Loading...
HomeMy WebLinkAboutRoad Maintenance/Wtlnds (3) MAR 9 1991 South Windsor INLAND WETLANDS AGENCY1 CONSERVATION COMMISSION TOWN OF SOUTH WINDSOR INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION /1 APPLICATION #. / 'D g�� DATE RECEIVED - 3 ZONE Y �7 INSTRUCTIONS 1. The application, map and plans must be submitted in triplicate, together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VI). 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application evaluation. (See Regulations, Sections VIII - X) . 3. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. (See Regulations Sa"Etion VII) . Also complete state filing form. A. APPLICANT'S NAME Town of South Windsor ADDRESS 1540 Sullivan Avenue South Windsor, CT 06074 PHONE: (HOME) (WORK) 644-2511, Ext. 245 B. LEGAL OWNER'S NAME: Town of South- Windsor ADDRESS 1540 Sullivan Avenue South Windsor, CT 06074 PHONE: (HOME) (WORK) 644-2511, Ext. 245 (List additional owners, addresses, and phone numbers on back of application) . C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. 'd D. PROJECT NAME: (if any) Graham Road Culvert Replacement 1. Contact Person (if further information is needed). Jerry C. Iazzetta, Town Engineer E. THE GEOGRAPHICAL LOCATION OF THE, PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES MAP. 1 The project is on Graham Road near intersection with ITevers Road. , � The Podunk River crosses under Graham Road at this point. F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE IF NECESSARY) " Town of South Windsor owns the property up stream and down. Thomas A. Pellette, 635 Graham Road," So. Windsor, CT Thomas C. Knox, 661 Graham "Road, So. Windsor, CT blark L. & Janice B. Girouard,. 666 Graham Road, So. Windsor, "CT G. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS PENDING BEFORE THE AGENCY?. _ **(You are required to supply a copy of the letter with the list of the names of the abutters) .** H. PURPOSE AND DESCRIPTION OF ALL PROPOSED .REGULATED ACTIVITY(S) INCLUDING AMOUNT AND TYPES OF FILL AND THE TIME ELEMENT INVOLVED: The Town is proposing to replace the existing culvert which is deterior- ating due to erosion The existing structure is a combination of poured in place concrete without a. bottom and precast _box. y I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1"-401 , SHOWING THE AREA TO BE DEVELOPED, EXTENT - OF THE WETLANDS AND- WATERCOURSES AFFECTED, TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES AND NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED. J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: 0 .223 K. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED: None 140 + L. LINEAL FEET OF PROPOSED STREAM ALTERATION — M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS: Essentially 100 0 N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIRED WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P. , F.E.M.A. , D.O.T. , The Army Corps of Engineers, and any other State, Local or Federal Permits. ) DEP, FEMA, Arm-: -Corps of Engineers, LoCIP 0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT "A SIGN WILL BE POSTED AT THE FOLLOWING LOCATIONS Graham "Road near Nevers Road Jerry- C. Iazzetta by Town of v] outh ' dsor NAME ON OR BEFORE E FOLLO G. DATE- irecte y Town" Staff SIGNATURE: MAR 9 1993 South Windsor INLAND.WETLANDS AGENCY/ CONSERVATION COMMISSION THE-UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HER AND CONFIRMS THAT: 1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE INLAND WETLAND, WATERCOURSES AND CONSERVATION REGULATIONS OF THE TOWN OF SOUTH WINDSOR. 2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATERCOURSES IN QUESTION AND/OR ANY PROPOSED ACTIVITY. 