Loading...
HomeMy WebLinkAboutSite Plan - Conservation (512) Jill P ill Ale U olslola& 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 S R-00 AREA CODE 203/644-2511 September 19, 1984 Mr. A. Richard Lombardi, P.E. A.R. Lombardi Associates, Inc. 25 Terrace Drive Vernon, Ct. 06066 RE: STOCKPILING MATERIAL T & M BUILDING CO. COUNTRY VIEW ESTATES Dear Mr. Lombardi: At the September 17, 1984 meeting, The South Windsor Conser- vation Commission approved your request to stockpile material at the location of the Northeast cormer of Dart Hill Road and Lawrence Road intersection with the following conditions: 1. That stockpiled material at no time be in excess of -six (6) feet high. 1-lized 2. That said stockpiled material be stab-" under the direction of the Town Engineer. That said stockpiled material be depleted by the end of Phase IV Country View Estates' comy?letion. Very truly yours, � .mow'�g� (� Con.r.tance Eriksson, Chairman Conservation Commission Town of South Windsor CE/se cc: Town Planning and Zoning Commission, Robert F. Gilligan A. B. Davies, Deputy Town Engineer Jacqueline J. Smith, Town Clerk SEP 121984 A A L 0 8 g D i "CONSULTING ENVIRONMENTAL ENGINEERS" 25 Terrace Drive ASSOCIATES, INC. Vernon, nnecticut ososs Tale on (203)872-2703 A.Richard Lombardi,P.E.,President eA �e September 7, 1984 Town of South Windsor Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 Dear Sirs: As requested, please find a plan of an existing loam stock- pile for your review and approval . The stockpile location is in L the northeast corner of the intersection of Lawrence Street and Dart Hill Road (see attached plan for exact location) . Pertinent information relating to this stockpile of material is as follows : Owner - T & M Building Co. , 110 Brook Street Torrington, CT Length & Width - As shown on plan Height - Average 9-10 feet Slopes - 5 Horizontal , 3 Vertical Volume - 3460 cy The material stockpiled consists solely of topsoil excavated from the construction of Country View Estates. It has been seeded and a stand of grass has been established. It is expected that this stockpile will be increased in volume when construction of Phase IV commences. The estimated increase in volume would be 1800 cy for a total estimated maximum volume of 5260 cy. Seeding of any new stockpiled material will take place at lease monthly. If there are any questions relating to this plan, please give me a call . Very truly yours , A.R. LOMBARDI ASSOCIATES, INC. A. Richard Lombardi , P.E. President ARL/krr enc. WASTEWATER •WATER SUPPLY • HAZARDOUS WASTES • WATER RESOURCES• GEOHYDROLOGY SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT•SURVEYING 0 14 A e e -�own ILI I I i LLJ �\ w cr Lf) A i _ 1 I � I 1 I i r DAR � —. S7'OGMO/LE L 0r—A7'/UN f'LA N Q /`` G G G �• TAG!^� S�/.&-i�+' C� �.T�m7 s",C _ © � _�'d U7-/-,I �✓ice/.0�1�.�= CEO i./�/. 1.E1,;ENU LW 7 ORI(I 11L CO:TOURS ' I 1�L J PRES,:AT S OCKPILE SIZE 6 LOCATIOK FUTURE INCRI. SE IN STOCKPILE SIZE ' �i -3,34