs cfs cfs cfs ds cfs 33.83 0.00 61.07 1.26 1.24 - - - - - - - 1.24 33.87 0.00 61.06 1.26 1.24 - - - - - - - 1.24 33.90 0.00 61.06 1.25 1.24 - - - - - - - 1.24 33.93 0.00 61.06 1.25 1.23 - - - - - - - 1.23 33.97 0.00 61.05 1.24 1.23 - - - - - - - 1.23 34.00 0.00 61.05 1.24 1.22 - - - - - - - 1.22 34.03 0.00 61.04 1.23 1.22 - - - - - - - 1.22 34.07 0.00 61.04 1.23 1.22 - - - - - - - 122 34.10 0.00 61.03 1.22 1.21 - - - - - - - 1.21 34.13 0.00 61.03 1.22 1.21 - - - - - - - 1.21 34.17 0.00 61.03 1.22 1.21 - - - - - - - 121 34.20 0.00 61.02 1.21 1.20 - - - - - - - 120 34.23 0.00 61.02 1.21 1.20 - - - - - - - 1.20 34.27 0.00 61.01 1.20 1.20 - - - - - - - 1.20 34.30 0.00 61.01 1.20 1.19 - - - - - - - 1.19 34.33 0.00 61.01 1.19 1.19 - - - - - - - 1.19 34.37 0.00 61.00 1.19 1.19 - - - - - - - 1.19 34.40 0.00 61.00 1.19 1.18 - - - - - - - 1.18 34.43 0.00 60.99 1.18 1.18 - - - - - - - 1.18 34.47 0.00 60.99 1.18 1.17 - - - - - - - 1.17 34.50 0.00 60.99 1.17 1.17 - - - - - - - 1.17 34.53 0.00 60.98 1.17 1.17 - - - - - - - 1.17 34.57 0.00 60.98 1.17 1.16 - - - - - - - 1.16 34.60 0.00 60.97 1.16 1.16 - - - - - - - 1.16 34.63 0.00 60.97 1.16 1.16 - - - - - - - 1.16 34.67 0.00 60.97 1.16 1.15 - - - - - - - 1.15 34.70 0.00 60.96 1.15 1.15 - - - - - - - 1.15 34.73 0.00 60.96 1.15 1.14 - - - - - - - 1.14 34.77 0.00 60.95 1.14 1.14 - - - - - - - 1.14 34.80 0.00 60.95 1.14 1.14 - - - - - - - 1.14 34.83 0.00 60.95 1.14 1.13 - - - - - - - 1.13 34.87 0.00 60.94 1.13 1.13 - - - - - - - 1.13 34.90 0.00 60.94 1.13 1.12 - - - - - - - 1.12 34.93 0.00 60.94 1.13 1.12 - - - - - - - 1.12 34.97 0.00 60.93 1.12 1.12 - - - - - - - 1.12 35.00 0.00 60.93 1.12 1.11 - - - - - - - 1.11 35.03 0.00 60.92 1.11 1.11 - - - - - - - 1.11 35.07 0.00 60.92 1.11 1.11 - - - ----- - - - 1.11 35.10 0.00 60.92 1.11 1.10 - - - - - - - 1.10 35.13 0.00 60.91 1.10 1.10 - - - - - - - 1.10 35.17 0.00 60.91 1.10 1.09 - - - - - - - 1.09 35.20 0.00 60.90 1.10 1.09 - - - - - ----- - 1.09 35.23 0.00 60.90 1.09 1.09 - - - - - - - 1.09 35.27 0.00 60.90 1.09 1.08 - - - - - - - 1.08 35.30 0.00 60.89 1.09 1.08 - - - - - - - 1.08 35.33 0.00 60.89 1.08 1.08 - - - - - - - 1.08 35.37 0.00 60.89 1.08 1.07 - - - - - - - 1.07 35.40 0.00 60.88 1.07 1.07 - - - - - - - 1.07 35.43 0.00 60.88 1.07 1.06 - - - - - - - 1.06 35.47 0.00 60.88 1.07 1.06 - - - - - - - 1.06 35.50 0.00 60.87 1.06 1.% - - - - - - - 1.06 Continues on next page... Page 15 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) ds ft cfs cfs cfs ds cfs cfs ds ds cfs ds 35.53 0.00 60.87 1.06 1.05 - - - - - - - 1.05 35.57 0.00 60.86 1.06 1.05 - - - - - - - 1.05 35.60 0.00 60.86 1.05 1.05 - - - - - - -- 1.05 35.63 0.00 60.86 1.05 1.04 - - - - - - - 1.04 35.67 0.00 60.85 1.05 1.04 - - - - - - - 1.04 35.70 0.00 60.85 1.04 1.04 - - - - - - - 1.04 35.73 0.00 60.85 1.04 1.03 - - - - - - - 1.03 35.77 0.00 60.84 1.04 1.03 - - - - - - - 1.03 35.80 0.00 60.84 1.03 1.03 - - - - - - - 1.03 35.83 0.00 60.84 1.03 1.02 - - - - - - - 1.02 35.87 0.00 60.83 1.03 1.02 - - - - - - - 1.02 35.90 0.00 60.83 1.02 1.02 - - - - - - - 1.02 35.93 0.00 60.83 1.02 1.01 - - - - - - - 1.01 35.97 0.00 60.82 1.02 1.01 - - - - - - - 1.01 36.00 0.00 60.82 1.01 1.01 - - - - - - - 1.01 36.03 0.00 60.82 1.01 1.00 - - - - - - - 1.00 36.07 0.00 60.81 1.01 1.00 - - - - - - - 1.00 36.10 0.00 60.81 1.00 1.00 - - ---- - - - - 1.00 36.13 0.00 60.81 1.00 0.99 - - - - - - - 0.99 36.17 0.00 60.80 1.00 0.99 - - - - - - - 0.99 36.20 0.00 60.80 0.99 0.98 --- - - - - - - 0.98 36.23 0.00 60.80 0.99 0.98 - - - - - - - 0.98 36.27 0.00 60.79 0.98 0.98 - - - - - - - 0.98 36.30 0.00 60.79 0.98 0.97 - - - - - - - 0.97 36.33 0.00 60.79 0.98 0.97 - - - - - - - 0.97 36.37 0.00 60.78 0.97 0.96 - ---- - - - - - 0.96 36.40 0.00 60.78 0.97 0.96 - - - - - - - 0.96 36.43 0.00 60.78 0.96 0.96 - - - - - - - 0.96 36.47 0.00 60.77 0.96 0.95 - - - - - - 0.95 36.50 0.00 60.77 0.95 0.95 - - - - - - - 0.95 36.53 0.00 60.77 0.95 0.94 - - - - - - - 0.94. 36.57 0.00 60.76 0.95 0.94 - - - - - - - 0.94 36.60 0.00 60.76 0.94 0.94 - - - - - - - 0.94 36.63 0.00 60.76 0.94 0.93 - - - - - - - 0.93 36.67 0.00 60.75 0.93 0.93 - - - - - - - 0.93 36.70 0.00 60.75 0.93 0.92 - - - - - - 0.92 36.73 0.00 60.75 0.93 0.92 - - - - - - - 0.92 36.77 0.00 60.74 0.92 0.92 - - - - - - - 0.92 36.80 0.00 60.74 0.92 0.91 ---- - - - - - - 0.91 36.83 0.00 60.74 0.91 0.91 - - - - - - - 0.91 36.87 0.00 60.73 0.91 0.90 - - - ---- - - - 0.90 36.90 0.00 60.73 0.91 0.90 - - - - - - - 0.90 36.93 0.00 60.73 0.90 0.90 ---- - - - - - - 0.90 36.97 0.00 60.72 0.90 0.89 - - - - - - - 0.89 37.00 0.00 60.72 0.89 0.89 - - - - - - - 0.89 37.03 0.00 60.72 0.89 0.89 - - - - ---- - - 0.89 37.07 0.00 60.72 0.89 0.88 - - - - - - - 0.88 37.10 0.00 60.71 0.88 0.88 - - - - - - - 0.88 37.13 0.00 60.71 0.88 0.87 - - - - - - - 0.87 37.17 0.00 60.71 0.88 0.87 - - - - - - - 0.87 37.20 0.00 60.70 0.87 0.87 - - - - - - 0.87 Continues on next page... Page 16 Hydrograph Discharge Table Time inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) ds ft cfs ds cfs ds cfs cfs cfs cfs cfs ds 37.23 0.00 60.70 0.87 0.86 - - - - - - - 0.86 37.27 0.00 60.70 0.86 0.86 - - - - -- - - 0.86 37.30 0.00 60.70 0.86 0.86 - - - - - - - 0.86 37.33 0.00 60.69 0.86 0.85 - - - - - - -- - 0.85 37.37 0.00 60.69 0.85 0.85 - - - - - - - 0.85 37.40 0.00 60.69 0.85 0.85 - - - - - - - 0.85 37.43 0.00 60.68 0.85 0.84 - - - - - - - 0.84 37.47 0.00 60.68 0.84 0.84 - - - - -- - - 0.84 37.50 0.00 60.68 0.84 0.83 - - - - - - - 0.83 37.53 0.00 60.67 0.83 0.83 - - - - - - - 0.83 37.57 0.00 60.67 0.83 0.83 - - - - - - - 0.83 37.60 0.00 60.67 0.83 0.82 - - - - - - - 0.82 37.63 0.00 60.67 0.82 0.82 - - - - - - - 0.82 37.67 0.00 60.66 0.82 0.82 - - - - - - - 0.82 37.70 0.00 60.66 0.82 0.81 - - - - - - - 0.81 37.73 0.00 60.66 0.81 0.81 - - - - - - - 0.81 37.77 0.00 60.66 0.81 0.81 - - - - - - - 0.81 37.80 0.00 60.65 0.81 0.80 - - - - - - - 0.80 37.83 0.00 60.65 0.80 0.80 - - - - - - - 0.80 37.87 0.00 60.65 0.80 0.80 - - - - - - 0.80 37.90 0.00 60.64 0.80 0.79 - - - - - - - 0.79 37.93 0.00 60.64 0.79 0.79 - - - - - - - 0.79 37.97 0.00 60.64 0.79 0.79 - - - - - - - 0.79 38.00 0.00 60.64 0.78 0.78 - - - - - - - 0.78 38.03 0.00 60.63 0.78 0.78 - - - - - - - 0.78 38.07 0.00 60.63 0.78 0.78 - - - - - - - 0.78 38.10 0.00 60.63 0.77 0.77 - - - - - - - 0.77 38.13 0.00 60.63 0.77 0.77 - - - - - - - 0.77 38.17 0.00 60.62 0.77 0.77 - - - - - - - 0.77 38.20 0.00 60.62 0.76 0.76 - - - - - - - 0.76 38.23 0.00 60.62 0.76 0.76 - - - - - - - 0.76 38.27 0.00 60.62 0.76 0.76 - - - - - - - 0.76 38.30 0.00 60.61 0.75 0.75 - - - - - - - 0.75 38.33 0.00 60.61 0.75 0.75 - - - - - - - 0.75 38.37 0.00 60.61 0.75 0.75 - - - - - - - 0.75 38.40 0.00 60.60 0.74 0.74 - - - - - - - 0.74 38.43 0.00 60.60 0.74 0.74 - - - - - - - 0.74 38.47 0.00 60.60 0.74 0.74 - - - - - - - 0.74 38.50 0.00 60.60 0.73 0.73 - - - - - - 0.73 38.53 0.00 60.59 0.73 0.73 - - - - - - - 0.73 38.57 0.00 60.59 0.73 0.72 - - - - - - - 0.72 38.60 0.00 60.59 0.72 0.72 - - - - - - - 0.72 38.63 0.00 60.59 0.72 0.72 - - - - - - - 0.72 38.67 0.00 60.59 0.71 0.71 - - - - - - - 0.71 38.70 0.00 60.58 0.71 0.71 - - - - - - - 0.71 38.73 0.00 60.58 0.71 0.70 - - - - - - - 0.70 38.77 0.00 60.58 0.70 0.70 - - - - - - - 0.70 38.80 0.00 60.58 0.70 0.69 - - - - - - - 0.69 38.83 0.00 60.57 0.69 0.69 - - - - - - - 0.69 38.87 0.00 60.57 0.69 0.69 - - - - - - - 0.69 38.90 0.00 60.57 0.69 0.68 - - - - - - - 0.68 Continues on next page... Page 17 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C Clv D Wr A Wr B Wr C Wr D ExH1 Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs 38.93 0.00 60.57 0.68 0.68 - - - - - - - 0.68 38.97 0.00 60.56 0.68 0.67 - - - - - - - 0.67 39.00 0.00 60.56 0.67 0.67 - - - - - - - 0.67 39.03 0.00 60.56 0.67 0.67 - - - - - - - 0.67 39.07 0.00 60.56 0.67 0.66 - - - - - - - 0.66 39.10 0.00 60.55 0.66 0.66 - - - - - - - 0.66 39.13 0.00 60.55 0.66 0.65 - - - - - - - 0.65 39.17 0.00 60.55 0.66 0.65 - - - - - - - 0.65 39.20 0.00 60.55 0.65 0.65 - - - - - - - 0.65 39.23 0.00 60.55 0.65 0.64 - - - - - - - 0.64 39.27 0.00 60.54 0.64 0.64 - - - - - - - 0.64 39.30 0.00 60.54 0.64 0.63 - - - - - - - 0.63 39.33 0.00 60.54 0.64 0.63 - - - - - - - 0.63 39.37 0.00 60.54 0.63 0.63 - - - - - - - 0.63 39.40 0.00 60.54 0.63 0.62 - - - - - - - 0.62 39.43 0.00 60.53 0.63 0.62 - - - - - - - 0.62 39.47 0.00 60.53 0.62 0.61 - - - - - - - 0.61 39.50 0.00 60.53 0.62 0.61 - - - - - - - 0.61 39.53 0.00 60.53 0.62 0.61 - - - - - - - 0.61 39.57 0.00 60.52 0.61 0.60 - - - - - - - 0.60 39.60 0.00 60.52 0.61 0.60 - - - - - - - 0.60 39.63 0.00 60.52 0.61 0.60 - - - - - - - 0.60 39.67 0.00 60.52 0.60 0.59 - - - - - - - 0.59 39.70 0.00 60.52 0.60 0.59 - - - - - - - 0.59 39.73 0.00 60.51 0.60 0.59 - - - - - - -- 0.59 39.77 0.00 60.51 0.59 0.58 - - - - - - - 0.58 39.80 0.00 60.51 0.59 0.58 - - - - ---- - ----- 0.58 39.83 0.00 60.51 0.59 0.57 - - - - - - - 0.57 39.87 0.00 60.51 0.58 0.57 - - - - - - - 0.57 39.90 0.00 60.50 0.58 0.57 - - - - - - - 0.57 39.93 0.00 60.50 0.58 0.56 - - - - - - - 0.56 39.97 0.00 60.50 0.57 0.56 - - - - - - - 0.56 40.00 0.00 60.50 0.57 0.56 - - - - - - - 0.56 40.03 0.00 60.50 0.57 0.55 - - - - - ----- - 0.55 40.07 0.00 60.50 0.56 0.55 - - - - - - - 0.55 40.10 0.00 60.49 0.56 0.55 - - - - - - - 0.55 40.13 0.00 60.49 0.56 0.54 - - - - - - - 0.54 40.17 0.00 60.49 0.55 0.54 - - - - - - 0.54 40.20 0.00 60.49 0.55 0.54 - - - - ---- - - 0.54 40.23 0.00 60.49 0.55 0.53 - - - - - - --- 0.53 40.27 0.00 60.48 0.54 0.53 - - - - - - - 0.53 40.30 0.00 60.48 0.54 0.53 - - - --- - - - 0.53 40.33 0.00 60.48 0.54 0.52 - - ---- - ----- - - 0.52 ...End Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 3.93 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 66.53 ft Max. Storage = 292,213 cuft Storage Indication method used. Outflow hydrograph volume=389,330 cuft Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExHl Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.83 15.26 60.65 0.80 0.80 - - - - - - - 0.80 11.87 17.47 60.70 0.87 0.87 - - - - - - - 0.87 11.90 19.97 60.77 0.95 0.94 - - - - - - - 0.94 11.93 22.95 60.84 1.03 1.02 - - - - - - - 1.02 11.97 26.77 60.92 1.11 1.10 - - - ----- - - - 1.10 12.00 31.86 61.01 1.20 1.20 - - - - - - - 1.20 12.03 38.26 61.13 1.32 1.29 - - - - - - - 1.29 12.07 45.53 61.27 1.44 1.41 - - - - - - - 1.41 12.10 53.13 61.43 1.55 1.54 - - - - - - - 1.54 12.13 60.74 61.62 1.75 1.67 - - - - - - - 1.67 12.17 67.96 61.83 1.87 1.82 - - - - - - - 1.82 12.20 74.11 62.06 2.00 1.97 - - - - - - - 1.97 12.23 78.43 62.26 2.13 2.09 - - - - - - - 2.09 12.27 80.69 62.47 2.26 2.21 - - - - - - - 2.21 12.30 81.39<< 62.68 2.39 2.33 - - - - - - - 2.33 12.33 81.10 62.90 2.48 2.44 - - - - - - - 2.44 12.37 80.13 63.11 2.55 2.55 - - - - - - - 2.55 12.40 78.51 63.32 2.66 2.66 - - - - - -- - 2.66 12.43 76.25 63.52 2.78 2.76 - - - - - - - 2.76 12.47 73.39 63.72 2.90 2.84 - - - - - - - 2.84 12.50 69.96 63.91 2.96 2.93 - - - - - - - 2.93 12.53 66.03 64.07 3.00 3.00 - - - - - - - 3.00 12.57 61.69 64.21 3.07 3.06 - - - - - - - 3.06 12.60 57.05 64.34 3.15 3.12 - - - - - - - 3.12 12.63 52.22 64.46 3.21 3.16 - - - - - - - 3.16 12.67 47.31 64.57 3.27 3.21 - - - - - - - 3.21 12.70 42.51 64.67 3.30 3.25 - - - - - - - 3.25 12.73 38.09 64.75 3.30 3.28 - - - - - - - 3.28 12.77 34.32 64.83 3.32 3.31 - - - - - - - 3.31 12.80 31.25 64.90 3.35 3.34 - - - - - - - 3.84 12.83 28.73 64.96 3.38 3.37 - - - - - - - 3.37 12.87 26.55 65.01 3.41 3.39 - -- - - - - - 3.39 12.90 24.63 65.07 3.44 3.41 - - - - - - - 3.41 12.93 22.94 65.11 3.46 3.42 - - - - - - - 3.42 12.97 21.46 65.16 3.48 3.44 - - - - - - -_ 3.44 13.00 20.18 65.20 3.51 3.45 - - - - - - - 3.45 13.03 19.07 65.23 3.51 3.47 - - - - - - - 3.47 13.07 18.12 65.27 3.52 3.48 - - - - - - - 3.48 Continues on next page... Page 2 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Civ C Civ D Wr A Wr B Wr C Wr D Exfii Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cis cfs 13.10 17.32 65.30 3.52 3.49 - - - - - - - 3.49 13.13 16.64 65.33 3.52 3.51 - - - - - - - 3.51 13.17 16.07 65.36 3.53 3.52 - - - - - - - 3.52 13.20 15.58 65.39 3.53 3.53 - - - - - - - 3.53 13.23 15.17 65.42 3.54 3.54 - - - - - - - 3_54 13.27 14.80 65.45 3.55 3.55 - - - - - - - 3.55 13.30 14.46 65.47 3.56 3.56 - - - - - - - 3.56 13.33 14.15 65.50 3.57 3.57 - - - - - - - 3.57 13.37 13.86 65.52 3.58 3.58 - - - - - - - 3.58 13.40 13.60 65.54 3.59 3.59 - - - - - - - 3.59 13.43 13.36 65.57 3.60 3.59 - - - - - - - 3.59 13.47 13.14 65.59 3.61 3.60 - - - - - - - 3.60 13.50 12.94 65.61 3.62 3.61 - - - - - - ---- 3.61 13.53 12.76 65.63 3.63 3.62 - - - - - - - 3.62 13.57 12.59 65.65 3.64 3.63 - - - - - - - 3.63 13.60 12.43 65.67 3.65 3.63 - - - - - - - 3.63 13.63 12.28 65.70 3.66 3.64 - - - - - - - 3.64. 13.67 12.13 65.72 3.67 3.65 - - - - - - - 3.65 13.70 11.99 65.73 3.68 3.65 - - - - - - - 3.65 13.73 11.86 65.75 3.69 3.66 - - - - - - - 3.66 13.77 11.72 65.77 3.69 3.67 - -- - ----- - - - 3.67 13.80 11.59 65.79 3.70 3.67 - - - ----- - - - 3.67 13.83 11.45 65.81 3.71 3.68 -- - - - - - - 3.68 13.87 11.32 65.83 3.72 3.69 - - - - - - - 3.69 13.90 11.18 65.84 3.73 3.69 - - - - - - - 3.69 13.93 11.04 65.86 3.74 3.70 - - - - - - - 3.70 13.97 10.90 65.88 3.74 3.70 - - - - - - - 3.70 14.00 10.76 65.90 3.75 3.71 - - - - - - - 3.71 14.03 10.62 65.91 3.76 3.72 - - - - - - - 3.72 14.07 10.49 65.93 3.77 3.72 - - - - - - - 3.72 14.10 10.3.5 65.94 3.78 3.73 - - - - - - - 3.73 14.13 10.22 65.96 3.78 3.73 - - - - - - - 3.73 14.17 10.09 65.97 3.79 3.74 - - - - - - 3.74 14.20 9.96 65.99 3.80 3.74 ---- -- - - - - - 3.74 14.23 9.84 66.00 3.80 3.75 - - - - - - - 3.75 14.27 9.73 66.01 3.80 3.75 - - - - - - - 3.75 14.30 9.62 66.03 3.80 3.76 - - - - - - - 3.76 14.33 9.52 66.04 3.80 3.76 - - - - - - - 3.76 14.37 9.43 66.05 3.81 3.76 - - - - - - - 3.76 14.40 9.34 66.06 3.81 3.77 - - - - - - - 3.77 14.43 9.25 66.07 3.81 3.77 - - - - - - - 3.77 14.47 9.17 66.09 3.81 3.78 - - - - - - 3.78 14.50 9.09 66.10 3.81 3.78 - - - - - - - 3.78 14.53 9.01 66.11 3.81 3.78 - - - - - - 3.78 14.57 8.94 66.12 3.81 3.79 - - - - - - - 3.79 14.60 8.86 66.13 3.81 3.79 - ---- - - - - - 3.79 14.63 8.79 66.14 3.81 3.80 - - - - - - - 3.80 14.67 8.73 66.15 3.81 3.80 - - - - - - - 3.80 14.70 8.66 66.16 3.81 3.80 - - - ----- ----- - - 3.80 14.73 8.59 66.17 3.82 3.81 - - - - - - - 3.81 14.77 8.52 66.18 3.82 3.81 - - - - - - - 3.81 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation CIv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) cfs ft cis cfs cfs cfs cfs cfs cfs cfs cfs cfs 14.80 8.46 66.19 3.82 3.81 - - - - - - 3.81 14.83 8.39 66.20 3.82 3.82 - - - - - - - 3.82 14.87 8.32 66.21 3.82 3.82 - - - - - - - 3.82 14.90 8.25 66.22 3.82 3.82 - - - - - - - 3.82 14.93 8.18 66.23 3.83 3.83 - - - - -- - - 3.83 14.97 8.11 66.24 3.83 3.83 - - - - - - - 3.83 15.00 8.05 66.25 3.83 3.83 - - - - - - - 3.83 15.03 7.98 66.25 3.84 3.84 - - - - - - - 3.84 15.07 7.91 66.26 3.84 3.84 - - - - - ____ - 3.84 15.10 7.84 66.27 3.84 3.84 - - - - - - - 3.84 15.13 7.77 66.28 3.85 3.85 - - - - - - - 3.85 15.17 7.70 66.29 3.85 3.85 - - - - - - - 3.85 15.20 7.63 66.30 3.85 3.85 - - - - - - - 3.85 15.23 7.56 66.30 3.86 3.85 - - - - - - - 3.85 15.27 7.49 66.31 3.86 3.86 - - - - ---- - - 3.86 15.30 7.42 66.32 3.86 3.86 - - - - - - - 3.86 15.33 7.35 66.33 3.86 3.86 - - - - - - - 3.86 15.37 7.28 66.33 3.87 3.86 - - - - - - - 3.86 15.40 7.21 66.34 3.87 3.87 - - - - - - - 3.87 15.43 7.13 66.35 3.87 3.87 - - - - - - - 3.87 15.47 7.06 66.35 3.87 3.87 - -- - --- - - - 3.87 15.50 6.99 66.36 3.88 3.87 - - - -- - - - 3.87 15.53 6.92 66.37 3.88 3.88 - - - - - - - 3.88 15.57 6.85 66.37 3.88 3.88 - - - - - - - 3.88 15.60 6.78 66.38 3.88 3.88 - - - - ----- - - 3.88 15.63 6.70 66.39 3.89 3.88 - - - - - - - 3.88 15.67 6.63 66.39 3.89 3.88 - - - - - - - 3_88 15.70 6.56 66.40 3.89 3.89 - - - - - - - 3.89 15.73 -6.49 66.40 3.89 3.89 - - - - - - - 3.89 15.77 6.42 66.41 3.89 3.89 - - - - - - - 3.89 15.80 6.34 66.41 3.90 3.89 - - - - - - - 3.89 15.83 6.27 66.42 3.90 3.89 - - - - - - - 3.89 15.87 6.20 66.42 3.90 3.90 - - - - - - - 3.90 15.90 6.12 66.43 3.90 3.90 - - - - - - - 3.90 15.93 6.05 66.43 3.91 3.90 - - - - - - - 3.90 15.97 5.98 66.44 3.91 3.90 - - - - - - - 3.90 16.00 5.90 66.44 3.91 3.90 - - - - - - - 3.90 16.03 5.83 66.45 3.91 3.90 - - - - - - - 3.90 16.07 5.76 66.45 3.91 3.90 - - - - - - 3.90 16.10 5.69 66.45 3.91 3.90 - - - - - - - 3.90 16.13 5.62 66.46 3.92 3.91 - - ---- - - - - 3.91 16.17 5.55 66.46 3.92 3.91 - - - - - - - 3.91 16.20 5.49 66.46 3.92 3.91 - - - - - - - 3.91 16.23 5.43 66.47 3.92 3.91 - - - - - - - 3.91 16.27 5.37 66.47 3.92 3.91 - - - - - - - 3.91 16.30 5.31 66.47 3.92 3.91 - - - - - - - 3.91 16.33 5.26 66.48 3.92 3.91 - - - - - - - 3.91 16.37 5.21 66.48 3.92 3.91 - - - - - - - 3.91 16.40 5.17 66.48 3.93 3.91 - - - - - - - 3.91 16.43 5.13 66.48 3.93 3.92 - - - - - - - 3.92 16.47 5.09 66.49 3.93 3.92 - - - - - - - 3.92 Continues on next page... Page 4 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Civ C Civ D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cfs ft cfs cfs Cfs cfs Cfs ds cfs cfs cfs cfs 16.50 5.05 66.49 3.93 3.92 - - - - - - -- 3.92 16.53 5.01 66.49 3.93 3.92 - - - - - - - 3.92 16.57 4.97 66.49 3.93 3.92 - - - - - - - 3.92 16.60 4.94 66.50 3.93 3.92 - - - - - - - 3.92 16.63 4.91 66.50 3.93 3.92 - - - - - - - 3.92 16.67 4.87 66.50 3.93 3.92 - - - - - - - 3.92 16.70 4.84 66.50 3.93 3.92 - - - - - - - 3.92 16.73 4.81 66.50 3.94 3.92 - - - - - - - 3.92 16.77 4.78 66.51 3.94 3.92 ----- - - - -- - - 3.92 16.80 4.75 66.51 3.94 3.92 - - - - - - - 3.92 16.83 4.71 66.51 3.94 3.92 - - - - - - - 3.92 16.87 4.68 66.51 3.94 3.92 - - - - - - - 3.92 16.90 4.65 66.51 3.94 3.92 - - - - -- - - 3.92 16.93 4.62 66.51 3.94 3.92 - - - - - - - 3.92 16.97 4.59 66.52 3.94 3.93 - - - - - - - 3.93 17.00 4.55 66.52 3.94 3.93 - - - - - - - 3.93 17.03 4.52 66.52 3.94 3.93 - - - - - - - 3.93 17.07 4.49 66.52 3.94 3.93 - - - - - - - 3.93 17.10 4.46 66.52 3.94 3.93 - ---- - - - - - 3.93 17.13 4.43 66.52 3.94 3.93 - - - - - - - 3.93 17.17 4.39 66.52 3.94 3.93 - - - - -- - - 3.93 17.20 4.36 66.52 3.94 3.93 - - - - - - - 3.93 17.23 4.33 66.52 3.94 3.93 - - - - - - - 3.93 17.27 4.30 66.53 3.94 3.93 - - - - - - - 3.93 17.30 4.26 66.53 3.94 3.93 --- - - - - - - 3.93 17.33 4.23 66.53 3.94 3.93 -- - - - ----- - - 3.93 17.37 4.20 66.53 3.94 3.93 - - - - - - - 3.93 17.40 4.17 66.53 3.95 3.93 - - - - - - - 3.93 17.43 4.14 66.53 3.95 3.93 - - - - - - - 3.93 17.47 4.10 66.53 3.95 3.93 - - - - - - - 3.93 17.50 4.07 66.53 3.95 3.93 ----- - - - - - - 3.93 17.53 4.04 66.53 3.95 3.93 - - - - - - - 3.93 17.57 4.01 66.53 3.95 3.93 - - - - - - - 3.93 17.60 3.97 66.53 3.95 3.93 - - - - - - - 3.93 17.63 3.94 66.53 3.95 3.93 ---- - - - - - - 3.93<< 17.67 3.91 66.53 3.95 3.93 - - - - - - - 3.93 17.70 3.87 66.53 3.95 3.93 - - - - -- - - 3.93 17.73 3.84 66.53 3.95 3.93 --- - - - - - - 3.93 17.77 3.81 66.53 3.95 3.93 - - ---- - - - - 3.93 17.80 3.78 66.53 3.95 3.93 - - - - - - - 3.93 17.83 3.74 66.53 3.95 3.93 - - - - - - - 3.93 17.87 3.71 66.53 3.95 3.93 - - - - - - - 3.93 17.90 3.68 66.53 3.95 3.93 - - - - - - - 3.93 17.93 3.64 66.53 3.94 3.93 - - - - - - - 3.93 17.97 3.61 66.53 3.94 3.93 ----- - - ---- - - - 3.93 18.00 3.58 66.53 3.94 3.93 - - - - - - - 3.93 18.03 3.55 66.52 3.94 3.93 - - - - - - - 3.93 18.07 3.51 66.52 3.94 3.93 - - - - - - - 3.93 18.10 3.48 66.52 3.94 3.93 - - - - - - - 3.93 18.13 3.45 66.52 3.94 3.93 - - - - - - - 3.93 18.17 3.42 66.52 3.94 3.93 - - - - - - - 3.93 Continues on next page... Page 5 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfi1 Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cis 18.20 3.39 66.52 3.94 3.93 - -- - - - - ---- 3.93 18.23 3.37 66.52 3.94 3.93 - - - - - - - 3.93 18.27 3.34 66.52 3.94 3.93 - - - - - - - 3.93 18.30 3.32 66.52 3.94 3.93 - - - - - - - 3.93 18.33 3.30 66.52 3.94 3.93 - ----- - - - - - 3.93 18.37 3.28 66.51 3.94 3.92 - - - - ---- - - 3.92 18.40 3.27 66.51 3.94 3.92 - - - - - - - 3.92 18.43 3.25 66.51 3.94 3.92 - - - - - - - 3.92 18.47 3.24 66.51 3.94 3.92 - - - -- - - - 3.92 18.50 3.22 66.51 3.94 3.92 - - - - - - - 3.92 18.53 3.21 66.51 3.94 3.92 - - - - - - - 3.92 18.57 3.20 66.51 3.94 3.92 - - - - - - - 3.92 18.60 3.19 66.50 3.93 3.92 - - - - - - - 3.92 18.63 3.18 66.50 3.93 3.92 - - - - - - - 3.92 18.67 3.17 66.50 3.93 3.92 - - - - - - - 3.92 18.70 3.16 66.50 3.93 3.92 - - - - - - - 3.92 18.73 3.15 66.50 3.93 3.92 - - - - - ----- - 3.92 18.77 3.14 66.50 3.93 3.92 - - - - - - - 3.92 18.80 3.13 66.49 3.93 3.92 - - ---- - - - - 3.92 18.83 3.12 66.49 3.93 3.92 - - - - - - - 3.92 18.87 3.11 66.49 3.93 3.92 - - - - - - - 3.92 18.90 3.10 66.49 3.93 3.92 - - - - - - - 3.92 18.93 3.09 66.49 3.93 3.92 - - - - - - - 3.92 18.97 3.08 66.49 3.93 3.92 - - - - - - - 3.92 19.00 3.07 66.48 3.93 3.91 - - - - - - - 3.91 19.03 3.06 66.48 3.93 3.91 - - - - - - - 3.91 19.07 3.05 66.48 3.93 3.91 - - - - - - - 3.91 19.10 3.04 66.48 3.92 3.91 - - - - - - - 3.91 19.13 3.03 66.48 3.92 3.91 - -- - - - - - 3.91 19.17 3.02 66.47 3.92 3.91 - - - - - - - 3.91 19.20 3.01 66.47 3.92 3.91 - - - - - - - 3.91 19.23 3.00 66.47 3.92 3.91 - - - - - - - 3.91 19.27 2.99 66.47 3.92 3.91 - - - - - - - 3.91 19.30 2.98 66.47 3.92 3.91 - - - - - - - 3.91 19.33 2.97 66.47 3.92 3.91 - - - - - - - 3.91 19.37 2.96 66.46 3.92 3.91 - - - - - - - 3.91 19.40 2.95 66.46 3.92 3.91 ----- - - - - - - 3.91 19.43 2.94 66.46 3.92 3.91 - - - - - - - 3.91 19.47 2.93 66.46 3.92 3.91 - - - - - - - 3.91 19.50 2.92 66.46 3.91 3.91 - - - - - - - 3.91 19.53 2.92 66.45 3.91 3.90 - - - - ---- - - 3.90 19.57 2.91 66.45 3.91 3.90 - - - - - - - 3.90 19.60 2.90 66.45 3.91 3.90 - - - - - - - 3.90 19.63 2.89 66.45 3.91 3.90 - - - - - - - 3.90 19.67 2.88 66.44 3.91 3.90 - - - - - - - 3.90 19.70 2.87 66.44 3.91 3.90 - - - - - - - 3.90 19.73 2.86 66.44 3.91 3.90 - - - - - - - 3.90 19.77 2.85 66.44 3.91 3.90 ----- - - - - - - 3.90 19.80 2.84 66.44 3.91 3.90 - - - - - - - 3.90 19.83 2.83 66.43 3.91 3.90 - - - - - - - 3.90 19.87 2.82 66.43 3.90 3.90 - - - - - - - 3.90 Continues on next page... Page 6 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfii Outflow (hrs) cfs ft cfs cfs cfs cis cfs cfs cfs cfs cfs cis 19.90 2.81 66.43 3.90 3.90 - - - - - - - 3.90 19.93 2.80 66.43 3.90 3.90 - - - - - - - 3.90 19.97 2.79 66.42 3.90 3.90 - - - - - - - 3.90 20.00 2.78 66.42 3.90 3.89 - - - - - - - 3.89 20.03 2.77 66.42 3.90 3.89 - - - - - - - 3.89 20.07 2.76 66.42 3.90 3.89 - - - - - - - 3.89 20.10 2.75 66.42 3.90 3.89 - - - - - - - 3.89 20.13 2.74 66.41 3.90 3.89 - - - - - - - 3.89 20.17 2.73 66.41 3.90 3.89 - - - - -- - - 3.89 20.20 2.72 66.41 3.89 3.89 - - - - - - - 3.89 20.23 2.71 66.41 3.89 3.89 - - - - - - - 3.89 20.27 2.70 66.40 3.89 3.89 - - - - - - - 3.89 20.30 2.69 66.40 3.89 3.89 - - - - ---- - - 3.89 20.33 2.68 66.40 3.89 3.89 - - - - - - 3.89 20.37 2.67 66.40 3.89 3.89 - - - - - - - 3.89 20.40 2.66 66.39 3.89 3.88 - - - - - - - 3.88 20.43 2.65 66.39 3.89 3.88 - - - - - - - 3.88 20.47 2.64 66.39 3.89 3.88 - - - - - - - 3.88 20.50 2.63 66.39 3.89 3.88 - - - - - - - 3.88 20.53 2.62 66.38 3.88 3.88 - - - - - - - 3.88 20.57 2.61 66.38 3.88 3.88 - - - - - -- - 3.88 20.60 2.60 66.38 3.88 3.88 - - - - - - - 3.88 20.63 2.59 66.37 3.88 3.88 - - - - - - - 3.88 20.67 2.58 66.37 3.88 3.88 - - - - - - - 3.88 20.70 2.57 66.37 3.88 3.88 - - - - - - - 3.88 20.73 2.56 66.37 3.88 3.88 - - - - - - - 3.88 20.77 2.55 66.36 3.88 3.87 - - - -- - - - 3.87 20.80 2.54 66.36 3.88 3.87 - - - -- - - - 3.87 20.83 2.53 66.36 3.88 3.87 - - - - - - - 3.87 20.87 2.52 66.36 3.87 3.87 - - - - - - - 3.87 20.90 2.51 66.35 3.87 3.87 - - - - - - - 3.87 20.93 2.50 66.35 3.87 3.87 - - - - - - - 3.87 20.97 2.49 66.35 3.87 3.87 - - - - - - - 3.87 21.00 2.48 66.34 3.87 3.87 - - - - - - - 3.87 21.03 2.47 66.34 3.87 3.87 - - - - - - - 3.87 21.07 2.46 66.34 3.87 3.87 - - - - - - - 3.87 21.10 2.45 66.33 3.87 3.86 - - - -- - - - 3.86 21.13 2.44 66.33 3.87 3.86 - - - - - - - 3.86 21.17 2.43 66.33 3.86 3.86 - - - - - - - 3.86 21.20 2.42 66.33 3.86 3.86 - - - - - - - 3.86 21.23 2.41 66.32 3.86 3.86 - - - - - - - 3.86 21.27 2.40 66.32 3.86 3.86 - -- - - - - 3.86 21.30 2.39 66.32 3.86 3.86 - -- - - - - 3.86 21.33 2.38 66.31 3.86 3.86 - - - - - - - 3.86 21.37 2.37 66.31 3.86 3.86 - - - - --- - - 3.86 21.40 2.36 66.31 3.86 3.86 - - - - - - - 3.86 21.43 2.35 66.30 3.86 3.85 - - - - - - - 3.85 21.47 2.34 66.30 3.85 3.85 - - - - - - - 3.85 21.50 2.33 66.30 3.85 3.85 ----- - - - - - - 3.85 21.53 2.32 66.29 3.85 3.85 - - - - - - 3.85 21.57 2.31 66.29 3.85 3.85 - - - - - - - 3.85 Continues on next page... Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 4.41 cfs Storm frequency = 25 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 68.34 ft Max. Storage = 397,905 cult Storage Indication method used. Outflow hydrograph volume=475,437 cult Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Civ C CIv D Wr A Wr B Wr C Wr D ExHI Outflow (hm) cfs ft cfs cfs cis cfs cfs cfs cfs cfs cfs cfs 11.57 9.80 60.73 0.90 0.90 - - - - - - - 0.90 11.60 10.45 60.76 0.94 0.94 - - - - - - - 0.94 11.63 11.25 60.79 0.98 0.98 - - - - - - - 0.98 11.67 12.27 60.83 1.02 1.02 - - - - - - - 1.02 11.70 13.55 60.87 1.06 1.06 - - - - - - - 1.06 11.73 15.14 60.92 1.11 1.10 - - - - - - - 1.10 11.77 17.08 60.97 1.16 1.15 - - - - - - - 1.15 11.80 19.38 61.02 1.21 1.21 - - - - - - - 1.21 11.83 22.03 61.09 1.28 1.26 - - - - - - - 1.26 11.87 25.05 61.17 1.36 1.33 - - - - - - - 1.33 11.90 28.45 61.25 1.43 1.40 - - - - - - - 1.40 11.93 32.45 61.35 1.49 1.48 - - - - - - - 1.48 11.97 37.56 61.47 1.59 1.57 - - - - - - - 1.57 12.00 44.31 61.60 1.74 1.66 - - - - - - - 1.66 12.03 52.75 61.76 1.83 1.77 - - - - - __- --. 1.77 12.07 62.25 61.95 1.94 1.90 - - - - - - - 1.90 12.10 72.14 62.14 2.06 2.02 - - - - - - - 2.02 12.13 81.96 62.34 2.18 2.14 - - - - - - - 2.14 12.17 91.22 62.57 2.32 2.27 - - - - - - 2.27 12.20 99.01 62.83 2.46 2.41 - - - - - - - 2.41 12.23 104.34 63.10 2.55 2.55 - - - - - - - 2.55 12.27 106.96 63.38 2.69 2.69 - - - - - - - 2.69 12.30 107.53<< 63.66 2.86 2.82 - - - - - - -_-_ 2.82 12.33 106.81 63.94 2.96 2.94 - - - - - - - 2.94 12.37 105.23 64.19 3.06 3.06 - - - - - - - 3.06 12.40 102.81 64.43 3.19 3.15 - - - - - - - 3.15 12.43 99.59 64.65 3.29 3.24 - - - - - - - 3.24 12.47 95.61 64.87 3.34 3.33 - - - - - - - 3.33 12.50 90.91 65.08 3.44 3.41 - - - - - - - 3.41 12.53 85.60 65.28 3.52 3.48 - - - - - - - 3.48 12.57 79.79 65.46 3.55 3.55 - - - - - - - 3.55 12.60 73.62 65.63 3.62 3.62 - - - - - - - 3.62 12.63 67.24 65.79 3.70 3.67 - - - - - - - 3.67 12.67 60.77 65.92 3.77 3.72 - - - - - - - 3.72 12.70 54.47 66.05 3.81 3.76 - - - - - - - 3.76 12.73 48.70 66.15 3.81 3.80 - - - - - - - 3.80 12.77 43.80 66.23 3.83 3.83 - - - - - - - 3.83 12.80 39.83 66.31 3.86 3.86 - - - - - - - 3.86 Continues on next page... Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Civ D Wr A Wr B Wr C Wr D ExH1 Outflow (hrs) cfs ft cfs cfs cis cfs cis cfs cfs cfs cis cfs 12.83 36.56 66.39 3.89 3.88 - - - - - - - 3.88 12.87 33.76 66.45 3.91 3.90 - - - - - - 3.90 12.90 31.29 66.51 3.94 3.92 - - - - - - - 3.92 12.93 29.12 66.57 3.96 3.94 - - - - - - - 3.94 12.97 27.22 66.62 3.98 3.96 - - - - - - ---- 3.96 13.00 25.57 66.66 4.00 3.97 - - - - - - - 3.97 13.03 24.16 66.71 4.02 3.99 - - - - - - - 3.99 13.07 22.94 66.75 4.03 4.00 - - - - - - - 4.00 13.10 21.91 66.79 4.05 4.01 - - - - - - - 4.01 13.13 21.05 66.82 4.06 4.03 - - - - - - - 4.03 13.17 20.31 66.86 4.06 4.04 - - - - - - - 4.04 13.20 19.69 66.89 4.07 4.05 - - - - - - - 4.05 13.23 19.16 66.92 4.07 4.06 --- ----- - - - - - 4_06 13.27 18.69 66.96 4.08 4.07 - - - - - - - 4.07 13.30 18.25 66.99 4.08 4.08 - - - - - - - 4.08 13.33 17.85 67.01 4.09 4.09 - - - - - - - 4.09 13.37 17.49 67.04 4.10 4.10 - - - - - - - 4.10 13.40 17.15 67.07 4.11 4.11 - - - - - - - 4.11 13.43 16.84 67.10 4.11 4.11 - - - - - - - 4.11 13.47 16.56 67.12 4.12 4.12 - - - - - - - 4.12 13.50 16.31 67.15 4.13 4.13 ---- - - - - - - 4.13 13.53 16.07 67.18 4.14 4.14 - - - - - - - 4.14 13.57 15.85 67.20 4.15 4.15 - - - - - - - 4.15 13.60 15.65 67.22 4.16 4.16 - - - - - - - 4.16 13.63 15.45 67.25 4.16 4.16 - - - - - - - 4.16 13.67 15.27 67.27 4.17 4.17 - - - - - - - 4.17 13.70 15.09 67.29 4.18 4.18 - - - - - - - 4.18 13.73 14.92 67.32 4.18 4.18 - - - - - - - 4.18 13.77 14.75 67.34 4.19 4.19 - - - - - - - 4.19 13.80 14.57 67.36 4.20 4.20 - - - - - - - 4.20 13.83 14.40 67.38 4.21 4.21 - - - - - - - 4.21 13.87 14.22 67.40 4.21 4.21 - - - - - - - 4.21 13.90 14.05 67.43 4.22 4.22 - - - - - - - 4.22 13.93 13.87 67.45 4.22 4.22 - - - - - - - 4.22 13.97 13.69 67.47 4.23 4.23 - - - - - - - 4.23 14.00 13.52 67.49 4.24 4.24 - - - - - - - 4.24 14.03 13.34 67.50 4.24 4.24 - - - - - - - 4.24 14.07 13.16 67.52 4.25 4.25 - - - - - - - 4.25 14.10 12.99 67.54 4.25 4.25 - - - - - - - 4.25 14.13 12.82 67.56 4.26 4.26 - - - - - - - 4.26 14.17 12.65 67.58 4.27 4.27 - - -- - - - - 4.27 14.20 12.49 67.60 4.27 4.27 - - - - - - - 4.27 14.23 12.34 67.61 4.28 4.28 - - - - - - - 4.28 14.27 12.20 67.63 4.28 4.28 ---- - - - - - - 4.28 14.30 12.07 67.65 4.29 4.29 - - - - - - - 4.29 14.33 11.94 67.66 4.29 4.29 - - - - - - - 4.29 14.37 11.82 67.68 4.30 4.30 - - - - - - 4.30 14.40 11.70 67.69 4.30 4.30 - - - - - - - 4.30 14.43 11.59 67.71 4.31 4.31 - - - - - - - 4.31 14.47 11.48 67.72 4.31 4.31 - - - - - - - 4.31 14.50 11.38 67.74 4.31 4.31 - - - - - - - 4.31 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A CIv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hm) cfs ft Cfs Cfs Cfs cfs cfs Cfs Cfs Cfs efs Cfs _ 14.53 11.28 67.75 4.32 4.32 - - - - - - - 4.32 14.57 11.19 67.77 4.32 4.32 - - - - - - - 4.32 14.60 11.10 67.78 4.33 4.33 - - - - - - - 4.33 14.63 11.01 67.80 4.33 4.33 - - - - - - - 4.33 14.67 10.92 67.81 4.34 4.34 - ----- - - - - - 4.34 14.70 10.83 67.82 4.34 4.34 - - - - - - - 4.34 14.73 10.75 67.84 4.34 4.34 - - - - - - - 4.34 14.77 10.66 67.85 4.35 4.35 - - - - - - - 4.35 14.80 10.58 67.86 4.35 4.35 - - - - - - - 4.35 14.83 10.49 67.88 4.36 4.36 - - - - - - - 4.36 14.87 10.40 67.89 4.36 4.36 - - - - - - - 4.36 14.90 10.32 67.90 4.36 4.36 - - - - - - - 4.36 14.93 10.23 67.91 4.37 4.37 - - - - ---- - - 4.37 14.97 10.14 67.93 4.37 4.37 - - - - - - - 4.37 15.00 10.05 67.94 4.37 4.37 - - - - - - - 4.37 15.03 9.97 67.95 4.38 4.38 - - - - - - - 4.38 15.07 9.88 67.96 4.38 4.38 - - - - - - - 4.38 15.10 9.79 67.97 4.38 4.38 - - - - - - - 4.38 15.13 9.70 67.98 4.39 4.39 - - - - - - - 4.39 15.17 9.62 68.00 4.39 4.39 - - - - - - - 4.39 15.20 9.53 68.00 4.39 4.39 - - - - - - -- 4.39 15.23 9.44 68.00 4.39 4.39 - - - - - - - 4.39 15.27 9.35 67.99 4.39 4.39 - - - - - - - 4.39 15.30 9.26 67.99 4.39 4.39 - - - - - - - 4.39 15.33 9.17 67.99 4.39 4.39 - - - - - - - 4.39 15.37 9.08 67.99 4.39 4.39 - - - - - - - 4.39 15.40 8.99 67.99 4.39 4.39 - - - - - - - 4.39 15.43 8.90 67.98 4.39 4.39 - - - - - - - 4.39 15.47 8.81 67.98 4.39 4.39 - - - - - - - 4.39 15.50 8.72 67.98 4.39 4.39 - - - - - - - 4.39 15.53 8.63 67.98 4.39 4.39 - - - - - - - 4.39 15.57 8.54 67.98 4.38 4.38 - - - - - - - 4.38 15.60 8.45 67.97 4.38 4.38 - - - - - - - 4.38 15.63 8.36 67.97 4.38 4.38 - - - - - - - 4.38 15.67 8.27 67.97 4.38 4.38 - - - - - - - 4.38 15.70 8.18 67.97 4.38 4.38 - - - - - - - 4.38 15.73 8.09 67.97 4.38 4.38 - - - - - - - 4.38 15.77 8.00 67.97 4.38 4.38 - -- - - - - - 4.38 15.80 7.91 67.96 4.38 4.38 - - - - - - - 4.38 15.83 7.82 67.96 4.38 4.38 - - - - - - - 4.38 15.87 7.72 67.96 4.38 4.38 - - - - - - - 4.38 15.90 7.63 67.96 4.38 4.38 - - - - - - - 4.38 15.93 7.54 67.96 4.38 4.38 - - - - - - - 4.38 15.97 7.45 67.96 4.38 4.38 - - - - - - 4.38 16.00 7.36 67.96 4.38 4.38 - - - - - - - 4.38 16.03 7.26 67.95 4.38 4.38 - - - - - - - 4.38 16.07 7.17 67.96 4.38 4.38 - - - - - - - 4.38 16.10 7.08 67.96 4.38 4.38 - - - - --- - - 4.38 16.13 7.00 67.96 4.38 4.38 - - - - - - - 4.38 16.17 6.91 67.97 4.38 4.38 - - - - - - - 4.38 16.20 6.83 67.97 4.38 4.38 - - - - - - - 4.38 Continues on next page... Page 4 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Civ C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cis cis cfs cfs cfs cis cis cfs cfs cis 16.23 6.76 67.98 4.39 4.38 - - - - - - - 4.38 16.27 6.68 67.98 4.39 4.39 - - - - - - - 4.39 16.30 6.62 67.98 4.39 4.39 - - - - - - - 4.39 16.33 6.55 67.99 4.39 4.39 - - - - - - - 4.39 16.37 6.49 67.99 4.39 4.39 - - - - - - - 4.39 16.40 6.43 67.99 4.39 4.39 - - - - - - - 4.39 16.43 6.38 68.00 4.39 4.39 - - - - - - - 4.39 16.47 6.33 68.25 4.39 4.39 - - - - - - - 4.39 16.50 6.28 68.26 4.39 4.39 - - - - - - - 4.39 16.53 6.23 68.26 4.39 4.39 - - - - - - - 4.39 16.57 6.19 68.26 4.40 4.40 - - - - - - - 4.40 16.60 6.15 68.27 4.40 4.40 - - - - - - - 4.40 16.63 6.10 68.27 4.40 4.40 - - - - - - - 4.40 16.67 6.06 68.27 4.40 4.40 - - - - - - - 4.40 16.70 6.02 68.28 4.40 4.40 - - - - - - - 4.40 16.73 5.98 68.28 4.40 4.40 - - - - - - - 4.40 16.77 5.94 68.28 4.40 4.40 - - - - - - - 4.40 16.80 5.90 68.29 4.40 4.40 - - - - - - - 4.40 16.83 5.86 68.29 4.40 4.40 - - - - - - - 4.40 16.87 5.82 68.29 4.40 4.40 - - - - - - - 4.40 16.90 5.78 68.29 4.40 4.40 - - - - - - - 4.40 16.93 5.74 68.30 4.40 4.40 - - - - - - - 4.40 16.97 5.70 68.30 4.40 4.40 - - - - - - - 4.40 17.00 5.66 68.30 4.40 4.40 - - - - - - - 4.40 17.03 5.62 68.30 4.41 4.41 - - - - - - - 4.41 17.07 5.58 68.31 4.41 4.41 - - - - - - - 4.41 17.10 5.54 68.31 4.41 4.41 - - - - - - - 4.41 17.13 5.50 68.31 4.41 4.41 - - - - - - - 4.41 17.17 5.46 68.31 4.41 4.41 - - - - - -- 4.41 17.20 5.42 68.32 4.41 4.41 - - - - - - - 4.41 17.23 5.38 68.32 4.41 4.41 - - - - - - - 4.41 17.27 5.34 68.32 4.41 4.41 - - - - - - - 4.41 17.30 5.30 68.32 4.41 4.41 - - - - - - - 4.41 17.33 5.26 68.32 4.41 4.41 - - - - - - - 4.41 17.37 5.22 68.32 4.41 4.41 - - - - - - - 4.41 17.40 5.18 68.33 4.41 4.41 - - - - - - - 4.41 17.43 5.14 68.33 4.41 4.41 - - - ---- - - - 4.41 17.47 5.10 68.33 4.41 4.41 - - - - - - - 4.41 17.50 5.06 68.33 4.41 4.41 - - - - - - - 4.41 17.53 5.02 68.33 4.41 4.41 - - - - - - - 4.41 17.57 4.97 68.33 4.41 4.41 - - - - --- - - 4.41 17.60 4.93 68.33 4.41 4.41 - - - - - - - 4.41 17.63 4.89 68.33 4.41 4.41 - - - - - - - 4.41 17.67 4.85 68.33 4.41 4.41 - - - - - - - 4.41 17.70 4.81 68.34 4.41 4.41 - - - - - - - 4.41 17.73 4.77 68.34 4.41 4.41 - - - - - - - 4.41 17.77 4.73 68.34 4.41 4.41 - - - - - - - 4.41 17.80 4.69 68.34 4.41 4.41 - - - - - - - 4.41 17.83 4.65 68.34 4.41 4.41 - - - - -- - - 4.41 17.87 4.61 68.34 4.41 4.41 - - - - - - - 4.41 17.90 4.57 68.34 4.41 4.41 - - - - - - 4.41 Continues on next page... Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D ExH1 Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cis cfs 17.93 4.52 68.34 4.41 4.41 - - - - - - - 4.41 17.97 4.48 68.34 4.41 4.41 - - - - - - - 4.41 18.00 4.44 68.34 4.41 4.41 - - - - - - - 4.41 18.03 4.40 68.34<< 4.41 4.41 - - - - - - - 4.41 << 18.07 4.36 68.34 4.41 4.41 - - - - - - - 4.41 18.10 4.32 68.34 4.41 4.41 - - - - - - - 4.41 18.13 4.28 68.34 4.41 4.41 - - - - - - - 4.41 18.17 4.25 68.34 4.41 4.41 - - - - - - - 4.41 18.20 4.21 68.34 4.41 4.41 - - - - - - - 4.41 18.23 4.18 68.34 4.41 4.41 - - - - - - - 4.41 18.27 4.15 68.34 4.41 4.41 - - - - - - - 4.41 18.30 4.12 68.34 4.41 4.41 - - - - - - - 4.41 18.33 4.10 68.34 4.41 4.41 - - - - - - - 4.41 18.37 4.07 68.34 4.41 4.41 - - - - - - - 4.41 18.40 4.05 68.33 4.41 4.41 - - - - - - - 4.41 18.43 4.03 68.33 4.41 4.41 - - - - - - - 4.41 18.47 4.01 68.33 4.41 4.41 - - - - - - - 4.41 18.50 4.00 68.33 4.41 4.41 - - - - - - - 4.41 18.53 3.98 68.33 4.41 4.41 - - - - - - - 4.41 18.57 3.97 68.33 4.41 4.41 - - - - - - - 4.41 18.60 3.95 68.33 4.41 4.41 - - - - - - - 4.41 18.63 3.94 68.33 4.41 4.41 - - - - - - --- 4.41 18.67 3.93 68.33 4.41 4.41 - - - - - - - 4.41 18.70 3.91 68.33 4.41 4.41 - - - - - - - 4.41 18.73 3.90 68.33 4.41 4.41 - -- - - - -- ---- 4.41 18.77 3.89 68.33 4.41 4.41 - - - - - - - 4.41 18.80 3.88 68.32 4.41 4.41 - - - - - - - 4.41 18.83 3.87 68.32 4.41 4.41 - - - - - - - 4.41 18.87 3.85 68.32 4.41 4.41 - - - - - - - 4.41 18.90 3.84 68.32 4.41 4.41 - - - - - - - 4.41 18.93 3.83 68.32 4.41 4.41 - - - - - - - 4.41 18.97 3.82 68.32 4.41 4.41 - - - - - - - 4.41 19.00 3.81 68.32 4.41 4.41 - - - - - - - 4.41 19.03 3.79 68.32 4.41 4.41 - - - - - - - 4.41 19.07 3.78 68.32 4.41 4.41 - - - - -. - - 4.41 19.10 3.77 68.31 4.41 4.41 - - - - - - 4.41 19.13 3.76 68.31 4.41 4.41 - - - - - - - 4.41 19.17 3.74 68.31 4.41 4.41 - - - - - - ----- 4.41 19.20 3.73 68.31 4.41 4.41 - - - - - - 4.41 19.23 3.72 68.31 4.41 4.41 - - - - - - - 4.41 19.27 3.71 68.31 4.41 4.41 - - - - - - - 4.41 19.30 3.70 68.31 4.41 4.41 - - - - - - - 4.41 19.33 3.68 68.31 4.41 4.41 - - - - - - - 4.41 19.37 3.67 68.30 4.41 4.41 - - - - - - - 4.41 19.40 3.66 68.30 4.40 4.40 - - - - - - - 4.40 19.43 3.65 68.30 4.40 4.40 - - - - - - - 4.40 19.47 3.64 68.30 4.40 4.40 - - - - - - - 4.40 19.50 3.62 68.30 4.40 4.40 - - - - - - - 4.40 19.53 3.61 68.30 4.40 4.40 - - - - - - - 4.40 19.57 3.60 68.30 4.40 4.40 - - - - - - - 4.40 19.60 3.59 68.29 4.40 4.40 - - - - - - - 4.40 Continues on next page... Page 6 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Civ C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (hm) ds ft cfs ds cfs eft ds ds ds ds ds cfs 19.63 3.58 68.29 4.40 4.40 - - - - - - - 4.40 19.67 3.56 68.29 4.40 4.40 - - - - - - - 4.40 19.70 3.55 68.29 4.40 4.40 - - - - - - - 4.40 19.73 3.54 68.29 4.40 4.40 - - - - - - 4.40 19.77 3.53 68.29 4.40 4.40 - - - - - - - 4.40 19.80 3.51 68.28 4.40 4.40 - - - - - - - 4.40 19.83 3.50 68.28 4.40 4.40 - - - - - - - 4.40 19.87 3.49 68.28 4.40 4.40 - - - - - - - 4.40 19.90 3.48 68.28 4.40 4.40 - - - - - - - 4.40 19.93 3.47 68.28 4.40 4.40 - - - - - - - 4.40 19.97 3.45 68.28 4.40 4.40 - - - - - - - 4.40 20.00 3.44 68.27 4.40 4.40 - - - - - - - 4.40 20.03 3.43 68.27 4.40 4.40 - - - - - - - 4.40 20.07 3.42 68.27 4.40 4.40 - - - - - - - 4.40 20.10 3.40 68.27 4.40 4.40 - - - - - - - 4.40 20.13 3.39 68.27 4.40 4.40 - - - - - - - 4.40 20.17 3.38 68.26 4.39 4.39 - - - - - - - 4.39 20.20 3.37 68.26 4.39 4.39 - - - - - - - 4.39 20.23 3.36 68.26 4.39 4.39 - - - - - - - 4.39 20.27 3.34 68.26 4.39 4.39 - - - - - - - 4.39 20.30 3.33 68.26 4.39 4.39 - - - - - - - 4.39 20.33 3.32 68.25 4.39 4.39 - - - - - - - 4.39 20.37 3.31 68.00 4.39 4.39 - - - - - - - 4.39 20.40 3.29 68.00 4.39 4.39 - - - - - - - 4.39 20.43 3.28 68.00 4.39 4.39 - - - - - - - 4.39 20.47 3.27 67.99 4.39 4.39 - - - - - - - 4.39 20.50 3.26 67.99 4.39 4.39 - - - - - - - 4.39 20.53 3.24 67.99 4.39 4.39 - - - - - - - 4.39 20.57 3.23 67.99 4.39 4.39 ----- - - - - - - 4.39 20.60 3.22 67.99 4.39 4.39 - - - - - - - 4.39 20.63 3.21 67.98 4.39 4.39 - - - - - - - 4.39 20.67 3.20 67.98 4.39 4.39 - - - - - - - 4.39 20.70 3.18 67.98 4.39 4.39 - - - - - - 4.39 20.73 3.17 67.98 4.39 4.39 - - - - - - - 4.39 20.77 3.16 67.98 4.39 4.38 - - - - - - - 4.38 20.80 3.15 67.97 4.38 4.38 - - - - - - - 4.38 20.83 3.13 67.97 4.38 4.38 - - - - - - - 4.38 20.87 3.12 67.97 4.38 4.38 - - - - - - - 4.38 20.90 3.11 67.97 4.38 4.38 - - - - - - - 4.38 20.93 3.10 67.97 4.38 4.38 - - - - - - - 4.38 20.97 3.08 67.96 4.38 4.38 - - - - - - - 4.38 21.00 3.07 67.96 4.38 4.38 - - - - - - - 4.38 21.03 3.06 67.96 4.38 4.38 - - - - - - 4.38 21.07 3.05 67.96 4.38 4.38 - - - - - - - 4.38 21.10 3.03 67.96 4.38 4.38 - - - - - - - 4.38 21.13 3.02 67.95 4.38 4.38 - - - - - - - 4.38 21.17 3.01 67.95 4.38 4.38 - - - - - - - 4.38 21.20 3.00 67.96 4.38 4.38 - - - - - - - 4.38 21.23 2.98 67.96 4.38 4.38 - - - - - - - 4.38 21.27 2.97 67.96 4.38 4.38 - - - - - - - 4.38 21.30 2.96 67.96 4.38 4.38 - - - - - - - 4.38 Continues on next page... Hydrograph Report Pagel Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 4.80 cfs Storm frequency = 50 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 69.91 ft Max. Storage = 497,361 cuft Storage Indication method used. Outflow hydrograph volume=539,774 cult Hydrograph Discharge Table Time Inflow Elevation CIv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cis ft eft cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.30 9.07 60.80 1.00 0.99 ----- ---- ----- ---- ----- ----= 0.99 11.33 9.45 60.83 1.03 1.02 - - - --- - - 1.02 11.37 9.86 60.86 1.05 1.05 -- ----- --- ---- --- --- ----- i.05 11.40 10.29 60.89 1.08 1.08 - - - --- ---- -- --- 1.08 11.43 10.76 60.92 1.11 i.i i ---- ----- -- - ---- ---- - 1.11 11.47 11.25 60.96 1.15 1.14 --- - --- - - - ---- 1.14 11.50 11.76 60.99 1.18 1.18 ---- ----- -- ----- ----- -- - 1.18 11.53 12.33 61.03 1.22 1.21 - ----- - --- --- - - 1.21 11.57 12.99 61.07 1.26 1.24 ---- --- -- ---- ----- -- 1.24 11.60 13.80 61.11 1.30 1.28 ---- --- ----- ----- ---- ---- 1.28 11.63 14.82 6i.16 1.35 1.32 ----- ----- -- ---- -- - 1.32 11.67 16.11 61.20 1.40 1.36 --- - - - - - - 1.36 11.70 17.72 61.26 1.43 1.40 ---- ---- - - -- ---- --- 1.40 11.73 19.73 61.32 1.47 1A5 - - ----- - --- - 1.45 11.77 22.17 61.38 1.51 1.50 --- ----- ----- --- ---- - 1.50 11.80 25.05 61.46 1.58 1.56 - - --. - - -- - 1.56 11.83 28.37 61.54 1.67 1.62 - - -- - ---- - - 1.62 11.87 32.13 61.64 1.76 1.69 -- 1.69 11.90 36.35 61.75 1.82 1.77 ----- --- --- - - --- - 1.77 11.93 41.29 61.88 1.90 1.85 ----- - ---- ---- ---- - - 1.85 11.97 47.57 62.02 1.98 1.95 - --- - - -. --- 1.95 12.00 55.83 62.15 2..06 2.03 --- --- --- -- - -- - 2.03 12.03 66.09 62.32 2.16 2.13 - - - -- --- - - 2.i 3 12.07 77.60 62.50 2.28 2.23 ----- - - - -- -- .-- 2.23 12.10 89.54 62.73 2.41 2.35 ---- ---- ---- - --- _-._ --- 2.35 12.13 101.35 62.98 2.49 2A9 --- _--- ---- -- 2.49 12.17 112.42 63.26 2.63 2.63 2.63 12.20 121.65 63.57 2.81 2.78 -- - -- ---- ---- --- --- 2.78 12.23 127.86 63.91 2.96 2.93 - ---- --- --.-- __-__ __._ ____ 2.93 12.27 130.76 64.21 3.07 3.06 ---- ---- - ----- - ---- 3.06 12.30 13,1.18« 64.51 3.24 3.18 --- ----- --- --- ---- ---- ----- 3.18 12.33 130.04 64.81 3.31 3.31 ---- ---- ---- -- --- ---- --_ 3.31 12.37 127.87 65.10 3.45 3.42 3.42 12.40 124.70 65.38 3.53 3.52 -- --_- ---_ -- ---- -- 3.52 12.43 120.59 65.66 3.64 3.63 - - - --- ---- 3.63 12.47 116.57 65.92 3.77 3.72 3.72 12.50 i 09.7 2 66.16 3.81 3.80 ---- - - - - - 3.80 12.53 103.15 66.37 3.88 3.88 ---- -- ---- ---_ - - ---- --- 3.88 Continues on next page... Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A CM B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cis cfs cis cfs cfs cis cfs cis 12.57 96.00 66.57 3.96 3.94 - - - - - - - 3.94 12.60 88.44 66.76 4.04 4.00 - - - - - - - 4.00 12.63 80.65 66.93 4.07 4.06 - - - - - - - 4.06 12.67 72.78 67.08 4.11 4.11 - - - - - - - 4.11 12.70 65.13 67.22 4.15 4.15 - - - - - - - 4.15 12.73 58.15 67.34 4.19 4.19 - - - - - - - 4.19 12.77 52.23 67.44 4.22 4.22 - - - - - - - 4.22 12.80 47.45 67.54 4.25 4.25 - - - - - - - 4.25 12.83 43.53 67.62 4.28 4.28 - - - - - - - 4.28 12.87 40.17 67.70 4.30 4.30 - - - - - - - 4.30 12.90 37.20 67.78 4.33 4.33 - - - - - - 4.33 12.93 34.60 67.84 4.35 4.35 --- - - - - - - 4.35 12.97 32.33 67.90 4.36 4.36 - - -- - - - - 4.36 13.00 30.36 67.96 4.38 4.38 - - - - - - - 4.38 13.03 28.66 68.00 4.39 4.39 - - - ---- --- ---- - 4.39 13.07 27.21 67.99 4.39 4.39 - - --- - ---- - - 4.39 13.10 25.98 67.98 4.39 4.39 - -- - - - - - 4.39 13.13 24.95 67.97 4.38 4.38 - - - ---- - - - 4.38 13.17 24.07 67.96 4.38 4.38 --- -- - -- - ----- ---- 4.38 13.20 23.33 67.96 4.38 4.38 - - - - - ---- 4.38 13.23 22.70 68.00 4.39 4.39 - ---- - - - --- - 4.39 13.27 22.13 68.28 4.40 4.40 - - - - - ---- 4.40 13.30 21.61 68.31 4.41 4.41 - ----- ---- ---- ----- ----- ---- 4.41 13.33 21.13 68.35 4.42 4.42 --- - - - -- - 4.42 13.37 20.69 68.38 4.42 4.42 --- - ---- - - - --- 4.42 13.40 20.29 68.41 4.43 4.43 - - - - - --- --- 4.43 13.43 19.93 68.44 4.44 4.44 - --- - - ----- ---- --- 4.44 13.47 19.59 68.41 4.45 4.45 - - - - -- -- -- -- 4.45 13.50 19.28 68.49 4.45 4.45 - - - ----- --- - --- 4.45 13.53 19.00 68.52 4.46 4A6 ----- - - - ---- ----- - 4.46 13.57 18.74 68.55 4.47 4.47 - - - - --- - - 4.47 13.60 18.49 68.58 4.47 4.47 - -- - -- - -- - 4.47 13.63 18.26 68.60 4.48 4.48 - - - - - --- ---- 4.48 13.67 18.04 68.63 4.49 4.49 - - -- --- - --- -- 4.49 13.70 17.83 68.65 4.49 4.49 - --- - --- - ---- - 4.49 13.73 17.62 68.68 4.50 4.50 - - -- - -- - 4.50 13.77 17.41 68.70 4.51 4.51 -- - ---- ---- -- -- - 4.51 13.80 17.21 68.73 4.51 4.51 --- 4.51 13.83 17.00 68.75 4.52 4.52 ---- --- - --.- -- - - 4.52 13.87 16.79 68.78 4.52 4.52 --- - --- - ---- - - 4.52 13.90 16.58 68.80 4.53 4.53 --- - - ----- - -- - 4.53 13.93 16.37 68.82 4.54 4.54 - - - -- -- --- - 4.54 13.97 16.16 68.84 4.54 4.54 - --- -- --- -.-- --- -- 4.54 14.00 15.95 68.86 4.55 4.55 ----- -- ---- --- -- --- 4.55 14.03 15.73 68.89 4.55 4.55 - --- --- - -- -- - 4.55 14.07 15.52 68.91 4.56 4.56 ---- - - --- ---- --- - 4.56 14.10 15.32 68.93 4.56 4.56 - -- - ---•- - -- --- 4.56 14.13 15.12 68.95 4.57 4.57 4.57 14.17 14.92 68.97 4.57 4.57 - ---- - - - --- - 4.57 14.20 14.73 68.99 4.58 4.58 - - - - - - - 4.58 14.23 14.55 69.01 4.58 4.58 ---- - - -- - - -- 4.58 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Oublow (hrs) cfs ft cis cis cfs cfs cis cfs cis cis cis cfs 14.27 14.38 69.02 4.59 4.59 - - - - - - - 4.59 14.30 14.22 69.04 4.59 4.59 - - - - - - - 4.59 14.33 14.07 69.06 4.60 4.60 - - - - - - - 4.60 14.37 13.92 69.08 4.60 4.60 - - - - - - - 4.60 14.40 13.78 69.10 4.60 4.60 - - - - - - - 4.60 14.43 13.65 69.11 4.61 4.61 - - - - - - - 4.61 14.47 13.52 69.13 4.61 4.61 - - - - -- - --- 4.61 14.50 13.40 69.15 4.62 4.62 - - - - - - - 4.62 14.53 13.29 69.16 4.62 4.62 - - - - - - - 4.62 14.57 13.18 69.18 4.63 4.63 - - - - - - 4.63 14.60 13.07 69.20 4.63 4.63 - - - - - - - 4.63 14.63 12.96 69.21 4.63 4.63 - - - - - - - 4.63 14.67 12.86 69.23 4.64 4.64 - - - - -- - - 4.64 14.70 12.75 69.24 4.64 4.64 - - - - - - - 4..64 14.73 12.65 69.26 4.64 4.64 - - - --- .--- - ---- 4.64 14.77 12.55 69.27 4.65 4.65 - - - - - - - 4.65 14.80 12.44 69.29 4.65 4.65 - - - - -- - - 4.65 14.83 12.34 69.30 4.66 4.66 - - - - - - - 4.66 14.87 12.24 69.32 4.66 4.66 -- - - - --- - - 4.66 14.90 12.14 69.33 4.66 4.66 - ----- - - ----- --- --.. 4.66 14.93 12.03 69.35 4.67 4.67 - -- - - ---- - - 4.67 14.97 11.93 69.36 4.67 4.67 - -- -- -- --- - - 4.67 15.00 11.83 69.37 4.67 4.67 - --- - - - -- - 4.67 15.03 11.72 69.39 4.68 4.68 - - - - - - -- 4.68 15.07 11.62 69.40 4.68 4.68 - --- - - -- - - 4.68 15.10 11.51 69.41 4.68 4.68 - - -- - - - - 4.68 15.13 11.41 69.43 4.69 4.69 - - - ---- -- - 4.69 15.17 11.30 69.44 4.69 4.69 --- --- - --- - - 4.69 15.20 11.20 69.45 4.69 4.69 - --- - - - -- - 4.69 15.23 11.09 69.46 4.69 4.69 - - --- --- - -- - 4.69 15.27 10.99 69.47 4.70 4.70 - - - - - - 4.70 15.30 10.88 69.49 4.70 4.70 - - - - - - - 4.70 15.33 10.78 69.50 4.70 4.70 - - - - - - - 4.70 15.37 10.67 69.51 4.71 4.71 - ----- - --- - - 4.71 15.40 10.57 69.52 4.71 4.71 - - - - - - - 4.71 15.43 10.46 69.53 4.71 4.71 ---- - - - - - ---- 4.71 15.47 10.35 69.54 4.71 4.71 - - - - - - --- 4.71 15.50 10.25 69.55 4.72 4.72 -- --- -- - ---- - - 4.72 15.53 10.14 69.56 4.72 4.72 -- - - - -- - - 4.72 15.57 10.03 69.57 4.72 4.72 - - - - - --- -- 4.72 15.60 9.93 69.58 4.72 4.72 - ---- - - - - - 4.72 15.63 9.82 69.59 4.73 4.73 - - ---- --- - --- ---- 4.73 15.67 9.71 69.60 4.73 4.73 - - --- -- --- --- - 4.73 15.70 9.61 69.61 4.73 4.73 - -- - --- -- - - 4.73 15.73 9.50 69.62 4.73 4.73 - - - - - - - 4.73 15.77 9.39 69.63 4.73 4.73 --- - - - -- - - 4.73 15.80 9.28 69.64 4.74 4.74 - -- --- --- --- - - 4.74 15.83 9.17 69.65 4.74 4.74 - - --- - - -- - 4.74 15.87 9.07 69.66 4.74 4.74 - - - - - - - 4.74 15.90 8.96 69.66 4.74 4.74 - - - --- --- - --- 4.74 15.93 8.85 69.67 4.74 4.74 - - - - -- - - 4.74 Continues on next page... Page 4 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cis ft cis cfs cfs cfs cis cfs cfs cis cis cis 15.97 8.74 69.68 4.75 4.75 - - - - - - - 4.75 16.00 8.63 69.69 4.75 4.75 - - - - - - - 4.75 16.03 8.52 69.69 4.75 4.75 - - - - - - - 4.75 16.07 8.42 69.70 4.75 4.75 - - - - - - - 4.75 16.10 8.31 69.71 4.75 4.75 - - - - - - - 4.75 16.13 8.21 69.71 4.75 4.75 - - - - - - - 4.75 16.17 8.11 69.72 4.76 4.76 - - - - - - - 4.76 16.20 8.02 69.73 4.76 4.76 - - - - - - - 4.76 16.23 7.93 69.73 4.76 4.76 - - - - - - - 4.76 16.27 7.84 69.74 4.76 4.76 - - - - - - - 4.76 16.30 7.76 69.75 4.76 4.76 - - - - - - - 4.76 16.33 7.69 69.75 4.76 4.76 - - - - - - - 4.76 16.37 7.61 69.76 4.76 4.76 - - - - - - - 4.76 16.40 7.55 69.76 4.77 4.77 - - - - - - - 4_77 16.43 7.48 69.77 4.77 4.77 - - - - - - - 4.77 16.47 7.42 69.77 4.77 4.77 - - - - - - - 4.77 16.50 7.36 69.78 4.77 4.77 - - - - - - - 4.77 16.53 7.31 69.78 4.77 4.77 - - - - - - - 4.77 16.57 7.26 69.79 4.77 4.77 - - - - - - - 4.77 16.60 7.21 69.79 4.77 4.77 - - - - - - - 4.77 16.63 7.16 69.80 4.77 4.77 - - - - - - - 4.77 16.67 7.11 69.80 4.77 4.77 - - - - - - - 4.77 16.70 7.06 69.80 4.78 4.78 - - - - - - - 4.78 16.73 7.01 69.81 4.78 4.78 --- - - - - - - 4.78 16.77 6.97 69.81 4.78 4.78 - - - - - - - 4.78 16.80 6.92 69.82 4.78 4.78 - - - - - - - 4.78 16.83 6.87 69.82 4.78 4.78 - - - - - - - 4.78 16.87 6.82 69.82 4.78 4.78 --- --- --- - --- - --- 4.78 16.90 6.78 69.83 4.78 4.78 - - - - - --- - 4.78 16.93 6.73 69.83 4.78 4.78 - - - - - - - 4.78 16.97 6.68 69.84 4.78 4.78 - - - - - - - 4.78 17.00 6.64 69.84 4.78 4.78 - - - - - -- - 4.78 17.03 6.59 69.84 4.79 4.79 - - - - - - - 4.79 17.07 6.54 69.85 4.79 4.79 - - - - - - - 4.79 17.10 6.49 69.85 4.79 4.79 - - - - - - --- 4.79 17.13 6.45 69.85 4.79 4.79 - - - -- -- --- - 4.79 17.17 6.40 69.86 4.79 4.79 - - - - - - -- 4.79 17.20 .6.35 69.86 4.79 4.79 - - - - - - 4.79 17.23 6.30 69.86 4.79 4.79 - -- --- - - --.