Loading...
HomeMy WebLinkAbout06-37P Site Plan of Development TOWN OF SOUTH WINDSOR PLANNING &ZONING COMMIS EIVED APPLICATION FORM Application No: 0 P JUL 12 2006 Official Receipt Date: SOUTH WINDSOR°LAiNNING DEPT, Receipt No: APPLICANT: A & S Boats, Inc. PROJECT NAME: ADDRESS: 729/735 John Fitch Boulevard South Windsor, CT 06074 OWNER OF RECORD ON LAND RECORDS: Alfonso J. & Shirley L. Passeri and 729 John Fitch Buu-1e*ard4 LLC ADDRESS: 735 John Fitch Boulevard South Windsor CT 06074 COMPLETE LOCATION OF PROPERTY: 729/735 John Fitch Boulevard ASSESSOR'S MAP# 46 PARCEL# 27&28 ZONE GC NAME, ADDRESS,TEL 8& FAX# OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Jay Ussery; J.R."Russo & Associates 1 Shoham RBad East Windsor, CT 06088 623-0569 Fax 623-2485 THIS APPLICATION IS FOR: (Check all that apply): ❑ Zone Change to (Public Hearing required and Certified letter to abutters required) ❑ Subdivision/Resubdivision ❑ Open Space Subdivision(Public Hearing Required) ❑ Subdivision ❑ Minor ❑ Major ❑ Resubdivision(Public Hearing Required) ❑ Minor❑ Major ❑ Conditional Approval ❑ Special Exception to Article (Public Hearing, Certified letter to abutters required) Site Plan of Development ❑ General Plan of Development ❑ Earth Filling(Sec. 15) and/or Earth Removal (Sec, 14- Public Hearing required) ❑ Regulation Amendment: ❑ Zoning ❑ Subdivision (Attach proposed amendment) ❑ Temporary and Conditional Permit for ❑ Major Home Occupation for ❑ Other(explain in detail) An Application Pending is required to be posted on the property for all applications ten (10)days prior to being heard by the Commission. WAI JAJ Sign at re of Applicant Sign of perty Owner w a C " �'�� �PrXv y,;� ��hR�*�., I r�"C":,. I fEr,✓ .y ^ Y YR / .. y iy ° $. ie /in"`� c,y ,, e `'S ^�h,r�.F /.pi �h✓ h bra",, °rw `^�;. �,�.L LL 1 X, dV� "'° ..;tyw � 7 r v,�U � . ✓° A �U v a� "'�"d+a. r '� 7+ i 4 ny 53 .. '.. n �� � �:xhi �,� � a° su,✓ � 5 ih 'rir A ry A �}� '3; .Y �' 1 �w � O e r.i a �f d3r✓ � pTp a/1 xK 7 Rr :5° � u ��� � �I W N � 9 iim, A Ir 1.1..1 ,w .�i�� t �Yqh •t.� an� rN �"nh�2 '', t M laF x���+kh"�r 1� p8 ,L �'✓f s �. ✓ 4 ��, �i�.X� 6 1 .�� pr I� (re� i }' t ...x.. L I / t W r✓K - 4 vHA cn cu vr `2 ° J 00 �µ Q F c w , N t r 8 4 t.l N Q J-1 7- 71F le-c 1 Le- ------------ • : • REcovED ONE SHOHAM ROAD JUL 12 2006 EAST WINDSOR, CT 06088 PHONE: (860)623-0569 FAX: (860)623-2485 SOUTH w"ypgORPLWW Ic,DEPT, Nknm To: Marcia Banach,Town Planner From: Tim Coon CC: Pages: 1 Drainage Impacts Re: A&S Boats,729/735 John Fitch Blvd. Date: 5/30/2006 ❑ Urgent 0 For Review ❑ Please Comment ❑Please Reply ❑Please Recycle A&S Boats, Inc. is proposing the demolition of an existing building, the construction of a building addition, and other improvements at their existing location at 729&735 John Fitch Boulevard in South Windsor. Runoff at the site currently flows in two directions. The portion of the site between the existing buildings and John Fitch Boulevard appears to drain toward the street. The buildings and rear of the site appears to drain across the property line to the rear(west)of the site. The proposed grading associated with the improvements is such that there is not expected to be any significant change to the existing runoff patterns at the site. The site is currently covered by approximately 61% (64,682 s.f.)of impervious surface. The proposed improvements will result in an increase in impervious area of approximately 1,321 s.f. This increase is not expected to create a noticeable increase in runoff from the site. However, in order to mitigate any potential increase in runoff, the proposal includes piping roof runoff from the new addition to a shallow drywell located in the sandy soils under the pavement. The attached calculations indicate that the drywell is sized for approximately 1/2"-of runoff from the roof area (ignoring infiltration)._Runoff in excess of the drywell capacity will overflow through a grate at the top of the drywell and sheet flow to the rear of the property,which is the current drainage pattern. .R. RUSSO & ASSOCIATES JOB- Surveyors&Professional Engineers SHEET NO. OF 1 Shoham Road CALCULATED BY DATE East Windsor, Connecticut 06088 TEL: (860) 623-0569 CHECKED BY DATE FAX: (860) 623-2485 SCALE ............................. "� . Fes) ................. C t?! a ..... ..............:.... ....:. ..... ...... ..... c — � ... .. x 2 1... t:. , F..: .._..............:.... � ,� Ca , rr ......... ......... ...:.... - ... . .................................. ... ....:.... ....:...........:.... ....:.... .... .......... ..t. i �/...._..........._ lid . .......:.... 1.2 .............................................................................................. -.�C;.............................:............:..............:........ ..... ..... • .... ..... . .. .... .............., ..... CAP t h L ..CA ... ..... use Z _ c vv1e " IC>?�l. _ ........... ... ....... .... o c , .. .. .. s-f Qw � e.r ........ 3 .f.........: . c vsc rxvsll�o C.S . . ... ...:............. _._ + _� L?se __ l Post-it®Fax Note 7671 Date #of d pages To a From ^' Co./Dept. Co. how N •.t Phone# Phone#! - X < �0 /l Fax# a 3 A =s Fax# s 1540 SULLIVAN AVENUE•SOUTH WINDSOR, CT 06074 �NosoIt.co`' TELEPHONE(860)644-2511 June 10, 2005 CERTIFIED#70020460000197444156 A&S Boats, Inc. 735 John Fitch Boulevard South Windsor,.CT 06074 RE: Application 92643-05—A & S Boats, Inc., 735 John Fitch Boulevard, GC zone To Whom It May Concern: At the meeting of the South Windsor Zoning Board of Appeals held on June 2, 2005, the Board approved your request with conditions for two variances to section 10.2: 1) to-allow building coverage of 36.3% (30% allowed), and 2) impervious coverage of 99% (65% impervious coverage allowed) at 735 John Fitch Boulevard, GC zone- The Board placed the following conditions on this request: Combined development of lot#1 and 2 can not exceed maximum building & impervious coverage allowed in the zone. 2. Transfer of land must occur prior to variance taking effect. The site is subject to Planning&Zoning Commission site plan approval prior to any new construction or sale of cars. The Board also approved with conditions you request for a State Hearing under section 14-55 of the General Statutes and Section 3.13 of the zoning regulations to allow a used car dealers license, (which includes a general repairers license), at 735 John Fitch Boulevard, GC zone. The Board placed the following conditions on this request: 1. No more than two vehciles to be stored outside for sale at any time. 2. Motorcycles and/or automobiles being offered for sale must be within the enclosed fenced area. 3. No vehicles are to be left outside that are under repair or in disrepair. A & S Boats, Inc. June 9, 2005 Page 2 These actions of the Board are effective upon your filing the enclosed form in the Town Clerk's Office at your own expense. Very truly yours, l� Thomas Berstene,Vice Chairperson Zoning Board of Appeals TB:dr cc: Building Department PLANNING DEPARMENT IN-HOUSE REFERRAL FORM DATE: 7/13/06 TO: Matt Galligan, Fred Shaw, Michael Gantick, Rich Bond, Walter Summers, Jeff Kris Lindstrom, Ray Favreau, Karl Reichle, Mel Stead, Chris Dougan, Bob Deptula Dennis Sheridan FROM: Marcia A. Banach, AICP, Director of Planning The Planning&Engineering Departments have received plans for the following projects: App106-37P, A & S Boats, Inc. Location: 729 and 735 John Fitch Boulevard ® Site Plan ❑ Subdivision No. Acres 2.4 Zone GC ❑ Industrial ® Commercial ❑ Residential No. Lots/Units Water: ® Public ❑ Private Well Sewerage: ❑ Public ® Septic System Project Description: 2,900+ Sf addition and outdoor display and storage of boats Future Town-owned property involved? ❑ Yes ®No ❑ new street(s) ❑ new detention area ❑ new open space/recreation area ❑ active ❑passive Planning Department notes: NOTE: there are two phases to this project Please comment by 7/28/06 and return to the Planning Department. Barbara Messino Re 06 37P A&S Boats, Inc ; Page 1 From: Bob Deptula To: Messino, Barbara Date: 7/14/06 11:15AM Subject: Re: 06-37P A&S Boats, Inc This project will be connected to sewers. >>> Barbara Messino 07/14/06 09:49AM >>> Comment or no comments? Barbara Messino Re 06 37P A&S Boats, Inc Page 1 From: Dennis Sheridan To: Messino, Barbara Date: 7/14/06 10:25AM Subject: Re: 06-37P A&S Boats, Inc NC >>> Barbara Messino 07/14/06 09:49AM >>> Comment or no comments? Barbara Messino Re: 06 37P A&S Boats, Inc Page 1 From: Sgt. Rich Bond To: Barbara Messino Date: 7/17/06 8:27AM Subject: Re: 06-37P A&S Boats, Inc no comments at this time....I will stop by to see the plans but do not anticipate any significant issues. >>> Barbara Messino 07/14/06 09:49AM >>> Comment or no comments? tOW N af4 P �i u 2 a` 1540 SULLIVAN AVENUE• SOUTH WINDSOR, CT 06074 '�OsoR•c� TELEPHONE (860) 644-2511 July 22, 2002 CERTIFIED#70020510000081152222 A&S Boats, Inc. 735 John Fitch Boulevard South Windsor,CT 06074 Re: Appl.#2550-02—A& S Boats,Inc., 735 John Fitch Boulevard, GC zone To Whom It May Concern: At the meeting of the South Windsor Zoning Board of Appeals held on July 11,2002,the Board approved with conditions your request for two variances to section 10.2: 1)to allow building coverage of 34.1%; and 2) to allow existing impervious coverage of 99+/_%at 735 John Fitch Boulevard, GC zone. The Board concluded the hardship on the property to be that the existing area is presently impervious coverage. The following conditions were placed on this application: 1. Percentage of bituminous pavement can not be expanded beyond what is currently existing on site. That percentage must be calculated and placed on the plans. 2. Approval is conditioned upon site plan approval by the Planning&Zoning Commission. Any new building, or alteration/additions to existing buildings,requires a building permit prior to start of construction. These actions are effective upon your filing the enclosed form in the Town Clerk's Office at your own expense. Very truly yours, Robert Warren, Chairman Zoning Board of Appeals RW:dr cc: Building Department ,SOWN Sf4 co r (� s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 Sox-c°�� TELEPHONE (860) 644 2511 CERTIFIED MAIL July 31, 2006 Jay Ussery J.R. russo &Associates 1 Shoham Road East Windsor, CT 06088 Re: App106-37P, A & S Boats, Inc.—request for approval for a site plan modification for a 2,900 + addition and outdoor display storage of boats on property located at 729/735 John Fitch Boulevard, GC zone Dear Mr. Ussery: Please be advised that the Regular Meeting of the Planning&Zoning Commission in the above referenced matter has been scheduled for Tuesday, August 15, 2006 at 7:30 in the Madden Room of the South Windsor Town Hall, 1540 Sullivan Avenue. Someone must be present at the hearing to represent the application. Two signs advertising the hearing must be posted on the property for ten(10) consecutive days prior to the hearing and must be clearly visible from a town street. Please have one sign posted at 729 John Fitch Blvd and one sign posted at 735 John Fitch Blvd by August 4,2006. Signs can be obtained in the Planning Department. Sincerely, r Barbara M. Messino Administrative Secretary MEMORANDUM To: Marcia Banach, Director of Planning From: Jeffrey B. Doolittle, P.E., Town Engineers Date: 8/9/06 RE: App 06-37P A& S Boats, 729/735 John Fitch Boulevard I have reviewed the proposed site plan expansion for A & S Boats located at 729/735 John Fitch Boulevard and I have the following comments: 1. Label the surface material in the large existing boat storage area in the western part of the site. This material appears to be compacted gravel. Show how there is only 49% impervious coverage proposed for this lot. All gravel and compacted surfaces are considered impervious. There may need to be some lawn and landscape areas planted on this lot. 2. Clarify where the proposed concrete pad is to be constructed south of the proposed addition. 3. How will the proposed parking spaces on gravel be line striped? 4. The gravity sanitary sewer lateral needs to be at minimum 2% slope unless it can be demonstrated that a self cleansing velocity of 2.5 fps will be achieved at the proposed slopes with the flows expected in this line. 5. An existing sewer pipe is shown heading west from the existing SMH between the two buildings. Use this lateral for the gravity lateral connection or abandon and remove it. 6. Eliminate the inside drop from the detail for the connection of the proposed sanitary force main to the existing SMH. The 4" force main connection should be built into the SMH invert. 7. Provide details for the proposed grinder pump system including pump make, model, horsepower, and design head. Also include details on the storage volume, controls,_etc. An external--connection-for-an auxiliary power-supply-may— be required or this pump station can be wired into an existing on-site generator. 8. Note that the existing septic system on site shall be abandoned. 9. The site plan calls for an oil/water separator and the detail sheet shows an oil/sand separator. Label these the same based on which separator is needed for the uses on this site. 10.WPCA review and approval is needed for this site plan application. Please call me if you have any questions. J.R. RUSSO & ASSOCIATES Land Surveyors & Professional Engineers AUG 11 2006 August 11, 2006 Marcia Banach Town Planner Town of South Windsor 1340 Sullivan Avenue South Windsor, CT 06074 Re: Response to Comments Appl # 06-37P A&S Boats, 729/735 John Fitch Boulevard Dear Marcia: Attached please find eight(8)revised sets of the Site Plans for the above referenced project prepared by J.R. Russo &Associates on behalf of A&S Boats. The plans have been modified to address comments presented in a memorandum from Jeffrey Doolittle to you dated August 9, 2006. The comments are restated below, followed by our response. 1. Label the surface material in the large existing boat storage area in the western part of the site. This material appears to be compacted gravel. Show how there is only 49% impervious coverage proposed for this lot. All gravel and compacted surfaces are considered impervious. There may need to be some lawn and landscape areas planted on this lot. As shown in the attached photos, the area beyond the limits of gravel that are delineated on the plans is a fine sand material. Grass is growing in this area; however, due to the lack of topsoil, the grass has not established itself very well. Regardless of the presence of vegetation, the material is sandy and is not impervious. To address concerns that gravel may be applied to the storage area in the future, a note has been added to the plan stating that this area is to be maintained as pervious material. - 2. Clarify where the proposed concrete pad is to be constructed south of the proposed addition. Dimensions have been added to the plan to define the location of the pad. 3. How will the proposed parking spaces on gravel be line striped. The gravel parking areas are not proposed to be striped, and the striping has been removed from the plan. The area has been dimensioned to show that adequate space exists for the number of spaces proposed. 4. The gravity sanitary sewer lateral needs to be at a minimum 2% slope unless it can be demonstrated that a self cleansing velocity of 2.5 fps will be achieved at the proposed slopes with the flows expected in this line. The sanitary line in question goes from south side of the proposed addition to the oil/sand separator, then to the existing sanitary manhole 2005-098\engineer response.doe A&S Boats 1 Shoham Road • East Windsor, CT 06088 • TEL: (860) 623-0569 • FAX: (860) 623-2485 Page 2 of 2 August 11,2006 where it discharges into the existing sanitary sewer main. This line is the proposed discharge from the floor drains within the addition. It will collect wash waster and will not transport raw sewage. The slope of this line has been changed to be a consistent 1.0%. It is our opinion that the 1.0% slope is sufficient for the proposed use of the line. 5. An existing sewer pipe is shown heading west from the existing SMH between the two buildings. Use this lateral for the gravity lateral'connection or abandon and remove it. The plan has been revised to reflect the removal of this lateral. 6. Eliminate the inside drop from the detail for the connection of the proposed sanitary force main to the existing SMH. The 4" force main connection should be built into the SMH invert. The detail has been revised per this recommendation. 7. Provide details for the proposed grinder pump system including pump make, model, horsepower, and design head. Also include details on the storage volume, controls, etc. An external connection for an auxillary power supply may be required or this pump station can be wired into an existing on-site generator. As discussed with Mr. Doolittle, the depth to the existing building sewer is unknown at this time.. The plan calls for a test pit to determine the depth to the existing sewer prior to construction. This information is required prior to completion of a pump station design. Thus, the test pit must be completed prior to design. It is requested that the plans be approved as presented with a condition that the pump station details be reviewed and approved by the Town Engineer prior to construction. 8. Note that the existing septic system on site shall be abandoned. This has been noted on the revised plans. 9. The site plan calls for an oil/water separator and the detail sheet shows an oil/sand separator. Label these the same based on which separator is needed for the uses on this site. Both have been labeled as an oil/sand separator. 10. WPCA review and approval is needed for this site plan application. An application to the WPCA will be submitted upon receipt of PZC approval. I hope that this letter and the revised plans address all of the comments satisfactorily. If there are any questions, or you require further information, please call our office at (860) 623-0569. Sincerely, f- ('s Timothy A. oon, P.E. J.R. Russo & Associates Attachments cc: A&S Boats 2005-098\engineer response.doc A&S Boats r � ' J.R. RUSSO & ASSOCIATES -111an Land Surveyors &Professional Engineers AUG 11 2006 OUT"4 IVXn C^ c C �T. August 11, 2006 Marcia Banach Town Planner Town of South Windsor 1340 Sullivan Avenue South Windsor, CT 06074 Re: Response to Comments Appl# 06-37P A&S Boats, 729/735 John Fitch Boulevard Dear Marcia: Attached please find eight(8) revised sets of the Site Plans for the above referenced project prepared by J.R. Russo &Associates on behalf of A&S Boats. The plans have been modified to address comments presented in a memorandum from Jeffrey Doolittle to you dated August 9, 2006. The comments are restated below, followed by our response. 1. Label the surface material in the large existing boat storage area in the western part of the site. This material appears to be compacted gravel. Show how there is only 49% impervious coverage proposed for this lot. All gravel and compacted surfaces are considered impervious. There may need to be some lawn and landscape areas planted on this lot. As shown in the attached photos, the area beyond the limits of gravel that are delineated on the plans is a fine sand material. Grass is growing in this area; however, due to the lack of topsoil, the grass has not established itself very well. Regardless of the presence of vegetation, the material is sandy and is not impervious. To address concerns that gravel may be applied to the storage area in the future, a note has been added to the plan stating that this area is to be maintained as pervious material. 2. Clarify where the proposed concrete pad is to be constructed south of the proposed addition. Dimensions have been added to the plan to define the location of the pad. 3. How will the proposed parking spaces on gravel be line striped. The gravel parking areas are not proposed to be striped, and the striping has been removed from the plan. The area has been dimensioned to show that adequate space exists for the number of spaces proposed. 4. The gravity sanitary sewer lateral needs to be at a minimum 2% slope unless it can be demonstrated that a self cleansing velocity of 2.5 fps will be achieved at the proposed slopes with the flows expected in this line. The sanitary line in question goes from south side of the proposed addition to the oil/sand separator, then to the existing sanitary manhole 2005-098\engineer response.doe A&S Boats 1 Shoham Road - East Windsor, CT 06088 - TEL: (860) 623-0569 - FAX: (860) 623-2485 Page 2 of 2 August 11,2006 where it discharges into the existing sanitary sewer main. This line is the proposed discharge from the floor drains within the addition. It will collect wash waster and will not transport raw sewage. The slope of this line has been changed to be a consistent 1.0%. It is our opinion that the 1.0% slope is sufficient for the proposed use of the line. 5. An existing sewer pipe is shown heading west from the existing SMH between the two buildings. Use this lateral for the gravity lateral connection or abandon and remove it. The plan has been revised to reflect the removal of this lateral. 6. Eliminate the inside drop from the detail for the connection of the proposed sanitary force main to the existing SMH. The 4" force main connection should be built into the SMH invert. The detail has been revised per this recommendation. 7. Provide details for the proposed grinder pump system including pump make, model, horsepower, and design head. Also include details on the storage volume, controls, etc. An external connection for an auxillary power supply may be required or this pump station can be wired into an existing on-site generator. As discussed with Mr. Doolittle, the depth to the existing building sewer is unknown at this time. The plan calls for a test pit to determine the depth to the existing sewer prior to construction. This information is required prior to completion of a pump station design. Thus, the test pit must be completed prior to design. It is requested that the plans be approved as presented with a condition that the pump station details be reviewed and approved by the Town Engineer prior to construction. 8. Note that the existing septic system on site shall be abandoned. This has been noted on the revised plans. 9. The site plan calls for an oil/water separator and the detail sheet shows an oil/sand separator. Label these the same based on which separator is needed for the uses on this site. Both have been labeled as an oil/sand separator. 10. WPCA review and approval is needed for this site plan application. An application to the WPCA will be submitted upon receipt of PZC approval. I hope that this letter and the revised plans address all of the comments satisfactorily. If there are any questions, or you require further information, please call our office at(860) 623-0569. Sincerely, i Timothy A. oon, P.E. J.R. Russo & Associates Attachments cc: A&S Boats 2005-098\engineer response.doc A&S Boats A hq Ste' h 1 s Y C { � - � 1 �� eft• r 7 it z � Y f Vt E, L; `` } t ♦ tom, tt x r c r s { {t tF { 4 _R f.• .g 3 f Al 4,z Ic IN Kc � ; 3 - � � ,t r s -itj�5;� �y� tCi-� ���.• { >S �x a ;-- � s f#y� " 3 $s. �, � '' ♦ �:� 1, e' �� a p a v;�f+ ,� 1 .tsf�r' } }��'" s.� 'g}�"" ;�F ��� t��r •F #t # >>- .� -. t - •f it i ,fit �`,' 1��' .' }¥r 3 tt _ t d€ �.. t �a r :1 4 sttis Yam.+.: R� � Tx k�� r Ey�•�,# 3 s y k� ,.,�. {- AlkyS-- & 1 W1�f� f •,vy% � t t . �_S t c a;l �Y F i t #mot x'�rs '[3 ,^ ` x ,s�E 8 # f��ti 3 `.•s�€r r " C �L-V Yam. T } - r' r' 'art r� _'�`.� fir• a� �'1}►° ' . } -117" Off. `. } 1 "�4 Ali rr r ' + Not i b W� t i- r ! A _ �1 ,4 } f Ak, >� a ' ji- a C L Appl #06-37P, A&S Boats Site Plan 8/15/06 5 y 4 5 y s(- Planning Department Report 1. Request for site plan approval to construct a 3,000 sq ft addition and for permanent outdoor storage of boats at 729 and 735 John Fitch Boulevard, GC zone. The site plan application shows two phases of implementation, with the new addition as part of Phase I. Other Phase I improvements include connection to public sewers and relocation of an existing hoop house that is currently located behind the existing A&S Boats building. Phase II improvements include demolition of the existing building at 729 John Fitch Boulevard and using the cleared area for both customer parking and additional boat storage. 2. The applicant received a 2-year temporary& conditional permit in April 2004 for storage of boats at 713 John Fitch Blvd (Rt 5 Motorcars site) and in front of the existing A&S building; that T&C permit has now expired. The T&C permit did not include the rear portion of 729 John Fitch Blvd; however, this area is being used to store boats as shown on the 2005 aerial photograph. At the time that the Commission granted the T&C permit, Commissioners expressed concern about the appearance of the A&S site, and the lack of landscaping or screening. The applicant had indicated that he was planning on adding planters in front of the existing gate. 3. Maximum impervious coverage allowed is 65%. The Zoning Board of Appeals granted a variance in June 2005 to allow 99% impervious coverage on the existing site, but with a condition that the combined impervious coverage on 729 and 735 John Fitch Blvd could not exceed 65%. The site plan indicates that the entire back area of the lot at 729 JF Blvd will continue to be used for boat storage, which raises the very real concern that the impervious coverage will over time exceed the ZBA-imposed maximum. Staff recommend that the required pervious area be identified on the site plan and fenced, landscaped or otherwise protected from compaction that occurs with continuous use by heavy vehicles such as boats and cars. 4. Proposed building addition height is 30 feet; 40 feet allowed. 5. There does not appear to be any landscaping nor screening proposed with Phase 1. The existing buildings partially screen the rear storage area; however, demolition of the old restaurant will open up the view plus provide additional boat display area. Phase II does include a 10' wide landscaping strip to be 14 6 U i planted with azaleas along the west side property line. Ts_stdcsa the public in spite of the recently-renovated d�k fagade, mainly because of the total lack of landscaping and the number of boats stored between the building and the street. 6. The parking requirement for this use is 35 spaces, with 11 spaces shown on the applicant's property. There are also 24 "deferred" parking spaces shown within the boat storage area in the rear of 729 JF Blvd. The site plan shows that there are 10 existing customer parking spaces located within State R.O.W. along Route 5, with no indication that these spaces will be eliminated until Phase II is implemented. 7. There does not appear to be any new site lighting proposed. There are at least two CL&P spotlights on the street utility poles. These spotlights should be brought into conformance with zoning requirements for full cutoff light fixtures. 8. There are no regulated wetlands on the site, so no IWA/CC approval is required. 9. South Windsor Police Department has reviewed the plan and has no comments. 10.The Fire Marshal has reviewed the plan and indicated that he requires a fire hydrant in front of the site. 11.Water Pollution Control Authority approval is required for the sewer connection. 12.There are no dumpsters shown on the site plan. If there are any on site or any are added in the future, they must be on a concrete pad and screened. 13.If this application is approved, Planning Dept. requests that the items noted be included as approval modifications. 2 i 40WN St Town O-P S-0ad, Vi� 9 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT.06074 f�OSOR"co�� TELEPHONE(860) 644-2511 CERTIFIED MAIL 70.041160 00021060 4251 August 17, 2006 A& S Boats, Inc. 735 John Fitch Boulevard South Windsor, CT 06074 Dear Sir: Re: Appl#06-37P,A&S Boats, Inc. Site Plan We are pleased to advise you that the Planning&Zoning Commission voted on August 15, 2006 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for the construction of a 3,000 sf addition 729 and 735 John Fitch Boulevard, GC zone as shown on plans prepared by J.R. Russo &Associates, Job No 2005-098 and dated June 8,2006, as revised. This approval does not include any additional outdoor storage and/or display of boats and is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. A landscape plan must be pursued on the island in the State ROW.This landscape plan should return to Town Staff for approval. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 6. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. . 7. The building street number must be included on the final plan. 8. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 9. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 10. Site lighting must be brought into conformance with current zoning requirements for full cutoff light fixtures, including all spotlights. 11. Existing or future external dumpsters must be placed on a concrete pad and screened. 12. Engineering comments dated August 9, 2006 must be addressed to the satisfaction of the Town Engineer. 13. The applicant shall not add any additional display areas or storage areas without further approval from this Commission. Black and white transparent mylar of Sheet#3 with the above modifications,together with three blueprint copies of the entire set of plans(including architectural elevations and landscaping plans),must be submitted to this Commission within 30 days to be stamped and signed. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, atrick Kenne y, Chairman Planning and Zoning Commission PK/pmm Enclosure cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal J. R. Russo &Associates, 1 Shoham Road, East Windsor, CT 06088 54'-0° AT 5EG0NO FLOOR _ -- � 2UOA I I i EDGE OF O p 12'xl'�' MEZZANINE — - _ 'x 12' W O.H.D. i � 12O O.H.D. (3 I GOWMN I � T'rP. I i I 1 I IOO I I O O O IL O.H.D. RIDGE ABOVE --*-I 14'xl4' O i i O.I-LD. O I I I I I I I I 1000 12 x1:2 VALLEY GUTTER - O.H.D. ABOVE i I BOLLARD i 5TAlk5 LANDING UP - I k/ GUARDRAIL I UP ALL PASSAGE DOORS ARE O - -- - SHORN AS 5070 O PARTS ECEIVED GOUNI ER FLOOR PLAN SOUTH WINDSOP\PLANNNGDEPT. SGALE: ---- / E:XISTINO BUILDING 717ANN FOR:PEI-LETIER WILDERS� . lcmBOATSMOATE. COMMERCIAL & INDUSTRIAL CONTRACTOR - SQ�)TH WINDSOR, CT N 138 MAIN STREET COVENTRY, CT 06238 SGALE: DATE: RAHN BY: DHG. TITLE: TEL. (860) 742-5317 FAX. (860) 742-8734 A- 11-4-05_1' D K05A PROPOSED FLOOR PLAN METAL SIDING PANELS RAKE FASCIA 12LlI lz EXISTING BUlLDfNc_, FRONT ELEVATION SAYE FASCIA METAL ROOFING PANELS TRANSLUGENT WALL PANELS TYP. _ II i VALLEY GUTTER I I i i „ i , , , , i t Ili r i i „ :1 I� _ ,I I I I —I— It cp lx 1 0 H T E f E\ / J\ T [ / � I METAL SfI�INC PANELS $� 56ALE: I/b"=►' j— �( � L/ I �I PELLETIERB--UILDERS , inc . ...—I AWN oR: AT BOUT , .� EVI5fON5:H fVlte.!DSO1i, CiNo. DATE: COMMERCIAL & INDUSTRIAL CONTRACTORSCALE: D.�TE: �� G�RP:1^JIY DlnlG, TITLE: 138 MAIN STREET COVENTRY, CT 06238 A- 2 TEL. (860) 742-5317 FAX. (8660) 74�2-88734 /Pj"—�' ED KOSA + PPIOPOSED ELEVATIONS _—. _..�.---._......a»...— ��q�IGC"—.- LT .J.Ei183R'6^•.650�'�9.J...�....�.- a.'.�.Su�3101.Y�3CtY0.^H 'S� y�....a_....._...Aa.�C,n�....�. •..a..em.-..��... �G�^JE�i41iffi�'NF.B.GIN®�E'.p01. f p METAL SIDING PANELS R,6,KE FA5G1A LINE OF MEZZANINE12 51 i I I �-- , I i i Ii III Lill. , IIll REAR ELEVATION SAVE F?56IA METAL ROOFING PANELS I I I I I I I I TRAN5LUGENT HALL - - PANELS TYP. VALLEY GUTTER EXIST INC-3 BUILDING I � G LEFT ELEVATION METAL SIDING PANELS SCALE: TIinc . DF2,4WN FOR: Rs!oNS: COMMERCIAL & INDUSTRIAL CONTRACTOR . A&S BOATS _ _ SOUTH WINDSOR, CT NO. DATE: 138 MAIN STREET- COVENTRY, CT 06238 ��..ALE: D,4Tf=: DRAWN BY UWv� TITLE: -- TEL. (860) 742-5317 FAX. (860) 742-8734 A-- 3 =�= 1 I I-4_D 5 ED KO' S:A � I� � -- �� �'i2Di�C)�L �L ,Tlr�!�15 SOWN Sf4 co Tai", o-P south 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 f�OSOR•CO TELEPHONE (860) 644-2511 CERTIFIED MAIL 70041160 00021060 4251 August 17, 2006 A& S Boats, Inc. 735 John Fitch Boulevard South Windsor, CT 06074 Dear Sir: Re: Appl#06-37P,A& S Boats, Inc. Site Plan We are pleased to advise you that the Planning&Zoning Commission voted on August 15, 2006 to approve with modifications the above referenced application for a Site Plan of Development. This approval is for the construction of a 3,000 sf addition 729 and 735 John Fitch Boulevard, GC zone as shown on plans prepared by J.R. Russo &Associates, Job No 2005-098 and dated June 8,2006, as revised. This approval does not include any additional outdoor storage and/or display of boats and is subject to the following modifications: 1. Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permit will be issued until the final mylars have been filed in the Town Clerk's office. 3. A landscape plan must be pursued on the island in the State ROW.This landscape plan should return to Town Staff for approval. 4. An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 8.1.11 of the Zoning Regulations. 5. All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 6. This approval does not constitute approval of the sanitary sewer,which can only be granted by the Water Pollution Control Authority. . 7. The building street number must be included on the final plan. 8. Pavement markings must be maintained in good condition throughout the site drives and parking areas. 9. All free standing signs and/or building signs require the issuance of a sign permit before they are erected. 10. Site lighting must be brought into conformance with current zoning requirements for full cutoff light fixtures, including all spotlights. 11. Existing or future external dumpsters must be placed on a concrete pad and screened. 12. Engineering comments dated August 9, 2006 must be addressed to the satisfaction of the Town Engineer. 13. The applicant shall not add any additional display areas or storage areas without further approval from this Commission. Black and white transparent mylar of Sheet#3 with the above modifications, together with three blueprint copies of the entire set of plans(including architectural elevations and landscaping plans),must be submitted to this Commission within 30 days to be stamped and signed. After the mylars have been signed by the Commission,they will be returned to you for filing in the Office of the Town Clerk. After filing these plans, a copy of the receipt must be submitted to the Planning Department. Sincerely, atrick Kenn y, Chairman Planning and Zoning Commission PK/pmm Enclosure cc: Town Engineer Chief Building Official Assessor Superintendent of Pollution Control Fire Marshal J. R. Russo &Associates, 1 Shoham Road, East Windsor, CT 06088 'C O'NN SE,q \t -O-uAn O-P Soud-t ?&&'40t y �, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CT 06074 soR.cO TELEPHONE (860) 644 2511 A& S Boats Inc. 735 John Fitch Boulevard South Windsor CT 06074 September 20, 2007 To Whom It May Concern: Re: Preconstruction Meeting—Appl#06-37P, A& S Boats 9/19/07 IN ATTENDANCE Wayne France Pelletier 138 Main Street Coventry 742-5317 Peter P. Borin Pelletier 138 Main Street Coventry 742-5317 Thomas Cavar Pelletier 138 Main Street Coventry 742-5317 Jeff Doolittle TOSW 1540 Sullivan Avenue 644-2511 x245 Bernie Drabek TOSW 1540 Sullivan Avenue 644-2511 x241 The following is a brief summary of points discussed during the meeting: Erosion and Sedimentation Control 1. All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Jeffrey Folger, Environmental Planner for inspection when measures are in place, prior to commencement of site work or if any problems/concerns arise during construction. 2. All topsoil stockpile areas to be protected(ringed with haybales or equal). 3. During construction a crushed stone tracking pad may need to be installed and maintained to minimize tracking of dirt/gravel on to John Fitch Boulevard Calcium chloride or water is to be used for dust control as required. Public Works 1. Three complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by the Planning Department along with plans developer needs. Only approved plans are to be used on the job site. 2. The Engineering Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist for the following: r - a. After site is staked out b. All drainage work c. Sanitary sewers 3. A drain layers permit is needed prior to work on the sanitary sewer line or oil/grit separator 4. Certification of all products used -- storm pipe, structures, pavement, oil/grit separator and sewer grinder pump system shall be presented to the Town Engineer prior to installation. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers and house service laterals located as per revised as-built checklist. 7. All pipe and structures to be backfilled with free draining material compacted in maximum one foot lifts with approved compaction equipment or approved equal if deep trench is encountered. Any pipe or structure work requires inspection prior to backfilling. 8. Any problems and/or questions regarding construction of this project will be directed to Wayne France in the field at phone 860-742-5317 ex 106. 9. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 10. Job meetings will be held as needed, and can be called by the developer or Town. 11. Seventy-two (72)hours' notice needed for certificate of occupancy inspection. 12. Any proposed changes are to be presented to the Engineering or Planning Department prior to implementation on change order form in quadruplicate with 4 copies of the drawing. Town will attempt to turn around within 24 hours. 13.Normal hours of operation 7:00 a.m.—5:00 p.m.,no work on Sunday. 14. DOT permit needed for all work within state road. Copy must be given to the Engineering Department. 15. No paving after October 15 or before April 15 without written approval from Director of Public Works. 16. Extra care must be taken when compacting around structures such as catch basins and manholes. These spots often become problem areas in the future due to settling, therefore, the town staff/inspectors will be requesting additional compaction tests in these areas. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1. Blasting(if required)to be coordinated with the Fire Marshal. Police Services 1. Emergency phone numbers for the duration of the construction must be provided to Police Services on a company letterhead. If the developer occupies or owns the building after construction emergency numbers must be provided to Police Services. 2. All buildings located on property that abuts a public highway must be numbered and visible from the street. All numbering shall comply with Town Ordinance 6-800 through 6-802. 3. Barns, garages, and outbuildings,which are located on the same premises as a numbered structure, are excluded. 4. Erect temporary sign on the site during construction identifying the project. 5. If an alarm is to be installed contact Police Services. Building Department 1. Plan review with Building Official/Fire Marshal required prior to application for building permit. Coordinate with Chief Building Official. Sincerely, Michele R. Lipe,AICP " Assistant Director of Planning MRL/ cc: Jeffrey Doolittle,Town Engineer Bernie Drabek, Engineering Inspector Karl Reichle, Public Works Mel Stead,Public Works Christopher Dougan, Chief Building Official Fred Shaw, Superintendent of Pollution Control Walter Summers, Fire Marshal CL&P SBC/SNET PRE CONSTRUCTION MEETING SIGN IN SHEET NAME_ _ --_-_-_ --_ _ - - - - COMPANY AD - -�- -COMPANY- - - - - - - - - - - - - - - - - - - DRESS -------------------- - -[-ADDRESS- - - -......... TELEPHONE # --------------------------------------------- ove c,3 ------------------------------ ----- ------------------------------------------- ---------------------------------------------- - - ----------------------------------------- ---------------- - - - - - - - - - - - - - - - - - - - - - - - --------------------------------------------------------------------- -------` RECEIVED TOWN OF SOUTH WINDSOR NOV 01Z001 s STAFF SITE CHANGE FOR SITE & SUBDIVISION SOUTH WINDSOR PLANNING DEPT, GENERAL: CHANGE ORDER CONTACT PERSON Mark Pa:sspri Phone No. 528-Rfg? Address 735 John Fitch Blvd., South Windsor, CT Site Name A&S Boats Inc. P&Z No. 06-37P Alfonso & Shirley P erl Owner 159 John Fitch Blvd7, LLC Phone No. 528-8682 Contractor Pelletier Builders Signature of Owner" Date: t0 31-0`7 Signature of Design Engr. Date: CHANGE: (Describe location and natu of change. Include Four (4 ) copies of plan/profile of Change. ) Relocate concrete slab and hoop house. Add trench drains to slab with primary discharge to sanitary and optional discharge for stormwater. Relocate oil water separator. I I 1 i Reason for Change: (Why is change required) To facilitate access & manuevering APPROVALS: (As Require Dir. Of Planning/` ti _ Date: t i Town Engineer Date: Dir. of PublicWorks- Date: Other: 5 �: n�i)y►�u� ( , �.er-Q r` - Date: "-7 STAFF COMMENTS: GJ C / Gcr-o, l S 1-L jq Q-7 ,J - DAc4 S�. 1 1 White - Town Engineer t�hq S Cbp Yellow - Applicant Pink - Director of Planning Goldenrod - Engineering Department e7i TOWN OF SOUTH WINDSOR - STAFF SITE. CHANGE FOR SITE & SUBDIVISION GENERAL: Frame _ 9S317Z106 CHANGE ORDER CONTACT PERSON Phone No. Address 729/735 John. Fitch Blvd. Site Name A&S Poatep Inc. P&Z No. #06-37P J A1F*_n_*o_7F_MffX_1ey PASSOVI 4 Phone No. 528-M2 Owner 722 jabn Igo b alud ram+ Contractor Pelletier Daildem Inc. Signature of Owner 4- ' Date Signature of Design Engr. ti,._ Date: CHANGE: (Describe location and natur of change. Include Four (4 ) copies of plan/profile of Change. ) 1. eve and replace-section of existing building sever ' inclading nanbola to ,achieve it ty sever and sIbLIMAto tart' pump station and force Bain. 20 Shift aAncrote pad locations and snap =nip pit to northern concrete toad. Add other utilities P 4 Reason for Change: (Why is change required) + 1* .To provide travity nearer and e1 juluate need for om a ere tnw 2. Svep eutsp pit to other pad to allow for construction of northsirn �w and southern pad in the future. APPROVALS: (As Require ) �, z-t�"�-_ Date: a- - U Dir. Of Planning �__ Town Engineer %r{f r i' ''f 1�z;� Date: Dir. of Public W ks Dates: Other: J� �a�..r"' ���i-~y /, `:� =>�,! e r Datez' (^1 STAFF COMMENTS White - Town Engineer Yellow - Applicant Pink Director of Planning Goldenrod - Engineering Department