Loading...
HomeMy WebLinkAboutSite Plan of Development (139) TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION .INNING AND ZONING CO SSION ACTION THIS APPLICATION SHALL BE ACCEPTED BY 'PLICATION # THE PLANNING AND ZONING COMMISSION AT &CEIVED DATE THE REGULARLY SCHEDULED MEETING ON THE 'PPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL REJECTED DATE: BE SUBMITTED TO THE PLANNING AND RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK PRIOR TO THE FOURTH TUESDAY. - :APPLICANT: Elmo Zaccardelli 9-r 017- CS/ ADDRESS: 352 Maple Street, East Hartford, CT 06118 TELEPHONE # 569-3003 / OWNER OF RECORD ON S.W. LAND RECORDS G & Z Realty Associates ADDRESS : 367 Ellington Road, East Hartford, CT 06108 COMPLETE DESCRIPTION OF LOCATION OF PROPERTY Northerly side of Burnham Street, South Windsor, CT 06074 (see map for more detailed description) f ZONE T , NAME,. ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE DIRECTED William E. Grace, Esquire, 25 Oakland Road, South Windsor, CT 06074 Phone - 644-1528 TELEPHONE # 6 4 4-15 2 8 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1. Zane Change to Zone (public hearing) 2. Filing for Subdivision 3. Filing for Open Space Subdivision (public hearing) 4. Filing for Resubdivision (public hearing) 5. Special Exception to Article of the Zoning Regulations (public hearing) X 6. Site Development Plan 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing) 8. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT WILL BE ACCEPTED BY HE PLANNING AND ZONING COMMISSI1461 APPLICANT OWNER (over) PLANNING AND ZONING COMMISSION SITE DEVELOPMENT PLAN GENERAL CHECKLIST D to submitted: ( �U App. # Name & Address of Applicant: �? Vf Name & Address of Agent: ca►a -Phone: Address of Property: Zone Cr-C., n ( PZC CLERK CHECKL T: n -► PLANNING DEPARTMENT CHECKLIST: ENGINEERING DEPARTMENT CHECKLIST 1. Fee Submitte 1. Zoning District Confirmed V 1. Overall Conceptual Plan 2. Date received by PZC 12. App. submitted in triplicate (a) Street Layout 3. 65 dayexpiration (b) Storm Drainage p 5 sets plans (6 if hearing) (c) Sanitary Sewer 4. Hearing date (if applicable) .� 4. Maps stamped and submitted to PZC 5. Legal Notices/riofification-transm-jtte and Engineering (d) Wetland & Flood Plain zones 6.` Decision date (65 days) 5. Architectural Elevations submitted S (e) Other Environmental Concerns 7. - Decision Legal Notices F � 1 6. Key map submitted & okayed 2. Plot Plans 8. Decision letter transmitted 7. Plot plan submitted & okayed (a) Rights of Way 9. Expiration date to file mylarst 8. Topo map submitted and okayed (b) Easements a. Liability Insurance submitted 9. Plans/profiles (engineering review (c) Bearings b. Surety bonds submitted 10. Zoning data block O.K. 3. Site Plans c. Deeds submitted & approved 11. Maps A-2 certified (a) Sanitary Sewers/Sewer Authorit, by Engineering & Town Attorne 12. Monuments/Maricers indicated Approval d. Drainage fee submittedtSec ' ed � 13. Building Lines (b) Storm Drainage e. Other conditions met14. Dimensional Requirements (c) Roads 10. Date mylars filed: 15. Parking Requirements (d) Detention Basins 16. Permitted Use I�°II�3 keno (e) Cuts & Fills 17. Variance Secured S 4. Conservation Plans 18. Sanitarian Approval Secured ,n (a) Sequence of Construction INTERDEPARTMENTAL RESPONSIBILITI pp (b) Wetlands Concerns 19. Overall Design/Layout O.K. 20. Circulation (c) Erosion Control Measures : 1. Wetlands/Conservation Approval 5. Plans & Profiles ` 2. Open Space Plan i (a) Road Profile & Grade 3. Buffering r Y (b) Drainage Lines 4. Landscaping �Do Oo �� � lc) (c) Sanitary Sewer Lines 5. Outdoor Storage ( 1 ) 6. Filing Plans 6. Outdoor Lighting " hAt,., (a) Bonding t7. Existing Easements ri hts- f-way shown (b) Easements & Deeds '. 8. Abutting property owners shown r (c) r Conditions Fulfilled 9. Other agencies/offic�i,,rapl-notified J wt. SW Cc5) - Sf_ (3) CeVWA4 WfJA) #_;�& TV~ S C:1ft/v�2n / Gtt. `S C OVtti ) ® ([(QQ In 1�20/81 r 'e- \1 L i .n PO L,A, .li✓���: w 1 a-v1n0, � � IV-1�11�_�flb'rll�;�e A' :ORGE A.DAGON MAYOR • TEI f t'HUNE (203)28Q-2781 ° TOWN OF FA5r 11"rFO AST 3� o '(�aet f�19 CTI�J� September 2, 1983 Mr. Joseph Russo Palmberg & Russo 522 Cottage Grove Road Bloomfield, Conn. 06002 Re: E.Z. Importers Burnham Street South Windsor Site Drainage Dear Mr. Russo: We have no objections to your plan to extend our drainage system . 152' easterly utilizing 18" ACCMP. Please contact our office- to- secure the necessary permits to work within the Town of East Hartford's right-of-way. Sincerely, 4 Arthur J. Mulligan Director of Public Works AJM/s MEMORANDUM September 2 , 1983 To : Mr. Peter DeMallie Director of Planning Re: Elmo Zaccardelli, Site Plan, Burnham Street Engineering review comments on the subject proposal are as follows : The new bituminous concrete parking area and entrance drive will cause a slight increase in surface water runoff from the site. The proposed grading of this area indicates that the direction of runoff from these paved areas will be toward Burnham Street. Since the storm drainage system in Burnham Street is owned by thQ Town of East Hartford, the acceptability of the runoff into the street system should be indicated, in writing, by either the Town Engineer or Director of Public Works of the Town of East Hartford. obert Arsenault Director of Public Works RA:prb t OWN Sf+ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 OR•cU AREA CODE 203/644-2511 September 13, 1983 William E. Grace, Esq. 25 Oakland Road South Windsor, Ct . 06074 Dear Bill: Re: App . #942 - Elmo Zaccar elli ''Si dun �• Please be advised that the Plan ni g and Z11-.00Commission voted to approved the above application for a site plan of development for property located on the northerly side of Burnham Street , as shown on a plan prepared by Palmberg & Russo, dated 8/18/83, revised to 9/2/83, entitled No. 83075, subject to the following -modifications : 1. Low shrubs rather than pine trees shall be shown at the southeast and southwest corners of the site, and additional white pine trees shall be shown to the north of t-he southeast corner. 2. A surety bond in the amount of $2, 000 shall be submitted to this Commission to ensure completion of landscaping and buffering. 3. No building permits will be issued until the final plans have been filed in the Town Clerk' s Office. 4. Prior to commencement of any site work, a meeting with . the Town' s public works and planning staff is required . A black and white transparent mylar of the plan, with this letter reproduced thereon, must be submitted to this Commission to be stamped and signed and filed in the Town Clerk' s Office no later than November 10, 1983 . Three paper prints of the mylar must also be submitted. Yours very truly, PLANNING AND ZONING COMMISSION vg By: � U� CC: R. Arsenault, Public Works 'a shall Montana, Chairperson 7 P. DeMallie, Planning Director T. D 'Auria, Building Official E. Belleville, Assessor