Loading...
HomeMy WebLinkAboutLitigation TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION Minutes (Verbatim) - November 24, 1998 Application #98-58P, Shady Brook SRD Good evening Mr. DeMallie, I assume you're here to present this application. Yes, Chairman Castro and members of the commission, good evening. That's correct. I'm Peter DeMa.11ie. Principle of Design Professionals, office here is South Windsor. We're representing the applicant, B&M Enterprises. Brian Edward's, as you know, who is seated in the second to last row there on your right. Who is proposing a senior residence development known Shady Brook Village. With this application we're just covering a couple of things. First of all we're creating the building lot 9.11 acre lot for the senior residence development. We're requesting siteplan approval for the senior residence development. And we're also requesting special exception to enable the senior residence development to go forward. So it's really three items rolled into one application. Our design team, if I could go around the room to present them to you aside from myself. The planner for the project, Karen to your left, Karen Isherwood is the Project Engineer. Seated behind her is Robert Arsenault, Chief of Engineering for Design Professionals. To his left is Rosemary Aldridge, she's the Landscape Architect from Planametrics in Avon. To her left is Bruce Hilson, he's with Traffic Engineering Solutions from Glastonbury, he's a Traffic Engineer. Seated behind Rosemary is Dan Wright, from Dan Wright Associates, who is the Project Architect. And also representing the owners of the project Harold Cumming's, who is the Attorney, and I think that's it. 2 The location of the project, most of you probably reviewed the plans, but if I may for the edification of the public, the site is located on the north side of Strong Road. That's between the site entrances is equal distance between Bancroft Lane and Gorski Drive. Again on the north side, or other side of the street from that single-family home development. It is west of which is west of Route 5, in a residential zone, A-40 zone and is also west of the industrial zone. The industrial zone does go from basically from our entrance drive to the east and is also opposite of about half of the I believe it's called Gorski Estates, the development south of us. So as for site location that will cover that. The original submission that we had made, another project entitled Brookside Landing, which was withdrawn, was for a similar 20-unit senior residence development, but also it contained a public cul-de-sac street. And it also contained two single-family homes on individual lots on that public cul-de-sac street. After a meeting with Town Staff, they suggested a private non-cul-de-sac street, in lieu of the public cul- de-sac street. And we removed the two building lots from the application and public cul-de-sac nature of it. We also added on some acreage which is encumbered by a conservation easement in the front left frontage along Strong Road. The easement is in favor of the South Windsor Land Conservation Trust. South Windsor Land Conservation Trust at present owns a significant tract of land to the west, north, east and in fact south of this particular development. They were approached for the frontage area and they agreed to convey that to my client in the event there were a conservation easement over it. Which would encumber it just the same as if they were to own it for conservation purposes. So there will be walking trails, what have you, through out the, what was it 16 acres now? Approximately 15. Approximately 15 acres of land that the South Windsor Land Conservation Trust owns primarily to the north and west of the site. And of course that will be available for the residents of this development and also residents in the surrounding neighborhood to utilize the walking trails that they'll be t 3 developing throughout that which is independent. Completely independent of this application. Mr. Edward's, right now, is only involved with the subject 9.11 acres. The remaining land to the east is owned by Bancroft Brook LLC, and the other land surrounding it is owned by the South Windsor Land Conservation Trust. The subject application tonight, Shady Brook Village, as I indicated is 9.11 acre tract. It's a proposed senior residence development, which is as we've done in the past. As Mr. Edward's has done in the past, is an elderly condominium form of ownership. They're proposing 20 dwelling units. All with an attached garage. All with a full basement. All with two bedrooms. Approximately 1,400 square feet of living space. One floor living. They're a low profile ranch-style homes. Four of those, four of the buildings will be, as you can see around the cul-de- sac there. Four of the buildings will be attached residences with four units each, and if I can maybe use this pointer here. Those one, two, three, four right there, those are the attached units. Four to a building. And then we have in this area down here, we have four units, all detached. Two of which have a two-car garage, which is new. And two of which have a one-car garage. Bailey Circle, which is the street that'll enter this development, again is a private street. It will;terminate in an island green of, cul-de-sac if you will. Not unlike that at Porter Share. There is a common parking area, with a total of 13 parking spaces within that island, for visitor parking. There are also 22 garage spaces. Again that's one for each unit, plus a second space for two of the detached units, as I mentioned. There are 22 driveway parking spaces for a total of 2.87 parking spaces per unit, or 57 total. Your regulations require 30, which is I believe one and a half spaces per unit. The conservation easement area, which is if I can point down right in that area there, that is a two acre encumbrance for the South Windsor Land Conservation Trust. And there are no improvements whatsoever, proposed in 4 kalgAtL_ that area at all. It'll be identical in nature to the conservation area that they have on the balance of their abutting tract. Your regulations allow for eight dwelling units for net buildable acre. That's after we take out for the wetlands, floodplain and any steep slopes on the property. And we show 2-1/2 units per net buildable acre, the computations as shown on the plans. Inpervious coverage you allow up to 60% on the property over the 9.11 acres, and we're proposing 16%. Substantially reduced from what is allowed. This is a first mixed use single-family and multi-family elderly condominium in the senior residence development. A form of ownership that's been proposed. The first development for individual single-family homes, of course, was Collins Hill one and two, along Sullivan Avenue. That's been approved and actually fully built out. So that was the first detached complex, elderly condominium. And the first attached complex was Wyndemere Court, on Nevers Road, which is I believe 14 units, the first one done by Mr. Edward's, both of those. And that was the first of all the senior residence developments. All the others, of course, Porter Share, and Collins Crossing were attached 20 unit senior residence development. So there's a little bit of a mix mixing the single-family and the multi-family on this particular site. Mr. Edward's and his advisors on this, marketing people, are convinced that there is such a demand and they've been getting a lot of feedback from many prospective purchasers of these types of units. And it seems like there's demand to go to both single-family and multi-family as your regulations were amended to allow. And we're trying this out on this development here. We have incidentally, we have submitted a separate special exception application, as of this date, for one individual lot, that area right there where there is a house, it's 2.73 acres in size. It's for an interior lot, it's not the subject of the hearing tonight. It will be the subject of the hearing, I understand it might be as early as December 8. What we're requesting is that the commission defer any action on this application until after you've heard that particular item, and after you've acted on that particular item. By virtue of the fact that your interior lot regulations do not allow a interior lot subdivision after the first lot is cut out, which would be the case with this subject application. 5 I'd like to bring a few things to your attention, first is that there is a 50' right- of-way along, a common 50' right-of-way, where the entrance in fee that we have to our development, which is right in this area right here. Glen Knafel, the property owner north and east of our entrance drive, has an unbuilt lot. And that has rights over our right-of-way. So in other words, that lot could be access potentially, by virtue of the legal instrument he has on file over our proposed private street. Also, I'd like to bring to your attention, I'll submit for the record, that Mr. Edward's has secured from the abutter on either side of the entrance drive, authorization to clear any branches, vegetation which may be obstructing the siteline for the entrance drive. That's the Winton Property and also the Charette Property, and I'll just submit those to Mr. Iazzetta if I may? The commission has zoned this land for residential uses. The property to the east is the industrial zone, including that across from Bancroft Brook, or Bancroft Lane as I mentioned. It has been brought to our attention that there is some noise generated sometimes at odd hours by industrial use to the east, known as Preston Trucking. It's been brought to our attention and I'd just like to bring a few things for the record. First of all, our particular site, the closet unit to their property line is 500', approximately. That's that single-family residence right there. That's the closest we are distant from their property line. Which is a relatively significant distance, but as you know sound does travel. Also, I'd like to bring to your attention just that not only in your zoning regulations, but also, by virtue of a town ordinance and statutes, any noise that exceeds, in other words any objectionable noise which exceeds noise level between industrial properties and residential properties, is an enforceable action by your zoning enforcement officer. And as you know he's got a meter. It's not as good as the one that the police department has but he does have a meter for monitoring any noise generating between industrial and residential properties. 6 Also, the police department, within the last year or so, secured a much more sophisticated instrument for measuring noise levels between industrial and residential properties and in fact police officers received training in the use of that instrument and they are they of course are in charge of enforcing the town ordinances of the town. And there is a noise ordinance of the Town of South Windsor which is in addition to the zoning ordinance that you have embodied within your zoning regulations. So you have, through your zoning enforcement officer, through the police department, there are measures to enforce the state, local ordinance and the zoning regulations regarding any noise that might be generated, which is objectionable. And we trust that and we hope that that would be enforced so that nothing objectionable is as far as noise goes, permeates off the industrial property into residential areas. And of course, this commission has zoned this area for residential purposes. The application was unanimously approved by the Inland/Wetlands Agency last Wednesday night, that's on November 18. Just to let you know they were considering, during their deliberations, they considered stormwater drainage, the two detention basins. And how we took effectively, in our opinion, took measures to control erosion and to minimize impact on the wetlands. There is very tiny wetlands impact. It's only where the two detention basins that we have in the northwest and northeast comers of our site, discharge into down toward Bancroft Brook. In fact, Jeff Folger recommended that he seek the advice of the soil conservation services engineer, who was brought in on the project. And he had made some recommendations for modifications to the plan which were incorporated. They also looked at issue of flooding, and we have zero runoff increase as our engineers are going to represent to you. And we're not having an impact at that. There are other things that Mr. Folger indicated, in his opinion, which were affecting flooding. And he indicated it was predominately downstream obstructions, beyond the control of us or immediate abutters. i Of course, we've gone before the Architecture Review Committee, and I trust their recommendations will be favorable. We still need to go to the Water Pollution Control Authority. t 7 We have notified a little bit twist on the norm. We have notified, at the request of the Inland/Wetlands Agency, and only with this application, this is the first one I can think of. We notified all abutters, plus all parties who have properties within 500' of our subject site, of this application, as well as the Wand/Wetlands Agency Application. We did that by certified mail/return receipt. And that was provided to the Inland/Wetlands Agency. Next, I'd like to introduce Karen Isherwood, who is project engineer,just to review quickly the engineering aspects of the plan. Karen? Good evening. For the record my name is Karen Isherwood, and I'm the U,�Ucje0ct Engineer for Design Professionals, here is South Windsor. There are only a few engineering issues related to this site. Bailey Circle is a 24' wide private road used for access to the 20 unit senior residence development and the single family lot. Public utilities will be are available in Strong Road. Water, directly at the intersection of Bailey Circle and Strong Road and sanitary sewer will be connected via gravity flow at the intersection of Gorski and Strong Road. We're planning on bringing the sanitary sewer up the remainder of Strong Road to Bailey Circle and bringing it up Bailey Circle to the residences. Strong water attenuation and quality are achieved using attention basins. We've designed two dry basins in the northwest and the northeast corner of the lot. We've designed the dry basins to maximize detention and minimize peak flow. Doing this has allowed us to achieve zero increase and runoff, which is required. Both detention basins also discharge to Bancroft Brook. The soils at discharge are classified as , and are known as being highly erodable. Therefore, we need to take extra precautions to minimize this chance. We're providing tow drains along the perimeter to intercept groundwater and prevent bleeding through the soils which could cause erosion. We're also providing two plunge pools at each discharge. One at the top of the slopes and one at the bottom of the stone rip rap channel, at the tow of the slope. 8 We are providing an operation to maintenance schedule which will detail ,�& emporary and permanent erosion and sedimentation control measures. And we're also noting in our sequence of construction, the need to stabilize these detention basins before we put any stormwater, before we discharge any stormwater into them. We are in receipt of the town engineer's comments and are able to comply to all of his comments. At this point this is the extent of our engineering for this site, as I said it was very limited. And we will be able to answer any questions following the presentation, regarding and sharing. Thank you. Rosemary Aldrige, the Landscape Architect from Planametrics next, is going to present her landscape plan, including buffering. Good evening my name is Rosemary Aldrige. I'm a licensed landscape *qA- architect with Planametrics from Avon. And I've prepared the planting plan and lighting plan for the project. The purpose with the planting plan was threefold. First of all to provide some buffering and screening to our residential neighbors. To provide some shade in the parking areas, drives and on the west and south side of the units. And also to provide color and texture, seasonal interest in all four seasons of the year. Just briefly, the there's a mix of planting on the site. A mix of evergreen trees, deciduous trees, and shrubs and ground covers. And the first issue with buffering and screening to our residential neighbors. On the south side of the site, I've provided an area of a mix of evergreen trees and shrubs. Actually, let me change the drawing so you can actually see the planting plan. So you see, again you see an area along the south side of our property line a mix of evergreen trees and shrubs. For the evergreen trees I've chosen Fraser Fir. Deciduous trees some white birch and also Northern Red Oak. For shrubs a mix of some shade tolerant shrubs as well because we do have some existing trees along our property lines. And so those this planted area would be on the north side of existing trees. So we need some shade tolerant shrubs, some vibernums, witch hazel and that type of thing. 