HomeMy WebLinkAboutSite Plan of Development (152) l '06 (f ffO6 ECEIVED TOWN OF SOUTH iy ! C 2 3 2005 �auth VVirldSOr INLANDERVATION COMM SSIION INLAND WETLANDt, , COURSES AND CONSERVATION APPLICATI Application # - P- eceived )�rr INSTRUCTIONS I. Fifteen applicati n with map and plans (2 copie hall be submitted together with the fee et forth in the Inland Wetlands, Watercourses and Conservation Re ations, Town of South Windsor. (See Regulations, Section VII - 2. The So t Windsor In Wetlands, Watercours and Co se ate should be reviewed with respect to the stand ds and criteria "r� pp11 a ' Evaluation. (See Regulations, Sections VII - X) 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Ag n y ve been submitted. The applicant shall also complete the state filing form. A. Applicant's Name: — Evergreen Walk, LLC / Address: 1109 Rose Lane, Virginia Beach Vir -a 23491 ,�4v -elf Phone: (home) (work) (757)422-5566 (fax) B. Legal owner's name: Evergreen Walk LLC Address 1109 Rose Lane, Virginia Beach, VA 23451 Phone (home) (work) (757)422-5566 (fax) ' (List additional owners, addresses, and phone numbers on bac o apple on)&`� C. If the applicant is not the owner of the subject property; a lette�thecowner(ss authorizing the proposed regulated activity set forth in the app ation must . accompany this form and will be part of the application. ctx_�t D. Project Name (if a c o 2700 Tamarack Avenue 1. Contact Person (if furt er *nfor a ion- s ne ed) Alan F. Lam on (work) (860)568-4030 (fax)(cn)5csq-512q E. The geographical location of the property which is to be affected by the proposed �� regulated activities including a description of the land in sufficient detail to allow (� dentification of the property on the I land Wetland and Watercourse Map. Assessor's map # 27 Parcel # 15 Zone RRcn F. Names of all abutting property owners from records in Town Clerk's office. (use separate sheet if necessary) On Sheet G1.0.3 G. Have you notified all abutting property owners (from records in Town Clerk's office) by certified letter that an application is pending before the Agency? Will notify by December 29, 2005. Q ** (you are required to supply a copy of the letter with the list of the names of the abutters).** H. Purpose and description of all proposed regulated activity(s) including amount of disturbance in square feet and types of fill and the time element involved: Road Crossing (Tamarack Avenue - North and West of proposed building) , parkin{_ within upland review area. I. A class A-2 map of the property drawn to 1" = 40', showing the area to be developed, extent of the wetlands and watercourses affected, topography, existing and proposed activities and names and locations of adjacent property owners must be submitted. J. Amount of regulated ar a disturbance and typ s of fill .(including wetlands and regulated buffers). upl nd review area distu ce 1.82 acres, detention basin disturbanc 2.05 acrY gravel fill (15,000 cy) . K. Acreage of etlands and watercourses in regulated areas to be altered: (1,420 OV 0.036 acres L. Acreage of wetlands and watercourses to be created: 0 acres M. Lineal feet of proposed stream alteration: 0 feet N. Total land area of project and percr tage which is wetlands: 5.129 acre site; .24 acres of wetland (4.70 of si e O. Identify all other permits or approvals that have been issued, applied for, or required with respect to the proposed activity set forth in this application. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T., The Army Corps of Engineers, and any other State, Local or Federal Permits.) PZC-General Plan of Development (approved) PZC-Site Plan (to be applied for) STC - Certificate of Traffic Safety (issued) 8 BEC-22-05 10 :34 AM FLH. ARCHITECTURE P• 06-A5 P. The applicant (or designated representative) hereby attests that a sign will be posted at the following location(s) Demme Street & Buckland Road BY ent _Name Alan F. Lamson on o before th 110 g dr January 6, 2006 Signature: Alan Lamson The s gns must be displayed continuously for at least ten (10) days prior to hedul d meeting (see Regulations, Section 7.3a) he. undersigned hereby applies for the regulated activities listed in paragraph H above, for a Inland Wetlands, Watercourses and Conservation permit for the property desc: ribed herein and confirms that: . She/lie is familiar with the currently effective Inland Wetlands, Watercourses and Cons rvation Regulations of the Town of South Windsor. . She/lie understands that at any time during the review period, the Agency may requi the applicant to provide more information about the wetlands and/or wate ourses in question and/or any proposed activity. . All in ormation submitted in the application for review shall be considered factual, or in he case of anticipated activity, binding. A knowing failure of the applicant or any o her/his agents to provide correct information, or performance exceeding the levels of activity anticipated, shall be sufficient grounds for revocation of any permit undez these regulations. By making this application, the applicant gives permission to the Inland Wetlands, Watei courses and Conservation Commission members and/or its representative to enter the portions of the premises which are subject of the application for the purpc se of inspect' n and investigation and otherwise evaluating the merits of the Oppli ati n oth ore and after a final decision has been issued. i of of Property gree lk C Date December 23, 2005 John ng ra, Me r my Aut orized igriatur of can —^ —�—�------� � vergreeI W LLC Date December 23, 2005 y John i erra, er --�— my Aut orized 9 KLEINFEL ® ER Employee-owned WETLAND IMPACT ASSESSMENT AND MITIGATION REPORT OFFICE SOUTH BUCKLAND ROAD AND DEMING STREET SOUTH WINDSOR, CONNECTICUT DECEMBER 2005 epared by: Prepared for: 3CIKleinfelder Evergreen Walk, LLC Lamberton Road, Suite 201 1109 Rose Lane indsor, CT 06095 Virginia Beach,VA 23451 60) 683-4200 RECEIVED GSCIKleinfelder Project No. 0510203 JAN 18 2006 South INLAND V5_1!.i'••::c.:_r._ a.^v CONS"�•..,.-iGi;';::)iviviS.ii1i4 KLEINEELDER 99 Lamberton Rd., Ste. 201,Windsor, CT 06095 (800) 929-4472 toll free (860) 683-4200 phone (860) 683-4206 fax Wetland Impact Assessment and Mitigation Report Office South Buckland Road and Deming Street South Windsor, Connecticut I Quality Assurance/Quality Control Th following personnel prepared and reviewed this report for accuracy, content and quality of pre entation: F. Z`2-v^-c s- Je e Shamas, CE, SS, CPWS Date S+o Project Manager 0510203 i i it I TABLE OF CONTENTS I 1.0 INTRODUCTION............................................................................................................................1 2.0 SITE INFORMATION.....................................................................................................................1 2.1 Topography...............................................................................................................................l 2.2 Geology.....................................................................................................................................1 2.3 Existing Site Drainage..............................................................................................................1 3.0 LANDSCAPE..................................................................................................................................2 i i 4.0 1' ECOLOGICAL COMMUNITIES ...................................................................................................2 4.1 Uplands—Early Successional Field(Previous cultivation) ........................................................3 4.2 Plum Gulley Brook Riverine Wetland(Wetland 1)...................................................................3 4.3 Shrub/Scrub Slope Wetland(Wetland 2)...................................................................................3 4.4 Unnamed Riverine Wetland(Wetland 3)...................................................................................4 5.0 WETLAND/WATERCOURSE FUNCTIONAL EVALUATION....................................................4 5.1 FUNCTIONAL EVALUATION.......................................................................................................4 5.1 Riparian Buffer Functions (Unnamed Watercourse).................................................................7 6.0 THREATENED AND ENDANGERED SPECIES..........................................................................8 7.0 PROPOSED REGULATED ACTIVITIES, IMPACTS AND MITIGATION..................................8 7.1 Description of Activities............................................................................................................8 7.2 Potential Impacts .......................................................................................................................9 7.3 Mitigation Measures Proposed..................................................................................................9 7.4 Alternatives................................................................................................................................9 8. CONCLUSIONS............................................................................................................................10 9. LIMITATIONS 10.0 REFERENCES...............................................................................................................................12 I FIGURES Figure 1 Site Location Map Figure 2 Ecological Communities Map Figure 3 Wetland Mitigation Areas A PENDICES j Appendix A Site Photographs i i i I i 1.0 INTRODUCTION E GSC leinfelder prepared this Ecological and Wetland Impact Assessment on behalf of Evergreen Walk, LLC. The project includes a proposed professional building development,known as "Office South" (here nafter referred to as the project site)located in South Windsor, Connecticut(see Figure 1). The pure se of this report is to provide a description of on-site ecological communities, an assessment of pote tial wetland impacts, and evaluate and provide an alternatives analysis and mitigation for ` unav idable and minimized impacts that may occur with the project. This report is based on a design layo t by FLB Architecture&Planning,Inc. I The roject consists of a proposed professional medical office building and associated parking area, an acce s boulevard from Deming Street, stormwater management measures and wetland mitigation enha cements. This project includes approximately 1,420 square feet of alterations to a wetland and a wetl nd/watercourse system as well as alterations to Upland Review Areas primarily consisting of old field habitat. In order to minimize unavoidable impacts to the wetland/watercourse area, spanning the wate course and wetland is proposed,via a bottomless box culvert. Mitigation, which includes a com ination of direct wetland and Upland Review Area enhancements, is being provided to offset the imp cts to the wetland/watercourse and Upland Review Areas. Stormwater management measures incl de swirl technology structures, level spreader outlets, a detention basin that will be planted with native wetland vegetation with micro-habitats and roof drains to be discharged to level spreaders. These ! measures have been incorporated into the project design to renovate surface water runoff prior to reac ing adjacent wetlands/watercourses and allow for continual hydrological inputs of surface water to E thes resource areas. 2.0 SITE INFORMATION 2.1 Topography The project site is located on a gently sloping terrain with a western solar aspect. The project site mai tains an approximately 35-foot drop in elevation over roughly 660 feet, which is equivalent to a 5.3 per ent slope. 2.2 Geology Th project site lies within the Portland Arkose bedrock parent material (Rogers, 1985), the most co on sedimentary rock of the Central Lowlands. Arkose(known as brownstone)is a reddish-brown sed mentary rock containing quartz, feldspar, and rock fragments, and is frequently quarried for use as bui ding stone. Su ficial soils beneath the project site comprise glacial till, fine sandy loams (uplands) and outwash silt loa s(wetlands) (Stone et. al., 1992). The reddish-brown surflcial soils exhibit the color of the parent be rock material. 