HomeMy WebLinkAboutSubdiv - Conservation (21) OCT 2 81992
TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APPLICATION
THIS APPLICATION SHALL BE RECEIVED BY THE
INLAND WETLANDS AGENCY ACTION INLAND WETLANDS AGENCY AT THE REGULAR-
LY SCHEDULED MEETING ON THE SECOND MON-
APPLICATION NO. DAY OF THE MONTH AT THE TOWN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLICATE
AT THE OFFICE OF THE TOWN CLERK. TOWN OF
PUBLIC HEARING DATE SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO
(if necessary) THE REGULAR MEETING DATE.
COMPLETED APPLICATION
PERMIT GRANTED ATE" ��� �3iv�'�3II91& A SET OF PLANS MUST BE SUBMITTED TO THE
�- 4 18 frLf-41 tis7b�5-'— TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO
PERMIT DENIED i5ATE THE REGULAR MEETING DATE.
PLEASE PRINT.
1. APPLICANT Windshire Abbe TEL. NO. 644-9441
57s-tates Ltd.
ADDRESS 1665 Ellington Rd. CITY & STATE South Windsor, CT.
2. OWNER Same TEL. NO.
ADDRESS CITY & STATE
3. LOCATION OF PROPERTY Lot 35 Map 116 Lot 17 Map 117 Windshire Drive Ext.
NAMES OF ADJACENT PROPERTY OWNERS
See attached map titled "Key Map, Windshire Abbe Estates , Ltd. Phase III'
dated 10/82, prepared by Fuss & O'Neill, Consulting Engineers .
STATE CLEARLY AND BRIEFLY
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED:
Develop Subdivision during 1983.
ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE
AGENCY HAVE BEEN SUBMITTED.
APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
MISSION.
A FIFTEEN DOLLAR ($15) APPLICATION FEE IS REQUIRED, AND IT MUST BE SUB-
MITTED TO THE AGENCY AT ITS REGULAR MEETING.
SIGNED: ,'ljl eGfd� jk
(A ant)
Owner)
Revised 3/78
tom'""ti. United States Soil 340 Broad Street
.-. .........
Department of Conservation Windsor CT 06095
Agriculture Service Phone 688-4946
October 26, 1982
Mr. William O'Neill
210 Main Street
Manchester CT 06040
Dear Mr. O'Neill:
This is to verify the field location of the wetland boundary behind the
Windshire Drive turn-around in South Rindsor. The boundary was flagged
with ribbon. Bramblebrae Road is proposed to cross at the upper limits
of the upper end of a small finger of the wetlands. The road would not
be crossing a wetland according to the revised wetland boundary.
The soil boundary was generally accurate according to the Hartford County
Soil Survey Report with the exception of a few minor changes.. Kathy Cyr
and I checked the soil boundary on 10/22/82. -
This wetland is at the upper limits of the major wetland area. Dominant
species of the wetland are intermediate size red maple with some white ash.
This wetland finger has less significance to wildlife, but all segments
of a wetland are important toward the total unit.
I hope this information will be useful toward proper land use of the area.
Sincerely,
C,%
Vern Anderson
District Conservationist
ATTACHMENTS
i
OVThe Sol.conservation Serwce SCS-AS-1
is an agency of the 10-79
Deoartment o' Agriculture
i
Fuss&O'Neiil Inc.
210 Main Street
Manchester,Connecticut 06040
Telephone(203)646-2469
November 4, 1982
Mr. Bowen Davies
Deputy Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Application No. 216, Windshire Abbe Estates, LTD .
Phase II - November 8, 1982 Meeting
Dear Bowe:
I have enclosed a copy of the October 26, 1982 letter
from Mr. Vern Anderson of the U.S. Soil Conservation
--- Service regarding the above referenced wetlands.
If you have any questions Or wculd like to review this
R
application in the field prior to the meeting, please let
j me know. -
Thank you for y your continued assistance.
Very truly you rs,
William D. O'Neill, P.E.
WDO/jb
Enclosure
cc: Attorney Harold Cummings -
Mr. Richard S. Kelley
i
4owM a�+
7-OWn
`,1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~Os0R.0 AREA CODE 203/644-25n
November 10, 1982
Windshire Abbe Estates, Ltd.
1665 Ellington Road
South Windsor, Connecticut 06074 RE: APPLICATION NO. 216
ATTENTIONS Richard S. Kelley Windshire Abbe Estates, Ltd.
Phase II
Dear Mr. Kelleys
Upon review of your proposal for the above application, the
Inland Wetlands Agency has determined that more information is re-
quired before making a decision.
At present the Agency does not have a full statement of the
impact on the adjoining wetlands and abutters. When you have this
information,please contact the Agency and you will be placed on the
next available agenda.
Ve y truly y rs,
M
Calvin Lane, Vice-Chairman
INLAND ►NIETLANDS AGENCY
TOWN OF SOUTH WINDSOR
CL s chin
CC: Harold R. Cummings, Attorney
William O'Neill, Fuss & O'Neill
A. B. Davies, Deputy Town Engineer
Marshall Montana, Chairman, PZC
t0* SEA
7_0_wf_;� O-P SOM44 ?dliul"6-ot
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONK. 06074
I.0 AREA CODE 203/644-2511
December 10, 1982
Mr. William D. O'Neill, P.E.
Fuss & O'Neill Consulting Engineers
21.0 Main Street
Manchester, Connecticut 06040
RE: WETLANDS APPLICATION
WINDSHIRE ABBE, SECTION II
Dear Mr. O'Neill:
In response to your letter of December 7, 1982, and a review
of the progress prints, your proposal is unacceptable.
There has been no change from the presentation to the Inland
Wetlands Commission in that the design is similar to the 1950 ' s
in which you are making a point discharge of a _30" pipe within
30 feet of an abutter, (structure No. 12) and you are grading the
abutter' s property without any documentation.
In the preparation of Section I, there was much effort put
into the design of-the 200+ acre watershed, the outlet structure and
the downstream improvements It appears that Section II is an
independent subdivision- and should make _its own arrangements for
storm water. detention and discharge across lands of others.
Until this matter has been resolved to the satisfaction of
the Town Engineer and the Town Attorney, I would not expect an
approval of the Wetlands Commission.
If you have any questions or wish to discuss this further, I
can be contacted at 644-2511, Extension 244.,
Very trulyyours,
TOWN OF SOUTH WINDSOR
A. Bowen Davies
Deputy Town: Engineer
cc: J. E. Page, Acting Director of Public Works
Richard Kelley
Mr. & Mrs. Thomas Field
C. Eriksson, Inland Wetlands Chairperson
a
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONK. 06074
a•co AREA CODE 203/644-2511
December 15, 1982
Windshire Abbe Estates, Ltd.
0/0 Richard S. Kelley
49 Rosemary Lane
South Windsor, Connecticut 06074 CERTI`FIE_D MAIL
Dear Sir:
At the December 13, 1982 meeting, the South Windsor Inland Wetlands
Agency approved a one-year extension for your Application NO. 184-
Windshire Abbe Estates, Ltd. , Phase I for property located on the
East side of Abby Road Ext. , South Windsor, Connecticut.
This extension is effective November 9, 1982 (the original expira-
tion date) through November 9, 1983.
Very truly yours,
Constance-�riksson, Chairman
IhTLAND WETLANDS AGENCY
TOWN OF SOUTH WINDSOR
CEsehm
CC: A. B. Davies, Deputy Town Engineer
Charles Enes, Town Clerk
Marshall Montana, Chairperson, PZC
Thomas D' Auria, Building Official
Harold R. Cummings, Esq.
(0*w at
a'
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
R.00 AREA CODE 203/644-2511
::`arch 23, 1983
indshire Abbe ;states, Ltd.
166J :�llington load
;oath .'indsor, Connecticut 06074 ':,I 'JS ,F , ; II
ATTENTION: Richard S. Kelley, President
Harold P. Cummings, :attorney
Gentlemen:
Before the inland -:�etlands rgencyy can make a ue lerr ina tion
on your application, the follo,!ing additional in'orriiation is
necessary:
1. The impact .-hase II will have on the wetland, the
detention basin and the surrounding areas, includinc:
the abutting Ireland ?oroper+v.
2. P lease designate on the plan the peri_,�eter of the
wetland.
3. 'the impact on the wetland under 100-year storm
conditions.
4. mhe increase in the a count of :,ate-: in the - etland,
in acre eet, Burin a. 100-wear story:..
profile of the lance alon; the boa?ldarN line bete:seen
the in,,?shire ,bbe Estates propert?% and file ire'and
property ;used on a field -survey.
I you ,rish to be place? on an _ -111ril at-enda, lease contact
the enc ; secretaryno later t lan .:arch 31, 198 3.
'lery truly, ,Tours ,
stance =,rikz, Chair :_an
CC: 9.. _iavies, T:eput T ' o,?n nF=ineer
1111ai'1 C. e i 1 , =11SS c�L C) ei 11
J
O
Ma r c n 2 5, 1983 FUSS&OWEILLconsulting engineers
Mr. Bowen Davies
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Windshire Abbe, Phase II
Stormwater Management Plan
Impact ' on Property N/F Ireland
Dear Mr. Davies:
As per your request, we have consolidated our previously submitted
computations to address the above referenced concern. You will
see on the attached sheet that the construction of Phases I and II
of Windshire Abbe will not measurably change the water surface
elevation in the natural detention area during a 100 year storm.
As you are aware, the proposed stormwater discharge in Phase II is
approximately 1000 feet from the property line of Mr. Ireland .
The route from the discharge to the property line is through a
heavily wooded swamp.
If you have any additional questions , please call .
Very/truly yours ,
William D. O'Neill , P.E.
WDo/jb
Enclosure
cc: Mr . Richard Kelley
Attorney Harold Cummings
210 MAIN STREET / MANCHESTER. CONN. 06040 / TELEPHONE (203)646-2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC• PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY
I
I I� I
So
•zti apo ws� rti ; Q-ot,,r u,Ir -L. q' _'4a�-r y4. � Sc
I Z;yc. 4 t .21 Z3S.•3 �co I yy:� Z38.2 y Q 47.7 Z.3g.z.G� ;Tlv)O
CD 0
s. (48: M
t7s',1 ( i3a•3 102 t��.o 23q.3 Lo-7 tul �' 23
i
I OY� 2 35 2�� uf -, �3 ,�i�
I 2
! � M
CAF
• 1
,
I ,
1 i I j 1 I
r
i i 1
i
•Tti-� wa` •• 3 w, tt� � ��.+�'�� �: C uV. �oo o at �, m
�oo�' . �atir�a.�t 3•s. n u,��os�s oti l �4v�•1�eG•e %AAs-
,� vto-fi fpwo c- 1 S,.G S w4u i i-w C!:5 i n
tz m
i
i
1 U
I
•
I
_ rr, o
o i m
nee •e 4
R�R 8 1983
O 044� Z/r 1�
April 5, 1983 FUSS&O'NEILLconsulting engineers
Mr. Bowen Davies
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Windshire Abbe Estates - Phase II
Supplemental Data - Inland Wetlands Permit
Dear Bowe:
In response to the March 23, 1983 letter from the Inland Wetlands
Agency, I offer the following:
1 . Assuming full development of Windshire Abbe Estates Phase I
and Phase II the increased run-off during the 100 year storm
will not measurably raise the water surface elevation in the
natural detention basin. Therefore, the property N/F Ireland,
which is more than 1,000 feet from the proposed Phase II storm
water outfall, will not be flooded from the increased run-off
from Windshire Abbe Phase I and II.
2 . The field located limit of the wetland is shown on the 1"=40 '
plan. (Sheet 4 of 7) . The approximate wetlands limits shown
on the attached 1"=200' plan are based on the Town' s official
wetlands map.
3 . The increased storm water run-off in the detention area during
the peak 100 year storm attributable to Windshire Abbe Estates
section II is 0.62 acre feet.
4. The enclosed profile dated 4-5-83 was developed from field
information showing the elevations along the northern property
line of property N/F Ireland.
Hopefully this information is responsive to your request and we
may expect action at the April 11, 1983 meeting. If you have any
questions please call .
Very truly yours,
William D. O'Neill, P.E.
WDO/ldb
cc: Atty. Harold Cummings
Richard Kelley
210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY
APR 8 1983
FUSS&O NEILL
consulting engineers
April 6, 1983
Mr. Bowen Davies
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Surface Restoration Specifications
Windshire Abbe Estates Phase II
Dear Bowe:
As per our discussion I have attached a Surface Restoration
Specification for your consideration.
If you have any questions, please call .
Very truly yours ,
- William D. O' Neill, P.E.
WDO/ldb
cc: Harold Cummings
Richard Kelley
210 MAIN STREET / MANCHESTER, CONN. 06040 1 TELEPHONE (203)646-2469
SDLID WASTE MANAGEMENT e WASTE VYATER SYSTEMS a EROSION CONTROL e WATER SYSTEMS e HYDROLOGY and DRAINAGE SYSTEMS a SITE PLANNING
HIGHWAYS and BRIDGES e SURVEYING 9 LANDSCAPE ARCHITECTURE e TRANSPORTATION and TRAFFIC e PUBLIC WORKS MANAGEMENT a HYDROGEOLOGY
SURFACE RESTORATION
DESCRIPTION: This work shall consist of placing topsoil,
furnishing topsoil when required, fertilizing, seeding and
mulching areas shown on the plans .
MATERIALS: Materials for this work shall conform to the following
requirements :
Topsoil : Topsoil excavated from the project shall be used
whenever possible. Topsoil supplied by the Contractor shall
conform to the requirements of Article M. 13 .01-1 of Form 812.
Fertilizer: Fertilizer shall conform to the requirements of
Article M. 13 .03 of Form 812.
Mulch: Mulch shall conform to Article M. 13 .05 of Form 812 and
shall be hay or wood fiber.
Seed Mixture: Seed mixture for seeding shall conform to the
following requirements :
Permanent Grass Areas
Proportion Minimum Minimum
by Weight Purity Germination
Percent Percent Percent
Kentucky Bluegrass 25 85 75
Creeping Red Fescue 35 98 85
K. 31 Tall Fescue 30 98 85
Domestic Ryegrass 5 98 90
Alsike Clover 5 96 85
Temporary grass areas shall be 100 percent perennial Ryegrass .
The seed mixture shall be delivered in new, clean, sealed
containers . Labels and contents shall conform to all State and
Federal regulations . Seed shall be subject to the testing
provisions of the Association of Official Seed Analysts .
CONSTRUCTION METHODS: All topsoil excavated from the project
shall be used. The areas on which topsoil is to be placed shall
be graded to a reasonably true surface . Topsoil shall then be
spread and shaped to the lines and grades shown on the plans . All
stones , roots, debris, sod, weeds and other undesirable material
shall be removed. After shaping and grading, all trucks and other
equipment shall be excluded from the topsoil area to prevent
excessive compaction. The Contractor shall perform such work as
required to provide a friable surface for seed germination and
plant growth prior to seeding.
y' �
Any earth material that is stockpiled must be immediately seeded
with perennial Ryegrass to minimize the dust and erosion.
During hauling and spreading operations , the Contractor shall
immediately remove any material dumped or spilled on pavement.
It shall be the Contractor' s responsibility to restore to the
line, grade and surface all eroded areas with approved material
and to keep topsoiled aras in acceptable condition until the
completion of the construction work.
The areas to be seeded shall be made friable and receptive to
seeding by approved methods which will not disrupt the line and
grade of the slope surface . In no event will seeding be permitted
on hard or crusted soil surface. All areas shall be free from
weeds taller than three ( 3) inches .
The normal seeding seasons shall be March 15th to June 15th and
August 15th to October 15th. Seeding at other times shall be done
only when ordered by the Owner.
Areas of disturbed soil which will contribute significantly to air
and stream pollution shall be established to the designated
vegetative cover as soon as feasible.
e. Seed shall be uniformly applied by any agronomically acceptable
and feasible method approved by the Engineer. Seed mixture shall
" be applied at the rate of 100 pounds per acre for permanent areas
and 60 pounds per acre for temporary areas . Fertilizer shall be
uniformly placed at the rate of 640 pounds per acre.
, All seeded areas shall be mulched with hay or, if hydroseeding is
used, wood fiber. Hay shall be uniformly applied by an approved
method to a placed depth of two (2) inches . Hay shall be held in
place by one uniform application of asphalt emulsion Type SS-I,
applied at the rate of 0. 08 gallons per square yard. The emulsion
shall have a temperature range within 50 to 120 degrees F at the
time of the application. The emulsion may be applied during or
immediately after the application of the mulch. Wood fiber mulch
shall be uniformly applied at the rate of one (1 ) ton per acre .
The Contractor shall keep all equipment and vehicular and
pedestrian traffic off areas that have been seeded to prevent
excessive compaction and damage to young plants .
The Contractor shall be required to replant areas damaged by
water, wind, fire, equipment or pedestrian traffic.
Work under this item shall not be complete until all stones and
debris have been removed from the seeded areas . In areas where
topsoil and seeding are not required, all disturbed areas shall be
neatly graded and cleared of all debris.
e
tpy1N SE4
soam
o r
5 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 66074
OR-CO AREA CODE 203/644-2511
April 20 , 1983
Windshire Abbe Estates , Ltd.
1665 Ellington Road
South .Jindsor, Connecticut 06074 CERTIFIED i:AIL
ATTENTION;: Richard S . Kelley, President
Harold R. Cummings , Attorney
Gentlemen:
At the April 18 , 1983 meeting, the South -iJindsor Inland- ,Jetlands
Agency approved with conditions your Application NO. 216 for Phase II
of the residential subdivision located on Jindshire Drive Ext. and
Bramble Brae Road, South tJindsor, Connecticut.
The permit is based on the plans entitled "cJindshire Abbe EstatesLtd. ,
Phase II , South indsor, Connecticut, " Sheets 1-7 of 7, dated 2/7/83,
' drawn by Fuss & 0"Neill , Consulting Engineers.
~ The following conditions must be adhered to for this permit
to be valid: /
1. The proposal is subject to the approval of the
Town ngineer.
2. No rubbish or debris shall be left on the property.
3. The applicant shall indemnify and hold harmless the
Town of South '�Jindsor against any liability which might
result from the proposed operation or use.
4. The permit is valid for one year and shall expire if not
initiated and completed within one year from the date of
approval .
Ve truly yo`y�s ,
7
onstance Eri. sson, Chiarman
IN,LAiIDI AGENCY
TOlJ'N1 OF SOUTH JI'dDSOR
CE : chm
\ cc : A. B . Davies , Deputy Town Engineer
(Continued on rage 2. ) '
LAW OFFICES
KUEHN, CAVANAUGH AND CUMMINGS, P. C.
1665 ELLINGTON ROAD
SOUTH WINDSOR, CONN. 06074
(203) 644.3473
WEST HARTFORD OFFICE:
EDWARD R. KUEHN 968 FARMINGTON AVENUE
DANIEL R CAVANAUGH WEST HARTFORD, CONN. 06107
HAROLD R.CUMMINGS -
FRAZIER G. SCOTT (203)236-2973
HARRY D.WELLER March
LORRAINE PAULHUS March 8, 1984 PLEASE REPLY TO:SOUTH WINDSOR
Y
Inland Wetlands Agency
Tom of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
In Re: Application No. 216 Windshire Abbey Ltd. Phase II
Attention Corinne H. Murray
Dear Corinne:
Per your letter of March 2, 1984, on behalf of Windshire Abbey Estates, Ltd. I am
requesting an extension of the above reference permit for another year. Enclosed
please find a check in the amount of $15 for the extension fee.
I would appreciate the Inland Wetlands Agency considering this request at its earliest
convenient opportunity.
Sincerely yours,
HkR. Ogs
HRC/can
Enclosure
c Tlov'/ .. 074C Soa& ?V .
9 ��~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
x•co� AREA CODE 203/644-2511
March 21 , 1984
Windshire Abbe,Ltd.
C/o Harold R. - Cummings, Esquire
1665 Ellington Road
South Windsor, Connecticut 06074 CERTIFIED MAIL
Dear Sir:
At the March 19, 1984 meeting, the South Windsor Inland WEtlands
Agency approved a one-year extension for Application NO. 216 by
Windshire Abbey Estates, Phase II on Windshire Drive and Bramble
Brae, South ,Windsor, Connecticut.
The extension becomes effective April 18, 1984 (the expiration
date of the previous approval) through April 18, 1985.
Very truly yours
Calvin Lane, Vice-Chairman
Inland Wetlands Agency
Town of South Windsor
CL: chm
cc: A4 B. ?Davies, Deputy Town Engineer
Robert Gilligan, Chairman, PZC
Thomas D' Auria, Building Official
Peter De Mallie, Director of Planning
Charles !�n.es, Town Clerk