9 Atvy� Tall growing plants that will fill in from ground level up to eight to 12 in height. So there's a mix of those with very tall growing evergreen trees. Along the driveways and around the parking lot we have Northern Red Oak, we have some Shablow in some of the frontyards here, which is one of our small native deciduous trees. Just providing some shade and some color and seasonal interest for the fronts of the units. We do have some existing trees all along this north side of the property which will remain and along the west side of the property that will remain. And then looking out from the backs of the units, again some seasonal interests, some small flowering trees. Some crabapples, again some Shablow, some native shrubs such as Winterberries and Bayberries, again for that seasonal interest. And then we have also, the two detention basins. One in the northwest side and I guess you'd call it the northeast side. And on these slopes on the sides of the basins I've proposed some Red Twig Dogwoods, against some viburnums and winterberries, those native habitat type shrubs. And then at the tops of the slopes where we're dealing with some rather dry, sandy soils, again the bayberries, which will do very nicely in that type of situation. So, as far as general the screening especially, it's really all around the site, a mix of evergreens and deciduous. The intention is not to create a solid hedge of material but some very natural groupings and so prominent views from residential neighbors to our south would be very subtlety screened by strategic groupings of trees with tall growing shrubs in between. I'd be happy to answer any questions that you have. Thank you. We have a few more presenters. First I'd like to introduce to you Dan Wright, whose the project architect. And Dan has some plans that he'd like to present to you for the single-family detached residences. And also the multi-family attached residences. My name is Dan Wright and I'm the Architect for the project. My office is in Vernon and 49 Hartford Turnpike. The first drawing, closest to the commission on the right, on the floor, is a plan and elevations of the single- family (tape change) 10 uh the drawing on the easel is the elevation of the multiple unit building. And then to the left on the floor is are some photographs of the Collins project, which the units are basically the same units and the materials be the same, and so on. For Shady Brook we've got four detached units. 16 attached units and four buildings of four units which you've heard. Arranged in a New England green kind of a format. Two detached units have 2-car garages. All the other units have a single car garage, attached. All units are one-story and full basement. The detached units are 11400 square feet a piece. The eight end units of the attached buildings are 1,398 square feet a piece. The eight interior units are 1,352 square feet, slightly smaller units. All the units contain two-bedrooms, two full baths, a living room, kitchen, dining room, private deck. A main level laundry. Lots of closet space and cathedral ceilings. There is an option for handicapped accessibility to a number of the units. They're traditional style buildings. Low maintenance material exteriors. Earth tone clapboard style vinyl siding, with white trim. Which give us a two-tone, two-color appearance for all of the buildings. The different attached buildings, the four different attached buildings would be of different colors, the entire building would be the same color with white trim. But each of the buildings would be slightly different color, in earth tones. There would be some brick areas, some brick focus areas. Asphalt shingles, again in earth tones. And the building height would be approximately 22'. As you see on the floor the third drawing, or the third (cough) the third board is in fact the units that have been built at Collins Crossing. We envision these units to be basically the same, very similar. The floor plans are the same and it's not often that you get to take photographs of a proposed project. And in fact what is labeled as Shady Brook Village should probably read proposed Shady Brook Village. And questions? Okay. 11 �Uh, Bruce Hilson from Traffic Engineering Solutions will be addressing you regarding traffic aspects of the development. Good evening. My name's Bruce Nilson I'm with Traffic Engineering Solutions. My office is located in Glastonbury. I've been doing traffic engineering in the State of Connecticut for 20 years. I'm a registered professional engineer in Connecticut as well as other states in New England. We performed a traffic study for the proposed development. It's entitled Brookside Landing, which was the original name of the development. It's since been changed. The report was dated August of 1998. We addressed essentially the innersection of Bailey Circle with Strong Road. The amount of traffic, the volume of traffic that's going to be generated by the 20-22 units on site, is going to be very diminutive. For instance during the morning peak hour fewer that 20 vehicles an hour, both coming and going, 13 one way, six the other thereabouts. In the afternoon, again, fewer than 20 vehicles during the entire hour. So we focused on the intersection of Bailey Circle and Strong Road. We looked at two aspects. One the ability of that intersection to handle the traffic. What's its operating level of service. And secondly, whether or not the sitelines would be adequate to allow vehicles to safely enter and exit the site. Strong Road runs in this direction, east/west. About 700' to the west is Main Street and to the east is Route 5, John Fitch Highway. Bailey Circle will intersect from the north, and what we found is with the traffic volumes that are presently traveling Strong Road and the traffic volumes coming and going from Bailey Circle, that all movements, left turns,- right turns, entering and leaving will operate at a level of service A. Which is the best level of service that you can achieve. They also looked at the sitelines looking from Bailey Road to the east, and then Bailey Road, excuse Bailey Circle, toward the west first and then toward the east. What we found is looking toward the west we can see 470'. And 12 the reason we can't see any further is because the road goes down hill rather abruptly and cars disappear beyond that. We can achieve that siteline by clearing some a couple of small trees in the front yard of our neighbor. And as indicated earlier, we do have a letter from the neighbor willing to allow that to take place so that we can achieve the sitelines. As a point of reference the looking toward the west from Gorski Drive, which is in this general area here, looking toward the left. Their siteline is about 305'. So we're more than 150' better as far as our intersection site distance is concerned. Looking from Bailey Circle toward the west then from Gorski Drive looking toward the west. Looking toward the east, the siteline is about 500'. A little better than 500'. We compared those with the intersection site distances recommended by the Connecticut Department of Transportation in their design guidelines. And we used the prevailing 85th percentile speed. We obtained the 85th percentile speed in conjunction with the traffic counsel we made. We put a machine out there with tubes going across the road. It counted the volume of traffic. And also the speed at which the traffic was traveling. We found that the 85th percentile speed, in the eastbound direction, coming from the west going this way, is about 41 miles per hour. Traveling in the westbound direction from the right, going toward the left, is 40 miles per hour. In the report we have a table that presents the minimum as well as the desirable intersection site distances. We find that looking toward the right we fall midway, and in fact a little better toward the higher end of that framework, minimum to desirable for the prevailing 85th percentile speed. Looking toward the left, or toward the east, we found that the intersection site distance that we're able to provide will virtually meet the desirable intersection site distance presented in the Connecticut DOT highway design guidelines. 13 Again, let me reemphasize the 85th percentile speed is the speed at which 85 percent of the drivers drive at or less than. And that speed is 41 miles an hour in one direction and 40 in the opposite direction. And in fact, we found from our speed study that fewer than one percent of all the vehicles that drive Strong Road, travel at speeds of 50 miles an hour or greater. That's five vehicles during an entire day. Out of the 500 vehicles that travel Strong Road. Our conclusion is, that we feel that the level of service, being level of Service A, is very good. And that the sitelines that are provided, both entering and leaving Bailey Circle, are more than adequate to allow drivers to enter and leave safely. We conclude that the development of this 22 residential units, will not have any detrimental impact on traffic operations or safety in the area. I'd be happy to answer any questions after the completion of our presentation. Thank you. Also, we have two more short presentations. Hal Cumming's would like to introduce something into the record, followed by Cile Decker. For the record Peter, I take great exception to your opening remarks. This is MTnot an elderly project. This is a senior project. Anybody 55 or older can live their. And since I'm 53, I'm not ready to call myself elderly. Senior maybe, but not elderly. I my approach, I'm submitting this exhibit is a copy of the proposed deed from the South Windsor Land Conservation Trust to Bancroft Brook Limited Liability Company by way of a little background. I represent both Bancroft Brook Limited Liability Company and also the South Windsor Land Trust. Sometime ago the current owner, Bancroft Brook Limited Liability Company deeded the acreage to the South Windsor Land Trust. South Windsor Land Trust is the present fee owner of all of the adjoining land between the proposal area and the Bancroft Brook including Bancroft Brook and the land to the other side, to the north of Bancroft Brook. And also to the west. R 14 The land trust acquires parcels two ways. Either we'll take an outright deed in fee. Or we'll take a conservation easement. As far as the land trust is concerned we don't care whether we own or whether we have all rights of control over the property for conservation purposes. As you review that deed, you will note that in fact we use the format of the South Windsor Land Conservation Trust Easement when the town takes land. Under a conservation easement. The same language is used as in this deed. Essentially when the property owner, Bancroft Brook, deeded the land to the land trust at that time the intent was a town road going in where you see Bailey Circle. And at that point the land owner had no issue and just deeded the land to the land trust. Subsequently, when it was discovered that the town road requirements wouldn't be met, the property owner approached the land trust and requested as a part of the application, that this area be reconveyed. Since the land trust would've taken rights under an easement in the first place, as far as we're concerned, it's a neutral transaction and the area that you see to be deeded to land trust with the conservation easement back, as you look at that deed you will see the land trust has full control over the property. Nothing can be built. Nothing can be done on that property. And also it's total right of access for land trust purposes. Again, I wanted to go into that a little bit simply because the land trust is very concerned that the town realize, and this board realize, that it takes it's responsibility to maintain in the natural state, the properties that it acquires, either by deed or by easement. And the practical affect is that property will continue in a conservation state in a natural state, under the full control of the land trust, as you see in the deed. Thank you. Cile Decker from Cile Decker Associates would like to make a few remarks regarding the demand for this project based on her experience. Good evening. For the record my name is Cile Decker. And my company is Coldwell Banker/Cile Decker Associates. I have been, my company has marketed now for subdivisions for B&M Enterprises which are Senior Residential Developments and Hal's point is very well taken.. 15 Just for a little background explanation. 55 is the magic age. We actually had one person move in who was going to be 55 by the time the closing happens. So you can see we have the younger end of the spectrum. And recently we had a closing with a woman who had just celebrated her 91 st A birthday just prior to closing. And that was in the last subdivision that we've just completed. So I want you to understand-that there's-a broad spectrum of people who are very, very interested in this project. The kinds of people that we're getting into these projects are varied. Some of them are people that have lived in South Windsor for years, that now want to scale down and decided they wanted a smaller home. Some are people who travel a lot. And they decide they don't want to have their big homes anymore, they want to have a different lifestyle,an easier lifestyle. And they can leave for six months out of the year and feel comfortable with these kinds of units. Many of the people are coming from out of town, and out of state. And they seem to be people who have children who live in this area. And they now want to come and be near their-, they've maybe never lived here. And they want to be near their children and their grandchildren, etcetera. So, the spectrum of people is very, very broad and very,_very appealing. And we've done, I think B&M and the people who've been involved with these projects in providing aesthetically the things that people want. As well as all those things that are needed to suit their lifestyles. We've studied different ways of going and we know what the needs are and the kinds of things we've done. With the central air, and the first floor laundries, and the attached garages and the full basements and all those things. These are the things that we find that are needed. We do follow-up with the people that have moved in and people are very, very happy with the units. We have a list of people that call the office and say if something comes available at either Wyndemere or Porter's Share or either one of the Collins Crossing, Nevers Road or Sullivan Avenue, please let us know. Well we just don't have any turnover in those areas, because people are very, very much satisfied with them. 16 And right now, without trying to do any marketing or those kinds of things, I can tell you that we have quite a list of people who are interested to know about the next project. Who've called us in. We've even had people who've offered to give us deposit money on the next project. Obviously I can't take deposit money. But, not even knowing what the projects going to be. Not even knowing, really, where it's going to be. But just that there is that kind of interest. So, I guess my purpose here tonight is to tell you if you have any reservations about the need for any additional program like this. An additional subdivision like this, it's certainly there. I could probably provide you with at least 20 names right now, of people who are interested. And it's very well known in the community that these projects are doing what they are supposed to do. And I'll be here later if you have any questions. Thank you. Thank you Cile. I'd just like a few concluding remarks. You've heard from our traffic engineer. And he indicated that we're going to have low, I think the term he used was diminutive, levels of traffic volumes egressing and ingressing to and from this project. We also learned-that the siteline is more than adequate at the street intersection. In fact it far exceeds that of Gorski Drive,just to the west of us in the subdivision to the south. We've also learned that the landscape architectural aspects, I think as Rosemary reviewed how she's proposing to landscape the development. It's beautifully landscaped and also she's has adequate buffer treatments to screen this particular development from abutting uses and vice versa for the abutters. Also, we've learned that the engineering aspects of the development, in terms of flooding, we have zero runoff increase. We're going to have zero impact on the floor waters down in Bancroft Brook. That, of course, is primarily contributed to downstream effects. We've also, if you look at your purpose of the Senior Residence Development, I urge you to take a look at that section 412A, which addresses the need for senior housing in the community and how this type of development can meet and address those needs, unmet needs, as Cile Decker indicated there is significant unmet needs in this community. 