2.31 Existing Site Drainage Thy project site lies within the Podunk River sub-regional drainage basin(Connecticut Department of Environmental Protection [CTDEP] Geographic Information Systems [GIS] Data, 2003). However,the project site drains to Plum Gulley Brook within the immediate micro-watershed area. The open field community, a slope wetland and riverine wetland system drain to Plum Gulley. Plum Gulley receives drainage from the residentially developed areas to the west of the project site. Plum Gulley Brook flows in a southwesterly direction from the project site and ultimately merges with the Podunk River. f Sol i'-1 i:<:C'Kk ill leIdc1, 20, ,, �.,C?t?L!l tr,:, !L � ",•i1i1C'C;1 '.1.'rt 3.0 LANDSCAPE Landscape ecology provides an understanding of the landscape mosaic, existing interrelationships between the matrix of habitat patches, and other landscape features within a macro and micro-scale scope. The macro-scale discussion provides information beyond the limits of the project site while the micro-scale discusses the immediate development site. 3.1 Macro-scale f The project site is located within a highly heterogeneous landscape mosaic composed of vast old field habitats, forested upland and wetland habitats,recent and older residential and commercial developments, and a matrix of local roads. The landscape is highly fragmented with habitat patches that likely serve to provide nesting and habitat for generalist or edge wildlife species. The convoluted shape of the forest patches increases the amount of edge zones and prevents interior forest species from residing in these habitats, except temporarily during migration. Therefore, it is expected that the predominant wildlife species present in these forested patches are generalist(e.g., edge) species. The hedgerow corridors that exist are low quality,predominately dead ends disconnected from habitat patches of higher quality. Species utilizing these hedgerows likely include small mammal predators that can travel the corridors and prey on birds or other small mammals, especially within the open field communities. The hedgerow perches, as well as existing building roof tops, can be used as hunting sites for birds of prey as they locate small mammals and birds in the upland and wetland open field/meadow community. Using the Hydrogeomorphic method(HGM; Brinson 1993) of wetland classification, the area watersheds include the following wetland types: riverine, depression, slope and lacustrine wetlands. M These wetlands include a variety of vegetative cover types consisting of emergent meadow(old field), shrub/scrub, and deciduous forests. The riverine systems (Plum Gulley Brook,Podunk River,Whaples ` Brook) are predominantly perennial, unconsolidated bottoms and do provide some limited finfish habitat. i 3.2 Micro-Scale The northern portion of the project site abuts the boulevard that is part of the ECHN site development. The existing ecological community where the development is proposed consists primarily of an upland old field(meadow)habitat. Convoluted wetland habitats occur along and within the forest edges and include old field(meadow) habitats, shrub/scrub and deciduously forested communities. A riverine wetland just north of the proposed Medical Office building flows from Buckland Road and continues down through the slope wetland system on site and discharges to Plum Gulley Brook. This on-site riverine system receives stormwater drainage from Buckland Road. These wetland communities include both native and state-listed non-native plant species. A variety of grassland bird species occur within the upland and wetland meadows including warblers, swallows, grackles, starlings,American robin, goldfinch, and red-winged blackbirds. Based on the time of year, some songbird species have migrated to wanner climates,therefore observations were limited. Typical generalist avian species occur within the shrub/scrub and forested wetlands, including catbirds, chickadees, eastern phoebe,blue jay, cowbird, American robins, woodpeckers, crow, owl,hawks, sparrows and others. Mammals expected and observed on the project site include red fox, coyote, turkey,woodchuck,raccoon, opossum, skunk, squirrel, and white-tail deer. 4.0 ECOLOGICAL COMMUNITIES The ecological communities of the project site were identified by field observation and aerial photographs. A total of four ecological communities were identified, of which one is upland and r f. ii7we=south (3S''K.lci;tI"k'Id i% n;0 er 2(1C15 Sottl.) i`ll.]ti:+':'. Coiluecu"Cu'll three are wetlands/watercourses. A list of the communities is presented below, and their locations are shown on Figure 2. I 4.1 Uplands—Early Successional Field(Previous cultivation) This community consists of a highly disturbed open field that has been graded over approximately the last year to accommodate a detention basin and water quality swales. Predominant vegetation consists of grasses and herbaceous volunteer species such as goldenrods(Solidago spp.),ragweed(Ambrosia artemisiifolia), field clover(Trifolium campestre), wild strawberry(Fragaria virginiana) and others. This community is bordered by the unnamed riverine wetland system north of the proposed office building and a slope wetland system to the west. The edge habitat along the border of the field and the wetlands could provide habitat for many wildlife species, as these transitional zones are typically wildlife sinks and provide food, cover and nest sites. However,the highly disturbed conditions of the edge zones reduce the ability of the edges to provide a high-quality habitat. Some species observed and r expected were noted in Section 3.1 and include warblers,bluebird,blue jay,robin, swallows, cardinal, deer,rabbit, and other small mammals and birds. 4.2 Plum Gulley Brook Riverine Wetland (Wetland 1) This perennial watercourse flows under Deming Street and discharges onto the project site, flowing in a southerly direction. The banks of this watercourse exhibited evidence of scour and erosion(i.e., undercut banks, observations of exposed roots, and areas of continuous soil movement along the bank). The substrate of the channel is composed primarily of fines (silt, sand). On-site inputs to the watercourse include the upland field and Wetland 2. Plum Gulley maintains some vegetated riparian buffer along its length on the property; however, the buffer in many areas significantly lacks a well- developed forested buffer zone that could otherwise provide many riparian buffer functions (i.e., nutrient renovation, sediment trapping, flood and stormwater modification,wildlife habitat, etc.). V Vegetation along this watercourse includes scattered trees such as red maple(Ater rubrum) and Eastern ` cottonwood(Populus deltoides). The understory layer is dominated by the non-native invasive species multiflora rose (Rosa multiflora)with native silky dogwood(Cornus amomum). This riverine community provides habitat for similar avian and small mammal species listed in the Upland community. Streams can provide habitat for some amphibians such as the gray tree frog(Hyla versicolor), green frogs (Rana clamitans), garter snakes,northern dusky salamander(Desmognathus Justus) and two-lined salamander(Eurycea bislineata), and a variety of aquatic invertebrates. While these species were not observed on site they may occur up or downstream of the site. 4.3 Shrub/Scrub Slope Wetland(Wetland 2) I This community is juxtaposed to Plum Gulley Brook and extends upslope and easterly,then turns to the south and continues in a south-southwesterly direction, generally paralleling the Brook. Overall, this wetland slopes gently in a westerly direction toward Plum Gulley Brook with an overall topographical elevation change of approximately 20 feet from the easterly limit of the wetland to the Brook. The majority of this habitat is in an early successional stage;however, some larger trees, such as red maple (Ater rubrum) and cottonwoods (Populus deltoides), are present. Portions of the understory canopy are relatively dense,while other areas containing purple loosestrife(Lythrum salicaria), goldenrods and brambles are sparse. Silky dogwood(Cornus amomum), arrowood viburnum(Viburnum recognitum) and the state-listed invasive species multiflora rose (Rosa multiflora), along with loostrife, are the dominant shrubs throughout the community. The herbaceous layer of this wetland contains species such as a variety of grasses,tussock sedge(Carex stricta),rush(Juncus effuses) and wood nettles and saplings of the loostrife,brambles, and dogwood. Wildlife using this habitat is presented in Section 3.1 and 4.2 above. W Clii'ic° Si L!ta� GrSC:F;,,(i11CJdcr Z G0 {sviSi�� �'�'I:1L15;,:Y{', �,,C.'•3.11�C17C1l. 4.4 Unnamed Riverine Wetland (Wetland 3) This unnamed watercourse originates in the northeasterly portion of the project site and receives stormwater drainage from Buckland Road and lands east of Buckland Road. The bank of the watercourse is relatively steep in places and highly eroded, and maintains a moderate canopy shading it from abrupt thermal fluctuations and provides some habitat for local wildlife. This watercourse flows in a westerly direction and continues to flow into and through Wetland 2. Similar wildlife and vegetative species occur within this wetland as occurs in the other wetlands on the project site. 5.0 WETLAND/WATERCOURSE FUNCTIONAL EVALUATION Wetland functions and their perceived value are the basis for the legal protection of wetlands throughout the country at local, state, and federal levels. Biophysical elements such as a wetland's landscape ! position, geology,hydrology, substrate, and vegetation determine the wetland functions and to what capacity they are performed. Due to the differing biophysical characteristics between on-site wetlands, the functions the wetlands provide and the capacity to perform those functions vary. To better understand these differences, a functional evaluation was completed for the wetland areas identified at the project site. 5.1 FUNCTIONAL EVALUATION The completed evaluation was based on The Rapid Assessment Procedure for Assessing Wetlands' Functional Capacity; however,reference wetlands were not utilized(Hollens and Magee 1998). This method assesses the relative importance of the wetlands for performing functions and provides a logical I' framework for observations, a structure for standardizing results, and a basis for achieving repeatable results among users. The initial step of the Assessment Procedure is to choose an assessment area. These areas at the project site are labeled W1 through W3. These areas were chosen based on their hydrogeomorphic (HGM)class and correspondence with the ecological community type. However, k other factors, such as proximity and connection to other wetlands and slope, were also considered. Each Wetland Assessment Area(WAA) and designated functional indicators (hydrologic, landscape, soil, and vegetation variables) of the Assessment Procedure was characterized for a range of conditions based on field investigations and reviews of topographic surveys and aerial photographs. Seven HGM classes were discussed and agreed upon by the numerous wetland researchers that attended a workshop in 1991 sponsored by the U.S.Army Engineers Waterways Experiment Station(WES). These include depression,riverine, slope,mineral soil flats, organic soil flats, estuarine fringe and lacustrine fringe. A subsequent workshop was held in 1992, at which the following eight primary wetland functions were identified and agreed upon by researchers: ➢ Modification of groundwater discharge ➢ Modification of groundwater recharge ➢ Storm and floodwater storage ➢ Modification of stream flow ➢ Modification of water quality ➢ Export of detritus ➢ Contribution to abundance and diversity of wetland vegetation ➢ Contribution to abundance and diversity of wetland fauna Each on-site wetland was assessed to determine its capacity to provide the following eight functions. A summary of the assessment for each wetland and function is provided at the end of this section. The following is a brief description of each function. Modification of Groundwater Discharge Modification of groundwater discharge is the capacity of a wetland to influence the amount of water moving from the ground to the surface. This can affect groundwater and surface water supplies and 05]020,11E)Bi- c!,r'.!'c:_'rI',^;a11�:1:1.C'7�O",l)5 f'age.y. Ofii_�'sc,:ith 6SC K.Icir ieadcr )c:err3 x;r 2005, SOLIO'l 1 71.lfiS()T. Cori-_.Csii l ! recreational activities. Typically, a perennial inlet and outlet indicate that a wetland is directly linked with the regional water table and has a high capacity to perform this function. Evaluation: Wetland 1 (Plum Gulley Brook)has high capacity to perform this function in that it has a perennial inlet due to its morphological and hydrodynamic features (unidirectional,horizontal flow). The slope characteristics of Wetland 2 contribute to this function moderately as slope wetlands slow the discharge of groundwater to the surface through its low permeability and transmissivity of the soils. This results in a long, constant groundwater discharge. Wetland 2 is not rated any higher based on its disturbed conditions which can prevent greater amount of modification of the groundwater. Wetland 3 also contributes,but at a lesser degree than Wetland 1,because it exhibits intermittent flows and is considerably smaller in length, which reduces its overall performance. Therefore, it is considered to contribute at a moderate level. ` Modification of Groundwater Recharge Modification of groundwater recharge is the capacity of a wetland to influence the amount of surface water moving to groundwater aquifers and thereby affecting public and private groundwater supplies. The subsoil and location of a particular site plays a significant role in the ability for on-site wetlands to modify groundwater recharge. With the exception of slope and riverine wetlands in the glaciated northeast, all wetlands have some capacity to contribute to this function. Poorly developed or no micro- relief is an indication that the water table is below the substrate of a wetland for most of the growing season and that groundwater recharge is occurring. Wetlands with perennial outlets are discharge areas 'I and cannot be recharge areas, even seasonally. f Evaluation: Wetland 1,Wetland 2 and Wetland 3 do not contribute to this function based on their hydrodynamic flows and morphological features; therefore,these wetlands are rated as low for this function. M Storm and Floodwater Storage Storm and floodwater storage is the capacity of a wetland to detain or retain stormwater on its surface. This benefits society by preventing storm damage and the potential loss of life and/or property. All wetlands, except slope wetlands, have some capacity to contribute to this function. Depression wetlands ' have the highest potential