- - 4.79 17.27 6.26 69.86 4.79 4.79 - - - - -- -- --- 4.79 17.30 6.21 69.87 4.79 4.79 - - -- -- - -- - 4.79 17.33 6.16 69.87 4.79 4.79 -- -- - - - 4.79 17.37 6.11 69.87 4.79 4.79 -- ---- -- - - - 4.79 17.40 6.07 69.88 4.79 4.79 - - -- -- - - - 4.79 17.43 6.02 69.88 4.79 4.79 - - - - - - - 4.79 17.47 5.97 69.88 4.79 4.79 - - - - -- - - 4.79 17.50 5.92 69.88 4.79 4.79 - -- - - - - --- 4.79 17.53 5.87 69.88 4.79 4.79 - -- - - -- - - 4.79 17.57 5.83 69.89 4.80 4.80 --- --- - - - - - 4.80 17.60 5.78 69.89 4.80 4.80 ---- - -- - --- -- - 4.80 17.63 5.73 69.89 4.80 4.80 - - - - --- -^- - 4.80 Continues on next page... Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B CIv C Civ D Wr A Wr B Wr C Wr D ExHl Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 17.67 5.68 69.89 4.80 4.80 - - - - - - - 4.80 17.70 5.63 69.89 4.80 4.80 - - - - - - - 4.80 17.73 5.59 69.89 4.80 4.80 - - - - - - - 4.80 17.77 5.54 69.90 4.80 4.80 - - - - - - - 4.80 17.80 5.49 69.90 4.80 4.80 - - - - - - - 4.80 17.83 5.44 69.90 4.80 4.80 - - - - - - - 4.80 17.87 5.39 69.90 4.80 4.80 - - - - - - - 4.80 17.90 5.35 69.90 4.80 4.80 - - - - - - - 4.80 17.93 5.30 69.90 4.80 4.80 - - - - - - - 4.80 17.97 5.25 69.90 4.80 4.80 - - - - - - - 4.80 18.00 5.20 69.90 4.80 4.80 - - - - - - - 4.80 18.03 5.15 69.90 4.80 4.80 - - - - - - - 4.80 18.07 5.10 69.90 4.80 4.80 - - - - - - - 4.80 18.10 5.06 69.91 4.80 4.80 - - - - - - - 4.80 18.13 5.01 69.91 4.80 4.80 - - - - - - 4.80 18.17 4.97 69.91 4.80 4.80 - - - - - - - 4.80 18.20 4.93 69.91 4.80 4.80 - - - - - - - 4.80 18.23 4.89 69.91 4.80 4.80 - - - - - - - 4.80 18.27 4.86 69.91 4.80 4.80 - - - - - - - 4.80 18.30 4.82 69.91 4.80 4.80 - - - - - - - 4.80 18.33 4.79 69.91 4.80 4.80 - - - - - - - 4.80<< 18.37 4.77 69.91 4.80 4.80 - - - - - - - 4.80 18.40 4.74 69.91 4.80 4.80 - - - - - - - 4.80 18.43 4.72 69.91 4.80 4.80 - - - - - - - 4.80 18.47 4.70 69.91 4.80 4.80 - - - - - - - 4.80 18.50 4.68 69.91 4.80 4.80 - - - - - - - 4.80 18.53 4.66 69.91 4.80 4.80 - - - - - - - 4.80 18.57 4.64 69.91 4.80 4.80 - - - - - - - 4.80 18.60 4.62 69.91 4.80 4.80 - - - - - - - 4.80 18.63 4.61 69.91 4.80 4.80 - - - - - - - 4.80 18.67 4.59 69.90 4.80 4.80 - - - - - - - 4.80 18.70 4.58 69.90 4.60 4.80 - - - - - - - 4.80 18.73 4.56 69.90 4.80 4.80 - - - - - - - 4.80 18.77 4.55 69.90 4.80 4.80 - - - - - - - 4.80 18.80 4.54 69.90 4.80 4.80 - - - - - - - 4.80 18.83 4.52 69.90 4.80 4.80 - - - - - - - 4.80 18.87 4.51 69.90 4.80 4.80 - - - - - - - 4.80 18.90 4.49 69.90 4.80 4.80 - - - - - - - 4.80 18.93 4.48 69.90 4.80 4.80 - - - --- - - - 4.80 18.97 4.47 69.90 4.80 4.80 - - --- - - - -. 4.80 19.00 4.45 69.90 4.80 4.80 - - - - - - - 4.80 19.03 4.44 69.90 4.80 4.80 - - -- - - - - 4.80 19.07 4.42 69.90 4.80 4.80 - --- - - --- - - 4.80 19.10 4.41 69.90 4.80 4.80 - - -- - -- - - 4.80 19.13 4.39 69.90 4.80 4.80 - - -- - - - - 4.80 19.17 4.38 69.90 4.80 4.80 - - -- - - - - 4.80 19.20 4.37 69.90 4.80 4.80 - - - - ---- - -- 4.80 19.23 4.35 69.89 4.80 4.80 - - - - - --- - 4.80 19.27 4.34 69.89 4.80 4.80 - - - -- - - - 4.80 19.30 4.32 69.89 4.80 4.80 - -- - - - - - 4.80 19.33 4.31 69.89 4.80 4.80 - - - - - - -- 4.80 Continues on next page... Page 6 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs efs cfs afs afs cfs cfs 19.37 4.29 69.89 4.80 4.80 - - - - - - - 4.80 19.40 4.28 69.89 4.80 4.80 - - - - - - - 4.80 19.43 4.27 69.89 4.80 4.80 - - - - - - - 4.80 19.47 4.25 69.89 4.80 4.80 - - - - - - - 4.80 19.50 4.24 69.89 4.80 4.80 - - - - - - - 4.80 19.53 4.22 69.89 4.80 4.80 - - - - - - - 4.80 19.57 4.21 69.88 4.79 4.79 - - - - - - - 4.79 19.60 4.19 69.88 4.79 4.79 - - - - - - - 4.79 19.63 4.18 69.88 4.79 4.79 - - - - - - - 4.79 19.67 4.17 69.88 4.79 4.79 - - - - - - - 4.79 19.70 4.15 69.88 4.79 4.79 - - - - - - - 4.79 19.73 4.14 69.88 4.79 4.79 - - - - - - - 4.79 19.77 4.12 69.88 4.79 4.79 - - - - - - - 4.79 19.80 4.11 69.88 4.79 4.79 - - - - - - - 4.79 19.83 4.09 69.87 4.79 4.79 - - - - - - - 4.79 19.87 4.08 69.87 4.79 4.79 - - - - - - - 4.79 19.90 4.07 69.87 4.79 4.79 - - - - - - - 4.79 19.93 4.05 69.87 4.79 4.79 - - - - - - - 4.79 19.97 4.04 69.87 4.79 4.79 - - - - - - - 4.79 20.00 4.02 69.87 4.79 4.79 - - - - - - - 4.79 20.03 4.01 69.87 4.79 4.79 - - - - - - - 4.79 20.07 3.99 69.86 4.79 4.79 - - - - - - - 4.79 20.10 3.98 69.86 4.79 4.79 - - - - - - - 4.79 20.13 3.96 69.86 4.79 4.79 - - - - - - - 4.79 20.17 3.95 69.86 4.79 4.79 - - - - - - - 4.79 20.20 3.94 69.86 4.79 4.79 - - - - - - - 4.79 20.23 3.92 69.86 4.79 4.79 - - - - - - - 4.79 20.27 3.91 69.86 4.79 4.79 - - - - - - - 4.79 20.30 3.89 69.85 4.79 4.79 - - - - - - - 4.79 20.33 3.88 69.85 4.79 4.79 - - - - - - - 4.79 20.37 3.86 69.85 4.79 4.79 - - - - - - - 4.79 20.40 3.85 69.85 4.79 4.79 - - - - - - - 4.79 20.43 3.83 69.85 4.79 4.79 - - - -- - - - 4.79 20.47 3.82 69.84 4.79 4.79 - - - - - - - 4.79 20.50 3.81 69.84 4.79 4.79 - - - - - - 4.79 20.53 3.79 69.84 4.78 4.78 - - - - - - 4.78 20.57 3.78 69.84 4.78 4.78 - - - - - - - 4.78 20.60 3.76 69.84 4.78 4.78 -- - - - - - 4.78 20.63 3.75 69.84 4.78 4.78 - - - - - - - 4.78 20.67 3.73 69.83 4.78 4.78 - --- - - -- --- - 4.78 20.70 3.72 69.83 4.78 4.78 - - - - - - - 4.78 20.73 3.70 69.83 4.78 4.78 - - - - - - - 4.78 20.77 3.69 69.83 4.78 4.78 --- - ----- - - --- - 4.78 20.80 3.68 69.83 4.78 4.78 - - - - - - - 4.78 20.83 3.66 69.82 4.78 4.78 - - - - - - - 4.78 20.87 3.65 69.82 4.78 4.78 - - - - - - - 4.78 20.90 3.63 69.82 4.78 4.78 - - - --- - - - 4.78 20.93 3.62 69.82 4.78 4.78 - - - - - - - 4.78 20.97 3.60 69.81 4.78 4.78 - - - - - - - 4.78 21.00 3.59 69.81 4.78 4.78 - - - - - - - 4.78 21.03 3.57 69.81 4.78 4.78 - - - --- - - - 4.78 Continues on next page... Page 7 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D ExHl Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs afs cfs cfs cfs 21.07 3.56 69.81 4.78 4.78 - - - - - - 4.78 21.10 3.54 69.81 4.78 4.78 - - - - - - - 4.78 21.13 3.53 69.80 4.78 4.78 - - - - - - - 4.78 21.17 3.51 69.80 4.78 4.78 - - - - - - - 4.78 21.20 3.50 69.80 4.77 4.77 - - - - - - - 4.77 21.23 3.49 69.80 4.77 4.77 - - - - - - - 4.77 21.27 3.47 69.79 4.77 4.77 - - - - - - - 4.77 21.30 3.46 69.79 4.77 4.77 - - - - - - - 4.77 21.33 3.44 69.79 4.77 4.77 - - - - - - - 4.77 21.37 3.43 69.79 4.77 4.77 - - - - - - - 4.77 21.40 3.41 69.78 4.77 4.77 - - - - - - - 4.77 21.43 3.40 69.78 4.77 4.77 - - - - - - - 4.77 21.47 3.38 69.78 4.77 4.77 - - - - - - - 4.77 21.50 3.37 69.78 4.77 4.77 - - - - - - - 4.77 21.53 3.35 69.77 4.77 4.77 - - - - - - - 4.77 21.57 3.34 69.77 4.77 4.77 - - - - - - - 4.77 21.60 3.32 69.77 4.77 4.77 - - - - -- - - 4.77 21.63 3.31 69.76 4.77 4.77 - - - - - - - 4.77 21.67 3.30 69.76 4.77 4.77 - - - - - - - 4.77 21.70 3.28 69.76 4.77 4.77 - - - - - - - 4.77 21.73 3.27 69.76 4.76 4.76 - - - - - - - 4.76 21.77 3.25 69.75 4.76 4.76 - - - - - - - 4.76 21.80 3.24 69.75 4.76 4.76 - - - - - - - 4.76 21.83 3.22 69.75 4.76 4.76 - - - - - - - 4.76 21.87 3.21 69.74 4.76 4.76 - - - - - - - 4.76 21.90 3.19 69.74 4.76 4.76 - - - - - - - 4.76 21.93 3.18 69.74 4.76 4.76 - --- - - - - - 4.76 21.97 3.16 69.74 4.76 4.76 - - - - - - - 4.76 22.00 3.15 69.73 4.76 4.76 - - - - - - - 4.76 22.03 3.22 69.73 4.76 4.76 - - - - - - - 4.76 22.07 3.30 69.73 4.76 4.76 - - - - - - - 4.76 22.10 3.37 69.72 4.76 4.76 - - - - - - - 4.76 22.13 3.45 69.72 4.76 4.76 - - - - - - - 4.76 22.17 3.54 69.72 4.76 4.76 - - - - - - - 4.76 22.20 3.63 69.72 4.76 4.76 - - - - - - - 4.76 22.23 3.72 69.72 4.75 4.75 - - - - - - - 4.75 22.27 3.68 69.71 4.75 4.75 - - - - - - - 4.75 22.30 3.65 69.71 4.75 4.75 - - --- - - - - 4.75 22.33 3.62 69.71 4.75 4.75 - - - --- - --- - 4.75 22.37 3.58 69.71 4.75 4.75 - - - - - - - 4.75 22.40 3.55 69.70 4.75 4.75 - - - - - - - 4.75 22.43 3.51 69.70 4.75 4.75 - - - - - - - 4.75 22.47 3.47 69.70 4.75 4.75 - - - - - - - 4.75 22.50 3.44 69.70 4.75 4.75 - - - - - - - 4.75 22.53 3.40 69.69 4.75 4.75 - - - - - - - 4.75 22.57 3.36 69.69 4.75 4.75 - - - - - - - 4.75 22.60 3.31 69.69 4.75 4.75 - - - - - - 4.75 22.63 3.27 69.69 4.75 4.75 - - - - - - - 4.75 22.67 3.23 69.68 4.75 4.75 - - - - - - - 4.75 22.70 3.18 69.68 4.75 4.75 - - - - - - - 4.75 22.73 3.13 69.68 4.75 4.75 - - - - - - - 4.75 Continues on next page... Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 5.14 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 71.40 ft Max. Storage = 601,339 cuft Storage Indication method used. Outflow hydrograph volume=596,218 cult Hydrograph Discharge Table Time Inflow Elevation CIV A Clv B Civ C CIv D Wr A Wr B Wr C Wr D ExHi Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 11.00 8.83 60.85 1.05 1.04 - - - - - - - 1.04 11.03 9.05 60.88 1.07 1.06 - - - - - - -- 1.06 11.07 9.29 60.91 1.10 1.09 - - - - - - - 1.09 11.10 9.54 60.94 1.13 1.12 - - - - - - - 1.12 11.13 9.81 60.96 1.15 1.15 - - - - - - - 1.15 11.17 10.11 60.99 1.18 1.18 - - - - - - - 1.18 11.20 10.43 61.03 1.21 1.21 - - - - - - - 1.21 11.23 10.79 61.06 1.25 1.23 - - - - - - - 1.23 11.27 11.18 61.09 1.28 1.26 - - - - - - - 1.26 11.30 11.61 61.13 1.32 1.29 - - - - - - - 1.29 11.33 12.07 61.16 1.36 1.32 - - - - - - - 1.32 11.37 12.57 61.20 1.40 1.35 - - - - - - - 1.35 11.40 13.10 61.24 1.42 1.38 - - - - - - - 1.38 11.43 13.66 61.28 1.44 1.42 - - - - - - - 1.42 11.47 14.26 61.32 1.47 1.45 - - - - - - - 1.45 11.50 14.88 61.37 1.50 1.49 - - - - - - - 1.49 11.53 15.56 61.41 1.53 1.53 - - - - - - - 1.53 11.57 16.36 61.46 1.59 1.56 - - - - - - - 1.56 11.60 17.35 61.51 1.64 1.60 - - - - - - - 1.60 11.63 18.59 61.57 1.70 1.64 - - - - - - - 1.64 11.67 20.15 61.63 1.75 1.68 - - - - - - - 1.68 11.70 22.11 61.70 1.79 1.73 - - - - - - 1.73 11.73 24.56 61.77 1.83 1.78 - - - - - - - 1.78 11.77 27.52 61.85 1.88 1.84 - - - - - - - 1.84 11.80 31.00 61.95 1.94 1.90 - - - - - - - 1.90 11.83 35.01 62.04 2.00 1.96 - - - - - - - 1.96 11.87 39.54 62.14 2.06 2.02 - -- - - --- - - 2.02 11.90 44.60 62.25 2.12 2.09 - - - - - - - 2.09 11.93 50.50 62.37 2.20 2.16 - - - - - - - 2.16 11.97 57.98 62.51 2.28 2.24 - - - - - - - 2.24 12.00 67.77 62.68 2.39 2.33 - - - - - - - 2.33 12.03 79.91 62.87 2.47 2.43 - - - - - - - 2.43 12.07 93.46 63.10 2.55 2.55 - - - - - - - 2.55 12.10 107.47 . 63.37 2.69 2.68 - - - - - - - 2_68 12.13 121.29 63.67 2.87 2.82 - - - - - - - 2.82 12.17 134.19 64.01 2.97 2.97 - - - - - - - 2.97 12.20 144.87 64.33 3.14 3.11 - - - - - - - 3.11 12.23 151.94 64.66 3.30 3.25 - - - - - - - 3.25 Continues on next page... Hydrograph Report Page 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Hydrograph type = Reservoir Peak discharge = 5.14 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyd. No. = 1 Reservoir name = single basin Max. Elevation = 71.40 ft Max. Storage = 601,339 cuft Storage Indication method used. Outflow hydrograph volume=596,218 cult Hydrograph Discharge Table Time Inflow Elevation Chr A Clv B Clv C Civ D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cis cfs cfs cfs cfs cfs cfs 11.00 8.83 60.85 1.05 1.04 - - - - - - - 1.04 11.03 9.05 60.88 1.07 1.06 - - - - - - - 1.06 11.07 9.29 60.91 1.10 1.09 - - - - - - - 1.09 11.10 9.54 60.94 1.13 1.12 - --- - - - - - 1.12 11.13 9.81 60.96 1.15 1.15 - - - - - - - 1.15 11.17 10.11 60.99 1.18 1.18 - - - - - - - 1.18 11.20 10.43 61.03 1.21 1.21 - - - - - - 1.21 11.23 10.79 61.06 1.25 1.23 - - - - - - - 1.23 11.27 11.18 61.09 1.28 1.26 - - - - - - - 1.26 11.30 11.61 61.13 1.32 1.29 - - - - - - - 1.29 11.33 12.07 61.16 1.36 1.32 - - - - - - - 1.32 11.37 12.57 61.20 1.40 1.35 - - - - - - - 1.35_ 11.40 13.10 61.24 1.42 1.38 - - - - - ---- - 1.38 11.43 13.66 61.28 1.44 1.42 - - - - - - 1.42 11.47 14.26 61.32 1.47 1.45 - - - - - - - 1.45 11.50 14.88 61.37 1.50 1.49 - - - - - - - 1.49 11.53 15.56 61.41 1.53 1.53 - - - - - - - 1.53 11.57 16.36 61.46 1.59 1.56 - - - - - _._. - 1.56 11.60 17.35 61.51 1.64 1.60 - - - - - - - 1.60 11.63 18.59 61.57 1.70 1.64 - - - - - - - 1.64 11.67 20.15 61.63 1.75 1.68 - - - - - - 1.68 11.70 22.11 61.70 1.79 1.73 - - - - - - - 1.73 11.73 24.56 61.77 1.83 1.78 - - - - - - - 1.78 11.77 27.52 61.85 1.88 1.84 - - ----- - - - - 1.84 11.80 31.00 61.95 1.94 1.90 - - - - - - 1.90 11.83 35.01 62.04 2.00 1.96 - - - - - - - 1.96 11.87 39.54 62.14 2.06 2.02 - - - - - - - 2.02 11.90 44.60 62.25 2.12 2.09 - - - - - ---- - 2.09 11.93 50.50 62.37 2.20 2.16 - - - - - - - 2.16 11.97 57.98 62.51 2.28 2.24 - - - - - - - 2.24 12.00 67.77 62.68 2.39 2.33 - - - - - - - 2.33 12.03 79.91 62.87 2.47 2.43 - - - - - - - 2.43 12.07 93.46 63.10 2.55 2.55 - - - - - - - 2.55 12.10 107.47 63.37 2.69 2.68 - - - - - - - 2.68 12.13 121.29 63.67 2.87 2.82 - - - - - - --- 2.82 12.17 134.19 64.01 2.97 2.97 - - - - --- - - 2.97 12.20 144.87 64.33 3.14 3.11 - - - - - - - 3.11 12.23 151.94 64.66 3.30 3.25 --- - - - - --- - 3.25 Continues on next page... Page 2 Hydrograph Discharge Table Time Inflow Elevation Clv A CN B Clv C Clv D Wr A Wr B Wr C Wr D EAU Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 12.27 155.09 65.01 3.41 3.39 - - - - - - - 3.39 12.30 155.33<< 65.36 3.53 3.52 - - - - - - - 3.52 12.33 153.75 65.71 3.67 3.65 - - - - - - - 3.65 12.37 150.95 66.05 3.81 3.77 - - - - - - - 3.77 12.40 147.00 66.36 3.88 3.87 - - - - - - - 3.87 12.43 141.95 66.65 4.00 3.97 - - - - - - - 3.97 12.47 135.86 66.93 4.07 4.06 - - - - - - - 4.06 12.50 128.82 67.20 4.15 4.15 - - - - - - - 4.15 12.53 120.95 67.46 4.23 4.23 - - - - - - - 4.23 12.57 112.43 67.69 4.30 4.30 - - - - - - - 4.30 12.60 103.46 67.91 4.37 4.37 - - - - - - - 4.37 12.63 94.22 67.98 4.39 4.39 - - - - - - - 4.39 12.67 84.92 68.26 4.39 4.39 - - - - - - - 4.39 12.70 75.91 68.40 4.43 4.43 - - - - - - - 4.43 12.73 67.69 68.53 4.46 4.46 - - - - - - - 4.46 12.77 60.74 68.64 4.49 4.49 - - - - - - - 4.49 12.80 55.14 68.74 4.52 4.52 - - - - - - - 4.52 12.83 50.55 68.83 4.54 4.54 - - - - - - - 4.54 12.87 46.62 68.92 4.56 4.56 - - - - - - - 4.56 12.90 43.15 68.99 4.58 4.58 - - - - - - - 4.58 12.93 40.12 69.06 4.60 4.60 - - - - - - - 4.60 12.97 37.47 69.13 4.61 4.61 - - - - - - - 4.61 13.00 35.17 69.19 4.63 4.63 - - - - - - - 4.63 13.03 33.20 69.24 4.64 4.64 - - - - - - - 4.64 13.07 31.51 69.30 4.65 4.65 - - - - - - - 4.65 13.10 30.08 69.35 4.67 4.67 - - - - - - - 4.67 13.13 28.87 69.39 4.68 4.68 - - - - - - - 4.68 -.13.17 27.85 69.44 4.69 4.69 - - - - - - - 4.69 13.20 26.99 69.48 4.70 4.70 - - - - - - - 4.70 13.23 26.25 69.52 4.71 4.71 - - - - - - - 4.71 13.27 25.59 69.56 4.72 4.72 - - - - - - - 4.72 13.30 24.98 69.60 4.73 4.73 - - - - - - - 4.73 13.33 24.43 69.64 4.74 4.74 - - - - - - - 4.74 13.37 23.92 69.68 4.75 4.75 - - - - - - - 4.75 13.40 23.45 69.71 4.75 4.75 - - - - - - - 4.75 13.43 23.02 69.75 4.76 4.76 - - - - - - - 4.76 13.47 22.63 69.78 4.77 4.77 - - - - - - - 4.77 13.50 22.27 69.81 4.78 4.78 - - - - - - - 4.78 13.53 21.94 69.85 4.79 4.79 - - - - - - 4.79 13.57 21.64 69.88 4.79 4.79 - - - - - - - 4.79 13.60 21.35 69.91 4.80 4.80 - - - - - - - 4.80 13.63 21.08 69.94 4.81 4.81 - - - - - - - 4.81 13.67 20.82 69.97 4.82 4.82 - - - - - - - 4.82 13.70 20.58 70.00 4.82 4.82 - - - - - - - 4.82 13.73 20.33 70.03 4.83 4.83 - - - - - - - 4.83 13.77 20.09 70.06 4.84 4.84 - - - - - - - 4.84 13.80 19.85 70.08 4.84 4.84 - - - - - - - 4.84 13.83 19.61 70.11 4.85 4.85 - - - - - - - 4.85 13.87 19.37 70.13 4.85 4.85 - - - - - - - 4.85 13.90 19.12 70.16 4.86 4.86 - - - - - - - 4.86 13.93 18.88 70.18 4.86 4.86 - - - - - - - 4.86 Continues on next page... Page 3 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cis cis cfs cfs 13.97 18.63 70.21 4.87 4.87 - - - - - - - 4.87 14.00 18.39 70.23 4.88 4.88 - - - - - - - 4.88 14.03 18.14 70.25 4.88 4.88 - - - - - - - 4.88 14.07 17.90 70.27 4.89 4.89 - - - - - - - 4.89 14.10 17.66 70.30 4.89 4.89 - - - - - - - 4.89 14.13 17.42 70.32 4.90 4.90 - - - - - - - 4.90 14.17 17.19 70.34 4.90 4.90 - - - - - - - 4.90 14.20 16.97 70.36 4.91 4.91 - - - - - - - 4.91 14.23 16.77 70.38 4.91 4.91 - - - - - - - 4.91 14.27 16.57 70.40 4.92 4.92 - - - - - - - 4.92 14.30 16.38 70.42 4.92 4.92 - - - - - - - 4.92 14.33 16.20 70.44 4.92 4.92 - - - - - - - 4.92 14.37 16.03 70.46 4.93 4.93 - - - - - - - 4.93 14.40 15.87 70.48 4.93 4.93 - - - - - - - 4.93 14.43 15.72 70.50 4.94 4.94 - - - - - - - 4.94 14.47 15.57 70.51 4.94 4.94 - - - - - - - 4.94 14.50 15.43 70.53 4.95 4.95 - - - - ---- - - 4.95 14.53 15.30 70.55 4.95 4.95 - - - - - - - 4.95 14.57 15.17 70.57 4.95 4.95 - - - - - - - 4.95 14.60 15.04 70.59 4.96 4.96 - - - - - - - 4.96 14.63 14.92 70.60 4.96 4.96 - - - - - - - 4.96 14.67 14.80 70.62 4.97 4.97 - - - - - - - 4.97 14.70 14.68 70.64 4.97 4.97 - - - - - - - 4.97 14.73 14.56 70.65 4.97 4.97 - - - - - - - 4.97 14.77 14.44 70.67 4.98 4.98 - - - - - - - 4.98 14.80 14.32 70.69 4.98 4.98 - - - - - - - 4.98 14.83 14.20 70.70 4.98 4.98 - - - - - - - 4.98 14.87 14.08 70.72 4.99 4.99 - - - --- - - - 4.99 14.90 13.96 70.73 4.99 4.99 - - - - - - - 4.99 14.93 13.84 70.75 5.00 4.99 - - - - - - - 4.99 14.97 13.72 70.76 5.00 5.00 - - - - - - - 5.00 15.00 13.60 70.78 5.00 5.00 - - - - - - - 5.00 15.03 13.48 70.79 5.01 5.01 - - - - - - -_ 5.01 15.07 13.36 70.81 5.01 5.01 - - - - - - - 5.01 15.10 13.24 70.82 5.01 5.01 - - - - - - - 5.01 15.13 13.12 70.83 5.01 5.01 - - - - - - - 6.01 15.17 13.00 70.85 5.02 5.02 ---- - - - - - - 5.02 15.20 12.87 70.86 5.02 5.02 - - - - - - - 5.02 15.23 12.75 70.88 5.02 5.02 --- - - - - ----- - 5.02 15.27 12.63 70.89 5.03 5.03 - - - - - - - 5.03 15.30 12.51 70.90 5.03 5.03 - - - - - - - 5.03 15.33 12.39 70.91 5.03 5.03 - - - - - - - 5.03 15.37 12.27 70.93 5.04 5.04 - - - - - - - 5_04 15.40 12.14 70.94 5.04 6.04 - - - - - - - 5.04 15.43 12.02 70.95 5.04 5.04 - - - - - - - 5.04 15.47 11.90 70.96 5.04 5.04 - - - - - - - 5_04 15.50 11.77 70.97 5.05 5.05 - - - - - - - 5.05 15.53 11.65 70.99 5.05 5.05 - - - - - - - 5.05 15.57 11.53 71.00 5.05 5.05 - - - - - - - 5.05 15.60 11.40 71.01 5.05 5.05 - - - - - 5.05 15.63 11.28 71.02 5.06 5.06 - - - - - - - 5.06 Continues on next page... Page 4 Hydrograph Discharge Table Time Inflow Elevation CIv A Chr B Clv C Clv D Wr A Wr B Wr C Wr D EMI Outflow (hrs) cis ft cis cis cfs cfs cfs cfs cfs cfs cfs cfs 15.67 11.16 71.03 5.06 5.06 - - - - - - - 5.06 15.70 11.03 71.04 5.06 5.06 - - - - - - - 5.06 15.73 10.91 71.05 5.06 5.06 - - - - - - - 5.06 15.77 10.79 71.06 5.07 5.07 - - - - - - - 5.07 15.80 10.66 71.07 5.07 5.07 - - - - - - - 5.07 15.83 10.54 71.08 5.07 5.07 - - - - - - - 5.07 15.87 10.41 71.09 5.07 5.07 - - - - - - - 5.07 15.90 10.29 71.10 5.07 5.07 - - - - - - - 5.07 15.93 10.16 71.11 5.08 5.08 - - - - - - - 5.08 15.97 10.04 71.11 6.08 5.08 - - - - - - - 5.08 16.00 9.91 71.12 5.08 5.08 - - - - - - - 5.08 16.03 9.79 71.13 5.08 5.08 - - - - - - - 5.08 16.07 9.66 71.14 5.08 5.08 - - - - - - - 5.08 16.10 9.54 71.15 5.08 6.08 - - - - - - - 5.08 16.13 9.42 71.15 5.09 5.09 - - - - - - - 5.09 16.17 9.31 71.16 5.09 5.09 - - - - - - - 5.09 16.20 9.20 71.17 5.09 5.09 - - - - - - - 5.09 16.23 9.10 71.18 5.09 5.09 - - - - - - 5.09 16.27 9.00 71.18 5.09 5.09 - - - - - - - 5.09 16.30 8.91 71.19 5.09 5.09 - - - - - - - 5.09 16.33 8.82 71.20 5.10 5.10 - - - - - - -- 5.10 16.37 8.74 71.20 5.10 5.10 - - - - - - - 5.10 16.40 8.66 71.21 5.10 5.10 - - - - - - - 5.10 16.43 8.59 71.21 5.10 5.10 - - - - - - - 5.10 16.47 8.52 71.22 5.10 5.10 - - - - - - - 5.10 16.50 8.45 71.23 5.10 5.10 - - - - - - - 5.10 16.53 8.39 71.23 5.10 5.10 - - - - - - 5.10 16.57 8.33 71.24 5.11 5.10 - - - - - - - 5.10 16.60 8.27 71.24 5.11 5.11 - - - - - - - 5.11 >.._ 16.63 8.21 71.25 5.11 5.11 - - - - - - - 5.11 -16.67 8.15, 71.25 5.11 6.11 - - - - - - ---_ 5.11 16.70 8.10 71.26 5.11 5.11 - - - - - - - 5.11 16.73 8.05 71.26 5.11 5.11 - - - - - - - 5.11 16.77 7.99 71.27 5.11 5.11 - - - .80 7.94 71.27 5.11 5.11 - - - - ____ 5.11 '1 -- 5.11 16.83 7.88 71.28 5.11 5.11 - - - - - - - 5.11 16.87 7.83 71.28 5.12 5.12 - - - - - - - 5.12 16.90 7.77 71.29 5.12 5.12 - - - - - - - 5.12 16.93 7.72 71.29 5.12 5.12 - - - - - - - 5.12 16.97 7.67 71.30 5.12 5.12 - - - - - - - 5.12 17.00 7.61 71.30 5.12 5.12 - ----- - - - - 5.12 17.03 7.56 71.31 5.12 5.12 - - - - - - - 5.12 17.07 7.50 71.31 5.12 5.12 - - - - - - - 5.12 17.10 7.45 71.31 5.12 5.12 - - - - - - - 5.12 17.13 7.39 71.32 5.12 5.12 - - - - - - - 5.12 17.17 7.34 71.32 5.12 5.12 - - - - - - - 5.12 17.20 7.28 71.32 5.12 5.12 - - - - - - - 5.12 17.23 7.23 71.33 5.13 5.13 - - - - - - - 5.13 17.27 7.17 71.33 5.13 5.13 - - - - - - - 5.13 17.30 7.12 71.34 5.13 5.13 - - - - - - - 5.13 17.33 7.06 71.34 5.13 5.13 - - - - - - - 5.13 Continues on next page... Page 5 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cfs cis cfs cfs 17.37 7.01 71.34 5.13 5.13 - - - - - - - 5.13 17.40 6:95 71.35 5.13 5.13 - - - - - - 5.13 17.43 6.90 71.35 5.13 5.13 - - - - - - - 5.13 17.47 6.84 71.35 5.13 5.13 - - - -- - - - 5.13 17.50 6.79 71.35 5.13 5.13 - - - - --� - - 5.13 17.53 6.73 71.36 5.13 5.13 - - - - - - - 5.13 17.57 6.68 71.36 5.13 5.13 - - - - - - - 5.13 17.60 6.62 71.36 5.13 5.13 - - - - - - - 5.13 17.63 6.57 71.36 5.13 5.13 - - - - - - - 5.13 17.67 6.51 71.37 5.13 5.13 - - - - - - - 5.13 17.70 6.46 71.37 5.13 5.13 - - - - - - - 5.13 17.73 6.40 71.37 5.13 5.13 - - - - - - - 5.13 17.77 6.35 71.37 5.14 5.14 - - - - - - - 5.14 17.80 6.29 71.38 5.14 5.14 - - - - - - - 5.14 17.83 6.24 71.38 5.14 5.14 - - - - - - 5.14 17.87 6.18 71.38 5.14 5.14 - - - - - - - 5.14 17.90 6.13 71.38 5.14 5.14 - - - - - - - 5.14 17.93 6.07 71.38 5.14 5.14 - - - - - - - 5.14 17.97 6.01 71.38 5.14 5.14 - - - - - - - 5.14 18.00 5.96 71.39 5.14 5.14 - - - - - - - 5.14 18.03 5.90 71.39 5.14 5.14 - - - - - - - 5.14 18.07 5.85 71.39 5.14 5.14 - - - - - - - 5.14 18.10 5.80 71.39 5.14 5.14 - - - - - - - 5.14 18.13 5.74 71.39 5.14 5.14 - - - - - - - 5.14 18.17 5.70 71.39 5.14 5.14 - - ---- - - - - 5.14 18.20 5.65 71.39 5.14 5.14 - - - - - - - 5.14 18.23 5.60 71.39 5.14 5.14 - - - - - - - 5.14 18.27 5.56 71.39 5.14 5.14 - - - - - - 5.14 18.30 5.53 71.40 5.14 5.14 - - - - - - - 5.14 18.33 5.49 71.40 5.14 5.14 - - - - - - - 5.14 18.37 5.46 71.40 5.14 5.14 - - - - - - - 5.14 18.40 5.43 71.40 5.14 5.14 - - - - - - - 5.14 18.43 5.40 71.40 5.14 5.14 - - - - - - - 5.14 18.47 5.38 71.40 5.14 5.14 - - - - - - - 5.14 18.50 5.36 71.40 5.14 5.14 - - - - - - - 5.14 18.53 5.34 71.40 5.14 5.14 - - - - - - - 5.14 18.57 _5.32 71.40 5.14 5.14 - - - - - - - 5.14 18.60 5.30 71.40 5.14 5.14 - - - - - - - 5.14 18.63 5.28 71.40 5.14 5.14 - - - - - - - 5.14 18.67 5.26 71.40 5.14 5.14 - - - - - - - 5.14 18.70 5.24 71.40 5.14 5.14 - - ---- - - - - 5.14 18.73 5.23 71.40 5.14 5.14 - - - - - - - 5.14 18.77 5.21 71.40 5.14 5.14 - - - - - - - 5.14 18.80 5.20 71.40 5.14 5.14 - - - - - - - 5.14 18.83 5.18 71.40 5.14 5.14 - - - - - - - 5.14 18.87 5.16 71.40 5.14 5.14 - - - - - - - 5.14 18.90 5.15 71.40<< 5.14 5.14 - - - - - - 5.14<< 18.93 5.13 71.40 5.14 5.14 - - - - - ____ - 5.14 18.97 5.11 71.40 5.14 5.14 - - - - - - - 5.14 19.00 5.10 71.40 5.14 5.14 - - - - - - - 5.14 19.03 5.08 71.40 5.14 5.14 - - - - - - - 5.14 Continues on next page... Page 6 Hydrograph Discharge Table Time Inflow Elevation Civ A Civ B Clv C Clv D Wr A Wr B Wr C Wr D Exfii Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cfs cis cfs cfs cfs 19.07 5.06 71.40 5.14 5.14 - - - - - - - 5.14 19.10 5.05 71.40 5.14 5.14 - - - - - - - 5.14 19.13 5.03 71.40 5.14 5.14 - - - - - - - 5.14 19.17 5.02 71.40 5.14 5.14 - - - - - - - 5.14 19.20 5.00 71.40 5.14 5.14 - - - - - - - 5.14 19.23 4.98 71.40 5.14 5.14 - - - - - - - 5.14 19.27 4.97 71.40 5.14 5.14 - - - - - - - 5.14 19.30 4.95 71.40 5.14 5.14 - - - - - - - 5.14 19.33 4.93 71.40 5.14 5.14 - - - - - - - 5.14 19.37 4.92 71.40 5.14 5.14 - - - - - - - 5.14 19.40 4.90 71.40 5.14 5.14 - - - - - - - 5.14 19.43 4.88 71.40 5.14 5.14 - - - - - - - 5.14 19.47 4.87 71.40 5.14 5.14 - - - - - - - 5.14 19.50 4.85 71.40 5.14 5.14 - - - - - - - 5.14 19.53 4.84 71.40 5.14 5.14 - - - - - - - 5.14 19.57 4.82 71.40 5.14 5.14 - - - - - - - 5.14 19.60 4.80 71.39 5.14 5.14 - - - - -- - - 5.14 19.63 4.79 71.39 5.14 5.14 - - - - - - - 5.14 19.67 4.77 71.39 5.14 5.14 - - - - - - - 5.14 19.70 4.75 71.39 5.14 5.14 - - - - - - - 5.14 19.73 4.74 71.39 5.14 5.14 - - - - - - - 5.14 19.77 4.72 71.39 5.14 5.14 - - - - - - - 5.14 19.80 4.70 71.39 5.14 5.14 - - - - - - - 5.14 19.83 4.69 71.39 5.14 5.14 - - - - - - - 5.14 19.87 4.67 71.39 5.14 5.14 - - - - - - - 5.14 19.90 4.65 71.39 5.14 5.14 - - - - - - - 5.14 19.93 4.64 71.39 5.14 5.14 - - - - - - - 5.14 19.97 4.62 71.39 5.14 5.14 - - - - - - - 5.14 20.00 4.60 71.39 5.14 5.14 - - - - - - - 5.14 20.03 4.59 71.38 5.14 5.14 - - - - - - - 5.14 20.07 4.57 71.38 5.14 5.14 - - - - - - - 5.14 20.10 4.55 71.38 5.14 5.14 - - - - - - - 5.14 20.13 4.54 71.38 5.14 5.14 - - - - - - - 5.14 20.17 4.52 71.38 5.14 5.14 - - - - - - - 5.14 20.20 4.50 71.38 5.14 5.14 - - - - - - - 5.14 20.23 4.49 71.38 5.14 5.14 - - - - - - - 5.14 20.27 4.47 71.38 5.14 5.14 ---- - - - - - - 5.14 20.30 4.45 71.38 5.14 5.14 - - - - - - 5.14 20.33 4.44 71.38 5.14 5.14 - - - - - - - 5.14 20.37 4.42 71.37 5.14 5.14 - ---- - - - - - 5.14 20.40 4.40 71.37 5.13 5.13 - - - - - - -- 5.13 20.43 4.39 71.37 5.13 5.13 - - - - - - - 5.13 20.47 4.37 71.37 5.13 5.13 - --- - - - - - 5.13 20.50 4.35 71.37 5.13 5.13 - - - - - - - 5.13 20.53 4.34 71.37 5.13 5.13 - - - - - - - 5.13 20.57 4.32 71.37 5.13 5.13 - - - - - - - 5.13 20.60 4.31 71.36 5.13 5.13 - - - - --- - - 5.13 20.63 4.29 71.36 5.13 5.13 -- - - - - - - 5.13 20.67 4.27 71.36 5.13 5.13 - - - - -- - - 5.13 20.70 4.25 71.36 5.13 5.13 - - - - -� -� _--_ 5.13 20.73 4.24 71.36 5.13 5.13 - - - - - - - 5.13 Continues on next page... Page 7 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) cfs ft cfs cfs cfs cfs cis cfs cis cfs cfs cfs 20.77 4.22 71.36 5.13 5.13 - - - - - - - 5.13 20.80 4.20 71.36 5.13 5.13 - - - - - - - 5.13 20.83 4.19 71.35 5.13 5.13 - - - - - - - 5.13 20.87 4.17 71.35 5.13 5.13 - - - - - - - 5.13 20.90 4.15 71.35 5.13 5.13 - - - - - - - 5.13 20.93 4.14 71.35 5.13 5.13 - - - - - - - 5.13 20.97 4.12 71.35 5.13 5.13 - - - - - - - 5.13 21.00 4.10 71.35 5.13 5.13 - - - - - - - 5.13 21.03 4.09 71.34 5.13 5.13 - - - - - - - 5.13 21.07 4.07 71.34 5.13 5.13 - - - - - - - 5.13 21.10 4.05 71.34 5.13 5.13 - - - - - - - 5.13 21.13 4.04 71.34 5.13 5.13 - - - - - - - 5.13 21.17 4.02 71.34 5.13 5.13 - - - - - - - 5.13 21.20 4.00 71.33 5.13 5.13 - - - - - - - 5.13 21.23 3.99 71.33 5.13 5.13 - - - - - - - 5.13 21.27 3.97 71.33 5.13 5.13 - - - - - - - 5.13 21.30 3.95 71.33 5.13 5.13 - - - - - - - 5.13 21.33 3.94 71.33 5.12 5.12 - - - - - - - 5.12 21.37 3.92 71.32 5.12 5.12 - - - - - - 5.12 21.40 3.90 71.32 5.12 5.12 - - - - - - - 5.12 21.43 3.89 71.32 5.12 5.12 - - - - - - - 5.12 21.47 3.87 71.32 5.12 5.12 - - - - - - - 5.12 21.50 3.85 71.32 5.12 5.12 - - - - - - - 5.12 21.53 3.84 71.31 5.12 5.12 - - - - - - - 5.12 21.57 3.82 71.31 5.12 5.12 - - - - - - - 5.12 21.60 3.80 71.31 5.12 5.12 - - - - - - - 5.12 21.63 3.79 71.31 5.12 5.12 - - - - - - - 5.12 21.67 3.77 71.30 5.12 5.12 - - - - - - -_ 5.12 21.70 3.75 71.30 5.12 5.12 - - - - - - - 5.12 21.73 3.74 71.30 5.12 5.12 - - - - - - - 5.12 21.77 3.72 71.30 5.12 5.12 - - - - - - - 5.12 21.80 3.70 71.30 5.12 5.12 - - - - - - - 5.12 21.83 3.68 71.29 5.12 5.12 - - - - - - - 5.12 21.87 3.67 71.29 5.12 5.12 - - - - - - - 5.12 21.90 3.65 71.29 5.12 5.12 - - - - - - - 5.12 21.93 3.63 71.29 5.12 5.12 - - - - - - --- 5.12 21.97 3.62 71.28 5.12 5.12 = - - - - - - 5.12 22.00 3.60 71.28 5.11 5.11 - - - - - - - 5.11 22.03 3.68 71.28 5.11 5.11 - - - - - - - 5.11 22.07 3.77 71.28 5.11 5.11 - - - - - - - 5.11 22.10 3.86 71.27 5.11 5.11 - - - - -- ____ 5.11 22.13 3.95 71.27 5.11 5.11 - - - - - - - 5.11 22.17 4.05 71.27 5.11 5.11 - - ---- ----- - - - 5.11 22.20 4.15 71.27 5.11 5.11 - - - - - - - 5.11 22.23 4.25 71.27 5.11 5.11 -- - - - - - -- 5.11 22.27 4.21 71.26 5.11 5.11 - - - - - - - 5.11 22.30 4.18 71.26 5.11 5.11 - - - - --- - - 5.11 22.33 4.14 71.26 5.11 5.11 - - - -- - - --- 5.11 22.37 4.10 71.26 5.11 5.11 - - - - - - - 5.11 22.40 4.06 71.26 5.11 5.11 - - - - - - - 5.11 22.43 4.02 71.26 5.11 5.11 - - - - - - - 5.11 Continues on next page... Page 8 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Outflow (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cfs cis cfs 22.47 3.97 71.25 5.11 5.11 - - - - - - - 5.11 22.50 3.93 71.25 5.11 5.11 - - - - - - - 5.11 22.53 3.88 71.25 5.11 5.11 - - - - - - - 5.11 22.57 3.84 71.25 5.11 5.11 - - - - - - - 5.11 22.60 3.79 71.25 5.11 5.11 - - - - - - 5.11 22.63 3.74 71.24 5.11 5.11 - - - - - - - 5.11 22.67 3.69 71.24 5.11 5.11 - - - - - - - 5.11 22.70 3.64 71.24 5.11 5.11 - - - - - - - 5.11 22.73 3.58 71.24 5.10 5.10 - - - - - - - 5.10 22.77 3.53 71.23 5.10 5.10 - - - - - - - 5.10 22.80 3.52 71.23 5.10 5.10 - - - - - - - 5.10 22.83 3.50 71.23 5.10 5.10 - - - - - - - 5.10 22.87 3.49 71.22 5.10 5.10 - - - - - _ - 5.10 22.90 3.48 71.22 5.10 5.10 - - - - - - - 5.10 22.93 3.47 71.22 5.10 5.10 - - - - - - - 5.10 22.97 3.45 71.22 5.10 5.10 - - - - - - - 5.10 23.00 3.44 71.21 5.10 5.10 - - - - - - - 5.10 23.03 3.43 71.21 5.10 5.10 - - - - - - - 5.10 23.07 3.41 71.21 5.10 5.10 - - - - - - - 5.10 23.10 3.40 71.21 5.10 5.10 - - - - - - - 5.10 23.13 3.39 71.20 5.10 5.10 - - - ---- - - - 5.10 23.17 3.38 71.20 5.10 5.10 - - - - - - - 5.10 23.20 3.36 71.20 5.10 5.10 - - - - - - - 5.10 23.23 3.35 71.19 5.10 5.10 - - - -- - - - 5.10 23.27 3.34 71.19 5.09 5.09 - - - - - - - 5.09 23.30 3.33 71.19 5.09 5.09 - - - - - - - 5.09 23.33 3.31 71.18 5.09 5.09 - - - - - - - 5.09 23.37 3.30 71.18 5.09 5.09 - - - - - - - 5.09 23.40 3.29 71.18 5.09 5.09 - - - - - - - 5.09 23.43 3.28 71.18 5.09 5.09 - - - - - - - 5.09 23.47 3.26 71.17 5.09 5.09 - - - - - - - 5.09 23.50 3.25 71.17 5.09 5.09 - - - - - - - 5.09 23.53 3.24 71.17 5.09 5.09 - - - - - - - 5.09 23.57 3.22 71.16 5.09 5.09 - - - - - - - 5.09 23.60 3.21 71.16 5.09 5.09 - - - - - - - 5.09 23.63 3.20 71.16 5.09 5.09 - - - - - - - 5.09 23.67 3.19 71.15 5.09 5.09 - - - - - - - 5.09 23.70 3.17 71.15 5.09 5.09 - - - - - - - 5.09 23.73 3.16 71.15 5.08 5.08 - - - - - - - 5.08 23.77 3.15 71.14 5.08 5.08 - - - - - - - 5.08 23.80 3.14 71.14 5.08 5.08 - - - - - - - 5.08 23.83 3.12 71.14 5.08 5.08 - - - - - - - 5.08 23.87 3.11 71.13 5.08 5.08 - - - - - - - 5.08 23.90 3.10 71.13 5.08 5.08 - - - - - - - 5.08 23.93 3.08 71.13 5.08 5.08 - - - - - ---- - 5.08 23.97 3.07 71.12 5.08 5.08 - - - - - - - 5.08 24.00 3.06 71.12 5.08 5.08 - - - - - - --- 5.08 24.03 3.01 71.12 5.08 5.08 - - - - - - - 5.08 24.07 2.92 71.11 5.08 5.08 - - - - - - 5.08 24.10 2.80 71.11 5.08 5.08 - - - - - - - 5.08 24.13 2.65 71.10 5.08 5.08 - - - - - - - 5.08 Continues on next page... Page 9 Hydrograph Discharge Table Time Inflow Elevation CIv A Clv B Ov C CIv D Wr A Wr B Wr C Wr D Exfil OuW*w (hrs) cfs ft Cfs Cfs Cfs cis cis cis cfs Cfs Cfs Cfs 24.17 2.45 71.10 5.07 5.07 - - - - - -- 5.07 24.20 2.22 71.10 5.07 5.07 ---- - ----- ---- ---- ----- -_-- 5.07 24.23 1.96 71.09 &07 5-07 --- ---- ---- - __-_ _____ 5.07 24.27 1.71 71.08 5.07 5.07 ----- -- -- __ __..... 5.07 24.30 1.48 71.08 5.07 5.07 - - --- -_-_ ____ - - 5.07 24.33 1.27 71.07 5.07 5.07 ----- ----- ----- _--- _____ -____ --- 5.07 24.37 1.07 71.07 5.07 5.07 ----- ----- _____ ----- _--_ ----- ----- 5.07 24.40 0.89 71.06 5.07 5.07 - ------- _ ..._ 5.07 24.43 0.73 71.05 5.06 5.06 - ---- ---- -_._ -_ - 5.06 24.47 0.58 71.04 5.06 6.06 ----- __- 5.06 24.50 OA5 71.04 5.06 5.06 ---- --- --- ----- ---- -_-- ----- 5.06 24.53 0-34 71.03 5-06 5 06 _-- 24.57 0.24 71.02 5.06 5.06 - - --__ ____ ____ - 5.06 24.60 0.16 7101 5.05 5.05 _ _____- T_.__ ------ ----- __-- 5-05 24.63 0.10 71.00 5.05 5.05 --- ---- -- - 05 24,67 0.05 70.90' 5.05 5 ff; - -- 24.70 0.02 70.99 5.05 5.05 24.73 O.Or' 7 .98 �JJ 24.77 6.0t1 70.97 6-04 5.04 ---- -- --- 5.0tt 24.80 0.00 70M 5.04 5.0 _._._.. -._... 5.0A 24.83 0.00 70.95 5.04 5.04 ----- ----- ____ ____ � - 5 04 24.87 0.00 10.94 6.04 5.04 -- ----- _ -- ----_ ---- 5.04 24.90 0.00 70.93 5,04 5_� ��_ __w-u ____ __ � ._ _---- 5.04 24.93 0.00 70.93 5.04 5.04 _. 5,04 24.97 0.00 70.92 5_63 6-03 _____ _____ 5_03 25,00 0.00 70.91 5.03 5.03 _._- ----- 5.03 5.03 25.03 (.-00 7090 5.t:►;t 111.03 25.07 0.00 70.89 6.03 6.03 __. 6,03 25.10 [?.X,' 70_88 5-03 15,03 --- --- . _____ ____ 6_03 25.13 0.00 10.87 5.02 5.02 _ - 5.02 25.17 C€,00 7C 87 S-w �.€7 -- --- �. � - i Cr 25.20 0.00 70.86 5.0; 6.02 _._ 6,02 i?6.23 o.00 70,815 6.02 1a.02 6-02 25.27 0.00 70.84 5.02 6.02 5.02 25.33 0.00 70.82 5.01 5.01 -- 5.01 25.40 0.00 70.81 5.01 6.01 _ _ 5.01 25-4E3 0.()0 70.8-0 5.01 6-W ____ -__ __ __ _ _ - - 5.01 25.47 0.00 70.79 5.00 &00 5.00 27.60 O of) 70.18 i.t3t) 6.00 _. _ ____ ._.. r. 6.00 25.53 0.00 70.77 5.00 6.00 ----• ------ _____ - 5.00 25.60 0.00 70.76 5.00 5.00 5.00 26.€ 3 O.00 1t1.75 4.99 4.994.W 25.67 0.00 70.74 A-99 4.99 _ __.___ -- 4.99 2L./0 0.On 41.13 4.99 4.4: ---- -_- --- �_ 4.94 25.73 0.00 70.72 4.9€3 4,99 4.99 26.71 0.00 rtJ.71 4.99 4.99 �._ - 4.99 25.80 0,00 70.10 4.98 4.9$ -____ __ ___.., _ 4.98 25.83 0.00 70.69 4.98 4M _r.... �.._.. 4.98 Continues on next page... Page 10 Hydrograph Discharge Table Time Inflow Elevation CIv A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cis ft cfs cfs cfs cfs cis cis cts cis tfs cfs 25.87 0.00 70.69 4.98 4.98 - - - - - - -- 4.98 25.90 0.00 70.68 4.98 4.98 ---- ----- ----- - - - - 4.98 25.93 0.00 70.67 4.98 4.98 --- ----- ----- - - - 4.98 25.97 0.00 70.66 4.97 4,97 ----- ----- -- -. -- __..._ _. 4.97 26.00 0.00 70.65 4.97 4.97 ---- ----- --- ----- - --- - 4.97 26.03 0.00 70.64 4.97 4.97 ----- a--- -- ---- ----- -- ----- 4.97 26.07 0.00 70.63 4.97 4.97 --- -- --- _-_-- -_-- __-- 4.97 26.10 0.00 70.63 4.97 4.97 - _ 4.97 26.13 0.00 70.62 4.97 4.97 - - -_- __ ____ �_ __- _ _ 4.97 26.17 0.00 70.61 4.96 4.96 4_97 26.20 0.00 70.60 4.96 4.96 ---- -- ---- --_- ---- ----- ----- 4.96 26.23 0.00 70.59 4.98 4.90 -- --- -- - - -- - 4 `6 26.27 0.00 70.58 4.96 4.96 ---- - ---__ _____ ____ - - 4.96 263 30 0.00 70.57 4.96 4,96 ----- - _ -- --_- - _ 4.96 26.33 0.00 70.57 4.95 4.95 --- - -- --- - --- ---- 4.95 z r- 3 f 0.00 70.56 x 95 �•_: < ;5 26.40 0.00 70.55 4.95 4.95 4.95 26.43 0.00 70.54 4.95 4.95 _.. 4 95 26.47 0.00 70.63 4.95 4.9.5 ____ ____ _ ____ �_ 4.y61 26.050 0.00 70.52 4.94 4.E4 _ ._._ __...- -.._.-_. __._._. _._. x 26_1-13 0.00 7C),52 4.94 4.gi4 -._ _____ «____ ... _..._ 4 94 26,57 0.00 70.61 4.94 4.94 -. _.___ __.-__ -- 4.94 96.66 C).of) 7()-fit_) 4_C14 4.44 --- 26.63 0.00 70.49 4.94 4,94 4.94 26-67 0.00 10.48 4.93 4.93 ----- ----- ----- ____ ____ -- 4.93 26.70 0.00 70.47 4.93 4.93 _._._ _ 4.93 2fi:t 3 C�.()t7 (i):4f i 4.4. 4.�3:i � _____ �_ � _Y 4 533 26.77 0.00 70.46 4.93 4.93 4.93 2680 0.()0 70AS 4.93 4.93 --__ ---- __._ ____ � ^� 4.93 26.83 0.00 70.44 4.92 4.92 -____ -_ _ _..__ __-__ 4.92 28.8 7 0.00 l i3.4:i 4.92 4.92 4.W 26.90 0.00 70A2 4.92 4.P2 4.92 96.y3 000 10�41 4.�2 4.u2 ____ __.._ 4.-2 26.97 0.00 70.41 4.92 4.92 _._ 4.92 11,I.0 C) ()00 70 446 4 -4 1 4.531 --- ---- _-- _ - - _ �-_ 4.41 27.03 0.00 10.39 4.91 4.91 _._ 4.91 21 07 (Vir) 7(O 38 4)=71 4,41 •---- -� _ � _ -.. � 4.91 27.10 0.00 70.37 4.91 4.91 4.91 27.17 0.00 70.315 4.90 4.90 _.... _........ .. � 4.90 9790 Off) 103S 4.40 4.90 4.W 27.23 0.00 70_34 4.90 4.90 ----- ____-. w.. -__ __r 4.90 27.30 0.00 70.32 4.90 4.90 4.90 97_33 0 60 1031 490 4. tJ 27.37 0.00 70.30 4.89 4.89 _ __..__ -__._ __.__ _ 4.89 27.40 ().t)() 7()A0 4.AC4 4.1t --- _ _ 4.NP 27.43 0.00 70.29 4.89 4.89 _.__. __- 4.89 9747 0 00 Ili 28 4 914 4 84 ---- _.._ _____ �- �- 4 81-4 27.50 0.00 70-27 4.89 4.89 _-_ w_ -. _.__ _ 4.89 27.53 0.00 70.26 4.8f, 4.88 4.88 Continues on next page... Page 11 H dro ra h Discharge Table Y 9 P 9 Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfll Outflow (hm) cfs ft cfs cis cis cis cfs cfs cis cfs cis cis 27.57 0.00 70.25 4.88 4.88 - - - - - - - 4.88 27.60 0.00 70.25 4.88 4.88 - - - - --- --- - 4.88 27.63 0.00 70.24 4.88 4.88 - ----- --- --- - - 4.88 27.67 0.00 70.23 4.88 4.88 --- _____ ___._ 4.88 27.70 0.00 70.22 4.87 4.87 - - ---- - _ ._ ____ - 4.87 27.73 0.00 70.21 4.87 4.87 --- -_- ---- ----- ----- ---- ----- 4.87 27.77 0.00 70.20 4.87 4.87 --- - -- --- ---- -- w___ 4.87 27.80 0.00 70.20 4.87 4B7 --.._. - _... 4.87 27.83 0.00 70.19 4.87 4.87 -- ----- -- ----- - ---- - 4.87 27.87 0.00 70.18 4.86 4.86 -__3_ _-__ ---- ----- =---- -_- ----- 4,86 27.90 0.00 70.17 4.86 4.86 - - ---- - --- ----- ---- 4.86 27.93 0.00 10.16 4.88 4.80 �- __. __.-- 4�; 27.97 0.00 70.15 4.86 4.86 - - - - - - - 4.86 28f)o o-fill ;f3. '? 4.88 4.Y -_ _._ _-__. ----- 4.6- 28.03 0.00 70.14 4.85 4.85 - ---- - - -- --_ -- --- 4.85 28.01 0.00 70.13 4.85 4.8S ----- ---- _.... __.. - 28.10 0.00 70.12 4.85 4.85 ---- --- _---- ---- -- - ---- 4.85 28.13 0.00 . 70,11 4 85 4.85 --__ -_ _ ---- �_ _--_ 4.85 28-17 0.00 70.10 4.85 4.85 - - - - -__ ---- - 4.85 28.20 0.00 7010 4.84 4.k! 4.84 28.23 0.00 70.09 4.84 4.84 --- - --- - -_ ____ _____ 4 84 28.27 0.00 70.08 4.84 4.84 _ - - ----- -__ _ _ _ __ ____ 4.84 28.30 0.00 70-07 4,84 4.84 4.84 28.33 0.00 70-06 4.M 48,4 4.64 28.37 000 70.05 4.84 483 483 28.40 0.00 /0.05 4.83 4.83 _ -- -- ----- 4.83 28.43 0.00 70 o4 4.83 4 83 ----- -- ---- -- - --- ----- ---- 4 83 28.47 0.00 70.03 4.83 4.V,3 __.._.- -...... 4.83 28.50 000 7002 4.83 4.83 _____ _- - - 4.83 23.53 0.00 10.01 4.133 4.83 4.83 28_57 0 fl0 70-00 4 82 4 82 _ ___ _ _ ___ _ �__ _- __-- 482 28.60 0,00 /tl.00 4.V.1 4.P _._ . 4.82 2 8.63 0.00 6999 4.82 4.82 ---- --- _____ _____ _____ - 482 28.61- 0.00 (39.98 4.82 4.32 ----- 4.82 28.70 000 6 1.97 4 8 1 44011 ____ _ __ r� ___ _ _ � _ ._� 48,41 0 28.73 ,00 69.iJCr 4.tl11 4.0 _.._._ 4.81 28.77 0.00 (19.96 4_81 4-81 ----- ____ � _ _____ ____ --- 4.81 2&80 W)0 4139.94 4.81 4.81 ----- 4.131 2883 000 69IrW 481 4ii1 ^- _ _ _ _ - - 481 28.87 0.00 69.92 4.80 4..V.O _......... 4.60 28.90 0.00 69.91 4 t;0 4.80 _____ - ._ . 4. 28.93 0.00 1139.91 4330 4.80 4.80 28.97 000 69.90 4 80, 4$0 .�_ ____ _ - __ _ 4.80 29.00 0.00 69.89 4.CO 4.8,0 _._.- ___..- 4.80 2903 0,00 169.88 4.'9 4.79 ____ � ____ - - 479 29.01 0,00 u9.81 4.79 4.19 4.79 29 1 i 479 479 -- ----- _ _-_ _ _ _ ___ ___ _ _ 479 29.13 0.00 6191.8b 4.'19 4.19 4.79 29.17 0.00 69 84 478 4,78 4.78 29.20 0.00 69JI33 4.18 4.78 ___ _-__ _--_ ___. _-- __-_- _ _ 4.78 29.23 0.00 69.62 4.78 418 4.78 Continues on nexit page... Page 12 Hydrograph Discharge Table Time Inflow Elevation CIv A Ctv,B CIv,C CIv D Wr A Wr B Wr C Wr D Extil Outflow (hrs) cfs ft cis cis cis cfs cis cfs cis cfs cfs cis 29.27 0.00 69.81 4.78 4.78 - - - - - - - 4.78 29.30 0.00 69.81 4.78 4.78 ---- - - - - - 4.78 29.33 0.00 69.80 4.77 4.77 - - - - -_ _____ - 4_77 29.37 0.00 69.79 4.77 4.77 ----- --- -- -- -- - _ Y__ 4.77 29.40 0.00 69.78 4.77 4.77 - - - - __.__ - - 4_77 29.43 0.00 69.77 4.77 4.77 ---- ---- - ---- ____ ____ ____ 1.77 29.47 0.00 69.76 4.77 4.77 - ---- - -_ - ____ - 4.77 29.50 0.00 69.75 4.76 4.76 --- -_- ___ _. _..._.. ___... _.-_ 4,76 29.53 0.00 69.74 4.76 4.76 - - - -- - - 4.76 29.57 0,1,0 68.73 4.76 4. 4.76 29.60 0.00 69.72 4.76 4.76 ----- ---- ---- ----- ---- --- - 4.76 2-V 0.00 69.72 4.75 4.75 -- 29.67 0.00 69.71 4.75 4.75 - - - - --- - -- 4.75 29,70 0,00 69.70 4.75 415 29.73 0.00 69.69 4.75 4.75 - -- ----- ----- _-_ _ __ 4.75 29.77 0.00 69.68 4.15 a 761 _____ __--- --_.__ 29.80 0.00 69.67 4.74 4.74 4.74 29,83 0.00 69.66 4.74 4.74 4.i4 29.87 0.00 69.65 4.74 4.74 - - - - -- - ---. 4.74 219.90 0-00 69.64 4.74 AL7114 ___ __ __....-. -..74 29.93 0.00 69.63 4.74 4.74 - - - --- - - 4.74 29.91 0.00 69.63 4.73 4.73 30.00 0.00 69.62 4.73 4.73 -- - --- -- -. -... ____ _ ___ 4.73 30-03 0.00 61901 4.73 4.3 - - -- 4.73 30.07 0.00 69.60 4.73 4.73 ---- --- - - ---- -- - 4.73 ,40.1c) 0.00 69.*9 4.7`2 4.72 _____ ___ ___„_ _____ _.__ q,72 30.13 0.00 69.58 4-72 4.72 --_ _ ___ ____ __ __- 4.72 311.17 U.uU b9.1W 4.72 4.•11 4.72'30.:20 0.00 %56 4-72 4.72 ___ - ____ ____ _____ ____ - 4.72 30.2.3 0.0U 69.65 4.72 44J2 ----- ,__ ____ _ 4.72 30.27 0.00 69.56 4.71 4.11 ____ - - __ _ ____ ___ 4.71 30.30 0,00 69. 4.%1 4.7i ____.. _ 4.71 30.33 0.00 69.63 4.71 4.71 ----- ---- ..-.- __.__ - 4.71 30.3 J f),u0 69.72 4.13 4.7i 4.71 30.40 0.00 69.51 4.71 4.11 4.71 30.4-,s 0.00 6 kilC) 4.70 i"f0 �_._.. 4,70 30.47 0.00 69.49 4.10 410 - ____ _ 4.70 :30.50 0.00 0a.48 4.Ai 4•JU -._ ____ _..__ _- tl_ _ ____ __- 4.70 30.53 0.00 69.47 4.-10 4,10 -_ _ _ __ ____ . r 4.10 30.57 0.00 69.41 4.0s 4.6 1 _ _.._.. 4.69 30.60 0.00 64-46 4.69 4.69 4.69 :30.153 (.00 t)i).45 'i.69 4.69 _ _ ------- -- ----- ----- 4.69 30.67 0.00 69.44 4.69 4.69 _ ____ ____ _ _ ___ ____ 4,69 30.7;3 0.00 69.42 4.68 4.68 4.68 30.J J 0.00 09.4'I 4.Ci3 4.68 ---_.._ _ _.__ ---__ __ 4.68 30.80 0.00 69.40 4.68 4.68 --- _____ ___ __ _____ ___ 4.68 30.81 0.00 69.39 4.68 4.68 _____ _ _. ____ _____ ____ 4.68 30.190 0.00 611.38 4.67 4.67 ____ _ ____ _ __ _ _ 4.67 V W fill MOO ll/l I iCAL PUYCP... Page 13 Hydrograph Discharge Table Time Inflow Elevation Ov A Ov B Ov C Ov D Wr A Wr B Wr C Wr D EON Outlbw (hm) cfs ft cis cis cis cis cfs cis cfs ds cia cfs 30.97 0.00 69.36 4.67 4.67 - - - - - ---- - 4.67 31.00 0.00 69.35 4.67 4.67 --- - ---- - - - - 4.67 31.03 0.00 69.34 4.66 4.66 -- - - - - - - 4.66 31.07 0.00 69.33 4.66 4.66 ----- -- - --a--- ----- ----- ----- 4.66 31.10 0.00 69.32 4.66 4.66 ---- - - - - - 4.66 31.13 0.00 69.31 4.66 4.66 ----- ---- ---- ---- __._ - - 4.66 31.17 0.00 69.31 4.66 4.66 --- ---- ____ ____ __ _ 4 66 31.20 0.00 69.30 4.65 4.65 -- - -- - --- ----- - 4.65 31.23 0.00 69.29 4.65 4-65 --- - -- - ---- 4.65 31.27 0.00 69 2€3 4.65 4.65 4.65 31.30 0.00 69.27 4.65 4-65 -- _ -- -_ --- --- -- -- 4.65 31.33 0.00 69.26 4.65 4.65 ----- --.-- -------- _-_... __..._ _..._. 31.37 0.00 69.25 4.64 4-64 -- --- --- - - - - 4.64 31.40 0.00 69.24 4.64 4.64 __ ___ ____ ___ ___ ____ - 4.64 31.43 0.00 69-24 4.64 4.64 ----- ----- --- _ _ _ 4_64 31.47 0.00 69.23 4.64 4.64 4.64 31 M 0.00 69-22 4.63 4.63 4.63 31.53 0.00 69.21 4.63 4.63 4.63 31.57 0.00 69.20 4.63 4.63 -_ -.-- ___ ___-- _-- -_ __-- 4.63 31.60 0.00 69.19 4,63 4.63 __ __ ___-- _._... __._.._ _.-__.-. 4.63 31.63 0.00 69.18 4.63 4.63 _____ ____ _____ ___ - - - 4.63 31.67 0.00 69.17 4.6h2 4.62 --__ ___.__ ____ ____ -_ _ 4.62 31.73 0.00 69.16 4.62 4.62 4.62 31.77 0 PIP6 .15 w.62 4.62 �.. �. ____ - - 4.62 31.80 0.00 69.14 4.62 4.62 ----- ____ 4.62 ?1 ;., 6 -V t j- 1� 4 c�-F�e 4 i i I ------ ---- -- - --- - - 4 61 31.87 0.00 69.12 4.61 4.61 ......... __.._ _... 4.61 i 7 1.i�i i [J y.1 4 4 f.3 1 -+.(3"r --- •---- ---- ----- -- --- --..-- 4 31 31.93 0.00 69.10 4.61 4.61 ---__ ____ ____ -_- --_ V 4.6//, 31 �)I ii l7ki [s9 iEl 4.CO)(; 46^ 32.00 0�,00 60.09 4.60 4.60 --- 4.60 j2.\a7 ll.Jil 69.ki 4-7 S 4.60 - �. A .• _..� +c.J 32.07 0.00 69.07 4.60 4.60 ----- --- - -- ----- ----- _- 4.60 32 "In rf iiii iiAi3 4F{i J`EJ` ____ ---- --___ - _ -- 4Es 32.13 0.00 69,06 4,69 A.159 4.59 0 4 A 19 32.r210 0.00-J 6.9�.03 4.69 4{.69 --_-_ �- ----- ,___ _�__ 4.5C9 t,' 4 S 3 _-..._ .......__ 4.Z,T^ _.._� ........_ 32.27 0.00 69.02 4.59 4.59 ........ -_._._._ --_ __.__ __..__ ___.. 4.59 P.30 1.00 ca9.tl1 + f'i 4.to ----- _____ � _ _ _--- A 4.58 32.33 0.00 69.00 4.68 4.6$ __ ._ ___ _ _ - 4.58 32.40 0.00 68.98 4.58 4.68 _ _...._ ___-- _-..._ _....._ 4.58 43 .iJii c i`'s 7i 4.-7 4 9 �� _�_ .�_ «_-._ � �- tt.�f7 32.47 0.00 68.97 4.67 4.67 --_- ---- ____ __ ____ __ __ 4.57 32 5C, ()60 6 96 4 tJr 4 r,,7 -- __ 4 S7 32.63 0.00 68.95 4.67 4.57 ---_ -_.__.. ____ _-_-... _. � 4.57 fiif Gil 94 4.51 %� i 4 67 32.60 0.00 68.93 4.66 4.66 - - ___ W_ ___ __._ 4.56 32.63 0.00 68.92 4.66 4.56 - - _-- _.___ _._ ___ 4.56 Continues on next page... O c1l) cr) (2 01, 00 to !� c 00 r- P� cir) 0 G1 ,O LO Z LO to 8 lz too 't v �r v 11 it v 4 4 4 ,q «i 4 ,4 ,i 44 '14 4 -4 4 4 «ter44 4 4 4 4 -4 'i .iq: f 4 -i 4 4 ,4i -4 -4 -4 a � � 1111lii : lii iii � i � i � ii � is { � iiiiiiiiiiii ; iia ; ii � � � : iiiiiiiiiiiiiii � iii : i � � � iiii . iiic � i � � i ► , il ; � iii � iii : iii : iiii � i � iii : ii . . iii . iiii � i . ii � � iii . ie ; � iiliiii lii . i ? ii � iii � ii � : iii . iiiiii . iii � liiii � � iiliiiiiiieiii � iiiiiii : iii . iii : iii : i3iii � , . iiii LO Lf) LO LO v L% CY) CY) m V� c") (N T- T- r- v- W. CO CO C'888 Z .0 40 0 to tic, LC) U)0 LD LO toJr) LO L() ie) n to LC? U� L9 to 4 1-i� LIP -tt A v v -v 't, v Nf 'T 4 v: 4 C Ufa 4 CO M Ct to to M to CO P- I,- z 00 OMO 0 00000 v v IT V, 4 4 -4 4 -i Lm M C)0 0 'r- T- 0 cri Z I- 1j," Lri 3 M N -r- CD OM OR cq OR 00 w co r- r, 12 ;4- r"?rl� rN- r-- ro- (0 m CO �O w 1.1) z VO L.7� txll U'� 1.11) Z Lc I-- 606 C6 co C6 C6 06 to OC, X CO CC Z CO CO to Oc C (XI t I 'm CO 00 cc eY S ui (0 CD (D CO CO Cc (D (D (D CO CC,CO (0 (0<0 CD W 12� IC06 8 CO (0 0 to CD 4L,:) w co to cc to 0 f S S- T 28 ez B cc coo QD c v CD a -c LlCL 8080080008001-1;) 8000080 08 0000c 00 COD O. CDOC 080C 8C 000C 4--*tn 8 ,08800 0 00 000 aoc:) 0000 00 CDC cc 08 Sf=) CD = Sf�=-, 6606660, 60' a coo 011=1000 0 CD 0 CD V CDC 0 := Oc CD : c 0 m 0 m 1- 0 fl- CD m r- 0' ce) I,- :) CO 0 P- 1= 0 r- 0 C r- C.) cy, fl- 0 cr) !- 0 M 11 co w CO0 M M M�- CD r- 0 M >% m r*'� CR OR 0 O� O� CD 0 0 NN N CO M M -4t v: in co �0- (p �- I- I-- M 0 M 0 0 0 v- T7 7 Ov M M N cri cv-5 cj cj C6 6 C6 1�n' cy)" M, c'), M, m vri co (n cr) -5 C-�� r,-; cf), ce), n, r1l) cf5 M, (76 C6 cd C6 Page 15 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil OuHbw (hm) cfs ft cfs cfs cfs cfs cfs cfs cfs cis cfs cfs 34.37 0.00 68.48 4.45 4.45 - 4.45 34.40 0.00 68.47 4.45 4.45 ---- --- - ---- ---- ---- - 4.45 34.43 0.00 68.46 4.45 4.45 - -- -- _ - - 4.45 34.47 0.00 68.45 4.44 4.44 ----- --_-_ ---- ----_ - _ --- 4.44 34.50 0.00 68.45 4.44 4.44 - ---- - - - - - 4.44 34.53 0.00 68.44 4.44 4.44 - --Y-- ---_ ____ _____ .` - 4.44 34.57 0.00 68.43 4.44 4.44 -- - - -- - - -- 4.44 34.60 0.00 68.42 4.44 4.43 ----- ----- -_-- ----- ----- ----- 4.43 34.63 0.00 68.41 4.43 4.43 - - --- - -_ --_ 4.43 34-67 0.00 68.40 4-43 4-43 - --- ----- -- ---- ----- ----- 4.43 34.70 0.00 68.39 4.43 4.43 --- - ----- ---- ---- ----_ �._ 4.43 34.73 0.00 68.39 4.43 4.43 - - 4 43 34.77 0.00 68.38 4.42 4.42 _--- ----- ____ _____ _____ 4.42 34.80 0.00 68.37 4.42 4.42 -- - ----- --- �_ �_ _____ 4A2 34-83 0.00 68.36 4.42 4.42 ----- ----- -�- __--- --._-- -- -- -. _ 4.42 2.4.87 0.00 68.35 4.42 4.42 ---_- ----- ----- ----- ------ _ A A,> 34.90 0.00 68.34 4.42 4.42 _ _--w ____ _____ _____ � 4.42 34.93 0-00 68.34 4.41 4.41 -- �_._ a__� ___� �_k _____ „� A a1 34.97 0.00 68.33 4.41 4.41 ---- ----- ---- ____ _- _____ ____.- 4_41 35.00 0.00 68.32 4.41 4.41 --.._.- _ __.. 4.41 35.03 0.00 68.31 4-41 4.41 ---- --- - -_ ___ ___ _____ 4.41 35.07 0.00 68.30 4.40 4.40 ----- ----- ----- ---_- -- -�. 4.40 35.10 0.00 68-29 4.40 4.40 --_ ____ ---- ----- ----- ----- 4.40 35.13 0.00 68.29 4.40 4.40 ----- ----- _._.. __.. 4.40 35.17 0.00 68.28 4.40 4.40 ---- - ---- -__ _____ 4.40 35-20 0.00 668,27 4.40 4.40 .____ _ ____ __�_ __� _� 4.40 J5.L.3 ll.lfV 68-20 4-39 4.39 _�o. __._-... _�...... _._.._ _..._._... 419 35.27 0.00 68.26 4.39 4.39 --... __._ 4.39 35 30 0 00 67.99 4.39 4.39 _- ____ _____ 4.39 35.33 0.00 67.99 4.39 4.39 ._ ___ ____ __ _ __ 4.39 35.37 000 67 98 4 39 4 39 __�_ ___ _ ____ ___ ____ 439 36.40 0.00 67.$1 4.38 4.38 --.._... - - - - -- _ 4.38 35.43 - 0 €3 0 07.98 4 38 4.38 4.38 35.47 0.00 61.98 4.38 4.3$ ----- ----- --___ ___ ____ _ � 4.38 35 50 0 96 67 95 438, 4 .`t --- - ___:. _ _. w-_ 4.38 36.53 0.00 6-t.96 4.38 4.38 __. _-..... 4.38 3557 000 67 96 438 4.38 �--- ____ _____ .� 438 35.60 0.00 61.96 4.38 4.38 _.__ _�_ __� ___� ____ _w_ 4.38 35 63 000 67 96 4 .%9 4 3£� --- --- _ _._ __ _ _ 4.3R 35.67 0.00 8i.96 4.38 4.e�8. __.___ __.__ ___ - __-- 4.38 35:70 0.00 67.97 438 4.38 ----- -� _____ _ _ 4.38 35.13 0.00 61.97 4.3€3 4.3$ -_ ___ �_ ____ _ _ 4.38 35 77 0 00 67.97 4 38 439 ___ ____ ____ ___ _ 4.38 36.60 0.00 6-1.91 4.38 4.36 ___._.. __._ 4.38 35-8 3 000 67 97 418 4.38 ____ ----- --- - 4.38 35.81 OM 61.98 4.38 4.38 ---- -- __ ____ _� 4.38 35.90 0 001 67 98 4 9 4 39 __- �_ - Y__ 439 35.93 0.00 67.98 4.39 4.39 4.39 .3597 000 67 9$ 4.39 4,39 ----- - _ ____ 4.39 36.00 0.00 6i.98 4.39 4,39 ___ ----- _�_ V_ _ 4.39 36.03 0.00 67.99 4.39 4.39 --- __ - ----- ---- --- ---- 4.39 Continues on next page... Page 16 Hydrograph Discharge Table Time Inflow Elevation Clv A Civ B Clv C CIv D Wr A Wr B Wr C Wr D ExHI, Outflow (hrs) cis ft cfs cfs cis cfs cis cis cfs cfs cfs cfs 36.07 0.00 67.99 4.39 4.39 - - - - - - - 4.39 36.10 0.00 67.99 4.39 4.39 - - - - - --- - 4.39 36.13 0.00 67.99 4.39 4.39 - - - - __ - 4.39 36.17 0.00 67.99 4.39 4.39 - -- - --- --- - - 4.39 36.20 0.00 68.00 4.39 4.39 - - - - - __ - 4.39 36.23 0.00 68.00 4.39 4.39 --- - - - - - - 4.39 36.27 0.00 68.00 4.39 4.39 ---- ----- --- �--- ---- ---- ---- 4.39 36.30 0.00 68.00 4.39 4.39 __... _..... - _._ 4.39 36.33 0.00 67.99 4.39 4.39 - - -- - --- - -� 4.39 36.37 0.00 67.98 4.39 4.39 - --- --- - ----- - - 4.39 36.40 0.00 67.97 4.38 4.38 - -- --- ----- ----- ---- --_ 4.38 36.43 0.00 67.96 4.38 4-38 ----- ----- ----- -- ----- ----- ----- 4f3 36.47 0.00 67.95 4.38 4.38 - - - - - ---- - 4.38 36.5i') 0.00 67.94 4.37 4.37 ----- ----- ---- --- ____ - 4.37 36.53 0.00 67.93 4.37 4.37 ----- ---- -- --- ____ --.� 4.37 36.57 0.00 67.9-2 4.37 4.37 -- 4.37 36.60 0.00 67.91 4.37 4.37 ---- ---- --- - .--_ --_ 4.37 36.63 0.00 67.90 4.36 4.36 4.36 36.67 0.00 67.89 4.36 4.36 -- - - -- -- _ - 4.36 36.70 0.00 67.89 4.36 4.30 --- ----_ -� ___ ____ -_-_ 4. 36.73 0.00 67.88 4.36 4.36 ----- - --- ____ - - - 4.36 36.l1 0.01) 6r.8z 4.35 4.35 - --- _ _ _____ _._ _____ _ 4.3-5 36.80 0-00 67.86 4-35 4.35 ----- .__ _ __ 4-35 :36.83 0.00 W.86 4.36 4.35 ---- ----- __.___ � 4.36 36.87 0.00 67.84 4.35 4.34 ----- -- __.__ ..__ ..� - 4:34 36.90 0.00 61.83 4.34 4.34 4.34 36_93 0.00 67_82 4-34 4-'4 _ _ _� _ - --- 4 M 36.9 0.00 6 i.81 4.M 4.34 4.34 .37.00 0.00 67.80 4.33 4-33 - -- _____ _____ - 433 3 Y.()3 0.00 6t.l9 4.3:3 4.:33 aH _____ __w __ __ _� 4.33 37.07 0-00 67.79 4.33 4.33 _ ____ 4.33 3YJO 0.00 hr.i8 4.