17 And also if you look at that same Section D, your review criteria for special exception in here and you go down through that list and you'll find that we meet or exceed those conditions or requirements for a senior residence development. For example, we're in close proximity to permanent open space as the South Windsor Land Conservation Trust land is contiguous to this. It will have walking trails throughout that available. There are other, there are houses of worship in relative close proximity to this site. And recognize also, that this is a development that's designed for the motoring public for residents who will have motor vehicles. In fact, every single unit has a one or two-car garage. So they can easily get, go down Strong Road and get to the other facilities in close proximity within the Town of South Windsor. So we believe we've presented a development which will have extremely low impact on the neighborhood. It can be nestled in here. Very low traffic volumes as Dan Wright indicated. Attractive residential scale. In fact, only one story buildings and with the buffer treatments you're really not going to know that this development is there. With the exception of the entrance driveway which will be a privately maintained road. And as far as the tax impact, they're going to be paying their taxes, all the residences here. Residents here. And they're also going to be maintaining the entire infrastructure here. There are no expenditure of funds on the part of the town to maintain any part of the infrastructure. It's not a public road. Not a public storm drain system. So it has very low impact and reasonable taxes that will be paid to the town so it will have a net benefit to the town from a tax perspective. And, of course, the no impact on the school system whatsoever other than dollars available to assist the school system. So with that we'd like to conclude our formal presentation. But everyone here is available for any questions from the commission. Or questions from the public through the chair. And we'd be glad to address any of that. Thank you. 18 Thank you Mr. DeMallie. Mr. Iazzetta, I believe you have some Planning Department comments. And Engineering comes next. Good evening. Unfortunately Marcia is unable to attend this meeting. She was involved in an automobile accident so I will be filling in for her. I do have her comments here, which I will read for you for the record. This is a request for a resubdivision, special exception and siteplan approval to construct a 20-unit senior residence development on Strong Road. The subject site property is 11.84 acres, with one lot of 9.1 acres for the SRD, and the remaining parcel with 2.73 acres. The applicant has just filed an additional application for a special exception to allow an interior lot on the 2.73 acre parcel. If an interior lot is to be created from that remainder parcel, it must be done prior to or prior to simultaneous, that's the way it reads, with this SRD subdivision. Or the right to create an interior lot will be forfeited under our interior lot regulations. Number 2. There are existing single family residents to the south and west of the proposed Shady Brook Senior Residence Development. To the east is an industrially zoned land and uses, including Preston Trucking. There is an existing 50' right-of-way along the new driveway to the industrially zoned rear property currently owned by Glen Knafel (see sheet three of your drawings for location of the Knafel property). To the northeast is property of the South Windsor Land Conservation Trust. We would also note the presence of a 10' strip of land belonging to the Land Trust surrounding most of the property. The town staff are concerned about this 10' strip of land, as it will be exceptionally difficult for (tape change) . . . for residents and neighbors to differentiate where Shady Brook land ends and the 10' strip of Land Trust property begins. Number three. The proposed density is 2.4 units per net buildable acre. Maximum eight units per net buildable acre are allowed. Maximum number of units in a senior residence development is 20 units. Proposed impervious coverage is 16%, 60% is allowed. Required parking is 1.5 spaces per unit, or 30 spaces. The applicant has provided 57 spaces or 2.85 spaces per unit. It appears that all other zoning requirements are met. 19 Number four. There are regulated wetlands on the site. The Inland/Wetlands iy6t'12� Conservation Commission approved the application on November 18th, with a $10,000 bond and an approval condition requiring the design engineer to oversee the installation of the detention basins. If this application is approved it will bring the total SRD units approved up to 72. The maximum number of units that the commission may approve is curing capped at 115. Number six. Public water is available on Strong Road. Public sewer can be extended from Gorski Drive. WPCA approval is required. If the development will have curbside refuse collection and recycling, a hold harmless agreement and permission to enter form, will need to be provided to the town, to allow the refuse and recycling vehicles to enter the site. Number seven. Sergeant Tom Field, the South Windsor Police Department Traffic Authority, has reviewed this proposal and has the following comments. This is dated September 18th, 1998. I viewed the site on Strong Road, Shady Brook Village, and found that existing shrubs and trees at 90 Strong Road blocked the siteline west. The view to the east was also blocked by shrubs and trees and SNET telephone pole #2204. Strong Road at this site has very little traffic going by the proposed road. The two proposed houses are very close to the existing Preston Tracking terminal. We have had and continue to receive complaints of noise from residential homeowners living near industrial zones and truck terminals. Signed E. Thomas Field, Sergeant, South Windsor Police Services, Traffic Unit Manager. There is a 25' buffer requirements around the site perimeter in addition to the yard setbacks. The applicant has included cross-sections, as required, to demonstrate the buffer. Number Nine. The Human Services Department has provided a memorandum regarding the provision of senior residence development. 20 jell This is dated October 12, 1998, from Human Services and Adult and Senior Services Director. Subject: Senior Residence Development. In response to your request for input from a senior resident's perspective, please be advised as follows: According to a survey of American's age 50 and older, done by the American Association of Retired Persons, quote understanding senior housing into the next century, end quote, dated September 1996, older people are very diverse in their housing needs and preferences. Seventy percent of respondents believe.that their current residences where they will always live. This finding seems consistent with an 1989 and 1992 survey also conducted by AARP. It seems fair to assume that thirty percent of the senior population will be looking at other ways to meet their housing needs. Senior residence development's seem to be well received by the seniors that have moved into these homes. In keeping with the overall finding of AARP survey most of these folks plan on staying in these homes and never having to move again. A portion, approximately 1/3 of this overall senior population will at some time, or regularly, use the senior center, require transportation. In home services. Meals on wheels. Outreach. Medical. Education. Social Services. Family Meetings, etcetera. It is important to note that this will have an impact on the senior service delivery system in South Windsor, as this addition to our senior population ages in place. Signed Valerie Bellard? Continuing. Number Ten. The Special Exception criteria's for review of an SRD include: Traffic impacts will not be detrimental to the residential character of the neighborhood; There will be minimal adverse effects on existing uses in the area; Surrounding property values will be conserved and the character of the neighborhood will not be unduly disrupted; 21 Impacts will be not be detrimental to the capacity of the present and proposed utilities; street, drainage system, sidewalks and other elements of the infrastructure; The land is physically suited to the proposed use and minimal adverse environmental impacts are created; The SRD proposal is consistent with the goals and objectives of the Town Plan of Development; The SRD proposal will help meet senior housing needs of South Windsor; The location of the SRD facility is within reasonable proximity to community facilities or amenities; which serve the needs of elderly residents; or is within reasonable proximity to indoor/outdoor activity centers, or is within close proximity to or contains permanent open space; The SRD facility has been designed to meet the needs of handicapped residents or visitors; The architectural design is aesthetically pleasing and low profile. If this application is approved the Planning Department requests no additional approval conditions other than as already noted. And this is from Marcia Banach, Director of Planning. Take a breath. Okay, the engineering perspective as Karen indicated we have about a page and a half of housekeeping items, but I'd like to highlight a few of them. As little as possible after reading Marcia's comments. We have reviewed the revised drawings dated 11/17, for the proposed Shady Brook Village and have the following comments. Strong Road's street lines should be established by monumentation and deed along the frontage of this property. There is two pieces that they have along Strong Road. r 22 A catch basin should be placed on the west side of Bailey Circle at Strong Road. Outlet protection is required at the outlets of putting drain outlet pipes. The profile from station zero plus 51 to three plus 50 plus or minus, should be revised to eliminate the changes in grade between two plus 0 and two plus 50. Sanitary sewers as shown, is at a 2.4% slope. The town standards indicate that the velocity in the pipe should be greater than or equal to 2.5' per second in the upper reaches of sewers. Applicant must show that a minimum of 2.5' per second flow is proposed. I also have a comment from Jeffrey Folger the Zoning Enforcement Inland/Wetlands Officer. It's dated 11/23/98. It concerns the location of the stormwater outfall on Shady Brook Village. He says; I would recommend moving the location of the level spreader associated with the northwestern stormfall outfall approximately 30' to the south. Which will put the spreader just south of the number 75 wetland flag. In examining the location of the proposed northwestern stormwater outfall, it appears that the current outfall location will result in a higher risk of erosion and entail a greater level of disturbance because the spreader would have to be placed in and through an existing berm. And directed at the brook. The revised location will result in stormwater flows taking a longer, flatter route to the brook, thereby increasing the attenuation of pollutants and slowing flow velocities. As he indicated this basically just came on board yesterday and I do have a sketch here that the proposed change which isn't on your drawings. Thank you. Thank you Jerry. At this time we go into the audience and I'll for people that would care to speak in favor and speak in opposition or have a question. I would ask that all questions come through the chair. We'll try to get an answer for you. So is there anyone here that would care to speak in favor of this application? 23 I have a question. Well you'll have your turn sir. You have to pay attention when I call for participation. Yes sir, would you step to the microphone and when you're done, Jerry do you have a piece of paper there where we can . . . ldt� It's right here and there's a pen and a pencil. Okay. <Arw The UCONN game is on tonight I want to get home. I won't take too long. My name is Eugene Flynn. I live at 21 Cityview Terrace. That's at Collins Crossing. We've been here now in the Town of South Windsor for approximately a year and a half. We lived in Windsor for 38 years and the move here was very traumatic and you know, it was not easy to do. But we did come here and someone called me and asked me to come down tonight and talk to you about B&M Enterprises and Brian Edward's and I never heard of these people until a year and a half ago and but wonder why I'm coming here at all tonight. And I guess I'm here tonight to say thank you to Brian Edward's and to B&M Enterprises. The project that we live in, if you can call it that, it's like beautiful. It's heaven. We have 18 units over there. We're all detached. We all have our own garages. We're all very compatible with each other. The quality of the work that was done on the project I think is superior, in my own opinion. The minor things that did go wrong were fixed, they were fixed in a timely manner. Although some people perhaps thought they weren't fast enough. But all of this was done and it was done in a good way by Brian Edward's. And I think they have an A team and I'm a tax payer in South Windsor now. And I'm concerned about what comes in here. And I think this type of project is needed and necessary. And I think the people that did the job up there should be allowed to do a few more. And so I just want to thank them and thank you for listening to me. Thank you very much. Thank you sir. Is there anyone else who would care to speak in favor of this application? 24 My name is Amy Pankowski. My husband and I have been residents of South Windsor for 40 years. We owned a big home. And decided we wanted to downsize and at that time Brian was building Collins Crossing so we bought one of his units. We're over on Hunter Drive and we enjoy it very much. And I feel that Brian has done a wonderful job in meeting the needs of the seniors. And I also think that there is a greater demand, as indicated by the cars that come in and out of our area. And also I have a petition here that was signed by a group of the people. And I'd like to read it. We the undersigned, although not able to be present for the public hearing, would like to make our thoughts known respecting the proposed senior residential development called Shady Brook Village off Strong Road. We hope you will accept this into the public record. We are residents of Collins Hill One and Two the Senior Residential Development off of Sullivan Avenue. We are happy to be in South Windsor. We hope you approve this project because we feel that there should be more senior residential developments in town. Some of us have family members of friends that would like to live in a similar community. We are aware that Shady Brook is in the process of approval, so we wanted to endorse this project as we feel it will be a boost for the Town of South Windsor, as well as an additional location for seniors within the town to reside. We are very happy with this unique, quiet community of our senior peers, and hope you will consider favorably, Shady Brook Village. We respectively ask that you accept this into the public record. Thank you. If you care bring it forward, we'll put it into the record. Also, could you print your name and address on that sheet that's on the podium. 