for providing this function. Evaluation: Three major influences affect the functioning capacity of riverine wetlands(Wetland 1) for storm and floodwater storage: 1.Frequency for overbank flooding; 2. Roughness of surface(i.e.,micro- relief and vegetation density); and 3. Gradient(topography) of wetland surface. This wetland likely overtops its banks frequently; however,portions of the floodplain area do not have a high degree of surface roughness. Plum Gulley maintains a relatively flat gradient through the project site and therefore adds to the ability to contribute to this capacity. This wetland contributes at a moderate capacity for this function,based on its lack of roughness and small length of watercourse on the project site. Slope wetlands (Wetland 2) do not contribute to this function based on their morphological characteristics. Slope wetlands may actually be generators of overbank flooding because they are predominantly saturated and direct precipitation may quickly run off to downstream channels (Plum Gulley). Therefore,Wetland 2 is considered to contribute at a low capacity. Wetland 3 consists of eroded steep banks, lacks an effective flood area to slow or store flood flows, and lacks surface roughness. It is essentially a flow-through system and therefore contributes at a low-moderate capacity. Modification of Stream Flow Modification of stream flow is the capacity of a wetland to produce or affect the hydrology of a downgrade stream. This function may affect societal values related to recreation,public water supply, flood control, and prevention of storm damage. Wetlands that have a high capacity to store storm and floodwater and to modify groundwater discharge have a high capacity to modify stream flow. Slope wetlands that are hydraulically isolated from down slope wetlands (no outlet)have no modification of stream flow. i)�1(J2Q;TT?13E:�,-erx�.r-earrr��',�I;tii;LC`�Io�(i� i'a c° south 4 Unds":!r. Evaluation: Based on the description above,Wetland 1 contributes moderately to this function. Wetland 2 can contribute at a moderate-high capacity for this function because it is connected to a perennial watercourse(Plum Gulley) and can provide stream base flow. Wetland 3 contributes at a low capacity because of its rating at storing storm and floodwaters. Modification of Water Quality Modification of water quality is the removal of suspended and dissolved solids from surface water and dissolved solids from groundwater and conversion into other forms,plant or animal biomass, or gases. This function may contribute to societal values related to public water supply,recreation, and aesthetics. The primary mechanisms for the removal of suspended solids are sedimentation and filtration. Dissolved constituents can be removed or made unavailable for downstream plant use via adsorption and absorption by soil particles, uptake by vegetation, loss to the atmosphere by microbiological processes, or a combination of the three. Flow characteristics and residence time are the primary wetland characteristics affecting the ability of a wetland to perform this function. Generally, depression, lacustrine fringe and flat wetlands have the highest potential for performing this function because typically the residence time of water is maximized. Riverine wetlands can modify the rate stage and volume of stream flow within the river channel. Conversely, slope wetlands have the least potential because they have the least amount of residence time of water than other HGM types, especially when their slope gradient increases and therefore the amount of water quality modification is less in slope wetlands. Evaluation: Wetland 1 and Wetland 3 is relatively small, contains non-native invasive plants, which have been documented as reducing water quality renovation, has low residence time of water(flow- through)and therefore contributes at a low capacity. As noted above, slope wetlands (Wetland 2) contribute to this function less than other HGM wetland types, especially when their slope gradient increases. Additionally,Wetland 2 is dominated in many areas with non-native vegetation. Thus, Wetland 2 contributes at a low capacity for this function. Export of Detritus Export of detritus refers to the ability of the wetland to produce and export dissolved and particulate organic particles to downstream aquatic ecosystems to serve as an energy source,to support their food chain, or both. Society may value this function as it relates to food web support and ultimately nature research and education,recreation(e.g. hunting and fishing), and the type and density of fauna supported by the wetland. The structure and composition of the wetland's vegetation affects the production of detritus and the degree of the wetland's surface water connection with a stream,river or lake affects the transport of detritus. Therefore, the more productive the ecological community structure is within a wetland as well as its relative size, adds to its contribution to this function yielding higher values. Based on hydrogeomorphic conditions,riverine wetlands have the greatest potential for export of detritus due to an unrestricted outlet. Depression and flat wetlands have the least potential because of their greater potential to retain suspended sediments. Slope wetlands can contribute significantly if they have a perennial outlet. Evaluation: Wetland 1 and Wetland 3, although a riverine system that should rate highest, contains many non-native plants, lacks a productive ecological structure and lacks the abundance and diversity of wetland vegetation. These negative influences decrease the wetlands ability to generate detritus. Therefore,Wetland 1 and Wetland 3 contribute at a low capacity for this function. Wetland 2 has the potential to significantly contribute to this function because of its size and because it has an outlet to the Brook; therefore,Wetland 2 is rated as moderate for this function. If the vegetative community had less non-native plants with greater structure and abundance of native species, the functioning capacity would increase. I I 05N I020 3l: R I],(Ns vo- l'fs,; 6 off" Sc All (; t. h3aiaielrcr ?_i}{;` Contribution of Abundance and Diversity of Wetland Vegetation Contribution to abundance and diversity of wetland vegetation is related to the number and type of hydrophytic plants that a wetland can produce and support. Society may value this function as it relates to environmental research and education,recreation, the type and density of fauna supported by the wetland, and production of harvestable goods. Because wetlands support plant species that occur in wetter and dryer(upland)habitats and species that grow only in wetland habitats (poorly drained and very poorly drained soils),most wetlands have a high capacity to contribute to the abundance and diversity of a landscape's vegetation. The primary variables affecting a wetland's capacity to perform this function are its plant species diversity, its vegetation density and dominance, its water regime diversity, and its juxtaposition to other wetlands and presence of non-native invasive species. Evaluation: Wetland 1,Wetland 2, and Wetland 3 rate poorly or low for this function,based on their lack of structural diversity and composition of plants. Non-native species dominate many of the wetland areas on the project site. Contribution to Abundance and Diversitv of Wetland Fauna Contribution to abundance and diversity of wetland fauna is the capacity of a wetland to support large and/or diverse populations of animal species that spend part or all of their life cycle in wetlands; either an individual wetland or a system or network of wetlands. Society may value this function as it relates to environmental research and education,recreation, aesthetics, and providing a source of food. A wetland's water regime is the primary factor affecting this function, as it largely controls the dominant vegetation type present and influences the animal movement to and within the wetland to food, cover, and breeding areas. Other factors affecting the capacity of a wetland to contribute to the abundance and diversity of wetland fauna are the structure and composition of the vegetation community and the juxtaposition of the wetland to other habitat types (i.e., another wetland,upland forest, farm field, surface waterbody, etc.) and the presence of non-native invasive species which can reduce habitat values. Evaluation: Based on the correlation to the previous function,the wetlands should rate low for this function. However,Wetland 2 can be considered slightly higher in functional capacity because of its size and greater diversity of community types (e.g., shrub/scrub and forest) on the project site. Thus, Wetland 1 and 3 are considered to be low and Wetland 2 is rated as low-moderate. Summary Overall,the quality of the wetlands assessed provides a low-moderate capacity to perform the above eight wetland functions. The mitigation plan, discussed later in this report,proposes to increase these functional values through enhancement plantings of Wetland 2 and planting a detention basin that is expected to add some ecological diversity to the local landscape. The detention basin, although a stormwater feature,will provide additional habitat to the local wildlife. 5.1 Riparian Buffer Functions (Unnamed Watercourse) Riparian buffers perform functions that protect watercourse systems from potential impacts due to development, agriculture and other activities within riparian areas. For the purposes of this report, the discussion of riparian buffers relates to the unnamed watercourse that is proposed to be affected by the Boulevard accessing Office South. Typical functions of riparian buffers are presented below and are adapted from the Connecticut River Joint Commissions, 1998. ➢ High filtration capacity—Vegetation in wetland buffers can protect the wetland from sedimentation and pollution. r ➢ Regulation of flow velocity—Vegetation and undisturbed soil can slow storm waters and reduce erosion. ➢ Regulation of microclimate—Buffers can help to regulate temperature and moisture fluctuations by providing windbreaks and shading. The control of water temperature is extremely important for fish and other wildlife, and influences water chemistry(i.e., dissolved t:)I3t::rer 31z��i`(.�1ai(<t.f_C`i j Pif;c° .`�nd,cWe r 2"005 'crt�t.Ir�,Vi�rir:��r. C'ct7xu�ciict!�, oxygen). Forested buffers can help to maintain evapotranspiration relationships and the humidities favored by some wetland species. ➢ Maintenance of wetland hydrology—Trees and understory vegetation in wetland buffers help to maintain wetland hydrology at near-natural levels through evapotranspiration. ➢ Protection of habitat—Vegetation provides a buffer between human activities and wetlands, thermal cover, food for wildlife, and valuable edge habitat. The present condition of the Upland Review Area(buffer)to the unnamed watercourse north of the proposed medical office building provides a low capacity to perform these functions noted above,based h on the existing conditions of the old field community. The predominant past land use within the riparian buffer from the unnamed watercourse was agriculture (i.e. crop cultivation). The activities associated with that land use are observed presently through the ecological successional stages of the fallow fields that lack the abundance and diversity of a vegetated community to provide the functions identified above. One area that will change is the proposed crossing if the boulevard by use of a bottomless box culvert. This area will maintain a vertical distance opening under the proposed culvert span of 4 feet to 8 feet. It is anticipated that woody vegetation in the areas under the span will not likely return,however R this area is not densely populated with native woody plantings presently. The proposal provides areas of the immediate wetland and its buffer to be planted with native woody shrubs to offset this impact. The majority of the emergent/herbaceous community post-development is expected to provide long-term habitat to local wildlife in that the vegetation will continue to receive solar exposure. 6.0 THREATENED AND ENDANGERED SPECIES An investigation of the project site was conducted by GSCIKleinfelder to determine the presence or ' absence of state or federal species listed as endangered,threatened, or special concern. The investigation included on-site surveys and remotely sensed data(CTDEP Environmental and Geographic Information Center Natural Diversity Database(NDDB)Map)reviews. No federally or state-listed endangered or threatened species were observed on the project site, or reported to exist there according to the resource map. 7.0 PROPOSED REGULATED ACTIVITIES,IMPACTS AND MITIGATION ! The state's policy of wetland avoidance, minimization of unavoidable impacts, and mitigation/compensation for the minimized impacts has been incorporated into project designs. Most project activities have the potential to cause short-and long-term impacts. These impacts can be observed through soil erosion and sedimentation during construction(short-term) and loss of wetlands, buffer zones, etc. (long-term). Identifying, analyzing and evaluating these impacts are part of any comprehensive environmental review. Providing mitigation to offset identified potential impacts (short- and long-term) is a regulatory requirement that serves to create a justified balance between the need for the proposed activity and environmental protection/preservation. In the process of environmental planning and project design, significant considerations are given to wetland and watercourse impact avoidance,minimization of loss, and compensation. Unavoidable impacts are offset through wetland compensation(conservation easements,restoration, enhancement or creation of wetlands). Ultimately, these planning considerations can achieve a balance that satisfies regulatory requirements,while protecting/preserving the environment. 