-3eS 4.X,;l 37.13 0.00 67.77 4.32 4.32 - 432 31.1 t 0.CH) 6 t.i 6 4.3 4.32 -- 4.32 37.20 0.00 67.75 4.32 4.32 --- ___ .____ - _ 432 31.2 (1.uu tir.%�! 4.3[ 4..r2 --_.__ ___-- ----- 4.:32 37.27 0.00 67.73 4.31 4.31 - ____ ____ ____ _.__ ____ w 4.31 3�.J() U.OU 6l,r 4.3i 4.31 __ _r-_ 4.31 37.33 0.00 67.71 4.31 4-31 __� ___ ____ ____ .� 431 37.31 U.UU 61.rU 4.30 4.30 ----- ----- _____ 4.:30 37.40 0.00 67.6-9 4.30 4.30 ____ ____ _____ _____ �� 410 31.43 0.UU br.69 4.30 4.30 -- --- __ ____ 4.30 374! 0.00 67.68 4.30 4.30 ____ ___ ____ �w 4.30 37.50 0.00 61.61 4.29 4.1y ____ ____ -_- -_-._ 4.29 '_•7.53 0.00 67.66 4.29 4.29 �_ __. ____ - __ �. 4 2�4 3i.51 0,00 b i.55 4. 9 4.29 ---- ----- ---- ---- _____ ----- 4.29 37 M 0-00 67.64 4.29 4-29 _- ____ ____ - - 4 2.q 37.63 U.UU 6f.63 4.2L3 4.28 4.26 -. .s7 0.00 67.62 4.28 4.28 --- ----- -.___ ____ ____ _ 4.28 jt.tu U.UU 6i.61 4.28 4.28 4.223 37.73 U.UU 6/.t U 4.2/ 4.2'f ---- -- _ _�_. ____ _ _-- 4.2! ni)ilii►lEfC�Uil i38Jii f =d' C... Page 17 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfll Outflow (hrs) ds ft cfs cis cis cfs cfs cfs cis cis cis cfs 37.77 0.00 67.60 4.27 4.27 - - - - - - - 4.27 37.80 0.00 67.59 4.27 4.27 - - - - - - -- 4.27 37.83 0.00 67.58 4.27 4.27 - - - - - - - 4.27 37-87 0.00 67.57 4.26 4.26 - - - - - - - 4.26 37.90 0.00 67.56 4.26 4.26 - - - - - - - 4.26 37.93 0.00 67.55 4.26 4.26 - - - - - - 4.26 37.97 0.00 67.54 4.25 4.25 - - 4.25 38.00 0.00 67.53 4.25 4.25 - ----- ---- ---- ---- ----- 4.25 38.03 0.00 67.52 4.25 4.25 - - - --. - .-- - 4.25 38.07 0.00 67.52 4.25 4.25 - --- - - - - - 4.25 38.10 0-00 67.51 4.24 4.24 -- - ----- ----- ----- _,___.-- _.___ 4.24 38.13 0.00 67.50 424 4.24 ----- ---- -- ----- ----- _._._ _.__-- 4.24 38.17 0.00 67.49 4.24 4.24 424 38.20 0.00 67.48 4.24 4.24 - - - - - - - 4.24 38.23 0.00 67.47 4.23 4-23 4.23 38.27 0.00 6i7.46 4.23 4.23 ___ _ _ ___-- -- __-- ___-- -- 493 38.30 0-00 67.45 4.23 4.23 - ---- - - - _____ 4.23 38.33 0.00 67A4 422 4,22 - ____ - - ____ 4 22 38.37 0.00 67.44 4-22 4.22 - - - - - - -- 4.22 38.40 0,00 67.43 4.22 4.22 _____ �_ -__ -__ �-_ _ _ 422 38.43 0.00 67.42 4.22 4.22 - - --- - - - - 4.22 38.47 0.00 67.41 4.21 4.21 ----- ---- - ____ _____ 4.21 . 38.50 0.00 67.40 421 4.21 ---- - ---- - -- _- - 4.21 348.53 0.00 61.39 4.21 4.21 ____. ._- _____ _.-__ ----- ----- __-_.- 4.21 38.57 0-00 67.38 4-21 4.21 - -- - - ____ ____ - 4.21 38.80 0.00 67.31 4.20 4,20 ____ ____ ___ - - 4.20 38-63 0-00 67.37 4-20 420 420 "3-S.6-1 0.00 t3l.36 4.20 4.20 _ __ - ----- -- - 4.20 38.70 0.00 67,35 4.19 4.19 4.19 38.13 0.00 6 1.34 4.19 4.19 _____ ___ _____ ____ _a___ _____ 4.19 38,77 0-00 67.33 4 19 4.19 4.19 38.80 0,00 0(.32 4.19 q.191 __.._ ___.. ___ __. __. _____ 4.19 38-83 0 0() 67 31 4.18 4.18 4.18 38.8 i 0.00 8 i.30 4.1 d 4.1 d 4.18 3890 000 67 29 4.18 4.1$ ----_ -__- _� _____ _�_ �_ __. 4 18 v8.93 0.00 61,20 4.1! 4.1 4.1 l 38.97 9.n0 67 28 4.17 4.17 ---- ---- - - - _- 4.17 39.00 0.00 (3i.21 4.11 4.11 4.17 39113 Ono 67 26 417 417 ----- - __- »__ - 417 39.0i O.U() 61.26 4,16 4.16 - -- _ _... - 39.10 Q 09 67.94 4.16 4 16 --.- -.-- ____ _____ - 416 39.13 0.00 6 i.23 4.16 4.16 --- --- - ___ ___ ____ 4.16 39.17 000 672.14 416 4.16 --- -__- ____ � 4.16 39.20 O,oO 0(.11 4.1 4.15 39.23 000 t37 21 4 15 4.15 - --� - - 4.15 39.2/ 0.00 0 i.20 4.16 4.15 -� _ __ _ __ ___ __ 4.16 39 30 000 67 19 414 414 --�- w_ ____ 414 39.33 0.00 Gl.18 414 4,14 _--- ----- __-- _.__�. _-__ 4.14 39.37 000 67 17 4.14 414 - ---- --- --_ ____ - 4.14 39.40 0.00 tii.16 4.14 4.14 --- ---- --- _- -- _-_ ---- ----- 4.14 39.43 0.00 6l.16 4.13 4.13 ---- ___ _____ ___ __w_ ___ 4.13 Continue's Oil next page... Page 18 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Civ C C{v D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cfs cfs cfs cfs cos cfs cfs cfs cfs 39.47 0.00 67.15 4.13 4.13 - - - - -- - - 4.13 39.50 0.00 67.14 4.13 4.13 -- - - - -- - -- 4.13 39.53 0.00 67.13 4.12 4.12 - - - - - - 4.12 39.57 0.00 67.12 4.12 4.12 - - - - - 4.12 39.60 0.00 67.11 4.12 4.12 --- -- - - - - 4.12 39.63 0.00 67.10 4.12 4.12 --- - --- - - - - 4.12 39.67 0.00 67.10 4.11 4.11 - ----- - --- - 4.11 39.70 0.00 67.09 4.11 4.11 ----- - ---- _ - 4.11 39.73 0.00 67.08 4.11 4.11 -- - -- - --- - - 4.11 39.77 0.00 67.07 4.10 4.10 - - --- - ____ .� 410 39.80 0.00 67.06 4.10 4.10 ----- __-_ ____ -_ 4.10 39.83 0.00 67.05 4.10 4.10 --_�a ----- .-�- - _..w. 4.10 39.87 0.00 67.04 4.10 4.10 ----- --- - - - - 4.10 39.90 0.00 67.03 4.09 4.09 --- - -- --- - --- -- 4.09 39.93 0.00 67.03 4.09 4.09 - - - - - 4.09 39.97 0.00 67.02 4.09 4.09 ----- --- --- -- ------ ---- 4.09 40.00 0.00 67.01 4.09 4.09 ----- - - - --- -- - 4.09 40.03 0.00 67.00 4.08 4.08 ----- --- ----- - ---- 4.08 40.07 0.00 66.99 4.08 4.08 ---- ----- ----- --- -- - ---- - - 4.08 40.10 0.00 66.98 4.08 4.08 ---- ......... 4 0€- 40.13 0.00 66.98 4.08 4.07 - ____ -___ -_ --- 4.07 }40.1[[7��� s0.00 66+.(977 4.{0�(8� 4.(07 ----- ____ - - w 4.07 . 40.Ll! 0.00 66.96 4.08 4.07 --� ---- -- -- -_ -_ 4.07 40.23 0.00 66.96 4.08 4.(1( _ - - - 4.07 40.27 0.00 66.94 4.07 4.06 ---- --- ---- - -_-_ - 4.06 40.30 0.00 66.93 4.07 4.06 -- ---- --- � - 4.06 40.33 0.00 66.92 4.07 4.06 ---- -.-- __._ - ,- 4.06 40.37 0.00 66.92 4.07 4.(x-v _._ 4.06 40.40 0.00 66.91 4.07 4.05 -- ----- -- ----- ---- --- 4.05 40.43 0.00 b5.90 4.0/ 4.05 --- ----- - ____ 4.05 40.47 0.00 66.89 4.07 4.05 - ---- ---- -- --__ 4.05 40.50 (}.67(i 66-88 4,0/ 4.04 ...---- _ 4.04 40.53 0.00 66.87 4.07 4.04 ---- _____ ____. - 4.04 40.5/ 0.00 IIs(86 4.06 4.04 ____ - ____ _- _____ 4.04 40.60 0.00 66.86 4.06 4.04 ----- -- - ----- 4.04 40.67 0.00 66.84 4.06 4.03 ---- -- --- ---- -____ 4.03 40.70 ()-(J0 66,8 3 4.06 4.ci3 _ _ _- __ - _--- 4.03 40.73 0.00 66.82 4.06 4.0: ---- ----_ --- --- ---_ 4.03 40.17 0.1-0 66.0 4.6 6 6e.O;, -_... ---- - - 4.02 40.80 0.00 66.81 4.06 4.02 ---- ----- ---. -_.. .._. 4.02 40.83 0-00 663.80 4.015 4.02 ----- - __` _� _-_ 4.02 40.87 0.00 66.79 4.05 4.01 -- - -- ____ � 4.01 40.9(1 0.00 66.7Zt 4.06 4.()1 ___.- __._ ___.. ___•-. 4.01 40.93 0.00 66.77 4.04 4.01 --- ---- ____ 4.01 40.91 0.00 6-b.16 4.04 4.01 -- -- - ---- - --- _ 4.01 41.00 0.00 66.76 4.04 4.00 --- - ---- -_- 4.00 41.03 0.0() ./tS 4.03 4.()6j ___ __� ____ ___-- 4.00 41.07 0.00 66.74 4.03 4.00 --- - _____ 4.00 41.10 0.00 66-13 4.03 4.067 ---- __. ---- -- -- -- --- 4.00 41.13 0,00 66.!j 4.02 3.99 -- _____ ____ ____ _- .�_ 3.99 Con noes on next page... Page 19 Hydrograph Discharge Table Time Inflow Elevation Civ A Clv B Civ C CIv D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) cfs ft cfs cis cfs cfs cfs Cfs cis cis cfs cfs 41.17 0.00 66.71 4.02 3.99 - - - - - - - 3.99 41.20 0.00 66.70 4.02 3.99 - - --- - - - - 3.99 41.23 0.00 66.70 4.01 3.98 ---- -- -_.- - - 3.98 41.27 0.00 66.69 4.01 3.98 - ----- ---- - --- _-_ 3.98 41.30 0.00 66.68 4.01 3.98 - - ----- - -_-_ -- 3.98 41.33 0.00 66.67 4.00 3.98 - - -- - --- - - 3.98 41.37 0.00 66.66 4.00 3.97 - ----- -- --- -.-_ 3.97 41.40 0.00 66.65 4.00 3.97 - ----- -- -- - 3.97 41.43 0.00 66.65 3.99 3.97 ---- --- --- ---- -� 3.97 41.47 0.00 66.64 3.99 3.97 - --- - - -- - -^ 3.97 41.50 0.00 66.63 3.99 3.96 ---- ---- -- _--- ---__ 3.96 41.53 0.00 66.62 3.98 3.96 - - ----- _-------- - 12 41.57 0.00 66.61 3.98 3.96 ---- --- --- -- - 3.9 41.60 0,00 66.60 3.98 3.95 6 --- -- -- - - - - 3.96 41.63 0.00 66.60 3.97 3.95 - - -- - -_ _- -- -- 3.95 41.67 0.00 66.59 3.97 3.95 3,95 41.70 0.00 66.58 3.97 3.95 - - - - - - -, 3.95 41,73 0.00 66.57 3.96 3.94 ----- --- --.-- _.a -.� - 4 41.77 0.00 66.56 3.96 3.94 ----- ----- --_- _____ ____ _ 3 3_94 41.80 0.00 66.56 3.96 3.94 _ ___ __ - __-- __--- ___-- ___.. ._OA 41.83 0.00 66.55 3.95 3.94 ----- ..-.-- ____ _____ ____ 3 3 94 41.87 0.00 66.54 3.95 3.93 --�- ____ - ____ - - 3.93 41.90 0.00 66.53 3.95 3.93 - -- - - -- -- - - _ - 3.93 41.93 0.00 66.52 3-94 3.93 ___ ___-.._ 3.93 41.97 0.00 66.51 3.94 3.92 - - - - - - 3.92 42.00 0.00 66.51 3.94 3.92 _�_ _ ____ ____ 3.92 42.03 0.00 66.50 3.93 3-92 --- ----- ____ - _ _ - 3.92 42.07 0.00 66.49 3.93 3.9 _ __ __-__ _.__.. _.. .._ 3.92 42.10 0.00 66.48 3.93 3.91 -- - - - 3.91 42.13 0.00 66.47 3.9.2 3.91 ----- __-- �_ �r � 3.91 42.17 0.00 66.46 3.92 3.91 ---- ----- --- --- - _�_ _ _ _ 3.91 42.20 0.00 66-46 3.92 3.91 191 42.23 0.00 66.45 3-91 3.90 --- - ____ ____ __ - 3.90 42.27 0.00 63.44 3.91 3.90 3.90 42.30 0.00 66.43 3.90 3.90 - -- -__ --- _-- --- 3.90 42.33 0.00 68.42 3.90 3.190 3,90 42.37 0.00 66.42 3.90 3.89 ---- --- --- .-_ ____ - 3.89 42,40 0.00 66.41 3.89 3.89 _- --- -- - --- ---- 3.89 42.43 0.00 66.40 3.89 3.89 ---- ---- --- --- -� - 3.89 42.47 0.00 66.39 3.89 3.tt-? __. __-_- ___.-- -- 188 42.50 0.00 66.38 3.88 3.88 - --- --- ---_- --- --_ 3.88 4L.53 0.00 C-6.38 188 3.88 � 3.88 42.57 0.00 66.37 3,88 3.88 - --- - -__ 3 88 42.60 0.00 C r.3t 3.8€; V;7 ___ ___ ___.__ ---- 3.87 42.63 0.00 66.35 3.87 3.87 - ---- -.- --_ 3.87 42.67 0.00 66.34 3.87 3.87 ---- ---- ---- -�- _-- -_ _-- 3.87 42.70 0-00 66.33 3.87 3.86 - _� _ _ 3.86 42.73 0.00 66.33 3.86 a.86 ---- ____ �_ ___ ____ _ 3. 86 42.77 0.00 66.32 3.86 3.86 -- --- - _____ - - 3.86 4280 0.00 € 6.:31 3_36 3.86 -- _� _____ �. 3.86 42.83 0.00 66.30 3.86 3.8 5 3.85 Continues on-next page... Page 20 Hydrograph Discharge Table Time Inflow Elevation Civ A CIv B CIv C CIv D Wr A Wr B Wr C Wr D Exfit Outnow (hrs) cfs ft cfs cfs cfs efs cfs cfs cfs cfs cfs cfs 42.87 0.00 66.29 3.85 3.85 - - - - - - - 3.85 42.90 0.00 66.29 3.85 3.85 - - - - - - - 3.85 42.93 0.00 66.28 3.85 3.84 - - - - .` 3.84 42.97 0.00 66.27 3.84 3.84 ----- - --- -- ---- -..- 3.84 43.00 0.00 66.26 3.84 3.84 - - ---- - - - 3.84 43.03 0.00 66.25 3.84 3.84 - - - - - - - 3.84 43.07 0.00 66.25 3.83 3.83 - - - - - - 3.83 43.10 0.00 66.24 3.83 3.83 ---- ---- ---- ----- - 3.83 43.13 0.00 66.23 3.83 3.83 - ----- --- - - - - 3.83 43.17 0.00 66.22 3.83 3.83 --- - - - - - - 3.83 43.20 0.00 66.21 3.82 3,82 - - - - _____ - 3.82 43.23 0.00 66.21 3,82 3.82 ----- -- -- --- -- - -- ----- 3.82 43.27 0.00 66.20 3.82 3.82 -- -- -- - --_ --- 3.82 43.30 0.00 66.19 3.82 3.81 - --- - ---- --- -- - 3.81 43.33 0.00 66.18 3.82 3.81 ---- ---- --.- --- --- 181 4137 0.00 66.17 3,82 3.81 --� --- --- --- --- --- 3.81 43.40 0.00 66.17 3.82 3.81 - - - - - - - 3.81 43.43 0.00 66.16 3.81 3.80 ----- ---- ---- ---- ----- ----- ---. 3.80 4147 0.00 66,15 3.81 3.80 --- ---- ----- ---- ----- ----- ----- 3.80 43.50 0.00 66.14 3.81 3.80 - ---- ---- --- --- ---- --- 3.80 43.53 0-00 66.13 3.81 3.79 - --- ---- --- ----- - 3.79 43.57 0.00 66.13 3.81 3.79 - --- -�- - --- ---- - 3.79 43.60 0.00 66.12 3.81 3.79 - _ _ ____ 3.79 43.63 0.00 66.11 3.81 3.79 ---- ---- _ ___ ____ __� -�- 3.79 43.67 0.00 66.10 3.81 3.76 --- ---- ----- ---- --- -- - 3.78 43.70 0.00 66.09 3.81 3.78 ----- ----- ---- --- -- 3.7$ 43.73 0.00 66.09 3.81 3.78 - ___ _ � � - .4 78 43.77 0.00 66.08 3.81 3.77 - --- _ _ __ _____ --_ __-.- -_ 3.77 43.80 0.00 66,07 3.,81 3-77 --- - - ____ - 3.77 43.83 0.00 66.06 3.81 3.77 - - --- - - - -- 3.77 43.87 0.00 66,06 3-81 3.77 ____ _____ _ __ - 3.77 43.90 0.00 66.05 3.81 3.76 --- 3.76 43.93 0-00 66.04 380 3.76 - __-_ _____ _____ __._ - - 76 43.97 0.00 66.03 3.80 3.76 ----- ___ _r - 3.76 44.00 0.00 66.02 3.80 3.7.5 - ____ _._ 7 44.03 0.00 66.02 3.80 3.7;� -- -- _ _ 3.75 .4.07 0,00 6&01 3.80 3.75 - - ____ .� ____ - .175 44.10 0.00 66.00 3.80 3.75 ----- ----- __ 3.75 44.13 0.00 65.99 3.80 3.74 ---- -_ ____ _ 374 44.17 0.00 65.98 3.79 3.14 ----- -- _____ _.._-Y _-_ _ _ 3.74 44.9.0 0.00 65.97 3,79 3.74 3.74 44.23 0.00 65.07 3.79 3.73 ---- - --� ____ _____ 3.73 44.27 0,00 65.% 3,78 3.71 ---- ____ .__ __ 3,73 44.30 0.00 65.94 3.18 3.,/3 3.73 44.33 0.003.73 04 3.77 3.73 ----- -- - 3.73 44.31 +0.00 65.93 3.77 3.72 ---- --.-- ---- --___ 3.72 44.40 0.00 65.92 3.77 3.72 --- .179 44.43 0.00 6b.91 3.%b 312 3.72 44.47 0.f}�1 65.90 3.76 3.71 - --- --- --_ ` .. - - 7 4 44.60 0.00 65.90 3.15 3.71 - __-_ - 3.71 44.53 0.00 65.89 3.75 3A - --- - _ _ ____ 3.71 Continues on next page... t+ J► �► ;► �► C+ J► }+ ► A Ja A x► C ► A ;► ty C[n► �► ;► �► ja �► Ja is }a A A C. A A A J] A A P {s Ja - CC�a Ca G) O? Cs) C) ) Cn t: Cn Ln Cn C. Cn G. Cn G' Cn CYO Cn 5:" v) C'n p., Cn Cn !C'Cn 1 Cn (A cn C31 cr m CA Cn ivlt? _a .a _aC: 0CDWCL7COC.) 00C. V ^�.IVC`., 0) 0 1pi0'b. :t► J`- W 'W 'w + IVN � -� -� nOnmmmwaow -4VVOWOCn C, . C:. C? 4W0 G -4 UC C: W 0 W -J0 -, WOVCsC7 -.1WC—4WNC.) W0 4WnVWOV WOV CA) 4 -IWOV CA) OV C70CC) 00C:, 0aGC) 00C00C?c0C> 0000000C) C) 00OOd0 0O0Op00000 o000oC0) 0aC C: CdOOC8'00C) Ocll >00 000c-ooc 007 00000000 pOoO 00 v c:l C-* 0 C?l M C 01) C'� C) C, 0 C' GE C"� C) 0 M C;, C) C'0) C) C) O C) C) m 0) 0 0') C} (M 0 0) 0 0) C) ()) 0) n Kn 0)0 cn V 01 0 V 0) ,M ) CJ)CD CA CA O n1 C•: Cn Cn C, CS C-, ul Gn C�: 4'n C`>Cn G= 0G r IL- Cj t", Cn C" C"1 G' Ct1 Gn C11 LTJ a to 0 M 0 0 in 0 to cJi Cn C) CD 0) < <! to ,4 .4 r.:% W + C7, 0 1,(A0C) G?, C�) C� ) � C� G) G) C) � V V V VN V V V �I ^J �I000DODOD 00 OO � O �C:i �d V C^ Cf7 C✓ _► 4' N W C" `v V :� tf7 C7 -► iti f�� C ► :'1 C� V C`: CQ) 0 - N.) W W 1a Im V 00 CO �D O -► IV W A 01 V OD O �p �t L? C> WG? WC?�JC: W .?G7L. 47C? WG C C) C) ) 4C 4C? W4G7CWWCWCrGCWS W WaW WW4WWWWWWWWWN NW W W WAWA WA no C W- --4CZ- C1Wa:, a) GC) 0 C) -4- CO � COCCDO00 - - NW Q � > �D A C:? G: G7C:> (r? GrW :.? WGSWG.WC.? WC? G7C.7WC: WG? WC-? WCsWS.3WG:WW WW W WL7WW WWWWWWWWW WWWW A (� v- C -``1 CnC`: c31 Cat GnL' cmc70t� 0C:, 0w, C) M`, mC) C)G) C) �C7G) c7 +J -3 V CO) C> � C)toCCnh (A cAff1toC) t� O)t7) �� ^d �IVV �' � V V V V 000DCO CO to0OOO W ! ! ! i ! ! i ! lilliiililllll ! ! ilil ! lliflllililflflllillll � � l ! I ( llllli ! ! IIlilfll ! ! i ! I ! ! ! lillillliflllillllll v ! li ( Ififlliilfiilfilili { l ( ! llillifllfllllllll ! lill � A tliilliiiillil ! iflil ( lilflliilliliilliililiiil ! ! il � � Ifillllilflfll11ll ! ! lillflililillillllllllilllllli � � 105t) ill ' Ilfilllllllliflilllifl ! lilillill ( Ifilifllllilll o ! ffllllllfliflllfllllfliillilillll1111 ! ( Illflllllli � � t ECO 4C. CGGryr7) CWOGW) W` GyWG7WGaW� C,) 4) WWWr,? W► C�*-ANW NWWNC:aP)wW � � �� WpW� WC) W0WWWWWWWWWWW� �WWWW WWWW+JVdOOt7 � WWW14Q C0079p9 � � � coo) tOCDOG00 Page 22 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C CIv D Wr A Wr B Wr C Wr D ExHI Outflow (hrs) cfs It cfs cfs cfs cis cfs cis cfs afs cfs cfs 46.27 0.00 65.45 3.55 3.55 - - - - - - - 3.55 46.30 0.00 65.44 3.55 3.55 - - - - - - - 3.55 46.33 0.00 65.43 3.54 3.54 - - - - - - - 3.54 46.37 0.00 65.42 3.54 3.54 - - - - - - - 3.54 46.40 0.00 65.42 3.54 3.54 - - - - - - - 3.54 46.43 0.00 65.41 3.53 3.53 - - - - - - - 3.53 46.47 0.00 65.40 3.53 3.53 - - - - - - - 3.53 46.50 0.00 65.39 3.53 3.53 - - - - - - - 3.53 46.53 0.00 65.38 3.53 3.52 - - - - - - - 3.52 46.57 0.00 65.38 3.53 3.52 - - - - - - - 3.52 46.60 0.00 65.37 3.53 3.52 - - - - - - - 3.52 46.63 0.00 65.36 3.53 3.52 - - - - - - - 3.52 46.67 0.00 65.35 3.53 3.51 - - - - - - - 3.51 46.70 0.00 65.34 3.52 3.51 - - - - - - - 3.51 46.73 0.00 65.34 3.52 3.51 - - - - - - - 3.51 46.77 0.00 65.33 3.52 3.50 - - - - - - - 3.50 46.80 0.00 65.32 3.52 3.50 - - - - - - - 3.50 46.83 0.00 65.31 3.52 3.50 - - - - - - - 3.50 46.87 0.00 65.30 3.52 3.49 - - - - - - - 3.49 46.90 0.00 65.29 3.52 3.49 - - - - - - - 3.49 46.93 0.00 65.29 3.52 3.49 - - - - - - - 3.49 46.97 0.00 65.28 3.52 3.48 - - - - - - - 3.48 47.00 0.00 65.27 3.52 3.48 ---- - - - - - - 3.48 47.03 0.00 65.26 3.51 3.48 - - - - - - --.. 3.48 47.07 0.00 65.25 3.51 3.48 - - - - - - - 3.48 47.10 0.00 65.25 3.61 3.47 - - - - - - 3.47 47.13 0.00 65.24 3.51 3.47 - - - - - - - 3.47 47.17 0.00 65.23 3.51 3.47 - - - - - - - 3.47 47.20 0.00 65.22 3.51 3.46 - - - - - - - 3.46 47.23 0.00 65.21 3.51 3.46 - - - - - - - 3.46 47.27 0.00 65.21 3.51 3.46 - - --._ _____ - - - 3.46 47.30 0.00 65.20 3.51 3.45 - - - --- - - --- 3.45 47.33 0.00 65.19 3.50 3.45 --- - - - - - - 3.45 47.37 0.00 65.18 3.50 3.45 - - - - - - - 3.45 47.40 0.00 65.17 3.49 3.45 ----- - - - - - - 3.45 47.43 0.00 65.17 3.49 3.44 ---- ---- -- - - - - 3.44 47.47 0.00 65.16 3.49 3.44 - ---- - - - - - 3.44 47.50 0.00 65.15 3.48 3.44 ---- - -- - -- - --- 3.44 47.53 0.00 65.14 3.48 3.43 ---- - - --- - _.__ - 3.43 47.57 0.00 65.13 3.47 3.43 -- ----- ----- -- -- - --- 3.43 47.60 0.00 65.13 3.47 3.43 -- ----- - - - - 3.43 47.63 0.00 65.12 3.46 3.43 - ----- - --- - - 3.43 47.67 0.00 65.11 3.46 3.42 -- - --- - - - - 3.42 47.70 0.00 65.10 3.46 3.42 ----- --- - --- - - 3.42 47.73 0.00 65.09 3.45 3.42 - - --- - - - - 3.42 47.77 0.00 65.09 3.45 3.41 ---- ---- - - - - - 3.41 47.80 0.00 65.08 3.44 3.41 --- ---- ---- --- ---- --_ 3.41 47.83 0.00 65.07 3.44 3.41 ---- ----- ---- --- --- - - 3.41 47.87 0.00 65.06 3.43 3.40 - - - --- -- - 3.40 47.90 0.00 65.05 3.43 3.40 - - - - - - - 3.40 47.93 0.00 65.05 3.43 3.40 -- - -_ --- - -- 3.40 Continues on next page... Page 23 Hydrograph Discharge Table Time Inflow Elevation Clv A Clv B Clv C Civ D Wr A Wr B Wr C Wr D Exfil Outflow (hrs) aft ft cfs cft cfs cfs cft aft cfs cfs cfs cis 47.97 0.00 65.04 3.42 3.40 — — — — — — — 3.40 48.00 0.00 65.03 3.42 3.39 — — — — — — — 3.39 ...End APPENDIX E The calculation for water quality volume required for the detention basin is as follows: WQV= 1" A 12 R=0.05+0.009(1) A=57.49 Acres I=24.41 =42.5% 57.49 R=0.4325 QWV=2.072 AC. FT=90,258 C.F. The total volume for water quality provided is 2.464 AC.FT=107,334 C.F. The total volume within the fore-bay= 11,140 C.F.(12.34%). Plantings within the aquatic shelf and on the slopes above the static water elevation are proposed and are included on the landscape plans for the project. APPENDIX F iPROJECT ONIH31N3 IV �f911��11���1111111111 GUTTER FLOW ANALYSIS 9l1��11�6d1111111111 TOWN OF SOUTH WINDSOR GUTTER FLOW ANAlY313 FORM 2.1 PROJECT DESIGNED BY DATE STREET FIRM CHECKED BY SNEET No NISV8 HD1VO m 9NIV31N3IV — O bo 13IN 1 9NISSVdAS IV '� o ' o 131N1 9N1 SMAG 0 � M MOId d0 H1a1M _8311n91V a J M01.4 d0 N1d3a — a3alnoHs -4o 3dOlS SSOHO 3 0 0 3 p 3 a311n9 d0 3aVa9 2 _ Q A ;D p Q — 13 I N 101 0 a or'� 111SN31Nl 11VANIVa mP: � I- A . - - IV 1V101 �' ns w IV x10 wns m °� a o M . o Irl 1N3101dd300 ddONns 0S3a3V N1 V3HV o o . 13lNl 01 3w11 a " o p 13Sdd0 ONV _ I o N011V1S 13IN1 -49- II�IIIIIIIIIIII�II�B TOWN OF SOUTH WINDSOR STORM SEWER 3Y3TEM DE31ON FORM 2.2 PROJECT DESIGNED BY DATE STREET FIRM CHECKED BY SHEET NO .. on �V AIIOO13A 39Va3AV a o o A 0040 b o v \ o J 3did d0 HION31 o o " o o " o 3ZIS 3did A O p O O O V431SAS NI O o _ � I - occ k V4 I AllSN31N1.11VdNiV8 M31SAS NI IV AO wns Am rl NISVB HDIVO 0 po 9NIa31N3 IV - 3N1il (131vinr# :33v •r c 3did NI 3WI1 1 131 N 1 0131111 a p too 0o O M p 1N3 N193S 3N 11ri - 7 II-23 TOWN OF SOUTH WINDSOR STORM SEWER SYSTEM DESIGN CHECKED BY 3did AO Hl!DN3j8���11�l�1l��1111111 �0��611���1���1111111 Ell 1111FIE19111111 9Nl?J3lN3 IV 11 CEO oil TOWN OF SOUTH WINDSOR STORY SEWER SYSTEM OE319N FORM 2.2 PROJECT DESIGNED BY DATE STREET FIRM CHECKED BY SHEET N' sue I 11119VdV0 lln� on) rI Val40 �= A113013A 3OV83AV IN 3d01S — \ o' ►� 3did J0 H19N31 3ZlS 3didris ch o • Ig31SllS N1 O CD 1111SN31N111V3NIVIS F` �° - M31SAS NI sV .4o wns . o NISVO HO1V0 ns o gN1H31N3 ICI 0 0 0 1 c0C o R 3W11 031Vinnnoov ♦ o .n � a cA 5 i 3did N1 31111 to c� 131NI013M111 a jo o O J J S 1N31493S 3N 1'1 — J J 00 J I1-23 LINE SEGMENT TIME IN PIPE ACCUMULATED TIME F �Al ENTERING CATCH BASIN SUM. OF Al . IN SYSTEM RAINFALL INTENSITY 0 IN SYSTEM LENGTH OF PIPE AVERAGE VELOCITY FULL CAPACITY HEADWATER I-ALA' AMming RECEIVED C O N S T R U C T t O N January 22, 2007 JAN 2 3 2001 SOUTH MNDSOR PLMMNG DEPT. ALDI -SOUTH WINDSOR, CT SUBMISSION AND APPROVAL SCHEDULE DATE ACTIVITY RESPONSIBILITY 1/24/2007 Submit preliminary Rye Street improvement plan noting DPI drainage and elevations to town of South Windsor 1/31/2007 Provide comments on preliminary Rye Street improvement South Windsor plan 2/14/2007 Submit formal Rye Street improvement plan and project site DPI plan to South Windsor 2/19/2007 Make formal STC submission DPI/Bubaris 2/21/2007 Wetlands commission hearing DPI/AMKing 2/27/2007 Planning and zoning hearing DPI/AMKing 1/31/07 & Meet with landowners regarding land needed for road AMKing/South Windsor 2/01/07 improvements 3/7/2007 Wetland commission hearing(2nd)if required DPI/AMKing 3/6/2007 WPCA meeting DPI/AMKing 3/13/2007 Planning and zoning hearing(2nd) if required DPI/AMKing 2/28/2007 Economic development meeting AMKing/ALDI 3/5/2007 Town Council meeting(For Presentation) AMKing/ALDI 3/19/2007 Town Council meeting(For Approval) AMKing/ALDI t R P.O. BOX 1167 425 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 es�gn PHONE: 860.291.8755 FAX: 8onalsi .8757 c.com www.designprofessionalsinc.com CIVIL S TRAFFIC ENGINEERS ! PLANNERS / SURVEYORS / GIS ANALYSTS ! LANDSCAPE ARCHITECTS February 14, 2007 Ms. Marcia Banach RIVD Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 FF8 15 2007 RE: Aldi Distribution Facility SOUTH WINDSOR PLANNING DEPT, Dear Marcia We have revised the plans and drainage analysis to address your review comments dated 12/28/06, Jeff Doolittle's comments dated 1/3/07, and Jeff Folgers comments up through 12/26/06. Our replies to the comments are as follows: : Your comments dated 12/26/06: 1. The zoning data block has been revised as requested. 2. The pins have been shown to be installed where noted to be missing on the plot plan sheets P1-P5, and a note to the same effect has been added to these plans. The monuments along the street frontage are shown on the Rye Street widening plans. 3. We understand that Aldi's prefers to have the 10' x 20' parking spaces. 4. The Rye Street road improvement plans are presently being prepared, and will be submitted prior to the Planning and Zoning Hearing. : 5. The floodlights have been removed from the elevation plans, and are no longer proposed. 6. The water tank has been show on the plans near the dispatch building. 7. The cross sections have been revised to reflect a 3.5' viewing height. • Jeff Doolittle's Comments dated 1/03/07: 1. All proposed curbing on site is concrete curb. The plans have been revised to reflect this. 2. The hatched areas on the plans reflect a striped off area. The plans have been : revised to reflect this. 3. The appropriate reference notes have been added to the plans, and the drainage stationing has been shown on the topographic sheets. 4. The applicable scales have been added. 5. The drainage structures have been labeled with the unique station number. 6. The drainage pipe materials have been labeled. 7. The roof drainage piping has been revised, and labeled to address the comments. 8. The retaining walls have been reduced in scope and the utilities in this area have been moved to be located under the proposed pavement. The site owner is very : much against removing the proposed pavement in this area. The ability to operate effectively and as cost effective as possible would be diminished with the removal of pavement in this area and moving the truck storage spaces to the west past the end of the building. The moving of these spaces would result in the need to travel : further on average to move trailers into position, and would result in an overall increase in impervious coverage on the site. Our client operates numerous similar facilities throughout the country and understands the amount of room necessary for the proper and safe operation of the facility. The proposed retaining walls have been significantly reduced in size and scope (max 6' in height), and are proposed over 20' from the nearest wetland boundary. We have contacted Clarence Welti regarding the stability of the proposed retaining walls, and Clarence Welti has determined that there are no issues with stability in constructing the proposed walls. We have included an additional sequence of operations to work to address concerns regarding possible impacts from the : construction on the wetlands. We believe with the reduction in the size and extent of the retaining walls, and the additional safeguards that we have included in the design,that these walls can be constructed with no impact on the wetlands. 9. The size of the detention basin was governed by water quality requirements. Due to the depth of the storm drainage on site,the detention basin needed to be deep in order to accept runoff from the on-site drainage. Due to this extra depth,there is an ability to detain runoff on site and discharge at rates much less than under existing conditions. Environmentally,this would appear to be a good option. The extended detention of the storm water during larger events would allow for better settling of solids within the basin, better contact time with vegetation, and would : also allow for lower discharge rates into the river during the periods when higher flows are causing erosion within the river corridor etc. We do not believe that for the infrequent larger storm events,the water backed up into the storm pipes for a few days will have any impact on the storm structures, and certainly the benefits to the environment far exceed any potential impact to the storm drainage structures. The basin has been redesigned slightly to increase the 100 year storm discharge to 5.14 CFS,with a maximum elevation within the pipes of 71.40. This elevation is still approximately 7 ft. below the storm drainage within the pavement which is generally set at an elevation of 78.35. 10. See comments under#9 above. 11. The detention basin outlet detail has been revised to correspond with the revised detention basin design. 12. Additional design detail has been added to the detention basin outlet pipes. In addition, Class V concrete pipe has been indicated for the steeper pipe sections. 13. We added additional detail regarding the outlet construction to the erosion control plan including an additional sequence of construction for this area. In general, along the steeper slopes, the pipe is fairly shallow. Near the top,the pipe starts getting deeper, and this is the area where there will need to be additional care. 14. The last piece of outlet pipe has been adjusted accordingly. 15. The appropriate changes have been made to the plans. 16. We do not anticipate any significant adverse impacts due to the discharge of the storm runoff from the site directly into the river and not into the ravine to the south of the site that drains into the river. The wetlands in this area appear to be from subsurface breakout, and as such the redirection of the surface runoff would • eonals : have little impact on these wetlands. See also response#3 to Jeff Folgers comments below. 17. We proposed the curtain drain around the detention basin in large part to address anticipated issues with the construction of the basin. The groundwater must be controlled during the excavation of the basin in order to allow for the excavation of the clay material. The clay extends up to approximately 68-72 across the basin. As such, only storms in excess of a 25 year storm will pond to depths reaching into the sand. Even during a 100 year storm event, water will pond above elevation 68 for less than 24 hours. With the curtain drains, and the relatively short ponding within the sand layer,we do not anticipate any substantial seepage into the sand layer that could cause issues with the embankments. 18. The details have been added to the plans. • 19. The detention basin does not have a berm. The basin is a fully excavated basin. The lowest elevation along the top of bank of the basin is approximately 77.0. : The 100 year design storm reaches an elevation of 71.40,thereby providing almost 6' of freeboard. The overflow structure set at elevation 71.50 provides the required overflow protection, and as such an emergency spillway would not be required. 20. The details have been revised accordingly. 21. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 22. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 23. See letter dated 1/26/07 from Design Professionals to Jeff Doolittle regarding sanitary sewer design. 24. WPCA approval will be requested. 25. The plans have been revised accordingly. 26. The landscape plan has been checked. 27. The Rye Street improvement plans are included separately. 28. The Rye Street improvement plans are included separately. 29. The Rye Street improvement plans are included separately. Jeff Folgers comments dated 12/22/06: 1. A larger scale plan of the area of the retaining walls has been included. 2. Additional detail of the outlet pipe from the detention basin is included. Jeff Folgers comments dated 1/03/07: 1. Rye Street road widening plans are being completed for submission. Jeff Folgers comments dated 12/26/06: • 1. We looked at the erosion scars on the site. In general,the erosion scars appear to be caused as much by subsurface breakout as surface runoff. In the rear of the site, beyond the limits of improvements, we did not note any locations with concentrated flow. Within the limits of the proposed improvements, both surface w • ' : and subsurface flows will be decreased;therefore, we do not expect a decrease or abatement in the erosion presently occurring. 2. We have included dewatering/pump notes with details etc. to cover the dewatering on the site. : 3. We reviewed the drainage area to the western gully to determine the percentage of site contribution to this area. Drainage area boundaries were marked on the USGS map included herein. The drainage limits were confirmed in the field with the aid of larger scale town topographic mapping. The total drainage area as shown is 148 acres. The downstream limits of the drainage area were defined as the downstream limits of the proposed development. Of this 148 acre drainage area, approximately 39 Acres (portion of the site development)will be directed into the river. This amounts to approximately 26.4% of the drainage area. In reviewing the drainage area in the field we noted that even after a period of days with no precipitation,there was substantial flow within this wetland system at the : road crossing, and there was running water within the ditches adjacent to the railroad that drain into this wetland system. As can be seen on the map included, the wetland system consists of a substantial ravine that extends up to the railroad, and the subsurface area draining to this ravine most likely extends well beyond the limits of the surface drainage area. 4. The retaining walls have been reduced in scope and the utilities in this area have been moved to be located under the proposed pavement. The site owner is very much against removing the proposed pavement in this area. The ability to operate effectively and as cost effective as possible would be diminished with the removal of pavement in this area and moving the truck storage spaces to the west past the end of the building. The moving of these spaces would result in the need to travel further on average to move trailers into position, and would result in an overall increase in impervious coverage on the site. Our client operates numerous similar facilities throughout the country and understands the amount of room necessary for the proper and safe operation of the facility. The proposed retaining walls have been significantly reduced in size and scope (max 6' in height), and are proposed over 20' from the nearest wetland boundary. We have contacted Clarence Welti regarding the stability of the proposed retaining walls, and Clarence Welti has determined that there are no issues with stability in constructing the proposed walls. We have included an additional sequence of : operations to work to address concerns regarding possible impacts from the construction on the wetlands. We believe with the reduction in the size and extent of the retaining walls, and the additional safeguards that we have included in the design,that these walls can be constructed with no impact on the wetlands. 5. The amount of impervious area draining into each catch basin is large (approximately 1 acre into many of the catch basins). Installation of trap hoods is not recommended for such large flow rates as will occur through this drainage system. As an alternative, we have proposed to install a water quality structure on the outlet side of the basin to catch any floatable material that drain through the basin. The installation on the outlet side will allow for the ample treatment of relatively low flows compared to the inlet pipes, which carry high flows. 6. We have not proposed to install a high efficiency gross particle separator. The basin as designed fully meets the 2004 CT Water Quality standards, and is expected on its own to remove over 80% Total suspended solids. The concrete : pavement on the site throughout the trucking areas has been designed to be between 1 and 1.5%in grade. These very minimal grades along with the southern exposure of the truck areas and office parking areas will result in minimal need for sanding of the pavement areas. The large fore-bay along with the catch basin : sumps and the deep low discharge basin will provide for ample settling of any solids. As a final measure, a water quality structure has been included on the outlet primarily to prevent floatable material from being discharged from the site. : 7. The limits of tree clearing have been adjusted on the plan. Thank you in advance for your consideration of the above, and please feel free to call with any questions or comments. Sincerely, Galen Semprebon, E. Executive Vice President Enclosures: r TOWN OF SOUTH WINDSOR GUTTER FLOW ANALYSIS FORM ?-.I PROJECT DESIGNED BY DATE A RE cpvW� t_D� 6T;s STREET FIRM CHECKED BY SHEET No �y F sT DPx FFJ3 N I S V 6 H 01V0 SU H WI IDSOF LAN NG DI pf. DNIN31N3IV L31N1 ONISSVdk8IV 1 I i 131N1 SNI SSWAIS 0 1 �. oQls MOId d0 H101M !2 H311ns 1V N D M MOId d0 H1d30 83aInOHS d0 _ t 3dO1S SSOHO 8311no d0 3avHo Q 3 3 o p o i 131 N 101 0 O O AIISN31NI I1VdNIVU IV I V101 IV -qo wns o r o o SV ans — o > 1N3101dd300 ddONnu o �. S3kl3V N1 V38V M p 4 0 10n y� Ac 0 O o o O 131N1 01 3w11 cc zjJcc 13Sdd0 ONV _ — NO11V1S 131N1 o y -49- �9��1�1111111111�1111 9����1111��1�1111111 TOWN OF SOUTH WINDSOR STORY SEWER .SYSTEM DE319N FORM 2.2 PROJECT DESIGNED SY DATE A L M fb 1�6 ? 1.� G7 STREET FIRM CHECKED BY SHEET NO -. "r 3 0 3 .ut �' 831VM0V3H I A113VdV3 11n-4 1° A113013A 30V83AV a � � �"_ OQ �0 cY? cw tc� i�h � � '� cy M ° a 3dO1S p °� !t� Vol . M Q o c� o p � o 3did d0 HION31 M a oA o r�1 a 3ZIS 3d1dfts h w31sAS NI 0 m Q Joe: O O - a AIISN31NI 11VdNIVU w31SAS NI Aro IV j o w n s NISVB H31YO SNIH31N3 IV M M 3w11 031Vinwnoov v l U1 a 4 3did NI 3w11 N 131N1 013w11 cal u r h J o .S 1 � 1N3wJ3S 3N II — ° / �= 1 r p 1 1 II-23 TM CULTEC, Inc. JOB Brookfield, CT + 1-800-4-CULTEC SHEET NO. OF www.cultec.com CALCULATED BY DATE RECHARGERTM • CONTACTORTM CHECKED BY DATE Quality Stormwater&Septic Chambers SCALE ------ _ t4 • s y�}.'�� /j/ ` ^�-} # nf s r — , s ' , s # , 1 r I t f + Y r ' i i S t { + < ' I , ( i r t , t t fw t +A t r + t + i ' T j ; : , Fxm,NEBS CUiTI.•M-'printing service t-F:tt?._r3%? Ni;3-.Inc•.FPete:C-wv r,.Nf4 G3438 :v'.a:s No G -r � -- d17 f ���� . S��-�,�� ��or ,��� s���� ems✓ ,oz� Vie✓ ��i Sec�� �����s���d���s �l ��7F �da� 4 e RECEIVED MAR 2 0 2007 South Windsor INLAND WETLANDS AGENCY CONSERVATION COMMISSION 1.1 AMKinN C O N S T R U C T I O March 27, 2007 Matt Galligan,Town Manager Town of South Windsor, CT 1540 Sullivan Avenue South Windsor,CT 06074 Re: Aldi-Rye Street Improvements Dear Matt: As you are aware,we are finalizing the details of the design for the Rye Street Improvements. Design Professionals,Inc. has enjoyed a positive working relationship with Town staff during the completion of this design process,and this has allowed us to move this project forward in an expeditious manner. During the design process,we have identified a few items which the Town has requested but we feel are beyond the scope of work that was intended to be provided by Aldi. Attached is a listing of those items. While we do not object to showing these items on the plans, or completing them during the course of the work,we do believe that they should be done at the expense of the Town. Therefore, while we have instructed Design Professionals,Inc. to include this work in their design,we would reserve the right to discuss their cost and reimbursement. Please review this list in anticipation of meeting soon to resolve these items. In the meantime,please feel free to contact me with any questions. Sincerely, A M King Construction Company,LLC tGalei Brccrebon,Design Professionals, Inc. 2115 Rexford Road•Suite 314•Charlotte,North Carolina 28211 704 365 3160 telephone•704 365 3101 facsimile www.amkingconstruction.com t ALDI—Rye Street Improvements Additional Work Scope Items- . March 26,2007 1: The Town Engineer has made requirements for additional storm drainage,etc. on Rye Street. They are looking for an additional 700' plus of storm drainage on Rye Street, replacement of the cross culvert at station 15+80(which will require additional easements to do this work from Shepard and Caron), and additional grading and stabilization of gullies on the south side of the.road that will require additional easement area there also. 2. Additional catch basins are requested on both sides of the proposed low point by Sta. a 19+43. This would place a pair near George Road. To the east, a pair of catch basins is requested to be placed at about Sta. 22+75,just east of a driveway,and near Sta. 26+00, about midway in the remaining distance to the high point. 3. The existing culvert is to be removed or abandoned in place and completely filled with cement grout. 4. It was requested that the storm drainage discharge at the deep cross culvert on Rye Street should.have a water quality structure on the discharge such as a stormcepter. 5. It has been requested that the drainage analysis for catch basin grate capacity at low points should be based on a maximum inundated road area extending 7.5 feet from the gutter,not 9 feet. The catch basins at Sta.19+43 presently meet the 9.0 foot standard,and to revise this to a 7.5 foot standard would require additional basins to be provided east and west of this basin. Double grate Type II catch basins would also be needed, particularly at Sta. 19+43. 6. The existing 15"cross culvert by Sta. 15+80 is to be replaced lower and at a flatter slope so it does not interfere with the proposed drainage and still drains the field to the south with lower outlet velocity. Also, a rip rap energy dissipater is to be included by the outlet to this pipe to help prevent further erosion next to the road. 7. A pair of catch basins is to be placed on George Road near Rye Street. Dent Greenman RECEIVED 190 McGrath Rd MAR 13 2007 South Windsor, Ct. SOUTH WINDSOR PLANNING DEPf, March 120' 2007 Dear Council & P&Z Members, I'd appreciate your serious consideration of my concerns regarding the proposal for the Aldi truck distribution center on Rye St. Below are many serious concerns I have regarding this project. There are very serious traffic safety issues with this project that will put our children's buses & town's residents at a very high risk on Rye St, Sullivan Ave and Buckland. As for my immediate neighborhood, noise, pollution and traffic safety are very real issues that cannot be dismissed. Respectfully Submitted, Kent Greenman. Important Issues to Consider Regarding the Aldi Truck Distribution Center The 1st public hearing on this project clearly showed that many very important issues had not even been considered. This Aldi trucking distribution center proposal is larger than anything currently in town. Didn't the town's recent survey suggest people are concerned that town is losing its rural character? Aldi is going to be generating electricity on site to make up for insufficient power located at the site. Power generation was not mentioned on any plans presented to town. Pollution and noise associated with continuous power generating are huge issues that do not appear to be getting serious/proper attention. What about underground fuel storage/ spills associated with power generation? These facts were not on the wetlands application. Noise associated with 18 wheel truck engines,j ake brakes and their refrigeration units does not appear to be regulated for this project. Only the building's noise. This is troubling. Even if trucks are shut down, what about the noise of 100+ refrigeration units running on each truck ? This needs to be considered/discussed. Will refrigeration units on the 100 trailers parked in the yard be running? What about the noise and pollution? How can there be 100 trailers parked in the yard and Aldi says there will not be a yard tractor to move them around? Or are they going to use an 18 wheeler tractor instead? Noise, pollution? Traffic — How can the state and town in good conscience send 100+ 18 wheelers down Sullivan Ave and down Buckland thru the mall area to get on 84 etc? Town should be very reluctant to take Aldi's traffic consultant's word that the state is in agreement— we should hear that from state directly. Both the town and state have expressed serious concern about the traffic/safety on Sullivan and Buckland. It is irresponsible to locate a massive trucking facility that will feed heavy and potentially overweight 18 wheelers down Sullivan and Buckland risking the lives of our town residents. This project will compromise our town's safety and health. facility. This means incoming trucks can come at any hour of day and Aldi can't control that. What is the track record of these sub contractors? Will each truck meet CT DOT inspections to prevent another disaster like the one in Avon awhile back? Lost trucks on Rye St, Troy Road and turning around in our neighborhood will happen and the town will be powerless to enforce. What keeps incoming trucks from coming down thru East Windsor's Rye St to site? It won't be Aldi because they don't control those independent trucks. The town will not see any tax revenue from those trucks. Noise & pollution of trucks and their refrigeration units will be unacceptable. This project risks the whole town's safety in terms of truck traffic. This proposal is a massive industrial operation that is a poor fit with our town. It appears no one (including state DOT) is evaluating the impact on Sullivan Ave and Buckland Rd corridor safety. This is very concerning and unacceptable. What about commercial lawn and snow removal service noise? This is a massive facility and will require massive noisy snow removal equipment operating throughout the night. Noise and pollution impact to our neighborhood is a very serious issue and needs a very serious town and P&Z review. It can't be ignored that noise and pollution complaints are on record with state and town for the metal recovery facility located across from the proposed Aldi site. 100's of trucks per day on Rye St will pound it to dust. Who will pay to resurface every few years? It came to light during I' public meeting that a 30 foot water tower with diesel pump will be on site. What about the noise /pollution from that? Freon — will truck or building refrigeration units be recharged on site? This project is a mistake — it will ruin the character of this section of town and risk those residents traveling to Rye St.Park. Planning and zoning should travel to one or more of these facilities and observe operations for a 2448 hr period to as part of their review process. South Windsor's founding fathers would be appalled by this project. P&Z seemed to indicate at the 1"public hearing that this project is a done deal. Why? This is troubling. During the 1"public hearing, Aldi had to be coaxed out of the audience. Why didn't the Aldi VP introduce himself Aldi was very misleading about the hours of operation. This is 3 am to 1 OPM 7 days. It was portrayed initially at public hearing as 8a-5p operation. He proceeded to dismiss an adjacent resident's concerns by saying that they didn't need that property. There are serious traffic issues with this project. Aldi's traffic consultant should have been held in contempt by the P&Z commission during the l' public hearing, He was disrespectful and not forthcoming with info. He acted as though he was not accountable to anyone. Why? Is this how Aldi feels towards our town? There should be a very real concern about safety of our school children as 100's of 18 wheelers traverse our town's roads at precisely the same time our buses will be carrying our children. It is irresponsible to place this volume of truck traffic on our town's roads with our children, It was clear that Design Professionals and Aldi's traffic consultant were not on same page regarding Rye and Sullivan traffic and DP sought to distance themselves from the consultant in the closing minutes of the public hearing. Why? This should be a concern to P&Z & town. Where is the state Department of transportation representative? They need to meet with P&Z and attend public hearing and comment on Sullivan and Buckland Rd impact. Why is the town considering a 7 year tax abatement—the town will need the money to provide enforcement for vehicle weight checks, responding to complaints, fixing Rye St etc. Did P&Z review the revenue the economic commission's assumptions line by line objectively? It may not be as good as it is portrayed, especially with the abatement and perhaps none of the vehicles on our tax roles. Trucks- We were led to believe that all trucks coming and going to facility would be owned and their movements controlled by Aldi. WRONG. They sub out the trucks rauc i � From: ""<nchampy@aol.com> To: <webmaster@southwindsor.org>, <townmanager@southwindsor.org>, <planning@southwindsor.org> Date: 3/13/07 2:39PM Subject: For Planning/Zoning/wetlands Request From: Nicholas champ Email: nchampy@aol.com Address: 101 Mcgrath rd City: South Windsor State: CT Zip: 06074 Phone: Organization: Trucking Distributions center Rye St. When elected to the planning zoning I'm sure your goal was to do what was best for the town of South Windsor.Respectfully, please keep in mind the mayor, Planning and Zoning and town council members are NOT THE TOWN.The PEOPLE are the town. This trucking distribution center is not in the best interest for the town and its people.Please put aside all the cons and think about how YOU would vote if this center was put in YOUR backyard! I understand this may be considered a done deal, however I can't help wondering if some sort of none standard gain has happened. I also wonder if those responsible for this center believe they can solicit our neighborhood's vote in the next election. Respectfully, Nick Champ 0 6, 144 k �. r e (-7- OY-L�, 3 3-0 Ensdronmental services, Inc. 90 9M.01"a mW Soli wrwdwr.CrOW4_J262 (860)52a-9M (aco)28"13a(1-) www.E.W.CGA1 March 20,2007 T/South Windsor Planning&Zoning Commission Town Hall 1540 Sullivan Avenue South Windsor CT 06074 RE New Aldi Distribution Facility,Rye Street Project Town Council Meeting to be held Monday,March,5,2007 Dear Commissioners: - ---Environmemat Services;Ins-(ESy and IVlitehell-Associates;Inc.fully-approves-of-the-project-as-------.--------- -- proposed by A.M.King Construction Company,LLC. This proposed development is a good fit for the existing industrial zone and is a win-win situation to both the Town,area residents and it's local contractors/businesses. The town will benefit in the way of real estate taxes;badly need road improvement costs will be -absorbed by the developer;along with an environmentally-friendly-facility providing-job --- ---°PP_ortuni ies-forthearea resid nts .......... -- _ -- -_.--.- ._._.__._....As-a-business owner-in-SouthWindsor;J-support-this project as-it-will-aliowlocal-businesses the-.- opportunity to share in the multi-million dollar construction costs. New construction and then on- -- -- - going maintenance of this facility will generate jobs for local contractors,vendors,firms and --- ------- — - ---... - ----- - ----- ----- — --- ------ -- - ---...... -- --- suppl�ers.