HomeMy WebLinkAboutPreliminary Design Plans L7�0.N N S4r.44
C �
Town 01P s,o� V&U&ot
y ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR COS AREA CODE 860 / 644-2511
April 1, 1999
To: Abutting Property Owners and Interested Parties
Subject: State Project No. 132-125
Reconstruction of Clark Street and Pleasant Valley Road
The Town of South Windsor is developing preliminary design plans for the
reconstruction of Clark Street from Chapel Road to 91 meters (300 feet) north of the
intersection of Pleasant Valley Road and Pleasant Valley Road from its intersection with Clark
Street to the Manchester, town line.
Improvements include providing a uniform 9 meters (30 foot) wide pavement for both
roadways, realignment of the intersection of Clark Street and Pleasant Valley Road, a new
roadway drainage, replacement of the existing culvert on Clark Street and new sidewalks. The
proposed roadway will accommodate a two lane roadway with exclusive turning lanes at the
intersection of Clark Street and Pleasant Valley Road.
Based on the preliminary assessment, the construction costs will be approximately
$2,000,000.
It is anticipated that the Federal Highway Administration will provide 80% of the land
acquisition costs and 80% of the construction costs. The State will provide 10% of the land
acquisition costs and 20% of the construction costs, and the Town will provide 10% of the
land acquisition costs and 100% of the design costs.
It is the policy of the Town of South Windsor and State of Connecticut to keep persons
informed and involved when such projects are undertaken. It is important that the community
share its concerns to assist in the project's development.
The Town of South Windsor will conduct a Public Hearing on April 29, 1999 at 7:00
p.m. in the Council Chambers, South Windsor Town Hall, 1540,Sullivan,Avenue, South
Windsor, Connecticut. The Town of South Windsor and the Connecticut Department of
Transportation personnel will be available one-half hour prior to the hearing to answer
questions regarding the project plans being presented.
Page Two
To: Abutting Property Owners and Interested Parties
Deaf and hearing impaired persons wishing to attend this public hearing and requiring
an interpreter may make arrangements by contacting the Department of Transportation's Office
of Communications at (860) 594-3062 (VOICE ONLY), at least five working days prior to the
public hearing.
All persons interested in this project are welcome to attend the public hearing. If you
have any questions please call me at telephone number (860) 644-2511, ext. 245.
Very truly yours,
Jn
C. az tta, P.E.
Eng 4
er
JCl/sfg
cc: Sebastian J. Sbalcio, Principal Engineer, CONNDOT
Matthew B. Galligan, Town Manager
Michael J. Gantick, P.E., Director of Public Works
\Projects-ConstructionTleasant Valley,Clark Street\Correspondence\To Residents\Notification April 28.doc
r
RICHARD M. RITTENBAND
ATTORNEY AT LAW RECEN11p,
17.1
T7"ELLINGTONROAD i =e1�rf
t+m
SOUTH WINDSOR,CONNECTICUT06074 nr^�
;'t 8't�isill�
Li
(203)644.2456
December 28, 1989
Marcia Banach
Director of Planning
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Request for Legal Opinion Dated December 14, 1989 (#89-22)
Dear Marcia:
This is in response to your request for a legal opinion concerning
the method of implementing the provisions of section 8-3 (f) of the
general statutes which requires, prior to the issuance of a building
permit or certificate of occupancy, a certification from the zoning
enforcement officer that the building, use or structure is in con-
formity with the town zoning regulations or is a valid nonconforming
use under such regulations.
You have indicated that the only way for you to be certain that the
structure or building is in compliance with zoning regulations is by
requiring a class A-2 survey for the building permit application
and a class A-2 as-built survey for the certificate of occupancy
application and that you use this requirement for new residences.
However, you have continued a long-standing practice for residential
additions, pools, sheds, etc. to allow the homeowner to provide the
best map the homeowner can produce which often ranges from very old
building permit plot plans to hand-drawn drawings, on the basis that
requiring an A-2 survey for these additions, sheds, etc. is financially
prohibitive and seems unreasonable, and you would like to find a way
to support the certificate from the zoning enforcement officer with-
out imposing this financial burden on every building permit application.
My opinion is as follows:
1. Under section 8-3 (f), the burden or requirement is clearly
on the zoning enforcement officer, and he must be satisfied
as to the conformance with the regulations. He obviously
cannot go out and conduct engineering surveys himself on all
these applications. He must, therefore, rely upon what is
presented to him by the applicant. Certainly, an A-2 survey
should be suffiellosmwbecause of its high degree of accur
If the survey is directed on its face in favor of the Town`
of South Windsor as well as the applicant, then, if there
is something inaccurate, the town can always look for in-
demnification to the surveyor whose seal and signature appears
L
r
r
December 28, 1989
- page 2 -
on the A-2 survey. Therefore, it seems to me that the town is pretty well
protected with an A-2 survey and should require one if the proposed work
and materials exceed a certain amount. For example, if the proposed cost
is $5000 or more and the average A-2 survey costs approximately $500,
then the cost to the applicant would be no more than 10%. If, as in many
cases, the applicant obtains a home equity loan to do this improvement,
the cost of the survey could be included in the funds borrowed. If the
project is sufficiently costly, it does not seem to me that it is a
tremendous burden to require the applicant to also pay for an A-2 survey
considering the relative cost of the project.
2. What to do, for example, in the case of relatively small projects, such
as under $5000, is less clear. Under $5000 you may wish to waive the
requirement of an A-2 survey. In that case, some sort of a diagram or
sketch should be submitted by the applicant together with an affidavit
along the lines of what I have suggested on Schedule A attached hereto.
However, even with the language in the affidavit on Schedule A, there is
no guarantee that a court will hold the terms of the affidavit binding
so as to relieve the town from liability and put the liability on the
part of the applicant., and even if the applicant is held responsible,
there is no guarantee that the applicant will have the funds to pay any
damages resulting from a factual situation which is in conflict with
what is stated in the affidavit. Further, there are statutes which pro-
hibit any action by the town against a homeowner after a certain period
of time. For example, section 8-13a • of the general statutes provides
that a building that is situated on a lot so as to violate zoning regula-
tions in relation to the boundaries of+ the lot is held to be a valid
nonconforming building in relation to such boundaries if three years have
elapsed without the institution of an action to enforce such regulation.
Section 29-265 of the general statutes provides that no removal,
alteration or abandonment of any single-family dwelling shall be required
and nothing shall prevent the continuance of the use and occupancy of
such dwelling after six years of the date of occupancy after substantial
completion of construction of, alteration to or addition to such dwelling
even though such dwelling does not comply with the building code.