7.1 Description of Activities The proposed regulated activities on the project site are presented below: 1. Professional office building, associated parking and infrastructure 2. Spanning, via bottomless box culvert, of an unnamed wetland/watercourse 3. Mitigation to offset wetland and Upland Review Area impacts 4. Stormwater management renovation measures (create detention basin and water quality swale) 5. Recommended wetland and riparian buffer(along unnamed watercourse) enhancement plantings 0 T3at,c. ,. , ,3.. .. , , _. PYI::.'-°ri;!iLi"i llJ �. tllljt'.�(C)I uU(:t`ll�l1?Gf 200_' ;irti(il'v`d`ii2(�s^..i'. t, Crila1�C'tr. t 7.2 Potential Impacts Short-term impacts are limited to the potential for soil erosion and sedimentation and are anticipated to ` be managed and mitigated through the erosion and sediment control plan developed by the project engineer. The soil and erosion control plan incorporates controls that are anticipated to manage the movement of soil during storm events in order to avoid adverse impacts to wetlands and watercourses during the construction phase. The plan will be used during this phase and until all disturbed soils are stabilized. The controls included in the plan involve the use of stormwater quality basins, swales, and plunge pools, and hay bale and/or silt fence filters at the limits of the project area disturbance. The ! implementation and continued maintenance during construction of these controls is important in order to ensure the protection of receiving surface waters (i.e. wetland/watercourses). Typically,we recommend the use of a qualified site monitor to review and report on the conditions of the soil and erosion controls. The qualified individual should have a comprehensive understanding of soil erosion and sedimentation control management; its practices, structural and non-structural measures, emergency response and the ability to concisely and effectively report deficiencies,provide recommendations for improvements, and act on other unforeseen events. Long-term impacts to the regulated wetland/watercourse areas on this project are expected to be minimized through the use of the bottomless box culvert to bridge over the wetland/watercourse area. Another small highly disturbed wetland area dominated with invasive plants is proposed to be filled in order to construct the connecting thoroughfare to other on-site developments. The losses of wetland and upland review locations are proposed to be mitigated through the enhancement of direct wetland areas currently degraded, and planting a density and diversity of native woody and herbaceous species within a new detention basin. Stormwater management measures are proposed to renovate stormwater from ! impervious surfaces in order to mitigate known pollutants in non-point stormwater discharge. This j includes structural and non-structural methods including swirl technology stormwater structures, level f[ spreader outlets, and a planted detention basin to become naturalized with the landscape. The potential long-term impacts to flora and fauna are also expected to be offset through mitigation efforts. However, the project site currently represents low-quality habitat due to its disturbed history, abundance of non- native invasive plants, and location in a highly fragmented and heterogeneous landscape. i 7.3 Mitigation Measures Proposed Long-term impacts are proposed to be mitigated through the recommended implementation of wetland and riparian buffer(unnamed watercourse) enhancement plantings and the removal of invasive species in those areas. The current assemblage of flora throughout the project site is dominated by native silky dogwood and many non-native,invasive species (purple loostrife,multiflora rose). The proposed mitigation plan will enhance the composition of the wetland edge zones by replacing invasive and old field volunteer species with indigenous shrub and tree species. These plantings will be focused within portions of Wetland 3 (shrub/scrub community), and the detention basin and the unnamed watercourse (Wetland 3). Additionally, stormwater from impervious surfaces will be renovated through several components of the proposed stormwater management system. It is strongly recommended that regular maintenance of the catch basins and stormwater system be conducted to maintain optimum efficiencies. 7.4 Alternatives The approach to development was chosen based upon the approved General Plan of Development of the site,the existing approved development, and the disturbed conditions of the site, couple with the mitigation options'. Based on the amount of space needed to provide the medical office building, associated parking space, and stormwater renovation features, the proposed activities have limited alternative potentials. Alternatives such as a no-build or total project reduction or portions thereof have been evaluated; however,the no-build alternative was not considered a prudent alternative. The 051(�%();1:)13I:�Lr;rc° ;�'t`:=ttl,l:f.Ci�c��U Pw e9 011" GSIC'RIt"Iil6c dcr S(;'ah V'i,1t St?t". �.'o,]:Ctt.' 1.icuL alternative of a total project reduction or portions thereof has also been considered, although at this time, the building design size is a critical component to justify the development of the project area. The existing site conditions allow for reasonable development with the ability to make improvements to the flora of the riparian zone and wetland edge zones. The alternative design of spanning the unnamed I� watercourse(Wetland 3)was considered a feasible and prudent alternative to the more intrusive and less environmentally sensitive approach of filling and culverting the wetland/watercourse system. 8.0 CONCLUSIONS f GSCIKleinfelder has reviewed and evaluated potential impacts to the regulated wetlands and watercourses on the project site in South Windsor, Connecticut. This report was completed to provide an assessment and evaluation of potential impacts to the wetlands and watercourses on site and to discuss feasible and prudent alternatives and mitigation. I i Overall,the wetlands evaluated in this report exhibit low to moderate functional values. The functional values exhibited by these wetlands are directly attributable to the existing lack of floral and faunal diversity,predominance of non-native invasive species, and low-quality riparian buffer to Plum Gulley Brook. While the majority of the proposed activities will occur outside of wetland areas,they will be located within the upland review and riparian buffer zone areas. Based on the low-quality conditions of the riparian buffer along the unnamed watercourse and wetland edge zones,mitigation is proposed to enhance these ecologically important areas through removal of invasive plants, and to provide a diversity of native shrub and tree plantings. The fragmented conditions of the forest patches and current assemblage of flora and fauna within these patches will not be negatively affected by this project nor will they be further impacted. This is based on the generalist nature of the species identified and expected on the project site. Balancing the proposed development with the need for environmental preservation and protection was an objective of the Applicant(Evergreen Walk,LLC). The proposed project intends to provide wetland and Upland Review Area enhancements while renovating stormwater through structural and non- structural water quality management practices. Swirl technology structures will provide the initial r measure of stormwater pollution filtration. Water quality basins, swales, and plunge pools will add additional pollution renovation of stormwater and will be naturalized through plantings. The naturalized stormwater features will be integrated into the landscape to become additional wildlife habitat areas. E I 6 f tl ,tI'll :"C1 t�r:05 Fa c' l.(i 3?fi,-e :S') .;i; Gsc,"1".16111" ldo.r )cc .rrt(;cr 200-11 -,ct.Wh Vvi_sittior_ t.<,v,oet•lrctti. 9.0 LIMITATIONS This report has been prepared for Evergreen Walk, LLC in accordance with the terms and conditions agreed upon'. Compliance with submitted recommendations, suggestions or any proposed scope of services in no way assures elimination of hazards, environmental impairment or fulfillment of the owner's or potential purchaser's obligations as may be required by any local, state or federal laws or modifications or changes thereto. In many cases local, state or federal regulations and/or statutes require the prompt reporting to "appropriate" authorities should a "release" occur or be identified. It is the responsibility of the current owner or operator to notify authorities of any conditions which exist or that were identified, which are in violation of current laws or codes. The findings and conclusions contained in this report are based solely on professional interpretation of observations of conditions, as they presently exist and on information obtained while conducting the scope-of-services detailed in this report. If the recommendations or findings within this report are not implemented or acted upon within a reasonable period of time,there can be no assurances that intervening factors will not arise which will effect the conclusions contained herein. In addition, data available from further inspections, assessments, subsurface explorations, sampling and testing of the subject property may modify or indicate the need to modify the conclusions and recommendations of this report. Should additional information or observations collected at a later date indicate the presence of an environmental situation not addressed in this report, GSCIKleinfelder will determine the need to modify the conclusions and recommendations contained in this report, if contacted by the client. t GSCIKleinfelder assumes no responsibility for damages arising from information or situations that are identified,but not brought to its attention immediately. f i t The terms and conditions were attached to the original contract. If,for any reason,these terms and conditions are not accepted,this report should be returned to the sender immediately. t}}1 )2{Y I:7}'•F.t er r,rt:°: n1l laIH IC t)v)� (?a{?e 1 Oii i t:. lr :iS ;hl�itxfelc{cr `)c;c rs�e� G'.t)0.`; 10.0 REFERENCES 1. Brinson,M.M. 1993. A Hydrogeomorphic Classification for Wetlands. Tech.Rpt.WRP-DE-4. Biology Dept. East Carolina Univ. Greenville,NC 27858. 2. Rodgers, J., 1985,Bedrock Geological Map of Connecticut. 3. Stone, J.R. et al, 1992,Surficial Materials Map of Connecticut. r 1 k r E i E R r FIGURES r via `- id gal • Ak mwnt m4f r g 1 � 1 r If 111 '- IF mk ,. R. 00 Fr, TTT333fffjf. L • JJ Ij R 3 Oka� r dis 7 d of ' m wigi' , pu ] q, r a -3 d t P `."•; ` `'t l'�aM� Kv- +.�i.' e *ai ate. ,E.i' `( i i �'[ �f_.>. j }%•�. K��° '_. #��`+ 'YaS•7 � �� ''����+ ��•�����4 ' jy{ "+'�` ,'t�y�ss a•+� �y8', ,�0 T�'�.-'¢i fit'. I, s �� � �y F.f k4 +iF �{.•- ,/� �F 'ii��m, � ��`+ r!/ ►�i` S�q1rra3,}� 1 {mod i }�f ,,. .'` y a_s��i� �t� ,w i�.. sk°>`.7'.,d•e;i{�it�Ys'�ii�3,'SS Try -,4 ia••2� � �c .s .i ��' 3� NOT TO SCALE FIGURE 1 SITE LOCATION EVERGREEN WALK,LLC OFFICE SOUTH E3UCKLAND ROAD SOUTH ■ •• CONNECTICUT •• 1 IV", ■ SOURCE: USGS 7.5'TOPOGRAPHIC MAP,MANCHESTER,CONNECTICUT QUADRANGLE GSCJKLEINFELDER 99 LAMBERTON ROAD,SUITE 201 i i LEGEND �— PLUM GULLEY BROOK WETLAND AREAS UPLAND- WETLAND 1- OLD FIELD PLUM GULLEY BROOK WETLAND 2- SHRUB&FORESTED SWAMP NOTES 1.ALL BOUNDARIES AND INFORMATION PRESENTED ON THIS FIGURE ARE CONSIDERED APPROXIMATE. WETLAND 3- UNNAMED WATERCOURSE NOT TO SCALE FIGURE 2 OFFICE SOUTH SITE ECOLOGICAL COMMUNITIES MAP EVERGREEN WALK LLC OFFICE SOUTH BUCKLAND ROAD SOUTH WINDSOR,CONNECTICUT PROJECT:0510203 CHECKED BY: DRAFTED BY:JS DRAFT DATE: REVISED BY:CTH REVISION DATE:12-06-05 SOURCE: USGS TERASERVER AERIAL PHOTOGRAPH GSCJKLEINFELDER 99 LAMBERTON ROAD,SUITE 201 WINDSOR,CONNECTICUT 06095 4itK L E I N F E L DER (800)929A472 WWW.KLEINFELDER.COM (860)6834206 F Employee-owned 051WWMFMEM5F2.DM LEGEND �--� PLUM GULLEY BROOK PLUM GULLEY BROOK NOTES 1.ALL BOUNDARIES AND INFORMATION PRESENTED ON THIS FIGURE ARE CONSIDERED APPROXIMATE. LOCATION OF MITIGATION AREA NOT TO SCALE FIGURE 3 OFFICE SOUTH SITE MITIGATION AREAS EVERGREEN WALK,LLC OFFICE SOUTH BUCKLAND ROAD SOUTH WINDSOR,CONNECTICUT PROJECT:0510203 CHECKED BY: PROPOSED DRAFTED BY:JS DRAFT DATE: DETENTION BASIN REVISED BY:CTH REVISION DATE,12-06-05 SOURCE: USGS TERASERVER AERIAL PHOTOGRAPH GSCJKLEINFELDER 99 LAMBERTON ROAD,SUITE 201 WINDSOR,CONNECTICUT06095 Iri( K L E I N F E L D E R (800)929-4472 WWW.KLEINFELDER.COM (860)683-4206(FAX Employee-owned 05lWWMFMECWM.MG i APPENDICES i PHOTOGRAPHIC DOCUMENTATION Evergreen Walk LLC Office South J, Photograph#1: Plum Gulley veiwing northerly s� t Photograph Typiclal Upland Buffer consisting of• • field habitat �.