------... Therefore,I am in favor of this proposed development and sincerely hope the Town Council approves the project as presented. Respectfully submitted, Dustin J. chell President Environmental Services,Inc. Mitchell Associates,Inc. swrv"Centen Lowted lhn�Uu"m New Eng&W & W Seater eovitzactiav eampavy, Vve. 75 COMMERCE WAY SOUTH WINDSOR, CONNECTICUT 06074 TEL: 528-5252 March 20,2007 Patrick Kennedy, Chairman Planning and Zoning Commission Town of South Windsor South Windsor, CT 06074 RE: New Aldi Distribution Facility South Windsor, CT Dear Mr. Kennedy, This letter is to urge the Planning and Zoning Commission to approve the new Aldi Distribution Facilitysite on Rye Street. We are life long residents y g es dents of South Windsor and have been in our own business here since 1969. As co-developers of the John Fitch Business Centre,just down Rye Street from the Aldi site,we are acutely aware of the various factors related to doing business in this area of town. The Adli site is perfectly suited for the facility that is being proposed for it. The land has been zoned Industrial for decades and various previous proposals for the site have failed to materialize. This is an excellent opportunity to convert un-productive industrially zoned land into a positive tax gain for South Windsor. Having developed and constructed similar,though smaller, such facilities in the same area we can testify to the lack of negative impact to surrounding properties. Warehousing produces no toxic waste and very little noise. We invite you to spend some time on Commerce Way to witness the lack of impact for yourself. In closing,we urge you not to let this excellent opportunity to benefit all of the residents of South Windsor to fall by the wayside as was the case when the Buckland Hills Mall was relocated from an ideal site in South Windsor to a rock pile in Manchester. Sincerely , oward O. Slater - A (f Lr �/'l James W. Slater ACCESSION CORPORATION 548 Boston Post Road Madison, CT 06443 March 5,2007 South Windsor Town Council and PZC Members Re: Aldi, Inc. Regional Headquarters/Distribution Center, Rye Street Dear Councilmen and PZC Members: I am writing as a representative and on behalf of Nutmeg Recycling LLC and Alta Realty LLC. It has been brought to our attention that Aldi,Inc.has proposed to build a$50 million regional headquarters and distribution center across the street from our facility on Rye Street. We are supporting this important economic development project for a number of reasons: 1. Aldi enjoys a terrific reputation and will be a wonderful addition to South Windsor's business community; 2. They will be creating many jobs for area residents; 3. It will add significantly to our local economy; 4. Aldi's first class facility will help diversify our grand list; 5. The Shepard/Griffin Land parcel they are acquiring has been zoned for this use for decades; 6. Aldi has agreed to rebuild and widen Rye Street,as requested by the Town at no cost to the Town,from their property all the way down to Sullivan Avenue,which is much needed and will foster additional industrial development opportunities; 7. Many South Windsor businesses will be benefiting through contracts to help build, service,and maintain this development; 8. The site has very large natural buffers around it; 9. Aldi's facility will be virtually pollutant-free,and represents the clean industry the Town is working hard to attract; 10. Truck traffic will not have to go through residential neighborhoods; and 11. The Aldi campus will have a high-quality building with an office-grade exterior. Please take these omments in support of this development into consideration as you deliberate. Sincerel , Ge rg in mith mm"MMAIIIIIIII VEOW. J. MOUNTFORD CO. GENERAL CONTRACTOR • CONSTRUCTION MANAGER 170 Commerce Way,South Windsor,CT 06074,(860)291-9448,Fax(860)289-6382 License#00900574 • www.wimouniford.com March 20, 2007 Town of South Windsor Planning and Zoning Commission South Windsor, CT 06074 RE: New Aldi Distribution Facility Rye Street South Windsor, CT 06074 Dear Town Council Members: W.J. Mountford Co. and MT. Ford Industries, LLC are in full support of the New Aldi Distribution Facility to be constructed on Rye Street in South Windsor. As a business owner, with my headquarters located just off Rye Street in South Windsor, and a future neighbor of the Distribution Center,which will be located near property I own on Rye Street, I am looking forward to the positive impact this facility will bring to the Town of South Windsor and to the area surrounding the Sullivan Avenue/Rye Street intersection which is in dire need of the improvements proposed. Creating jobs and enhancing tax revenue by developing a parcel of land that has been on the market for years, in combination with producing an environmentally friendly, aesthetically pleasing building for the area is certainly a project I am proud to support. Please contact me with any questions or concerns. Sincerely, Scott . Mountford Pres',ent W.J. Mountford Member, MT. F rd Industries, LLC A*16k steelt Since 1966 March 20, 2007 Planning and Zoning Commission Town of South Windsor Town Hall South Windsor, CT 06074 Reference: New Aldi Distribution Facility Dear Commission Members, I write this letter in support of the New Aldi Distribution Facility Project. As the owner of Steeltech Building Products, Inc., a construction subcontracting business here in town, I am hoping to participate in the construction project to the benefit of Steeltech and its employees, a majority of which are South Windsor residents. As a long time resident of South Windsor, I welcome the additional real estate to our tax grand list and the potential of additional local jobs for our citizens. Without a doubt, this would be a great boost to South Windsor's economy and I can unequivocally state that we are 100% behind it. The location of the distribution center in an area, zoned for industrial use for the last twenty years, is a correct use of the land. The existing businesses of South Windsor should send a message to the new businesses that we stand behind our zoning, and welcome new businesses to our Town. Please do all you can to see that this project is built. Sincer William E. Ke ne, resident Steeltech wilding Products, Inc. WEK/cvb Structural &Miscellaneous Steel Doors & Hardware Architectural Metal Wall &Roof Systems �' SS'HE DR' Toilet Partitions &Accessories Metal Buildings ..R Solar Wall Systems Steeltech Building Products, Inc. 636 Nutmeg Road North • South Windsor, CT 06074 Tel. (860) 290.8930 • Fax (860) 290-8940 • email: info@steeltechbp.com • www.steeltechbp.com ICebalo Electric Company, Inc. 175 Wheeler Road,South Windsor,CT 06074 (860) 644-5124 • Fax (860) 644-2577 State License No. 104943 March 15,2003 Mr. Patrick Kennedy Planning and Zoning Commission 1540 Sullivan Avenue South Windsor,CT 06074 Dear Chairman Kennedy: Re: Aldi Regional Headquarters and Distribution Center I would like to express my full support for the above-referenced project on Rye Street. My primary reason for supporting the Town's financial incentive offer to Aldi, Inc is that this is a tremendous economic development project,which will generate significant tax revenue. I further support this project because it is in an appropriate location that has been zoned for industrial uses, including distribution centers, for decades. Aldi has a reputation for being a good employer(pay and benefits)and for building facilities meeting the highest standards. It will add significantly to the tax base and employment opportunities. The construction itself will benefit many local businesses. I am hopeful to be able to bid on this project for electrical services,however,if the project is not approved there will be no opportunities for my business or any other local business to submit a bid. Incidentally,I have resided in South Windsor since 1961 and my electrical contracting business is located here as well. Kebalo Electric is a commercial electrical contractor that serves many good customers in South Windsor,customers include Steeltech,Capewell Manufacturing and EMI (Electra Methods Industries). We also wired the new South Windsor Post Office on Clark Street. Again, I would like to urge the Council to approve the Aldi's incentive package a.s.a.p. Sincerely, 4�Z41 "1/4 Walter Kebalo President RECEIVED John T. Phillips,P.E. MAR U Z 2007 200 McGrath Road South Windsor, CT 06074 SOUTH WINDSOR PLANNING DEPT, Planning and Zoning Commission Town of South Windsor March 2, 2007 Re: Aldi Distribution To Whom It May Concern: After listening to the P&Z presentation on Tuesday, I am concerned about the apparent lack of open discussion from Aldi and their representatives. Some of my specific concerns are: 1. Building Orientation The unwillingness to consider reorienting the building and refusal to give the reasons that it would be unworkable to reorient the building is disturbing. There may be valid reasons. The reasons are not obvious. On a lot as flat as the Rye Street lot, topography and site problems do not dictate or restrict the layout. As shown, the main building, paved truck operating areas, and the circumferential access road form what is essentially a square. Any of the four orientations of the square would fit. If a mirror image design is impractical because of predesigned standardized equipment, a design rotated a quarter turn would have an identical internal layout to the proposed design. Underground utilities would need to be redrawn. Maximum stormwater piping distances would not change. 2. Back up generator The oversight of mentioning that they will have a back up generator and a diesel powered fire pump is another concern. Both from the stand point of technical concerns and being concerned about what other details they have not mentioned. How is the generator going to be fueled? Where is the fuel going to be stored? They repeatedly stressed that they were not going to be fueling trucks on site,but failed to mention that they may need to receive and store fuel for the generator. If the system is going to be used in conjunction with NU for distributed generation and peak shaving, the operating conditions and number of hours it is run will be orders of magnitude larger than a system that is only an emergency back up for use during power failures. They will need to store much larger quantities of fuel, and have take deliveries of that fuel. There has been no mention of how the fuel will be handled. The stormwater system appears to be capable of handling the expected quantities from a leaking fuel tank on a truck. It would have trouble if an 8000 or 9000 gallon semi trailer full was spilled. A 110% containment area should be provided where the fuel trucks are off-loaded. What grade of muffler and sound lagging will the motor have? I would recommend "Hospital Grade" or"Residential Grade." 3. Air Permits Depending on the method of heating the building, air permits may be required. Depending on the size of the back up generator, air permits and/or compliance testing may be required. A blanket statement that none are required, without any supporting data, should not be an acceptable answer. 3. Refrigerants What refrigerant are they going to be using. If they are going to be using ammonia, I have major concerns. Ammonia is poisonous. Ammonia is flammable. Depending on the quantity on site, a Risk Management Program, Facility Response Procedure, Community Right to Know, and other emergency and environmental regulations must be met. Even if they stay below the State and Federal limits, the South Windsor emergency response organizations would need the information and local notice and evacuation procedures should be in place. 4. Yard Tractors The Applicant has repeated stated, at both the P&Z and the IWA hearings, that there would be no use of yard tractors. At the P&Z hearing, they stated that the parking was primarily for trailers, without tractors. If they are not going to use yard tractors, how do they intend to move these trailers? Some less technical observations; The fact that representatives from Aldi where present,but not identified, does not instill in me a confidence that the really want to be a"good neighbor." Whenever I have been making presentations at IWA and P&Z hearings in other towns, I considered it unethical to not identify all people present. The apparent unwillingness to provide supporting data and information on some of the blanket statements (i.e.,building orientation, air permits, etc.)is disturbing. If the applicant does not provide acceptable supporting data at the next meeting, I request that the Commission continue the Public Hearing until the supporting data are provided. Sincerely, John T. Phillips,P.E. Griffin Land RECEIVED 204 West Newberry Road 200� Bloom Q field,CT 06002 a division of MAR 8 Telephone-860/286.7660 Griffin Land & Nurseries, Inc. Facsimile:8MM-7653 SOUTH WINDSOR PMNO DOI www.grifland.com March 7, 2007 Mr. Patrick Kennedy Chairman Planning &Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: NEW ALDI DISTRIBUTION FACILITY RYE STREET-SOUTH WINDSOR,CT Dear Chairman Kennedy: As the owner of the property that is currently being considered for site plan approval by the South Windsor Planning &Zoning Commission, I wish to express our support of this project. Being that we presently own the property and have contracted for its sale to Aldi, it is no secret that we have an interest in the project being approved. However, it is our opinion that, from a planning and market feasibility standpoint, its improvement into a single user facility is the best possible scenario. It has been more than ten years since the property owner sought and obtained municipal approvals for the property's development into an industrial subdivision, known as the "South Windsor Technology Center". Unfortunately,the combination of market conditions and requisite off site improvements were such that a development of this type was not feasible. Therefore, the site has remained undeveloped. The town now has before it a well capitalized and reputable user, that being Aldi, Inc., who wishes to construct a Class A regional distribution facility and offices that will create 75-plus new jobs, generate substantial long term tax revenue, and additional taxable revenue from the procurement of construction and servicing contracts with local and regional businesses. In addition, Aldi has agreed to reconstruct portions of Rye Street at no cost to the town. Lastly, we believe that this facility designed to be the best possible fit for the property. Clearly, the community stands to benefit from the development of this facility on this property. In short, there is a ready, willing, and able user who wishes to develop a first class facility that will unlock the property's highest and best use and deliver much needed jobs, street repairs, and tax revenue to the town. It is for these reasons, amongst others, that we support this project. Thank you in advance for your consideration. Respectfully, CULBRO SHEPARD PARTNERSHIP,INC. Thomas M. Lescalleet Senior Vice President—Griffin Land As duly authorized c: Peter DeMaillie—Design Professionals, Inc. Brian King—A. M. King Construction * Griffin Land is the real estate division of Griffin Land&Nurseries, Inc., which owns the majority interest in Culbro Shepard Partnership, Inc. DESIGN PROFESSIONALS, INC. civil engineers ♦ planners ♦ surveyors landscape architects ♦ gis ♦ gps Aldi Distribution Facility 295 Rye Street South Windsor, Connecticut DPI Project No. 2282 Requested Zoning Waivers: 1. Section 13.4.1 Modification of Minimum Required Parking Spaces—Reduction in Parking Spaces(from 438 to 151), in order to: a. Minimize changes in topography; and b. Minimize disturbance to existing trees and other desirable plants;and c. Minimize the increase in stormwater runoff. 2. Section 17.20.3c Luminaire Pole Height—To allow luminaire/pole heights of up to 35' within the truck maneuvering/dock/parking areas, and up to 30' within the office parking area(a 10 feet and 5 feet waiver respectively). The primary justifications for granting of this waiver are: a. To reduce possible interference with truck movements(safety factor); b. To maintain a higher uniformity of light(safety factor)with less reflective light bouncing off the pavement(environmental factor—less light pollution); c. Traffic or other hazards will not be created,and indeed will be reduced; d. General property values will be conserved,especially given the significant distances from property lines; e. No adverse effects on existing area uses; f. The general welfare of the community will be served; g. Less energy consumption due to fewer luminaries; h. No adverse environmental impacts will be created; i. Exterior lighting systems are regulated so as to save energy and reduce unnecessary lighting;and j. Topography of the land,especially in regard to proposed planted berms along the perimeter and existing mature vegetation,make the property suitable for the requested pole heights. 425 Sullivan Avenue,South Windsor,Connecticut 06074 Tel:(860)291-8755•Fax:(860)291-8757 www.designprofessionalsine.com .f Bub a risiON.Tr a ffic ASS O C7 ATES Planning*EngI nee ring eDesign To: South Windsor Planning and Zoning Commission From: James G. Bubaris, P.E. Date: March 20,2007 Re: Proposed Aldi Distribution Facility, Rye Street north of Sullivan Avenue,South Windsor,CT CC: File ❑ Urgent ❑ For Review ❑ Please Comment ❑ For Action X As Requested •Comments: At the last PZC hearing on this application, we were asked to provide information on the amount of truck traffic on Rye Street. Reference is made to attached Table A which summarizes the results of an automatic axle-classification study that was conducted by us on Rye Street on Thursday, February 22, in the vicinity of the proposed site drive.The"class"descriptions are contained at the top of the column headings in the table as well as on the second attached sheet This table provides a summary of the actual counts by class and by direction. We were also asked about the number of trucks either turning left from Rye Street onto Sullivan Avenue(to head east), or turning right from Sullivan Avenue(coming from the east)onto Rye Street I checked with the individual who had conducted the manual turning movement counts for our study during the periods from 7 to 9 am and 4 to 6 pm in mid-April 2006 and he does not recall any large vehicles attempting this maneuver since such is currently very difficult to negotiate, hence the purpose of the proposed realignment proposal for the intersection of Sullivan Avenue at Rye Street 288 Highland Avenue a Cheshire,CT 06410 a Telephone:203-272-0400 a Fax:203-272-5655 ejbubaris@a BubarisTraffic.come i Table A Summary of Axle-Classification Study Rye Street Vicinity of Proposed Aldi Site Drive South Windsor,Connecticut Thursday,February 22,2007 Class 1 Class 2 Class 3 Class 4 Class 5 Class 6 Class 7 Class 8 Class 9 Class 10 Pickups 2-axle 3-axles 4 axles 3 or4-axles 5-axles 6-axles Total Total Passenger Vans Single-Unit Single-Unit Single-Unit Tractor Tractor Tractor Total Smaller Bus and Direction Motorcycles Cars SUVs Buses Trucks Trucks Trucks Trailers Trailers Trailers Vehicles than Bus Larger Northbound Percent 0.9% 65.1% 30.5% 1.3% 8.1% 0.3% 0.0% 2.0% 1.3% 0.5% 100.0% 86.4% 13.6% Volume 13 836 462 20 123 4 0 31 20 8 1,517 1,311 206 Southbound Percent 0.2% 67.5% 21.2% 0.7% 5.2% 0.2% 0.9% 2.0% 1.6% 0.5% 100.0% 88.9% 11.1% Volume 4 1,098 344 11 84 4 15 32 26 8 1,626 1,446 180 Total Percent 0.5% 61.5% 25.6% 1.0% 6.6% 0.3% 0.5% 2.0% 1.5% 0.5% 100.0% 87.7% 12.3% Volume 17 1,934 806 31 207 8 15 63 46 16 3,143 2,757 386 Bubaris Traffic Associates March 20,2007 �...zs� .<,.�� ���, � .�W,•ww� I i Appendix ` Federal Highway Administration Class 5 —Two-Axle, Six-Tire Scheme F Vehicle Classifications Single Unit Trucks This class includes all vehicles on a single frame Class 1 — Motorcycles which have two axles and dual rear tires. This includes trucks,camping and recreation vehicles, motor homes,etc. This class includes all two- or three-wheeled motorized vehicles.These vehicles typically have a saddle-type of seat Class 6 —Three-Axle and are steered by handlebars rather than a steering wheel. This includes motorcycles, motor scooters, mopeds, mo- Single Unit Trucks ' t i tor-powered bicycles and three-wheel motorcycles. � � This class includes all vehicles on a sin le g .frame which have three axles. This includes trucks, camping and recreation vehicles, motor homes, Class 2 — Passenger cars t This class includes all sedans,coupes and station etc. wagons manufactured primarily for the purpose Class 7 — Four or More Axle of carrying passengers, including those pulling recreational or other light trailers. Single Unit Trucks f t f This class includes all vehicles on a single frame Class 3 — Pickups,Vans and other with four or more axles. 2-axle, 4-tire single unit vehicles Class Four or Less Axle This class includes all two-axle,four tire vehicles ' r ' other than passenger cars,which includes pickups, _ Single railer Trucks vans, campers, small motor homes, ambulances, This class includes all vehicles with four or less minibuses and carryalls. These types of vehicles ° t " axles consisting of two units, in which the pulling which are pulling recreational or other light trail- unit is a tractor or single unit truck. ers are.included. ` Class 9 — Five-Axle Class 4 — Buses Single Trailer Trucks This class Includes all vehicles manufactured as tra- " This class includes all five-axle vehicles consist- ditional passenger-carrying buses with two axles and ing of two units in which the pulling unit is a trac- } six tires or three or more axles. This includes onlycgm - for or single unit truck. traditional buses,including school and transit buses, i functioning as passenger-carrying vehicles. All two- Class 10 — Six or More Axle axle,four tire minibuses should be classified as Class o n Modified buses should be considered to be trucks Single Trailer Trucks 3. Modi ' �' This class includes all vehicles with six or more and classified appropriately. o axles consisting of two units in which the pulling unit is a tractor or single unit truck. " A-2 A-3 is LOCI Summary Report Fiscal and Economic Impact Analysis Level 3 Analysis - Facility, Employees, and Multiplier Impacts Following are summary results from a fiscal and economic impact analysis conducted for a City in the state of Connecticut.The impact analysis measures the amount of new revenues the jurisdiction can expect from all as a result of the project. Sources include sales tax, income tax, real and personal property taxes, fees, and utility revenues if those apply. These revenues are compared against projected increases in costs borne by the jurisdiction as a result of the new development. Costs include items found in the jurisdiction's budget such as police and fire protection, health, social services, and utility investments and operating expenses. Community Name: South Windsor Description: Local municipal governmaot Households in the jurisdiction: 9,011 Jurisdiction's local sales tax rate: .00% Total employment in the jurisdiction: 11,582 Jurisdiction's total operating budget: $84,266,468 Property Tax Rates: Non-Residential Residential Incorporated Areas Unincorporated Areas Incorporated Areas Unincorporated Areas Real Property: 32.54 N/A 32.54 N/A Personal Property: 32.54 N/A 32.54 N/A Inventory: 32.54 N/A N/A N/A Project Name: Aldi INC. Description: Aldi food distribution Facility NAICS Code:4451 , Grocery Stores. Facility payroll: $2,808,300 Value of real property(building and land): $4,868,000 Facility employment: 75 Value of personal property(equipment and furnishings): $3,510,000 Results The detailed reports are displayed in a cash flow statement showing each year's benefits and costs. Below are the first five years and the last year of the forecast period.Also shown is the net present value of discounted net benefits. These results are based on a 20 year forecast horizon and a Level 3 analysis. Year 0 Year 1 Year 2 Year 3 Year 4 Year 5 Last Year Total Benefits: $77,700 $217,083 $217,083 $223,562 $223,562 $223,562...... $1,357,337 Total Costs: $0 $66,965 $66,965 $66,965 $66,965 $66,965...... $66,965 Net Benefits: $77,700 $150,118 $150,118 $156,597 $156,597 $156,597...... $1,290,372 Present Value of Net Beneftis = $11,514,555 Multiplier impacts add to the direct impacts estimated from a Level 2 analysis. The table below**shows household, income, retail, and employment impacts with multiplier effects shown separately. Non-Residents Residents Multiplier Effects Total Households 56 3 0 59 Annual Income $2,667,885 $140,415 $0 $2,808,300 Annual Retail Expenditures*** $0 $0 $0 $4,928,317 Employment 71 4 0 75 ** Households, annual income, annual retail expenditures, and employment don't print when communities are aggregated. Also,for a phased project, annual retail expenditures and multiplier effect quantities correspond to the last phase. ***Total retail expenditures includes facility purchases of $4,928,317 Printed on: 03/19/2007 Project: Aldi INC. Aldi food distribution Facility Report Title: Totals Only Community:South Windsor Local municipal governmaet Analysis Level: 3 0 1 2 3 4 5 Year6 7 8 9 10 BENEFITS TOTAL BENEFITS $77,700 $217,083 $217,083 $223,562 $223,562 $223,562 $250,066 $250,066 $1,357,337 $1,357,337 $1,357,337 COSTS TOTAL COSTS $0 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 NET BENEFITS $77,700 $150,118 $150,118 $156,597 $156,597 $156,597 $183,101 $183,101 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits= $11,514,555 Printed on: 03/19/2007 Page 1 Project: Aldi INC. Aldi food distribution Facility Report Title: Totals Only Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 BENEFITS TOTAL BENEFITS $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 COSTS TOTAL COSTS $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 NET BENEFITS $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits= $11,514,555 Printed on: 03/19/2007 Page 2 Project: Aldi INC. Aldi food distribution Facility Report Title: By Major Category COmmunity:South Windsor Local municipal governmaet Analysis Level: 3 0 1 2 3 4 5 Year6 7 8 9 10 BENEFITS Sales Taxes $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Property Taxes $0 $215,263 $215,263 $221,742 $221,742 $221,742 $248,246 $248,246 $1,355,517 $1,355,517 $1,355,517 Water Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Revenues $77,700 $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Solid Waste Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #1 Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #2 Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Franchise Fees $0 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Business License/Occupation Tax $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Liquor License Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Alcoholic Beverage Tax Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Income Tax Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenues from Fines $0 $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Revenues from Permits $0 $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Miscellaneous Fees $0 $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Salvage Value $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 TOTAL BENEFITS $77,700 $217,083 $217,083 $223,562 $223,562 $223,562 $250,066 $250,066 $1,357,337 $1,357,337 $1,357,337 COSTS Support $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education $0 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Public Works $0 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Recreation/Libraries $0 $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Court System $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fee Services $0 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 General Government $0 $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Health Services $0 $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Social Welfare $0 $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Public Safety $0 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Other Visitor Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Costs $0 $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Solid Waste Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Production Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#1 Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#2 Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 TOTAL COSTS $0 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 NET BENEFITS $77,700 $150,118 $150,118 $156,597 $156,597 $156,597 $183,101 $183,101 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits $11,514,555 Printed on: 03/19/2007 Page 1 Project: Aldi INC. Aldi food distribution Facility Report Title: By Major Category Community:South Windsor Local municipal govemmaet Analysis Level: 3 11 12 13 14 15 Year16 17 18 19 20 BENEFITS Sales Taxes $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Property Taxes $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 Water Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Revenues $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Solid Waste Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #1 Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #2 Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Franchise Fees $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Business License/Occupation Tax $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Liquor License Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Alcoholic Beverage Tax Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Income Tax Revenues $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenues from Fines $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Revenues from Permits $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Miscellaneous Fees $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Salvage Value $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 TOTAL BENEFITS $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 COSTS Support $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Public Works $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Recreation/Libraries $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Court System $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fee Services $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 General Government $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Health Services $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Social Welfare $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Public Safety $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Other Visitor Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Costs $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Solid Waste Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Production Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#1 Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#2 Costs $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 TOTAL COSTS $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 NET BENEFITS $1,290,372 $1,290,372 $1,290,372 $1,290' 1290372 $372 1$ ,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits= $11,514,555 Printed on: 03/19/2007 Page 2 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 BENEFITS Sales Taxes Construction 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Equipment 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Workers 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Resident Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Nonresident Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility Purchases 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility Sales 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Direct Expenditures by Visitors 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Excise Taxes 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Property Taxes Facility Real Property 0 $114,685 $114,685 $121,164 $121,164 $121,164 $147,668 $147,668 $1,254,939 $1,254,939 $1,254,939 Facility Furn&Equipment 0 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 Facility Inventory 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial-Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial-Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential-Facility Employees 0 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Mult Eff-Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $215,263 $215,263 $221,742 $221,742 $221,742 $248,246 $248,246 $1,355,517 $1,355,517 $1,355,517 Water Revenues Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Revenues Residential 0 $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 77,700 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $77,700 $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Solid Waste Revenues Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 1 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 0 $ $0 $0 $0 0 0$ $ $0 $0 0 0 Electric Power Revenues Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #1 Revenues Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #2 Revenues Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Franchise Fees Facility and Employees 0 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Business License/Occupation Facility and Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 2 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Liquor License Revenues Facility and Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier.Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Alcoholic Beverage Tax Facility and Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Income Tax Revenues Facility and Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenues from Fines Facility and Employees 0 $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Revenues from Permits Facility and Employees 0 $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Miscellaneous Fees Residential 0 $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Other Fees from Multiplier Effects 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Impact Fees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Salvage Value Development Support 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Transportation 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Municipal 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Solid Waste 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other1 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 3 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Benefits $77,700 $217,083 $217,083 $223,562 $223,562 $223,562 $250,066 $250,066 $1,357,337 $1,357,337 $1,357,337 COSTS Support Development 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Transportation Investment 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Municipal Investment 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Educational Investment 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Operations 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education Facility Employees 0 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Public Works Facility Employees 0 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Recreation/Libraries Facility Employees 0 $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Court System Facility Employees 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fee Services Facility Employees 0 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 General Government Facility Employees 0 $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 4 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 Total $0 $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Health Services Facility Employees 0 $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Social Welfare Facility Employees 0 $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Public Safety Facility Employees 0 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Security 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Other Visitor Costs Temporary Facilities 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Items Supplied 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Costs Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Costs Residential 0 $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Solid Waste Costs Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 5 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 0 1 2 3 4 5 6 7 8 9 10 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Production Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#1 Costs Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#2 Costs Residential 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect 0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Costs $0 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 Net Benefits $77,700 $150,118 $150,118 $156,597 $156,597 $156,597 $183,101 $183,101 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits= $11,514,554 Printed on: 03/19/2007 Page 6 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details COmmunity:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 BENEFITS Sales Taxes Construction $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Equipment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Workers $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Resident Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Nonresident Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility Purchases $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility Sales $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Direct Expenditures by Visitors $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Excise Taxes $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Property Taxes Facility Real Property $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 $1,254,939 Facility Fum&Equipment $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 $82,692 Facility Inventory $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial-Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial-Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential-Facility Employees $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 $17,886 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Mult Eff-Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 $1,355,517 Water Revenues Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Revenues Residential $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $647 $647 $647 $647 $647 $647 $647 $647 $647 $647 Solid Waste Revenues Printed on: 03/19/2007 Page 1 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal govemmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Revenues Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #1 Revenues Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility #2 Revenues Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Franchise Fees Facility and Employees $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $7 $7 $7 $7 $7 $7 $7 $7 $7 $7 Business License/Occupation Facility and Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 2 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Liquor License Revenues Facility and Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Alcoholic Beverage Tax Facility and Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Income Tax Revenues Facility and Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Revenues from Fines Facility and Employees $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $278 $278 $278 $278 $278 $278 $278 $278 $278 $278 Revenues from Permits Facility and Employees $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $232 $232 $232 $232 $232 $232 $232 $232 $232 $232 Miscellaneous Fees Residential $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Other Fees from Multiplier Effects $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Impact Fees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $656 $656 $656 $656 $656 $656 $656 $656 $656 $656 Salvage Value Development Support $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Transportation $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Municipal $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Solid Waste $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Printed on: 03/19/2007 Page 3 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Benefits $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 $1,357,337 COSTS Support Development $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Transportation Investment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Municipal Investment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Educational Investment $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Operations $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Education Facility Employees $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 $56,515 Public Works Facility Employees $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 $2,312 Recreation/Libraries Facility Employees $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $402 $402 $402 $402 $402 $402 $402 $402 $402 $402 Court System Facility Employees $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Fee Services Facility Employees $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 $3,551 General Government Facility Employees $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Printed on: 03/19/2007 Page 4 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $975 $975 $975 $975 $975 $975 $975 $975 $975 $975 Health Services Facility Employees $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $39 $39 $39 $39 $39 $39 $39 $39 $39 $39 Social Welfare Facility Employees $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $221 $221 $221 $221 $221 $221 $221 $221 $221 $221 Public Safety Facility Employees $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Visitor Security $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 $2,074 Other Visitor Costs Temporary Facilities $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Items Supplied $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Water Costs Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Wastewater Costs Residential $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $876 $876 $876 $876 $876 $876 $876 $876 $876 $876 Printed on: 03/19/2007 Page 5 Project: Aldi INC. Aldi food distribution Facility Report Title: All the Details Community:South Windsor Local municipal governmaet Analysis Level: 3 Year 11 12 13 14 15 16 17 18 19 20 Solid Waste Costs Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Electric Power Production Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#1 Costs Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Other Utility#2 Costs Residential $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Residential Visitor Induced $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Facility $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Commercial Visitor Derived $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Industrial Multiplier Effect $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 Total Costs $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 $66,965 Net Benefits $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 $1,290,372 Present Value of Net Benefits= $11,514,554 Printed on: 03/19/2007 Page 6 Level 3 Analysis Report: Miscellaneous Measures Project: Aldi INC. Desc: Aldi food distribution Facility Community:South Windsor Desc: Local municipal governmaet Annual Employment Resident Facility Employment 4 Non-Resident Facility Employment 71 New Employees Resulting from Multiplier Effect 0 Visitor Induced 0 Total New Employment 75 Estimated New Households from Resident Employees 3 New Households from Multiplier Effect 0 Visitor Induced Households 0 Total Estimated New Households 3 New Pupils From Facility: 5 From Multiplier Effects: 0 Visitor Induced: 0 Annual Income Paid to Resident Employees 140,415 Paid to Non-Resident Employees 2,667,885 Multiplier Effect Income 0 Generated by Visitors 0 Total New Income $2,808,300 Annual Retail Activity Spending by Resident Employees 0 Spending by Non-Resident Employees 0 Facility Retail Purchases 4,928,317 Facility Retail Sales 0 Retail Sales from Multiplier Effect 0 Retail Purchases by Visitors 0 Total New Retail Spending $4,928,317 Annual Service Purchase Activity Purchases of Services by the Facility 0 Purchases of Services by Resident Employees 0 Purchases of Services Due to Multiplier Effects 0 Purchases of Services by Visitors 0 Total New Service Purchases $ 0 New Establishments From Multiplier Effects New Manufacturing Establishments 0.00 New Retail Commercial Establishments 0.00 New Service Companies 0.00 New Wholesale Companies 0.00 Total New Commercial Firms 0.00 Visitor Induced Retail Establishments(Visitor) 0 Recreational Establishments(Visitor) 0 Lodging Establishments(Visitor) 0 Local Transport Firms(Visitor) 0 Business Activity From Multiplier Effects Total Business Revenues(Multiplier Effect) $0 Total Income(Multiplier Effect) $0 Total Manufacturing Revenues(Multiplier Effect) $0 Total Purchases from Service Firms(Multiplier Eff.) $0 Total Purchases from Wholesale Firms(Multiplier) $0 Visitor Activity Number of Visitors to the Facility 0 Duration of Visitor Stays in Days 0.00 Average Daily Expenditures per Person $0.00 Total Visitor Expenditures $0 LOCI Report Printed on: 03/19/2007 NORTHEAST DIVISION P:860/432-1788 i ( P.0.BOX 699 F:860/432-1707 SOUTH WINDSOR,CT 06074 E: swn@aldi.us March 16, 2007 Craig Stevenson Connected to Connecticut, LLC 52 Milwood Road East Hartford, CT 06118 Dear Craig, Pursuant to our conversation, I am clarifying the fleet sizing program of Aldi's selected logistics company for the proposed South Windsor Division. Initially,their plans would be to utilize twelve tractors and thirteen trailers(one being a spare). Within a couple of years,this number would likely increase to roughly sixteen or seventeen of each. At full capacity with 75-80 stores being serviced from this facility,twenty-eight to thirty tractors and approximately thirty-five to forty trailers would be utilized. These figures are determined from current operations in several other Aldi facilities. Exclusive of any unforeseen market factors or technological innovations, it is safe to assume the proposed division's operations would be similar. Please let me know if you need any other information. Sincerely, Bruce Persohn Vice President BP/so C� SOWN Sf4 G U co 7_0� O-P siov� ?d&U&3�-t m � w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�Osoe•Co�� TELEPHONE(860) 644-2511 June 30, 2008 Dan Crist AM King Construction 2115 Rexford Road Suite 314 Charlotte NC 28211 Dear Mr. Crist: Re: Expiring Letters of Credits Appl. #06-60P,Aldi Distribution Center The Planning and Zoning Commission is holding the following Letters of Credit: `PROJECTS BANK AMOUNT EXPIRATION Aldi Distribution Carolina First $50,000.00 6/20/08 Aldi Distribution Northern Trust $1,364,600.00 7/25/08 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one-year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, /Z. du� Michele R. Lipe Assistant Director of Planning MRL/bmm PRE CONSTRUCTION MEETING SIGN IN SHEET NAME----------------------------------- _COMPANY ADDRESS TELEPHONE # r-7d cz, fir-3� C -- - _` #--�-`-- --- •-- lam'✓'.y.- -- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -------- �— _ = - - - -Z`----------------' SOWN SC So R•co 11�� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �O March 29, 2007 TELEPHONE(860) 644-2511 CERTIFIED MAIL 7004 1160 0007 4128 0894 Design Professionals Mr. Peter DeMallie 425 Sullivan Avenue South Windsor, CT 06074 Dear Mr. DeMallie: Re:Appl. 06-06P Aldi Distribution Center Site Plan We are pleased to advise you that the Planning &Zoning Commission voted on March 27, 2007 to approve with modifications, application #06-60P Aldi Distribution Center Site Plan request for a 500,000 sf distribution facility for property located at 295 Rye Street,I Zone as shown on plans by-Design Professionals,Job No 2282,dated 2-2-07 as revised. This approval is subject to the following modifications. 1. Prior to commencement of any site work,a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including bonds in the amount of$100,000 for construction of stormwater controls including the detention basin, $40,000 for wetland and mitigation plantings,and $60,000 for erosion and sedimentation control. - 4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars. S. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 7. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 9. No building permits will be issued until the State Traffic Commission certificate has been issued (per CGS §14- 311). 10. The building street number must be included on the final plan. 11. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 12. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 13. The supplemental evergreen plantings along the northern boundary line,as shown on sheet L3,dated 3/12/07 and submitted at the public hearing on 2/27/07, must be incorporated into the final landscaping plan. 14. The Town Engineer's review comments dated March 20, 2007, and March 27, 2007, must be addressed to the Town Engineer's satisfaction. 15. Tractor-trailer trucks are not allowed to turn left from the site onto Rye Street. A pork chop island must be installed at the exit to channel tractor-trailer trucks to the right,with a narrow passenger vehicle lane that allows passenger vehicles to turn left. Both the entrance median island and the pork chop island must be raised.The radius on the east side of the driveway entrance at Rye Street must be reduced to 50 feet. Signage must be installed to prohibit left turns by trucks.The final driveway design is subject to the Town Engineer's approval. 16. All notes referring to construction"by others"must be removed from the off-site street improvement plans.All road construction plans and specifications must be designed and constructed in accordance with the Public Improvement Specifications of the Town of South Windsor and are subject to the approval of the Town Engineer and the Director of Public Works.The Director of Public Works shall make the final decision on any road design issues,and his decision shall be binding. 17. Rye Street must remain open to at least one lane of traffic, alternating directions, during road reconstruction. 18. A waiver is hereby granted to allow 30-foot and 35-foot light poles as shown on the approved site plan. Outside lighting must be dimmed after 9:00 p.m.within the employee parking area and driveway. 19. A waiver of 287 parking spaces is hereby granted to allow 151 parking spaces. 20. The water tower is limited to maximum twenty(20)feet height. 21. No air horns shall be used on the site. Black and white transparent mylars of Sheets #I1, PI-PS with the above modifications, together with three blueprint copies of the plans must be submitted to this Commission to be stamped and signed. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. Very truly yours, I Patrick Kennedy, Chairman Planning and Zoning Commission Enclosures cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal Board of Education STATE OF CONN ECTICUT MEMBERS . STATE TRAFFIC COMMISSION Commissioner of Transportation DEPARTMENT OF TRANSPORTATION 2800 BERLIN TURNPIKE,P.O.BOX 317546 Commissioner of Public Safety RE E IVF,-.€) NEWINGTON, CT 06 1 3 1-7546 Commissioner of Motor Vehicles Phone: (860)594-3020 Fax: (860)594-2377 APR 1 d 2008 April 15, 2008 SOUTH WINDSOR PLANNING DEPT Mr. Bruce Persohn Vice President ALDI, Inc. 828 Sullivan Avenue P.O. Box 699 South Windsor, CT 06074 Dear Mr. Persohn: Subject: Town of South Windsor ALDI, Inc: We have been advised that a bond has been posted with the Department of Transportation's District 1 Office and with the Town of South Windsor for the above development, and a copy of the recorded Traffic Investigation Report has been forwarded to us. We have also received confirmation that the drainage easements/right-of-way along Rye Street have been secured for the Town of South Windsor. In accordance .with Condition Nos. 15, 16, 18, 19 and 20 of Traffic Investigation Report No. 132-0703-01, approved at the July 17, 2007 meeting of the State Traffic Commission (STC) , enclosed is Certificate No. 903-A. The Certificate will expire two (2) years from the approval date of the aforementioned report unless all conditions and requirements are complied with within that period or permission is requested and obtained from the STC to extend the expiration date. An encroachment permit must be obtained from the Department of Transportation's District 1 Office at 1107 Cromwell Avenue, Rocky Hill, CT 06067, (860)258-4544, prior to performing any work within the state highway right-of-way. An encroachment permit will not be issued until the Certificate has been filed on the land records to satisfy the remainder of Condition No. 20; the STC Office has been provided with evidence of recording (i.e. copy of the recorded Certificate) , and the District Office has reviewed and approved detailed construction plans for the work in the state highway right-of-way. Operation of any portion of the expansion of the facility is prohibited until all conditions of the Certificate have been satisfied, unless permission to do so has been granted by the STC. The STC will consider a request for a partial opening of the development without full compliance with the certificate requirements only if the request and supporting data are received sixty (60) days prior to the anticipated partial opening date. Very e truly yours, ,, ih Robbin L. Cabelus Executive Director Enclosures cc: Lieutenant Richard A. Bond Mr. Christopher J. Dougan - Please see Paragraph No. 3. Please return the enclosed check list to confirm completion of certificate requirements on town roadways. Please confirm completion of other certificate requirements prior to the issuance of any certificates of occupancy by calling the STC Office at (860)594-3020. _Planning and Zoning Commission Mr. James G. Bubaris, P.E. Mr. Lyle Wray STATE OF CONN ECTICUT MEMBERS STATE TRAFFIC COMMISSION Commissioner of Transportation DEPARTMENT OF TRANSPORTATION 2800 BERLIN TURNPIKE,P.O.BOX 317546 Commissioner of Public Safety NEWINGTON,CT 06131-7546 Commissioner of Motor Phone: (860)594-3020 Fax: (860) 594-2377 CERTIFICATE NO. 903-A STC NO. 132-0703-01 APPROVED July 17, 2007 EXPIRES July 16, 2009 ISSUED TO: ALDI, Inc. 828 Sullivan Avenue P.O. Box 699 South Windsor, CT 06074 FOR: ALDI, Inc. Route 194 Town of South Windsor pursuant to Section 14-311 of the General Statutes of Connecticut, as revised, and the Regulations of the State Traffic Commission. The applicant is hereby ordered to comply with the conditions and requirements as set forth in the attached report and plan(s) . Failure to comply with all conditions and requirements will constitute sufficient basis for revocation of the Certificate. NO PERSON SHALL OPERATE THE DEVELOPMENT OR ANY PORTION THEREOF UNTIL SUCH TIME AS THE APPLICANT HAS COMPLIED WITH THE ABOVE UNLESS PERMISSION HAS BEEN REQUESTED AND RECEIVED FROM THE STATE TRAFFIC COMMISSION TO OPERATE PRIOR TO COMPLETION OF THE CONDITIONS AND REQUIREMENTS. THIS CERTIFICATE WILL EXPIRE TWO (2) YEARS FROM THE APPROVAL DATE OF THE ATTACHED REPORT UNLESS ALL CONDITIONS AND REQUIREMENTS ARE COMPLIED WITH WITHIN THAT PERIOD OR PERMISSION IS REQUESTED AND OBTAINED FROM THE STATE TRAFFIC COMMISSION TO EXTEND THE EXPIRATION DATE. Upon due notice from this Commission, this Certificate may be reviewed and modified or revoked in the interest of public safety. A& t, Robbin L. Cabelus Executive Director Date: April 15, 2008 TRA-10 REV 12106 Report By: MRS Date: 06/07 STATE OF CONNECTICUT STC No: 132-0703-01 DEPARTMENT OF TRANSPORTATION Checked By: PJC Date: 06/07 TRAFFIC INVESTIGATION Loc. No: Recommended By: Ak STATE TO THE Approved By STC TRAFFIC COMMISSION See Previous Traffic Investigation Report No. Town of South Windsor JUL 1 7 Date: Requested By: Location: ALDI, Inc. James G. Bubaris, P.E. Route 194(Sullivan Avenue)and Rye Street How Requested: Certificate Application ri Date: March 8,2007 EXECUTIVE DIRECTOR Recommendation(s): In accordance with Section 14-311 of the Connecticut General Statutes, as revised, it is recommended that the State Traffic Commission (STC) issue a certificate to ALDI, Inc. for a 482,685 square-foot gross floor area distribution center with 151 parking spaces, located on Rye Street in the Town of South Windsor stating that the operation thereof will not imperil the safety of the public based on the following conditions: The conditions are based on and referenced to the following plans prepared by Design Professionals entitled: A. "Overall Site Plan, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet 01/01, dated March 28,2007. B. "Signage and Striping Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet SS1/SSl, dated January 25, 2007, revised May 18, 2007. C. "Signage and Striping Plan, Rye Street, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet RS 1/RS2,dated January 24,2007,revised May 18,2007. D. "Signage and Striping Plan, Rye Street, Aldi Distribution Facility, 295 Rye Street, South Windsor,Connecticut,"Sheet RS2/RS2,dated January 24,2007,revised July 5,2007. E. "Sightline Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet SL2/SL3,dated May 15,2007. F. "Sightline Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet SL3/SL3, dated May 15, 2007, revised July 5, 2007 1. That the site driveway on Rye Street be constructed in substantial conformance with the referenced plans. 2. That Route 194 and Rye Street be widened in substantial conformance with the referenced plans. 1 i Town of South Windsor ALDI,Inc. Route 194 (Sullivan Avenue) and Rye Street Traffic Investigation Report No. 132-0703-01 3. That approach grades of the driveways and Town roads along Route 194 affected by the roadway widening noted in this report meet Department of Transportation standards for intersecting streets or not be increased. 4. That all roadway and drainage improvements within the State highway right-of-way be subject to review by the Department of Transportation and all their requirements including those pertaining to maintenance and protection of traffic be satisfied prior to the issuance of a permit for work within the highway right-of-way. 5. That Route 194 be overlaid within the limits of the widening. The extent of the overlay is to be determined by the Department of Transportation's District 1 Office. 6. That all conflicting pavement markings in the area of roadway work be eradicated to the satisfaction of the Department of Transportation. 7. That all work on roadways that are owned and maintained by the Town of South Windsor be performed in conformance with the standards and specifications of the Town. 8. That any cutting, removal or pruning of trees, shrubbery or vegetation situated partially or wholly within the limits of the State highway right-of-way be in accordance with Department of Transportation Regulations. 9. That intersection sight distance of Rye Street and the intersection sight distances of the driveways along Route 194 affected by the roadway widening, be provided as shown on the referenced plans. 10. That the intersection sight distances of the site driveway and the intersection sight distance of the driveway along Rye Street affected by roadway widening noted in this report,be provided as shown on the referenced plans. 11. That a traffic signal be installed on Route 194 at Rye Street. 12. That signs and pavement markings on Route 194, Rye Street and within the site driveway be installed and maintained in substantial conformance with the referenced plans, and in accordance with the "Manual on Uniform Traffic Control Devices,"latest edition. 13. That all pavement markings installed on State roads be of epoxy material, or of a material as directed by the Department of Transportation. 14. That all utility relocations in the State highway right-of-way be at no cost to the State and in accordance with"A Policy on the Accommodations of Utilities on Highway Rights-of-Way." 15. That property on Rye Street be deeded for highway purposes, to the Town of South Windsor, at no cost, as indicated on the referenced plans prior to the issuance of a certificate. 2 Town of South Windsor ALDI,Inc. -Rye Street Traffic Investigation Report No. 132-0703-01 16. That appropriate drainage easements on Rye Street be secured for the Town of South Windsor, at no cost,prior to the issuance of a certificate. 17. That an encroachment permit be obtained from the Department of Transportation's District 1 Office prior to performing any work within the State highway right-of-way. The permit forms must include the applicable detailed construction plans. 18. That prior to the issuance of a Certificate, a bond be posted and maintained in the amount of $862,000 to cover the costs of satisfying the conditions of this report. Upon submission of the final design plans, the dollar amount of this bond may be adjusted either upward or downward during the encroachment permit review process. 19. That prior to the issuance of a Certificate, a bond be posted and maintained with the Town of South Windsor to cover the costs of the work required on Rye Street. 20. That prior to the issuance of a Certificate, a copy of this report be recorded on the municipal land records in accordance with the attached procedure. A copy of the Certificate shall be recorded on the land records upon issuance. 21. That the STC reserves the right to require additional improvements or changes, as deemed necessary, due to the development's traffic in the future. The cost of any additional improvements or changes shall be borne by the owner of the development. Mr. James G. Bubaris, P.E., the applicant's authorized representative, concurred with the above recommendations on July 9, 2007. Police Commander Thomas Hart, representing Chief Gary K. Tyler, the Legal Traffic Authority for the Town of South Windsor, concurred with the above recommendations on July 9,2007. 1 3 Report of Findings Town of South Windsor-ALDI,Inc. Route 194(Sullivan Avenue)and Rye Street 1 Traffic Investigation Report No. 132-0703-01 Site: The proposed development is a 482,685 square-foot distribution center with 151 parking spaces located on the north side of Rye Street approximately 2,300 feet north of Route 194 (Sullivan Avenue). The facility will consist of a truck distribution center with associated loading docks, offices and truck storage. Access will be provided via a single median divided stop controlled driveway on Rye Street. Generated Traffic: The development is expected to generate 256 trips during the morning peak hour (210 entering, 46 exiting) and 235 trips during the afternoon peak hour (59 entering, 176 exiting). The site is expected to generate 240 truck trips per workday. The Bureau of Policy and Planning has reviewed and approved the submitted volumes. Division of Traffic Engineering Comments: To accommodate the additional traffic generated by the development, particularly large trucks, the applicant has proposed the widening of Route 194 and Rye Street to provide an eastbound left-turn lane, revise the intersection's geometry to adequately accommodate turning movements by tractor-trailers as well as provide signalization. To accomplish the improvements to the town leg of the intersection, the applicant is acquiring property and drainage easements along the west side of Rye Street just north of Route 194. The widening will also require relocation of several utility poles along Route 194. The applicant's engineer has provided traffic count projections and analysis indicating that traffic volume warrants for signalization of the intersection are satisfied. In addition to the above, the applicant is proposing a widening of Rye Street at the site driveway to provide a left-turn lane on the northbound approach. The planning and zoning approval by the Town of South Windsor required site driveway geometry that will restrict exiting trucks to right turns onto Rye Street, thereby directing site truck traffic to Route 194. Conclusion• The roadway improvements recommended in this report should adequately accommodate site traffic added to Rye Street and Route 194 and are acceptable to the Department and the Town of South Windsor. i 4 ....... 3 SITE East Windsor Hill In. two h Exhibit 1 Location Map Proposed Distribution Center South Windsor, Connecticut Buhans ��:Traffi James G. Bubaris P. E. A S S O C I A T E S ' Principal Planning Engineering Design May 23, 2006 Mr. Brian T. King, Principal A.M. King Construction Company RECEIVED 2115 Rexford Road, Suite 314 ' Charlotte, NC 28211 DEL 0 1 2006 RE: SITE TRAFFIC EVALUATION STUDY SOUTH WINDSOR PLANNING DEPT. ' PROPOSED DISTRIBUTION CENTER RYE STREET, NORTH SIDE,WEST OF TROY ROAD SOUTH WINDSOR, CONNECTICUT Dear Mr. King: Reference is made to the proposal to develop a 500,000 square-foot distribution center on the parcel of land located on the north side of Rye Street, west of Troy Road, in the Town of South Windsor, Connecticut. Introduction The parcel of land located on the north side of Rye Street west of Troy Road and will consist of a truck distribution center with a building area of about 500,000 square feet and a parking area to serve about 240 vehicles. Access and egress ' for this development will be provided via a new site drive intersecting the north side of Rye Street. ' Section 13-311 of the Connecticut General Statutes stipulates that all developments that either abut or materially impact a State highway, and that have development parameters that either exceed 100,000 square feet of building ' area or 200 parking spaces, require the issuance of a Certificate of Operations from the State Traffic Commission (STC). ' Although the subject development does not directly abut a State highway, its site-generated traffic will directly impact Sullivan Avenue (Connecticut Route 194) to the south, and its development parameters of 500,000 SF of building ' area and 240 parking spaces exceed the STC thresholds. Therefore, as part of the review and approval process for this development, a Certificate Application, ' with the required supporting data, will need to be submitted to the State Traffic Commission for its review and approval. Plans are to begin construction of this development in 2007 and to have it fully developed and occupied by 2008, or 2 years from now. 288 Highland Avenue • Cheshire, CT 06410 • Telephone: 203-272-0400 • Fax: 203-272-5655 •bubaris.trafficasbcglobal.nat• ! 2 1 Background Conditions ' Given the nature of this development and the manner in which it will interface with the surrounding roadway network, the selected study area for the proposed development consists of the following intersections shown in the location map ' included as Exhibit 1 of the Appendix: • U.S. Route 5 (John Fitch Boulevard) at Route 194 (Sullivan Avenue): This is ' a 4-way, signalized intersection with Route 5 running north-south, Sullivan Avenue as the west leg, and Route 194 (Sullivan Avenue) as the east leg. The Route 5 northbound approach is four lanes wide, with one left turn lane, ' two through lanes, and a right turn lane. The Route 5 southbound approach is four lanes wide, with two left turn lanes, a through lane, and a combination through and right turn lane. The Sullivan Avenue eastbound approach is one ' lane wide. The Route 194 (Sullivan Avenue) westbound approach is three lanes wide, with one left turn lane, one combination left turn and through lane, and one right turn lane. The traffic signal is part of an interconnected ' signal system operating along U.S. Route 5 to provide synchronized signal operation along the corridor. The traffic signal at this intersection provides four vehicular phases. The first phase is a northbound/southbound phase on Route 5 to move the left turns onto both legs of Sullivan Avenue. The second I! phase moves all the through and right turn movements from the northbound and southbound approaches of Route 5. The third phase moves the Route 194 (Sullivan Avenue) westbound approach which has a double left turn movement onto Route 5. The fourth phase moves the Sullivan Avenue eastbound approach. All approaches are vehicular-actuated. ' • Route 194 Sullivan Avenue at Commerce Wa . This is a 3-way, unsignalized intersection with Sullivan Avenue running east-west and ' Commerce Way as the north leg. The Sullivan Avenue eastbound approach is two lanes wide, with one lane for left turns, and the other lane for through movements. The Sullivan Avenue westbound approach is two lanes wide, with one lane for through movements, and the other lane for right turns. The Commerce Way southbound approach is one lane wide and is controlled by a ' Stop sign. • Route 194 (Sullivan Avenue) at RyeStreet: This is a 3-way, unsignalized ' intersection with Sullivan Avenue running east-west and Rye Street intersecting at a skew as the north leg. Both the Sullivan Avenue eastbound and westbound approaches are one lane wide, as is the Rye Street ' southbound approach to the intersection. The Rye Street approach is controlled by a Stop sign. ' 3 ' Rye Street at Commerce Way: This is a 3-way, unsignalized intersection with Rye Street running north-south and Commerce Way as the west leg. Both ' the Rye Street northbound and southbound approaches are one lane wide, as is the Commerce Way eastbound approach to the intersection. The Commerce Way eastbound approach is controlled by a Stop sign. ' Rye Street at Proposed Site Drive: This will be a 3-way, unsignalized intersection with Rye Street running north-south and the proposed site drive ' as the west leg. Both the Rye Street northbound and southbound approaches will be one lane wide, and the proposed site drive will have a one-lane wide exiting eastbound approach controlled by a Stop sign. • Rye Street at Troy Road: This is a 3-way, unsignalized intersection with Rye Street running north-south and Troy Road as the east leg. Both the Rye ' Street northbound and southbound approaches are one lane wide, as is the Rye Street westbound approach to the intersection. The Troy Road westbound approach is controlled by a Stop sign. ' Route 194 (Sullivan Avenue) at Troy Road: This is a 3-way, signalized intersection with Sullivan Avenue running east-west and Troy Road as the ' north leg. The Sullivan Avenue eastbound approach is two lanes wide, with one left turn lane and one through lane. The Sullivan Avenue westbound approach is one lane wide and serves as a combination through and right ' turn lane. The Troy Road southbound approach is one lane wide for both left turns and right turns. The traffic signal provides three vehicular phases. The first phase is an eastbound advance to allow Sullivan Avenue left-turning ' traffic an opportunity to turn onto Troy Road. The second phase moves all movements eastbound and westbound on Sullivan Avenue. The third phase moves Troy Road southbound approach traffic onto Sullivan Avenue. All ' approaches are vehicular-actuated. Background Traffic Volumes ' A review was made of information provided b p y the Connecticut Department of Transportation (ConnDOT) to determine the latest recorded traffic volumes on roadways within the defined study area as shown on the next page in Table 1 for 2004. Manual turning movement counts were conducted at all of the existing study intersections in early-April 2006 for the purpose of developing background traffic volume and traffic distribution estimates. 4 ' Table 1 Summary of Traffic Volumes ' ConnDOT, 2004 Roadway AM Peak PM Peak Average ' Segment Hour Hour Daily U.S. Route 5 north of Sullivan Avenue: 1,400 1,650 16,500 U.S. Route 5 south of Sullivan Avenue: 1,400 1,500 15,600 Sullivan Avenue west of U.S. Route 5: 92 150 1,700 ' Sullivan Avenue east of U.S. Route 5: 950 1,275 13,500 Sullivan Avenue east of Rye Street: 850 950 10,300 ' Sullivan Avenue west of Troy Road: 650 1,050 11,200 Sullivan Avenue east of Troy Road: 962 1,244 13,100 Please refer to Exhibits 2 and 3 of the Appendix that represent the existing 2006 weekday commuter am and pm peak hour traffic volumes derived from the foregoing traffic counting exercise. Please refer to Exhibits 4 and 5 of the Appendix that represent the background 2008 weekday commuter am and pm peak hour traffic volumes when it is anticipated that the proposed development will be fully occupied. Exhibits 4 and 5 were developed by applying a 2 percent per year expansion factor to the existing traffic volumes shown in Exhibits 2 and 3 for two years, or expanded-by a factor of 1.04 (i.e., a 4 percent increase over existing 2006 levels). Additionally, following a discussion with the Town Director of Planning and the Town Engineer, the site-generated traffic volumes associated with the approved, but yet to be developed, South Windsor Technologies Center, were also added to the 2008 background traffic volumes under the assumption that this development will be fully occupied by 2008. The South Windsor Technologies Center is approved to be developed on the parcel of land located to the south of ' the existing termini of Patria Road and Schweir Road, south of Sullivan Avenue, to be subdivided to allow the development of a series of office, warehousing, and light-industrial buildings within an industrial park setting. In total, it is estimated ' that the total development will consist of 200,000 square feet of building area and 305 parking spaces. III ' I ' I ' 5 ' Please refer to Exhibits 6 and 7 of the Appendix that represent the background 2008 weekday commuter am and pm peak hour traffic volumes with the inclusion of the site-generated traffic volumes associated with the South Windsor Technologies Center. Exhibits 6 and 7 were derived by adding the site-generated am and pm peak hour traffic volumes for the South Windsor Technologies ' Center to the 2008 weekday commuter am and pm peak hour traffic volumes shown in Exhibits 4 and 5. Site-Generated Traffic For the purpose of estimating site-generated traffic volumes associated with the ' subject development, we compared two available sources to develop estimates, and then used the higher of the two estimates to provide a conservative, high-side analysis. ' The first source was the trip generation data made available for this purpose, by land use, in Trip Generation Report, by the Institute of Transportation Engineers (ITE), seventh edition, 2003. Please refer to Exhibit 8 of the Appendix that summarizes the trip generation calculations that were made utilizing ITE Land Use Code #150 for warehousing facilities (based on building area) which is the closest ' land-use to the one proposed. A trip is defined as a one-way vehicular movement traveling either to or from the proposed development. ' The second source was based on the client's data showing the intended use of the facility in the way of employees, supply trucks and shipping trucks traveling to and from the site. A total of 120 employees, 60 supply trucks and 60 shipping trucks are proposed to travel to and from the site on a daily basis. Please refer to Table 2 on the next page which summarizes both the ITE and the ' client's data which, when compared, are relatively the same, with one having a higher am estimate and the other having a higher pm estimate. To provide a conservative analysis, the higher of each was used, showing a weekday am peak ' hour estimate of 260 vehicles per hour and a weekday pm peak hour estimate of 240 vehicles per hour. For the purpose of estimating the likely distribution of site-generated traffic for the subject development, we utilized the journey-to-work data that is made available from the document entitled Connecticut Town Profiles published by the ' Connecticut Department of Economic and Community Development (CDECD). It has been assumed that employees of the proposed facility, which constitute the highest segment of site-generated traffic during the weekday commuter peak ' periods, will continue to follow the same journey-to-work trends as currently exist and are documented in the aforementioned CDECD source. TABLE 2 SUMMARY OF TRIP GENERATION CALCULATIONS PROPOSED DISTRIBUTION CENTER RYE STREET SOUTH WINDSOR, CONNECTICUT USE OF ITE DATA CLIENT'S DATA DATA WAREHOUSE SUPPLY SHIPPING USED ITE CODE#150 EMPLOYEES TRUCKS TRUCKS FOR (500,000 SF) (120) (60) (60) TOTALS STUDY AM PEAK IN 214 120 60 --- 180 214 HOUR OUT 47 0 60 = 60 47 TOTAL 260 120 120 0 240 260 PM PEAK IN 58 0 - 60 60 60 HOUR OUT 174 120 _ 60 180 180 TOTAL 233 120 0 120 240 240 BUBARIS TRAFFIC ASSOCIATES / ( MAY 2006 6 iPlease refer to Table 3 below and Table 4 on the next page that summarize the journey-to-work data and provides an estimate on how these journeys, or trips in traveling to and from the subject development, will be distributed on the ' surrounding roadway network. ' Please refer to Exhibit 9 of the Appendix for a graphical representation of these distributions as summarized below in Table 3. Table 3 Summary of Site-Generated Traffic Distributions ' To and from the north via Route 5: 6% To and from the north via Rye Street: 2% To and from the east via Route 194: 58% ' To and from the south via Route 5: 34% ' Please refer to Exhibits 10 and 11 of the Appendix that represent the site- generated traffic volumes that can be expected during the weekday am and pm commuter peaks by 2008 with the proposed development in place. Exhibits 10 ' and 11 were developed by multiplying the site-generated traffic volumes shown in Table 2 on the previous page, by the site-generated traffic distributions shown in Exhibit 9 of the Appendix and Table 3 above. Operations Analysis 2006 existing weekday am and pm commuter peak analyses, representing existing conditions, are based on the peak hour traffic volumes shown as Exhibits 2 and 3 of the Appendix. 2008 background (no-build) weekday am and pm commuter peak analyses, representing no-build conditions in the year when the proposed development is expected to open for use, are based on the peak hour traffic volumes shown as Exhibits 6 and 7 of the Appendix. ' 2008 combined (build) weekday am and pm commuter peak analyses, representing conditions when the proposed development is expected to be open for use, are based on the peak hour traffic volumes shown as Exhibits 12 and 13 of the Appendix. Exhibits 12 and 13 were developed by combining the background (no-build) peak hour traffic volumes from Exhibits 6 and 7 with the site-generated traffic volumes from Exhibits 10 and 11. TABLE 4 JOURNEY TO WORK DATA FROM 2000 CENSUS SOUTH WINDSOR EMPLOYMENT JOURNEY-TO-WORK DATA TO/FROM TO/FROM TO/FROM PERCENT EAST SOUTH NORTH NUMBER OF OF VIA VIA VIA FROM DESTINATION VEHICLES TOTAL ROUTE 194 ROUTE 5 ROUTE 5 SOUTH WINDSOR SOUTH WINDSOR 2327 32.2% 24.0% 8.2% VERNON SOUTH WINDSOR 591 8.2% 8.2% EAST HARTFORD SOUTH WINDSOR 793 11.0% 11.0% MANCHESTER SOUTH WINDSOR 931 12.9% 12.9% HARTFORD SOUTH WINDSOR 605 8.4% 4.2% 4.2% ENFIELD SOUTH WINDSOR 606 8.4% 8.4% WEST HARTFORD SOUTH WINDSOR 312 4.3% 4.3% EAST WINDSOR SOUTH WINDSOR 354 4.9% 4.9% ELLINGTON SOUTH WINDSOR 410 5.7% 2.8% 2.9% GLASTONBURY SOUTH WINDSOR 295 4.1% 2.0% 2.1% TOTAL 7224 100.0% 58.4% 33.9% 7.8% CALL: 5$% 34.0% 8.0% SOURCE: "CONNECTICUT TOWN PROFILES"BY STATE OF CONNECTICUT DEPARTMENT OF ECONOMIC AND COMMUNITY DEVELOPMENT,2005 Bubaris Traffic Associates May 2006 7 ' Intersection operational analyses were performed for the study intersections utilizing the methodology described in the latest edition of Highway Capacity Manual, Special Report 209, Transportation Research Board, 1985, updated to ' 2000. Application of this methodology was facilitated by use of Synchro Analysis Software, developed by the Trafficware Corporation, Version 7, 2004. Operational analyses are utilized to determine a Level of Service (LOS) for a given intersection operating under either signalized or unsignalized control. In the case of signalized intersections similar to the signalized intersections along Route 194 including Route 5, Level of Service (LOS) is defined in terms of control delay, which is a measure of driver discomfort, frustration, increased fuel consumption, and lost of travel time. The delay experienced by a motorist is comprised of a number of factors that relate to control, geometric, traffic, and incidents. Total delay is the difference between the travel time actually ' experienced and the reference travel time that would result during base conditions in the absence of traffic control, geometric delay, any incidents, and any other vehicles. Specifically, LOS criteria for traffic signals are stated in terms of the average control delay per vehicle, typically for a 15-minute analysis period. Delay is a complex measure and depends on a number of variables, including the quality of progression, the cycle length, the green ratio, and the volume-to- capacity (v/c) ratio for the lane group. In the case of signalized intersections, the Level of Service for each approach is computed, and an overall Level of Service for the entire intersection is determined. In today's environment, Levels of ' Service C to D are considered acceptable, and Levels of Service A to B are seldom achieved at signalized intersections. Please refer to Exhibit 14 in the Appendix, which provides details on the definitions of Levels of Service for signalized intersections. In the case of unsignalized intersections similar to the intersections along Rye Street including the proposed site drive intersection, Level of Service (LOS) is defined in terms of the average control delay for the approach or movement evaluated. Control delay involves movements at slower speeds and stops on intersection approaches as vehicles move up in the queue or slow down upstream of an intersection. The delay experienced by a motorist is comprised of factors that relate to control, geometrics, traffic, and incidents. Total delay is the ' difference between the travel time actually experienced and the reference time that would result during base conditions in the absence of incident, control, traffic, or geometric delay. Control delay includes initial deceleration delay, ' queue move-up time, stopped delay, and final acceleration delay. At two-way stop-controlled and all-way stop-controlled intersections, control delay is the total elapsed time from a vehicle joining the queue until its departure from the stopped ' position at the head of the queue. The control delay also includes the time required to decelerate to a stop and to accelerate to the free-flow speed. Level of Service for a one-way or two-way stop-controlled intersection is determined by 1 8 r ' the computed or measured control delay and is defined for each minor movement. LOS for a one-way or two-way stop-controlled intersection is not ' defined for the intersection as a whole. In today's environment, Levels of Service D to F are common and are often experienced on minor street approaches to major streets carrying relatively high traffic volumes. Please refer to Exhibit 15 in the Appendix, which provides details on the definitions of Levels of Service for unsignalized intersections. The results of the operational analyses, which compare 2006 existing, 2008 background (no-build), and 2008 combined (build) conditions, are summarized in Table 5 on the next page of this study. rThe computer-generated worksheets for these operational analyses are included as Exhibits 16 through 23 of the Appendix as follows: • Exhibit 16 —2006 Existing AM Peak • Exhibit 17 —2006 Existing PM Peak • Exhibit 18 —2008 Background AM Peak • Exhibit 19 —2008 Background PM Peak • Exhibit 20 —2008 Background AM Peak (with S.W. Technologies Center) ' Exhibit 21 —2008 Background PM Peak (with S.W. Technologies Center) • Exhibit 22 —2008 Combined AM Peak • Exhibit 23 —2008 Combined PM Peak ' A review of Table 5 shows that levels of service in the year 2008 when full development is expected to be in place will remain at virtually the same levels as ' would otherwise exist without this development, with one exception. ' The signalized intersection of Route 5 at Sullivan Avenue/Route 194 will remain at overall level of service C, which is an average level of service. The signalized intersection of Sullivan Avenue at Troy Road will remain at overall level of service B for the am peak, and change from overall level of service A to B during the pm peak, which is a very good level of service. ' All but one of the unsignalized intersections within the defined study area, including the proposed site drive intersection on Rye Street, will remain at levels of service ranging from LOS A (considered very good) to LOS D (considered fair) for the critical movements associated with unsignalized traffic control. ' The unsignalized intersection of Sullivan Avenue at Rye Street will experience critical movement levels of service ranging from LOS A (considered very good) on Sullivan Avenue to LOS F (considered poor) for the outbound movements r Table 5 ' Summary of Operational Analyses Proposed Distribution Center Rye Street South Windsor,Connecticut ROUTE 5 AT ROUTE 194 20M 2008 2008 BACKGROUND 2008 COMBINED EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER AM PM AM PM AM PM AM PM EASTBOUND D D D D D D D - D-WESTBOUND C C C C D C D C NORTHBOUND B B B C B C B C SOUTHBOUND C C D C D C D C OVERALL C C C C C C C C DELAY 30.1 23.3 31.3 24.2 31.5 24.2 32 27.9 ' ROUTE 194 AT COMMERCE WAY 2006 2008 2008 BACKGROUND 2008 COMBINED EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER AM PM AM PM AM PM AM PM EASTBOUND A A A A A A A A SOUTHBOUND C C C C C C D D AVERAGE DELAY 1 1.7 1 1.8 1.1 1.9 1.1 2.1 ROUTE 194 AT RYE STREET 2008 COMBINED 2006 2008 2008 BACKGROUND 2008 COMBINED WITH SW TECHNOLOGIES CENTER EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER (SIGNALIZED) AM PM AM PM AM PM AM PM AM PM EASTBOUND A A A A A A A A A B WESTBOUND C B SOUTHBOUND C C C C C D F F B C OVERALL B B AVERAGE DELAY 5.2 4.2 5.4 4.5 5.4 4.8 19.2 119.6 15.4 16.8 ' RYE STREET AT COMMERCE WAY 2006 2008 2006 BACKGROUND 2008 COMBINED EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER EASTBOUND AB B B B AB B AB B NORTHBOUND A A A A A A A A AVERAGE DELAY 0.6 0.9 0.6 0.9 0.6 0.9 0.6 0.9 RYE STREET AT SITE DRIVE 2006 2008 2008 BACKGROUND 2008 COMBINED ' -EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER AM EASTBOUND I'M AM PM AM PM AM PM NORTHBOUND - - - - B A - - A A AVERAGE DELAY - - - - - - 4 4.1 RYE STREET AT TROY ROAD 2006 2008 2008 BACKGROUND 2008 COMBINED EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER AM PM AM I'M AM PM AM PM WESTBOUND A B A B A B A B SOUTHBOUND A A A A A A A A AVERAGE DELAY 2.2 3 2.2 3 2.2 3 2.2 3 ROUTE 194 AT TROY STREET 2006 2008 2008 BACKGROUND 2008 COMBINED EXISTING BACKGROUND WITH SW TECHNOLOGIES CENTER WITH SW TECHNOLOGIES CENTER AM PM AM PM AM PM AM PM EASTBOUND A A A A A A A A WESTBOUND B B B B B B C B SOUTHBOUND C C C C C C C C OVERALL B A B A B A B B AVERAGE DELAY 12.6 9.2 12.8 9.5 14.4 9.8 17.3 10.4 Bubaris hartic Associates May 2006 9 r from Rye Street. However, signalization of the Sullivan Avenue at Rye Street intersection would achieve overall levels of service B for this intersection. Therefore, the proposed development will not have an adverse impact on traffic operations that would otherwise exist within the defined study area without the subject development with the exception of the intersection of Sullivan Avenue at Rye Street. Sight Line Evaluation Sight lines from the proposed site drive on Rye Street were evaluated utilizing ' the guidelines set forth by the Connecticut Department of Transportation. These sight lines were measured from a viewing height of 3.5 feet above the proposed site drive grade, to an object height of 3.5 feet above the major street grade in either direction, from a viewing point 15 feet back of the nearside edge of pavement of the major street. Automatic traffic recorder measurements were conducted on Rye Street in the vicinity of the proposed site drive to measure approaching traffic speeds by direction on an hourly basis over a 48-hour period. A review of the tabular summaries of these traffic speed measurements are included as Exhibit 24 of the Appendix and summarized below in Table 6: Table 6 Summary of Traffic Speed Measurements Rye Street Speed Parameter Northbou nd Southbound -Average Speed: 42 mph 42 mph 85 nPercentile Speed: 50 mph 49 mph ' Posted Speed Limit: 35 mph 35 mph -Suggested Minimum Sight Distance: 555 feet 555 feet Available Sight Distance: 700 feet 700 feet Prevailing travel speeds (i.e., 85 thpercentile speeds) in the vicinity of the proposed site drive on Rye Street were measured at 50 miles per hour northbound and 49 miles per hour southbound suggesting sight line distances of 555 feet. Available sight lines were found to be 700 feet in either direction and therefore found to be satisfactory. 10 Accident Experience A review was made of the most recent three-year accident experience summary for the subject study area as compiled by the Connecticut Department of Transportation for the period from October 2002 through September 2005 and summarized in Exhibit 25 of the Appendix. A review of Exhibit 25 shows that all locations within the defined study area, with the possible exception of Route 5 at Route 194, have experienced favorable accident experiences, with no recurring problems requiring correction, or that may be exacerbated by the proposed development. The intersection of Route 194 at Rye Street showed only11 accidents during this 9 3-year period and only one accident for the entire length of Rye Street. ' Conclusions It is the professional opinion of Bubaris Traffic Associates that the proposed distribution facility, to be located on the north side of Rye Street west of Troy Road with access/egress via one site drive on Rye Street, should not adversely impact traffic operations on the surrounding roadway network in the year 2008 when full development of the parcel is expected to be completed and occupied. The proposed development will consist of a 500,000 square-foot building with 240 parking spaces generating from 240 to 260 trips per hour during the weekday am and pm peak commuter periods. Operational analyses indicate that the proposed development will not alter the satisfactory levels of service that would otherwise be in place without introduction of site-generated traffic traveling to and from this site, with the exception of the intersection of Sullivan Avenue at Rye Street. Available sight lines from the one proposed access/egress point on Rye Street are excellent. The accident experience for the subject study area is satisfactory, with no recurring problems that need to be corrected, or that may be exacerbated by the proposed development. 11 Improvements in either geometrics or traffic control are not deemed necessary to accommodate the site-generated traffic volumes to be added to the surrounding roadway network by the proposed development, with the exception of the possible signalization of the intersection of Sullivan Avenue at Rye Street following a review of this project by the State Traffic Commission as part of its Certificate Application approval process. Very truly yours, `',``,`►�ti►tONu�i„''''/'' BUBARIS TRAFFIC ASSOCIATES No.9203 James G. Bubaris, P.E. °90�..4�CENs�a. \��``�� Conn. Reg. No. 9203 SS/oNAJ���,. Principal 1 x Z W a a Q SITE TRAFFIC EVALUATION STUDY PROPOSED DISTRIBUTION CENTER RYE STREET SOUTH WINDSOR, CONNECTICUT APPENDIX TABLE OF CONTENTS Exhibit 1 — Location Map Exhibit 2 —2006 Existing AM Peak Hour Traffic Volumes rExhibit 3 —2006 Existing PM Peak Hour Traffic Volumes Exhibit 4 —2008 Background AM Peak Hour Traffic Volumes Exhibit 5 —2008 Background g d PM Peak Hour Traffic Volumes Exhibit 6 —2008 Background AM Peak Hour Traffic Volumes (With South Windsor Technologies Center) Exhibit 7 —2008 Background PM Peak Hour Traffic Volumes (With South Windsor Technologies Center) Exhibit 8 —Summary of Trip Generation Calculations Warehousing- ITE Code#150 tExhibit 9 — Site Generated Traffic Distributions Exhibit 10—Site Generated AM Peak Hour Traffic Volumes Exhibit 11 —Site Generated PM Peak Hour Traffic Volumes Exhibit 12 —2008 Combined AM Peak Hour Traffic Volumes Exhibit 13 —2008 Combined PM Peak Hour Traffic Volumes (Continued) (Continued) Exhibit 14 — Definitions of Levels of Service Signalized Intersections Exhibit 15 — Definitions of Levels of Service Unsignalized Intersections Exhibit 16 —Operational Analysis Worksheets 2006 Existing AM Peak Hour Traffic Exhibit 17— Operational Analysis Worksheets 2006 Existing PM Peak Hour Traffic Exhibit 18 —Operational Analysis Worksheets ' 2008 Background AM Peak Hour Traffic Exhibit 19 —Operational Analysis Worksheets 2008 Background PM Peak Hour Traffic Exhibit 20 —Operational Analysis Worksheets 2008 Background AM Peak Hour Traffic (With South Windsor Technologies Center) Exhibit 21 —Operational Analysis Worksheets 2008 Background PM Peak Hour Traffic (With South Windsor Technologies Center) Exhibit 22 — Operational Analysis Worksheets 2008 Combined AM Peak Hour Traffic (With South Windsor Technologies Center) Exhibit 23 —Operational Analysis Worksheets 2008 Combined PM Peak Hour Traffic (With South Windsor Technologies Center) Exhibit 24 —Automatic Traffic Recorder Counts Rye Street at Site Drive Exhibit 25 — Summary of Accident Experience '"7FgRRD MIDIILET.►ty////�/�///// , // '///////// '//� g } (y NI 4 i East Windsor SITE X� Hill N a Exhibit 1 Location Map Proposed Distribution Center South Windsor, Connecticut m m m m = m m m m m PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 259 77 16 1 6 , N 1 t 48 13 NOTE:DRAWING NOT TOO SCALE TROYROAD 265 SITE 64 19 246 , 1 ROUTES 1OMMERCE 2 WAY 6 15 62 11 753 237 L 350 21 11 239 18 58 68 1 ♦— 26 329j 4 68a 461 ROUTE 194 602 ROUTE 194 24 18 I ♦ y,1► 44 16 1 32 59 __J 23 J 29 —+ 5 357 171 404 356 —► 289 —� 4 ROUTE 5 EXHIBIT 2 2006 EXISTING AM PEAK HOUR TRAFFIC VOLUMES PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 259 77 1 16 6 Tt 48 13 SITE 265 TROYROAD NOTE:DRAWING NOT TOO SCALE 1 64 19 246 1 RO TE 5 r 2 6 15 62 11 753 237 350 21 11 1 26 239 18 ♦ 58 68 329 `--- 18 + L l♦ 44 16 32 59 29 5 357 171 404 -► 356 23 4 289 -� ROUTES EXHIBIT 2 2006 EXISTING AM PEAK HOUR TRAFFIC VOLUMES PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 76 43 t 1 �► 5 5 1 217 14 NOTE:DRAWING NOT TOO SCALE TROYROAD 81 SITE I 231 3 78 RO TE 5 MMERCE 19 WAY 9 1 212 4 387 304 1 297 76 15 78 19 27 76~ 40 �. 22`0 ( 10 23 � 123 366 25 I 27 yy� 190 --J 81 �J 51 5 610 303 631 456 568 -� 4 ROUTE 5 EXHIBIT 3 2006 EXISTING PM PEAK HOUR TRAFFIC VOLUMES m m m m m � m ' M m � m ow' m m: m m PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 1 264 79 L I 16 1y 6 N r 1 49 13 NOTE:DRAWING NOT TOO SCALE TROYROAD 270 SITE 65 19 251 RO TE 5 r r CE 2 6 15 63 11 768 242 L 357 21 11244 18 59 69 27 336 18 � it4:::: ,� -4 — J 16 r 33 -J 60 -JI' 23 30 5 364 174 412 363 295 -► 4 ROUTE 5 EXHIBIT 4 2008 BACKGROUND AM PEAK HOUR TRAFFIC VOLUMES ,� mom = `� M =1 m m m m m m m m = PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYESTREET 194 79 45 L I 5 ly 5 AA�� IY 226 15 NOTE:DRAWING NOT TOO SCALE TROYROAD l 84 SITE !' 1 f 1 240 3 81 RO TE 5 rWA 20 41 9 1 220 4 402 316 309 79 1681 20 28 79 42 1 229 24 128 26 `►__J 28 y_ J 198 84 53 5 634 315 656 474 -► 591 -► 4 ROUTES EXHIBIT 5 2008 BACKGROUND PM PEAK HOUR TRAFFIC VOLUMES <= m m = i M MI m m M EW = M PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 264 79 L 16 ♦I ly 6 N 1 t 49 13 NOTE:DRAWING NOT TO SCALE TROYROAD 270 SITE f I 65 19 251 ROUTE 5 [24 RCE 2 Y 6 15 63 11 768 251 ♦ 359 21 11 244 18 59 69 1 27 I 349j � 4__ 18 y 45 O ROUTE 194 16 ♦ 1 4 - 33 -? 60 _? 23 30 -/ 5 364 234 481 432 314 -� 4 ROUTES EXHIBIT 6 2008 BACKGROUND AM PEAK HOUR TRAFFIC VOLUMES (WITH SOUTH WINDSOR TECHNOLOGIES CENTER) w w w �w w ww w w w w w w w w w w w w w PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 79 45 94 Iy 5 N T � t 226 15 NOTE:DRAWING NOT TOO SCALE TROYROAD I 84 SITE f I 240 3 81 ROUTE 5 T [WA RCE 20 9 1 220 4 402 318 � 309 79 1681 20 28 79 �-- 42 �Ir 229j 566 I 24 128 y5o6 ROUTE 194 402ROUTE J" 26 T 28 198 - 84 53 -11� 5 634 330 673 491 -♦ 674 --� 4 ROUTE 5 EXHIBIT 7 2008 BACKGROUND PM PEAK HOUR TRAFFIC VOLUMES (WITH SOUTH WINDSOR TECHNOLOGIES CENTER) 04/26/2006 ' WAREHOUSING• (2003) ' EXHIBIT 8 ' SUMMARY OF TRIP GENERATION CALCULATIONS ' SOURCE: TRIP GENERATION REPORT,INSTITUTE OF TRANSPORTATION ENGINEERS,1997 LAND USE:WAREHOUSING-CODE#150 PROJECT: PROPOSED DISTRIBUTION CENTER RYE STREET,SOUTH WINDSOR,CT NUMBER OF 1,000'8 SQUARE FEET AREA: 500.000 ' TOTAL TIME PERIOD ITE TRIP GENERATION EQUATION TRIPS INBOUND OUTBOUND ' AVERAGE T=3.68(X)+350.27(X) 2190 1095 1095 WEEKDAY 50%INBOUND*50%OUTBOUND PEAK HOUR LN M=0.71 LN(X)+1.15 260 214 47 7 TO 9 AM 82%INBOUND*18%OUTBOUND ' PEAK HOUR LN M=0.79 LN(X)+0.54 233 58 174 4 TO 6 PM 25%INBOUND*75%OUTBOUND AM PEAK HOUR T=0.39(X)+63.12 258 152 106 ' OF GENERATOR 59%INBOUND*41 %OUTBOUND PM PEAK HOUR T=0.46(X) +53.12 283 23 260 OF GENERATOR 8%INBOUND*92%OUTBOUND ' AVERAGE T=1.22(X) 610 305 305 SATURDAY 50%INBOUND*50%OUTBOUND ' SATURDAY T=0.12(X) 60 38 22 PEAK HOUR 64%INBOUND*36%OUTBOUND AVERAGE T-0.79(X) 395 198 198 SUNDAY 50%INBOUND*50%OUTBOUND SUNDAY T=0.07(X) 35 18 17 ' PEAK HOUR 52%INBOUND*48%OUTBOUND PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYESTREET 2% L N 1 r' (2%) NOTE:DRAWING NOT TOO SCALE TROYROAD 2% � 1fim XX EQUALS INBOUND VEHICLES SITE ♦ (YY) EQUALS OUTBOUND VEHICLES (2%) _J (98%) 98% (98%) RO TE5 h OMMERCE + WAY 98% 8% ; (6%) (40%) (58%) 1 (34%) � t--+—(t4D%i j 1-- 58% I ♦ o ROUTE 194 —� 34% 40% (58%)—� ROUTE 5 EXHIBIT 9 SITE GENERATED TRAFFIC DISTRIBUTIONS rr r rr r� rr �r r� rr r rr it rr r rr rr r r r r PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYESTREET 4 N r �► (1) NOTE;DRAWING NOT TOO SCALE TROYROAD 4 .� 1 XX EQUALS INBOUND VEHICLES SITE t (YY) EQUALS OUTBOUND VEHICLES (46) 210 (41) RO TES MMERCE WAY 210 13 - (3) (19) (27) 1, (16) 124 I I 86 -� 73 86 (27) -� ROUTE5 EXHIBIT 10 SITE GENERATED AM PEAK HOUR TRAFFIC VOLUMES PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYESTREET ' L 1 �► �- N r (4) NOTE:DRAWING NOT TOO SCALE TROYROAD NOTE L 4].