Therefore, despite the language of the affidavit attached, there is no guarantee
that not requiring an A-2 survey will result in the town being relieved of
liability. Accordingly, what risk the town wishes to take and under what
circumstances it is, therefore, willing to waive the requirement of an A-2
survey, becomes a policy issue not a legal question. On the basis that the
town could be ultimately held liable without an A-2 survey, the determination
as to when to waive the A-2 survey requirement becomes a policy decision based
upon all of the circumstances described above. That is a decision that should
be made by the chief administrative officer, namely the Town Manager, probably
with approval of the Town Council.
Very tru ours,
_ and Rittenband
l TOWN RMR:ds ATTORNEY
Enc.
a
S�pN Sf,
G 70Wn 0-Y -OU.& ?dzlf-"�Ot
U
1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
f'IosOR•Co AREA CODE 203/644-2511
May 30, 1990
MEMORANDUM:
TO: Members of the IWA/CC
FROM: James Lombardi, Chairperson of IWA/CC
RE: Rittenband' s letter of May 25, 1990
Because I was out sick for a week the agenda is going out as such.
Please be aware at any time during the discussion of Clark Corners,
it is felt that this should be an Executive Session instead of an
open meeting, do not hesitate to bring it up.
I call your attention to paragraph 3 of the Town Attorney' s letter
dated May 23, 1990 that if an executive session is needed it should
be called for.
JAL/pmm
lor
May 1, 2000 >
To: Town of South Windsor
Zoning Board of Appeal H,
Majorie Anthony, Chairperson `° 9
From: Richard E Spadaccini
42 Debbie Drive
South Windsor, Connecticut
Re: Robert C. Reault - Application#2462-00 Request for Variance
Due to my inability to attend the Zoning Board of Appeal hearing on Application#2462-00, I
would liked to address the members of the Zoning Board of Appeal my views regarding this
application.
As the adjacent-property owner and only property owner affected by Application#2462-00
submitted by Robert C. Reault of 50 Debbie Drive, South Windsor, Connecticut, for a 1 foot
variance to section 10.3 to allow a pool to remain 9 feet from the property line. I would to like
recommend to the Zoning Board of Appeal that the request for variance be denied under the
conditions stated in South Windsor Zoning Board of Appeals—Information Sheet and other
considerations as follow:
Conditions
"The hardship must be different in kind from that generally affecting properties in the
same zoning district, and must arise directly out of the application of the ordinance to
circumstances or conditions beyond the control of the applicant. Self-inflicted or self
created hardship is never considered proper grounds for a variance"
Fact#1 —The applicant disassembled the 18-foot pool located on the property during May of
1999 and erected a 24-pool which is 33% larger without an Application For Building Permit
and without determining the zoning requirements.
Fact#2—An Application For Building Permit was filed August 8, 1999, approximately 70
days after the pool was in use and only after notification that a Application For Building
Permit was never filed by the Town Building Inspector.
Fact#3 —Without first determining that the replacement pool was in compliance with zoning
regulations, the applicant constructed a deck subsequent to filing an Application For Building
Permit.
Fact#4—The Application for Zoning Board of Appeals was submitted April 12, 2000, eleven
months after the project was started and approximately eight months after the project was
completed.
Other Considerations
Section II—Required Information, Question 13 Town of South Windsor Application for
Zoning Board of Appeal—"If requesting a variance state clearly the unusual hardship
or exceptional difficulty on the property that prompts this application and indicate why
other options are unacceptable.
The following is the applicant responds: 'larger replacement pool erected on existing site
using old footprint of Boundary&Electrical as fixed extending additional size towards
middle of property. In addition topography of land is such that relocation would require
substantial regrading of property."
Fact#1 — Additional size was not extended towards the middle of property, but in all
directions of the smaller pool.
Fact#2— Relocation of the pool towards the middle of the property would not require
substantial regrading of property. Based on the Civil Engineers and Land Surveyors map
provided as Exhibit I,the pool is located on the section of the property with a greater incline
than the land toward the middle of the property.
Fact#3 —At the expense of my rights to zoning regulations, open space, and privacy desired
when I built my house in 1985, the applicant selfishly erected the replacement pool in a
location of his property to preserve his own open space and view disregarding those of the
adjacent property holder.
Conclusion
Over the past five years four Building Permits were personally or by contractors received for
repairs or renovation to my property. The permits were received to ensure that the repairs or
renovations were performed and completed in accordance with established building codes. I
believe that the Zoning Board of Appeal should not approve this variance request due to the
gross negligence of the applicant. Even though significant time and efforts would be required
of the applicant to remedy the situation,I believe that I as the adjacent property holder should
not be the one giving up his privacy due to his neighbor negligence.
r
YYSpalini
yd
42 Debbie Drive
South Windsor, Connecticut, 06074
October 23, 2000
Zoning Board of Appeals
Town of South Windsor
1540 Sullivan Avenue RECE!'!�
South Windsor,CT. 06074
Dear Board of Appeals:
Thank you for your reply to our request for a variance to section 4.1.4e.
We have some questions in regard to your suggestion of moving the goat shelter as far
back on the property as possible. The back yard is approximately fifty feet wide from the
back of the house to the start of the densely wooded area of our property. Our proposed
position of the shelter is just about on the tree line and putting it any further back on the
property would require the cutting down of many trees. Is this what you are suggesting
that we do? The pen area for the goats and for that matter, any animal, requires pretty
much full sunshine to keep the area dry and minimize any potential odor issues. The
putting of the shelter in the dense woods would certainly run counter to this.
We certainly appreciate your offer to reconsider our application,but your guidance is
necessary so that our new application be in sync with the thinking of the Board, so that
we do not waste everyone's time and efforts.
We have a couple of associated questions in regards to this matter. What is the
timeframe in which we would make a new application,based on the guidance of the
Board? Do we still have to wait six months? Would the Building Department be a
source of information for us, as they were cc'ed on your reply?
Yours Truly
J �
Raymond Conrad
Patricia Conrad
4OwN 7
~ T-Own ar
m 1540 SULLIVAN AVENUE•SOUTH WINDSOR,CT 06074-2786
��tiOsoR:co��,� AREA CODE 860/6442511
FAX 860/64 -3781
November 1, 2000
Certified Mail
Gardner Chapman
115 West Road
Ellington, CT 06029
LOCATION: Avery Street, Chase Orchards Subdivision
ZONE: Rural Residential (RR)
Re: Withdrawal of Cease and Desist Order dated June 12, 2000
Dear Mr. Chapman:
It is my understanding that a Settlement Agreement has been executed between you and the Town of South
Windsor resolving the issues raised in my Cease and Desist Order to you dated June 12, 2000. Those issues
pertained to your use of an accessway from Chase Orchards to your property in Vernon. Based upon this
settlement, the Cease and Desist Order of June 12, 2000 is hereby withdrawn and I have so notified The
South Windsor Zoning Board of Appeals by copy of this letter.
If you have any questions regarding this matter, feel free to contact me at 644-2511, ext. 229.
Sincerely,
Jeffrey H. Folger
Zoning/Wetland Enforcement Officer
CC: Zoning Board of Appeals
Planning/Zoning Commission
Director of Planning
Town Attorney
FROH : LABELLE,LABELLE,NAAH&HORVATHI PHONE NO. Nov. 02 2000 01:01PM P3
LAW OFFICES OF
L,ABELLE, LABELLE, NAAB & HO
kVATH, P.C.
295 EAST CENTER STREET
MANCHESTETt,CT 0604U
JOHN D.LABELLP
JOHN D.LAEELLE,JR. TELEPHONL (660)647_7000
GEOFFREY NAAB TELFCOPI$R,(860)645-0524
LEONARD M.HORVATH
VIA FAX AND REGULAR MAIL
TO: ZOnina Board of Appeals
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074-2786
The undersigned hereby withdraws the appeal of Gardner
L. Chapman to the Zoning Board of Appeals filed on July 10,
2000 .
Dated at Manchester, Connecticut, this 2nd day of
November, 2000 .
GARDNER L. CHAPMAN
By
John D. LaBelle
His Attorney
FROM : LABELLE,LABELLE,NAAB&HORVATHI PHONE NO. Nov. 02 2000 01:OOPM P2
L%OFFTGES OF
L,kBELLE, LA,BELLE, N'AAB & HORVATH, P.C.
295.EAST CiEiNTFR STREET
M&NCHF-STER,CT 06040
JOHN D.LA,aELLE
jOk1N D.LABELLE,,f R. 'XEIEPFT4NE: (860)647-7004
TEY.ECOPiER.(860)6454524
GEOFFREY NAAB
LEONARD M.HORVATH
VIA FAX AND REGULAR MAIL
November 2, 2000
Barry D. Guliano, Esq.
Town Attorney
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Barry:
RE: GARDNER L. CHAPMAN ZONING BOARD OF APPEALS
As requested, I enclose withdrawal of Mr . Chapman' s appea,JpL
Very truly yours,
John D. LaBelle
JDL:L
Enclosure
FROM : LABELLE,LABELLE,NAAB&HORVATHI PHONE NO. Nov. 02 2000 01:00PM P1
I.ABEi,LE, LABELhE, NAAB & FIORVATH, p.C.
295 East Center Street
Manchester, CT 06040
(860
FAX NUMBER: (860) 000 647-0295
FACSIMYLE TWW814leajoN
COVER SHEET _
DATE; 11 Z UO Y
TIME: 11-40
r0' Town Attorne
FROM:
SUBJECT: GAM)NER L. CHAPM N -- ZBA
TOTAL WJ=Ek OF' PAGES (INCLUDING COVER PAGE) 2
If you do not receive all of the pages, or if you have difficulty
with ' the transmission, please call the telephone number above and
ask for _ Jean
MEMO:
This message is intended only for the use of the individual or
caLiLy to which iL is addcesaW and may contain information that is
PRIVILEGED, CONFIDENTIAL AND EXEMPT From disclosure under applicable
law. If the reader of thin message is noL Lhe iuLcuded reuipient,
or the employee or agent responsible for delivering the message to
the intended recipient, you are hereby notified LhaL any
dissemination, distribution or copy of this communication is
strictly prohibited. Yf you have received this communication in
error, please notify us immediately by telephone and return the
original message to us at the Manchester Office, which address in
given above, via the U.S. Postal Service. Thank you.
RECEIVED
SEP 12 2003
Dear Mr. Warren, SOUTH WINDSOR PLANNING DEPT, 9/10/03
I am a single, recently divorced, mother and homeowner
living at 879 Avery Street in South Windsor. Some time last year
my neighbor at 871 Avery Street, took out a variance, unbe-
known to me, to build an attached 2-car garage, plus addition onto
his home. The reason he applied for a variance is because he
wanted to build 9 feet from my side property line. The neighborly
thing for him to do would have been to approach me with this
proposal. Knowing that I would have been the only one affected by
this structure, he opted not to approach me personally. Being a
contractor, he knew the procedures and maneuvers to avoid having
to deal with me on this matter. He correctly assumed that I would
not be aware of, understand, nor even question the procedures of
the variance that was posted on that property. The way I found out
about this addition or application for variance was after
construction had begun. I feel this was very devious and
underhanded. I am sorry that I am not knowledgeable or educated
when it comes to the ins and outs of building a structure in this
town.
I am a first time homeowner and do not know anything about
variances, permits or what is involved with building additions to
peoples homes. Nor would I think I'd have to. Putting a piece of
paper on someone's tree does not tell me a thing. I had no idea.-
nor would even think to question that it would have had anything
to do with my property or me. What business do I have walking
onto another person's property to read a sign. A sign that was
definitely not readable from my property line. I do not recall
noticing a sign. I do not subscribe to any newspaper. Nor do I
think if I had, I would have seen it or understood it there either.
The next thing I knew, construction was underway and a
foundation was being poured right on top of me.
Being a single mother, I spend much of my time in Maine
and Florida visiting my family. I am also away on business several
times a year. If I spent 2=3 months away from my home during the
year, does this give someone the right to apply and get approved
for this gigantic structure with out my knowledge?
This addition is double the size of his exciting home and
twice as high. The way my property is laid out, his foundation is
only a few feet from my driveway, not the existing 20 feet that I
had when I bought my home.
I bought this home because it was inviting and
appealing for myself, my family and especially my successful
home based beauty salon. I will loose the attractive vista that I
once had and have became very accustomed to. I feel this
structure is intrusive, and imposes on my visual and personal rights
as a homeowner. It is so close to me that it gives the feeling and
appearance of an alleyway. This structure will not only affect the
value, but more importantly the overall appeal of my property in
the future. I'm very upset that this has happened to me. I've spent
months agonizing over the unjust ways that this was done. The
mental anguish that this has caused me is well justified.
I feel if I was notified by the building/zoning department by a
certified letter, something in my hands, something that I would
have had to sign for, I would have been well informed of these
happenings, and able to protect myself. The way this was handled,
and the way this town conducted this variance/building procedure,
was very unfair and wrong. The very thing that was supposed to
protect the homeowner did not protect me at all. I'm frustrated and
sick over this whole thing. Where are my rights as a taxpayer in
this town? It seems I have lost my rights. My rights were taken
away from me the day this town granted this variance without my
knowledge. The gentleman next door in question is a "live-in"
boyfriend, who is a building contractor, "of some sorts," and
understands the underhanded "loop- holes" regarding this matter.
Please find enclosed pictures of this property in
question. You will also see that nothing has been done to the
property in over a year. Only the foundation has been put in.
Weeds and debris have been sitting making the property look
condemned and not lived in. This is significantly hurting my
business. I find it very hard to imagine why the town has not been
aware of this.
Sincerely;
Deborah L. Haynes
�SowN a
t�
s
To� OPSC�
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074
tiosOA'cO�� TELEPHONE(860) 644-2511
December 8, 2003
Certified Mail
Patrick Bannon
DBB.Management, LLC
111 Farm Brook Lane
South Windsor, CT 06074
LOCATION: Hartford Truck Equipment Inc.
67 McGuire Road (General Commercial Zone)
Dear Mr. Bannon:
This letter is in response to the truck parts and equipment which continue to be
stored on the property, visible from McGuire Road and John Fitch Boulevard,
without the appropriate approvals. You had met with the Assistant Director of
Planning, Michele.Lipe, back in August of this year. It was our understanding
that you would be applying for outdoor storage as well as approval for an off-site
parking facility across the street from Hartford Truck Equipment Inc.. SOUTH
WINDSOR ZONING REGULATION: Section 3.15 Commercial and Industrial
Storage and Section 13.2 Off-Street Parking and Loading are enclosed. As you
have been made aware, all outdoor storage and off-site parking requires
approvals from the Planning &Zoning Commission.
Please submit an application to Planning &Zoning Commission as soon as
possible so that no further enforcement action would be required. If there are
any questions regarding this matter, feel free to contact me at 644-2511, ext.
251.
Si cerely,
Connor
Zoning Enforcement Officer
X. c;.
CC: Director of Planning
Town Attorney
Hal Cummings
Hartford Truck Equipment
SOWN Sfq
7-0-u
�I V 074C So� �•
O J
a
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR.00 AREA CODE 860/644-2511
June 16, 2004
Mr. John H. Wrynn
195 Wood pond Road
South Windsor, CT 06074
Dear Mr. Wrynn:
The Board is in receipt of your request for a waiver of the Zoning Enforcement
Appeal application fee of$160.00. The Zoning Board of Appeals can not
consider the merits of this appeal without an application submitted. Once an
application is submitted the Board is required to hold a public hearing and
advertising fees are then incurred. This process is required by law.
We apologize that we can not assist you, however if you wish to go through this
process, you can contact the Planning Department at 644-2511 extension 252 for
the appropriate paper work.
Thank you,
Step en Wagner, Chairman
Zoning Board of Appeals
June 1, 2004
Mr. Stephen Wagner RECEIVED
Chairman, Zoning Board of Appeals
Town of South Windsor JUN 0 12004
1540 Sullivan Avenue
South Windsor, CT 06074 SOUTH WINDSOR PLANNING DEPT.
Re: 186 Wood Pond Rd. (RR Residential Zone)
Dear Chairman Wagner,
I am writing you to request a waiver of the Appeal Application Fee of$ 160.
My request is based on an incorrect decision made by Zoning Enforcement Officer Joy
O'Connor, dated April 28,2004,thereby forcing me into an Appeal.
The decision was incorrect because the information supplied by the owner of the Mack truck on
which the decision was made was not correct and not supported by the facts. The facts contradict
the information supplied by the owner of the Mack truck.
The facts are that the Mack truck in question is registered as an`Early American"commercial
vehicle not an antique. According to Sergeant Don Bridge of the Connecticut Motor Vehicle
Department, Mack trucks are commercial vehicles and require a commercial license to drive on
roads in Connecticut due to safety requirements of such large vehicles. Another fact,the Mack
truck does have advertisement on the door as follows "Rusted Nut Garage". Another fact,the
owner runs a commercial operation from his garage by repairing and rebuilding vehicles then
selling them. He has sold more than one vehicle and currently has another just completed vehicle
which I am sure he will be selling at one of the"shows"he aledgedly goes to.
If I had been given the opportunity to submit these facts I believe the decision would have been
different.
I ask that the original decision be reconsidered or if that is not possible that you waive the
Appeal filing fee and give me a chance to present this information to you.
Newspaper articles over the past several weeks leave me to believe that South Windsor prides
itself in having a safe and visually pleasing appearance to our town. A large Mack truck with a
huge diesel engine is unhealthy and not suited for a residential neighborhood with small children
playing and riding bicycles in the road.
Your favorable consideration would be appreciated.
Sincerely,
H. Wrynn f
195 Wood Pond Rd.
South Windsor, CT 06074
- CO c.c_S 4-6,.
f OwN rl ()Ia k c)- "FY
,2 4)
i L I /C CLOC"_
RETURN DATE: MARCH 29, 2005 SUPERIOR COURT
JOY L. O'CONNOR, ZONING :
ENFORCEMENT OFFICER, AND JUDICIAL DISTRICT OF
MARCIA A. BANACH, PLANNING HARTFORD
DIRECTOR
V.
ZONING BOARD OF APPEALS OF THE
TOWN OF SOUTH WINDSOR, ET AL. FEBRUARY 9, 2005
CITATION
You are hereby commanded by the authority of the State of Connecticut to summon
the Zoning Board of Appeals of the Town of South Windsor, Connecticut; Finn-Daniels
Architects, Inc., with offices at 2145 Ford Parkway, Suite 201, St. Paul, Minnesota 55116;
Poag & McKewn Lifestyle Centers-Connecticut LLC, with offices at 6410 Poplar Avenue,
Memphis, Tennessee 38119; Evergreen Walk Lifestyle Center LLC, with offices at 6410
Poplar Avenue, Memphis, Tennessee 38119; and Christopher & Banks Corporation, with
offices at 2400 Xenium Lane North, Plymouth, Minnesota 55441, to appear before the
Superior Court for the Judicial District of Hartford on the Return Date of March 29, 2005,
then and there to answer the attached Appeal of Marcia A. Banach in her capacity as
Planning Director of the Town of South Windsor, and of Joy L. O'Connor in her capacity as
SHIPMAN&GOODWIN®LLP • COUNSELORSAT LAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 061 03-1 91 9 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
Zoning Enforcement Officer of the Town of South Windsor, both with offices at 1540
Sullivan Avenue, South Windsor, Connecticut, by leaving two (2) true and attested copies of
this Citation and the attached Appeal, at least twelve (12) days before the Return Date, with
or at the usual place of abode of Gretchen Bickford, Clerk of the Town of South Windsor,
South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074, and
by serving, at least twelve (12) days before the Return Date, Finn-Daniels Architects, Inc. by
registered mail, return receipt requested or as otherwise provided by law; by serving Poag &
McKewn Lifestyle Centers-Connecticut LLC by serving its agent for service, Corporation
Service Company, 50 Weston Street, Hartford, Connecticut 06120; by serving Evergreen
Walk Lifestyle Center LLC by serving its agent for service, Corporation Service Company,
50 Weston Street, Hartford, Connecticut 06120; and by serving Christopher & Banks
Corporation by serving its agent for service, CT Corporation System, One Commercial
Plaza, Hartford, Connecticut 06103. Such appearances shall not be made in person, but shall
be made by filing a statement of appearance with the Clerk of the Superior Court, whose
address is 95 Washington Street, Hartford, Connecticut on or before the second day
following the Return Date. Marcia Banach as Planning Director of the Town of South
Windsor, and Joy L. O'Connor as Zoning Enforcement Officer of the Town of South
2
SHIPMAN&GOODWIN®LLP • COUNSELORSATL4W
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
Windsor, as principals, and Alan Jones, 36 Auburn Road, West Hartford, Connecticut
06119, as surety, are recognized in the amount of$500 to comply with all orders and decrees
entered hereunder.
Hereof fail not, but of this writ with your actions thereon make due service and return
according to law.
Dated this 9th day of February, 2005 at Hartford, Connecticut.
hristopher J Smith
Commission r of the Superior Court
394070 v.01 S 1
. I
SHIPMAN&GOODWIN®LLP • COUNSELORS AT LAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251.5099 • JURIS NO.57385
RETURN DATE: MARCH 29, 2005 SUPERIOR COURT
JOY L. O'CONNOR, ZONING
ENFORCEMENT OFFICER, AND JUDICIAL DISTRICT OF
MARCIA A. BANACH, PLANNING HARTFORD
DIRECTOR
V.
ZONING BOARD OF APPEALS OF THE
TOWN OF SOUTH WINDSOR, ET AL. FEBRUARY 9, 2005
APPEAL
1. Plaintiff Marcia A. Banach ("Banach") is an individual who is employed by the
Town of South Windsor, Connecticut, as the Planning Director ("Planning Director").
Banach brings this appeal in her official capacity of Planning Director.
2. Plaintiff Joy L. O'Connor ("O'Connor") is an individual who is employed by the
Town of South Windsor, Connecticut, as the Zoning Enforcement Officer ("ZEO").
O'Connor brings this appeal in her official capacity of ZEO.
3. Pursuant to the South Windsor Zoning Regulations ("Regulations") § 18.1, "it
shall be the duty of the Planning Director or designee to enforce the provisions of these
regulations and to make such orders and decisions as may be necessary to carry out the intent
thereof." Plaintiff ZEO O'Connor is the designee of Planning Director Banach with respect
1
SHIPMAN&GOODWIN®LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
to the day-to-day actions of zoning enforcement for the Town of South Windsor. In the event
that O'Connor is unable to conduct enforcement, Banach is the party who enforces the
Regulations.
4. Defendant Zoning Board of Appeals of the.Town of South Windsor (the "ZBA")
is the municipal agency established by the Town of South Windsor to receive and act upon
applications for variations of the Regulations pursuant to Conn. Gen. Stat. §§ 8-6 and 8-7.
5. In October 2000, the Town of South Windsor Planning and Zoning Commission
("PZC") developed and ultimately adopted amendments to § 17.8.5 of the Regulations for the
Buckland Gateway Development Zone ("Gateway Zone") that address numerous design
issues, including signage for retail stores within the Gateway Zone. During this zoning
amendment process, the project manager for a proposed retail development known as the
Shops at Evergreen Walk ("Evergreen Walk"), that was/is owned by defendant Poag &
McEwen Lifestyle Centers-Connecticut LLC (also doing business in Connecticut as defendant
Evergreen Walk Lifestyle Center LLC) (collectively "Owners"), was integrally involved in
the preparation of the signage portion of the amendments to the Gateway Zone.
6. In early October 2004, the PZC sponsored and adopted an amendment to the
signage provisions of the Regulations in the Gateway Zone to accommodate signage requested
2
i
I
SHIPMAN&GOODWIN®LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
r
by Evergreen Walk. This amendment created substantial flexibility in the signage provisions
of the Regulations for the retail tenants at Evergreen Walk.
7. Later in October 2004, defendant Finn-Daniels Architects, Inc., as agent for
defendant retail company called "Christopher & Banks, (collectively "Applicant") filed a
request for a variance of § 17.8.5 of the Regulations with the ZBA pursuant to Conn. Gen.
Stat. §§ 8-6 and 8-7, and § 18.4 of the Regulations ("Request"). Christopher & Banks is a
tenant at Evergreen Walk.
8. The Request sought a variance of the Gateway Zone signage requirements to
allow additional signage near the rear entrance of the area leased by defendant Christopher &
Banks. Christopher & Banks previously used the maximum signage permitted by the
Regulations for signage on the front fargade of its retail store.
9. The ZBA scheduled a hearing on the Request for December 2, 2004, but at the
Applicant's request, the hearing was continued to the January 6, 2005. Due to weather
conditions, the hearing was postponed on January 6, 2005, and was held on January 20,
2005.
10. The support documentation submitted with the Request by the defendant
Applicant to the ZBA does not describe a valid "legal hardship" for which a variance would
3
SHIPMAN&GOODWIN*LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 061 03-1 91 9 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
be necessary, as required by Connecticut land use law. Instead, Applicant Finn-Daniels, as a
basis for an alleged "legal hardship," expressed a policy disagreement with the formula for
calculating the permitted signage for the leased areas at Evergreen Walk as provided by the
Gateway Zone Regulations, claiming that the formula should be applied to exclude any area
without lettering, even if that area falls within the dimensions set forth in the Regulations.
11. Despite the absence of a "legal hardship," the ZBA voted to approve the Request
at its meeting on January 20, 2005 ("ZBA's Decision").
12. Notice of the ZBA's Decision was published in the Journal Enquirer on January
25, 2005.
13. The ZBA's Decision is improper, illegal, ultra vires, and constitutes an abuse of
discretion, for the following reasons:
a. the Decision exceeds the scope of authority delegated to the ZBA as provided by
Conn. Gen. Stat. §§ 8-6 and 8-7, and § 18.4 of the Regulations;
b. the Decision was made without the establishment of legal hardship, as required by
law;
C. the Decision is not supported by the substantial evidence of the administrative
record; and
4
SHIPMAN&GOODWIN®LLP - COUNSELORSAT LAW
ONE CONSTITUTION PLAZA - HARTFORD,CONNECTICUT 06103-1919 - (860)251-5000 - FAX(860)251-5099 - JURIS NO.57385
d. the Decision is based upon economic hardship and/or the mere convenience of the
defendants Applicant and Owners which do not constitute legal hardship, as
required by law.
14. Plaintiffs O'Connor and Banach are aggrieved by the ZBA's Decision pursuant to
Connecticut General Statutes § 8-8 because they are charged with enforcement of the
Regulations pursuant to Conn. Gen. Stat. §§ 8-6 and 8-7, and § 18.1 of the Regulations. The
decision rendered by the ZBA is in violation of § 17.8.5 and § 18.4 of the Regulations.
Plaintiffs are permitted and/or required to take action to enforce the provisions of the
Regulations. Plaintiffs have a specific, personal and legal interest in the subject of the ZBA's
Decision pertaining to their zoning enforcement responsibilities and authority, and such
specific, personal and legal interest has been specially and injuriously affected by the ZBA's
decision. Therefore, plaintiffs are aggrieved.
5
SHIPMAN&GOODWIN®LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
WHEREFORE, plaintiffs respectfully request the following relief:
1. That this appeal be sustained, and the variance issued by the defendant Town
of South Windsor ZBA on January 20, 2005 be held void; and
2. The Court grant such other relief at law or in equity as the Court may deem
appropriate.
PLAINTIFFS,
JOY L. O'CONNOR, ZONING
ENFORCEMENT OFFICER OF THE TOWN OF
SOUTH WINDSOR, AND MARCIA A.
BANACH, PLANNING DI OR OF THE
TOWN OF UTH OR
By
Christ h r J. Smith
Amy E. Souchuns
For Shipman & Goodwin LLP
One Constitution Plaza
Hartford, CT 06103-1919
(860) 251-5000
(860) 251-5318 (fax)
Juris No. 57385
Their Attorneys
6
SHIPMAN&GOODWIN®LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 • JURIS NO.57385
Please enter the appearance of
Shipman& Goodwin LLP
on beh all plain ' s.
Shipman& G od in LLP
Juris No. 573 5
394070 v.01 S2
7
SHIPMAN&GOODWIN®LLP • COUNSELORSATLAW
ONE CONSTITUTION PLAZA • HARTFORD,CONNECTICUT 06103-1919 • (860)251-5000 • FAX(860)251-5099 JURIS NO.57385
.4 ~ ap soo
1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074
�OsoR.co�'� TELEPHONE(860) 644-2511
April 6, 2005
Certified/First-Class Mail
Patrick Bannon
DBB Management, LLC
111 Farm Brook Lane
South Windsor, CT 06074
LOCATION: Hartford Truck Equipment Inc.
67 McGuire Road (GC Zone)
Dear Mr. Bannon:
Truck parts and other equipment continue to be stored on the property, visible from
McGuire Road and John Fitch.Boulevard, without the appropriate approvals.
The.Planning and Zoning Commission (PZC) had approved the zone change for
the property adjacent to your present site on January 4, 2005. It was represented
at the PZC hearing that you would be applying to the Planning and Zoning
Commission for site plan approval!-bufwe-have not seen anythin-from you. It is
felt that we have given you more than enough time to accomplish this. Please
submit the application for site plan approval as soon as possible, so that no further
enforcement action need be taken. Outdoor storage other than what is specifically
approved by the PZC is not allowed.
Your cooperation in this matter is greatly appreciated. Feel free to contact me at
644-2511, ext. 251 if there are any questions.
YLe.
relyVonn
or
Zoning Enforcement Officer
CC: Director of Planning
Town Attorney
Design Professionals
T _ _
DOCKET NO.: HHD CV OS 4012958 S . SUPERIOR COURT
KUPCHUNOS, MARYLOU AND : J. D. OF HARTFORD/NEW BRITAIN
KUPCHUNOS, SUSAN
V. AT HARTFORD
SOUTH WINDSOR ZONING BOARD FEBRUARY 8, 2006
OF APPEALS
SETTLEMENT AGREEMENT
WHEREAS, MARYLOU KUPCHUNOS and SUSAN KUPCHUNOS (hereinafter
"Kupchunos") commenced an action against the SOUTH WINDSOR ZONING BOARD OF
APPEALS (hereinafter "ZBA") under Docket #: HHD CV-05-4012958 S in the Superior Court
for the Judicial District of Hartford/New Britain at Hartford; and
WHEREAS, the parties have concluded that it is in their best interest to resolve the
appeal by voluntary settlement;
NOW, THEREFORE, IT IS AGREED:
1. a) Kupchunos will apply to the ZBA for variances necessary to create a 3-lot
subdivision upon the premises which was the subject of the appeal to the Zoning Board of
Appeals and thence the appeal to the Court located at 178 Graham Road in the Town of South
Windsor.
2. If the ZBA, after a hearing under their statutory authority, grants the variances
required for the 3-lot subdivision upon conditions acceptable to Kupchunos; then, Kupchunos
shall withdraw the pending appeal upon approval of the settlement and withdrawal of the appeal
by the Court pursuant to statute.
3. Following approval of the settlement agreement by the Court, Kupchunos will
proceed to the Town Planning & Zoning Commission for approval of the subdivision. Within
180 days of the final approval of the subdivision by the Town Planning & Zoning Commission,
including the final resolution in favor of Kupchunos of any appeals of any such approval,
Kupchunos shall remove the existing structures from the property at 178 Graham Road.
4. Each of the parties understands that they will be responsible for their own
attorney's fees, costs and expenses related to the appeal, this settlement and the final resolution
of the matter.
5. Each of the parties to this agreement represents, warrants and agrees as follows:
a) Each party has received independent legal advice from his/its attorneys,
with respect to the advisability of making the settlement provided for herein, and with respect to
the advisability of executing this Agreement.
b) Each party to this Agreement has made such investigation of the facts
pertaining to this settlement and this Agreement and of all the matters pertaining thereto as it
deems necessary.
c) Each party or responsible officer thereof has read this Agreement and
understands the contents hereof. Each of the officers executing this Agreement on behalf of their
respective entity is empowered to do so and thereby binds his or her respective entity.
d) The parties will execute all such further and additional documents as may
be reasonable, convenient, necessary or desirable to fulfill the provisions of this Agreement.
6. This Agreement affects the settlement of claims which are denied and contested,
and nothing contained herein shall be construed as an admission by either party of any liability of
any kind to any other party. The parties further stipulate and agree not to characterize the terms
of this Agreement to any third party.
7. a) This Agreement shall be deemed to have been executed and delivered
within the State of Connecticut, and the rights and obligations of the parties hereto shall be
construed and enforced in accordance with, and governed by, the laws of the State of
Connecticut.
b) This Agreement is the entire agreement among the parties with respect to
the subject matter hereof and supersedes all prior and contemporaneous oral and written
agreement and discussions. This Agreement may be amended only by an agreement in writing.
c) This Agreement is binding upon and shall inure to the benefit of the
parties hereto, their respective agents, employees, representatives, officers, directors, divisions,
subsidiaries, affiliates, assigns, heirs, successors in interest and shareholders.
d) Each party has cooperated in the drafting and preparation of this
Agreement. Hence, in any construction to be made of this Agreement, the same shall not be
construed against any party.
e) This Agreement may be executed in counterparts, and when each parry has
signed and delivered at least one such counterpart, each counterpart shall be deemed an original,
and, when taken together with other signed counterparts, shall constitute one Agreement, which
shall be binding upon and effective as to all parties.
Dated this day of February, 2006.
TOWN OF SOUTH WINDSOR
ZONING BOARD OF APPEALS
By:
Its Chairman
Marylou Kupchunos
Susan Kupchunos
STATE OF CONNECTICUT)
) SS:
COUNTY OF HARTFORD )
Personally Appeared Chairman, SOUTH WINDSOR
ZONING BOARD OF APPEALS, as aforesaid, Signer of the foregoing Instrument, and
acknowledged the same to be the authorized and free act and deed, and the free act and deed of
said SOUTH WINDSOR ZONING BOARD OF APPEALS, before me.
Commissioner of the Superior Court
STATE OF CONNECTICUT)
) SS:
COUNTY OF HARTFORD )
Personally Appeared MARYLOU KUPCHUNOS, as aforesaid, Signer of the foregoing
Instrument, and acknowledged the same to be her free act and deed, before me.
Wayne Christopher Gerlt
Commissioner of the Superior Court
STATE OF CONNECTICUT)
) SS:
COUNTY OF HARTFORD )
Personally Appeared MARYLOU KUPCHUNOS, as aforesaid, Signer of the foregoing
Instrument, and acknowledged the same to be her free act and deed, before me.
Wayne Christopher Gerlt
Commissioner of the Superior Court
Town of S
50
,I --F96 & 1 4 Suffivan
/Z
'�-••��j /J - NOS \. i/
' SCOT
BREEZY
i
t
1 ! 1
i _ ti
A ROAD of
/ Oj
/ 1/N
F=
0,11 0 0.2 0.3 o,4 0.6 Miles
---- -- ----s__— _— __ ------ -------- S
�r r� ry ,y�rri.�z v
�A1 ......
R
Umq
40TE 1a'. g�O.E �i'A.QO 2
v�R i A� c1�
t,
a°
I
f 24
6op-
iP
I
lV 1
j
k
40
I q7 38
WJAJO
ie2tbO1;,06 ;o.4rz0 or APIPIFALs
oP-
�� ��n � `r-A►' ap J^ni ANce
�Z SAND HILL ROAD
ZY
k
hNtcR� `� C
� F
4$ O
O
A LANE �e��
H� L N '0 'Q1-
G�
South Windsor N CONDOS
rnnecticut General Map
,s 18 Heritage Drive 0 PARCELS
' Date Printed: April 29,2005
Sao Feet ROAD NAMES
Property boundaries are derived from the Town of South Windsor Tax Assessor maps,digitized at a scale of 1 inch=100 feet,and include the same data limitations and disclaimer
All other data portrayed is representation only and,due to inherent mapping limitations,should be used as a guide only. The intent of this map is to present a graphical representatic
and selected data,and the map is subject to change as more accurate surveys may disclose. Property boundaries mapped as of June 4,2001.
AGREEMENT
THIS AGREEMENT entered into this �� day of
November, 2000, by and between the TOWN OF SOUTH WINDSOR, a
municipal corporation in the Town of South Windsor, County of
Hartford, and State of Connecticut (hereinafter called "TOWN" )
and GARDNER L. CHAPMAN, of the Town of Ellington, County of
Tolland, and State of Connecticut (hereinafter called
"CHAPMAN") , in consideration of the undertakings and agreements
hereinafter set forth, the parties agree as follows :
WITNESSETH
WHEREAS, CHAPMAN owned a contiguous parcel of land in
the towns of South Windsor and Vernon; and
WHEREAS, CHAPMAN used the South Windsor land as an
entrance to his Vernon land; and
WHEREAS, CHAPMAN sold the South Windsor land to Chase
Orchards; and
WHEREAS, the TOWN approved a residential subdivision
for the South Windsor land; and
WHEREAS, CHAPMAN, in the deed to Chase Orchards,
included the following clause:
"The grantor herein hereby reserves for himself, his
heirs and assigns, the right to use the streets shown
on the said subdivision map in the Town of South
Windsor for all purposes for which a highway may be
used and to connect to said streets through the stubs
shown on the aforesaid map; " and
WHEREAS, the TOWN, through its zoning enforcement
LABELLE,LABELLE officer, issued a cease and desist order ordering CHAPMAN to
NAAB&HORVATH,P.C.
ATTORNEYS AT LAW cease utilizing the stub access to his Vernon land which he was
295 EAST CENTER ST.
MANCHESTER,CT developing for a multi-family use, alleging
06040 p g Y ging that it was not
(860)647-7000 zoned for such use; and
WHEREAS, CHAPMAN appealed the cease and desist order
to the South Windsor Zoning Board of Appeals, which appeal is
still pending; and
WHEREAS, the parties desire to settle this dispute and
-1-
set forth the limits of the use of the South Windsor accessway;
and
WHEREAS, pursuant to permits and approvals by the Town
of Vernon, the Corps of Engineers, and the State Traffic
Commission, CHAPMAN is to construct a bridge across the
Hockanum River to access his Vernon land to Route 83 in Vernon;
and
WHEREAS, the bridge construction is scheduled for
completion on or about November 15, 2000 .
NOW, THEREFORE, the parties hereto agree as follows :
1. CHAPMAN agrees that only a twenty-foot-wide paved
driveway shall connect his Vernon land to the Vernon-South
Windsor border.
2 . CHAPMAN agrees to maintain said driveway.
3 . CHAPMAN agrees that he will not make any
application to make the driveway above described a town of
Vernon street .
4 . The State Traffic Commission has ordered that
CHAPMAN install a gate at the South Windsor town line where the
above-mentioned driveway will connect .
5 . CHAPMAN agrees to comply with the State Traffic
Commission order, and the gate is scheduled to be installed by
November 15, 2000.
6. The gate will be electronically controlled by code
or electronic device.
7. CHAPMAN agrees to install a gate which is
LABELLE,LABELLE architecturally compatible with the Chase Orchards development;
NAAB&HORVATH,P.C.
ATTORNEYS AT LAW install physical border, plantings, rocks or fence between
295 EAST CENTER ST.
MANCHESTER,CT Chase Orchards and the Vernon development to be contiguous with
06040
(660)647-7000 the gate to prohibit cutting around the gate; in the emergency
access from the gate at the Vernon town line to the Kingsley
Drive cul-de-sac, will install a suitable base to carry
emergency vehicles but be seeded over with grass rather than
paved with gravel or any other road or drive surface; the curb
-2-
on Kingsley Drive at the emergency access shall not be fully
cut, but rather be at least one-half of the height of a
I standard curb to discourage non-emergency use of the access
while allowing emergency use; install a "No Trespassing/
Emergency Use Only" sign on the Vernon side of the gate facing
the Vernon development.
8 . CHAPMAN agrees that, as soon as the bridge is
completed and the gate installed, he will use the stub
connection to and from South Windsor only for emergency
purposes .
9 . Emergency purposes shall be defined as use by
police, fire apparatus, ambulance services, emergency medical
service vehicles, municipal vehicles, state vehicles and for
emergency use by CHAPMAN if the bridge is temporarily closed.
10 . The TOWN agrees that it will not authorize public
vehicular traffic from South Windsor to access the gate and use
the driveway.
11. The TOWN reserves the right to access the gate
and use the driveway for purposes of maintaining, repairing,
replacing, and the like, storm sewer and sanitary sewer lines
presently running from the Chase Orchard Subdivision across
CHAPMAN' s Vernon land.
12 . CHAPMAN agrees that, while the bridge
construction is being finished, he will not use the stub and
driveway for passage by construction equipment, provided he is
able to access the Vernon property through Gerber ' s land.
LABELLE,LABELLE Construction equipment shall include the blasting truck,
NAAB&HORVATH,P.C.
ATTORNEYS AT LAIN portable toilet trucks and fuel trucks, but shall not include
295 EAST CENTER ST.
MANCHESTER, CT pickup trucks and workers ' personal vehicles .
06040
13 . The cost to maintain, repair, and replace the
(660)647-7000
gate shall be paid by CHAPMAN.
14 . This Agreement shall be binding on CHAPMAN' s
heirs and assigns and on the TOWN, its successors and assigns .
15 . This Agreement shall be recorded in the Land
-3-
Records of the Town of South Windsor and the Town of Vernon and
its terms are intended to run with the land and be binding upon
the successors in title to CHAPMAN for his parcel in Vernon
which he is developing for a multi-family use and which is
accessed by the intended electronic gate and emergency access
way and to the TOWN for its parcel running from the cul-de-sac
at Kingsley Drive to the Vernon town line as depicted on a map
entitled "CHASE ORCHARDS SUBDIVISION MAP PREPARED FOR CHASE
ASSOCIATES SOUTH WINDSOR, CONNECTICUT--ENGITEK LUCHS A DIVISION
OF ENGITEK, INC. ENGINEERS, SURVEYORS & ENVIRONMENTAL
CONSULTANTS 12 NATIONAL DRIVE, GLASTONBURY, CT 06033 PHONE
(860) 633-9401 FAX (860) 633 8851 A-97-39-S5 SHEET 8 OF 27 REV
03/03/98 -- TOWN COMMENTS REV 05/19/98 -- TOWN COMMENTS REV
05/27/98 -- GEN. REV 06/28/99 -- ADJUST PROP. LINE REV 07/27/99
REMOVE CUL-DE-SAC, " said map being on file in the Town Clerk' s
Office in said Town of South Windsor.
16 . The TOWN agrees to withdraw its cease and desist
order on the signing of this Agreement.
17. CHAPMAN agrees to withdraw his appeal to the TOWN
zoning board of appeals upon the signing of this Agreement and
the withdrawal of the cease and desist order .
IN WITNESS WHEREOF, the parties hereto do hereunto set
their hands and seals on the day and year first above written.
Signed, Sealed and Delivered
in thedprsence of : TOWN OF SOUTH WINDSOR
9
L-- By
LABELLE,LABELLE Its Town' anag r
NAAB&HORVATH,RC. ' Hereunto duly authorized
ATTORNEYS AT LAW
295 EAST CENTER ST.
MANCHESTER,CT
/ �-�
06040
(860)647-7000 v �u `t Gardner L. Chhpman
rJ��tr� L arn�rrz�>.
STATE OF CONNECTICUT)
) ss : South Windsor November �_, 2000
COUNTY OF HARTFORD )
On this the is day of November, 2000, before
-4-
4
ti
me, the undersigned officer, personally
appeared B40 (A who acknowledged himself
to be the Town Manager of the TOWN OF SOUTH WINDSOR, a
municipal corporation, and that he as such Town Manager being
authorized so to do, executed the foregoing instrument for the
purposes therein contained, by signing the name of the said
corporation by himself as Town Manager.
IN WITNESS WHEREOF, I hereunto set my hand and
official seal .
Commissioner of the Superior Court
Notary Public; My Comm. Expires :
a-13 f IaYi 3
STATE OF CONNECTICUT)
) ss: Manchester
COUNTY OF HARTFORD )
On th' s the �-�X day of November, 2000, before me,
�s2CtR? the undersigned officer,
personally appeared GARDNER L. CHAPMAN known to me (or
satisfactorily proven) to be the person whose name is
subscribed to the within instrument and acknowledged that he
executed the same for the purposes therein contained, as his
free act and deed.
IN WITNESS WHEREOF, I hereunto set my hand and
official seal .
CrAffim V�.rcrr �'• G..Ceinc?s�Z
m�t-her--Su-per ar--Court
Notary Public; My Comm. Expires :
LABELLE,LABEL.LE
NAAS&HORVATH,P.C.
ATTORNEYS AT LAW
295 EAST CENTER ST.
MANCHESTER, CT
06040
(860)647-7000
-5-