��••rr iT s i 3• t k._ I T < 4 ti i Y, i N 1 j � , f _ r Y y EIVED JAN 13 2006 0th Windsor i E-FLANDS AGENCY g • ' ��r'ON COMMISSION z FLB Architecture& Plannin ,Inc. 19 Silver Lane, East Hartford,cT Obi fItf 860.568.4030 • fax:860.568.5129 • http://home.att.net/—archflb January 11, 2006 CERTIFIED MAIL Town of South Windsor 1540 Sullivan Avenue - South Windsor, CT 06074 Dear Property Owner: Re: 60k Office South, Evergreen Walk, LLC In accordance with Section 7.3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard please contact Jeff Folger, Environmental Planner/Conservation Officer, Planning Department, 644-2511, ext. 253. S' cerel , A n F. Lamson, AIA FLB Architecture& Planning, Inc. 19 Silver Lane East Hartford, CT 06118 860-568-4030 1 g and Address of Sender Chec type of mail or service: I Affix Stamp Here If issued as a ����n h/n f �nC. Certified ❑ Recorded Delivery(International) certificate of mailing, L�h ❑ COD ❑ Kegistered or for additional [� _ C ❑ Delivery Confirmation Return Receipt for Merchandise copies of this bill) 0 (�/!p n Express Mail CI Signature Confirmation Postmark and L Insured— __—_ _.__.— iDate of Recee 1 � --i Handlin Actual Valued Insured Due SenderT DC T SCTSH 7 RD RR Article Number Addressee Name,Street,and PO Address Postage Fee Charge if Registered Fee Fee Fee Fee Fee re Value i T /�LoW`S fv-em� C'e�p{rrS a�-! ' /l o f.c.y c✓IcY c✓�.�'1. �oC��/T��,C� 1�_— .--I1------I------ -------—�--- --- -- --- — -- i /�'I�STownlb-ief4SSoc. I ; I t I /< RE %nc/ Kam pl5soe. r• � I �q _ -- --— - O - — - -- -- — aL 4ore1"74 Jyrrip ! QO' _ tu-C_/�G]elm l _ s.�). ycq t v�Y een GJo./K eh o I Cc�oi� V �He rYo- I I 1 06 --— — The full declaration----�----- --- -----J— -------_.—.._. L----L_�-- — — y-� ' of Pieces Total Numbe—r o f Pieces Postmaster,Per(Name of receive g employee) , tion of value is required on all domestic and international registered mail.The maximum indemnity payable for he der Received at Post Office (reconstruction of nonnegotiable documents under Express Mail document reconstruction insurance is$500 per piece subjec to G additional limitations for multiple pieces lost or damages in a single catastrophic occurrence.The maximum indemnity payable p Ion Express Mail merchandise insurance is$500,but optional Express Mail Service merchandise insurance is available for up to 1$5,000 to some,but not all countries.The maximum indemnity payable is$25,000 for registered mail. See Domestic Mail ;Manual R900,S913,and S921 for limitations of coverage on insured and COD mail.See International Mail Manual for limitations of covera a on international mail.Special handling charges apply only to Standard Mail A and Standard Mail Bparcels. i i - ,August 2000 Complete by Typewriter,Ink,or Ball Point Pen Name and Address of Sender Check type of mail or service: Affix Stamp Here (If issued as a Certified [] Recorded Delivery(International) certificate of mailing, COD ❑�-�/pegistered or for additional L Delivery Confirmation LV eturn Receipt for Merchandise copies of this bill) ❑.Express Mail O Signature Confirmation Postmark and Insured —_ _ a Date-of Recei t -- g - - Fee Fee e if COD ee Fe ate•,e - ------.-- r' -- _ - Handling Actual Valuer Insured Due Sender DC SC SH RD RR Line' Article Number _ Addressee Name,Street,and PO Address Postage Fee Charge if Registered Value Fe Fee She 14) v ----- - -- — h 2 .F��l —-- 31 S. J. 5 Kc /-21ol)PIF VTr'N$ �G ✓<A _ l 1A)AC'.1 , �—tJ-� �,,!, � /�i� S',��•� , sf ��, i I i a � it � ' `t toI l -- /-srraih� GJj'1r�� t ____ 3i S -�- -I- -� . S S o � ,-��•— - ---- - ---- -- ,---- -------- - 12 ` 13 /1ppGr� % T/PVcrt�/ e S --- --------- — -------- 1 ---� / ---- -- — -- _ ' �r tt C� t rL �A"P s��Y � �✓G`-J�Y- I i I � �_.._...--_ 14t r" 115SfS--J C'4�• ---—I—--— -- --- e Total Number of Pieces Total Number of Pieces tPostmaster,Per(Name of receiving eriiployee) tTh.efulldeclarationof v lue is required on all domestic and international registered mail.The maximum indemnity payable for eListed by Sender Received at Post Office nstruction of nonnegotiable documents under Express Mail document reconstruction insurance is$500 per piece subject o w ladditional limitations for multiple pieces lost or damages in a single catastrophic occurrence.The maximum indemnity payab ion Express Mail merchandise insurance is$500,but optional Express Mail Service merchandise insurance is available for up to $5,000 to some,but not all countries.The maximum indemnity payable is$25,000 for registered mail. See Domestic Mail I Manual R900,S913,and S921 for limitations of coverage on insured and COD mail.See International Mail Manual for limitations lof coverage on international mail.Special handling charges apply only to Standard Mail(A)and Standard Mail(B)parcels. PS Form 3877,August 2000 Complete by Typewriter,Ink,or Ball Point Pen Name and Address of Sender Check type of mail or service: I Affix Stamp Here (If issued as a Certified ❑ Recorded Delivery(International) 'certificate of mailing, COD ❑ egistered or for idditionai [] Delivery Confirmation �Retum Receipt for Merchandise copies of this bill) Ell Express Mail I_. Postmark and — Insured g Date of Recut — _.. T— -- --- r — — --- ---�-- p � Signature Confirmation � Postage Handling Actual Value Insured Due Sender DC SC SH RD RR Line( Article Number Addressee Name,Street,and PO Address ge Fee — e — _ —ee .---.—e L_if ----- -- --- Fee Charge Registered Value if COD Fee Fee Fee ,Fee 1 i _ ��/ I �.�� I i /•fir 2 31 _.- I � rt— �S a U co2 a.r��2 zz• i i o n e l m �7�a M r�� S )/ - i e�ro 7��tc ru a — 9 1 -- Sf�vcrl !fie JA c 141 -- --------- - ---- ----- --- --- o �L� .e� S ��� C —�— ---- ---- — — 15 — ---- --- ---..- -- ---------- - — i� �Ph,, C - Total Number of Pieces Total Number of Pieces Postmaster,Per(Nam6,bf receiving employee) IThe full declaration of value is required on all domestic and international registered mail.The maximum Indemnity payable for the Listed by Sender Received at Post Office reconstruction of nonnegotiable documents under Express Mail document reconstruction insurance is$500 per piece subject to additional limitations for multiple pieces lost or damages in a single catastrophic occurrence.The maximum Indemnity payable • on Express Mail merchandise insurance is$500,but optional Express Mail Service merchandise insurance is available for up to $5,000 to some,but not all countries.The maximum indemnity payable is$25,000 for registered mail. See Domestic Mail Manual R900,S913,and S921 for limitations of coverage on insured and COD mail.See International Mail Manual for limitations of coverage on international mail.Special handling charges apply only to Standard Mail(A)and Standard Mail(B)parcels. PS Form 3877,August 2000 Complete by Typewriter,Ink,or Ball Point Pen Name and Address of Sender Check type of mail or service: Affix Stamp Here (If issued as a (Certified ❑ Recorded Delivery(International) certificate of mailing, ❑ COD ❑ Registered or for additional ❑ Delivery Confirmation [Return Receipt for Merchandise copies of this bill) ❑ Express Mail ❑ Signature Confirmation Postmark and Insured Date of Receipt _ - -- -- ------ -------T—..--- i — - —re -- - - �— Postage Fee Handling Actual Value —Insured Due Sender DC SC SH RD RR Line Article Number Addressee Name,Street,and PO Address Charge if Registered Value if COD Fee Fee Fee Fee Fee Y/a r/L sf T ----� -� �—��C,_ - ----- — - I 31 i ------ I -- - 5 ' r ! 71 �S MvW3 10 I !I 12 -- — -- - --- 13 14 15I r — r me of receivin em to ee The full declares Total Number of Pieces Total Number of Pieces TPostmaster,Pe (Na g p y ) declaration of value is required on all domestic and international registered mail.The maximum indemnity payable for the ` _Lfsted by Sender Received at Post Office (reconstruction of nonnegotiable documents under Express Mail document reconstruction insurance is$500 per piece subject to additional limitations for multiple pieces lost or damages in a single catastrophic occurrence.The maximum indemnity payable • on Express Mail merchandise insurance is$500,but optional Express Mail Service merchandise insurance is available for up to $5,000 to some, but not all countries.The maximum indemnity payable is$25,000 for registered mail.See Domestic Mail Manual R900,S913,and S921 for limitations of coverage on insured and COD mail.See International Mail Manual for limitations C lof coverage on international mail.Special handling charges apply only to Standard Mail(A)and Standard Mail(B)parcels. C h� Complete by Typewriter,Ink,or Ball Point Pen ,,'PS Form 3877,August 2000 �t� P:\05281.20\A-DT_SIGN_F.dwg, 3/23/2006 2:22:37 PM, FLB Architecture &Planning by FH 2-0" 4'-0" z m I I y �c < [ z � I I � I j JOB NAME OFFICE 50UTH EVERGREEN WALK TAMARACK AVE. SOUTH WINDSOR, CT SKETCH TITLE FREE5TAND I NG 51 GN SCALE JOB NO. ,-Fm A5 NOTED 05251.20 DATE BY SKETCH NO.SK-X FM ArchHecture 8 Plannino,Ina 19311vw Lane East Hwftrd CT 06118 (M)ms-am ra(sso)W"In 0-"h nr®nr.�� web:. .fimmk m 3/22/O6 .RF Z-4 Michele Lipe Regular_In house Review Meetin 1%24/2006 Page 1 From: Fred Shaw To: Doolittle, Jeff Date: 1/24/06 9:36AM Subject: Regular In-house Review Meeting 1/24/2006 1 will be unable to attend the above referenced meeting. I'am providing herewith my comments regarding the agenda items-Tiger Lily Ventures, and the Medical Office Building , Buckland Road (south of ECHN building): Tiger Lily Ventures: W.P.C.A. approval will be required. MDC approval will also be required as well as the prepayment of any and all MDC connection/outlet charges, and assesssments. Medical Office Bdg.: W.P.C.A. approval is required. There should be cleanouts provided for the forcemain at intervals as recommended by the system manufacturer. The engineer should provide pump calculations to justify the sizing of the pumping station, and infomation concerning the depth of the forcemain, etc( no profiles provided). Detail information should be provided regarding the connection of the force main to the existing gravity sewer. The plans show no sewer easements; are any required? CC: Gantick, Mike; Lipe, Michele I of EEIVEQ `ri( K L E 1 N FELDER Employee-owned FEB 0 12006 South W ndt -or January 30,2006 INLAND WETLANDS AGENCY CONSERVATION COM„USSION Mrs.Elizabeth Warren,Chairperson Inland Wetland and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 RE: Response to Staff Comment Evergreen Walk Office South South Windsor,CT Dear Mrs. Warren: GSCIKIeinfelder respectfully submits this letter to the South Windsor Inland Wetland and Conservation Commission("IWCC")pursuant to the January 3,2006 letter prepared by Mr.Jeffrey Folger, South Windsor Environmental Planner and addressed to Mr.Alan Lamson of FLB Architecture and Planning. Specifically,comment#11 of Mr.Folger's report,relates to GSCIKleinfelder's focus of the proposed project. This comment discusses mitigation for wetland and upland review area impacts with respect to the South Windsor IWCC's policy of"no net loss of wetlands within a sub-watershed area". The site development drawings have been amended to include an area of proposed wetland creation that will provide an overall increase in wetlands within the same sub-watershed area. The proposed created wetland consists of approximately 6,000 square feet,which offsets the proposed 1,420 square feet of loss associated with the development of Office South. The proposed location of the wetland creation is on the westerly downgradient side of the proposed detention basin and will extend the existing wetland boundaries further to the east. This areas will be planted in clumps consisting of approximately 54 total plants the following species: highbush blueberry(Vaccinium corymbosum),winterberry(Ilex verticillata), and arrowood(Viburnum recognitum). Disturbed soils within the proposed creation areas will be seeded with New England Wetmix(source:New England Wetland Plants,Inc.),or similar product. Each plant location will be prepared by adding 6 inches of clean topsoil or compost to increase survivability of the plants. The new wetland area is expected to provide similar functional values as the wetland being eliminated. Based on the disturbed conditions of the wetland proposed to be filled,it is anticipated that in the long- term the created wetland will be provide a high level of functional valuables. The proposed wetland creation area discussed herein,combined with the originally submitted wetland and wetland buffer enhancements provide mitigation in an amount that we believe offsets the minor amount of wetland and Upland Review Area proposed to be disturbed as part of the Office South permit application. Please contact me at(860)683-4200 ext. 145 if you have any questions,comments, or request additional information. Very truly yours, GSCIKleinfelder Date: 2006.01.31 89f 11':57:09-05'00' Jeffrey R. Shamas, CE, SS,PWS Environmental Planning Senior Project Manager 0510203DA ` C KLEINFELDER 99 Lamberton Road,Suite 201,Windsor,CT 06095 (800)929-4472 toll free (860)683-4200 phone (860)683-4206 fax WETLAND CREATION AREA(total sq.tt.--6,000scIft) -EXCAVATE TO PROPOSED DEPTHS. -PREPARE EACH PLANT BED AREA WITH A MINIMUM OF 6 INCHES OF CLEAN TOP SOIL -PLANT AREA IN CLUMPS WITH THE FOLLOWING SPECIES AT SPACING OF 10 FEET ON CENTER: SPECIES NAME TOTAL -HIGHBUSH BLUEBERRY(VACCINIUM CORYMBOSUM) 20 -SILKY DOGWOOD(CORNUS AMOMUM) 22 -ARROWOOD(VIBURNUM RECOGNITUM) 23 65 PLANTS NOTE:APPLY NEW ENGLAND WETMIX,OR SIMILAR WITHIN CREATION AREA 12" MODIFIED RIPRAP FOR SLOPE PROTECTION FLARED CULVERT END INV. 95'00 NOTES 1.ALL BOUNDARIES AND INFORMATION PRESENTED ON THIS FIGURE ARE CONSIDERED APPROXIMATE. WETLAND CREATION AREA _ 6,000 sq.8. NOT TO SCALE s=z.9�c CDNCRETE HEADINAII,_ INV. 97.00 1 FIGURE 1 WETLAND CREATION AREAS EVERGREEN WALK,LLC OFFICE SOUTH BUCKLAND ROAD —— SOUTH W IN SOR,CONNECTICUT PROJECT:0510203 CHECKED BY: DRAFTED BY:JS DRAFT DATE: REVISED BY:CTH REVISION DATE:0131-06 SOURCE: GSCIIKLEINFELDER 98 LAMBERTON ROAD,SUITE 201 WINDSOR,CONNECTICUT 06095 `s( K L E I N F E L D E R� (800)929-4472 WWW.KLEINFELDER.COM 860 683-4206 FAX Employee-owned as+azoawF wras.ava IVED FUSS &O'NEILL FEB 0 1 2006 South Windsor f4pDisciplines to Deliver I N L AN D W�-' January 31, 2006 Mr.Jeffrey Folger Environmental Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application#06-01P Office South at Evergreen Walk Response to Jeffrey Folger Comments dated January 3,2006 Dear Mr. Folger: The following is in response to your comments dated January 3,2006 for the above referenced projects. Fuss &O'Neill's response below pertains only to the comments for our portion of the project. The other comments are addressed under separate cover by the appropriate professionals. Fuss & O'Neill's responses are in italics. 