Loading...
HomeMy WebLinkAboutZone Change (67) TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHALL BE ACCEPTED BY APPLICATION # 2 THE PLANNING AND ZONING COMMISSION AT RECEIVED DATE: -3- Fi THE REGULARLY SCHEDULED MEETING ON THE APPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL REJECTED WE: BE SUBMITTED TO THE PLANNING AND RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK PRIOR TO THE FOURTH TUESDAY. APPLICANT: M Ar-. ._ C. L 166►-T ADDRESS: V L#,Mhfj3 20 TELEPHONE �� �I�12 693S OWNER OF RECORD ON S.W. LAND RECORDS ('?Qj4Ckaffl-jQn) A jVal lAp-_ -L ADDRESS: SLA TI°1tUI-T" &it. (ZOCI�V1�, C1 COMPLETE DESCRIPTION OF LOCATION OF PROPERTY I,.U P,IA►riD 11\ -rVK- NQ P-rffMj 7- C'D e-AM e. SU0- I. iRbl6Qf &R-WRI't b EU-1\ (97yio niA)jy cI zUJ'f Tl't�- NAME,. ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE DIRECTED: �kPQ LO e'--Ss 1QL 1��5�IF� �A� NflU�tj �l/ILlYL1�1AI�l.I . 1' e fLUiNkT0rJ (ZO. . ' C kr t! �Ui�It�Sy�-.C, T C�6Q��1 TELEPHONE �k C�N4� 3N73 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) X_ 1. Zone Change to A• 3o Zone (public hearing) ft- 2. Filing for Subdivision ; 3. Filing for Open Space Subdivision (public hearing) APR 4. Filing for Resubdivision (public hearing) Sput Planning & , 5. Special Exception to Article of the Zoning Regulations 1t hearing) Issi 6. Site Development Plan 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing) B. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT-WILL BE ACCEPTED BY THE PLANNING AND ZONING COMMISSION o APPLICANT OWNER • of (over) t PROPOSED SUBDIVISION AMENDMENTS CONSERVATION PLAN Section 3.2.a. (11)' delete the 2nd and 3rd paragraphs and substitute the following: "A Conservation Plan shall be submitted by the applicant for all proposals and/or activities disturbing an area larger than one-half acre, except Conservation Plans- shall not be required for the construction of a single family home on a. lot that. is not part of a subdivision or resubdivision. Conservation Plans shall be submitted where required by Public Act 83-388 , as amended. Conservation Plans may be required under the provisions. of said Public Act, where not otherwise required by these regulations, or by other regulations of the Town of South Windsor. The Topographic Neap of Section 3.2.a. (3) shall be used to detail and outline the proposed Conservation Plan. The Conservation Plan shall function as, and shall conform to , the requirements of an. ' Erosion and Sediment Control Plan' , as set forth in Public Act 83-388 , as amended. The Conservation Plan shall be prepared in accordance with the Connecticut Guidelines for Soil Erosion and Sediment Control of the Connecticut Council on Soil and Water Conservation, January 1985 , as amended. The- South Windsor Conservation Commission shall not approve the Conservation Plan until said plan has been certified to comply with Public Act 83-388 , as amended, by the Hartford County Soil and Crater Conservation District. Certification must be obtained by the applicant. Any and all costs incurred for certification from the Hartford County Soil and Water Conservation District shall be borne by the applicant. After all required approvals have been obtained, the applicant's engineer shall be responsible for inspecting the subject site in order to verify compliance with the approved Conservation Plan. " Town Clerk MAY 81985 PROPOSED ZONING AMENDMENTS CONSERVATION PLAN Section 4. 13. 6 delete the 2nd and 3rd paragraphs and substitute the following: "A Conservation Plan shall be submitted by the applicant for all proposals and/or activities disturbing an area larger than one-half acre, except Conservation Plans shall not be required for the construction of a single family home on a lot that is not part of a subdivision or resubdivision. Conservation Plans shall be submitted where required by Public Act 83-388, as amended. Conservation Plans may be required under the provisions of said Public Act, where not otherwise required by these regulations, or by other regulations of the Town of South Windsor. The Topographic Map of Section 4.13.2.4 shall be used to detail and outline the proposed Conservation Plan. The Conservation Plan shall function as, and shall conform to, the requirements of an 'Erosion and Sediment Control Plan' , as set forth in Public Act 83-388 , as amended. The Conservation Plan shall be prepared in accordance with the Connecticut Guidelines for Soil Erosion and Sediment Control of the Connecticut Council on Soil and Water Conservation, January 1985, as amended. The South Windsor Conservation Commission shall- not approve the Conservation Plan until said plan has been certified to comply with Public Act 83-388 , as amended, by the Hartford County Soil and Water Conservation District. Certification must be obtained by the applicant. Any and all costs incurred for certification from the Hartford County Soil and Water Conservation District shall be borne by the applicant. After all required approvals have been obtained, the applicant' s engineer shall be responsible for inspecting the subject site in order to verify compliance with the approved Conservation Plan. " Add to Section 4 . 13. 7: 1, as follows: "10 . Conservation Plan"