9&tv�- Thank you. Okay. Is there anyone else who would care to speak in favor of this application? Yes sir. 25 My name is Stan Terlage and I'm at 11 Collins Crossing_ And I guess I can "T- only repeat what my cohorts have repeated. I'm one of those transferee's from another town that came into South Windsor because the need for senior housing was there. I think the town should be lauded that they got out of the gate faster than my town did. And had something like these senior developments in South Windsor. I'm happy at Collins Hill. I think the hill's been transformed into a place of beauty. We did have some problems in all. They were adequately taken care of. And I think there's a big need for more of this housing because we seniors are a growing group and we all want to downsize and get rid of those chores of maintenance and shoveling and so forth. But we're not quite ready for assisted living,.such as going up in the center of town. And this adequately meets our needs. And we're happy where we are and I think that that will be the same for any resident's of the new project. Thank you very much. Thank you sir_ Can I get you to print your name and address on that sheet in front of on the podium? Thank you. Is there anyone else who would care to speak in favor of this application? Is there anyone who would care to speak in opposition or have a question? Yes sir, in the back. 7Mr. Castro would it be possible, I,mean some of these diagrams are very refined and beautiful, and photographs and so forth. Is it possible to have a five minute break . . . OA2&z Sure, we can do that. I'll call a five minute recess at this time and we'll resume at about quarter to. Is that okay? Okay we'll call the public hearing back to order. And at this time again, we will ask for participation from the audience. People who care to speak in opposition or have a question. Yes ma'am. I would also ask that you when you're done to sign the you can do it after you speak . . . 26 My name is Laurie Charette, and I live at 90 Strong Road,which is right on the corner of the right-of-way going into that land. I have some questions t6UIL concerning the traffic, basically. Living right there, I know the siteline isn't exactly accurate as to what the traffic company was saying. Excuse me. I know we have a very hard time pulling in and out of our driveway, due to the sun rising in the east and setting in the west. Depending on the time of the year you can't see up or down due to the sun. Also, there's a little berm which is west of my driveway. And there's a little bend in the road, which makes the siteline very difficult to see. And the hill at the bottom of Strong Road, which faces west. One of my concerns is there's eight kids between the ages of ten years old and four months old in those four houses along Strong Road. And you know, there is a lot of traffic, they speed up and down that road. You know, the machines that they uses, aren't accurate. I would say the average speed is 45, on that road. From standpoint of standing in my driveway and just watching cars. And I've contacted Officer Fields about this, to no avail. And my question is where do I go to see if I can get a stop sign put in at that intersection to slow traffic down. Because now I'm going to have four places that I have to look when I'm backing out of my driveway. One being the proposed road, Gorski east and west on Strong Road. And I have a hard time getting out now. I mean, you know, I'm not looking to get hit or anything but it's a dangerous spot right there. Because of the berm and the bend in the road, and the hill. Um, my other question is the road's going to be 25' wide. How far from my property line is this road going to be, if I can get an answer to that. Um, I realize it's a private road. And some of the questions I have here have been answered. Another question I have is is this going to effect the value of my property? You know these are basically, by looking at it they're like condo units. And is it going to effect the value of my property right now. Right now we're in a very desirable neighborhood. I have a small ranch. But across the street from me U gave $200,000 homes. And behind me now, you know, and I'm not completely opposed to this. I enjoy looking out my back window and 27 seeing nothing there, but I just want to know is this going to effect my aALat�l property value? And is it going to be lower than what I've got invested into my property? And I'd like to know what the price of the units are going to be so I can kind of base what my home is worth now? Or what my home may be worth. I'd like to know when construction's going to begin. Is it going to begin in the winter, which, you know, heavy equipment going in there clearing land. I'd prefer to start when my windows are shut, as opposed, because we have a backyard pool. You know with the kids and stuff back there, and I would prefer, you know, a little bit of quiet. Speaking of quiet we do have the noise level from Preston Trucking. We've got a new trucking company moving in at the end of Strong Road. We've also got the garbage company that has a noise level. They start at four o'clock in the morning with banging. (Question - couldn't hear) The garbage company? (Answer) Tobacco Valley. Their noise starts at four ( tape change) realize there's a noise ordinance but how can you put a trucking company out of business for making noise? You can't. You know,they were there. I guess that's basically it for my questions. I'm not completely opposed to it. If anything has to go back there I would love to see a senior residence go back there. No, I'm very happy with the way it is now, but if anything has to go back there, and I've seen Brian's work. Brian does beautiful work. I'm in favor of his work. But, you know, these are issues that I have personally, because I live right there. I have kids that play in the woods back there, and I am concerned about it. And I guess that's about it. Thank you. Okay. Mr. DeMallie. (Question asked - couldn't hear) 28 1q11Le� ould you like us to respond to the question. Yes, I would if you'll let me I will call the questions one at a time. The stop sign I believe, is the traffic authority of the police department. You'd have to petition them and have them review that. 9AALt6L Okay. The property line to the road, Mr. DeMallie? From the private drive to our property, westerly property line, which is also her easterly property line is 12-13'. The road is basically centered in the right-of-way, how wide 24? It's a 24' wide roadway, and it's centered in the right-of-way, 50' right-of- way. Property value. Would you care to have Cile respond? Yes, Cile Decker is prepared to respond on that. I obviously can't respond to the part about noise or diesel smells or any of those kinds of things, but I can tell you that basically we've had no effect on property values on the projects we've done. As a matter of fact I'd like to just site up to you the projects that we've done on Nevers Road and Sullivan Avenue. If you know how that Collins Hill runs you have the one SRD on one end on the Nevers Road end another on the Sullivan Avenue end. Collins Hill is a hill and it goes up and then down again. And there are some spectacular views on the top of that hill. We have 10 lots up there known as Sunrise Estates. There are restrictions in that area, the homes are a minunum of 2,800 square feet, as you all probably know. And I can tell you right now we have out of the 10 lots we have four left, and there's a spec house going up on one and so that basically leaves three. And those homes are in the price range of, I'd say minimum coming in at around $385,000. So they're that kind of price range. The SRD are very, very visible from those homes and you have to go through either one or the other of those subdivisions in order to get up to those high prices homes. 29 &JklL So it doesn't seem to be having that kind of an effect. Okay, Cile while you're up there, price of the units. Would you be able to address that? Which units? O-Iffb-o These particular units. The ones that we're proposing now? Yes. I, my assumption is, and I can't give you an accurate price. My assumption they're going to be somewhere in the high $140s to low $150s, that kind of a price range. fAA Thank you. If I might just also follow up on that coincidentally, within the last week I had an opportunity to review an appraisal of one of the 1,250 square foot units at Q Porter Share, done by an appraisal for Savings Bank of Rockville, and the unit appraised at $144,000, current market value. And that's a 1,25a square foot unit, which would be slightly smaller than the ones being proposed here, so I think it would be safe to say that the current market values would be at least in the $140s. Okay. Construction. If this were approved when do you think it would begin? Yesterday (laughter). They already closed the asphalt they are going to close the asphalt plant in 6,bL�L three weeks, but . . Our clients intention is to commence construction as soon as he receives approval, weather permitting. Like to proceed immediately with construction of development. And as you know the last few winters, two winters at least, have been relatively mild and relatively snow-free, and they have been able to do work progress on work, through the winter. So the 30 expectation is that it would start immediately and Cile Decker gave me an indication of the market demand for senior residence developments, even though this project is not specifically noted as necessarily in their interest. Okay. Is there anyone else who would care to speak in opposition or have a question? All right. One more. Where our house is, we're in a strictly residential zone. So I realize that it's, I realize Collins Crossing that the property values aren't any lowered, but it's also on Sullivan Avenue. You know, we're in a residential zone. Where, like I said, I have a very small ranch, and behind us we're going to look out to not far from my backyard what looks like condos. They're beautiful. Don't get me wrong. They're beautiful units. But, you know, from I've put a lot of money into my house. And we're still working on it and you know, I just want to make sure that I'm going to get some of my money back. And it's not going to interfere with my profitability. ea, We, I can't guarantee that I . . Well that's . . . We've had some testimony . . 7 I know I'm just saying that that Sullivan Avenue I can understand because . . Sullivan Avenue, incidentally, where they were talking about is all residential. 7 It's business zoned there. The property value is not going to go down. It's all residential in that area. '7 Is it? Yes. '� Even with the oil company across the street from . . okay. f 31 Is there anyone else who would care to speak in opposition, yes ma'am. Did I, lady from Strong Road. Did I get you sign the. Yeah. You cans sp eak first an d d do it after. My name is Louise Goodwin. I'm a resident of Main Street and there's a few concerns that we have at this point. Some of them are already brought up as far as the noise level. Preston Trucking, Tobacco Valley Sanitation. Capital Moving which will be coming in, it's a moving company, it's got trucks. It's going to make just as much noise, most likely if not more, than Preston Trucking all hours of the night. Route 5 traffic, no one's mentioned that at this point. We live, I live on Main Street. I can still hear Route 5 traffic. I chose to live on Main Street because of Main Street the way it is. And the aesthetics and historical and all of that. I can deal with the traffic, you can't get rid of Route 5 traffic. But, my concern is the seniors at this point. I feel for them, I feel that there is a need for this type of housing in town. I have an aging mother in the same circumstance. I have in-laws in the same circumstance. We just feel that this particular site is not really, we feel 100% chosen for this type of facility. There is a couple of concerns, that as far as the trees that are going to be cut down. Right now they're used as a buffer for the noise,Route 5 noise. Some of the Preston Trucking noise. Also, guns in Windsor. No ones really picked up that concern. There is a shooting range in Windsor, that we hear. And, if seniors were to move into this type of environment, I think their moving in to have some quiet time. I don't know if they want to be listening to trucks during the evening, guns, Route 5 traffic. That type of thing. The guns are prominent during summertime. Most of the seniors and most of everyone else is outside. And you can really hear that. As far as the trees, losing the buffer zone, we have a big concern about that, �/ too. 32 We're concerned too that the seniors moving in, I know in other towns when they have this type of establishment, they address the issue of living in a type of industrial type of environment by telling the potential buyers up front that this is a noise type of level. Is that going to be done in this particular proposal? Will there be written notification to them? &Lb_6 I'm confused. I don't understand the question. When potential buyers come in to look at the property and all that, they don't live there. They don't hear the noise. Will someone be telling them, the P"14" association or whatever, be telling them that this is a potential noise level. Or that the noise level is at a certain amount? No I couldn't . . . Well, we have a concern with that, too. The major thing is if this retirement community comes in and people start moving out because of the noise level, what will it become at that point? Will it go to lower cost housing? Can they change the usage of that at this point to lower cost housing? We certainly don't want that in our neighborhood. There's wildlife back there which is another issue. We've had beautiful foxes in the back. There's an endangered, I-think it was a salamander or something, someone had told me lives back there. That issue hasn't been addressed either,and that's a.concern. We bought the property because of the beautiful backyard, the brook area. The wildlife. The birds are phenomenal out there. Where are the birds going to go if there's no trees. Granted there's going to be a little bit of trees in our slope, but the trees in the back will be all gone. So I believe will also be displaced in that area. With all these concerns we have gone around and we've got at least, I'm basically a representative. Because of the holiday week a lot of people couldn't make it. We have a petition of over 75 names of residents,Main Street residents, Oxbow, Ferry Lane, residents, unfortunately because of the time limit we didn't get a chance to go to the Strong Road area. And I guess there is some opposition there. If we need to,that can also be done. But I'd like to present this to the zoning board. 33 Please. If I might, Mr. Chairman for a second. Could you sit down Mr. Cumming's . . . &Ulm+ Yes, in objection to the submission of the petition . . . (�,� I'll note your objection but she has the floor. I understand. But I'd just like to comment before you accept it. You may comment when I call upon you. Thank you. The petition is basically a similar petition we did for the wetlands commission, opposing at that point in time it was the water, the flooding problem. I know you don't need to hear that at this point. It has gone through that. We are addressing zoning board issues and we kind of combined them together in that particular, so we didn't have to go back and forth among the people. Do you have any concerns or questions on that? I don't. Okay. I will ask Mr. Cummings when you're done speaking, I have a specific question I want him to answer. Okay. I just want . . . We're not going to have a verbal verbiage back and forth. But I do have a question for him. If you're done speaking. Okay, one other issue. If this were to go through, we feel it might set a precedent for other condo type living. Not necessarily retirement type of 34 living in the neighborhood of Main Street. We'd like to keep the historical aesthetics alive for future generations, basically. And we feel and all those people on the petition feel that the opposition is there. Thank you. Okay, thanks for your comments. Mr. Cummings there was a question asked about, specifically now, about housing reverting to something other than senior residence. And would you explain how that covenant works, and how complicated it is to do something like that. Yes sir. It is a covenant that runs with the land. It's part of the original declaration that everybody buying, it's part of the declaration and bylaws that are submitted to this town approved by the Planning Commission. The end result is every single resident would have to agree to a change in the use of the facility. Then they would have and also all the banks, mortgaging on the units. And then they would have to come to this commission to seek a petition. So, I guess the best example I can give is I'm familiar with a number of subdivisions that were developed since the 50's, where there were restrictive covenants which limited uses of property. I'm not aware of a single project in the last 50 years, where the homeowners of a 20 unit subdivision, were able to get everybody together to break the conveyance that were put on at the time of the original subdivision. So, using that as an analogy, all I can say is as close to anything is a certainty in this life,the concept of the unit owners getting together and everybody agreeing to petition for a change, is extremely unlikely. And it would still require an amendment by this so it's for all practical purposes locked in as a senior residence project. eAQ1U Okay, thank you. And if I might address the petition. I'll give you time. Oh the petition? Just briefly, in reviewing that petition, we do object for it being into the @ � record as essentially a heresay document. But more importantly, I would request this commission to review the factual statement, if it's the same petition that was filed before inland/wetlands I believe there is significant factual errors in the statement at the beginning. And I question whether the people that signed that really understood the nature of this application. 