Loading...
HomeMy WebLinkAboutSite Plan of Development (155) f SOW N SEco S u ��-��2���UZ e�• 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR•CO AREA CODE 860/644-2511 July 21,2003 Certified#70001670000775519706 Mr. John Manners The Casle Corporation. 200 Fisher Drive Avon, CT 06001-3739 RE: Appl.#03-21P—The Casle Corp.westerly of Buckland road, and southerly of Deming Street, GD, Gateway Development zone Dear Mr. Manners: At the July 16, 2003 regular meeting,the Inland Wetlands Agency/Conservation Commission approved with conditions application#03-21P—Buckland Road—Inland Wetland/Conservation Commission application to construct a medical office building,parking lots, stormwater structures, and associated improvements on property located westerly of Buckland Road, and southerly of Deming Street. GD, Gateway Development zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning&Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on July 16, 2008. It is the landowner(s)/applicant(s)responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. The rain garden shall be constructed under the supervision of Dr. Clausen. 7. A maintenance plan be developed and implemented for the rain gardens. The implementation will be the responsibility of the landowner. The Casle Corporation July 21, 2003 Page 2 8. Any onsite topsoil that is to be used for landscaping or the mitigation area must be tested for contaminants consistent with the historical agricultural use. 9. We recommend a bond in the amount of$20,000 be submitted to the Planning&Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 10. We recommend a bond in the amount of$25,000 be submitted to the Planning&Zoning Commission to ensure installation of the stormwater structures including the detention basin. 11. We recommend a bond in the amount of$100,000 be submitted to the Planning&Zoning Commission to ensure creation of the mitigation area. The mitigation area is to be monitored for three consecutive years to insure the proper establishment of the proposed plant community. Any disturbances caused to this area will result in the continuation of the monitoring period until the three consecutive year monitoring period can be completed. 12. The recommendations from the Town Engineer listed in the July 2,2003 memo must be incorporated into the plan. Very truly yours, Eliza bet arren, Chai erson INLA D WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr Cc. Fuss & O'Neill r SOWN St co a v 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR•CO� AREA CODE 860/644-2511 September 22, 2003 Certified#70020510000081151898 Poag&McEwen Lifestyle Centers—Connecticut, LLC Attn: Josh Poag \. Tower 2, International Place 6410 Poplar Avenue, Suite 850 Memphis, TN 38119 RE: Appl: #03-28P—The Shops at Evergreen Walk—westerly of Buckland Road, and northerly of Smith Street—GD, Gateway Development Zone Dear Mr. Poag: At the September 17, 2003'regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application#03-28P—The Shops at Evergreen Walk- Buckland Road—Inland Wetland/Conservation Commission application to construct a multi- building retail complex,parking lots, stormwater structures,.and associated improvements on property located westerly of Buckland Road, and northerly of Smith Street. GD, Gateway Development zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon,must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning&Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on September 17,2008. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. 6. The rain gardens shall be constructed with the supervision and installation approved by Dr. Clausen. The Shops at Evergreen Walk September 22, 2003 Page 2 7. We recommend a bond in the amount of$60,000 be submitted to the Planning&Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Plan. 8. We recommend a bond in the amount of$50,000 to ensure the installation and the establishment of the stormwater structures, to be held for five growing seasons to assure adequate establishment of the vegetation. 9. We recommend a bond in the amount of$5,000 to ensure the establishment of wetlands creation, to be held for five growing seasons to assure adequate establishment of the vegetation. 10. Maintained landscape area adjacent to Deming Street within the 330 foot buffer can be used for aesthetics or passive recreation and shall be placed on the plans. 11. Phasing of the grading activities through the site in relation to the interior erosion control measures, should be consistent with the proposed plan. If there are substantial changes in that phasing,based on contractor input, an alternative erosion and sedimentation control plan must be developed and approved by this Commission. 12. The establishment of the riparian buffer, 330' from the center of the stream channel must be in place prior to: a) Any other applications on the site coming before the Commission b) The approval of any building permits associated with the project and c) Within 6 months of a Planning&Zoning Commissions approval on the site 13. Any onsite topsoil that is to be used for landscaping, stormwater structures or for the mitigation area must be tested for contaminants consistent with the historical agricultural use. 14. Management of any soils contaminated with pesticides will be managed in accordance to the State regulations. The Shops at Evergreen Walk September 22, 2003 Page 3 15. Documentation for the riparian buffer will be prepared and executed in a format acceptable to the Town Attorney's Office. Vi3arren, ours, El Chairperson INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr cc. Fuss &O'Neil Cummings &Lockwood FLB Architecture&Planning, Inc.