1. The existing tree line and proposed limits of clearing must be shown on the plans. The existing tree line and proposed limits of clearing have been added to the revised plans January 26, 2006. 2. It is recommended that the topsoil within the detention basins be at least 12" thick comprised of at least 30%compost by volume. This can substantially increase survivability and vigor of proposed plantings and provide absorption sites for dissolved metals. To be addressed by Rosemary Aldridge,Insite Inc. 146 Hartford Road 3. A soils report should be submitted listing the soil types found on the site. Information Manchester,CT should also include suitability for infiltration and rain gardens. 06040-5921 t(860)646-2469 To be addressed by Jeff Shamus,Kleinfelder. (800)286-2469 f(860)533-5143 4. Locations of soil stockpiles should be shown with appropriate erosion controls. www.FandO.com The to stockpile area has been added to the revised plans. Connecticut Massachusetts New York Rhode Island North Carolina South Carolina FAP2000\481\S10\Response to Jeff Folger's Comments January 3 2006.doc Corres.(HQ) Mr.Jeffrey Folger January 31,2006 Page 2 5. A swirl type particle separator must be incorporated into the stormwater treatment train. A swirl concentrator has been added to the revised plans. 6. Rain gardens could be placed east and south of the building to collect runoff from paved surfaces in those areas. Based on available geotechnical information and conversations with Mr.Max Welti, Clarence Welti Associates, the existing soils are not suitable for the construction of rain gardens. Therefore, we are not proposing to construct rain gardens on this site. 7. A rip-rap swale is shown in the detail sheet. Where is it proposed to be located on the site? The rip rap swale detail was a carryover mistake from the LA Fitness pr ject and has been removed from the revised plans. 8. The landscape plan must include both slopes and lawn seeding types,rates, and dates. This information must address temporary and permanent seeding. To be addressed by Insite Inc. 9. The long-term inspection and maintenance schedule for the stormwater structures should be completed. Several of the item descriptions have been truncated. The operation and maintenance notes have been fixed on the revised plans. 10. The construction sequence must state that the detention/water quality basin must be fully complete,with all grading, and vegetation establishments completed and growing prior to the issuance of a building permit. Note #5 has been added to the Site Development Sequence. 11. The mitigation plan proposed to establish habitat plantings to enhance existing wetlands but it does not address the anticipated loss of wetlands as a result of the application. As you are aware,the compensatory mitigation policy adopted by the Inland Wetland/Conservation Commission is "no net loss of wetlands within a sub- watershed area". F:\P2000\481\S10\Response to Jeff Folger's Comments January 3 2006.doc Corres.(HQ) Mr.Jeffrey Folger January 31,2006 Page 3 To be addressed by Kleinfelder. 12. Perimeter erosion controls along the western edge of development are inadequate to control sediments generated by the fill and grading operations proposed. Interior erosion controls must be installed across the slope at intervals to slow and contain runoff. More substantial erosion measures must be proposed along the western perimeter. More substantial erosion and sedimentation controls have been added to the revised plans. 13. The outlets to the detention basin appear to be straight 20"pipes. How will this design address concerns with excess stormwater volume that will be generated as a result of the increased impervious surface? The outlets to the detention basin have been clarified on the revised plans. Please do not hesitate to contact me at 646-2469 ext. 5269 if you need additional information. Sincerely, Michelle Carlson,P.E. Associate c: Alan Lamson, FLB Architecture&Planning, Inc. F:\P2000\481\S10\Response to Jeff Folger's Comments January 3 2006.doc Corres.(HQ) MEMORANDUM To: South Windsor Inland Wetland/Conservation Commission. From: Jeffrey H. Folger— Environmental Planner/Conservation Officer Date: February 6 2006 Re: Appl. #06-01P Review of the proposed Evergreen Walk - Office South site plan. Plans dated 12/20/05. The project is to construct a 60,000-sqft medical office facility, parking lots, and stormwater structures on a 5.1 acre parcel. A portion of the project (detention/water quality basin) will also occur on an adjacent 3 acre parcel to the west. This project is a part of the 230-acre Evergreen Walk development that has been approved by the PZC for a general plan of development. Regulated activities include the crossing of a watercourse with a bridge, filling and grading of 0.036 acres (1,420 sqft) of wetland, and filing and grading within the 80-foot regulated upland review area to accommodate a detention/water quality basin. Proposed disturbance within the URA is estimated at approximately 1.82 acres (67,000 sqft), and 0.036 acres (1,420 sqft) of wetland disturbance. Site: The site is located in the Plum Gully Brook watershed. The evergreen Walk project is comprised of 230 acres. The proposed site plan will occupy a 5.1-acre parcel for the building and parking, and the stormwater swale and basin will occupy an adjacent 3+-acre parcel to the west. The land slopes down moderately to the west from Buckland Road. The sites are 90% cleared and have recently been used for agricultural operations. The regulated areas consist of a watercourse along the northern property boundary conveying road runoff to the west, a wetland finger northwest of the building site, and a shrub/scrub wetland that leads to the west to the Plum Gully Brook stream corridor. The main stem of Plum Gully Brook borders the site to the west. The northern watercourse that travels east to west into Plum Gully Brook would be considered a perennial watercourse. The channel shows evidence of scour and unstable banks at intervals. Portions of the banks have moderate vegetation on them. The channel bottom is 12-18" in width and has a sandy substrate, with active soil migration through the channel. Average water depth is estimated at 1-2 inches. Past agricultural practices have a resulted in plowed fields within 10-feet of the stream bank. Hydrology to the watercourse is supplied by surface runoff from east of Buckland Road and some ground water contribution. Functional values of this wetland would be groundwater recharge/surcharge, and stormwater conveyance. Wildlife values would be considered poor in the eastern portion to moderate in the western portion due to the width of the riparian vegetation associated with the watercourse, and high degree of exposure to urban runoff(Buckland Road). The wetland to the west would be considered a shrub/scrub wetland. It is a mosaic of shrubs and open, saturated herbaceous areas. Groundwater and some surface runoff supply moisture the wetland. This wetland is larger than the eastern wetland (4+ acres), and shows much less evidence of disturbance. Shrub species like silky dogwood dominate this wetland, as well as skunk cabbage and sedges in the open areas. Overstory trees in the area consist of red maples and cottonwoods. The watercourse previously described runs through the wetland and empties into Plum Gully Brook further west. This wetland is definitely an integral part of the Plum Gully wetland system that is present through the western portion of Evergreen Walk. Functional values associated with this wetland area would be groundwater recharge/surcharge, nutrient/sediment retention and removal, flood storage, and wildlife habitat. The main channel and riparian corridor of Plum Gully Brook is the final regulated area associated with the site. This occurs west of the proposed detention/biofilter basin and swale. From this site on down stream to the Podunk this stream corridor is one of the most valuable and unique habitats in the Town. Just about every wetland type, from open water to forested wetland can be found along the corridor. The riparian area adjacent to the stream channel varies from 10 to 100s of feet. The meandering channel varies from 3 to 6 feet on width and from 6" to 3 feet in depth. The bottom substrate is sandy with vertical banks and sand bars as common features. Historical impacts to the corridor include sediment generated from agricultural activities to the east and urban runoff to the north. Functional values include Finfish habitat, wildlife habitat, flood storage, sediment and nutrient trapping and assimilation, ecological integrity, esthetics, groundwater recharge, and stormwater conveyance. With the anticipated level of development planned for the 230 acres, the Plum Gully Brook corridor represents the most sensitive area on the site to pollution impacts, change in hydrology, and loss of wildlife habitat. Impacts: The existing tree line has not been shown on the plans, so tree clearing impacts cannot be commented on. Short Term: Soils on the site are mapped as Tisbury Silt Loam (TsB) 3 to 8% slopes, and Enfield Silt Loam (EsB) 3 to 8% slopes. These soils are listed as having medium to high erosion potential by the Hartford County Soil Survey. Erosion controls proposed consist of silt fence perimeter controls. The western perimeter controls should be reinforced with earthen berms to capture and retain construction borne sediment. I have asked additional interior controls be designed to prevent undue strain on the perimeter controls during construction. Erosion blankets are proposed to be applied to all of the slopes adjacent to the building that exceed 10%. Long Term: The majority of the area to be developed consists of recently tilled fields in the eastern portion of the site. The proposed swale and detention basin are to be located in a field that has been regularly mowed or tilled. Wildlife utilizing the tilled field during non-growing times will be precluded from doing so. Wildlife using the western field will be temporary excluded from utilizing this area. After construction, the area will contain a different habitat. The detention basin and swale will more closely resemble a shallow marsh and wet meadow habitat. This habitat type will compliment the stream corridor and provide a more efficient riparian buffer than the present conditions. Landscape and habitat plantings will provide some diverse food availability to bird and mammal species: Habitat cover will be enhanced by the stormwater structures. Stormwater Impacts: Stormwater quality and quantity impacts are proposed to be addressed by utilizing several structures. Water collected in catchbasins will be piped to a detention basin/biofilter. Sediment storage will be accomplished using 4-foot deep sumps in catch basins w/traphoods, plunge pools at stormwater pipe outlets, and a forebay in the detention basin. The detention basin will develop into a wet marsh to utilize the plant community to trap sediments, attenuate dissolved chemicals, and provide wildlife habitat enhancement to the stream corridor. A swirl type gross particle separator will be added into the treatment train to provide additional sediment removal. The current design of the detention basin outfall does not address concerns on increased volume generated by increased impervious surface impacting stream channel geometry. While the basin may reduce peak flows it does not reduce an anticipated overall volume increase. The suggestion of incorporating raingardens into the design was dismissed. To date there is nothing in the plans that address this concern. Wetland Loss Mitigation: The planned loss of 1,420 sqft of wetland is proposed to be mitigated by the creation of 1,420 sqft of wetlands farther to the southwest adjacent to the proposed detention basin. By locating the wetland creation in this area several benefits will occur to the wetland system as a whole. First, the riparian area east of the stream channel will be significantly increased by a combination of shallow and deep marshes and a wet meadow this will serve to further increase the distance from . development in the area and the stream corridor. Second, the habitat associated with the flanking wetland areas will be diversified and enhanced by the presence a created wetland of a different type. LEFOLL &LEFOLL,LLC ATrOFNEYS AT LAW 2301 SILAS DEANS HWX. P.O.BOX 727 ROCKY H L.L,CT 06067 RM?Y[.40ND G.LsFoLL ' - 'H j,EPHONH (Seo)56'-2355 T,MMY L.LaFOLL FAX (860)257-412 February 15, 2006 Town of south Windsor Inland Wetlands Agency/Conservation Commission South Windsor Town Hall South Windsor, Connecticut 06074 Re: Appl. #06-01P-Evergreen Walk Office South Dear Coramissioners_ Please be advised that this office represents Jean Marc Jacques who ovens a sizable parcel of land which abuts Evergreen Walk- Mr Jacques is concerned about the drainage in the pond and Plum Gully Brook located on his property. In his opinion the applicants do not have sufficient drainage and erosion control. Since the development during the past several years the water level in the pond has risen dramatically and now up to capacity. Reference is hereby made to previous correspondence from Attorney John Kinddated July 21, 2003 alerting the Commission,of Mr. Jacque?s concerns regarding waterways, ponds and drainage on his property- Please notify this office of any `ons concerning this#application. v yours, oll c outh Windsor Planning and Zoning Commission zoo► — Wd VS:VT 900zi9Tiz0 MEMORANDUM To: Marcia Banach, Director of Planning Jeff Folger, Environmental Planner From: Jeffrey B. Doolittle, P.E., Town Engineer ' Date: 2/15/06 RE: App 06-01 P Office Building South I have reviewed the proposed development plan for the Office Building South on Evergreen Walk property along Buckland Road, and I have the following comments: 1. With regard to the storm drainage system, I recommend the slope of the pipes between CB 3 and CB 4 and between CB 4 and CB 8 be increased. The pipe calculation report needs to be revised to include a 30" diameter pipe between MH 1 and MH 2 as shown on the plans. 2. What flow is the Vortechs Model 9000 designed for? 3. 1 have lots of questions about the proposed detention basin. What flows and detention time was this detention basin designed for? The Drainage Report has different inlet flows in the pipe report, Appendix B and Appendix F. It is also not clear how the detention basin outlet flows were calculated. What are the expected water elevations in the detention basin for the different storms? Again Appendix B and F have different outlet flow and water surface elevation values. Why are there two separate outlet pipes from the detention basin that go in different directions? Why is the lower pipe 10" diameter and the higher pipe 6" diameter. This is different from other detention basins at Evergreen Walk and around South Windsor. There is usually one outlet structure with different size orifices at different elevations. The lower one is usually smaller. What is the expected detention time for a 10 year storm in the detention basin and the duration of the discharge from the detention basin? This basin needs to be designed to hold the stormwater long enough to provide stormwater treatment, reduce the outlet flow and offset the peak discharge so there is no adverse effects such as erosion or flooding on downstream channels or properties. Over half of the proposed detention basin is to be constructed in fill. Details for the construction of this basin need to be included in the plans. Does this proposed basin need a DEP Dam Safety, Repair and Alteration permit? A rip rap lined emergency overflow spillway needs to be constructed with the detention basin. Where is the gravel access drive to access the basin, inlet and outlet for maintenance? 4. What is the effect of discharging all the roof runoff into the field via a level spreader? 5. The plans and Drainage Report show a grass swale and calculations. Where is this located on the plans? 6. The culvert and old farm crossing in the drainage ditch between ECHN and this site needs to be removed and the channel restored in this area. This culvert appears to be undersized and may be clogged by debris in the channel, resulting in flooding of either adjacent site. 7. This plan includes connecting Evergreen Way with Tamarack Drive. However, Evergreen Way does not seem to be suitable for a connector road from ECHN to the Shops at Evergreen Walk as it is narrow and there are several sharp turns. Why not make Evergreen Way wider with a median and turn lanes? Is there a plan to build Tamarack Drive to connect the north and south ends of this property in the future? 8. There should be a large visible barrier (such as a guardrail) with reflectorized signs and curb (with leakoffs) at the south end of Tamarack Drive and at the sharp comer on Evergreen Way shown on these plans so vehicles do not drive off these areas if they miss these turns. 9. Check for conflicts between the utilities (esp storm drainage and water) and the landscaping and lighting. These need to be corrected. 10.Show an anti tracking pad at the entrance to this site from the existing end of Evergreen Way or Tamarack Drive. Will construction access to this site be from Evergreen Way or will a temporary access be constructed across the drainage ditch at the end of Tamarack Drive (until the culvert is constructed)? 11.Provide design calculations for the sanitary sewer pump station and pressure main. The long sanitary force main should have clean-outs or access ports at bends and regular intervals for maintenance access. Show these on the plan. 12.The detail for the Roof Drain Pick-up needs to include a metal frame and cap if this is in pavement or a concrete sidewalk. 13.The pavement slope over the box culvert should be increased to at least 1% so water flows off the surface of this culvert and does not puddle. 14.On the culvert detail what is the material under and around the sidewalk, in the median, under the road subbase and on the snow shelf on the south side of the culvert? 15.This project must be submitted to the WPCA for review and approval. Please call me if you have any questions. IF FLB Architecture &Planning, Inc. 19 Silver Lane East Hartford CT 06118 (860)568-4030 fax: (860)568-5129 e-mail:flb(pflbarch.com web:www.fibamh.com TO: Inland Wetland and Conservation Commission— Town of South Windsor rZD Attn. Mr. Jeffery Folger � FROM: Frank Hubeny, AICP DATE: 3/09/2006 �nP,p3:,Vp.(IUi�wreidJtl`3=�iC RE: Office South, 2700 Tamarack Avenue Project No. 05261.20 Dear Mr. Folger, During the hearing of the Inland Wetland Commission on Wednesday, February 15, 2006 the question was raised, if the alignment of the proposed extension of Tamarack Avenue to the south could be adjusted in order to reduce the direct impact of approximately 1,400 square feet on Wetland#2. We are pleased to submit to this commission a revised road layout and site design which completely eliminates the direct wetland impact on Wetland#2. For details please refer to the enclosed `Addendum to Wetland Impact Assessment and Mitigation Report (12/30/05)' by Jeffery R. Shamas, dated March 9, 2006. Due to the above mentioned revisions, we would like to submit the following changes to the original application, dated January 6, 2006: J. Amount of regulated area disturbance and types of fill(including wetlands and regulated buffers). • Upland review area disturbance: 1.45 acres (previously 1.82 acres) • Detention basin disturbance: 2.05 acres (previously 2.05 acres) • Gravel fill: 5,650 cy (previously 15,000 cy) K.Acreage of wetland watercourse to be altered: • (0 square feet) 0.0 acreage (previously 1,420 square feet) L. Acreage of wetlands and watercourses to be created. • 6,000 square feet (previously 0 acres) (Please see `Response to Staff Comment' by Jeffery Shamas, dated January 30, 2006. Please do not hesitate to contact us if you should have any questions. c: file PA05281.20TLB Zone\WA 060309UWCC Memo 030609.Doe `S( K L E 1 N FELDER Employee-owned March 9,2006 5D Mrs. Elizabeth Warren,Chairperson w� ^ Inland Wetland and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 ""vJ✓r RE: Addendum to Wetland Impact Assessment and Mitigation Report(12/30/2005) Evergreen Walk Office South South Windsor,CT Dear Mrs. Warren: GSCIKleinfelder respectfully submits this addendum to the South Windsor Inland Wetland and Conservation Commission("IWCC")pursuant to the March 10,2006 site plan revisions completed by Fuss&O'Neill,Inc. Specifically,the original boulevard(Tamarack Drive)location had proposed a direct impact to the unnamed watercourse of Wetland 3 and the westerly periphery of the wetland system known as Wetland 2 in the GSClKleinfelder Wetland Impact Assessment and Mitigation Report,dated December 2005 (See Figure attached). The revised design of this boulevard requires the crossing of Wetland 3 to remain as originally proposed,however,eliminates the need for the direct impact to Wetland 2. The boulevard has been relocated further to the east away from the wetland. The character and quality of this wetland has been degraded from historic land uses and thus the proposed wetland enhancements within the portion of the wetland westerly of the revised proposed boulevard location will result in a net increase in wetland functional values. Presently,the portion of Wetland 2 that is closest to the proposed boulevard is classified as a palustrine(inland freshwater)shrub-scrub wetland that is dominated by non-native invasive species that includes purple loostrife(Lythrum salicaria), multiflora rose(Rosa multi flora) as well as native silky dogwood(Corpus amomum). The proximity of the boulevard to the wetland will not cause a significant adverse or physical impact on Wetland 2 based upon its existing degraded condition and the fact that the road is proposed within an upland area presently consisting of a field grass community. The previously noted GSCIKleinfelder wetland impact report provides additional details on this and the other wetlands on or within the vicinity of the project site. Please contact me at(860)683-4200 ext. 145 if you have any questions,comments,or request additional information. Very truly yours, GSCIKleinfelder Date: 2006.03.08 21:58:08-05'00' Jeffrey R. Shames,CE, SS,PWS Environmental Planning Senior Project Manager cc: FLB Architecture and Planning 0510203DA "C KLEINFELDER 99 Lamberton Road,Suite 201,Windsor,CT 06095 (800)929-4472 toll free (860)683-4200 phone (860)683-4206 fax Mar 22 2000 10: 56 HP LRSERJET FAX p, 1 M/S Town Line Associates 555 Main Street Manchester, CT 06040 March 22, 2006 Inland Wetland/Conservation Commission Town of South Windsor 1540 Ellington Road South Windsor, CT 06074 Re: Office South, 2700 Tamarack Avenue Application #06-01 P Dear Commission Members, This letter consents to an additional extension of time to conclude the public hearing on the subject application for a total period of 7 days to allow the hearing to continue on Wednesday, April 5, 2006. Very truly yours, M/S ine Associates By o inguerra Its Member, duly authorized Cc: Alan F. Lamson Atty. Laurence P. Rubinow P:05281.20/FLBUr/IWA060322 FUSS &O'NEILL Disciplines to Deliver April 3,2006 Jeffrey B. Doolitle,P.E. Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor,CT 06074 Re: Application#06-01P Office South at Evergreen Walk Response to Jeffrey Doolittle's Comments dated March 28,2006 Dear Mr.Doolitle: The following is in response to your comments dated March 28,2006 and our meeting in your office on Friday,March 31,2006 for the above referenced projects. Fuss&O'Neill's response below pertains only to the comments for our portion of the project. The other comments are addressed under separate cover by the appropriate professionals. Fuss&O'Neill's responses are in italics. 1. Are all 4 stop signs necessary at the intersection of Tamarack Ave and Evergreen Way and at the sharp corner on Evergreen Way? The plans show a stop bar at both ends (N&S) of the front drive along the west side of the building but no stop signs. Add a stop sign at these two locations... The 4 stops signs are necessary far safety reasons until Tamarack Avenue and Evergreen Way are extended in the future. Stop signs have been added to the revised plans. 2. This plan includes connecting Evergreen Way with Tamarack Drive. However,Evergreen Way does not seem to be suitable for a connector road from ECHN to the Shops at Evergreen Walk as it is narrow and there are several sharp turns. Why not make Evergreen Way wider with a median and turn lanes? Is there a plan to build Tamarack Drive to connect the north and south ends of this property in the future? F B Architecture will respond to this comment. 146 Hartford Road Manchester,CT 3. There should be a large visible barrier(such as a guardrail)with reflectorized signs at the sharp 06040-5992 corner on Evergreen Way shown on these plans so vehicles do not drive off the pavement and t(860)646-2469 into the drainage ditch if they miss this turn. (800)286-2469 f(860)533-5143 Guardrail and refiectorked signs have been added to the revised plans. www.FandO.com 4. Include flow/sizing calculations for the Vortechs Model 9000 sediment chamber. Connecticut The calculations for the Vortechs Model 9000 are included in the revised Drainage Report Massachusetts -New York Rhode-Island North Carolina G:\P2000\481\S10\Response to Jeff Doolittle's Comments March 28 2006.doc South Carolina Corres.