� 1 SITE xX EQUALS INBOUND VEHICLES (4) 1 (YY) EQUALS OUTBOUND VEHICLES (176) 59 (176) RO TE 5 1 OMMREEYWA 59 4 L (11) (72) (104) 1 (61) � 44- (721 - j -- ROUTE 194L- 35 ` - t Y r 24 -� 20 24 (104) -� ROUTE 5 EXHIBIT 11 SITE GENERATED PM PEAK HOUR TRAFFIC VOLUMES r m m m m m m m m = m i m PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYESTREEr 268 79 1 I ,6 ly 6 Tt 50 50 13 TROYROAD NOTE:DRAWING NOT TOO SCALE 4 270 SITE 46 210 65 19 297 RO TE5 MMERCE 2 � Fr WAY 6 15 273 11 1 768 264 362 21 11 263 45 27 59 69 365 24 142 I L ♦ l`1 45 16 33 -1 146 30 - 5 364 307 567 432 3 23 -�4 ROUTE 5 EXHIBIT 12 2008 COMBINED AM PEAK HOUR TRAFFIC VOLUMES (WITH SOUTH WINDSOR INDUSTRIAL PARK) PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CT RYE STREET 1 80 45 94 + 5 ly 5 N 230 15 NOTE:DRAWING NOT TOO SCALE TROYROAD 1 84 SITE 1 4 --? '1 1 176 59 240 3 257 RO TE 5 41 t MMERCE 20 WAY 9 1 279 4 4 402 322 L 320 79 16 153 124 28 79 1 /--- 42 290 10 59 L 128 - 4 R-"A 506 -ROUTE 19426 28 ---+ 222 84 --Sy 53 5 634 350 697 -10, 491 -�4 776 -� ROUTE 5 EXHIBIT 13 2008 COMBINED PM PEAK HOUR TRAFFIC VOLUMES (WITH SOUTH WINDSOR INDUSTRIAL PARK) EXHIBIT 14 LEVEL OF SERVICE CRITERIA SIGNALIZED INTERSECTIONS SOURCE: HIGHWAY CAPACITY MANUAL (HCM) 2000 ' TRANSPORTATION RESEARCH BOARD (1) Level of Service for signalized intersections is defined in terms of control ' delay, which is a measure of driver discomfort, frustration, increased fuel consumption, and lost travel time. The delay experienced by a motorist is comprised of a number of factors that relate to control, geometric, traffic, and ' incidents. Total delay is the difference between the travel time actually experienced and the reference travel time that would result during base conditions in the absence of traffic control, geometric delay, any incidents, and any other vehicles. Specifically, LOS criteria for traffic signals are stated in terms of the average control delay per vehicle, typically for a 15-minute analysis period. Delay is a complex measure and depends on a number of variables, including the quality of progression, the cycle length, the green ratio, and the volume-to-capacity (v/c) ratio for the lane group. ' In the case of signalized intersections, the Level of Service for each approach is computed, and an overall Level of Service for the entire intersection is ' determined. Levels of Service (LOS) for signalized intersections are defined as follows: ' LEVEL OF SERVICE CONTROL DELAY PER CONDITION VEHICLE (SECONDS) ' LOS A < 10 LOW DELAY LOS B > 10 TO 20 SHORT DELAY LOS C > 20 TO 35 AVERAGE DELAY ' LOS D > 35 TO 55 CONGESTION NOTICEABLE LOS E > 55 TO 80 LIMIT OF ACCEPTABLE DELAY LOS F > 80 UNACCEPTABLE In today's environment, Levels of Service C to D are considered acceptable, and Levels of Service A to B are seldomly achieved at signalized intersections. (1) HCM, Exhibit 16-2. EXHIBIT 15 LEVEL OF SERVICE CRITERIA ' UNSIGNALIZED INTERSECTIONS SOURCE: HIGHWAY CAPACITY MANUAL MCM). 2000 TRANSPORTATION RESEARCH BOARD (1) Level of Service for unsignalized intersections similar to the study intersections is defined in terms of the average control delay for the approach or movement evaluated. Control delay involves movements at slower speeds and stops on intersection approaches as vehicles move up in the queue or slow down upstream of an intersection. The delay experienced by a motorist is comprised of factors that relate to control, ' geometrics, traffic, and incidents. Total delay is the difference between the travel time actually experienced and the reference time that would result during base conditions in the absence of incident, control, traffic, or geometric delay. Control delay includes ' initial deceleration delay, queue move-up time, stopped delay, and final acceleration delay. ' At two-way stop-controlled and all-way stop-controlled intersections, control delay is the total elapsed time from a vehicle joining the queue until its departure from the stopped position at the head of the queue. The control delay also includes the time required to decelerate to a stop and to accelerate to the free-flow speed. Level of Service (LOS) for a two-way stop-controlled intersection is determined by the computed or measured control delay and is defined for each minor movement. LOS is not defined for the intersection as a whole. Level of Service (LOS) for an all-way stop-controlled intersection is determined by the ' computed or measured control delay and is defined for all movements. A LOS is then defined for the intersection as a whole. Levels of Service (LOS) for unsignalized intersections are defined as follows: LEVEL OF SERVICE AVERAGE CONTROL DELAY CONDITION PER VEHICLE SECONDS LOS A 0 TO 10 LITTLE OR NO DELAY LOS B > 10 TO 15 SHORT DELAY ' LOS C > 15 TO 25 AVERAGE DELAY LOS D > 25 TO 35 LONG DELAY LOS E > 35 TO 50 VERY LONG DELAY LOS F > 50 EXTREME DELAY In today's environment, Levels of Service D to F are common and are often experienced on minor street approaches to major streets carrying relatively high traffic volumes. (1) HCM, Exhibits 17-2 and 17-22. 1 r r r r r 1 r r r Exhibit 16 Operational Analysis Worksheets ' 2006 Existing AM Peak Hour Traffic Volumes r 1 i i 1 1 r r Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EST EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 1 4 r I ,r„t, rr 11 +T Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Fit 0.990 0.850 0.850 0.998 Fit Protected 0.984 0.950 0.959 0.950 0.950 ' Satd. Flow(prot) 0 1815 0 1681 1697 1583 1770 3539 1583 3433 3532 0 Fit Permitted 0.832 0.321 0.353 0.220 0.374 Satd. Flow(perm) 0 1534 0 568 625 1583 410 3539 1583 1352 3532 0 Right Turn on Red Yes Yes Yes Yes ' Satd. Flow(RTOR) 4 380 186 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 ' Link Distance (ft) 1088 848 1120 1856 Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 16 29 4 329 26 350 5 357 171 237 753 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 17 32 4 358 28 380 5 388 186 258 818 12 Lane Group Flow(vph) 0 53 0 179 207 380 5 388 186 258 830 0 Turn Type custom custom custom custom custom custom Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split (s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% 1 Yellow Time(s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag ' Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.1 33.4 33.4 42.4 35.5 28.1 65.5 35.5 28.1 Actuated g/C Ratio 0.11 0.37 0.37 0.47 0.39 0.31 0.73 0.39 0.31 ' v/c Ratio 0.30 0.85 0.89 0.40 0.02 0.35 0.15 0.37 0.75 Control Delay 38.7 59.5 64.3 2.0 20.8 28.5 1.2 20.3 38.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ' Total Delay 38.7 59.5 64.3 2.0 20.6 28.5 1.2 20.3 38.0 LOS D E E A C C A C D Approach Delay 38.7 32.3 19.7 33.8 ' Approach LOS D C B C Queue Length 50th (ft) 26 89 106 0 2 103 0 53 -291 Queue Length 95th (ft) 61 #212 #242 22 10 151 20 84 #418 Internal Link Dist (ft) 1008 768 1040 1776 Turn Bay Length (ft) Base Capacity (vph) 198 234 257 947 273 1104 1258 704 1102 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 -A �— t 4/ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.27 0.76 0.81 0.40 0.02 0.35 0.15 0.37 0.75 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 75 (83%), Referenced to phase 2:NBSB, Start of Yellow ' Natural Cycle: 90 Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay: 30.1 Intersection LOS: C ' Intersection Capacity Utilization 51.8% ICU Level of Service A Analysis Period (min) 15 Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity,queue may be longer. Queue shown is maximum after two cycles. Slits and Phases: 1: Route 194& Route 5 01 e2 m4 08 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1� Y Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 32 404 684 24 11 21 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 35 439 743 26 12 23 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.91 vC, conflicting volume 770 1265 757 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 770 1290 757 tC,single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 96 92 94 ' CM capacity(veh/h) 845 158 408 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 474 770 35 Volume Left 35 0 12 Volume Right 0 26 23 cSH 845 1700 264 Volume to Capacity 0.04 0.45 0.13 Queue Length 95th (ft) 3 0 11 Control Delay(s) 1.2 0.0 20.7 Lane LOS A C Approach Delay(s) 1.2 0.0 20.7 Approach LOS C Intersection Summary Average Delay 1.0 Intersection Capacity Utilization 57.7% ICU Level of Service B Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Pagel HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 to Y Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 59 356 461 18 18 239 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 64 387 501 20 20 260 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) ' Upstream signal (ft) 1253 pX, platoon unblocked 0.95 vC, conflicting volume 521 1026 511 vC1, stage 1 conf vol ' vC2, stage 2 conf vol vCu, unblocked vol 521 1027 511 tC, single(s) 4.1 6.4 6.2 ' tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 94 92 54 cM capacity(veh/h) 1048 233 563 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 451 521 279 Volume Left 64 0 20 Volume Right 0 20 260 cSH 1046 1700 512 Volume to Capacity 0.06 0.31 0.55 Queue Length 95th (ft) 5 0 81 Control Delay(s) 1.8 0.0 20.2 Lane LOS A C Approach Delay (s) 1.8 0.0 20.2 Approach LOS C Intersection Summary Average Delay 5.2 Intersection Capacity Utilization 73.1% ICU Level of Service D Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour Tnaffi6ynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 i HCM Unsignalized Intersection CapacityAnalysis 8: Commerce Way& Rye Street y 4/27/2006 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 to Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 2 6 15 62 246 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 7 16 67 267 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 378 278 288 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 378 278 288 tC, single(s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 99 99 cM capacity(veh/h) 616 761 1274 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 9 84 288 Volume Left 2 16 0 Volume Right 7 0 21 cSH 719 1274 1700 Volume to Capacity 0.01 0.01 0.17 ' Queue Length 95th (ft) 1 1 0 Control Delay(s) 10.1 1.6 0.0 Lane LOS B A Approach Delay(s) 10.1 1.6 0.0 Approach LOS B Intersection Summary ' Average Delay 0.6 Intersection Capacity Utilization 26.2% ICU Level of Service A Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour Traff aynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 HCM Unsignalized Intersection Capacity Analysis 8: Commerce Way & Rye Street 4/27/2006 --* '\ t Movement EBL EBR NBL NBT SBT SBR i Lane Configurations Y *T 1 Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 2 6 15 62 246 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 7 16 67 267 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 378 278 288 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 378 278 288 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 100 99 99 ' cM capacity(veh/h) 616 761 1274 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 9 84 288 Volume Left 2 16 0 Volume Right 7 0 21 cSH 719 1274 1700 Volume to Capacity 0.01 0.01 0.17 Queue Length 95th (ft) 1 1 0 Control Delay(s) 10.1 1.6 0.0 Lane LOS B A Approach Delay(s) 10.1 1.6 0.0 Approach LOS B Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 26.2% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 i HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 --* -'V '\ t Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y *T Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 0 0 0 64 266 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 70 288 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) ' Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 358 288 288 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 358 288 288 tC, single(s) 6.4 6.2 4.1 tC, 2 stage (s) IF (s) 3.5 3.3 2.2 p0 queue free% 100 100 100 cM capacity(veh/h) 641 751 1274 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 0 70 288 ' Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1274 1700 Volume to Capacity 0.00 0.00 0.17 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay(s) 0.0 0.0 0.0 Approach LOS A Intersection Summary ' Average Delay 0.0 Intersection Capacity Utilization 17.3% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 iHCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 "r k t Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T 4 Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 6 16 48 13 77 259 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 7 17 52 14 84 282 Pedestrians Lane Width (ft) Walking Speed(ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 508 59 66 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 508 59 66 tC, single (s) 6.4 6.2 4.1 tC, 2 stage(s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 98 95 cM capacity(veh/h) 496 1006 1535 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 24 66 365 Volume Left 7 0 84 Volume Right 17 14 0 cSH 786 1700 1535 Volume to Capacity 0.03 0.04 0.05 ' Queue Length 95th (ft) 2 0 4 Control Delay(s) 9.7 0.0 2.1 Lane LOS A A Approach Delay(s) 9.7 0.0 2.1 Approach LOS A Intersection Summary ' Average Delay 2.2 Intersection Capacity Utilization 34.6% ICU Level of Service A Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Lane Configurations I + 1� Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.991 0.938 Fit Protected 0.950 0.974 Satd. Flow(prot) 1770 1863 1846 0 1702 0 Fit Permitted 0.245 0.974 Satd. Flow(perm) 456 1863 1846 0 1702 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 8 47 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time (s) 140.9 18.2 164.3 Volume (vph) 23 289 602 44 68 58 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 25 314 654 48 74 63 Lane Group Flow(vph) 25 314 702 0 137 0 1 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 Detector Phases 1 1 2 4 Minimum Initial(s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 38.8 44.1 31.5 10.3 Actuated g/C Ratio 0.67 0.76 0.54 0.17 v/c Ratio 0.05 0.22 0.70 0.42 Control Delay 3.3 3.7 15.3 21.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 3.3 3.7 15.3 21.3 LOS A A B C Approach Delay 3.6 15.3 21.3 Approach LOS A B C Queue Length 50th (ft) 2 29 171 26 Queue Length 95th (ft) 9 69 327 m88 Internal Link Dist (ft) 6119 722 7148 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour TraffiSynchro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 _)F --r` r-- �'-► Lane Group EBL EBT WBT WBR SEL SER Turn Bay Length (ft) 85 Base Capacity(vph) 470 1415 1180 431 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.05 0.22 0.59 0.32 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 58.1 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.70 Intersection Signal Delay: 12.6 Intersection LOS: B Intersection Capacity Utilization 48.5% ICU Level of Service A Analysis Period(min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road 01 m2 04 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing AM Peak Hour Traffi6ynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 ' Exhibit 17 Operational Analysis Worksheets ' 2006 Existing PM Peak Hour Traffic Volumes 1 1 1 1 1 ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR ' Lane Configurations 41, 1 4 r I ft r 11 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 ' Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.994 0.850 0.850 0.999 Fit Protected 0.985 0.950 0.965 0.950 0.950 Satd. Flow(prot) 0 1824 0 1681 1708. 1583 1770 3539 1583 3433 3536 0 ' Fit Permitted 0.838 0.314 0.421 0.333 0.220 Satd. Flow(perm) 0 1552 0 556 745 1583 620 3539 1583 795 3536 0 Right Turn on Red Yes Yes Yes Yes ' Satd. Flow(RTOR) 2 310 329 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed(mph) 30 30 30 30 Link Distance (ft) 1088 848 1120 1856 ' Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 25 51 4 220 40 297 5 610 303 304 387 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 ' Adj. Flow(vph) 27 55 4 239 43 323 5 663 329 330 421 4 Lane Group Flow(vph) 0 86 0 120 162 323 5 663 329 330 425 0 Turn Type custom custom customcustom customcustom ' Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 ' Minimum Split (s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(Q/o) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.70k 24.7% 45.6% 12.7% 24.7% 0.0% ' Yellow Time(s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time(s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag ' Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.7 26.5 26.5 34.7 39.3 31.9 62.4 39.3 31.9 Actuated g/C Ratio 0.12 0.29 0.29 0.39 0.44 0.35 0.69 0.44 0.35 v/c Ratio 0.46 0.73 0.74 0.40 0.01 0.53 0.27 0.59 0.34 Control Delay 44.4 52.0 46.8 2.6 19.0 29.3 1.3 22.6 26.0 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 44.4 52.0 46.8 2.6 19.0 29.3 1.3 22.6 26.0 LOS D D D A B C A C C Approach Delay 44.4 24.2 20.0 24.5 Approach LOS D C B C ' Queue Length 50th (ft) 45 64 86 3 2 166 0 58 98 Queue Length 95th (ft) 91 116 141 23 10 #302 26 #113 164 Internal Link Dist(ft) 1008 768 1040 1776 ' Turn Bay Length (ft) Base Capacity (vph) 198 229 306 801 365 1253 1324 564 1252 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 ' Reduced v/c Ratio 0.43 0.52 0.53 0.40 0.01 0.53 0.25 0.59 0.34 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length:90 Offset: 75 (83%), Referenced to phase 2:NBSB, Start of Yellow Natural Cycle: 70 Control Type:Actuated-Coordinated Maximum We Ratio. 0.74 Intersection Signal Delay: 23.3 Intersection LOS: C ' Intersection Capacity Utilization 49.6% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194 &Route 5 02 1 m1 � - F e4 m8 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 ' HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR ' Lane Configurations 4 1� Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 27 631 481 10 15 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 29 686 523 11 16 83 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.88 vC, conflicting volume 534 1273 528 vC1,stage 1 conf vol ' vC2, stage 2 conf vol vCu, unblocked vol 534 1309 528 tC,single (s) 4.1 6.4 6.2 ' tC, 2 stage (s) tF(s) 2.2 3.5 3.3 p0 queue free% 97 89 85 ' cM capacity(veh/h) 1034 151 550 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 715 534 99 ' Volume Left 29 0 16 Volume Right 0 11 83 cSH 1034 1700 383 Volume to Capacity 0.03 0.31 0.26 ' Queue Length 95th (ft) 2 0 25 Control Delay(s) 0.7 0.0 17.6 Lane LOS A C ' Approach Delay(s) 0.7 0.0 17.6 Approach LOS C Intersection Summary ' Average Delay 1.7 Intersection Capacity Utilization 67.3% ICU Level of Service C Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Pagel HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR ' Lane Configurations 4 T Y Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 190 456 423 23 19 78 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 207 496 460 25 21 85 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal(ft) 1253 pX, platoon unblocked 0.91 vC, conflicting volume 485 1381 472 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 485 1419 472 tC, single(s) 4.1 6.4 6.2 ' tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 81 81 86 ' cM capacity(veh/h) 1078 111 592 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 702 485 105 ' Volume Left 207 0 21 Volume Right 0 25 85 cSH 1078 1700 320 Volume to Capacity 0.19 0.29 0.33 ' Queue Length 95th (ft) 18 0 35 Control Delay(s) 4.4 0.0 21.7 Lane LOS A C ' Approach Delay(s) 4.4 0.0 21.7 Approach LOS C Intersection Summary ' Average Delay 4.2 Intersection Capacity Utilization 74.0% ICU Level of Service D Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour Traffi6ynchro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 8: Commerce Way& Rye Street 4/27/2006 --* ' t Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 T Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 19 9 1 212 78 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 21 10 1 230 85 3 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 319 86 88 ' vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 319 86 88 tC, single (s) 6.4 6.2 4.1 1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 97 99 100 ' cM capacity(veh/h) 674 972 1508 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 30 232 88 ' Volume Left 21 1 0 Volume Right 10 0 3 cSH 748 1508 1700 ' Volume to Capacity 0.04 0.00 0.05 Queue Length 95th (ft) 3 0 0 Control Delay(s) 10.0 0.0 0.0 Lane LOS B A ' Approach Delay (s) 10.0 0.0 0.0 Approach LOS B Intersection Summary ' Average Delay 0.9 Intersection Capacity Utilization 22.0% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 1 --* N 4\ t +� Movement EBL EBR NBL NBT SBT SBR ' Lane Configurations Y 4 T Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 0 0 0 231 81 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 251 88 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare(veh) Median type None Median storage veh) ' Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 339 88 88 ' vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 339 88 88 tC, single (s) 6.4 6.2 4.1 ' tC, 2 stage (s) tF(s) 3.5 3.3 2.2 p0 queue free% 100 100 100 ' cM capacity(veh/h) 657 970 1508 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 0 251 88 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1508 1700 Volume to Capacity 0.00 0.00 0.05 ' Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 0.0 Lane LOS A Approach Delay(s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 15.5% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South WIndsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 rr 4- t `�• Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y t+ 4 Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 5 90 217 14 43 76 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 98 236 15 47 83 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 420 243 251 ' vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 420 243 251 tC, single (s) 6.4 6.2 4.1 ' tC, 2 stage(s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 88 96 cM capacity(veh/h) 569 795 1314 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 103 251 129 ' Volume Left 5 0 47 Volume Right 98 15 0 cSH 779 1700 1314 Volume to Capacity 0.13 0.15 0.04 ' Queue Length 95th (ft) 11 0 3 Control Delay(s) 10.3 0.0 3.0 Lane LOS B A Approach Delay(s) 10.3 0.0 3.0 Approach LOS B Intersection Summary ' Average Delay 3.0 Intersection Capacity Utilization 34.5% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 5 Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 ' Lane Group EBL EBT WBT WBR SEL SER Lane Configurations I + T V Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 ' Storage Lanes 1 0 1 0 Total Lost Time(s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.966 0.965 Fit Protected 0.950 0.964 Satd. Flow(prot) 1770 1863 1799 0 1733 0 Fit Permitted 0.363 0.964 Satd. Flow(perm) 676 1863 1799 0 1733 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 36 19 ' Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time(s) 140.9 18.2 164.3 ' Volume (vph) 81 568 365 123 76 27 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 88 617 397 134 83 29 Lane Group Flow(vph) 88 617 531 0 112 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 Detector Phases 1 1 2 4 Minimum Initial (s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 34.7 39.8 27.6 9.7 Actuated g/C Ratio 0.65 0.75 0.52 0.17 v/c Ratio 0.15 0.44 0.56 0.35 Control Delay 3.9 5.3 12.2 21.3 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 3.9 5.3 12.2 21.3 LOS A A B C Approach Delay 5.1 12.2 21.3 Approach LOS A B C Queue Length 50th (ft) 7 71 105 26 Queue Length 95th (ft) 20 150 205 m71 Internal Link Dist (ft) 6119 722 7148 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER ' Turn Bay Length (ft) 85 Base Capacity(vph) 586 1389 1167 440 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced We Ratio 0.15 0.44 0.46 0.25 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 53.4 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum We Ratio: 0.56 Intersection Signal Delay: 9.2 Intersection LOS:A Intersection Capacity Utilization 48.7% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road "01 Pt-- m2 1 Proposed Distribution Center, South Windsor,CT 4/27/2006 2006 Existing PM Peak Hour TraffiSynchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 Exhibit 18 Operational Analysis Worksheets ' 2008 Background AM Peak Hour Traffic Volumes ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 ' Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4, 1 4 F I ft F 1) 0 Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 ' Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.990 0.850 0.850 0.998 Fit Protected 0.985 0.950 0.959 0.950 0.950 Satd. Flow(prot) 0 1816 0 1681 1697 1583 1770 3539 1583 3433 3532 0 Fit Permitted 0.834 0.315 0.348 0.220 0.365 Satd. Flow(perm) 0 1538 0 557 616 1583 410 3539 1583 1319 3532 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow(RTOR) 4 386 189 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1088 848 1120 1856 Travel Time (s) 24.7 19.3 25.5 42.2 Volume (vph) 16 30 4 336 27 357 5 364 174 242 768 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 17 33 4 365 29 388 5 396 189 263 835 12 Lane Group Flow(vph) 0 54 0 183 211 388 5 396 189 263 847 0 Turn Type custom custom custom custom custom custom Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split (s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.1 34.0 34.0 43.0 34.8 27.4 65.5 34.8 27.4 Actuated g/C Ratio 0.11 0.38 0.38 0.48 0.39 0.30 0.73 0.39 0.30 ' v/c Ratio 0.31 0.87 0.91 0.40 0.02 0.37 0.16 0.38 0.79 Control Delay 38.8 62.9 66.9 2.1 20.6 28.9 1.2 20.7 39.6 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.8 62.9 66.9 2.1 20.6 28.9 1.2 20.7 39.6 LOS D E E A C C A C D Approach Delay 38.8 33.8 20.0 35.1 Approach LOS D C B D Queue Length 50th (ft) 26 93 110 0 2 106 0 55 -303 Queue Length 95th (ft) 62 #223 #250 23 10 154 20 85 #430 Internal Link Dist(ft) 1008 768 1040 1776 Turn Bay Length (ft) Base Capacity (vph) 198 229 253 959 270 1078 1249 684 1077 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 -A --I. ---t j *— k 4\ t 4/ Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 ' Reduced v/c Ratio 0.27 0.80 0.83 0.40 0.02 0.37 0.15 0.38 0.79 Intersection Summary Area Type: Other ' Cycle Length:90 Actuated Cycle Length: 90 Offset: 75 (83%), Referenced to phase 2:NBSB, Start of Yellow Natural Cycle: 90 ' Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.91 Intersection Signal Delay: 31.3 Intersection LOS: C ' Intersection Capacity Utilization 52.4% ICU Level of Service A Analysis Period (min) 15 Volume exceeds capacity, queue is theoretically infinite. ' Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194&Route 5 m1 02 '?F` m4 m8 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 t Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 33 412 698 24 11 21 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 36 448 759 26 12 23 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) ' Upstream signal (ft) 848 pX, platoon unblocked 0.91 vC, conflicting volume 785 1291 772 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 785 1321 772 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 96 92 94 ' cM capacity(veh/h) 834 150 400 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 484 785 35 Volume Left 36 0 12 Volume Right 0 26 23 cSH 834 1700 255 Volume to Capacity 0.04 0.46 0.14 Queue Length 95th (ft) 3 0 12 Control Delay(s) 1.2 0.0 21.4 Lane LOS A C ' Approach Delay(s) 1.2 0.0 21.4 Approach LOS C Intersection Summary Average Delay 1.0 Intersection Capacity Utilization 58.9% ICU Level of Service B Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Pagel HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1� Y Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 60 363 470 18 18 244 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 65 395 511 20 20 265 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 1253 pX, platoon unblocked 0.95 vC, conflicting volume 530 1046 521 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 530 1048 521 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF(s) 2.2 3.5 3.3 p0 queue free% 94 91 52 cM capacity(veh/h) 1037 224 556 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 460 530 285 Volume Left 65 0 20 Volume Right 0 20 265 cSH 1037 1700 504 Volume to Capacity 0.06 0.31 0.56 Queue Length 95th (ft) 5 0 86 Control Delay(s) 1.8 0.0 21.0 Lane LOS A C ' Approach Delay(s) 1.8 0.0 21.0 Approach LOS C Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 74.3% ICU Level of Service D Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 ' HCM Unsi nalized Intersection Capacity Analysis 9 p Y Y 8: Commerce Way& Rye Street 4/27/2006 1 --* `% t 1 •� Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 1� Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 2 6 15 63 251 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 7 16 68 273 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 384 283 293 ' vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 384 283 293 tC, single (s) 6.4 6.2 4.1 tC, 2 stage(s) tF(s) 3.5 3.3 2.2 p0 queue free% 100 99 99 cM capacity(veh/h) 611 756 1268 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 9 85 293 Volume Left 2 16 0 Volume Right 7 0 21 cSH 713 1268 1700 Volume to Capacity 0.01 0.01 0.17 ' Queue Length 95th (ft) 1 1 0 Control Delay(s) 10.1 1.6 0.0 Lane LOS B A Approach Delay(s) 10.1 1.6 0.0 Approach LOS B Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 26.2% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 -A 4% t 1 .� ' Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 1� Sign Control Stop Free Free Grade 0% 0% 0% ' Volume(veh/h) 0 0 0 65 270 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 71 293 0 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) I ' Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 364 293 293 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 364 293 293 tC, single (s) 6.4 6.2 4.1 ' tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 100 100 100 ' cM capacity(veh/h) 635 746 1268 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 0 71 293 ' Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1268 1700 ' Volume to Capacity 0.00 0.00 0.17 Queue Length 95th (ft) 0 0 0 Control Delay (s) 0.0 0.0 0.0 Lane LOS A Approach Delay(s) 0.0 0.0 0.0 Approach LOS A Intersection Summary ' Average Delay 0.0 Intersection Capacity Utilization 17.5% ICU Level of Service A Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour T&¢flchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 1 ' HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 1< k t r ,� ' Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y t* 4 Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 6 16 49 13 79 264 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 7 17 53 14 86 287 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 519 60 67 ' vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 519 60 67 tC, single (s) 6.4 6.2 4.1 ' tC,2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 98 94 ' cM capacity(veh/h) 488 1005 1534 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 24 67 373 ' Volume Left 7 0 86 Volume Right 17 14 0 cSH 780 1700 1534 ' Volume to Capacity 0.03 0.04 0.06 Queue Length 95th (ft) 2 0 4 Control Delay(s) 9.8 0.0 2.1 Lane LOS A A ' Approach Delay(s) 9.8 0.0 '2.1 Approach LOS A Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 34.9% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 ' Lane Group EBL EBT WBT WBR SEL SER Lane Configurations I + 1� V Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.991 0.938 ' Fit Protected 0.950 0.974 Satd. Flow(prot) 1770 1863 1846 0 1702 0 Fit Permitted 0.235 0.974 ' Satd. Flow(perm) 438 1863 1846 0 1702 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 8 47 ' Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time(s) 140.9 18.2 164.3 ' Volume (vph) 23 295 614 45 69 59 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 25 321 667 49 75 64 ' Lane Group Flow(vph) 25 321 716 0 139 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 Detector Phases 1 1 2 4 Minimum Initial (s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 ' All-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 39.2 44.6 31.9 10.3 Actuated g/C Ratio 0.67 0.76 0.54 0.17 v/c Ratio 0.05 0.23 0.71 0.43 Control Delay 3.3 3.7 15.5 21.7 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 3.3 3.7 15.5 21.7 LOS A A B C Approach Delay 3.7 15.5 21.7 Approach LOS A B C Queue Length 50th (ft) 2 30 176 27 Queue Length 95th (ft) 9 71 339 m91 Internal Link Dist(ft) 6119 722 7148 ' Proposed Distribution Center,South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER ' Turn Bay Length (ft) 85 Base Capacity(vph) 460 1417 1179 429 Starvation Cap Reductn 0 0 0 0 Spiilback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced We Ratio 0.05 0.23 0.61 0.32 ' Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 58.6 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.71 Intersection Signal Delay: 12.8 Intersection LOS: B Intersection Capacity Utilization 49.2% ICU Level of Service A Analysis Period (min) 15 ' m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road m1 02 m4 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM Peak Hour TWfiichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 ' Exhibit 19 Operational Analysis Worksheets ' 2008 Background PM Peak Hour Traffic Volumes 1 1 Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 ' Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 1 *T pr I ff r 1) ti� Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 ' Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.994 0.850 0.850 0.996 Fit Protected 0.985 0.950 0.965 0.950 0.950 Satd. Flow(prot) 0 1824 0 1681 1708 1583 1770 3539 1583 3433 3525 0 ' Fit Permitted 0.836 0.311 0.415 0.307 0.220 Satd. Flow(perm) 0 1548 0 550 734 1583 572 3539 1583 795 3525 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow(RTOR) 2 306 342 3 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance(ft) 1088 848 1120 1856 ' Travel Time(s) 24.7 19.3 25.5 42.2 Volume(vph) 26 53 4 229 42 309 5 634 315 316 402 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 28 58 4 249 46 336 5 689 342 343 437 12 Lane Group Flow(vph) 0 90 0 125 170 336 5 689 342 343 449 0 Turn Type custom custom custom custom custom custom ' Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial(s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split(s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% ' Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag ' Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.8 27.2 27.2 35.4 38.5 31.1 62.3 38.5 31.1 Actuated g/C Ratio 0.12 0.30 0.30 0.39 0.43 0.35 0.69 0.43 0.35 ' v/c Ratio 0.48 0.75 0.77 0.42 0.01 0.56 0.28 0.62 0.37 Control Delay 45.0 53.3 48.9 2.9 19.2 30.4 1.3 24.0 26.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ' Total Delay 45.0 53.3 48.9 2.9 19.2 30.4 1.3 24.0 26.7 LOS D D D A B C A C C Approach Delay 45.0 25.3 20.8 25.5 ' Approach LOS D C C C Queue Length 50th (ft) 47 66 89 6 2 178 0 62 106 Queue Length 95th (ft) 95 123 151 26 10 #319 26 #122 173 Internal Link Dist(ft) 1008 768 1040 1776 ' Turn Bay Length (ft) Base Capacity(vph) 198 226 302 809 343 1222 1317 557 1219 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR ' Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 ' Reduced v/c Ratio 0.45 0.55 0.56 0.42 0.01 0.56 0.26 0.62 0.37 Intersection Summary Area Type: Other ' Cycle Length: 90 Actuated Cycle Length: 90 Offset: 75(83%), Referenced to phase 2:NBSB, Start of Yellow Natural Cycle: 70 Control Type:Actuated-Coordinated Maximum We Ratio: 0.77 Intersection Signal Delay: 24.2 Intersection LOS: C ' Intersection Capacity Utilization 51.1% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. ' Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194 & Route 5 .08 m1 02 V e4 „" Y m8 r r ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 ' Movement EBL EBT WET WBR SBL SBR Lane Configurations c,'(' '* Y Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 28 656 500 10 16 79 ' Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 30 713 543 11 17 86 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.88 vC, conflicting volume 554 1323 549 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 554 1369 549 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 97 87 84 cM capacity(veh/h) 1016 137 536 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 743 554 103 ' Volume Left 30 0 17 Volume Right 0 11 86 cSH 1016 1700 360 ' Volume to Capacity 0.03 0.33 0.29 Queue Length 95th (ft) 2 0 29 Control Delay(s) 0.8 0.0 19.0 Lane LOS A C ' Approach Delay(s) 0.8 0.0 19.0 Approach LOS C Intersection Summary ' Average Delay 1.8 Intersection Capacity Utilization 69.7% ICU Level of Service C Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWftchro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations *T t Y Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 198 474 440 24 20 81 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 215 515 478 26 22 88 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 1253 pX, platoon unblocked 0.90 vC, conflicting volume 504 1437 491 vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 504 1486 491 tC, single (s) 4.1 6.4 6.2 tC, 2 stage(s) tF (s) 2.2 3.5 3.3 p0 queue free% 80 78 85 ' cM capacity(veh/h) 1060 98 577 Direction, Lane# BB 1 WB 1 SB 1 Volume Total 730 504 110 ' Volume Left 215 0 22 Volume Right 0 26 88 cSH 1060 1700 294 Volume to Capacity 0.20 0.30 0.37 ' Queue Length 95th (ft) 19 0 42 Control Delay(s) 4.6 0.0 24.4 Lane LOS A C ' Approach Delay(s) 4.6 0.0 24.4 Approach LOS C Intersection Summary Average Delay 4.5 Intersection Capacity Utilization 76.6% ICU Level of Service D Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 ( � HCM Unsignalized Intersection Capacity Analysis 8: Commerce Way& Rye Street 4/27/2006 -,* ---,► 4N I* Movement EBL EBR NBL NBT SBT SBR j Lane Configurations Y 4 T, I Sign Control Stop Free Free Grade 0% 0% 0% i Volume (veh/h) 20 9 1 220 81 3 I Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 10 1 239 88 3 ( � Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ` Right turn flare(veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 331 90 91 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 331 90 91 tC, single (s) 6.4 6.2 4.1 ! tC, 2 stage (s) t tF (s) 3.5 3.3 2.2 p0 queue free % 97 99 100 ( � cM capacity(veh/h) 663 968 1504 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 32 240 91 ( � Volume Left 22 1 0 Volume Right 10 0 3 cSH 735 1504 1700 1 Volume to Capacity 0.04 0.00 0.05 Queue Length 95th (ft) 3 0 0 Control Delay(s) 10.1 0.0 0.0 Lane LOS B A Approach Delay(s) 10.1 0.0 0.0 Approach LOS B Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 22.4% ICU Level of Service A Analysis Period (min) 15 I � II �L1 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 I � HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 'r 4- T Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y '* 4 Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 5 94 226 15 45 79 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 102 246 16 49 86 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 438 254 262 1 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 438 254 262 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 87 96 cM capacity(veh/h) 555 785 1302 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 108 262 135 L Volume Left 5 0 49 Volume Right 102 16 0 cSH 769 1700 1302 Volume to Capacity 0.14 0.15 0.04 Queue Length 95th (ft) 12 0 3 Control Delay(s) 10.4 0.0 3.1 Lane LOS B A Approach Delay(s) 10.4 0.0 3.1 Approach LOS B Intersection Summary Average Delay 3.0 Intersection Capacity Utilization 35.5% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Lane Configurations Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.966 0.965 ' Fit Protected 0.950 0.964 Satd. Flow(prot) 1770 1863 1799 0 1733 0 Fit Permitted 0.348 0.964 ' Satd. Flow(perm) 648 1863 1799 0 1733 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 36 19 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 ' Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time (s) 140.9 18.2 164.3 Volume(vph) 84 591 380 128 79 28 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 91 642 413 139 86 30 Lane Group Flow(vph) 91 642 552 0 116 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 ' Detector Phases 1 1 2 4 Minimum Initial (s) 4.0 4.0 25.0 9.0 Minimum Split (s) 8.0 8.0 30.0 13.0 Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 Ail-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 35.0 40.1 27.8 9.8 Actuated g/C Ratio 0.65 0.75 0.52 0.17 v/c Ratio 0.16 0.46 0.58 0.36 Control Delay 4.0 5.5 12.5 21.8 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 4.0 5.5 12.5 21.8 LOS A A B C Approach Delay 5.3 12.5 21.8 Approach LOS A B C Queue Length 50th (ft) 7 75 112 28 Queue Length 95th (ft) 21 161 218 m75 Internal Link Dist(ft) 6119 722 7148 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 ' Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Turn Bay Length (ft) 85 Base Capacity(vph) 571 1390 1166 438 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.16 0.46 0.47 0.26 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 53.8 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum We Ratio: 0.58 Intersection Signal Delay: 9.5 Intersection LOS:A Intersection Capacity Utilization 49.9% ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road 1AX 01 :t� m2 84 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM Peak Hour TWfichro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 I � Exhibit 20 Operational Analysis Worksheets 2008 Background AM Peak Hour Traffic Volumes (With South Windsor Technologies Center) Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 1 4 r I ++ r 11 ft Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.990 0.850 0.850 0.998 Fit Protected 0.985 0.950 0.958 0.950 0.950 Satd. Flow(prot) 0 1816 0 1681 1695 1583 1770 3539 1583 3433 3532 0 Fit Permitted 0.831 0.315 0.347 0.220 0.365 Satd. Flow(perm) 0 1532 0 557 614 1583 410 3539 1583 1319 3532 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow(RTOR) 4 386 254 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1088 848 1120 1856 Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 16 30 4 349 27 359 5 364 234 251 768 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 17 33 4 379 29 390 5 396 254 273 835 .12 Lane Group Flow(vph) 0 54 0 190 218 390 5 396 254 273 847 0 Turn Type custom custom custom custom custom custom Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial(s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split (s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.1 34.9 34.9 43.9 34.0 26.6 65.5 34.0 26.6 Actuated g/C Ratio 0.11 0.39 0.39 0.49 0.38 0.30 0.73 0.38 0.30 v/c Ratio 0.31 0.88 0.92 0.40 0.02 0.38 0.21 0.41 0.81 Control Delay 38.9 64.5 68.9 2.1 20.6 29.4 1.2 21.2 41.1 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.9 64.5 68.9 2.1 20.6 29.4 1.2 21.2 41.1 LOS D E E A C C A C D Approach Delay 38.9 35.2 18.4 36.3 Approach LOS D D B D Queue Length 50th (ft) 26 98 115 1 2 106 0 57 -303 Queue Length 95th (ft) 62 #233 #263 23 10 154 23 88 #430 Internal Link Dist(ft) 1008 768 1040 1776 Turn Bay Length (ft) Base Capacity (vph) 198 229 252 970 267 1046 1252 672 1045 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW InM RWtkp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.27 0.83 0.87 0.40 0.02 0.38 0.20 0.41 0.81 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 75(83%), Referenced to phase 2:NBSB, Start of Yellow Natural Cycle: 90 Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.92 Intersection Signal Delay: 31.5 Intersection LOS: C Intersection Capacity Utilization 52.8% ICU Level of Service A Analysis Period (min) 15 Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194& Route 5 'T 0� o2 IF 04 `' e8 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW ln(S)OW tk)6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations *T T Y Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 33 481 713 24 11 21 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 36 523 775 26 12 23 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.90 vC, conflicting volume 801 1383 788 vC1,stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 801 1424 788 tC, single(s) 4.1 6.4 6.2 tC, 2 stage (s) tF(s) 2.2 3.5 3.3 p0 queue free% 96 91 94 cM capacity(veh/h) 822 129 391 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 559 801 35 Volume Left 36 0 12 Volume Right 0 26 23 cSH 822 1700 230 Volume to Capacity 0.04 0.47 0.15 Queue Length 95th (ft) 3 0 13 Control Delay(s) 1.2 0.0 23.4 Lane LOS A C Approach Delay (s) 1.2 0.0 23.4 Approach LOS C Intersection Summary Average Delay 1.1 Intersection Capacity Utilization 62.4% ICU Level of Service B Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW In(S)RWtkj�6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Y Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 60 432 485 18 18 244 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 65 470 527 20 20 265 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 1253 pX, platoon unblocked 0.94 vC, conflicting volume 547 1137 537 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 547 1146 537 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF(s) 2.2 3.5 3.3 p0 queue free % 94 90 51 cM capacity(veh/h) 1023 193 544 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 535 547 285 Volume Left 65 0 20 Volume Right 0 20 265 cSH 1023 1700 484 Volume to Capacity 0.06 0.32 0.59 Queue Length 95th (ft) 5 0 93 Control Delay(s) 1.7 0.0 22.6 Lane LOS A C Approach Delay(s) 1.7 0.0 22.6 Approach LOS C Intersection Summary Average Delay 5.4 Intersection Capacity Utilization 78.8% ICU Level of Service D Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW In(95ftttcp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 8: Commerce Way & Rye Street 4/27l2006 4� t Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 T* Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 2 6 15 63 251 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 7 16 68 273 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal(ft) 810 pX, platoon unblocked vC, conflicting volume 384 283 293 vC1,stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 384 283 293 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF(s) 3.5 3.3 2.2 p0 queue free % 100 99 99 cM capacity(veh/h) 611 756 1268 Direction, Lane# EB 1 NS 1 SB 1 Volume Total 9 85 293 Volume Left 2 16 0 Volume Right 7 0 21 cSH 713 1268 1700 Volume to Capacity 0.01 0.01 0.17 Queue Length 95th (ft) 1 1 0 Control Delay(s) 10.1 1.6 0.0 Lane LOS B A Approach Delay (s) 10.1 1.6 0.0 Approach LOS B Intersection Summary Average Delay 0.6 Intersection Capacity Utilization 26.2% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW IncSyli'r8fkjp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y *T T+ Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 0 0 0 65 270 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 71 293 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 364 293 293 vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 364 293 293 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 100 100 100 cM capacity(veh/h) 635 746 1268 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 0 71 293 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1268 1700 Volume to Capacity 0.00 0.00 0.17 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 0.0 Lane LOS A Approach Delay(s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 17.5% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW In(9y9Wk)D 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 '4r k t . ' Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T, Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 6 16 49 13 79 264 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 7 17 53 14 86 287 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 519 60 67 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 519 60 67 tC, single(s) 6.4 6.2 4.1 ' tC, 2 stage (s) tF(s) 3.5 3.3 2.2 p0 queue free % 99 98 94 ' cM capacity(veh/h) 488 1005 1534 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 24 67 373 ' Volume Left 7 0 86 Volume Right 17 14 0 cSH 780 1700 1534 ' Volume to Capacity 0.03 0.04 0.06 Queue Length 95th (ft) 2 0 4 Control Delay(s) 9.8 0.0 2.1 Lane LOS A A ' Approach Delay(s) 9.8 0.0 2.1 Approach LOS A Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 34.9% ICU Level of Service A Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW ln(S)PWO 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 ' Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Lane Configurations V1 + t y Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 ' Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 ' Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.992 0.938 Fit Protected 0.950 0.974 ' Satd. Flow(prot) 1770 1863 1848 0 1702 0 Fit Permitted 0.172 0.974 Satd. Flow(perm) 320 1863 1848 0 1702 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 7 47 ' Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time (s) 140.9 18.2 164.3 ' Volume (vph) 23 314 702 45 69 59 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 25 341 763 49 75 64 Lane Group Flow(vph) 25 341 812 0 139 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 ' Detector Phases 1 1 2 4 Minimum Initial (s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 ' Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 ' All-Red Time (s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode Max Max Min None ' Act Effct Green (s) 41.7 47.2 34.4 10.5 Actuated g/C Ratio 0.68 0.77 0,56 0.16 v/c Ratio 0.06 0.24 0.78 0.44 Control Delay 3.3 3.6 17.8 23.1 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 3.3 3.6 17.8 23.1 LOS A A B C ' Approach Delay 3.6 17.8 23.1 Approach LOS A B C Queue Length 50th (ft) 2 32 219 30 ' Queue Length 95th (ft) 9 76 426 m91 Internal Link Dist(ft) 8119 722 7148 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background AM (With SW In(SylPatk)D 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Turn Bay Length (ft) 85 Base Capacity(vph) 393 1436 1178 418 Starvation Cap Reductn 0 0 0 0 ' Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.06 0.24 0.69 0.33 ' Intersection Summary Area Type: Other Cycle Length: 80 ' Actuated Cycle Length: 61.2 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.78 Intersection Signal Delay: 14.4 Intersection LOS: B Intersection Capacity Utilization 53.8% ICU Level of Service A Analysis Period (min) 15 ' m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road ' m1 a2 �► m4 r Proposed Distribution Center, South WIndsor,CT 4/27/2006 2008 Background AM (With SW ln(S)Ris O 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 ' Exhibit 21 Operational Analysis Worksheets 2008 Background PM Peak Hour Traffic Volumes ' (With South Windsor Technologies Center) 1 1 ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR ' Lane Configurations *4 1 4 I I ft F 11 +T Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 ' Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.994 0.850 0.850 0.999 Fit Protected 0.985 0.950 0.965 0.950 0.950 Satd. Flow(prot) 0 1824 0 1681 1708 1583 1770 3539 1583 3433 3536 0 ' Fit Permitted 0.836 0.311 0.415 0.316 0.220 Satd. Flow(perm) 0 1548 0 550 734 1583 589 3539 1583 795 3536 0 Right Turn on Red Yes Yes Yes Yes ' Satd. Flow(RTOR) 2 306 359 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1088 848 1120 1856 Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 26 53 4 229 42 309 5 634 330 318 402 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 ' Adj. Flow(vph) 28 58 4 249 46 336 5 689 359 346 437 4 Lane Group Flow(vph) 0 90 0 125 170 336 5 689 359 346 441 0 Turn Type custom custom custom custom custom custom ' Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 ' Minimum Split (s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% ' Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time(s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag ' Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.8 27.2 27.2 35.4 38.5 31.1 62.3 38.5 31.1 Actuated g/C Ratio 0.12 0.30 0.30 0.39 0.43 0.35 0.69 0.43 0.35 ' v/c Ratio 0.48 0.75 0.77 0.42 0.01 0.56 0.30 0.62 0.36 Control Delay 45.0 53.3 48.9 2.9 19.2 30.4 1.3 24.2 26.