Loading...
HomeMy WebLinkAbout06-22P Approval Letter SOW N Sf,q � Tawn O-P siou� w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Soe-co� TELEPHONE (860) 644-2511 CERTIFIED MAIL July 19, 2006 JohnIennaco LB Companies 150 Trumbull Street, Oh Floor Hartford, CT 06103 Dear Mr. Iennaco: Re: App106-22P,Buckland Road Retail, LLC—site plan We are pleased to advise you that the Planning&Zoning Commission voted on July 11,2006 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for the construction of 88,095of retail shopping center,to be known as The Shops at Evergreen Walk Phase III on property located on the southwesterly corner of Tamarack Ave and Buckland Road, GD zone as shown on plans prepared by BL Companies,Job No. 5C1506 dated June 30, 2006 as revised. This approval is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of$20,000 to ensure compliance with the erosion and sediment control plan, and a bond in the amount of$25,000 to ensure the installation and establishment of stormwater structures. The$25,000 bond will be held for two growing seasons to ensure adequate establishment of vegetation. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. A landscape bond in the amount of$30,000 is required and must be submitted prior to filing of mylars. 6. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7. This approval does not constitute approval of the sanitary sewer, which can only be granted by the Water Pollution Control Authority. 8. The building street numbers must be included on the final plan. 9. Outstanding items from Phases I and II must be completed prior to the start of construction on Phase III, including: connection of water to southernmost median irrigation system; final as-built plans for Buckland Road; all monumentation of Buckland Road;retrofitting of sediment chamber off the end of Tamarack Avenue. Additional rooftop screening landscaping along Buckland Road between SNET pole#11 and corner of Tamarack Avenue must be completed by October 15, 2006. 10. The Town Engineer's review comments dated July 11, 2006,must be addressed to the satisfaction of the Town Engineer. 11. The Director of Planning's review comments dated July 6, 2006,must be addressed to the satisfaction of the Director of Planning. 12. Screening of rooftop units (RTUs) from both Buckland Road and Tamarach Avenue(west of Buckland Road)is required. No certificate of occupancy will be issued for any building or tenant space until all RTU screening for that building/tenant space(as appropriate)has been installed and approved by the Director of Planning. 13. Pavement markings must be maintained in good condition at all times. 14. Architectural elevations for all buildings must be reviewed by Planning Department staff for conformance to the approved site plan prior to issuance of a building permit for each building and/or individual tenant space. 15. In areas designated for outside dining and display, at least six feet of unobstructed sidewalk must be available for pedestrians. 16. Stamped concrete to match the theme set in Phases I and II must be installed. Final stamped concrete plan to be reviewed and approved by Town staff. 17. Dumpster enclosure detail (matching the enclosures in Phases I and II)is required on the final plans. 18. The final fire pit design in LL Bean Park is subject to review and approval of the Fire Marshal. 19. Facades of buildings facing Tamarack Avenue must be designed to resemble building fronts. Black and white transparent mylars of Sheet#SP-1 with the above modifications, together with three blueprint copies of the entire set of plans (including architectural elevations and landscaping plans)must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission as well as the Inland Wetlands Agency/Conservation Commission must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. SPerely, Patrick Kennedy, Chairman Planning and Zoning Commission cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal