HomeMy WebLinkAboutSite Plan of Development (143) TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
/ The Commission will officially receive applications
Application No , vJ at either Special or Re ular meetings provided they
Received Date : p7— — were submitted t i
s'sion Chairperson, Secretary
Action or Public Hearing by : or agen y, u (14) days prior to the
meet F officiallyreceived.
No a 5. n officially eived at a Special Meeting
eceipt NO . will ed upon at that meeting.
APPLICANT: Town of South Windsor th `��indsor jSsion
& ZOt11Cl
ADDRESS : 1540 Sullivan Avenue, So. Windso*)an TELEPHONE 644-2511
OWNER OF RECORD ON LAND RECORDS : Town of South Windsor
ADDRESS : 1540 Sullivan Avenue, South Windsor, CT 06074
COMPLETE LOCATION OF PROPERTY: Northeast corner of intersection of Route 74
and Foster Streets
ZONE RR
NAME, ADDRESS & TELEPHONE NUMBER. OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED: Mr. Howard E. Fitts, Chairman, Public Building Commission,
239 Oak Street, South Windsor, CT 06074 TELEPHONE 644-1271
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
1 . Zone Change to (public hearing required)
2 . Filing for Subdivision
3 . Filing for Open Space Subdivision (public hearing required)
4 . Filing for Resubdivision (public hearing required)
5 . Special Exception to Article (public hearing required)
X 6 . Site Plan of Development (Modification for building addition)
7 . Removal of Sand, Gravel , Clay or Quarry Stone & Ore (public
hearing required)
X 8 . Other (explain in detail) Approval under Section 8-24 of the
Connecticut General Statutes.
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED WITH 6 SETS OF PLANS (7 setts if public hearing is required)
BEFORE IT RECEIVE BY THE PLANNING & ZONING C M SSION.
Applicant 0 er
Howard E. Fitts, Chairman Richard J. Sartor, Town Manager
Public Building Commission
12 /84
- PUBLIC BUILDING C014MISSION
1Y
SOUTH WINDSOR, CONNECTICUT Ate.L�.,
Regular Meeting - February 6, 1985
Present : Chairman Fitts , Messrs. Archer, Blakley, Garcia, Lanza and
Stingle
Also Present : Chief Crombie of SWVFD and Architects Lawrence and Hossain
of Lawrence Associates. Consulting Engineers James E.
Berning and Walter A. Colby for Firehouse #2 Project. Charles
Kennedy of SWVAC
The PBC meeting held at the Police Facility Meeting Room opened at 7 :30
PM with the call for approval of minutes of previous meetings by the
Chairman. The minutes of the regular meeting of January 2, 1985 were
corrected on Page 2, last paragraph, second sentence to say that land
which will be deeded to the Town, rather than from the Town. With this
correction a motion was made and seconded that each of the minutes for
meetings of January 2nd and Special Meeting of January 10th be approved.
The motion was passed.
Chairman Fitts reviewed correspondence during the month which included
his letter to Town Manager Sartor with requisitions and comments on
last months activities. Documentation dated 12-31-84 for Proposal
Request 31 and 32 with Drawings of proposed work from Lawrence Assoc.
Copy of Lawrence Associates --i-etter of January 3rd to John Hoidge of
Goodell & Assoc . regarding "laymants" what to do if certain items were
not functioning properly. Letter of January 28th from Lawrence to
John Tavernesi regarding diesel oil spill on roof and treatment. Letter
of January 16th regarded types of signs available for ambulance area
and was addressed to President Joseph Russo of SWVAC from Lawrence
Associates . Charles Kennedy said he had some comments in this regard
to bring up later. , Letter to Martin Falk of GLT Industries returned
Invoice No. 204417 to Town pertaining to the failure of the zenerator
to start on December 24, 1Q84. Lawrence also discussed in this letter
of Jan nary 16th the oil spill on roof of Police/Ambulance Facility.
Lawrence said he had not heard any further in connection with the
voiding of the invoice . Locker correspondence from Lawrence to Renublic
Steel Corp. will be brought up later in the meeting. Chairman Fitts
wrote to Robert Arsenault, Director of Public Works for Town or, Jan.
28th giving him detailed information on work to be done by Town in
connection with Firehouse #2 if possible along with request for several
test holes . This letter has not been responded to as yet according to
Chairman Fitts .
A letter from Diane Taylor dated January 15th to Chairman Fitts ex-
pressed her concern with serious space problems in current quarters
at South Windsor Community Center due to postponement of activities on
the Community Center Project. He . als(o discussed in his reply to her
long and short term solutions , purchasing of telephone system and
equipment and advised that the commission still plans to visit some
operating community centers in April or May of this year - in order to
refine our earlier proposals . Chairman Fitts advised the commission
that Councilman Brown and Pitts have recently mentioned continued
interest in this project.
Chairman Fitts submitted PBC Budget to Finance Director George Spring
on February 4th and also received communication from Mayor Mitchell
on April 11, 1Q85 review date for budgets of Boards and Commissions .
Public Building Commission Minutes of Meeting t
Regular Meeting - February 6, 1985 Page 2 ' .
Chief Ryan and Capt. Guilini could not be present due to other com-
mitments but had left some notes on various items . The pigtale has
been delivered for the meeting room. A switch from Sonecor was re-
turned because it was not correct. Colonial Electric has been re-
quested to do a number of things involving pigtales which have not
been done as yet. Lights in Sallyport stay on all the time . In the
covered parking area four lights stay on all the time and only two
are considered necessary. Furniture repairs and replacement have not
yet been completed .
Chairman Fitts passed out conies of Financial Status to all rresent
dated February 2, 1085. He noted that $5,400. Universal Gym Equipment
item has been paid but was not signed by PBC.
John Tavernesi, Superintendent of the Public Buildings in Town would
like a proposal on a maintenance package with comprehensive specs .
Architect Lawrence said the consulting engineers had been contacted
and they were working on this item.
Architect Lawrence in response to a question by Stingle said he has
received "as builts" from the contractor which he did not have with
him tonight and will get copies made up and send them to the proper
people. There was discussion on $317 for Special Survey Change Order
#42 (Certification by a land surveyor that the utilities were as built ).
Lawrence also told commission that he had contact with Republic Steel
Lockers representative who have promised they would correct the situation
regarding the coat rods .
Charles Kennedy had a discussion with Lawrence about their idea of a
sign for the Ambulance area which he described as large white raised
letters . Lawrence spoke of following the same style bronze as other
signs around the building and said he would get back to us with some
proposals with price and description. Chief Crombie said sign they
needed for Company I with large white raised letters had been in the
range of $1,000. There was some discussion on having a sign on end
of driveway for ambulance area as well.
The correspondence on the wearing of the carpets and the letter from
J. P. Stevens & Co. representative Richard H. Carlson was reviewed.
This letter of 2-5-85 was written after their inspection of the areas
of concern, attached a copy of features , benefits and care recommended
for the carpet installed and noted chair pads are recommended under
office chairs with roller casters . The result is that an arrangement
has been made per our request that New England Inspection Service
will inspect the carpet. J. P. Stevens & Co. and Dalene Flooring will
receive copies of their report. There was considerable discussion on
the spots of wear after only six months, soiling and dirt retention.
The rugs had been treated with fiberseal for soil resistance. We now
await the results of the independent testing service .
Lawrence discussed his idea of a floor plan sign which could be
changed and a $500 Credit for the Directory Sign. Chairman Fitts
asked Lawrence to talk this matter over further with Capt. Guilini
and also told Lawrence there was no further activity on the matter of
the door locks . Lawrence said he would send someone over to take care
of this also.
f'
Public Building Commission Minutes of Meeting
Regular Meeting - February 6, 1985 Page 3
The change of the duct work in the communications room proposal was
discussed by Lawrence and he had a quote from Delco Air of $2,143 total,
included was $149. overhead/profit. A 48 hour labor figure from Naek
at 18' dollars per hour was over $900. with a total in excess of $3,000.
for the entire job. Tire problems causing this duct change were again
reviewed with many comments from commission members and James Bernina
consulting engineer. The drawings were also reviewed and the end result
was that Naek was not that keen on being involved in the changes and
Lawrence was asked to go back to Delco Air and get a price on them
doing the entire job.
Proposal Request #32 was for furnishing and installing a new laundry
tray type sink in the Evidence Processing Room for disposal of liquids .
Lawrence said Cannon Plumbing quoted $51�6. to put in the sink but the
contractor' s labor and cost involved in the job (12 hours labor) brought
the cost figure to 1,264. total. After discussion of the way this
Job would be done if accepted, John Archer suggested that we purchase
a four wheel dolly sink truck arrangement for disposal of liquids at
approximately $100. It was agreed that the installation of this sink
failed the "cost benefit test .
In Application for payment #19 Naek Construction asked us to reduce the
retainage figure from $6,500— to $3,000. The matter was discussed .
A motion was made by Mr. Blakley that we reduce the retainage to $3,000.
and approve the Application .410 in the amount of $3,817.12 for payment.
It was seconded by Mr. Lanza and approved by the commission.
A bill from American Lock Security Systems in the amount of 811�8.1�0 was
received. Garcia motioned we approve this for payment and Archer
seconded with all voting in favor of approval. A bill from BIT for
coat hooks and electric pigtails was $355. This bill was approved for
payment in a motion made by Stingle and seconded by Lanza. The vote
was unanimous. Charles Kennedy asked about making holes in the wall
in the ambulance area and Chairman Fitts said he should discuss this
matter with Manager Sartor.
The Firehouse #2 was the next item on the agenda and Chairman Fitts
reviewed his meeting with Council on January 14th with the resulting
go-ahead to a 81929300 addition. to Firehouse -,412. Prel 'a-M�ry Project
Budget Estimates, less costs nostnoned and work done by the Town and
Fire Departmer-1 could bring estimated ;project costs down to 81ffl,1�00.
as per attached prepared by Chairman Fitts . A o_ ossible z; - )lic hearn?
and other ways of appropriation of needed funds were discusser? and
Chm. FittO o-Lid we are proceeding on the basis of their commitment and
will work toward a set of plans which would allow us to p--o to bid .
Architect Lawrence introduced James E. Berning and Walter A. Colby of
the Berning Consulting Engineers Firm who he would like to use on this
project. Lawrence said that floor plans have been developed from an
architectural standpoint and are ready for the scope of the project
from the standpoint of consulting engineers . Lawrence passed out an
outline he had prepared dated February 6th with the adgenda for the
project for purposes of review and discussion with our commission.
This included site plan, establishing of dates and strategy for sub-
mission to Regulatory Agencies : Planning and Zoning and Zoning Board
Public Building Comnission Minutes of Meeting
r
Regular Meeting - February 61 1P8c� Page 4
of Appeals . Item 3 on his adgenda was to Present Progress Prints :
Architectural/Mechanical/Electrical to include floor plans, elevations ,
sections and schedules , HVAC systems , Electrical Systems, Emergency
Generator, etc. and on to Item 4 - Project Completion Schedule .
James Berning presented a schedule of items for the addition and the
existing building covering items under plumbing, heating_ and electrical
which he wished to discuss with us and invited comments and auestions .
The first item which came under plumbing for the addition was floor
drains with grease/sand interceptor. . He said rules regarding this vary
from town to town and Hossain commented that they would meet with the
Town Engineers and discuss this matter. James Berning said they felt
a gas fired radiant tube heating system in Apparatus Room was energy
efficient. Lawrence told Chief Crombie there are places around here
that use this system and they could go and see them.
Under Electrical for the addition there were several items starting
with providing new underground service to Northwest corner of Anparat us
room, providing new main disconnect/meter and panelboard for Apparatus
room, transfer switch for emergency generator furnished by Town as well
as other items involving wiring, fire alarm syste^z, emergency lighting
and exit si7na7e, site lighting and communication raceways . In the
Existing building there were several items under plumbing_ as well as
a new item added to relocate existing Hot 'plater Heater. Old restroom
would be removed and two new--toilet rooms would be added, including
extension of supply lines and damage. Existing kitchen would remain
but.-new sanitary line to city sewer, new gas piping and extending of
water line were listed . There was a discussion on the meeting room and
the fact that existing furnace is adequate for q0 people or so. Chief
Crombie said larger �zroups met at the Ellington Road facility. Berning
discussed code violations which exist presently and Lawrence showed the
group some pictures of the present facility they had taken. Electrical
items were discussed and Berning said this was their understanding of
the stove of the work at present. Mr. Stin.gle come-ented that many of
the items listed in the scope of the project looked to him as if they
were going to run into alot of money. Hossain said that this is like
a programming tool and they had asked for a list from the Berning Office
and we are basically asking if there is anything in the list they have
made up that you do not need or want.
Other discussions centered around new heater in new building, hanging
units vs Gas Fired Radiant Tube Heating System and Lawrence asked Bernina
to get cost estimates on both systems and come back to us with them.
The electrical items discussed will be checked out with the Fire Marshall
and handicapped facilities were also touched upon as well as heating of
the new restrooms . Chairman Fitts felt this was an exchange process and
we should give them guidance on our needs . He asked for clarification
of both the gas and electric company as to what they will and will not do.
Lawrence said they had met with Peter DeMallie, Planning Director for
Town who had indicated they had to go to the Zoning Boar? of Anneals- for
side yard variance and it was expected they would take ur this matter
at a meeting of this board on March 7th. Posting of si7.ns was discussed
with Chief Crombie 10 days before the meeting. The next meeting of the
commission will be the regular meeting_ of March 6 here at the Police/
Ambulance Facility at 7 :30 PM •
Public Building Commission Minutes of Meeting
x
Regular Meeting - February 6, 1g85 Pa?e
Lawrence discussed site and architectural progress prints and said they
had ff5 architectually and nothing as yet for mechanical drawings .
Hossain told Chief Crombie he might have to come to the meeting'-with
the Zoning Board of Appeals and state his needs . Hossain gave Chairman
Fitts the paperwork from the Planning and Zoning Commission and the
Zoning Board of Appeals . Stingle asked about target dates for bid and
Fitts said bid target was for month of June.
