Loading...
HomeMy WebLinkAboutSite Plan - Conservation (491) TOWN OF SOUTH WINDSOR SEP 14 1982 INLAND WETLANDS AND WATER CO R APPLICATION INLAND WETLANDS AGENCY ACTION THIS APPLICATION SHALL BE RECEIVED BY THE INLAND WETLANDS AGENCY AT-THE REGULAR - APPLICATION SCHEDULED MEETING ON THE SECOND MON- APPLICATION NO. o DAY OF THE MONTH AT THE TOWN HALL. RECEIVED DATE ® /Z17,9A THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK. TOWN OF PUBLIC HEARING DATE(if necessary) SOUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO COMPLETED APPLICATION THE REGULAR MEETING DATE. PERMIT GRANTED DATE t�l�Ig� A SET OF PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO PERMIT DENIED DATE THE REGULAR MEETING DATE. PLEASE PRINT. 1. APPLICANTFaith Tabernacle Church, Inc-EL. NO. 568-6282 ADDRESS 1535 Forbes Street CITY & STATE East Hartford, CT 2. OWNER John C. Midlin TEL. NO. ADDRESS 1970 John Fitch Blvd. - CITY & STATE South Windsor, CT 3. LOCATION OF PROPERTY 1970 John Fitch Blvd., South Windsor, CT NAMES OF ADJACENT PROPERTY OWNERS John P. Malin, John G. Roman, Anne Batulevitz, William and Evelyn Ulcinskas, Culbro Corporation, Martin F. McGrath, Holiday . - -�nterprises and Sperry Wood Corporation STATE CLEARLY AND BRIEFLY 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: Erection and use of a church and school building and conversion of an existing single family residence to this use. ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQU-IRED BY THE AGENCY HAVE BEEN SUBMITTED. APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. 1 A FIFTEEN DOLLAR ($15) APPLICATION FEE IS REQUIRED, AND IT MUST BE SUB- MITTED TO THE AGENCY AT ITS REGULAR MEETING. SIGNED: i (Applicant) I c a It;K (Ow er) Revised 3/78 Aot raAOaP A.4"o-a nem #6% Lji p od CN-CONS-7 SOIL AND NATURAL SOIL GROUPS MAP 3-73 Prepared by (File Code U. S. DEPARTMENT OF AGRICULTURE . SOIL CONSERVATION SERVICE c== • CONS-14-5) Cooperating with == CONNECTICUT AGRICULTUREAL EXPERIMENT STATION, r STORRS AGRICULTURAL EXPERIMENT STATION, AND Hartford County SOIL AND WATER CONSERVATION DISTRICT COOPERATOR own or SouthWindsor DATE Oct 15, 1982 COUNTY Hartford STATE Connecticut APPROX. SCALE 1:20 000 SOIL MAP NUMBER SYMBOLS 324-B-1 or CaB = DETAILED SOIL SURVEY A-la, B-2a, etc. = NATURAL SOIL GROUP Soil Map SOIL NAME N.S. Sheet Symbol Group No. pWwA f6 Wv�„�!�. W.wA nA ►` nA - Id �L ake =� 340 Broad Street f , United States Soil u3k Department of ConservationWindsor CT 06095 ; � Agriculture Service - Phone 688-4946 October 15, 1982 TO: Hartford County Soil and Water Conservation District FOR: A. Bowen Davies, Deputy Town Engineer Town of South Windsor RE: Faith Tabernacle Church INVENTORY 1. Proposal is to construct a church building and parking area on a part of a 61.28 acre parcel. There presently is an existing house on the parcel. 2. The Scantic River flows through. the property and the 100-year flood line encompasses part of the area.. However, no work is proposed to be done within this 100 year flood line. 3. The soils on the property are: Am - Alluvial Land - BfA - Biddeford silt loam, 0 to 3 percent slopes-, very poorly drained BxC - Buxton silt loam, 8 to 15 percent slopes, moderately well drained EnB - Elmwood sandy loam, 3 to 8 percent slopes, moderately well drained * LmA - Limerick silt loam, 0 to 3 percent slopes, poorly drained * ScA Scantic silt loam, 0 to 3 percent slopes, poorly drained Te - Terrace Escarpments sand and clay * denotes an inland wetland soil. EVALUATION 1. The plans show the planned access drive and possibly some of the building in the area of the Biddeford very poorly drained soil. The boundary of this wetland soil type should be delineated in the field and shown on the site plan. 2. The proposed sediment basin is providing for approximately 3.71 + of water and sediment storage based on the elevations shown. The Buxton soil type is very erosive and provision for sediment removal are not shown. Detail on the peak runoff from the site is needed to insure that the basin is properly sized and an emergency spillway location is shown. 1 3. The proposed outlet of the culvert at the main drive has a hay bale check dam shown. There exists a potential for gully erosion at this point. A rock rip rap plunge pool would be more effective as an energy dissipator. 0 The Soil Conservation Service `J is an agency of the SCS-AS-1 Department of Agriculture 10-79 FOR: A. Bowen Davies, Deputy Town Engineer age 82 p Town of South Windsor page -2- RE: Faith Tabernacle Church 4. The runoff from the 24 car parking area on the east side of the building and the access drive is proposed to be directed to a "paved leakoff"and r discharged into a swale to the sediment basin. There exists a potential for erosion to occur at this "leakoff" as it enters the swale. A suggestion is to use curbing on the access drive and direct all runoff into a catch basin and pipe the water to the sediment basin and outlet into a plunge pool. 5. Hay bales should be installed at the top of the steep undisturbed slopes to contain sediment on site and eliminate possible runoff problems. This will provide erosion sediment protection for the Scantic River. 6. The major portion of the area of the parking area, building site and septic system is located on the Buxton silt loam soil. This soil has a high water table ranging from 12" to 24" from the surface. The proposed septic tank and pump chamber will be in this water table. Since the proposed elevation of outlet of the pipe from the tank to the leaching area is 36.3 and the bottom of the chamber is 71'6" which is elevation 28.8, the entire pump chamber will be under water. The data for test hole #4 supports r the existence of the high water table with mottling at 24" and the existing ground is 43.0. There should be subsurface drainage installed in the area of the tank and pump chamber to lower this water table. The catch basins for the parking area will also be in this water table. Subsurface drainage should also be used to lower the water table. This will provide a more suitable soil base for material for the parking areas and reduce frost heaving potential. 7. All topsoil should be stockpiled and temporarily seeded or have haybales at the base. This will protect the Scantic River from sediment. In conclusion the main concerns are the wetland soil boundary, high water table, sediment basin and protection of the steep slopes. The Connecticut Erosion and Sediment Control Handbook will be valuable in developing an erosion and sediment control plan. Any questions give me a call. Sincerely, Rob Cochran Soil Conservationist USDA Soil Conservation Service ATTACHMENT CC: Wilson M. Alford, Alford Associates, Inc. gOwN SE7 t� C r Zwn, 011?slolt� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R.CO � AREA CODE 203/644-2511 November 10 , 1982 Faith Tabernacle Church/John Midlin 1535 Forbes Street East Hartford, Connecticut 06118 CERTIFIED MAIL ATTENTIONS Rev. Ralph A. Saunders Dear Sirs At the November 8, 1982 meeting, the South Windsor Inland-Wetlands Agency approved with conditions your Application NO. 214 for a church, school, residence on property located at 19?0 John Fitch Boulevard, South Windsor, Connecticut. The permit is based on the set of plans entitled "Faith Tabernacle Church, U. S. Rt. 5, South Windsor, Ct. , "numbered SP-1, 3 & 4, A-1, A-2, and SK-1, drawn by Wiles and Associates Architects, dated 9/14/82; and "Faith Tabernacle Church, U. S. Rt. 5, South Windsor, Ct. , Topographic Map; numbered SP-20 drawn by Wiles and Associates Architects and Alford Associates, Inc. , dated 9/13/82; revised 9/29/82 and ll/1/82. The following conditions must be adhered to for this permit to be valid. 1. The Scantia River shall be protected from soil erosion and siltation by the following precautions. a. There shall be a continuous berm of hay bales along the periphery of the river. b. All disturbed areas shall be seeded in accordance with the SCS Manual ,151 and subject to the approval of the Town Engineer. c. A detailed sequence of operations is required,subject to the approval of the Town Engineer. d. A Conservation Plan including, but not limited to ,the above mentioned precautions shall be submitted to and approved by the Conservation Commission prior to any earth movement and/or construction. Faith Tabernacle Church/John Midlin 1535 Forbes Street East Hartford, Connecticut 06118 ATTENTION% Rev. Ralph A. Saunders Letter of Permit - Application No. 214 November 10, 1982 Page 2. 2. The applicant shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 3. This permit shall expire if not initiated and completed within one year from the date of approval. Very truly ours, Calvin Lane, Vice-Chairman INLAND WETLANDS AGENCY TOWN OF SOUTH WINDSOR CLschm cos Lawrence M. Wood, Attorney Len Xbrton, Alford Associates, Inc. A. Bowen Davies, Deputy Town Engineer Charles Enes, Town Clerk Edward F. Havens, Mayor Richard J. Sartor, Town Manager - Marshall Monatan, Chairperson, PZC Richard Ryan, Town Council Liaison Thomas D'Auria, Building Official Peter De Mallie, Director of Planning Peter Bortolan, Chairman, EDC Sow H af4 t� a u 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 oe•CO AREA CODE 203/644-2511 December 9 , 1982 Howard M. Wood, III, Esq . P. 0. Box 515 Glastonbury, Ct . 06033 Dear Mr . Wood: Re : App . #887 - Faith Tabernacle Church Please be advised that the Planning and Zoning Commission voted to approve the application of Faith Tabernacle Church for a special exception of 4 . 1 . 8b of the Zoning Regulations, and the site plan of development for approximately 61. 28 acres on the east side of John Fitch Boulevard, as shown on plans prepared by Wiles & Associates , Architects , dated September, 19829 entitled Proj . No . 