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 ' Total Delay 45.0 53.3 48.9 2.9 19.2 30.4 1.3 24.2 26.7 LOS D D D A B C A C C Approach Delay 45.0 25.3 20.5 25.6 Approach LOS D C C C ' Queue Length 50th (ft) 47 66 89 6 2 178 0 62 105 Queue Length 95th (ft) 95 123 151 26 10 #319 27 #111 171 Internal Link Dist(ft) 1008 768 1040 1776 ' Turn Bay Length (ft) Base Capacity (vph) 198 226 302 809 349 1222 1321 557 1222 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(S)Rwtkp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.45 0.55 0.56 0.42 0.01 0.56 0.27 0.62 0.36 Intersection Summary Area Type: Other ' Cycle Length: 90 Actuated Cycle Length: 90 Offset: 75 (83%), Referenced to phase 2:NBSB, Start of Yellow ' Natural Cycle: 70 Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.77 Intersection Signal Delay: 24.1 Intersection LOS:C ' Intersection Capacity Utilization 51.1% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194& Route 5 ' ° wu 01 _. o2 08 i i ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW ln(EIRft 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 ' HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR ' Lane Configurations 4 1� Y Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 28 673 566 10 16 79 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 30 732 615 11 17 86 Pedestrians Lane Width(ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.87 vC, conflicting volume 626 1413 621 ' vC1, stage 1 conf vol vC2,stage 2 conf vol vCu, unblocked vol 626 1472 621 tC, single (s) 4.1 6.4 6.2 ' tC, 2 stage(s) tF (s) 2.2 3.5 3.3 p0 queue free % 97 85 82 ' cM capacity(veh/h) 956 118 488 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 762 626 103 ' Volume Left 30 0 17 Volume Right 0 11 86 cSH 956 1700 320 Volume to Capacity 0.03 0.37 0.32 ' Queue Length 95th (ft) 2 0 34 Control Delay(s) 0.8 0.0 21.6 Lane LOS A C Approach Delay(s) 0.8 0.0 21.6 Approach LOS C Intersection Summary Average Delay 1.9 Intersection Capacity Utilization 70.6% ICU Level of Service C Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(SyfAsticjo 6 Report BUBARIS TRAFFIC ASSOCIATES Pagel HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 t Y Sign Control Free Free Stop Grade 0% 0% 0% ' Volume (veh/h) 198 491 506 24 20 81 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 215 534 550 26 22 88 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) r Median type None Median storage veh) Upstream signal (ft) 1253 pX, platoon unblocked 0.90 vC, conflicting volume 576 1527 563 vC1, stage 1 conf vol ' vC2, stage 2 conf vol vCu, unblocked vol 576 1588 563 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free % 78 74 83 I , cM capacity(veh/h) 997 83 526 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 749 576 110 Volume Left 215 0 22 Volume Right 0 26 88 cSH 997 1700 257 Volume to Capacity 0.22 0.34 0.43 ' Queue Length 95th (ft) 20 0 51 Control Delay (s) 4.9 0.0 29.1 Lane LOS A D Approach Delay(s) 4.9 0.0 29.1 Approach LOS D Intersection Summary Average Delay 4.8 Intersection Capacity Utilization 81.0% ICU Level of Service D Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(S pImft 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 2 l HCM Unsignalized Intersection Capacity Analysis 8: Commerce Way& Rye Street 4/27/2006 -A -I-* 4N t 1 � ' Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 1� Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 20 9 1 220 81 3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 22 10 1 239 88 3 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 331 90 91 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 331 90 91 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 97 99 100 cM capacity(veh/h) 663 968 1504 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 32 240 91 ' Volume Left 22 1 0 Volume Right 10 0 3 cSH 735 1504 1700 ' Volume to Capacity 0.04 0.00 0.05 Queue Length 95th (ft) 3 0 0 Control Delay(s) 10.1 0.0 0.0 Lane LOS B A Approach Delay(s) 10.1 0.0 0.0 Approach LOS B Intersection Summary Average Delay 0.9 Intersection Capacity Utilization 22.4% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(S)Maft 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 1 --A 4% t �► Movement EBL EBR NBL NBT SBT SBR ' Lane Configurations Y 4 T4 Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 0 0 0 240 84 0 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 0 0 0 261 91 0 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 352 91 91 vC1,stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 352 91 91 tC, single(s) 6.4 6.2 4.1 ' tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 100 100 100 ' CM capacity(veh/h) 645 966 1504 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 0 261 91 Volume Left 0 0 0 Volume Right 0 0 0 cSH 1700 1504 1700 Volume to Capacity 0.00 0.00 0.05 Queue Length 95th (ft) 0 0 0 Control Delay(s) 0.0 0.0 0.0 Lane LOS A ' Approach Delay(s) 0.0 0.0 0.0 Approach LOS A Intersection Summary Average Delay 0.0 Intersection Capacity Utilization 16.0% ICU Level of Service A Analysis Period(min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(S?sfkp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 I' k t Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y T* 4 Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 5 94 226 15 45 79 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 102 246 16 49 86 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 438 254 262 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 438 254 262 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 99 87 96 ' cM capacity(veh/h) 555 785 1302 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 108 262 135 ' Volume Left 5 0 49 Volume Right 102 16 0 cSH 769 1700 1302 Volume to Capacity 0.14 0.15 0.04 ' Queue Length 95th (ft) 12 0 3 Control Delay (s) 10.4 0.0 3.1 Lane LOS B A Approach Delay(s) 10.4 0.0 3.1 Approach LOS B Intersection Summary Average Delay 3.0 Intersection Capacity Utilization 35.5% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW ln(S)Fatkp 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 r ' Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Lane Configurations Ideal Flow(vphpl) 1900 1900 190 1900 1900 1900 Storage Length (ft) 85 0 0 0 ' Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 ' Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.967 0.965 Fit Protected 0.950 0.964 Satd. Flow(prot) 1770 1863 1801 0 1733 0 Fit Permitted 0.331 0.964 Satd. Flow(perm) 617 1863 1801 0 1733 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 34 19 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 ' Link Speed (mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time(s) 140.9 18.2 164.3 Volume(vph) 84 674 402 128 79 28 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 91 733 437 139 86 30 Lane Group Flow(vph) 91 733 676 0 116 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 Detector Phases 1 1 2 4 Minimum Initial (s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 1 Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time(s) 3.0 3.0 3.0 3.0 All-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 35.3 40.5 28.2 9.9 Actuated g/C Ratio 0.65 0.75 0.52 0.17 v/c Ratio 0.16 0.53 0.61 0.37 Control Delay 4.0 6.1 13.0 22.1 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 4.0 6.1 13.0 22.1 LOS A A B C Approach Delay 5.9 13.0 22.1 Approach LOS A B C Queue Length 50th (ft) 7 92 120 28 Queue Length 95th (ft) 21 201 233 m77 Internal Link Dist (ft) 6119 722 7148 ' Proposed Distribution Center, South Wlndsor,CT 4/27/2006 2008 Background PM (With SW In(S~6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Turn Bay Length (ft) 85 Base Capacity(vph) 555 1392 1166 436 Starvation Cap Reductn 0 0 0 0 Spiliback Cap keductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.16 0.53 0.49 0.27 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 54.2 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.61 Intersection Signal Delay: 9.8 Intersection LOS:A Intersection Ca pacity Utilization 51.1 /o ICU Level of Service A Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road m2 04 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Background PM (With SW In(SIRAft 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 Exhibit 22 Operational Analysis Worksheets 2008 Combined AM Peak Hour Traffic Volumes 1 i 1 I tLanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations 4 1 4 r I ++ F 11 0 Ideal Flow(vphpi) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Frt 0.990 0.850 0.850 0.998 Fit Protected 0.985 0.950 0.958 0.950 0.950 Satd. Flow(prot) 0 1816 0 1681 1695 1583 1770 3539 1583 3433 3532 0 Fit Permitted 0.828 0.315 0.345 0.220 0.365 Satd. Flow(perm) 0 1527 0 557 611 1583 410 3539 1583 1319 3532 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow(RTOR) 4 386 334 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 Link Distance (ft) 1088 848 1120 1856 Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 16 30 4 365 27 362 5 364 307 264 768 11 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 17 33 4 397 29 393 5 396 334 287 835 12 Lane Group Flow(vph) 0 54 0 199 227 393 5 396 334 287 847 0 Turn Type custom custom custom custom custom custom M Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split(s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% 1 Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 Ail-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? ' Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.1 35.6 35.6 44.6 33.2 25.8 65.5 33.2 25.8 Actuated g/C Ratio 0.11 0.40 0.40 0.50 0.37 0.29 0.73 0.37 0.29 v/c Ratio 0.31 0.90 0.94 0.40 0.02 0.39 0.27 0.43 0.83 Control Delay 38.9 68.2 73.0 2.1 20.6 29.7 1.3 21.8 42.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 38.9 68.2 73.0 2.1 20.6 29.7 1.3 21.8 42.7 LOS D E E A C C A C D Approach Delay 38.9 37.8 16.7 37.4 Approach LOS D D B D Queue Length 50th (ft) 26 106 124 1 2 106 0 60 -303 Queue Length 95th (ft) 62 #247 #276 24 10 154 26 92 #430 Internal Link Dist(ft) 1008 768 1040 1776 Turn Bay Length (ft) Base Capacity(vph) 197 229 251 980 263 1016 1262 661 1015 Proposed Distribution Center, South WIndsor,CT 4/27/2006 2008 Combined AM (With SW Ind.Vpftro 6 Report BUBARIS TRAFFIC ASSOCIATES Pagel i Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spiliback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.27 0.87 0.90 0.40 0.02 0.39 0.26 0.43 0.83 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length: 90 Offset: 75(83%), Referenced to phase 2:NBSB, Start of Yellow Natural Cycle: 90 Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.94 Intersection Signal Delay: 32.0 Intersection LOS: C Intersection Capacity Utilization 53.2% ICU Level of Service A Analysis Period (min) 15 Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ' Splits and Phases: 1: Route 194 &Route 5 01 02 04 08 1 r Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.S)ari*ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 1� +fir Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 33 567 732 24 11 21 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 36 616 796 26 12 23 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage 1 Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.89 vC, conflicting volume 822 1497 809 vC1, stage 1 conf vol ' vC2,stage 2 conf vol vCu, unblocked vol 822 1557 809 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 96 89 94 1 cM capacity(veh/h) 808 106 381 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 652 822 35 Volume Left 36 0 12 Volume Right 0 26 23 cSH 808 1700 201 Volume to Capacity 0.04 0.48 0.17 Queue Length 95th (ft) 3 0 15 Control Delay (s) 1.2 0.0 26.6 Lane LOS A D Approach Delay (s) 1.2 0.0 26.6 Approach LOS D Intersection Summary ' Average Delay 1.1 Intersection Capacity Utilization 66.8% ICU Level of Service C Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind. 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 1 fHCM Unsignalized Intersection Capacity Analysis ■ 8: Commerce Way & Rye Street 4/27/2006 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 T Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 2 6 15 273 297 19 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 2 7 16 297 323 21 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 810 pX, platoon unblocked vC, conflicting volume 662 333 343 vC1, stage 1 conf vol 1 vC2, stage 2 conf vol vCu, unblocked vol 662 333 343 tC, single (s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free % 99 99 99 ' cM capacity(veh/h) 421 709 1216 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 9 313 343 Volume Left 2 16 0 Volume Right 7 0 21 cSH 605 1216 1700 Volume to Capacity 0.01 0.01 0.20 Queue Length 95th (ft) 1 1 0 Control Delay (s) 11.0 0.5 0.0 Lane LOS B A Approach Delay(s) 11.0 0.5 0.0 t. Approach LOS B Intersection Summary Average Delay 0.4 Intersection Capacity Utilization 36.6% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.gyn#ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 3 ' HCM Unsignalized Intersection Capacity Analysis 1 0: Site Drive & Rye Street 4/27/2006 --* ---* -4\ t Movement EBL EBR NBL NBT SBT SBR ' Lane Configurations Y 4 T* Sign Control Stop Free Free Grade 0% 0% 0% Volume(veh/h) 1 46 210 65 270 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 1 50 228 71 293 4 Pedestrians j ' Lane Width(ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) ' Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 823 296 298 vC1, stage 1 conf vol ' vC2, stage 2 conf vol vCu, unblocked vol 823 296 298 tC, single(s) 6.4 6.2 4.1 ' tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 100 93 82 ' cM capacity(veh/h) 281 744 1263 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 51 299 298 ' Volume Left 1 228 0 Volume Right 50 0 4 cSH 719 1263 1700 Volume to Capacity 0.07 0.18 0.18 ' Queue Length 95th (ft) 6 16 0 Control Delay (s) 10.4 6.9 0.0 Lane LOS B A ' Approach Delay(s) 10.4 6.9 0.0 Approach LOS B Intersection Summary ' Average Delay 4.0 Intersection Capacity Utilization 42.8% ICU Level of Service A Analysis Period (min) 15 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.Vin"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 HCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 Movement WBL WBR NBT NBR SBL SBT ' Lane Configurations Y 1� 4 Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 6 16 50 13 79 268 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 7 17 54 14 86 291 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 524 61 68 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 524 61 68 tC, single(s) 6.4 6.2 4.1 tC, 2 stage (s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 98 94 ' cM capacity(veh/h) 485 1004 1533 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 24 68 377 ' Volume Left 7 0 86 Volume Right 17 14 0 cSH 777 1700 1533 Volume to Capacity 0.03 0.04 0.06 Queue Length 95th (ft) 2 0 4 Control Delay (s) 9.8 0.0 2.1 Lane LOS A A ' Approach Delay(s) 9.8 0.0 2.1 Approach LOS A Intersection Summary Average Delay 2.2 Intersection Capacity Utilization 35.1% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW lnd.Syrri*ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 ' Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 ' -)F -► 4- Lane Group EBL EBT WBT WBR SEL SER Lane Configurations I + T y Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 ' Storage Lanes 1 0 1 0 Total Lost Time(s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 ' Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.993 0.938 Flt Protected 0.950 0.974 Satd. Flow(prot) 1770 1863 1850 0 1702 0 Fit Permitted 0.087 0.974 ' Satd. Flow(perm) 162 1863 1850 0 1702 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 6 47 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed(mph) 30 30 30 Link Distance (ft) 8199 802 7228 Travel Time (s) 140.9 18.2 164.3 Volume (vph) 23 341 826 45 69 59 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 25 371 898 49 75 64 ' Lane Group Flow(vph) 25 371 947 0 139 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 ' Detector Phases 1 1 2 4 Minimum initial (s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 ' Total Split(s) 11.0 11.0 50.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 ' All-Red Time (s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 47.6 53.1 40.1 10.6 Actuated g/C Ratio 0.71 0.79 0.60 0.15 v/c Ratio 0.09 0.25 0.85 0.46 Control Delay 3.5 3.5 21.9 25.6 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 3.5 3.6 21.9 25.6 LOS A A C C Approach Delay 3.6 21.9 25.6 Approach LOS A C C Queue Length 50th (ft) 2 37 299 39 Queue Length 95th (ft) 9 84 #653 m91 Internal Link Dist(ft) 6119 722 7148 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.Vp"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 ' Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER ' Turn Bay Length (ft) 85 Base Capacity(vph) 293 1477 1177 387 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.09 0.25 0.80 0.36 ' Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 67 Natural Cycle: 60 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.85 ' Intersection Signal Delay: 17.3 Intersection LOS: B Intersection Capacity Utilization 60.4% ICU Level of Service B Analysis Period (min) 15 ' # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. m Volume for 95th percentile queue is metered by upstream signal. ' Splits and Phases: 15: Route 194&Troy Road ml m2 A Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.SVn#ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 ' Lanes, Volumes, Timings 7: Route 194 & Rye Street 5/1/2006 Lane Group EBL EBT WBT WBR SBL SBR ' Lane Configurations Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed(mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 ' Frt 0.969 0.885 Fit Protected 0.950 0.993 Satd. Flow(prot) 1770 1863 1805 0 1637 0 FIt Permitted 0.160 0.993 Satd. Flow(perm) 298 1863 1805 0 1637 0 Right Turn on Red Yes Yes ' Satd. Flow(RTOR) 30 286 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 405 6199 810 Travel Time (s) 9.2 140.9 18.4 Volume (vph) 146 432 485 142 45 263 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 159 470 527 154 49 286 Lane Group Flow(vph) 159 470 681 0 335 0 Turn Type custom Protected Phases 1 1 3 ' Permitted Phases 2 2 2 3 Detector Phases 1 1 2 3 Minimum Initial (s) 4.0 4.0 4.0 4.0 ' Minimum Split(s) 8.0 8.0 21.0 9.0 Total Split(s) 12.0 12.0 29.0 0.0 19:0 0.0 Total Split(%) 20.0% 20.0% 48.3% 0.0% 31.7% 0.0% ' Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 0.0 2.0 2.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? ' Recall Mode None None None None Act Effct Green (s) 30.2 34.3 22.5 9.3 Actuated g/C Ratio 0.58 0.66 0.43 0.18 ' v/c Ratio 0.40 0.38 0.85 0.63 Control Delay 8.3 5.5 26.1 10.7 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 8.3 5.5 26.1 10.7 LOS A A C B Approach Delay 6.2 26.1 10.7 Approach LOS A C B Queue Length 50th (ft) 13 45 160 14 Queue Length 95th (ft) 46 124 #408 71 Internal Link Dist (ft) 325 6119 730 ' Turn Bay Length (ft) Base Capacity(vph) 404 1204 853 642 ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.Vftftro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 7: Route 194 & Rye Street 5/1/2006 Lane Group EBL EBT WBT WBR SBL SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.39 0.39 0.80 0.52 Intersection Summary Area Type: Other Cycle Length: 60 ' Actuated Cycle Length: 51.8 Natural Cycle: 50 Control Type:Actuated-Uncoordinated ' Maximum v/c Ratio: 0.85 Intersection Signal Delay: 15.4 Intersection LOS: B Intersection Capacity Utilization 71.0% ICU Level of Service C ' Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. ' Splits and Phases: 7: Route 194& Rye Street Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined AM (With SW Ind.Syff"ro 6 Report ' BUBARIS TRAFFIC ASSOCIATES Page 2 Exhibit 23 Operational Analysis Worksheets ' 2008 Combined PM Peak Hour Traffic Volumes r ' Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR ' Lane Configurations 4, 1 4 r I ++ F n +1� Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 50 50 50 50 50 50 Trailing Detector(ft) 0 0 0 0 0 0 0 0 0 0 Turning Speed (mph) 15 9 15 9 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 1.00 1.00 0.95 1.00 0.97 0.95 0.95 Fit 0.994 0.850 0.850 0.999 Fit Protected 0.985 0.950 0.963 0.950 0.950 Satd. Flow(prot) 0 1824 0 1681 1704 1583 1770 3539 1583 3433 3536 0 Fit Permitted 0.823 0.311 0.377 0.316 0.220 Satd. Flow(perm) 0 1524 0 550 667 1583 589 3539 1583 795 3536 0 Right Turn on Red Yes Yes Yes Yes ' Satd. Flow(RTOR) 2 306 380 1 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 30 ' Link Distance (ft) 1088 848 1120 1856 Travel Time(s) 24.7 19.3 25.5 42.2 Volume (vph) 26 53 4 290 42 320 5 634 350 322 402 4 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 ' Adj. Flow(vph) 28 58 4 315 46 348 5 689 380 350 437 4 Lane Group Flow(vph) 0 90 0 158 203 348 5 689 380 350 441 0 Turn Type custom custom custom custom custom custom Protected Phases 1 1 4 1 Permitted Phases 8 8 4 4 4 2 2 2 2 2 Detector Phases 8 8 4 4 1 1 2 4 1 2 Minimum Initial (s) 5.0 5.0 9.0 9.0 5.0 5.0 15.0 9.0 5.0 15.0 Minimum Split(s) 11.6 11.6 15.8 15.8 11.4 11.4 21.8 15.8 11.4 21.8 Total Split(s) 15.4 15.4 0.0 41.0 41.0 11.4 11.4 22.2 41.0 11.4 22.2 0.0 Total Split(%) 17.1% 17.1% 0.0% 45.6% 45.6% 12.7% 12.7% 24.7% 45.6% 12.7% 24.7% 0.0% ' Yellow Time (s) 3.6 3.6 3.6 3.6 3.0 3.0 5.0 3.6 3.0 5.0 All-Red Time (s) 3.0 3.0 3.2 3.2 3.4 3.4 1.8 3.2 3.4 1.8 Lead/Lag Lead Lead Lag Lead Lag Lead-Lag Optimize? Recall Mode None None None None None None C-Max None None C-Max Act Effct Green (s) 10.8 32.1 32.1 40.3 33.6 26.2 62.3 33.6 26.2 Actuated g/C Ratio 0.12 0.36 0.36 0.45 0.37 0.29 0.69 0.37 0.29 ' v/c Ratio 0.49 0.81 0.85 0.40 0.02 0.67 0.31 0.68 0.43 Control Delay 45.5 55.3 57.6 2.6 20.6 35.9 1.4 29.0 30.5 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay 45.5 55.3 57.6 2.6 20.6 35.9 1.4 29.0 30.5 LOS D E E A C D A C C Approach Delay 45.5 30.1 23.6 29.9 Approach LOS D C C C ' Queue Length 50th (ft) 47 76 101 6 2 205 0 75 120 Queue Length 95th (ft) 95 #185 #225 29 10 #319 28 #114 171 Internal Link Dist(ft) 1008 768 1040 1778 Turn Bay Length (ft) Base Capacity(vph) 195 226 274 878 317 1031 1274 514 1031 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.SWTOro 6 Report 1 BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 1: Route 194 & Route 5 4/27/2006 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 0 0 Reduced v/c Ratio 0.46 0.70 0.74 0.40 0.02 0.67 0.30 0.68 0.43 Intersection Summary Area Type: Other Cycle Length: 90 Actuated Cycle Length:90 Offset: 75 (83%), Referenced to phase 2:NBSB, Start of Yellow ' Natural Cycle: 75 Control Type:Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay: 27.9 Intersection LOS: C Intersection Capacity Utilization 52.5% ICU Level of Service A Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. ' Queue shown is maximum after two cycles. Splits and Phases: 1: Route 194&Route 5 07 o2 f 04 .:;= m$ ' Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.Sro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 5: Route 194 & Commerce Way 4/27/2006 Movement EBL EBT WBT WBR SBL SBR Lane Configurations 4 T ►fit Sign Control Free Free Stop Grade 0% 0% 0% Volume(veh/h) 28 697 638 10 16 79 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 30 758 693 11 17 86 ' Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 848 pX, platoon unblocked 0.86 vC, conflicting volume 704 1517 699 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 704 1600 699 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 97 82 80 ' cM capacity(veh/h) 893 97 440 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 788 704 103 ' Volume Left 30 0 17 Volume Right 0 11 86 cSH 893 1700 276 Volume to Capacity 0.03 0.41 0.37 ' Queue Length 95th (ft) 3 0 42 Control Delay(s) 0.9 0.0 25.7 Lane LOS A D Approach Delay (s) 0.9 0.0 25.7 Approach LOS D Intersection Summary Average Delay 2.1 Intersection Capacity Utilization 71.8% ICU Level of Service C Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.S3aftro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 r HCM Unsignalized Intersection Capacity Analysis 7: Route 194 & Rye Street 4/27/2006 Movement EBL EBT WBT WBR SBL SBR ' Lane Configurations 4 T +fir Sign Control Free Free Stop Grade 0% 0% 0% Volume (veh/h) 222 491 506 59 124 153 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate(vph) 241 534 550 64 135 166 Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage ' Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) 1253 pX, platoon unblocked 0.88 vC, conflicting volume 614 1598 582 vC1, stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 614 1681 582 tC, single (s) 4.1 6.4 6.2 tC, 2 stage (s) tF (s) 2.2 3.5 3.3 p0 queue free% 75 0 88 cM capacity(veh/h) 965 69 513 Direction, Lane# EB 1 WB 1 SB 1 Volume Total 775 614 301 ' Volume Left 241 0 135 Volume Right 0 64 166 cSH 965 1700 132 Volume to Capacity 0.25 0.36 2.29 Queue Length 95th (ft) 25 0 640 Control Delay(s) 5.6 0.0 657.2 Lane LOS A F Approach Delay(s) 5.6 0.0 657.2 Approach LOS F Intersection Summary Average Delay 119.6 Intersection Capacity Utilization 94.6% ICU Level of Service F Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.$W"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 HCM Unsignalized Intersection Capacity Analysis 10: Site Drive & Rye Street 4/27/2006 -` ""\ t # Movement EBL EBR NBL NBT SBT SBR Lane Configurations Y 4 T Sign Control Stop Free Free Grade 0% 0% 0% ' Volume (veh/h) 4 176 59 240 84 1 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 4 191 64 261 91 1 Pedestrians Lane Width (ft) Walking Speed (ftls) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 481 92 92 vC1,stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 481 92 92 tC, single (s) 6.4 6.2 4.1 ' tC, 2 stage(s) tF (s) 3.5 3.3 2.2 p0 queue free% 99 80 96 cM capacity(veh/h) 521 966 1502 Direction, Lane# EB 1 NB 1 SB 1 Volume Total 196 325 92 ' Volume Left 4 64 0 Volume Right 191 0 1 cSH 948 1502 1700 Volume to Capacity 0.21 0.04 0.05 Queue Length 95th (ft) 19 3 0 Control Delay(s) 9.8 1.8 0.0 Lane LOS A A Approach Delay(s) 9.8 1.8 0.0 Approach LOS A Intersection Summary ' Average Delay 4.1 Intersection Capacity Utilization 40.3% ICU Level of Service A Analysis Period (min) 15 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW lnd.$Yff#ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 4 r rHCM Unsignalized Intersection Capacity Analysis 12: Troy Road & Rye Street 4/27/2006 r4,- k t �" `w Movement WBL WBR NBT NBR SBL SBT Lane Configurations Y 1� 4 Sign Control Stop Free Free Grade 0% 0% 0% Volume (veh/h) 5 94 230 15 45 80 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Hourly flow rate (vph) 5 102 250 16 49 87 r Pedestrians Lane Width (ft) Walking Speed (ft/s) Percent Blockage Right turn flare (veh) Median type None Median storage veh) Upstream signal (ft) pX, platoon unblocked vC, conflicting volume 443 258 266 vC1,stage 1 conf vol vC2, stage 2 conf vol vCu, unblocked vol 443 258 266 tC, single(s) 6.4 6.2 4.1 tC, 2 stage(s) tF (s) 3.5 3.3 2.2 p0 queue free % 99 87 96 r cM capacity(veh/h) 551 780 1298 Direction, Lane# WB 1 NB 1 SB 1 Volume Total 108 266 136 Volume Left 5 0 49 Volume Right 102 16 0 cSH 764 1700 1298 Volume to Capacity 0.14 0.16 0.04 Queue Length 95th (ft) 12 0 3 Control Delay(s) 10.5 0.0 3.0 Lane LOS B A Approach Delay (s) 10.5 0.0 3.0 Approach LOS B Intersection Summary ' Average Delay 3.0 Intersection Capacity Utilization 35.8% ICU Level of Service A Analysis Period (min) 15 r r r Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.S.Woro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 5 r Lanes, Volumes, Timings 15: Route 194 &Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Lane Configurations + T y Ideal Flow(vphpi) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 85 0 0 0 Storage Lanes 1 0 1 0 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.969 0.965 Fit Protected 0.950 0.964 Satd. Flow(prot) 1770 1863 1805 0 1733 0 Fit Permitted 0.304 0.964 Satd. Flow(perm) 566 1863 1805 0 1733 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 31 19 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed(mph) 30 30 30 Link Distance (ft) 6199 802 7228 Travel Time (s) 140.9 18.2 164.3 Volume (vph) 84 776 437 128 79 28 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 91 843 475 139 86 30 Lane Group Flow(vph) 91 843 614 0 116 0 Turn Type custom Protected Phases 1 1 4 Permitted Phases 2 2 2 4 Detector Phases 1 1 2 4 Minimum Initial(s) 4.0 4.0 25.0 9.0 Minimum Split(s) 8.0 8.0 30.0 13.0 Total Split(s) 11.0 11.0 60.0 0.0 19.0 0.0 Total Split(%) 13.8% 13.8% 62.5% 0.0% 23.8% 0.0% Yellow Time(s) 3.0 3.0 3.0 3.0 Ail-Red Time(s) 0.0 0.0 2.0 1.0 Lead/Lag Lead Lead Lag Lead-Lag Optimize? Recall Mode Max Max Min None Act Effct Green (s) 36.5 41.7 29.2 9.9 Actuated g/C Ratio 0.66 0.75 0.53 0.17 v/c Ratio 0.17 0.60 0.63 0.37 Control Delay 4.0 7.1 13.5 23.0 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 4.0 7.1 13.5 23.0 LOS A A B C Approach Delay 6.8 13.5 23.0 Approach LOS A B C Queue Length 50th (ft) 7 118 134 28 Queue Length 95th (ft) 21 260 255 m80 Internal Link Dist(ft) 6119 722 7148 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.S�n#ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 8 Lanes, Volumes, Timings 15: Route 194 & Troy Road 4/27/2006 Lane Group EBL EBT WBT WBR SEL SER Turn Bay Length (ft) 85 Base Capacity(vph) 529 1401 1167 430 Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced v/c Ratio 0.17 0.60 0.53 0.27 Intersection Summary Area Type: Other Cycle Length: 80 Actuated Cycle Length: 55.4 Natural Cycle: 55 Control Type: Semi Act-Uncoord Maximum v/c Ratio: 0.63 Intersection Signal Delay: 10.4 Intersection LOS: B Intersection Capacity Utilization 55.0% ICU Level of Service B Analysis Period (min) 15 m Volume for 95th percentile queue is metered by upstream signal. Splits and Phases: 15: Route 194&Troy Road klk z . ., 01 r t Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.$jar"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 9 Lanes, Volumes, Timings 7: Route 194 & Rye Street 5/1/2006 Lane Group EBL EBT WBT WBR SBL SBR Lane Configurations + T y Ideal Flow(vphpl) 1900 1900 1900 1900 1900 1900 Total Lost Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 1 Leading Detector(ft) 50 50 50 50 Trailing Detector(ft) 0 0 0 0 Turning Speed (mph) 15 9 15 9 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.986 0.926 Fit Protected 0.950 0.978 Satd. Flow(prot) 1770 1863 1837 0 1687 0 Fit Permitted 0.188 0.978 Satd. Flow(perm) 350 1863 1837 0 1687 0 Right Turn on Red Yes Yes Satd. Flow(RTOR) 12 98 Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Link Speed (mph) 30 30 30 Link Distance (ft) 405 6199 810 Travel Time (s) 9.2 140.9 18.4 Volume (vph) 222 491 506 59 124 153 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Adj. Flow(vph) 241 534 550 64 135 166 Lane Group Flow(vph) 241 534 614 0 301 0 Turn Type custom ' Protected Phases 1 3 Permitted Phases 2 2 2 3 Detector Phases 1 2 2 3 Minimum Initial (s) 4.0 4.0 4.0 4.0 Minimum Split(s) 8.0 20.0 20.0 8.0 Total Split (s) 12.0 29.0 29.0 0.0 19.0 0.0 Total Split(%) 20.0% 48.3% 48.3% 0.0% 31.7% 0.0% Yellow Time (s) 3.0 3.0 3.0 3.0 All-Red Time (s) 0.0 1.0 1.0 1.0 Lead/Lag Lead Lag Lag Lead-Lag Optimize? Recall Mode None None None None Act Effct Green (s) 25.5 25.3 25.3 11.4 Actuated g/C Ratio 0.52 0.54 0.54 0.23 ' v/c Ratio 0.60 0.53 0.62 0.64 Control Delay 14.2 15.1 17.4 20.4 Queue Delay 0.0 0.0 0.0 0.0 Total Delay 14.2 15.1 17.4 20.4 LOS B B B C Approach Delay 14.8 17.4 20.4 Approach LOS B B C Queue Length 50th (ft) 28 136 164 62 Queue Length 95th (ft) #92 250 #350 134 Internal Link Dist(ft) 325 6119 730 Turn Bay Length (ft) Base Capacity(vph) 439 1024 1015 582 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.5yff"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 1 Lanes, Volumes, Timings 7: Route 194 & Rye Street 5/1/2006 Lane Group EBL EBT WBT WBR SBL SBR Starvation Cap Reductn 0 0 0 0 Spillback Cap Reductn 0 0 0 0 Storage Cap Reductn 0 0 0 0 Reduced We Ratio 0.55 0.52 0.60 0.52 Intersection Summary Area Type: Other Cycle Length: 60 Actuated Cycle Length: 47.1 Natural Cycle: 55 Control Type:Actuated-Uncoordinated Maximum v/c Ratio: 0.64 Intersection Signal Delay: 16.8 Intersection LOS: B Intersection Capacity Utilization 68.8% ICU Level of Service C Analysis Period (min) 15 # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. Splits and Phases: 7: Route 194&Rye Street *4',- "01 .�-...�,. m2 � 03 1 Proposed Distribution Center, South Windsor,CT 4/27/2006 2008 Combined PM (With SW Ind.5Yff"ro 6 Report BUBARIS TRAFFIC ASSOCIATES Page 2 Exhibit 24 Automatic Traffic Recorder Counts Rye Street at Site Drive Connecticut Counts Inc. Page 1 Kensington, Connecticut 06037 Rye Street at Distribution Facility Dr (860) 828-1693 Site Code:887 South Windsor,Connecticut Station ID: Northbound Latitude:0'0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 Total Percent Percent 04109/06 02:00 # * * R # * # R # # # # # # « 03:00 * R # * * # * # * # # R * # 04:00 # R * # * # * # # * # * R # # # 05 M « * * # # « # * * # # 0606:00 * * * # # * # * * * * * # * * # 08:00 0 0 1 1 2 5 20 9 3 1 0 0 0 0 42 49 52 09:00 1 0 0 0 0 10 24 14 4 4 0 0 0 0 57 50 56 10:00 3 0 0 0 3 12 28 18 5 2 1 0 0 0 72 49 54 11:00 1 1 0 0 1 13 29 26 8 2 0 0 0 0 81 50 53 12 PM 1 0 0 0 0 10 27 21 5 2 0 2 0 0 68 50 56 13:00 0 0 0 0 2 16 38 15 8 0 0 0 1 0 77 49 53 14:00 0 0 0 0 1 14 23 24 8 4 0 0 0 0 74 51 55 15:00 0 0 0 0 1 5 31 19 7 3 0 0 0 0 66 50 55 16:00 0 0 0 1 0 6 28 17 9 2 0 0 0 0 63 51 54 17:00 0 0 0 0 2 7 16 21 4 3 0 0 0 0 53 50 54 18:00 0 0 0 0 3 10 16 18 5 1 0 0 0 0 53 50 53 19:00 0 0 0 0 2 3 16 10 3 1 0 0 0 0 35 50 52 20:00 0 0 0 0 1 8 11 1 0 1 0 0 0 0 22 45 46 21:00 0 0 0 0 1 4 14 2 1 0 0 0 0 0 22 45 47 22:00 0 0 0 0 0 1 5 1 0 0 1 0 0 0 8 46 61 23:00 0 0 0 0 0 0 1 3 1 1 0 0 0 0 6 55 56 Total 6 1 1 2 19 123 325 219 71 27 2 2 1 0 799 Percent 0.8% 0.1% 0.1% 0.3% 2.4% 15.4% 40.7% 27.4% 8.9% 3.4% 0.3% 0.3% 0.1% 0.0% AM 10:00 11:00 08:00 08:00 10:00 11:00 11:00 11:00 11:00 09:00 10:00 11:00 Peak Vol. 3 1 1 1 3 13 29 26 8 4 1 81 PM 12.00 16:00 18:00 13:00 13:00 14:00 16:00 14:00 22:00 12:00 13:00 13:00 Peak Vol. 1 1 3 15 36 24 9 4 1 2 1 77 Connecticut Counts Inc. Page 2 Kensington, Connecticut 06037 Rye Street at Distribution Facility Dr (860)828-1693 Site Code:887 South Windsor,Connecticut Station ID: Northbound Latitude:0'0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 Total Percent Percent 04/10/06 0 0 0 0 1 2 2 0 1 0 0 0 0 0 6 42 51 01:00 0 0 0 1 0 0 1 0 0 0 0 0 0 0 2 41 41 02:00 0 0 0 0 0 2 0 0 0 0 0 0 0 0 2 37 37 03:00 0 2 3 1 1 2 2 1 1 0 0 0 0 0 13 42 50 04:00 1 4 3 1 1 0 0 1 1 0 0 0 0 0 12 31 50 05:00 0 4 7 2 2 5 15 11 3 0 1 1 0 0 51 49 52 06:00 1 3 2 0 3 14 13 17 3 1 0 0 0 0 57 49 51 07:00 1 1 3 1 4 12 22 13 6 0 0 0 0 0 63 49 52 08:00 1 3 3 3 1 10 18 15 2 1 0 0 0 0 57 48 50 09:00 1 2 3 5 2 20 20 13 4 0 0 0 1 0 71 48 51 10:00 3 5 5 1 9 8 25 21 3 0 0 0 0 0 80 48 50 11:00 0 2 5 4 3 13 33 17 2 3 0 0 0 0 82 48 54 12 PM 0 5 7 1 1 12 33 20 6 0 0 0 0 0 85 49 51 13:00 1 6 3 4 3 13 28 24 7 3 1 0 0 0 93 50 54 14:00 1 3 2 2 1 23 75 69 10 5 1 1 0 0 193 50 54 15:00 3 2 5 5 3 21 68 Be 23 3 1 0 0 0 220 50 54 16:00 3 3 3 1 2 29 61 60 22 3 0 1 0 0 188 50 54 17:00 3 2 1 1 1 11 61 38 8 1 1 0 1 0 129 49 53 18:00 1 4 3 0 4 12 15 19 5 1 1 0 0 0 65 49 54 19:00 0 1 0 0 1 9 26 13 5 0 0 0 0 0 55 49 52 20:00 3 0 1 0 0 8 15 8 4 1 1 0 1 0 42 51 60 21:00 1 2 0 1 0 6 3 3 2 1 0 0 0 0 19 48 52 22:00 1 0 0 0 0 1 6 6 1 1 0 0 0 0 16 50 55 23:00 0 0 0 1 1 4 6 2 3 1 0 0 0 0 18 51 53 Total 25 54 59 35 44 237 548 457 122 25 7 3 3 0 1619 Percent 1.5% 3.3% 3.6% 2.2% 2.7% 14.6% 33.8% 28.2% 7.5% 1.5% 0.4% 0.2% 0.2% 0.0% AM 10:00 10:00 05:00 09:00 10:00 09:00 11:00 10:00 07:00 11:00 05:00 05:00 09:00 11:00 Peak Vol. 3 5 7 5 9 20 33 21 6 3 1 1 1 82 PM 15:00 13:00 12:00 15:00 18:00 16:00 14:00 15:00 15:00 14:00 13:00 14:00 17:00 15:00 Peak Vol. 3 6 7 5 4 29 75 86 23 5 1 1 1 220 Connecticut Counts Inc. Page 5 Kensington, Connecticut 06037 Rye Street at Distribution Facility Dr (860)828-1693 Site Code:887 South Windsor,Connecticut Station ID: Southbound Latitude: 0'0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 Total Percent Percent 04/10/06 0 0 0 0 1 0 1 0 0 0 0 0 0 0 2 41 41 01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 02:00 1 0 0 0 0 1 0 1 1 2 0 0 0 0 6 56 57 03:00 0 0 0 0 1 2 5 5 1 0 0 0 0 0 14 49 50 04:00 1 2 0 0 6 16 36 14 1 0 0 0 0 0 76 47 49 05:00 7 1 1 0 2 29 91 70 9 2 0 0 1 0 213 49 51 06:00 4 5 1 2 0 26 103 94 21 3 1 1 0 0 261 50 53 07:00 1 1 2 3 10 27 60 44 14 4 1 0 0 0 167 50 54 08:00 0 3 4 0 7 19 44 28 12 2 0 0 0 0 119 50 53 09:00 2 3 1 0 2 23 24 13 8 1 0 0 0 0 77 49 53 10:00 4 4 3 1 1 15 27 11 3 1 0 0 0 0 70 47 50 11:00 4 1 2 3 11 24 38 17 3 1 0 0 0 0 104 47 50 12 PM 2 2 2 2 3 23 31 22 5 1 0 0 0 0 93 48 51 13:00 3 3 10 3 2 17 33 29 7 1 2 0 1 0 111 49 53 14:00 1 2 6 4 0 10 41 16 8 2 0 0 0 0 90 49 53 15:00 1 3 5 1 5 16 28 19 6 1 0 0 0 0 85 49 52 16:00 5 0 4 0 3 16 26 15 5 1 1 0 0 0 76 49 53 17:00 1 0 0 2 4 17 31 24 6 1 0 0 0 0 86 49 52 18:00 1 1 4 0 1 14 23 12 2 0 0 0 0 0 58 47 50 19:00 1 0 0 0 1 1 7 5 2 0 0 0 0 0 17 49 51 20:00 1 1 0 0 1 2 6 4 2 0 0 0 0 0 17 48 51 21:00 1 0 1 0 0 1 3 1 0 0 0 0 0 0 7 43 46 22:00 1 0 1 0 0 1 6 1 0 0 1 0 0 0 11 45 46 23:00 0 2 1 0 0 1 0 0 0 0 0 0 0 0 4 21 36 Total 42 34 48 21 61 301 664 445 116 23 6 1 2 0 1764 Percent 2.4% 1.9% 2.7% 1.2% 3.5% 17.1% 37.6% 25.2% 6.6% 1.3% 0.3% 0.1% 0.1% 0.0% AM 05:00 06:00 08:00 07:00 11:00 05:00 06:00 06:00 06:00 07:00 06:00 06:00 05:00 06:00 Peak Vol. 7 5 4 3 11 29 103 94 21 4 1 1 1 261 PM 16.-00 13:00 13:00 14:00 15:00 12:00 14:00 13:00 14:00 14:00 13:00 13:00 13:00 Peak Vol. 5 3 10 4 5 23 41 29 8 2 2 1 111 Connecticut Counts Inc. Page 6 Kensington, Connecticut 06037 Rye Street at Distribution Facility Dr (860)828-1693 Site Code:887 South Windsor, Connecticut Station ID: Southbound Latitude:0'0.000 Undefined Start 0 16 21 26 31 36 41 46 51 56 61 66 71 76 85th 95th Time 15 20 25 30 35 40 45 50 55 60 65 70 75 9999 Total Percent Percent 04/11/06 0 0 0 0 1 1 0 0 0 0 0 0 0 0 2 36 36 01:00 0 3 0 0 0 2 0 0 0 0 0 0 0 0 5 36 37 02:00 0 2 1 0 0 1 1 1 1 0 0 1 0 0 8 51 66 03:00 0 0 0 0 0 1 6 8 1 0 0 0 0 0 16 49 50 04:00 1 1 1 0 4 16 24 20 7 0 0 0 0 0 74 49 52 05:00 3 5 1 0 2 32 105 68 16 0 1 0 0 0 233 49 52 06:00 3 3 2 0 7 36 99 103 20 6 0 0 0 0 279 50 53 07:00 1 1 2 5 11 30 73 39 15 4 2 0 0 0 183 50 54 08:00 3 5 1 0 2 17 39 25 3 2 0 0 0 0 97 48 50 09:00 5 4 5 0 4 12 26 12 3 2 0 0 0 0 73 47 51 10:00 2 7 3 1 6 20 24 5 9 1 1 0 0 0 79 49 54 11:00 4 4 5 2 4 27 46 16 3 1 0 0 0 0 112 46 50 12 PM 5 3 2 0 2 20 24 25 2 0 0 0 0 0 83 48 50 13:00 3 2 5 5 3 20 27 19 9 2 0 0 0 0 95 49 53 14:00 3 1 8 0 1 5 24 15 5 1 0 0 0 0 63 49 53 15:00 # « * * * # # « « * « # * * « 16:00 * « # # « * # « « « * * « * * « 17:00 # * * * * * # * # « * « # # 18:00 * # # # # * # # # # # * # # # « # 19:00 # « « « * * # # * * * « « * * « 20:00 # # # « * « # * * # * # # * « # 21:00 # * * * # « « « « # # * # « * « # 22:00 * # # # # # # * # # * # * # « * « 23:00 # « « « * * # # * R * « * * # # # LLTJJottaall 33 41 36 13 47 240 518 356 94 19 4 1 0 0 1402 Percent 2.4% 2.9% 2.6% 0.9% 3.4% 17.1% 36.9% 25.4% 6.7% 1.4% 0.3% 0.1% 0.0% 0.0% AM 09:00 10:00 09:00 07:00 07:00 06:00 05:00 06:00 06:00 06:00 07:00 02:00 06:00 Peak Vol. 5 7 5 5 11 36 105 103 20 6 2 1 279 PM 12:00 12:00 14:00 13:00 13:00 12:00 13:00 12:00 13:00 13:00 13:00 Peak Vol. 5 3 8 5 3 20 27 25 9 2 95 Total 85 77 86 43 137 676 1505 1046 270 55 11 4 2 0 3997 Percent 2.1% 1.9% 2.2% 1.1% 3.4% 16.9% 37.7% 26.2% 6.8% 1.4% 0.3% 0.1% 0.1% 0.0% 15th Percentile: 37 MPH 50th Percentile: 43 MPH 85th Percentile: 49 MPH 95th Percentile: 53 MPH Stats 10 MPH Pace Speed: 41-50 MPH Number in Pace: 2551 Percent in Pace: 63.8% Number of Vehicles>30 MPH: 3706 Percent of Vehicles>30 MPH: 92.7% Mean Speed(Average): 42 MPH EXHIBIT 25 SUMMARY OF ACCIDENT EXPERIENCE PROPOSED DISTRIBUTION CENTER SOUTH WINDSOR, CONNECTICUT OCTOBER 1, 2002 TO SEPTEMBER 30, 2005 SECTION1 M.P. 42.47 TO 42.49 (INTERSECTION OF ROUTE 5 AT ROUTE 194) SECTION2 M.P. 0 TO 0 (INTERSECTION OF ROUTE 194 AT ROUTE 5) SECTION3 M.P. 0.2 TO 0.32 (INTERSECTION OF ROUTE 194 AT RYE STREET) SECTION4 M.P. 1.65 TO 1.73 (INTERSECTION OF ROUTE 194 AT TROY ROAD) SECTION5 M.P. TO (RYE STREET ENITRE LENGTH) SECTION6 M.P. TO (TROY ROAD- ENTIRE LENGTH) S-3 S-4 DRIVER UNDER THE INFLUENCE S-1 S-2 S-5 S-6 TOTALS 1 1 2 DRIVER FOLLOWING TOO CLOSELY 8 15 8 6 1 38 DRIVER VIOLATED TRAFFIC CONTROL 3 1 2 1 7 DRIVING ON WRONG SIDE OF ROAD 1 1 VEHICLE CHANGED LANES IMPROPERLY 1 1 2 VEHICLE TIRES UNSAFE 1 1 DRIVING TOO FAST FOR CONDITIONS 3 4 5 12 DRIVER FAILED TO GRANT RIGHT OF WAY 3 2 1 6 TOTALS: 19 22 11 14 1 2 69 BUBARIS TRAFFIC ASSOCIATES MAY 2006 Page 1 of 1 Banach, Marcia From: Lavigueur, Stephan Sent: Thursday, February 07, 2008 12:48 PM To: Gantick, Michael; Banach, Marcia; Doolittle, Jeffrey Subject: Rye Street Street Trees Mr. Kevin Foley felt the Tilia (lindens) specified for Rye St were perhaps not the best choice of tree. Although I rather like lindens I agreed with him in this instance. I offered London Plane Tree or Sweet Gums as a substitute and we agreed on London plane. The Pin Oaks will not be substituted. 2/7/2008 TOWN OF SOUTH WINDSOR I�ul STAFF SITE CHANGE FOR SITE & SUBDIVISION gQ(((EINNN!'lS0R?L#0GK-RT, GENERAL: / CHANGE ORDER CONTACT PERSON C, 5"eonde'e6c-j Phone No. Address_y S' � �llvu�! /��P i(/i s'o� 0.f Site Name �) �jJ�` /J,s�.. �U a" �ar��7i P&Z No. d� 40 /0 Owner_ n �. Phone No. Contractor Signature of Owner Date: Signature of Design Engr. Dater o CHANGE: (Describe location and nature of change. Include Four (4 ) copies of plan/profile of Change. ) �IJ'l' S�,tr't H'/G�P/` �i!/J/J�� 7"'B Lf !L �.f7d kLi(ac� [b t.✓/e/e"r' Reason for Change: (Why is change required) / IJ C�ti ���� `�� /r ;off 4 62 r/r, 'L, 2L4 P A/ ,�. `� APPROVALS: (As Require ) Dir. Of Planning Date: 10 "tJ Town Engineer Date: /� Dir. of Public orks Date: Other: Date: STAFF COMMENTS: D� �:� �i r� Pu->r,! r�vJ•-h ;�� l�•+s" G.,M Or�`�h S REeEIVED SOUTH WINDSOR EN61NEERING SEPT. White - Town Engineer Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department MEMORANDUM To: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineer GY- Date: 7/20/07 RE: App 06-60P Aldi, Rye Street Improvements Bond The Engineering Division recommends establishment of a bond in the amount of $1,364,600 for the required improvements to Rye Street associated with the Aldi Site Plan on Rye Street. Please call me if you have any questions. "Ft7 RECEIVED John T. Phillips,P.E. FFR 2 200 McGrath Road 22007 South Windsor, CT 06074 SOUTH INDSOR PLANNING DEPT, Planning and Zoning Commission Town of South Windsor 7- 7 February, 23, 2007 To Whom It May Concern: I am writing with some concerns about and suggestions for the Aldi distribution center application(07-06P). 1.Noise at the adjoining neighborhood. • At the IWA/CC meeting, Mr. Semperbon stated that Aldi wants to maximize the distance between the trucking operations and the McGrath Road neighborhood. Having truck bays on the southeast side(Rye Street side)of the building and the entrance drive at the northeast comer places these operations adjacent to the neighborhood. If the building was oriented as a mirror image,the trucking operations would be on the southwest wall, facing Commerce Way, and the northwest wall, facing the Scantic River. The entrance could be approximately where the plans currently show the dispatch office. • Significant amount of landscaping is planned along Rye Street. If some of that effort could be spent placing a dense row of evergreens along the north side of the site,it would provide additional noise abatement between the site and McGrath Road. With the trucking operations moved to the opposite side of the building,the need for visual screening from Rye Street is reduced. Please review the attached marked sketches that show the currently planned and my proposed mirror image layout. Since construction has not started,both changes can be made at a minimal expense. The building would be the same size and layout,just reversed. Truck circulation would be essentially unchanged. 2. Traffic control while Rye Street is rebuilt. It will be not be possible to continuously maintain traffic on Rye Street while the culvert is being replaced and the road is widened. At a minimum, Rye Street will be closed for short times during the day while the work takes place. At the other extreme,it could be closed for days or weeks as the culvert is replaced. Again, according to Mr. Semperbon at the IWA/CC hearing,many hundreds of trucks a day use Rye Street for access to East Windsor and to the recycle plant at 300 Rye Street. Alternate routes will be needed for these trucks and the residential traffic. '47 If Troy Road is used as the alternate route, I have some critical safety concerns: • The intersection of Troy and Rye in not designed to handle tractor-trailer traffic. Currently, northbound trucks, coming from the recycle plant and making a right turn into Troy Road,need to cross the centerline of both Rye Street and Troy Road to have sufficient clearance for the trailer. They completely block opposing traffic on both streets. I,personally,have been southbound on Rye Street and had to stop because of trucks on the wrong side of the road while making the turn. In one case,the truck-had failed to negotiate the comer on the first try and was backing up on Rye Street,blocking both lanes. Active traffic control, a temporary traffic light or a full time Police Officer,would be needed to assure safety. • The curve on Troy Road,between Sullivan Avenue and Brookfield Street, is extremely narrow and blind. Because of the telephone pole and the house that are only inches from the edge of the road,many people,including trucks, drift toward the center of the road while going around the comer. The ESI trucks that currently use the road are aware of the condition and cautious. The additional hundreds of trucks might not be aware or as careful. A head on collision, or a truck hitting the telephone pole or house, is a very real possibility. I recognize that the bernied section of Rye Street is in critical need of a proper rebuilding. I recognize that there will be some inconveniences during the construction. I want to make sure that it is only an inconvenience, and not an unsafe condition that is created. Troy Road is a poor, and probably dangerous, alternate route. Sincerely, John T. Phillips,P.E. WIN. 1A 45 O� N� ,- t Aw FWA M A� WNJ- � D® MR WE e� SULLIVANTROY ROAD • BROOKFIELD ro � L0� � d V 1� ti'�` � � Irrsa��?.t:�q"bo�T'pig�ikmN�aicebes F'ralro8e�r A'I°.5�'t3�.65" 'tit T.