35 So in reviewing that I would simply suggest that the petition is flawed because of a defective factual statement it references the project extending to Oxbow Lane. This property goes nowhere near Oxbow Lane. The South Windsor Land Trust, owns the abutting property there so. I think it's important in reviewing that for substance. Thank you. Your comments are noted. Is there anyone else who would care to speak in opposition. Where, do you have something fiu-ther? Are you going to respond to his comments. Um, briefly. All right. Let me get to the rest of the audience here and if there's time at the end. Is there anyone else who would care to speak in opposition to this application or have a question? Yes, ma'am. My name is Barbara Giard I live at 80 Strong Road. Aside from some of the things some other people have already said I'm concerned about the value of my property. There is noise from Preston Trucking that we do hear and I'm a little bit farther down. I'm concerned with the displacing of the wildlife behind us, by taking all those trees down. As was just stated I guess I'm still a little confused as far as what exactly a covenant means as far as there being seniors there and not . . . Well, the State of Connecticut when they designate this as a senior residence zone their under they have bylaws and they have, I'll try to do it as simply as I can without getting into. . .it's dedicated under certain specific conditions and bylaws that state what it's used for. What the criteria's to get involved. The 55 years of age. There's all kinds of things that are spelled out. It's not changed very easily. So, it's not going to be like a deed requirement then as far as like the deed on the homes. &Lttz They operated under rules and regulations . . . 36 Chapter 828? C� 1 Yeah, there's specific to a . That's just also one of my concerns is that it stays a senior residence. I'm not totally opposed to it either but if that's what it's going to be I'd like to keep it there. I'm also concerned with the exact amount of a buffer that's going to be behind our property. Before there's evergreens and there row of shrubbery and all that is starting. On one of the maps we saw that the South.Windsor Land Conservation does looks like they do own a strip of land. I'd like to, if I could find out exactly how much that is and where they are going to start their planting of evergreens and all that. And I guess that's about it. Zrb,—o Okay thank you. Is there anyone else who would care to speak in opposition or have a question. Yes sir? Good evening ladies and gentleman. My name is Bruce Burnham. I've lived on Main Street for 20 years and I have some questions and some comments to make about this. I think is a very schizophrenic piece of property. It lies between Old Main Street which is very historic and Route 5 which is very commercial. The town itself has decided, because of their zoning plan, to create this impossible situation. You have industry on one side, and you have historic homes, residences, along Main Street. Now, how are you going to solve this problem? You've already allowed three trucking companies, Tobacco Valley, Preston and the new company to come in along Route 5. This land is now open and fallow land. It acts as a buffer between Route 5 and Main Street. Main Street is an historic district. It's soon to become, hopefully, a scenic road. It therefore, has aesthetic characters to it. It has 37 historic capabilities to it. And it has an ambiance which needs to be t3"L4IW protected. The open land protects that. Now what protects the retirement community if the zoning board of the Town of South Windsor allows the retirement community to go it? If the people move in and they spend $140,000 for these units, and after they get in and the trees, the leaves are down in the winter time. What is going to happen to the noise level in that area. Now the attorney says that the noise level would be enforced. But the town zoning board has already allowed the trucking companies to come in. Now how are you going to tell the bucking companies that they cannot function as a trucking company. They cannot start their engines at four o'clock in the morning. They can't close the hoods of their bucks. They can't blow their horns. Which is all happening because I just talked to the people that live in that area. Now, if you allow the retirement community to invest in this area,and there's you're going to be creating a battle between the retirement community and the trucking companies. It is your responsibility because you have created that situation. You've created an impossible scenario. Now I hope you consider that when you make a decision as far as this. The zoning laws of the town are very specific. And I have a question. Is the site plan and the buildings themselves aesthetically pleasing. They appear to be so. If I was doing this I'd much I'd be much in favor of the colonial architecture over the traditional or contemporary architecture because it maybe seen through the trees along Main Street. I think the photographs on the floor are much more attractive than the ones up on the top that seem more appropriate I should say. Number two. The commission may grant a special exception. They're asking for a variance in a Residential A-40 zone, however, this is not ' appropriate because of it's location is adjacent and between the historic district and an industrial zone. For the reasons I just said. The commission knows the buyers cannot be legally warned that they are next to an industrial, therefore it becomes your responsibility if you were to approve this. 38 Number four. The traffic impacts along Strong Road and Old Main Street 6WJA4r could be detrimental to the residential character to this quiet, historic neighborhood. The property itself abuts a house, that is the oldest house on the street. It was built in 1694, the Joseph Strong House. It's one of the four oldest houses on the street. And (tape change) and the industrial zone. You're going to be creating an impossible problem. Five. The surrounding property values will be adversely effected and the character of the neighborhood will be absolutely disrupted. There will be adverse environmental impact in the area and this could be effective because of the runoffs into the stream. In a flood situation, if you've looked at the new parking lot on the new trucking company, it is gigantic. It looks like it could possibly hold 200 trucks. Now, the question, I'm not familiar with engineering on the site. Is that runoff coming down , is that going to be running down the pipes along Strong Road? Is that runoff, which is downhill going to effect Main Street? And in a heavy rain could you be creating a problem of runoff in that stream from both properties. The three trucking companies and the now the pavement on Bailey Street and, which is all going to be paved. Where is that rainwater? If we got a 6" of rain in an hour, is it going to washoff down into Mr. Sunderland's historic home in that area? Which has been known to flood before. Has consideration been taken about that? I'm concerned about the erosion downstream that could occur in a heavy storm. Thank you very much. Thank you. Could I get you to print your name and address on the planners table. Mr. DeMallie would you care to respond? Yes in particular I'd like to respond. There have been a number of comments regarding the view toward the east for the industrial zone and notification to prospective home owners. Just to let you know, Mr. Edward's would like to have us add to the plan, the site plan that will be shown to everybody that looks at these units, Cile Decker and her associates would be utilizing. And that he will be utilizing in his office. And we prepare all the plans that he uses. He's authorized us {k t 39 make it perfectly clear to the east side of the development, that it's industrial zone will add that right along there. That it's industrially zoned. That's east of the development where the industrial zone line occurs. So that everyone's aware that it's industrially zoned to the east. That's number one. Number two. I guess if you've seen probably the finest example is at Collins Crossing, behind Hunter Drive. The Collins Crossing senior residence development, you've seen the size of the trees that Mr. Edward's has. He has the largest hydraulic spade, I believe, in Connecticut for moving trees. He has ability within his own business to move large trees, evergreen.trees onto the site. Transplant evergreen trees on the site. To supplement or replace the smaller nursery grown stock on the landscape plan. So he is intending to, and he's even notified some of the neighbors of this. He is intending to put larger trees that he transplants along the buffer, to supplement the smaller nursery stock that we have. So it'd be an instant buffer. So that the view toward the industrial area and the view behind the units abutting those residences along Strong Road can be obscured substantially, and immediately. Collins Hill I and II also, if you see between that development and existing residents, I know, along Sullivan Avenue, he's installed very large, mature trees, evergreen. And I think that's basically that's your intention to install large trees that are going to be as tall as around 20'. His large hydraulic spade can move. And he's had a very successful rate of retention of those particular plantings. So he has the capability of doing that at very low expense for himself, because he owns the whole operation and he can, and he will be doing that. And also we'll be adding that notation right on the plan so it's clear to anyone looking at the plans where the industrial zone starts. And there will be no confusion as to where it is. It'll be right there on the plans. So he's authorized us to do that. Thank you. Anyone else care to speak in opposition or have a question? 40 Yes, the young lady with the red jacket, you may come up. I will only say Un this, that the petition, the commission will judge for itself what's in that petition. All right, please. If you want to (without microphone) b4j�w Pardon me? ? If you want I won't bother with the petition. aAAio I'm sorry I still can't hear you. Do you want, can I make my comments on the petition . . . Oh yeah, please. By all means. Actually, it says extending to the Oxbow Road area. It wasn't the Oxbow Road street. It is the area of Oxbow Road. And as far as the flooding problems, there are problems now we feel with all the drainoff from all these other companies and all that. It's just going to continue it in addition to this too. That was the meaning behind that. But there was one thing I forgot to suggest, if we could, could we suggest a noise level survey? To be actually done in that area, to see what the actual levels would be? That way everyone would be clear. For what purpose. I don't believe this development's going to create any noise? The noise level in the particular area now. The ambient noise probably is not a concern, as it addresses this application. But if people moving in don't know about the noise. 7 I'm sorry. 41 I don't know what, the Latin term is buyer beware. I don't know what else to say. Okay. Well it was a suggestion at this point. That way everybody would be clear on it. Thank you. Okay. Is there anyone else who would care to speak in opposition or have a question before I close the public's participation. Just a request that the commission not take any action until after the public hearing on the interior lot. Application has already been submitted. 040� Does that require we hold the public hearing open? &n(4kj,�u Probably a good idea to do that. O, ,o All right. And convene it the same night as the that one lot interior lot, the special &jbA_-U exception application and site plan is heard by this commission. All right. If that's the case does the commission care to ask questions now. 0-4'0t�'6 Or would you rather hold them until the continuation? We probably won't have everyone here. Okay. All right let me go to the commission then. Doug? Just two quick questions. One is this is going to be a common interest community form of ownership, is that right? vnc �o Yes. �� Okay. 42 And secondly. What, in going through the special exception criteria. Could you point out how the facility has been designed to meet the needs of handicapped residents or visitors? Yeah, uh I think Mr. Wright can address that. He has there are policies that the building department has to require the handicapped accessibility and there are certain provisions that are required of the development. I think Mr. Wright could address that. Aside from the ability, well accessibility into the unit and internally within the unit, what is required by Mr. Collins, Chief Building Official. The answer is yes. Not all of the units, but a number of them are capable of that if it's selected and in effect has to be in certain cases. It's designed into the unit. Is there a certain number or percentage of them that have to have that accessibility. Yeah, I think it's two or whatever. But really what has happened is that we've responded to the market. And we found that in each case I want to say that it was we ended up with the number that was requested by the regulations. Is that Mr. Town Engineer, do you know what that regulation is? No. I don't. ` Basically it's a couple units. Okay. If my just add, Mr. Edward's has indicated that it's a requirement that 10% which is two units for every 20, is required to be handicapped accessible. Okay. �l Thank you. Tim? Terry? Walter? 43 Yes, thank you Mr. Chairman. I have first some comments that Mrs. Pat Porter, Commissioner Porter would like to be read into the record this evening. Number one. Mrs. Porter will ask for . . .I'm sorry? Can I, how can Mrs. Porter comment without seeing the application? Uh, she researched up at the Town Planners Office, and as other people come in and write notes or letters to the Commission, so has she. (Question without microphone) So she can make her comments at the next meeting. Well, I think it would be more appropriate . . . I,,* Okay. after reviewing the presentation. Almost as a sense of predetermination. Right. Okay. OAAr0 I mean that's my opinion anyway. All right. Fine. What she did she was going to make a comment knowing that this parcel was next to an industrial zone. Which she did note before this hearing. Okay. (k"-4) So, hold it off for the next portion. My other question was form of ownership, which has been asked. And as far as the noise, we're having a residential zone, or next to an industrial zone, it's been this commission's experience that our noise ordinance doesn't hold much water. When it comes to trying to enforce it. We've had one case where a gentleman has been coming to this commission for eight years, with a s 44 noise problem within a member of an industrial zone. And that has never come to fi-uition to either side. We know that trees will be taken down. We've heard comments on the noise. Comments not withstanding of the folks who live over on Collins Crossing, they don't put up with that noise. In fact, Mr. Flynn alluded to a peaceful, quiet community. I don't know that this would be such, being next to the truckers that have already been mentioned this evening. Those are my comments, thank you. �Azblo Susan? Just two quick questions, I believe. I just would like a little bit of clarification &W_e v on this right-of-way, with the Mr. Knafel's property. Just so I have it clear in my mind. Now that's an industrial piece of property. They have the right-of- way that's going to go right over the road, part of Bailey Circle? nftk�- The Glen Knafel's property? �OA,g- � Right. Yeah, that's in a vacant parcel. It's in the industrial zone. They already have, without us doing anything, and again we're residentially zoned right Pam- now in our property. They already have the rights in place previously held the rights in place for access to their property over our entrance drive. That area, it goes up to a certain point where it starts to curve off, their rights terminate at that point. In other words, so they can turn right into their land. Okay, so we could have a residential zone and an industrial zone on a short Q"hz" piece of that road? It's a small parcel and it is possible to have that. But of course, all industrial uses require siteplan approval by this commission, or some other kind of approval by this commission. To my knowledge he hasn't approved anything. His family members own the house in front of that parcel, and also the property to the east. The Winton's and the Knafel's are related. I believe he's the grandson of Mrs. Winton who owns the residence which she does not occupy out front. 