82-.292 , subject to the following modifications : 1 . The applicant shall be responsible for installing traffic signalization on Route 5 where it intersects with the proposed driveway, or in lieu thereof , other appropriate means for controlling traffic at this location. Said traffic signals , or other improvements , shall be installed at the expense of the applicant and are subject to approval of this Commission and the State of Connecticut Department of Transportation . A surety bond in the amount of $10, 000 shall be submitted to the Town of South Windsor to ensure that such improvements are made . 2 . A fire hydrant shall be installed in close proximity to the proposed school building and shall be connected to the public water system in Route 59 and is subject to approval of the Fire Marshal . The location of the hydrant shall be shown on the plot plan . A surety bond in the amount of $2, 500 shall be submitted to the Town of South Windsor to ensure that said hydrant is properly installed . 3 . A surety bond in the amount of $59000 shall be submitted to the Town cf South Windsor to ensure that landscaping is completed in accordance with the approved plan. Howard M. Wood , Esq . -2- 12/9/82 4 . This approval is subject to the conditions of approval of the Inland Wetlands Agency dated November 10 , 1982 . 5 . The survey of this property prepared by Petersen & Hoffman, dated May, 1980, must be reproduced on a mylar and bear an A-2 certification, and shall be filed in the Town Clerk ' s Office . 6 . The title page, page SP-1 and SP-3 shall be reproduced on mylars, signed and stamped by this Commission, and filed in the Town Clerk ' s Office within 90 days of the date of approval (by March 8 , 1983) . Pages SP-1 and SP-3 shall bear an A-2 certification and shall be signed by a Land Surveyor or Pro- fessional Engineer and shall bear the imprint of his seal , prior to being submitted to this Commission for filing. The letter of appro-al of this Commission, as well as the Inland Wetlands Agency, shall be reproduced on the title page . 7 . No building permits will be issued until the final plans have been filed in the Office of the Town Clerk. Yours very truly, PLANNING AND ZONING COMMISSION v g By : Marshall Montana, Chairperson CC: J. Page, Town Engineer W. Ryan, Chief of Police P . DeMallie, Planning Director J. P. Moriarity, Conndot T. D'Auria, Building Official Inland Wetlands Agency/ ;•. =.: - RUNS � kid-Yfi-.ts�9 �. 81 C.'+��- ' RK .$. �a 5 ARC!11TECIS/fJLI1NNERS December 21 , 1982 Faith Tabernacle 1535 Forbes Street East Hartford, Cohnecticut 06148 Attention: Rev. Ralph Saunders Re: Faith Tabernacle South Windsor Dear Rev. Saunders: We have just received codes of letters from South Windsor Town -fall , as transmitted to us by Attorney Wood. In response to the letter Vated December 9, 1982 from Marshall Montana, Chairperson Flc(n?is & Zoning Commission, to -John Mor•iarity of Connecticut- D.O.T. we had seat three sets of . presentation drawings to Mr. Ma iarity's attentiononOctober 13, 1982. He has Kvi ewe d our site plans and has proposed these revisions, per our telephone conversation of December 14, 1982: 1 . Provide a 10' wide storage lane within the existing Route 5 median stria for southbound left-turning traffic onto our site. It should be 100' in length with an 80' taper. This would necessitate re--locating an existing catch basin. In Mr. Moriarity's opinion, a traffic light would not be necessary if a storage lame were provided. The amount of traffic generated, as a result of. o_fr project, could not be significant enough to warrant such an expensive installation. 2. Delete -the proposed island located within the project's entrance drive for maintenance purposes_. He stated that this island does- not pose as a traffic safety hazard and therefore is purely a suggestion, not a requirement. continued . . . . . W5 WAS Mil Had Fairfield, -onn cticuf(W13o (t D31 366 6003 MR .- - MOSS", BUMES 11 rMT:V ram•° .;gig �-�-�� .�-���:�y, ,� ;; ; ARC PiAI'jNERS December 21 , 1982 - 2 - Faith Tabernacle Mr. Moriarity has drawn a revision sketch showing the storage lane and deletedisland. He will be forwarding a copy of this sketch to our office along with S written list of his suggestions. We will send a copy of this to the Town Nall to answer any questions they may have concerning the traffic light. Concerning the letter dated December 9, 1982 from Marshall. Montana to attorney Wood, 4,e will be completing items ;5 and no within the next several ;creeks. If you have any questions, please call . Yours very truly, i UJU �Hl ' j y o;�' Laura' E. raeh,er y EK/fda cc: attorney Wood Alford Assoc. IL. Morton) Marshall Montana, Chairperson P & Z J. Pane, Town Engineer W. Ryan, Chief of Police Fire Chief ?anning T. D'Auria, Building Official .i. P. MorArity, Conn. D.O.T. /inl and Wetlands agency P. DeMallie, Planning Director