Lawrence said full plans continue to develop and he had a discussion
with Chief Crombie with some ideas for front of existing building.
Chief Crombie told Lawrence he did not like glass 'clock.
There were some discussions on availability of money for project and
regulatory agency approvals . Unless the council comes up with the
money it is not available to spend until the lst of July. If they
hold a public hearing it will be ready before then.
Architect Lawrence presented a requisition for $2,8[[. for 35 hours .
The amount of $298KK was approved for payment in a motion made by
Lanza, seconded by Archer and unanimously approved .
The secretary of the PBC presented her requisition for lq hours from
January 2nd to February 6th. A motion for approval of payment was made
by Stingle and seconded by Lanza. It was passed unanimously. The meeting
adjourned at 10 :30 PM. -
Respectfully submitted ,
�( le�
Kathleen L. Rafferty
Preliminary Project Budget Estimates
- Fire Station #2 New Two-Bay 2,100 Square Foot Building $100,600
less estimated labor costs for
roofing to be done by members
of the Fire Department -2,000
Total at Current Costs $98,600
Renovation of Existing Building 39,000
less labor and materials for reroofing -7,700
less replacement of overhead doors and
blocking of exterior -5,000
less relocation of entry door and in-
stallation of overhead door for storage area -600
Total at Current Costs 25,700.
Estimated Contingency Fund 8,000
Escalation to reflect project timing 4,000
Estimated Architect and Engineering Fees 17,000
Miscellaneous Expenses
(Insurance, Legal Advertisements, etc.) 2,200
Total 155,500
Site Development Costs (Estimated Labor and Supplies)
Prepare site, strip topsoil, excavate for footings 1,400
Paving: removals and repaving 7,300 _
Landscaping 2,300
Connection to Sanitary Sewer, Excavation and Backfill 8,200
Miscellaneous 2,300
Total $21,50b
To keep project costs at a minimum, these site development
activities are proposed for completion by Town employees
using materials available to the Town.
SU-2,MRY
Estimated Project Costs with all activities contracted $192,300
less items of lower priority postponed -13,300
less items proposed for Town action -21,500
less work proposed for Fire Department -2,000
Estimated Project Costs proposed for Town Council action 155,500
H.E.F 1-11-85
O L1t12 �-���O'LCUZ •
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
Soa•co AREA CODE 203/644-2511
March 29 , 1985
Mr. Howard E. Fitts, Chairman -
Public Building Commission
✓� niJ r"
239 Oak Street
South Windsor, Ct. 06074
Dear Hap:
Re: App. #1052 - Site Plan and
Approval under Section 8-24
Please be advised that the Planning and Zoning Commission voted
to approve the application of the Town of South Windsor for
a site plan of development, and granted approval under Section
8-24 of the Connecticut General Statutes, for property located
at the northeast corner of the intersection of Ellington Road
and Foster Street, as shown on a plan prepared by The Lawrence
Associates, Project No. 1870, and tmr associates, TMR No. 132-84-61,
subject to the following modifications :
1. Dumpsters shall be adequately screened.
2. Consideration shall be given to planting flowering shrubs
on the site, particularly on the island in front of the building.
3 . Prior to commencement of site work, a meeting must be held with
Town Staff.
4 . No building permits will be issued until the final plans have
been filed in the Town Clerk' s Office.
Within 90 days (by June 24, 1985) black and white transparent mylars
of Sheets S-1 and S-2, with this letter of approval reproduced
thereon, together with three paper prints, shall be submitted
to this Commission to be signed and stamped. After signing they
will be filed in town Clerk's Office.
Yours very truly,
` . PLANNING & ZONING COMMISSION
�ca �NG °E�ty
vg By: _i
Marshall Montana, Vice Chairman/
CC: R. Martel`, Town Engineer
T. D'Auria, Building Official
P. DeMallie, Planning Director
(
7-awn' 0-le S�td-A ?dl:a�
a
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
►dsOR•co� AREA CODE 203/644-2511
April 8, 1985
Mr. Howard E. Fitts, Chairman
Public Building Commission
239 Oak Street
South Windsor, Ct. 06074
Dear Hap:
Re: App. #1052 - Site Plan and
Approval under Section 8-24
In connection with the approval granted on March 26th for
a site plan for property located at the northeast corner of
the intersection of Ellington Road and Foster Street,
please be advised that the approval letter should have
noted that a waiver was granted for five parking spaces
in accordance with Section 8. 4. 1 of the Zoning Regulations.
Please reproduce this letter on the mylar before filing
same, as well as the original approval letter dated
March 29 , 1985.
Yours very truly,
PLANNING & ZONING COMMISSION
' 7 q
vg By r` 'j > Spa Lit
Marshall Montana, Vice-Chairmdn
CC: P. DeMallie, Planning Director
WINDSOR P!NANING DEPT.