45 So it is possible for them to propose an industrial use there. They would also have to meet the buffer requirements to the commission, on their property in addition to all the buffering that we're doing. And recognize that between the proposed SRD development and their building lot;industrially zoned building lot, is another parcel which is subject of a future application, well an application that's already been submitted. So for the record I've mentioned that. And I think Mrs. Banach and her remarks indicated that. That's a subject of one house lot and the requirements for buffering on that one house lot which will separate that parcel also, from the SRD development. So there are buffers will be required on the proposed interior lot along it's easterly line, which is the industrial zoned line. And also along the westerly line of their property. And so the exact design of that will be subject to approval by you and reviewed by the Engineering and Planning Department Staff. So it is possible to have something developed there, that's correct. That's an existing condition. That could happen now. Right now. They could come in with an application to do something on that property and have a driveway that comes in between the Winton House and the Charette House. That could happen right now. Okay. Whenever we have an industrial zone abutting a residential zone in this town fi we've always had to plan. Every other community in this state ate- always had somewhat of a problem between that. There's got to be something in transition. Question is what use is going transition? It has be residential use in transition. Because it's residentially zoned. And we're saying that with our buffers and these regulations require a buffer. Whereas if you had a single-family development, it'd be slightly different. But with this particular type of development we think it's a nice transition and Mr. Edward's is proposing to bring in much larger trees than you're required to have in a buffer. And he's going to do that just like he did at Collins Crossing and Collins Hill. Some degree in Collins Hill, but especially the back of Collins Crossing, between the Sunrise View Estates Neighborhood and the Collins Crossing SRD on Hunter Drive. Okay. 46 � If you see there there's a line of very substantial trees that he installed himself, above and beyond the commission's requirements. Okay. And then I have a question for Mrs. Goodwin. You mentioned that there was some form of an endangered species. With the public hearing being open until December 8, could you provide proof that an endangered species does live on that property? I didn't hear the answer? Yes. Okay. Where in the commission now,, Mr. Cummings. r I'm sorry. I'd just also wanted to address Mr. Mealy s comment. Mr. Mealy's comment? Yeah. Mrs. Evans? Yes, there was one question, Mr. Chairman that the someone from the public asked that didn't really get answered. And that concerned drainage and the flow of drainage. I wanted Jerry, could you talk about the drainage of existing approved projects and how they are going. And then I could ask Peter or someone to talk about the drainage again from this particular project? The Capitol Moving and Storage siteplan has a significant swale around two sides of it. Let's see if it's north it would be the west in the north side that provide a detention/retention type of situation. I don't think that that goes in this direction. I think it goes out towards Route 5. There's none of that storm drainage in Capitol Moving that does goes into the system in Strong Road. t 47 When that area was proposed for another use years ago, the furniture people were going to be doing something at that time, we were going to, in fact, take some of the storm drainage from Strong Road and put it into their system. Which was going out the back of their property. But what's proposed for Capitol Moving and Storage was basically retention system, or most of that's going to be retained on site. And then go into the ground. This facility here we talked to the engineers early on, and suggested that detention may not be the best situation here since the brook is right in the back of the property. But from a standpoint of sedimentation control and after looking at the time of concentration and the time that the peak gets to this area from upstream, it was decided that this detention would work very well, for both reasons. For stormwater and also for erosion control, sedimentation control. We've looked this, Jeff has looked at this, Soil Conservation Services has looked at this site, the detention proposed they've made several suggestions. And there's been some changes made from the original design to provide as little erosion problems as possible with the stormwater runoff. They've several areas where there is a level spreader. There's been quite a bit of design in this area. There's even now a tow drain, basically an underdrain for a portion of both those detention areas to keep the side slopes from sloping from the ground water. So there's been a substantial investigation, determination and design in this site to try and avoid those kind of problems downstream or into the brook. 64tAAk/j, Now where does the Preston Trucking Company . . (Couldn't understand response) 6A44-6- Peter, that was adequate I think to cover unless there was something you wanted to add to it? We've gone through a long process with Jerry and with Jeff Folger and also WX.aLCl , Bob's been to communication with the Soil Conservation Services State } Engineer and his recommendations and we modified the plans to meet, we 48 believe, the requirements of all three officials. And Mr. Arsenault put his ,n stamp on it with Karen Isherwood to come up with a design which does not give any additional problem to the existing flooding condition there, and also does a proper job in handling our stormwater runoff for erosion control measures and stuff. So we think we've done an adequate job. There is a 100 year flood plain in the brook, we recognize that. Jeff Folger at the Inland/Wetlands Agency meeting, and I think Jerry might be familiar with these comments but, he indicated that the immediate flooding in that immediate area, is really caused by constrictions and blockages downstream from the site. Which is beyond the control of us or the Goodwin family . . . Well, I know that when the culvert under Strong Road was increased in size it made a big difference in the amount of water that was spreading out to the north . . Aatft� That was an enhancement. eka4411 Well, yes and no. But okay. It all depends on how you look at it. aThat aesthetically . . dAk,&44_j- There was deeper water before. But now it's more marshy than it was. Okay. Thank you very much. A couple of,just a couple of questions for clarification. So we really have two interior lots. One is in the industrial zone, which has nothing to do with this. And the other, we're holding the public hearing open to consider. And that interior lot is labeled the remaining land of Bancroft Brook. Yes, I believe it's 2.73 acres in size. That's a subject of the additional application, this hearings been held open for. And the other, what you're calling an interior lot. I don't know how that it originally was approved, r maybe it predates any zoning requirement for that. But, that's an existing, j and it never came in under your interior lot provisions. It's a rear parcel. It i 49 has no frontage on any street. And it's industrially zoned. And it has a right- of-way going out to Strong Road. Which has historical right-of-way, that's on land records. Okay. Which is going to be the new entrance? Yes. It will be the new entrance. They still have rights over it. Just like they khuvu do today, they'll have rights over that. Earlier on when we were talking about sanitary and water service. Where is the water service actually going to enter the property? It's right along Strong Road in the front, and it comes right up our driveway, into the driveway. The main . . ( � .,Yeah, it's right along Strong Road. OAZUtp- Oh, okay. And the sewer is down at I believe, Gorski and Strong Road. Right, I saw that on the plan . . ik&VA :- . we'll bring it out to the east and then in. I didn't see the water service on the plan. I guess it will allow for sewers connections if they choose for the residences along the frontage, also. If they choose to do that if they were to have a failed septic system. Okay. There was a comment, several times about two-car garages. I only saw one- car garages on the plans that I'm looking at. 50 There are two, if you notice, of the four units as you go in on the left hand side. They are separate homes. � e- Correct. There are two of them with the extra-wide driveways. And they have an extra-wide garage, you can indicate there. The last one on the left? The first and the forth. The two end units. Those are both with two-car garages. � - Okay. And those are the only two-car garages units proposed for the 20-unit development. Okay. Then there was a reference Peter, to an existing house on this property. Where is that? Can somebody point that out to me? AeJM,Q._ There is no existing house on this property that I'm aware of. There is an existing, on to the east of the entrance drive there is an existing residence in the industrial zone. Oe, Oh, okay. Which is, I believe, owned by Florence Winton, who does not reside there. Okay. Okay. And then the only other question I had was and I'm looking at drawing three A of thirteen. Behind the Charette's and the Giard's and the Bennett's and so forth, there's that what is that a 10' buffer. There is a, it's not a buffer it's not under our control. There is a 15' wide, the &_R Q,Q.« entire parcel that the South Windsor Land Trust owns basically a contiguous parcel, they have a 15' wide, the width of their parcel between those z 1� 51 residences there and our development, is 15' in width. And again, Mr. P Edward's does not have any control over that. That was a grant a donation by the current property owners to, a conveyance by the current property owners to the South Windsor Land Trust and Mr. Edward's was not involved. He's agreed to purchase the remaining land, the 9.11 acres. Where there is 15', and it's wooded, it will remain wooded. They like the idea of pathways. And as I mentioned earlier in my presentation, there's an approximately two acre conservation easement over the land which gives us frontage, along Bancroft Brook. Which we will keep it forever just like the rest of the land that they own in fee. So that 15' strip is forever. It'll be natural state. Same thing with the conservation easement and their remaining 15, 16, 17 acres that they have to the west, north and east of the project. So if I wanted to gain access to this this area, I could go down there and park on Strong Road and walk in between the Giard's and the Bennett's. F� That's an existing condition. Okay. And that the South Windsor Land Conservation Trust owns it. They have the only other large tract. Who owns the one the one in your office? bkq" �'Q'The South Windsor Land Trust. &htAJJ,tx- No I mean, what's the name of the tract? &"t4JT The, you mean to the rear of the? Yeah, what's the name of that one, what's her name? Who donated it? b*YKI+Oh, the Williams. Yes, the William's tract on Ellington Road, Route 30 which surroundings Mr. &MAJI — Cummings office building is the largest single tract that the South Windsor Land Conservation Trust owns. They have another small parcel along the 52 Scantic River. It's about five or six acres, I know we did some mapping for them at one point. And they also will eventually own the 23 acres at Deming Hill Estates which will be a little bit larger than this, and now they own this. And that's the extent of their land holdings to my understanding. But they will create trails just like what's going to happen at the open space Deming Hill Estates. And they already have done the William's property. I've walked it myself several times. And you go nature hiking and that type of thing. That's the intent here. But this, what I'm looking at here is a can be a walking trail? It could be a walking trail . . . In other words I could walk along there and nobody would come out and threaten me with their shotgun? Okay. The intent of the land trust is to do similar to if you go to my office at 1610 Ellington Road. And out behind the barn there you'll see a sign that was put up by an Eagle Scout, and there's a trail. And throughout the 80 acres behind our office, all South Windsor Land Trust land or easement rights, some in fee and some in easement. Over the years encouraging Boy Scouts, Eagle Scouts, Girl Scouts have created a number of walking and hiking trails which are regularly used by a number of South Windsor folks. If you look at that map, a person can come in off of Strong Road, and actually on land trust land that'll eventually be trails, walking trails; go all the way around the brook, the land in the back and come out the other side. One of the concerns of the land trust in accepting the parcel, was that there be a circular trail, so you could go in on one (tape change) C� Marcia? Yeah, Peter on this industrial interior lot. Is everyone sharing the same, I mean I know there's, understand there's a right-of-way, is there room for Y"�them to have a separate road. Or is everyone going to be all using the same 25' wide square road. 53 They have rights to construct a driveway somewhere within that 50' right-of- way. A4itW4t_& So theoretically . . . We would be . . I mean because I was going to say, I mean some time in the future if they decide to develop this lot as an industrial use, it could get pretty exciting if it's only 25' wide and you've got industrial use and another house in the back and plus this senior residence also. They could have what most likely scenario is they would have a driveway coming off this existing roadway, this constructed private roadway. But they still would have to access this road at some point and time to get out to Strong Road. I mean there's not enough room there for them to have a parallel exit onto Strong Road. No, there really isn't enough room for them to have a parallel driveway. � R- They'd end up utilizing the pavement that we're putting down. That's what I was asking. So yes, they will be utilizing that. Aa&x Absolutely. �t,e► � Okay. If they ever develop it, and if they want to utilize that right-of-way, they have their family members own other property there. There's nothing to say that they wouldn't consolidate those. Again, it's the grandson who owns the property to the rear. Well, he does now. But I'm just concerned at_some point in the future that all of a sudden. ��Yeah, that would make it very interesting to say the least. 