�,°3�°18.7(J° 4t+J ro-l�av S2fk �S®�,�arrrBreck'{ININ{1111 9���`0 �y�o afk t897tt' r STATE OF CONN ECTICUT MEMBERS STATE TRAFFIC COMMISSION Commissioner of Transportation DEPARTMENT OF TRANSPORTATION 2800 BERLIN TURNPIKE,P.O.BOX 317546 Commissioner of Public Safety NEWINGTON,CT 06 1 3 1-7546 Commissioner of Motor Vehicles Phone: (860)594-3020 Fax: (860) 594-2377 July 18, 2007 Mr. Bruce Persohn "'` Vice President RECEV .' ALDI, Inc. 828 Sullivan Avenue s�F P.O. Box 699 �9€s` South Windsor, CT 06074 Dear Mr. Persohn: 5)11i"EVIt�DSt?R�L�NM�G�J�;! Subject: Town of South Windosr ALDI, Inc. Enclosed is a copy of Traffic Investigation Report No. 132-0703-01 approved at the July 17, 2007 meeting of the State Traffic Commission, detailing conditions for the issuance of a Certificate. In accordance with Section 14-311 of the General Statutes, a building/foundation permit cannot be obtained from the Town until a certificate is issued. A certificate will not be issued by this office until: 1. the Traffic Investigation Report has been recorded on the municipal land records in accordance with Condition No. 20, and this office has been provided with evidence of recording (i.e. copy of recorded report) ; 2. a bond, sufficient to cover the full cost of implementing the required improve- ments, has been posted with the Department of Transportation District No. 1 Office (Attn: Mr. David A. Sawicki) at 1107 Cromwell Avenue in the Town of Rocky Hill, CT 06067, (860)258-4544, as noted in Condition No. 18, and this office has been so notified by that office; 3. a bond has been posted with the Town of South Windsor to cover the cost of the work required on Rye Street as noted in Condition No. 19, and this office has been so notified in writing by the Town; and 4. drainage easements/right-of-way have been secured for the Town of South Windsor as noted in Condition Nos. 15 and 16, and this office has received sufficient evidence as such (i.e. copy of recorded easement/deed) . Additionally, an encroachment permit must be obtained from the District Office prior to performing any work within the state highway right-of-way. An encroachment permit will not be issued until the certificate has been issued and filed on the municipal land records in accordance with the enclosed procedures, and detailed construction plans have been reviewed and approved by the District Office. The approval will expire on July 16, 2009, unless all the requirements are satisfied. Very truly yours, #?66b4 ri Robbin L. Cabelus Executive Director Enclosures cc: Chief Gary K. Tyler Mr. Christopher J. Dougan - Please confirm certificate issuance with STC. Planning and Zoning_Commission Mr. James G. Bubaris, P.E. Mr. Lyle Wray TRA-10 REV 12/06 Report By: MRS Date: 06/07 STATE OF CONNECTICUT STC No: 132-0703-01 DEPARTMENT OF TRANSPORTATION Checked By: PJC Date: 06/07 TRAFFIC INVESTIGATION Loc.No: Recommended By: Aq4 REPORT TO THE Approved By STC STATE TRAFFIC COMMISSION See Previous Traffic Investigation Report No. � Town of South Windsor AjL 1 7 20 =' Date: Requested By: Location: ALDI, Inc. James G. Bubaris, P.E. Route 194(Sullivan Ave ue)and How Requested: Certificate Application Rye Str ertificate U Date: March 8,2007 Not EXECUTIVE DIRECTOR Recommendation(s): ` In accordance with Section 14-311 of the Connecticut General Statutes, as revised, it is recommended that the State Traffic Commission (STC)issue a certificate to ALDI, Inc. for a 482,685 square-foot gross floor area distribution center with 151 parking spaces, located on Rye Street in the Town of South Windsor stating that the operation thereof will not imperil the safety of the public based on the following conditions: The conditions are based on and referenced to the following plans prepared by Design Professionals entitled: A. "Overall Site Plan, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet 01/01, dated March 28, 2007. B. "Signage and Striping Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet SS1/SS1, dated January 25, 2007, revised May 18,2007. C. "Signage and Striping Plan, Rye Street, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet RS 1/RS2, dated January 24,2007,revised May 18,2007. D. "Signage and Striping Plan, Rye Street, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet RS2/RS2, dated January 24,2007,revised July 5,2007. E. "Sightline Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor,Connecticut,"Sheet SL2/SL3,dated May 15, 2007. F. "Sightline Plan, Proposed Rye/Sullivan Intersection, Aldi Distribution Facility, 295 Rye Street, South Windsor, Connecticut," Sheet SL3/SL3, dated May 15, 2007, revised July 5, 2007 1. That the site driveway on Rye Street be constructed in substantial conformance with the referenced plans. 2. That Route 194 and Rye Street be widened in substantial conformance with the referenced plans. 1 " r Town of South Windsor ALDI,Inc. Route 194(Sullivan Avenue) and Rye Street Traffic Investigation Report No. 132-0703-01 3. That approach grades of the driveways and Town roads along Route 194 affected by the roadway widening noted in this report meet Department of Transportation standards for intersecting streets or not be increased. 4. That all roadway and drainage improvements within the State highway right-of-way be subject to review by the Department of Transportation and all their requirements including those pertaining to maintenance and protection of traffic be satisfied prior to the issuance of a permit for work within the highway right-of-way. 5. That Route 194 be overlaid within the limits of the widening. The extent of the overlay is to be determined by the Department of Transportation's District 1 Office. 6. That all conflicting pavement markings in the area of roadway work be eradicated to the satisfaction of the Department of Transportation. 7. That all work on roadways that are owned and maintained by the Town of South Windsor be performed in conformance with the standards and specifications of the Town. 8. That any cutting, removal or pruning of trees, shrubbery or vegetation situated partially or wholly within the limits of the State highway right-of-way be in accordance with Department of Transportation Regulations. 9. That intersection sight distance of Rye Street and the intersection sight distances of the driveways along Route 194 affected by the roadway widening, be provided as shown on the referenced plans. 10. That the intersection sight distances of the site driveway and the intersection sight distance of the driveway along Rye Street affected by roadway widening noted in this report,be provided as shown on the referenced plans. 11. That a traffic signal be installed on Route 194 at Rye Street. 12. That signs and pavement markings on Route 194, Rye Street and within the site driveway be installed and maintained in substantial conformance with the referenced plans, and in accordance with the "Manual on Uniform Traffic Control Devices,"latest edition. 13. That all pavement markings installed on State roads be of epoxy material, or of a material as directed by the Department of Transportation. 14. That all utility relocations in the State highway right-of-way be at no cost to the State and in accordance with"A Policy on the Accommodations of Utilities on Highway Rights-of-Way." 15. That property on Rye Street be deeded for highway purposes, to the Town of South Windsor, at no cost,as indicated on the referenced plans prior to the issuance of a certificate. 2 • Town of South Windsor ALDI,Inc. -Rye Street Traffic Investigation Report No. 132-0703-01 16. That appropriate drainage easements on Rye Street be secured for the Town of South Windsor,at no cost,prior to the issuance of a certificate. 17. That an encroachment permit be obtained from the Department of Transportation's District 1 Office prior to performing any work within the State highway right-of-way. The permit forms must include the applicable detailed construction plans. 18. That prior to the issuance of a Certificate, a bond be posted and maintained in the amount of $862,000 to cover the costs of satisfying the conditions of this report. Upon submission of the final design plans, the dollar amount of this bond may be adjusted either upward or downward during the encroachment permit review process. 19. That prior to the issuance of a Certificate, a bond be posted and maintained with the Town of South Windsor to cover the costs of the work required on Rye Street. 20. That prior to the issuance of a Certificate, a copy of this report be recorded on the municipal land records in accordance with the attached procedure. A copy of the Certificate shall be recorded on the land records upon issuance. 21. That the STC reserves the right to require additional improvements or changes, as deemed necessary, due to the development's traffic in the future. The cost of any additional improvements or changes shall be borne by the owner of the development. Mr. James G. Bubaris, P.E., the applicant's authorized representative, concurred with the above recommendations on July 9,2007. Police Commander Thomas Hart, representing Chief Gary K. Tyler, the Legal Traffic Authority for the Town of South Windsor, concurred with the above recommendations on July 9, 2007. 3 Report of Findings Town of South Windsor-ALDI,Inc. Route 194(Sullivan Avenue)and Rye Street Traffic Investigation Report No. 132-0703-01 Site: The proposed development is a 482,685 square-foot distribution center with 151 parking spaces located on the north side of Rye Street approximately 2,300 feet north of Route 194 (Sullivan Avenue). The facility will consist of a truck distribution center with associated loading docks, offices and truck storage. Access will be provided via a single median divided stop controlled driveway on Rye Street. Generated Traffic: The development is expected to generate 256 trips during the morning peak hour (210 entering, 46 exiting) and 235 trips during the afternoon peak hour (59 entering, 176 exiting). The site is expected to generate 240 truck trips per workday. The Bureau of Policy and Planning has reviewed and approved the submitted volumes. Division of Traffic Engineering Comments: To accommodate the additional traffic generated by the development, particularly large trucks, the applicant has proposed the widening of Route 194 and Rye Street to provide an eastbound left-turn lane, revise the intersection's geometry to adequately accommodate turning movements by tractor-trailers as well as provide signalization. To accomplish the improvements to the town leg of the intersection, the applicant is acquiring property and drainage easements along the west side of Rye Street just north of Route 194. The widening will also require relocation of several utility poles along Route 194. The applicant's engineer has provided traffic count projections and analysis indicating that traffic volume warrants for signalization of the intersection are satisfied. In addition to the above, the applicant is proposing a widening of Rye Street at the site driveway to provide a left-turn lane on the northbound approach. The planning and zoning approval by the Town of South Windsor required site driveway geometry that will restrict exiting trucks to right turns onto Rye Street, thereby directing site truck traffic to Route 194. Conclusion: The roadway improvements recommended in this report should adequately accommodate site traffic added to Rye Street and Route 194 and are acceptable to the Department and the Town of South Windsor. 4 �3 g N� SITE East Windsor Htll t Exhibit 1 Location Map Proposed Distribution Center South Windsor, Connecticut RECEIVE® P.O.BOX 1167 425 SULLIVAN AVENUE FFR — 6 Z007 SOUTH WINDSOR,CT 06074 PHONE: 860.291.8755 FAX: 860.29nc.co 7 SOUTH WINDSOR PLANNING DEPT. www.designprofessional si c.com l CIVIL S TRAFFIC ENGINEERS/ PLANNERS /SURVEYORS / GIS ANALYSTS/ LANDSCAPE ARCHITECTS February 2, 2007 Marcia Banach, Director of Planning Town of South Windsor 1540 Sullivan Avenue : South Windsor, CT 06074 DPI Project No. 2282 RE: Aldi Distribution Center(Site Plan) Rye Street South Windsor, Connecticut Dear Marcia, On behalf of my client,AM King Construction Co., and pursuant to the above- referenced application, I hereby grant to the Planning&Zoning Commission a 30-day extension to open the public hearing. Thank you. Respectfully submitted, DESIGN PROFESSIONALS INC. By �N�112Q Andrea M. Momnie Executive Coordinator CC: AM King Construction Co. Peter R. DeMallie Galen B. Semprebon,P.E. : s RECEIVE" P.O. BOX 1167 I�t 425 SULLIVAN AVENUE SOUTH WINDSOR,CT 06074 MAR 0 z 2007 PHONE:860.291.8755 FAX:860.291.8757 $01liHWINDSOR PLANNINB 6NPfi: www.designprofessionalsinc.com CIVIL & TRAFFIC ENGINEERS I PLANNERS I SURVEYORS 1016 ANALYSTS I LANDSCAPE ARCHITECTS : February 28, 2007 Marcia Banach,Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 • DPI Project No. 2282 RE: Aldi Distribution Center(Site Plan) Rye Street South Windsor, Connecticut Dear Marcia, On behalf of my client, AM King Construction Co., and pursuant to the above- referenced application, I hereby grant to the Planning&Zoning Commission a 10-day extension to close the public hearing. Thank you. • Respectfully submitted, DESIGN PROFESSIONALS INC. • By. l '� •J Andrea M. Momnie Executive Coordinator CC: AM King Construction Co. Peter R. DeMallie Galen B. Semprebon, P.E. t0�N se, U Tola� O-P sou V&U&IOt 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�dsoe-co TELEPHONE (860) 644-2511 CERTIFIED MAIL 7004 1160 0002 1060 4930 February 13, 2007 Design Professionals Inc 425 Sullivan Avenue South Windsor, CT 06074 Re: Appl 06-60P Aldi Distribution Center Please be advised that the Public Hearing of the Planning & Zoning Commission in the above referenced matter has been scheduled for Tuesday, February 27, 2007 at 7:30 pm in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. A sign advertising the hearing must be posted on the property for ten(10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have a sign posted at 295 Rye Street by February 17, 2007. Signs can be obtained in the Planning Department. Very truly yours, 3in S. Vallez istrative Secretary jsv RECEIVED John T. Phillips, P.E. MAR 0 2 Z��� 200 McGrath Road South Windsor, CT 06074 SOUTH WINu,)vn ruiigMwG DE?i. Planning and Zoning Commission Town of South Windsor March 2, 2007 Re: Aldi Distribution To Whom It May Concern: After listening to the P&Z presentation on Tuesday, I am concerned about the apparent lack of open discussion from Aldi and their representatives. Some of my specific concerns are: 1. Building Orientation The unwillingness to consider reorienting the building and refusal to give the reasons that it would be unworkable to reorient the building is disturbing. There may be valid reasons. The reasons are not obvious. On a lot as flat as the Rye Street lot, topography and site problems do not dictate or restrict the layout. As shown, the main building, paved truck operating areas, and the circumferential access road form what is essentially a square. Any of the four orientations of the square would fit. If a mirror image design is impractical because of predesigned standardized equipment, a design rotated a quarter turn would have an identical internal layout to the proposed design. Underground utilities would need to be redrawn. Maximum stormwater piping distances would not change. 2. Back up generator The oversight of mentioning that they will have a back up generator and a diesel powered fire pump is another concern. Both from the stand point of technical concerns and being concerned about what other details they have not mentioned. How is the generator going to be fueled? Where is the fuel going to be stored? They repeatedly stressed that they were not going to be fueling trucks on site,but failed to mention that they may need to receive and store fuel for the generator. If the system is going to be used in conjunction with NU for distributed generation and peak shaving, the operating conditions and number of hours it is run will be orders of magnitude larger than a system that is only an emergency back up for use during power failures. They will need to store much larger quantities of fuel, and have take deliveries of that fuel. There has been no mention of how the fuel will be handled. The stormwater system appears to be capable of handling the expected quantities from a leaking fuel tank on a truck. It would have trouble if an 8000 or 9000 gallon semi trailer full was spilled. A 110% containment area should be provided where the fuel trucks are off-loaded. What grade of muffler and sound lagging will the motor have? I would recommend "Hospital Grade"or"Residential Grade." 3. Air Permits Depending on the method of heating the building, air permits may be required. Depending on the size of the back up generator, air permits and/or compliance testing may be required. A blanket statement that none are required, without any supporting data, should not be an acceptable answer. 3. Refrigerants What refrigerant are they going to be using. If they are going to be using ammonia, I have major concerns. Ammonia is poisonous. Ammonia is flammable. Depending on the quantity on site, a Risk Management Program, Facility Response Procedure, Community Right to Know, and other emergency and environmental regulations must be met. Even if they stay below the State and Federal limits, the South Windsor emergency response organizations would need the information and local notice and evacuation procedures should be in place. 4. Yard Tractors The Applicant has repeated stated, at both the P&Z and the IWA hearings, that there would be no use of yard tractors. At the P&Z hearing, they stated that the parking was primarily for trailers, without tractors. If they are not going to use yard tractors,how do they intend to move these trailers? Some less technical observations; The fact that representatives from Aldi where present,but not identified, does not instill in me a confidence that the really want to be a"good neighbor." Whenever I have been making presentations at IWA and P&Z hearings in other towns, I considered it unethical to not identify all people present. The apparent unwillingness to provide supporting data and information on some of the blanket statements (i.e.,building orientation, air permits, etc.) is disturbing. If the applicant does not provide acceptable supporting data at the next meeting, I request that the Commission continue the Public Hearing until the supporting data are provided. Sincerely, John T. Phillips, P.E. R ' John T. Phillips,P.E. RECEIVED 200 McGrath Road FFA 2 32007 South Windsor, CT 06074 Planning and Zoning Commission 5WH WINDSOR PLANNING DEPT, Town of South Windsor February, 23, 2007 To Whom It May Concern: I am writing with some concerns about and suggestions for the Aldi distribution center application(07-06P). 1. Noise at the adjoining neighborhood. • At the IWA/CC meeting, Mr. Semperbon stated that Aldi wants to maximize the distance between the trucking operations and the McGrath Road neighborhood. Having truck bays on the southeast side(Rye Street side) of the building and the entrance drive at the northeast corner places these operations adjacent to the neighborhood. If the building was oriented as a mirror image,the trucking operations would be on the southwest wall, facing Commerce Way, and the northwest wall, facing the Scantic River. The entrance could be approximately where the plans currently show the dispatch office. • Significant amount of landscaping is planned along Rye Street. If some of that effort could be spent placing a dense row of evergreens along the north side of the site, it would provide additional noise abatement between the site and McGrath Road. With the trucking operations moved to the opposite side of the building,the need for visual screening from Rye Street is reduced. Please review the attached marked sketches that show the currently planned and my proposed mirror image layout. Since construction has not started,both changes can be made at a minimal expense. The building would be the same size and layout,just reversed. Truck circulation would be essentially unchanged. 2. Traffic control while Rye Street is rebuilt. It will be not be possible to continuously maintain traffic on Rye Street while the culvert is being replaced and the road is widened. At a minimum, Rye Street will be closed for short times during the day while the work takes place. At the other extreme, it could be closed for days or weeks as the culvert is replaced. Again, according to Mr. Semperbon at the IWA/CC hearing, many hundreds of trucks a day use Rye Street for access to East Windsor and to the recycle plant at 300 Rye Street. Alternate routes will be needed for these trucks and the residential traffic. If Troy Road is used as the alternate route, I have some critical safety concerns: • The intersection of Troy and Rye in not designed to handle tractor-trailer traffic. Currently,northbound trucks, coming from the recycle plant and making a right turn into Troy Road, need to cross the centerline of both Rye Street and Troy Road to have sufficient clearance for the trailer. They completely block opposing traffic on both streets. I, personally,have been southbound on Rye Street and had to stop because of trucks on the wrong side of the road while making the turn. In one case, the truck had failed to negotiate the corner on the first try and was backing up on Rye Street,blocking both lanes. Active traffic control, a temporary traffic light or a full time Police Officer,would be needed to assure safety. • The curve on Troy Road,between Sullivan Avenue and Brookfield Street, is extremely narrow and blind. Because of the telephone pole and the house that are only inches from the edge of the road, many people, including trucks, drift toward the center of the road while going around the corner. The ESI trucks that currently use the road are aware of the condition and cautious. The additional hundreds of trucks might not be aware or as careful. A head on collision, or a truck hitting the telephone pole or house, is a very real possibility. I recognize that the bermed section of Rye Street is in critical need of a proper rebuilding. I recognize that there will be some inconveniences during the construction. I want to make sure that it is only an inconvenience, and not an unsafe condition that is created. Troy Road is a poor, and probably dangerous, alternate route. Sincerely, John T. Phillips, P.E. r t ! ! i t r t t ! 1 ! s t r s t E sn , } s t- t t + E 1 r t t � rn ! E E ! t ! E E E i ! I r + ! t ! t ! i ti MIRROR IMAGE LAYOUT C L r. M h - G SULLIVANTROY ROAD • BROOKFIELD L w. p w, to - A S SP � E SIGN SIGN 3 Plea a rite,"name and ad vss HiHm lot ................. lz �Tfll�!i��07 3 S i a 7. 9. Z, J6 hhY A Ill// 2(z 41 IP� flT /'how �l'ZG 6z-74- Mc 6 -4z.6411 03/29/2007 THU 13:22 FAX 860 644 7280 South Windsor Town Hall 1@001 ********************* *** FAX TX REPORT *** ********************* TRANSMISSION OK JOB NO. 3302 DESTINATION ADDRESS 94321707 PSWD/SUBADDRESS DESTINATION ID ST. TIME 03/29 13:21 USAGE T 00' 31 PGS. 2 RESULT OK .SOWN Sf4 J slou VI V ?A/ Cd V 1540 SULLIVAN AVENUE•SOUTH WINDSOR, CT 06074 f�OSox•co��� TELEPHONE(860)644-2511 March 29,2007 CERTIFIED MAIL 70041160 0007 4128 0894 Design Professionals Past-it®Fax Note 7671 Date Mr. Peter DeMallie From 425 Sullivan Avenue rc�t ice n South Windsor,Cr 06074 poroe�t. Phone# Phone#� 'Dear Mr.DeMallie: Re:Appl.06-06P Aidi Distribution Center Site Plan ......... .._._..—_. . We are pleased to advise you that the Planning&Zoning Commission voted on March 27,2007 to approve with modifications,application#06-60P Aid!Distribution Center Site Plan request for a 500,000 sf distribution facility for property located at 295 Rye Street,I Zone as shown on plans by Design Professionals,Job No 2282,dated 2-2-07 as revised. This approval is subject to the following modifications. 1. Prior to commencement of any site work,a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission,including bonds in the amount of$100,000 for construction of stormwater controls including the detention basin,$40,000 for wetland and mitigation plantings,and$60,000 for erosion and sedimentation control. 4. A landscape bond in the amount of$50,000 is required and must be submitted prior to filing of mylars. 5. All bonds must be in one of the forms described in the enclosed Bond Policy. 6. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 7. All plans used In the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 8. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. S ON4 3f4 -own O-P S-0ad-7, ?di�� 5 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OsoR•co TELEPHONE (860) 644 2511 May 1, 2007 Galen Semprebon Design Professionals Inc 425 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Semprebon: Re: Preconstruction Meeting—Appl#06-60P Aldi Distribution Center IN ATTENDANCE Laurie Fiore Yankee Gas/LLC 48 Tolland State Road 860-871-3470 Bernie Drabek TOSW 1540 Sullivan Ave 860-644-2511 ex 241 Lt.Rich Bond SWPD SWPD 860-644-2551 Jim Paganetti CL&P 48 Tolland Stage Road 860-871-3331 Karl Reichle TOSW 1540 Sullivan Ave 860-648-6366 Galen Semprebon Design Professionals Inc. 425 Sullivan Ave 55 860-291-8 p g 7 Jim Slater J& E Slater Construction 75 Commerce Way 860-528-5252 Ed Gates AM King Construction Charlotte,NC 704-401-6660 Dan Crist AM King Construction 2115 Rexford Road,NC 603-696-2366 Lloyd Folson Folson Construction 138 Rye Street 860-528-8928 Michael Weinzimmer Folsom Construction 138 Rye Street 860-528-8928 Michele Lipe TOSW 1540 Sullivan Ave 860-644-2511 ex 252 Walter Summers TOSW 1540 Sullivan Ave 860-644-2511 ex 217 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving_operations in each area and maintained/cleaned out area and maintained/cleaned out duringconstruction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel on to Rye Street. Calcium chloride or water is to be used for dust control as required. 4. Weekly erosion and sedimentation inspection must be conducted and a report submitted to Jeff Folger, Environmental Planner. 5. An erosion and sedimentation inspection must be conducted after every major storm event. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist for the following: a. After site is staked out b. All drainage work c. All sewer work d. Preparation of subbase, six (6)inch lifts e. Placement of pavement. 3. Certification of gravel used as subbase and processed stone for base will be required from an approved testing company. 4. Certification of all products used -- storm pipe, structures, pavement, etc., shall be presented to the Town Engineer prior to installation. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and service laterals located as per revised as-built checklist. 7. All pipe and structures to be backfilled with free draining material compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 8. Any problems and/or questions regarding construction of this project will be directed to Mike Weinzimmer from Folsom Construction in the field at phone#528-8928. 9. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. r 10. Job meetings will be held as needed, and can be called by the developer or Town. 11. Seventy-two (72)hours' notice needed for certificate of occupancy inspection. 12.Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 13.Normal hours of operation 7:00 a.m. —5:00 p.m., no work on Sunday. 14.No paving after October 15 or before April 15 without written approval from Director of Public Works. 15. A street cut permit is needed for the new driveway and for each utility connection in Rye Street 16. A drain layers permit is needed for the sewer lines on site. The connection charge must be paid before sewer work begins on site. 17. Inspection of gravel access roads required prior to placement of topsoil. Planning_Department 1. Landscaping is to be installed in accordance with the approved landscaping plan. If there are changes required, contact the Planning Dept. Additional landscaping installed on one part of a site will not preclude planting all of the remaining items shown on the landscaping plan. 2. This application is subject to the conditions of approval of the Inland wetland Agency/Conservation Commissions, including bonds in the amount of$100,000.00 for construction of stormwater controls including the detention basin, $40,000 for wetland and mitigation plantings, and $60,000.00 for erosion and sedimentation control. 3. A landscape bond in the amount of$50,000.00 is required and must be submitted prior to filling of mylars. 4. No building permits will be issued until the State Traffic Commission certificate has been issued(per CGS §14-311). SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. l 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings, which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building_Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, AZ 4-2-t Michele R. Lipe,AICP Assistant Director of Planning MRL/mk- cc: Jeff Folger, Environmental Planner Jeffrey Doolittle, Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle, Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal CL&P SBC/SNET 8OUtA windiot.Econonde perelopmeid Otaig etevea-son,OCcononz& Deve pment dootdinatot w `5e February 27, 2007 Mr. Patrick Kennedy, Chair Members and Alternates Planning & Zoning Commission RE: Appl 06-60P, Aldi Distribution Center— request for site plan approval for a 500,000 sf distribution facility for property located at 295 Rye Street (northerly side of Rye Street, northeasterly of Commerce Way), I zone Dear Chairman Kennedy, Members and Alternates: The above project represents a significant addition to the economic base of this town. The development would bring to reality a vision originally contemplated when this area was designated for industrial development. Providing economic growth, quality development and a highest and best use of land, this project is an excellent fit for the Town, area and needs of this community. From an economic stand point this project will generate more than 75 jobs (full time with benefits), it will provide an opportunity to create an entity to serve its transportation needs with additional jobs, perhaps as many as another 50. Although the applicant intends to request tax abetment for an initial period, ultimately the development is projected to generate over $1,000,000 a year in taxes, equipment and land would generate additional taxes in excess of $300,000 annually and this amount would not be abated. This development represents the highest quality of its type. The materials, architecture and landscaping, as presented to me, far exceed our regulations and create a highly desirable industrial, actually office like, environment. In addition to on-site improvements, which are highly desirable, the development will also allow for the reconstruction of Rye Street. Aldi has been extremely cooperative and community minded in their reaction and approach to this requirement, which is adding significantly to their total project costs. This investment on Aldi's part will benefit not only their project but also provide future economic development. The owners of the land have tried for more than a decade to market this area as a business park for multiple users. Due to the constraints of the property and the road improvements required here, the economics require a larger single project to make it feasible. Given this economic reality this project suits the property well and maximizes its economic potential. Further, the hours of operation will be fairly traditional with the majority of the activity and traffic occurring during the day, making them a good neighbor to nearby residential property. The use in general is fairly low impact and Page 2 of 2 natural barriers that provide natural shielding to guarantee negligible impacts surround the property. Overall, this is a great project for the Town. From an economic, quality and land-use perspective, there are no downsides. In addition, Aldi calls this building a "99-year Building" this is not just jargon but indicative of their business model and commitment to quality and the future. Aldi shares the Town's values especially in regard to quality and long-term commitment. This would be a great match; I enthusiastically recommend your approval of this application. Sincerely, Craig Stevenson Economic Developer r, t ARCHITECTURAL & DESIGN REVIEW COMMITTEE MINUTES November 2,2006, 5:45 p.m. Members present: Dave Goslin, Dave Schwabe, Terri Parrot, Charles Regalbuto Staff present: Michele R. Lipe,Assistant Director of Planning 1. Rye Street Distribution Center-request for site plan approval for property located on the northwesterly side of Rye Street, I zone. Dick Boston, landscape architect with Design Professionals, Inc. presented the application. The existing site is known as the Shepard/Culbro property on the northerly side of Rye Street, Industrial zone. This property is surrounded on all sides by industrially zoned land. Site size is 106 acres,proposed building coverage is 10%; proposed impervious coverage is 23.6%. Approximately 20+acres of the site is regulated wetlands. They are proposing 121 parking spaces and the applicant anticipates 80-100 employees. Their operations are generally 4 am to 8:30 pm. The primary building is proposed to be setback 160 feet. The site currently has mature trees around the perimeter consisting of white oaks, red oaks, red maples. Most of those trees will be saved and will provide screening particularly for properties to the north. The applicant is proposing a 8-10 foot high berm along Rye Street which will result in the building not being visible from Rye Street. The street trees proposed are 3 inch caliper pin oaks and/or lindens. The parking lot trees will consist of honey locust trees. Other landscaping consists of foundation plantings and ornamental tree around the office area. The applicant plans on planting the big open areas with a variety of native grasses that will do well in sandy soils. The detention basin in the back of the site will be stabilized with plantings that do well in wet soils and take pollutants out of the water. The lighting proposed will consists of 30 foot high full cut-off lights around the perimeter of the parking area,using 250-400 watt metal halide lights. The applicant will be requesting the light poles in the trucking area be 35' high. The light poles will be bronze color to match the bronze on the building. There will be a divided entranceway with a 10 foot island planted with perennials and ornamental grasses. Smaller light poles (14' high) will be used along the entrance drive and bollards (42"high)will be installed for walking paths to the office area. All lighting will be full cut-off and will have no light spill off of the property. Joseph Tornetta, Director of Architecture with Webber/Smith Associates, Inc was present to discuss the proposed architecture of the building. There will be five buildings on site: 478,000 sf distribution facility; 13,000 sf office; 2,690 sf trucking dispatch; bath house 578 sf; guard house of 215 sf. The materials include pre-cast concrete with clear story of glass on the top part of the loading area to allow for as much natural light as possible. The color of the building will be a creamy white color with all the metal work being a dark bronze color. The windows will also be tinted bronze. The warehouse part of the building will be 31 feet high and the office area will b e17 feet high. There is architectural relief designed into the panels around the entire building to provide some interest to the building. The mechanical units will be on top of the roof and will be boxed out with same material (and color) of the proposed building. The roof will be white in color. The applicant will be adding one free standing sign in conformance with the regulations. A picture of the proposed sign was shown. The board discussed the proposal. They noted that the building is set so far back that it will not be visible to the average driver along Rye Street. They were satisfied with the proposal as presented. They felt the proposed building was well designed with some architectural treatments that are not usually seen on warehouse facilities. They commended the applicant for a well designed project. Res ectfully submitted: C Michele R. 1pe,AI Assistant Director of Planning TOWN OF SOUTH WINDSOR STAFF SITE. CHANGE FOR SITE & SUBDIVISION GENERAL: (} f CHANGE ORDER CONTACT PERSON ?� t' f, Phone No. j ;1 Address Site Name ��L rhl` C�,� 1,�. P&Z No. ( Owner L o,; S 7 t Phone No. Contractor Signature of Owner Date: Signature of Design Engr. - _ Date: CHANGE: (Describe location and nature of change. Include .Four (4 ) copies of plan/profile of Change. ) „ 1 Reason for Change: (Why is change required) APPROVALS: (As Rem d R /J 4 `1 C Y Dir. Of Planning ,�tf �` -�„J ��, Date: Date: Town Engineer I Dir. of Public Works Date: Others Date: STAFF COMMENTS: White - Town Engineer_ Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: Ben Wheeler CHANGE ORDER CONTACT PERSON Design Professionals, Inc. Phone No. 860-291-8755 Address 21 Jeffrey Drive South Windsor,CT 06074 Site Name Aldi Distribution Facility P&Z No. 06-06P Owner Aldi, Inc. Phone No. Contractor 174 Signature of Owner Date: 7 Signature of Design ng Date: 20'I CHANGE: (Describe locatio nd nature of change. Include Four (4) copies of plan/profile of Change. ) 33,000+SF parking lot expansion to allow for an additional 86 parking spaces,associated drainage, landsca in ,& lighting. Reason for Change: (Why is change required) Additional parking needed for current use. APPROVALS: (As Require Dir.. Of Planning ~ '-J Date: 7) 0r Town Engineer Date: *�,,J Zo-4� l!� Dir. of Public W sks Date: Other: Date: STAFF COMMENTS: White - Town Engineer Yellow - Applicant Pink - Director of Planning I�1 AMK!ng C O N S T R U C T 1 0 N October 7,2008 RECEIVED Ms.Michelle Lipe Town of South Windsor OCT 1540 Sullivan Avenue South Windsor,CT 06074 SOUTH WINDSOR PtMNNG DEPT, Reference: ALDI Distribution Facility Request for Release of Letters of Credit Dear Ms.Lipe: A M King Construction respectfully requests your consideration in releasing the two(2)Letter of Credit provided for the ALDI Project in South Windsor,CT. The Letters of Credit include: • One(1)in the amount$200,000.00,issued by Wachovia Bank,for"Construction of stormwater controls,including detention basin" ($100,000.00),"Wetland and mitigation plantings" ($40,000.00)and"Erosio:i-andsedimentation controls" ($60,000.00). • One(1)in the amount of$50,000:00,Assued by Carolina First Bank,for landscaping. Should you have any questions or comments,feel free to contact me at 630.696.2366. Sincerely, Daniel M.Crist Project Manager A M King Construction Company,LLC 2115 Rexford Road•Suite 314•Charlotte,North Carolina 28211 704 365 3160 telephone•704 365 3101 facsimile www.amkingconstruction.com 10NN S. 710utn O-PS � s C, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OsoR•CO TELEPHONE (860) 644-2511 November 3, 2008 Aldi Inc. Saxonburg Division Brian McGee 6000 North Noah Drive Saxonburg,PA 16056 Dear Mr. McGee: Re: Appl. 06-60P, Aldi Distribution Road Improvements and Appl. 06-60P, Aldi Landscaping This is to advise you that the Planning and Zoning Commission voted on October 28, 2008 to reduce the site bond for the above-referenced project from $1,364,600 to $136,460. The Commission also voted to reduce the landscaping bond from $50,000 to $10,000. Please forward an amendment to the bond we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you Very truly yours, PLANNING&ZONING COMMISSION Patrick Kennedy, Chairman PK/ma cc: Town Engineer AWN Sfq t 0 TomO-P siou� ?d � G V .1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OsoR.CO TELEPHONE (860) 644-2511 November 3, 2008 AM King Construction Daniel M. Crist 2115 Rexford Road Suite 314 Charlotte,North Carolina 28211 Dear Mr. Crist: Re: Appl. 06-60P, Aldi Distribution Facility Letter of Credit This is to advise you that the Planning and Zoning Commission voted on October 28, 2008 to release the IWA/CC bond for the above-referenced project in the amount of$60,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING& ZONING COMMISSION Patrick Kennedy, Chairman ' PK/ma cc: Town Engineer tOW N Sf470� O-P siou� V&U&ot < "tl c V s� • w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 IsoR.C-O TELEPHONE (860) 644-2511 November 24, 2008 AM King Construction Daniel M. Crist 2115 Rexford Road Suit 314 Charlotte,North Carolina 28211 Dear Mr. Crist: Re: Appl. 06-60P,Aldi Detention Basin This is to advise you that the Planning and Zoning Commission voted on November 18, 2008 to release the IWA/CC bond in the amount of$ 100,000. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING&ZONING COMMISSION Patrick Kennedy, Chairman Postal CERTIFIED ru D. Only; Provided) Irij For delivery information visit our website at vvvvvv.0 ps,corn N ru Postage $ Certified Fee ru Postmark M Retum Receipt Fee Here O (Endorsement Required) C] Restricted Delivery Fee 1= (Endorsement Required) Lr) OTotalge&Fees s 3:43 Se#To • y� Q Street,Apt.No.; ' (`� N or PO Box No. 2 I •-•- -••••-------------- City,State,ZIP+4 C C+n (� (\�J` C t 1 V� tpWN SF4 -" L i < J aps'o� � U �f w� 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 SOR Co TELEPHONE(860) 644-2511 November 24, 2008 AM King Construction Daniel M. Crist 2115 Rexford Road Suit 314 Charlotte,North Carolina 28211 Dear Mr. Crist: Re: Appl. 06-60P, Aldi Landscaping This is to advise you that the Planning and Zoning Commission voted on October 28, 2008 to reduce th landscaping bond from$50,000 to $10,000. e Please forward an amendment to the bond we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you Very truly yours, PLANNING&ZONING COMMISSION Patrick Kenney—Chairman - - PK/ma cc: Town Engineer �W N Sfq t G ' l y � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 !�°soR•CO TELEPHONE (860) 644-2511 March 17,2009 Mr. Daniel Crist Project Manager A M King Construction Company, LLC 1610 East Morehead, Suite 200 Charlotte,NC 28207 Dear Mr. Crist: RE: 06-60P Aldi's This is to advise you that the Planning and Zoning Commission voted on March 10, 2009 to reduce the IWA/CC bond for the above mentioned project from$40,000 to $16,300.00. Please forward an amendment to the bond we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, Patrick Kennedy, Chairm Planning and Zoning Commission PK/j sv cc: Town Engineer Chief Building Official �OwN SFq x � O-Pslou� ?v&G V afi 9 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSox•cO TELEPHONE (860) 644 2511 REVISED May 4, 2009 Mr. Daniel Crist Project Manager A M King Construction Company, LLC 1610 East Morehead, Suite 200 Charlotte,NC 28207 Dear Mr. Crist: RE: 06-60P Aldi's This is to advise you that the Planning and Zoning Commission voted on March 10, 2009 to reduce the IWA/CC letter of credit for the above mentioned project from$40,000 to $16,300.00. Please forward an amendment to the letter of credit we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644- 2511, ext. 252. Thank you. Very truly yours, - _ - - - — - Patrick Kennedy, Chairman Planning and Zoning Commission PK/j sv cc: Town Engineer Chief Building Official 05/04/2009 MON 15:17 FAX 2001 *** FAX TX REPORT *** ********************* TRANSMISSION OK JOB NO. 1910 DESTINATION ADDRESS 917043653101 PSWD/SUBADDRESS DESTINATION ID ST. TIME 05/04 15:17 USAGE T 00' 18 PGS. 1 RESULT OK SOW p SP,q . C � 5 r. 1540 SULLIVAN AVENUE•SOUTH WINDSOR, CT 06074 R•co TELEPHONE(860)644-2511 REVISED May 4,2009 Mr.Daniel Crist Project Manager A M King Construction Company,LLC 1610 East Morehead,Suite 200 Charlotte,NC 28207 Dear Mr.Crist: RE:-06-60P Aldi's- - - - - -- This is to advise you that the Planning and Zoning Commission voted on March 10, 2009 to reduce the IWA/CC letter of credit for the above mentioned project from$40,000 to$16,300.00. Please forward an amendment to the letter of credit we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644- 2511,ext.252. Thank you. Very truly yours, Patrick Kennedy,Chairman Planning and Zoning Commission PK/jsv ALDI Inc.Saxonburg Division 6000 North Noah Drive Tel:724/352-9393 Saxonburg,PA16056 FAX:724/352-9337 November 17,2009 VIA:UPS OVERNIGHT COURIER 1 Z 9 V V 698 23 1000 3405 Ms.Michelle Lipe 1540 Sullivan Avenue South Windsor,CT 06074 Dear Ms.Lipe, On behalf of ALDI Inc.,I am requesting the Letter of Credit in favor of the Town of South Windsor,for the account of ALDI Inc.,Project#Application 06-06P in the amount of$136,460.00 be released as soon as possible. All work on Rye Street has been completed 100%. At your earliest convenience,please send correspondence on the Township's letterhead for said release. Please return to the address listed below,also please make to my attention. Please also send a copy of the release for the bond for the landscaping that you stated was inadvertently sent to Brian King at AM King. Thank you in advance for your prompt attention in this matter. Please contact me with any questions. (SB han u, rian National Warehouse Coordinator ALDI Inc. MAIL TO: ALDI INC. ATTN: BRIAN MCGEE ADDRESS: 6000 NORTH NOAH DRIVE SAXONBURG, PA 16056 (724)352-9393 x 116 �0*N Sp s -0 �s� �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�Osox CO TELEPHONE (860) 644-2511 January 15, 2010 Lori Duncan Real Estate Division 6000 North Noah Drive Saxonburg, PA 16056 Dear Ms. Duncan: RE: 06-60P Aldi's,Rye Street Improvements This is to advise you that the Planning and Zoning Commission voted on January 12, 2010 to reduce the site bond for the above-referenced project from $ 136,640 to $10,000. This remaining bond is to ensure that the required wetlands plantings are thriving come spring time. Please forward an amendment to the bond we are currently holding showing this reduction or provide a substitute surety at your earliest convenience. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANN G&ZONING COMMISSION Patrick Kennedy, Chairman PKJma cc: Town Engineer l r� OWN Sf _0� ap So� Vbl� C V S � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�OSox ca�� TELEPHONE (860) 644-2511 January 1,5 2010 Mr. Daniel Crist Project Manager A M King Construction Company, LLC 1610 East Morehead, Suite 200 Charlotte,NC 28207 Dear Mr. Crist: RE: 06-60P Aldi's, Rye Street Improvements This is to advise you that the Planning and Zoning Commission voted on January 12, 2010 to reduce the site bond for the above-referenced project from$ 136,640 to $10,000. Please forward an amendment to the bond we are currently holding showing this reduction at your earliest convenience. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, PLANNING&ZONING COMMISSION _1A4'tCk__ �k"k_� Patrick Kennedy, Chairman PK/ma cc: Town Engineer Page 1 of 1 Lipe, Michele From: Folger, Jeffrey Sent: Tuesday, September 07, 2010 1:14 PM To: 'Dan Crist'; Lipe, Michele Subject: RE: ALDI Wetlands Letter of Credit Yes, and I'll tell Michele to release it at the next PZC meeting. Regards, Jeff Folger From: Dan Crist [mailto:dcrist@amkingconstruction.com] Sent: Thursday, September 02, 2010 9:58 AM To: Lipe, Michele Cc: Folger, Jeffrey Subject: ALDI Wetlands Letter of Credit Michele, It is my understanding that the Letter of Credit for the wetlands has not been released by the Town of South Windsor. I believe it's still held at$16,300.00. Can you confirm that this can be released? Thanks, Daniel M. Crist Project Manager A M King Construction Company,LLC 1610 East Morehead,Suite 200 Charlotte, NC 28207 Charlotte Office Phone-704.365.3160 Charlotte Office Fax-704.365.3101 Mobile Phone-630.696.2366 9/7/2010 10W N Se o � a � u 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �dsoR.CO TELEPHONE (860) 644-2511 September 20, 2010 Aldi Inc. Brian McGee 6000 North Noah Drive Saxongurg, PA 16056 Dear Mr. McGee: Re: App1.06-60P, Aldi Wetland Plantings-Bond Release This is to advise you that the Planning and Zoning Commission voted on September 14, 2010 to release the above mentioned bond in the total amount of$16,300. The letter of credit is enclosed. If you have any further questions contact the Planning Department at 644- 2511, ext. 252. Thank you. Very truly %yours, Patrick Kennedy, Chairman PLANNING &ZONING COMMISSION PK/ma -- - cc: Town Engineer OW N SF4 ' < Wo� 1/oP siou U2 ?d&U&Ot a y � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 �OSox-co� TELEPHONE (860) 644-2511 September 21, 2010 Our Savior Lutheran Church c/o Michael Bedwell 239 Graham Road South Windsor CT 06074 Dear Mr. Bedwell: Re: Appl. 06-06P, Our Savior Lutheran Church Landscape Bond This is to advise you that the Planning and Zoning Commission voted on September 14, 2010 to release the above mentioned bond in the total amount of$2,000. A check will be mailed to you from the Town of South Windsor. If you have any further questions contact the Planning Department at 644-2511, ext. 252. Thank you. Very truly yours, Patrick Kennedy, Chairman PLANNING&ZONING COMMISSION PK/ma cc: Town Engineer SOW N Sf4 O-P S"V t1j'A vi�� o � . v 5 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Sox..co TELEPHONE (860) 644 2511 September 28, 2010 Lori Duncan Real Estate Division 6000 North Noah Drive Saxonburg, PA 16056 Dear Ms. Duncan: Subject: Aldi LOC L/C 302525 Please be advised the above referenced bond is being released by the Town of South Windsor as the project is complete. If you have any questions,please call me at(860) 644-2511, ext. 252. Respectfully your , Michele e, AICP Town Planner mmrl