(HO) Jeffrey Doolittle,P.E. April 3,2006 Page 2 5. I still have questions about the Drainage Report and would be gland to talk to the Engineer about these issues. This report needs to be signed and stamped by a licensed PE in CT. The pipe report in Appendix A shows three 30"pipes with insufficient capacity,however,the value used for Mannings n was high. This needs to be checked. What flows and detention time was the detention basin designed for? The Drainage Report has different inlet flows in the pipe report,Appendix B and Appendix F. It is also not clear how the detention basin outlet flows were calculated. What are the expected water elevations in the detention basin for the different storms? Again Appendix B and F have different outlet flows and water surface elevation values. What is the expected detention time for a 10 year storm in the detention basin and the duration of the discharge from the detention basin? This basin needs to be designed to hold the stormwater long enough to provide stormwater treatment,reduce the outlet flow and offset the peak discharge so there is not adverse effects such as erosion or flooding on downstream channels or properties. Over half of the proposed detention basin is to be constructed in fill. Details for the construction of this basin need to be included in the plans. Does this proposed basin need a DEP Dam Safety,Repair and Alteration permit? Extend the gravel drive to the detention basin outlet for maintenance? The revised Drainage Report is signed and stamped by a licensed PE in CT. The pipe report in A endix A has been revised to use the correct Mannings n. The pipes all have su fteient capacity. The Drainage.Report shows the analysis of the total rvaterrhed for a full build in Appendix E. This analysis waf used to determine the size of the detention basin. A endix B is the analysis of the total watershed for the development of the Ofce South site only. The expected water surface elevations for the detention basin are shown in revised A4endix B for the development of the proposed Office South site and th y are shown in Appendix E for the full build condition. Text has been added to the revised report for clarifi"cation. The detention time for the 10- year storm is included in Appendix E. Three stone berms have been added to the low flow channel in the detention basin to assist in stormwater treatment and minimi.Ze the peak discharge. The stone berms are shown on the revised plans. This detention basin is constructed similar to the other 4 detention basins on site. During the design of the basins,it was determined that a DEP Dam Safety, Repair andAlterationpermit was not required. The gravel drive to the detention basin has been modified 6. All the roof runoff enters the level spreader at a velocity of over 5 fps and has to make a sharp turn to fill the level spreader before flowing out into the field. The configuration of the level spreader should be checked to be sure this will not cause erosion of the sides of the level spreader. A drop manhole was added to the revised plans to slow the stormwater down before it reaches the level spreader. In addition,more rip rap armoring was added to the discharge in the level spreader so that no erosion occurs. These changes are shown on the revised plans. 7. The Drainage Report shows a grass swale and calculations. Where is this located on the plans? The grass Swale and calculations have been removed from the drainage report. There are no grass swales on the revised plans. G:\P2000\481\S10\Response to Jeff Doolittle's Comments March 28 2006.doc Corres.(HQ) Jeffrey Doolittle,P.E. April 3,2006 Page 3 8. The culvert and old farm crossing in the drainage ditch between ECHN and this site needs to be removed and the channel restored in this area. This culvert appears to be undersized and may be clogged by debris in the channel,resulting in flooding of either adjacent site. The revised plans call out for the old farm culvert and crossing to be removed and the channel restored. 9. Check for conflicts between the utilities (esp storm drainage and water) and the landscaping and lighting. These need to be corrected. Rosemary Aldridge,Insite Inc.,will check herplans against ours to coordinate tree plantings with the proposed utilities and make any necessary adjustments. 10. Provide design calculations for the sanitary sewer pump station and pressure main. The long sanitary force main should have clean-outs or access ports at bends and regular intervals for maintenance access. Show these on the plan. The calculations and recommendations for the sanitary seiverpump station and pressure main were done by Water Resource Technologies and are attached. 11. Include a detail for the transition from the sanitary force main to a gravity line upstream of the existing manhole behind LA Fitness. Consider designing the sanitary sewer main to be gravity flow for as far as possible upstream of the connection to the existing manhole behind LA fitness to serve future buildings in this area. A callout has been added to the revised plans to require that a 6-inch diameter length ofp pe be connected to the sanitary manhole and the force main will tie into the 6-inch lateral. This is what was done for the ECHN force main connection to thegravity sewer in Buckland Road. 12. Add items for the regular sweeping of the parking lot,sidewalks and driveways and inspection/cleaning intervals for the Vortechs unit to the stormwater Operations and Maintenance plan (on sheet CE.5.10. The information has been added to the revised plans. 13. What is the Basin Outlet Structure detail for and where is it to be located? (On sheet CE.5.1) Is this a Temporary Basin Outlet Structure? Show where this is to be installed. It is a temporary sediment basin outlet structure. 14. Include a detail for the rip rap emergency spillway construction. The detail has been added to the revised plans. G:\P2000\481\S10\Response to Jeff Doolittle's Comments March 28 2006.doc Corres.(HQ) Jeffrey Doolittle,P.E. April 3,2006 Page 4 15. Change the concrete sidewalk detail to show a 4 ft minimum sidewalk width. The concrete sidewalk detail shows a minimum 4'sidewalk on the revisedplans. 16. Extend the trash rack to cover the upper 6"inlet orifice on the detention basin outlet structure detail. A trash rack has been added to cover the upper 6"inlet orifice. 17. The detail for the Roof Drain Pick-up needs to include a metal frame and cap if this is in pavement or a concrete sidewalk. Metal frame and cap is called out on the revised plans. 18. Will drains be included in the process aggregate fill over the culvert to drain any water that seeps into this material through the grass surfaces over the culvert. No. The area isgraded such that any overflow will drain to thegutters. 19. This project must be submitted to the WPCA for review and approval. This project will be submitted to the W�PCA for review and approval the week ofApril 3,2006. Please do not hesitate to contact me at 646-2469 ext. 5269 if you need additional information. Sincerely, �f- Michelle Carlson,P.E. Associate Attachment c: Marcia Banach,Town Planner,Town of South Windsor Jeff Folger,Environmental Planner,Town of South Windsor Alan Lamson,FLB Architecture&Planning,Inc. G:\P2000\481\S10\Response to Jeff Doolittle's Comments March 28 2006.doc Cones.(HQ) e %ar. 01 2006 4: 35PM Water Resource Technologi 860. 872. 6822 P. 1 a■N n Water Water ReSource Technologies, LLC Re` :d U rcCo P.O.Box 156 Vernon, Connecticut 06066 Teo h n Eag ilex Voice 518.817.3198 Fax 860.872.6822 Scrvice 877-WRT-PUMP calexander@wrtli.c.com P«tecri»� r3tersh�d Attention: Michelle M Carlson Company: Fuss & O'Neill Inc. Subject: Office South Building Date: March 1, 2006 Michelle, Attached are the hydraulics and preliminary pipe sizing analysis for the office south building at Evergreen Walk. I ran the analysis using 1-112" SDR 9 IPS HDPE pipe with a "C"factor of 150. Two separate reports were calculated to show the friction loss and velocity in situations where one or both pumps were running. Both head conditions were well within the ideal operating parameters. I am assuming you will be using the same pump that we used for the previous building, which is a quadraplex tank with only 2 cores installed. That will handle your 6,600 gpd estimate and should work perfectly. I would recommend a flushing connection installed at the first 90 degree bend for cleanouts. If you have any other questions please feel free to give me a call. Regards, Connor Alexander Connecticut Sales Water Resource Technologies, LLC O' iV O O O -P Cri (il iI II! (M }rtr F: . 1 a '�,h 5 +,F xs;l; �•-�•-�— �41 of c"?, T.Ffh'J 1.rr. �r! a i r / F"S,..�V -r i co ay +� 0. r � + -z < 'aG?x- '_' A,�r`.'... ti tfe�'y`+""c•., �u^" fit L7 yrw,>'.A,.e...t.,,,. z. rs 4 tt.—•�;.,��5£--r*S�'F —,-.,ems"t. E r it�Y6.Y3a� i ;, I' w�,. - x ri 7TM"+ I .-2' i'�ti4 c i +'; tt' t,t"--�'~ .x..i•�'Ir sR .rat ro, �1 # x;fir i r 5 t , a eta tix Ln P l�nr1 r •1,n•�? r 'F t '1�trlR da -,-<-e'�rN.7, d•..•.M.�::rrr-+A Sr - xid',..._ t 'r'-r`. (D 4 +•+. f 7 K• s Connor Alexander > fe52 ';da� � 3 a"33� rS ^�'�a l LrT to yk e �. i.w '�'w „'�XyT '1 r : Office South Building at Evergreen . ... <.. `. sLA u"''� j1»�y"-,•>:,'�t�3:.. r*a'^ a� 4 . ru > 4+ O tn.� h'cf . •,T�6I^-`n r�'' ISC .,r<u- �1 ��`-�y Nyp� n3i -�.q = l I �t..-S.. .r,4.d7.._�.. .J a C O'Neill Fuss& o i n C#�Min* „.•'• .'`asr,"'-s -' 'i"+"gg. ,,� 'a �_,--� 7 `• " r,.�;fi" -..y'c , 3 '.. "� ^r»eta 'S x1t:w' a Iz. a^•'�a -I n max^ r.r C r g� rUp ur. .if• ,�s :a:i +S ^^•ro+ 1 1I7-at_..t x 1..._,.. Ac. .. r .x:.r '-r7i 5•x""-t..a.t't -, hs<4 f _ ,��nFF='1.i: ._ '^n��.!'w•.,�-.-at ., ...:,at'k3� '�', r�+':.5.....r�4.?�.,a..r"i.�ei::,>�'T"Y�� 3�'-_''' w« . r �I ��r; t'J�{. �':Y . '�" �;1-.v O '� ' 9 150 SDR 9 PE Pipe(US) e :3 ' z o AF 10111 �• j O F.1 R )(.' s1t F•�.p:•i„cp ,v.'-.-rn'(,s 7—• 3 ^y ^5' r P .-..�.�. tr !'��HC? f a �at...��'-a,---•^�re_'^.T�,,�„ *s,'..---t...;:z N. �,�}„ ..RdfiU'..xes r..nr�,.,.—..-,.,+dln--'�'".v.7w.cn.+1-t�.r ..�.: .,,...�w:.��` •.,.. � i _ +�,. �� � ` A 6600 t 240 Volt 60 Hz - i o-:r a) FqM _ rr a. txa x m t y It �1 O —dit. s'I"v .a i•-s;"} _x^ r .:[u+ s. tr' :Sic yY!..,r7 �+,M,a-r—vt�t� t u .. �r....s Nt -1_ •fir ,�, 1� 41:... '�i.i..F ��'t1FS- •w.�'hMd """�, %tea O », O ' N N File: Blank Hydraulic Analysis Sheet:Main Menu Page 1 of 3 ry 3/1/2006 PRELIMINARY PRESSURE SEWER—PIPE SIZING AND BRANCH ANALYSIS Blank Hydraulic Analysisfu Date: Mar-01-06 Office South Building at Evergreen Walk Prepared By: 0.` Fuss&O'Neill Connor Alexander r ' fV Zone Number Of Cores Accumulated Maximum Number Maximum Pipe Maximum Length Friction Friction Accumulated Maximum Minimum Statle Total 0 Number Connected Total Of Cores Of Simultaneous Flow In Size Velocity Of Main loss Factor Loss Friction Loss Main Pump Head Dynamic 0 0 This Zone This Zone Operations GPM (Inch) (FPS) This Zone (FT1100 FT) This Zone (Feet) Elevation Elevation (Feet) Head(Ft) Pipe diameters used for: SDR 8 PE Pipe(US) -. Power. 240 Volt 60 Hz Constant for inside roughness of'C" = 150 _ - W One Core Runnin `3 • 3 1.00 1 1 1 13 1.50 2.43 1262 1.70 21.43 21.43 136 l 115 21 42.43 Both Cores RunningE __. It 2.00 2 2 2 22 1.50 4.11 12621 4.50 56.79 56.79 136 115 21 77.79 m --- to - O C m 0 T 0 0- -- 00 i m - — I N � Ol i --�— - - -_ IV __ fV i W Page 2 of 3 Note:This analysis valid only with the use of ElOne positive displacement pumps. LPS 2000—Ver 1.0 3. PRELIMINARY PRESSURE SEWER—PIPE SIZING AND BRANCH ANALYSIS Blank Hydraulic Analysis Date: Mar-01-06 Office South Building at Evergreen Walk Prepared By: 0- Fuss&O'Neill Connor Alexander _ N 4 Zone Accumulated Existing Gal Per Length Capacity Average Average Average Accumulated 0 Number Total Of Cores Pipe 100 Lineal Of Of Daily Fluid Changes Retention Retention 0 m This Zone Size Feet Zone Zone Flow Per Day Time(Mr) Time(Hr) Pipe diameters used for: SDR 9 PE Pipe(US) Gallons/Day/Core = 6600 .. W e Core ron -D 3 1.00 1 1.50 8.91 1262.00 112.47 6600.00 58.68 0.41 0.41 Both Cot Eo� r+ 2.00 2 1.50 8.91 1262.00 112.47 13200.00 117.36 0.20 0.20 . m - — O C 0 M M -- 0 s —L..... �._.—-- I m o m -- I' IU t� N 'a -A Page 3 of 3 Note:This analysis valid only with the use of ElOne positive displacement pumps. LPS 2000—Ver 1.0 .r 11O'NN Sf4 Sou. ?d S � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 r�dSOR-CO � TELEPHONE (860) 644-2511 April 12, 2006 Certified #70020460000197444613 FLB Architecture & Planning Attn: Alan Lamson 19 Silver Lane East Hartford, CT 06118 RE: Appl. #06-01 P— Evergreen Walk Office South Dear Mr. Lamson: At the April 5, 2006 regular meeting, the Inland Wetlands Agency/Conservation Commission approved application #06-01 P— Evergreen Walk Office South —West side of Buckland Road — Inland Wetland/Conservation Commission application to construct a medical office building, parking lots, stormwater structures, and associated improvements on property located approximately 270 feet westerly of Buckland Road, and approximately 310 feet southerly of Deming Street, on portions of the "sixth" and "fourth" pieces of land owned by Evergreen Walk LLC. Gateway Development Zone. This approval is subject to the following conditions: 1. One blueprint copy of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. Plans submitted to Planning &Zoning Commission shall be considered having met this requirement. 2. The application shall indemnify and hold harmless the Town of South Windsor against any liability, which might result from the proposed operation or use. 3. The permit is valid for five years and shall expire on April 5, 2011. It is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. 4. All approvals required must be obtained and submitted prior to any activity on the site. 5. A contact person shall be identified on the plans. Evergreen Walk Office South April 12, 2006 Page 2 6. A monitoring plan to be drafted in order to monitor the rain gardens for 5 years. Town staff to review and approve the plan. 7. A bond in the amount of$20,000 to be submitted to the Planning &Zoning Commission to ensure compliance with the erosion and sedimentation control measures. 8. A bond in the amount of$50,000 to be submitted to the Planning &Zoning Commission to ensure establishment of the stormwater structures. 9. The elevation of the low flow channel should be set six inches below the invert of the outlet pipe. Very truly yours, /,Java 01/ &Iabetp A. Warren, Chairperson INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION EW:dr cc: Chief Building Official