54 Yeah. Has there been any consideration given to buffering to the rear as far as the noise levels are concerned. I know, Rosemary, you went and described very nicely what was on the property as far as vegetation right now. And then you never mentioned again. Is it all going to be cut down. Or, I mean is anything going to be left on the property except around the edges? If I may just indicate one thing. The majority of the land between us and the industrial zone is that 2.73 acre parcel. We're proposing, and subject of the next hearing, one single-family home there. The vast majority of the trees on that property will remain . . Well, you hope. I mean he could go in, that person could go and cut it down, too. Well, as Mr. uh, and the applicant is Mr. Edward's, of B&M Enterprises. As Mr. Edward's indicated through me,just a few minutes ago, he has every intention of putting in extra plantings along that buffer, along the easterly side of that lot. To screen both the SRD and that residential lot from any industrial. So, he'll put in permanent evergreen vegetation. So even if the leaves fall down you'll still get the buffer screening effect. k,d ZN� ** Okay, I guess I have a question for Rosemary. Just generally to answer you question. The tree removal is related to the (ttJj,;,L grading plant. So, wherever the grading ends the tree removal ends. So, where you see that. So, that pretty much, you're pretty much clearing everything out, except for `_ 11 around the edges? Not entirely. I mean is there anything of any substance in there that's worth saving or? Or that could be put aside and maybe replanted at a later date by Brian? Well there is a group with gt' p of(without microphone) west side. � r f t f 55 �I don't imaging they're going to want you to do much with those. (Response without microphone) O—ty�� Yeah. So all of that remains and basically the 15' (again without microphone) Nbt"- � So, essentially as I said you're pretty much clearing the site except for around the edges? CUAi---V Yes. And there's nothing in the middle that's, because of the grading plan you can't save anything that's in the middle. Is it heavily wooded right now? Some places are totally wooded. Some places are a little bit more open . . . There's that's probably (no mic) So there's a variety. &AX- Okay. n If I may just add a quick comment. In conferring with Mr. Edward's. He has KI� tagged 50, identified 50-75 trees onsite that they're going to move to the perimeter of the site. Okay, good. And relocate for additional buffering. And also, this map shows the developed area of the property. There is a couple of hundred, there's approximately 300' from the westerly most unit, for example, to the closest property line which is going to remain essentially all wooded in that ravine there. So just to give you an idea that this doesn't show, and if I may just walk up to the exhibit to show you. kA— You may. ,�� The area's that we're not showing are going to remain wooded. t 56 This whole are here (over by exhibit-no mic) all in here. 300'. Okay. Okay. I know that this is not to do with the commission but I think the suggestion for the stop sign at the intersection where this road comes out would be a very good idea. Because I think it sort of would protect everyone. When we decide what we're going to do with this we could send a recommendation into the traffic department and say that we think it's a very good idea for safety. I am concerned about the drainage downstream, Jerry because I know many years when the Gorski subdivision was put in there was some very, very large problems, as I recall. And, you know, I'm sure that you guys are on top of it but just so we don't have something of that magnitude happening again. It was sort of catastrophic as I recall. Something to do with runoff on steep slopes and they hadn't seeded things. But I just remember it was a great muddy water downstream for quite a while. It still is a real problem and erosion in that subdivision continues and it's getting to the point where we may have to go in and do something. This is all in litigation right now with Mr. Gorski, etcetera. Okay. I know it's been an ongoing problem, but just so we don't have 4L- something. Yeah, that's what I was saying, you know, with the type of soils that are in the back of this property, we've taken some real, I wouldn't say extreme, but real definitive measures to try and stabilize the area and not have the situation that happened at the outflow of Mr. Gorski's detention basin. What they've done here is they've done soil conservation has taken a page from what they did on Dower Road, what that drainage ditch in the back that they had and use some of their philosophies there and these detention basins and try to stabilize the embankments and also stabilize the outfall. Okay. Well, because I just, you know, when you have a problem already happening downstream, you don't want to certainly don't want to add to it. If the Wand/Wetlands Agency required in their approval, which I believe you have before you, if not was alluded to in the comments from Marcia Banach, 57 and they required that the design engineer, that's Mr. Arsenault, be present y � and observe the installation of the sensitive areas that they were working with FCS engineer, Jeff Folger and Jerry Iazzetta. ARUK,4 All right. So, there'll have to be an onsite inspection. Which was not the case I'm sure I don't remember what happened with that. But I just know it was a big ��' problem, and you just don't want to see it made worse. We even inspected it once and wrote up a report on it and we've observed it &IXA,tL-s- and we know exactly what happened. Okay. Good. Thank you. Okay. I believe that do you have something. Yes, I just want to ask Mr. Chairman at the continuance I'd like to request a presence of Jeff Folger, he's been mentioned several times this evening with statements where there's been questions we've had on drainage, both Louise and Marshall. And I would like his presence at our next continuance of this hearing. Thank you. J"-4. Well I'd like to make a motion to continue this public hearing to December &. e— Is there a second. � Second. &AU- Let's have a discussion, that was a question, Jerry. If I may this situation with the easement industrial use, etcetera. We will be looking at that a little further, and bring something probably back and the next hearing so that everybody knows that we don't just surprise somebody with something. Okay. 58 Let me call the motion. All in favor of continuing this until December 8, will l� be the continuance date, signify by saying Aye. Aye. Opposed? Public hearing will be continued until the eighth of December. I'm not sure of the agenda item order but we'll post it over the next few days. TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION Minutes (Verbatim) - February 16, 1999 Application #98-58P, Shady Brook SRD G Regrettably the proposed SRD site on Strong Road does not have the luxury of being placed at the Community Center or any other facility for that matter. A trucking terminal borders its boundaries along with Capitol Moving and Storage. And Tobacco Valley being close by. The noise from the trucks from these sites along with the smell of diesel fumes from trucks warning up, the constant hooking up and unhooking of trailers with loud back-up horns that these trucks will have will become an unbearable nuisance, especially on the hot summer months. I also feel that the entrance of this site is dangerous because it is on top of a blind hill. The front footage is also questionable. And, in fact we've already touched on all the rest of that. I believe that if we allow this project to go through we will have far more problems to impose undue stress on our elderly because of issues I have brought up is not good planning on the part of Planning & Zoning. Therefore, I make a motion to deny the application. I'll second it. c�S�c e Okay any further discussion? 0,,o<N,(_tYes. Okay. 2 Um, I have some of the concerns. Oh. I'm very concerned about the noise. We have just been through many hours C_,of listening over the course of the last two years about someone who has a house next to an industrial area. And we have people from Main Street come in and complain about the noise from the trucks. And now we're putting a whole new residential development right next, closer to the problem, and people who are are hearing it. You know, after what we've been through over on, that's not Barber Road. �_orAO`' Barbara. Yeah. mean, I guess I just don't get it. I mean it just doesn't mare sense to me. The other thing that I'm concerned about is, I mean I like the housing for the elderly project. And I think they're a good thing. And I'm as we get older we see the need for more. Um, however, it is a kind, oh you're not going to get older. �C, � o I'm your older . . . vNU\`l It would take longer for Frank to get older. LGSl c° Right. Just wait to the next couple of months. At any rate, this is the kind of multi-family housing. When you look at all the little streets that go from Route 5 down to Main Street, this is like the first incursion of this type of housing into this area. And I think the potential after this is opening up a lot of doors for things to happen. I might there are life five or six streets all the way the length of South Windsor that go down Route 5 into Main Street. Hardly any of them have 3 any building on it. And I'm just overly concerned about starting some bind of a precedent with letting something like this start here. And somebody or someone else can say, well gee we were down on Chapel Road, or Pleasant Valley Road, there's a lot of land down there that's not developing. A lot of it's wet, and you can't do anything to it anyway. And this happens to be, I guess one of the higher area. But, it's just letting something happen down there, nothing's there right now. And you know that once one happens here there's going to be pressure to put others. And I just don't think it would, I just don't think it's the right place for it. •fit t i �<pYr Okay, when you say others, you mean other senior residence or just other development. ,-,,ca' &LtNot other development, I have I don't think, I mean have who knows what's ,,d\vn^planned for the rest of the whole area there. I don't think this is the area for multiple types of houses. That whole corridor going down there. And that's what I'm concerned about, being it one thing or another. �GnS Well . . Oh I'm sorry. I just wanted to say as I'm listening to Marcia. I sat here one evening with the Lou Miller family and we looked at an overhead of this piece of property with that industrial land. I can't imagine why Planning & Zoning allowed that home, Lou Miller's, to be put that close to industrial land. I was amazed, I thought it was the dumbest thing I ever saw. I'd just like to reiterate what Marcia said. What we're doing here is the same thing. I consider the Police ordinance for noise incidence ridiculous, it's not being held up. There's no problems t+,vn Gnsve,j. And at that portion of Marcia's statement I'd like to agree . . Well, one of the reasons I voted for the rear lot, was because that's the type j�,,c1ry of residential use I feel ought to go in. Next to a questionable area. To put the more dense development in seems to be exactly what all the rest of you are saying. It's seeing a lot of lot more people into contact with a possibly poor situation. Rather than restricting it through to a few. Like (too many papers shuffling around) 4 I thinly it's got a lot of problems from the standpoint of noise. I'm just not in favor of putting a dense piece of development into a questionable area. I disagree with the applicant who said that it was close to all sorts of things. Life the applicant mentioned the Community Center, not the Community Center the convalescent home, the Congregational Church. Things of this sort. It's not any it's not exceptionally close to any of those. Two, three miles that's quite a bit. Well or else it's a stupid regulation to have, requirement or regulation. Because you could argue well nothing is far away within the town. And I thinly that's really true. But, we in putting that into our regulation have to mean something more than that. Yeah. 1 �;5 More than just that you can hop in your car and you can go five miles, or three miles or whatever you need to do. I would life to see such an area stay densely developed. Walter, I thinly that there's a problem. You say why did we put residential next to industrial. What do you put there? Something has to go next to it. Wady No. If you looped at the overhead the way that little hoof. It was a little hoof 1(,Vec' Y that went up into it, and that lot could have been changed. So he wasn't that close. Well that was . . That's that's PtaVi I'm just reiterating, you know. All the problem I thinly that we all want to make. . . ,,,p&9hat was when the parr center compound . . 5 I think it's great to have the conservation easement land in there. Conservation commission land. I think that that's a positive thing for any kind of residential development that goes in there. o All right. All right. Well, oh Susan. Sorry. I just want to, you know, I agree with what everyone said. I just want to add c�er� my own perceptions having gone and deliberately driven Strong Road several times, especially when you've had a lot of that ice and snow and stuff. I don't think that particular parcel of land can handle that amount of development. So I wouldn't even, you know, I wouldn't even look at this at all for 20 units. It just, it can't handle it. The drainage isn't going to be there. �c,�,Ac o Same with density. LG�,e r,The density is just too much. Way too much. Vic,Sic o Anything further? Okay we have a motion to deny. And a second. A lot of discussion on it. � n S Can we have a motion to deny, I mean we've been through this before. Been there. Yeah, you don't have to reverse. C�Ct Spa Well there was a motion to deny. Yes, you did. You're right I did. I did. �cin5 Yeah, I know we've had discussion on this before, that's why I want to . . . Well I think we're done. . 4 'ON06 If you think you're done, if you all would indulge me and let me read you back 4�- what I've got to make sure its. D Well, I think we're done. ��,a.V%-Okay. The past history of the Planning and Zoning Commission with noise problems and complaints of residential areas next to industrial areas has been very intense. This would be the first incursion of multi-family housing on the west side of Main St. area, it would be precedent setting in the rural neighborhood of Main St. thus it is inappropriate for the Main St. area. Bringing in higher density against an industrial zone is not a good idea we should keep the density sparse. Abutting the industrial zone. Isn't it abutting? It will be when I finish. I'm just writing down what you're saying right now. It's ,\JaffcC�--not close enough to community services. The development density itself is too intense for this parcel. Does this summarize everything everybody said? o I think that about does it. O.K., let me call the motion. All those in favor of this application signify by saying aye. Ayes �0�kj J Abstentions or nays? This application is denied. CV 99 058 75 31 BANCROFT BROOK LLC :SUPERIOR COURT ET AL : JUDICIAL DISTRICT OF HARTFORD V. : AT HARTFORD PLANNING AND ZONING COMMISSION, : OCTOBER 5,2001 TOWN OF SOUTH WINDSOR MEMORANDUM OF DECISION Plaintiffs Bancroft Brook LLC and B & M Enterprises, Inc. appeal the decision of the defendant planning and zoning commission of the town of South Windsor denying the plaintiffs' application for a special exception/site development plan approval for the construction and operation of a Senior Residence Development(SRD) on their property in that town. The commission acted pursuant to General Statutes § 8-3, 8-3c and applicable plan and zoning regulations of the town. The plaintiff appeals pursuant to § 8- 8. The court finds in favor of the plaintiffs. -, CD T �sm AA V 1 The facts essential to the court's decision are undisputed and fully reflected in the record. Plaintiff Bancroft Brook LLC is the owner of a 9.11 acre parcel of land in South Windsor. Plaintiff B & M Enterprises, Inc. holds an option to purchase the property. The land is in a Rural Residential district, zoned R-40. Applicable zoning regulations allow the construction and operation of a Senior Residence Development providing housing for the elderly upon the obtaining of a special exception and site plan approval from the defendant commission. In October 1998, the plaintiffs applied for a special exception/site plan approval for an SRD consisting of twenty dwelling units on their property as well as a resubdivision. The requested resubdivision would carve out a single family residential lot, which would be adjacent to the SRD parcel. The commission convened a public hearing on November 18, 1998, which was continued to January 12, 1999, and concluded at that time. On February 16, 1999, the commission met and voted to deny the plaintiffs' application for SRD approval. The commission approved the resubdivision creating the single family residential lot. In its decision denying the SRD, the commission cited four reasons, set forth below verbatim: "1. Serious reservations about siting a high-density development directly adjacent to an industrial zone with existing industrial uses, due to the ongoing noise complaints from other residential developments abutting industrial zones. 2. Locating a multi-family development in the rural, historic Main Street area is inappropriate. This would set a precedent for future high-density development applications west of Route 5, which is an area whose rural character the Commission desires to preserve and maintain. Commissioners indicated that the density should be kept low in this area for both prevention of noise complaints 2 and preservation of rural character. 3. This site is not within reasonable proximity to community facilities or amenities which serve the needs of elderly residents. 