HomeMy WebLinkAboutZone Change (67) TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHALL BE ACCEPTED BY
APPLICATION # 2 THE PLANNING AND ZONING COMMISSION AT
RECEIVED DATE: -3- Fi THE REGULARLY SCHEDULED MEETING ON THE
APPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL
REJECTED WE: BE SUBMITTED TO THE PLANNING AND
RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK
PRIOR TO THE FOURTH TUESDAY.
APPLICANT: M Ar-. ._ C. L 166►-T
ADDRESS: V L#,Mhfj3 20 TELEPHONE �� �I�12 693S
OWNER OF RECORD ON S.W. LAND RECORDS ('?Qj4Ckaffl-jQn) A jVal lAp-_ -L
ADDRESS: SLA TI°1tUI-T" &it. (ZOCI�V1�, C1
COMPLETE DESCRIPTION OF LOCATION OF PROPERTY I,.U P,IA►riD 11\ -rVK- NQ P-rffMj 7- C'D e-AM e.
SU0- I. iRbl6Qf &R-WRI't b EU-1\ (97yio niA)jy cI zUJ'f Tl't�-
NAME,. ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE
DIRECTED: �kPQ LO e'--Ss 1QL 1��5�IF� �A� NflU�tj �l/ILlYL1�1AI�l.I . 1' e
fLUiNkT0rJ (ZO. . ' C kr t! �Ui�It�Sy�-.C, T C�6Q��1 TELEPHONE �k C�N4� 3N73
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
X_ 1. Zone Change to A• 3o Zone (public hearing)
ft-
2. Filing for Subdivision ;
3. Filing for Open Space Subdivision (public hearing) APR
4. Filing for Resubdivision (public hearing) Sput
Planning & ,
5. Special Exception to Article of the Zoning Regulations 1t hearing)
Issi
6. Site Development Plan
7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing)
B. Other (explain in detail)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND
SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT-WILL BE ACCEPTED BY THE PLANNING AND
ZONING COMMISSION
o
APPLICANT OWNER • of
(over)
t
PROPOSED SUBDIVISION AMENDMENTS
CONSERVATION PLAN
Section 3.2.a. (11)' delete the 2nd and 3rd paragraphs and substitute the
following:
"A Conservation Plan shall be submitted by the applicant for
all proposals and/or activities disturbing an area larger than one-half
acre, except Conservation Plans- shall not be required for the construction
of a single family home on a. lot that. is not part of a subdivision or
resubdivision. Conservation Plans shall be submitted where required by
Public Act 83-388 , as amended. Conservation Plans may be required under
the provisions. of said Public Act, where not otherwise required by
these regulations, or by other regulations of the Town of South Windsor.
The Topographic Neap of Section 3.2.a. (3) shall be used to detail and
outline the proposed Conservation Plan. The Conservation Plan shall
function as, and shall conform to , the requirements of an. ' Erosion and
Sediment Control Plan' , as set forth in Public Act 83-388 , as amended.
The Conservation Plan shall be prepared in accordance with the
Connecticut Guidelines for Soil Erosion and Sediment Control of the
Connecticut Council on Soil and Water Conservation, January 1985 , as
amended.
The- South Windsor Conservation Commission shall not approve the
Conservation Plan until said plan has been certified to comply with
Public Act 83-388 , as amended, by the Hartford County Soil and Crater
Conservation District. Certification must be obtained by the
applicant. Any and all costs incurred for certification from the
Hartford County Soil and Water Conservation District shall be borne
by the applicant.
After all required approvals have been obtained, the applicant's
engineer shall be responsible for inspecting the subject site in order
to verify compliance with the approved Conservation Plan. "
Town Clerk
MAY 81985
PROPOSED ZONING AMENDMENTS
CONSERVATION PLAN
Section 4. 13. 6 delete the 2nd and 3rd paragraphs and substitute the
following:
"A Conservation Plan shall be submitted by the applicant for
all proposals and/or activities disturbing an area larger than one-half
acre, except Conservation Plans shall not be required for the construction
of a single family home on a lot that is not part of a subdivision or
resubdivision. Conservation Plans shall be submitted where required by
Public Act 83-388, as amended. Conservation Plans may be required under
the provisions of said Public Act, where not otherwise required by
these regulations, or by other regulations of the Town of South Windsor.
The Topographic Map of Section 4.13.2.4 shall be used to detail and
outline the proposed Conservation Plan. The Conservation Plan shall
function as, and shall conform to, the requirements of an 'Erosion and
Sediment Control Plan' , as set forth in Public Act 83-388 , as amended.
The Conservation Plan shall be prepared in accordance with the
Connecticut Guidelines for Soil Erosion and Sediment Control of the
Connecticut Council on Soil and Water Conservation, January 1985, as
amended.
The South Windsor Conservation Commission shall- not approve the
Conservation Plan until said plan has been certified to comply with
Public Act 83-388 , as amended, by the Hartford County Soil and Water
Conservation District. Certification must be obtained by the
applicant. Any and all costs incurred for certification from the
Hartford County Soil and Water Conservation District shall be borne
by the applicant.
After all required approvals have been obtained, the applicant' s
engineer shall be responsible for inspecting the subject site in order
to verify compliance with the approved Conservation Plan. "
Add to Section 4 . 13. 7: 1, as follows:
"10 . Conservation Plan"