4. The proposed density is too high for the site. " It is this decision which is the subject of this appeal. It is stipulated by the parties that the plaintiffs are owners of the property which is the subject of the commission's decision. They are, therefore, aggrieved by that decision and have standing to bring this appeal. In their brief and at oral argument on this appeal, the plaintiffs advance essentially three arguments in support of their appeal: 1)that the commission misinterpreted and illegally applied the applicable regulations; 2) that there was insufficient evidence of excessive noise emanating from the industrial zone; and 3) that one of the commissioners was biased and acted so as to deprive the plaintiffs of a fair hearing. Before addressing the specific issues raised by this appeal, it will be helpful to restate several general principles of the law relating to the role of the commission and the court in special permit cases. If an application for a special permit satisfies the requirements of applicable regulations and statutes, the commission must grant it. But this does not mean that the commission's review of the application is a mere formality. " We previously have recognized that the special permit process is, in fact, discretionary ... (We have also) concluded that general considerations such as public health, safety and welfare, which are enumerated in zoning regulations, may be the basis for the denial of a special permit. Also, we have stated that before the zoning commission can determine 3 whether the specially permitted use is compatible with the uses permitted as of right in the particular zoning district, it is required to judge whether any concerns, such as parking or traffic congestion, would adversely impact the surrounding neighborhood ... Although it is true that the zoning commission does not have discretion to deny a special permit when the proposal meets the standards, it does have the discretion to determine whether the proposal meets the standards set forth in the regulations. If during the exercise of its discretion, the zoning commission decides that all of the standards enumerated in the special permit regulations are met,then it can no longer deny the application. The converse is, however, equally true. Thus,the zoning commission can exercise its discretion during the review of the proposed special exception, as it applies the regulations to the specific application before it. ... In situations in which the zoning commission does state the reasons for its action, the question for the court to pass on is simply whether the reasons assigned are reasonably supported by the record and whether they are pertinent to the considerations which the commission is required to apply under the zoning regulations ... The agency's decision must be sustained if an examination of the record discloses evidence that supports any one of the reasons given. (Citations and internal quotation marks omitted.) Irwin v. Planning& Zoning Commission, 244 Conn. 619, 626-629 (1998). The first reason cited by the commission as a basis for its decision is that noise from the nearby industrial zone might engender complaints from residents of the SRD. The principal flaw in this reasoning is that there is nothing in the regulations that supports it. All of the regulations that might be considered even remotely pertinent to the proposal 4 in this regard are focused on potentially adverse effects that the project might have on the existing neighborhood, not on potential problems that the neighborhood might have on the SRD. Thus, for example, Regulations sec. 4.1.12.d.1. requires that "traffic impacts will not be detrimental to the residential character of the neighborhood." So, although the commission is "required to judge whether any concerns, such as parking or traffic congestion, would adversely impact the surrounding neighborhood," Irwin v. Planning and Zoning Commission, supra, 244 Conn. 627; even if noise is in the same category as parking and traffic congestion, the commission has no authority to reject a special permit application on the ground that the_applicant's property would be adversely impacted. Although noise that already exists in the neighborhood might very properly be a concern of the applicant and later of someone contemplating moving into one of the units, it would seem to be none of the commission's business in its consideration of this application. The commission's concerns are expressly based on "ongoing complaints from other residential developments abutting industrial zones." This would be relevant to the plaintiffs' application only if there was substantial evidence that there is also significant and undue noise emanating from the industrial property that is near the plaintiffs' proposed project. Such evidence as there is,however, is at best vague and unsubstantiated. The most egregious indication of the unreliability of this evidence is the statement made during the public hearing by one of the commissioners, Patricia Porter, who said that she herself had made two recent complaints about noise generated by a trucking company on the property nearest the plaintiffs' SRD. Later, when questioned 5 under oath at a deposition called by the plaintiffs, Commissioner Porter admitted that her statement at the public hearing was false. Further, and most significantly, on the noise issue, the court notes that South Windsor has enacted an ordinance establishing a "noise pollution standard," the purpose of which is to control the volume of noise emanating from a particular site. The ordinance sets noise limits for the different zones in the town, including the industrial zones, and it prohibits an individual or a business from emitting noise beyond its own boundary in excess of the applicable limit. This ordinance applies to the industrial zone nearest to the plaintiffs' property in the residential zone, which is the subject of this appeal. There is no evidence in the record that the noise emanating from the industrial zone into the plaintiffs' property is in excess of the applicable limit or that any of the businesses generating noise in that industrial zone have been the subjects of enforcement action pursuant to the ordinance. It is noteworthy in this regard that the commission's stated reason for denying the plaintiffs' application is that the commission anticipates noise complaints, not noise violations. The defendant commission argues that the ordinance would not adequately protect the residents of the SRD because the many exceptions to the enforcement provisions mandated by state law and regulations allow a legal but nonetheless bothersome level of noise. In effect, the commission says that the noise justifies the denial of the plaintiffs' application even though the noise level complies with the applicable regulations. This argument illustrates one of the fundamental flaws in the town's reasoning in rejecting the special permit. The commission concedes that the application conforms to the 6 i requirements of existing regulations, in this case the noise ordinance, but nevertheless rejects the application on the basis that the regulations are inadequate. In essence, the commission seeks to establish a higher or different standard for the current application than that already established by existing regulations. The law does not afford the commission such discretion in considering an application for a special permit that complies with the current regulations. If the town is not satisfied that current regulations accomplish its goals, the proper course is to change the regulations. The commission also argues, apparently in the alternative, that if it were forced by complaints from SRD residents to enforce the noise ordinance against businesses in the industrial zone, that would be contrary to the requirement in the regulations that the project have "minimal impact on surrounding properties." The commission's interpretation of this requirement is plainly erroneous. "Impact," in this context, obviously does not mean the effect that due enforcement of the law might have on a violator. The commission's reasoning, if adopted, would logically require it to reject any application for an SRD on the basis that the residents might insist that the government enforce laws that restrict the conduct of business -pollution prevention, traffic control, outdoor advertising, are just some examples that come to mind. The short answer to the commission's argument in this regard is that the government should enforce duly enacted laws without waiting for citizen complaints and without regard for the "impact" that such enforcement might have on the violator. Finally,the plaintiffs point out that the commission's approval of the new residential subdivision lot, which is directly adjacent to the industrial zone, is inconsistent 7 with its assertion that noise emanating from that industrial zone will be annoying or harmful to residents. In its brief to the court, the commission in effect concedes that the residents of the new lot might be just as adversely affected by the noise as the SRD residents, but since there will be at most only one family on the lot, the commission claims that its actions are "a reasonable compromise between the interests of the town in minimizing problems with noise" and the interests of the plaintiffs in the use of their property. The point that the commission seems to miss is that its actions should be based on the protection of all its citizens, that the protection of just one individual from illegal noise, or any other illegal activity, is as necessary as is the protection of many. If the commission was truly acting to protect its citizens from the harmful effects of noise from the industrial zone, it would not have approved a residential subdivision directly adjacent to the source of the noise even if only one person would be a victim. (It's entirely likely, of course, that a whole family will occupy the new lot,perhaps even a family that includes elderly people.) In approving the subdivision as a "compromise," however, the commission undermines its entire argument that excessive noise emanating from the industrial zone is a problem that can legitimately be a basis for official action; that is, can be a basis for denying the plaintiffs' application. For the reasons set forth above, the court concludes that there was insufficient evidence to support the commission's fmding that there was noise in excess of the legal limit emanating from businesses in the industrial zone to the plaintiffs' property. Further, the commission abused its discretion in denying the plaintiffs' application on the basis that noise from such businesses would harm or annoy SRD residents in the absence of 8 evidence that such noise exceeds the legal limit. The second reason given by the commission for denying the plaintiffs' application is that a multi-family development is "inappropriate" in the Main Street area of town. In its brief, the commission cites section 4.1.12.d.6. of the regulations in support of this reason. That section requires that the SRD proposal be "consistent with the goals and objectives of the Town Plan of Development." One of the goals of the Plan of Development is to establish a "Rural land use category" of certain land in the town zoned for residential use. This "category" is "characterized by the Community's lowest intensity land uses. The primary land uses to be encouraged are: agriculture; open space; nature preserves; and passive recreation. Residential land uses would be limited to single-family homes on large lots only, with recommended minimum residential density far exceeding one acre for every home." The plaintiffs' land is located within this geographical "category." The town's zoning regulations do not, however,provide these limitations on the plaintiffs' property, which is located in a residential A-40 zone. In addition to the single family homes on large lots endorsed by the town plan,the regulations currently in force for that zone permit professional offices, boarding houses, two family dwellings, and SRD's by special permit. That is to say,the town's duly enacted regulations have not caught up with the vision of the area set forth in the town plan. In Irwin v. Planning&Zoning Commission, supra, 244 Conn. 631, the Supreme court reaffirmed the general rule that "because the overall objectives contained in the town plan must be implemented by specific regulations, the plan itself can operate only as an interpretive tool," citing Smith v. Zoning Board of Appeals, 227 Conn. 71 (1993). In 9 1 . the Irwin case, the court approved the administrative agency's reliance on the town's plan of development but "only as an aid for interpreting the standards in the regulation." In the present case, in rejecting the SRD permit as "inappropriate" in the "rural Main Street area," the commission is not using the town plan as a tool for interpreting the existing zoning regulations,which allow SRD's by special permit, but rather, the commission is seeking to implement the goals of the town plan in the absence of specific zoning regulations accomplishing those goals. Such action exceeds the authority of the commission The third reason cited by the commission for denying the application is that the project would not be "within reasonable proximity to community facilities" for elderly people. The applicable regulation is section 4.1.12.d.8., which requires that: 8. The location of the SRD facility is within reasonable proximity to community facilities or amenities which serve the needs or elderly residents, or is within reasonable proximity to indoor/outdoor activity centers, or is within close proximity to or contains permanent open space land. (Emphasis added.) It is undisputed that the plaintiffs' project includes the donation of fifteen acres of land surrounding the SRD to be designated as permanent open space. Thus, the application complies with this section of the regulations, which requires reasonable proximity to community facilities only as an alternative to open space. The commission's argument that the open space must be suitable for hiking by possibly fragile or unstable elderly citizens finds no support in the plain language of this regulation. The last reason cited by the commission for denying the application is that "the proposed density is too high for the site." It is undisputed that section 4.1.12.f., as 10 applied to the project set forth in the plaintiffs' application, sets the maximum density at eight units per buildable acre, subject to an overall limit of twenty units. The site contains 7.89 buildable acres, and the proposal calls for twenty units. This is a "density" of 2.53 units per acre, well within the requirements of the applicable regulation. The commission argues that it has the discretion to impose tighter density limits within those contained in the regulations. In this case, the commission contends that its conclusion that the density of the plaintiffs' project is excessive is justified by evidence in the record of"poor drainage conditions." The court has examined the record in this regard . The record discloses, first, that the project was approved by the town's Inland Wetlands and Watercourses and Conservation Commissions. During the course of the public hearing before the defendant commission, the subject of drainage received some comment from town officials,the public, and the plaintiffs' engineer. There is considerable evidence in the record indicating that all drainage concerns were adequately addressed by the plaintiffs' final construction plans and to the satisfaction of the town's professional staff. The fact that the subject was discussed and that some members of the public were not satisfied with the final plans is not substantial evidence which would support the commission's decision in this regard. The court concludes that the commission's reasoning in rejecting the application insofar as it is based on the "density" of the project has no support in the regulations or in the evidence. In Irwin v. Planning&Zoning" Commission, supra 244 Conn. 628, our Supreme Court states the familiar rule setting the high bar that a plaintiff must scale in order to overturn a decision of the commission: "In applying the law to the facts of a particular 11 $ f case, the (commission) is endowed with a liberal discretion, and its action is subject to review by the courts only to determine whether it was unreasonable, arbitrary or illegal." In the present case, for the reasons set forth above, the court concludes that the commission's stated reasons for denying the plaintiffs' application for a special exception/site development plan approval are not supported by evidence in the record or by provisions of applicable law or regulations. The commission's decision may not, therefore, be affirmed. The appeal is sustained. Malone�J. 12