3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE'EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THESE REGULATIONS . 4. BY MAKING. THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND, WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO ENTER THE PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE- PURPOSE OF INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION BOTH BEFORE AND AFTER A FINAL DECIS HAS N ISSUED. Signature of Applic t Jean E3nge urb en Date Town 11 Receive�dg-nd filed it the office of the ing Department this -�'-=�-- day of 19 �13 Laws_" Signature of Agent Date FEE RECEIVED YES NO AMOUNT DATE RECEIVED by HEARING DATE ZJH I ADV. (1) (2) PERMIT GRANTED DATE PERMIT DENIED DATE xt.. .' r# ;;s:. ^�`:�et -_` ,�. 1 sr i G`K`� - � ♦ ar` P �'+' � -,i�t c -- F�f1 s < 'aa'v",g� ..a,.� . 7. NNECTICUT-DEPARTMENT OF E1N-M0N1VMNT 4tA-: OTECTION STATEWIDE INLAND WETLAND & WATERCOURSE ACTIVITY REPORTING FORM n accordance with the requirements of Section 22a-39-14 of the Regulations of Connecticut State Agencies, this form is to be completed for each action. Completed forms-for all reportable actions during a calendar month shall be mailed to the Commissioner by the local agency no later than the 15th day :of the month following the month in which the action was taken. (See instructions on back) -------------- 1 . TOWN: SO,r`q L4j-L_,i nQ 2. LOCATION:(original scale copy of the USGS QUAD Map with the site outlined or pinpointed) USGS QUAD MAP NAME OR UNIT: tVLtA�yc�.-�ri=rtr 3 . APPLICANT'S eR wGLATeR,s thva: ';Zb�,tr 4 . PROJECT NAME: CtKVaZT- REP(AC Mt"&r- R."ArA f oF- 5. ACTIVITY TYPE CODE: (see list of codes on back, max. of 4 codes) . . . [ 13 J If type code is 12 or 1.3 , briefly describe the activity: Ref u4cf '0E r "MXZ*Tz'-1- Emuri y►& U c.VC41— mycgens-- s 6. ACTIVITY PURPOSE CODE: (see list of codes on back, max. of 4 codes) . . . . . . . . . . 7 . ACREAGE OF WETLANDS AND WATERCOURSES ALTERED: (or proposed to be altered, . temporary or permanent)(for ALL agency permits, denials and enforcement actions) A. Wetland Soil(s) Area Altered: . . . . . . . . . . . . . . . . . . . . [ &?23 ACRES] . Wetland soil symbols (e.g. Lg, PkA, Rn) . . . . . . . . . . . WC(A B. If soil type is not available specify the area as follows: Swamp . . . [ ACRES] Marsh . . . [ ACRES] Bog . . . [ ACRES] C. Open Water Body Area Altered: . . . . . . . . . . . . . . . . . . . . . [ -- ACRES] 8 . ACREAGE OF WETLANDS OR WATERCOURSES CREATED: . . . . . . . . . . . [ ACRES] 9. LINEAR FEET OF STREAM ALTERATION [ 140 , FEET] 10. TOTAL ACREAGE OF PROJECT SITE: . . . . . . . . . . . . . . . . . . . . . . . . . [ t d.$ ACRES) For Local Agency Use Only * For State Use Only 11. REPORTING MONTH: 12 . PUBLIC HEARING HELD: Y * GIS CODE: * * 13 . _ACTION: enter letter A_ A. permit issued B. permit denied C. permit extend/amend D. map amendment E. enforcement F. jurisdictional ruling * 14 AGENT.' DATE. RECEIVED - �� * _F T# DEP�rev/10/91 s y n ; ,i end ✓ate. _ _ _ _ "t'_�21`.tL® `a A'$' «.t+i ....r=r=�+_ "b+!•rrar.s is MANCHESTER QUADRANGLE T l( CON N ECTICUT V. 0 cRe o (� 7.5 MINUTE_ SERIES (TOPOGRAPHIC) �`' (BROAD BROOK) �03 N - '30,r 660000 PEEi '05 Iruu,•.,u;,'rrrr r rr.rr �a• ib e O �M7R / / ,'!� rl. ,., ,II %/I - rii�-. ? ----I(� --r----- 107 -30, `oQ M �� /R,,U• :P, :�R ���. Q'•i i 1 !'rrl f r� !r !.: �1fI� \ �\Rf�k r rin. ii - 41arJ2'3�n "j• .. 1_'t;T lli �',,�, 1I ' / / d �' J.II( �'• , r. S� i�-_- ,.� �I Y\` •' a R!' x r t rD, ,' /Y1 1'j�,�`"Sr I1 ''.i 1 / " '1/ , Rn'_'a •�_ a ;� e,4 c3.` IFy � o - tsG � / !� t i /!• J / l�rr •a •�'.,�j n� :%�"' , 1 % l`.`�' )', '�). ��• v N S p+�n�;�,, l.,.i;:':? Aifit •II PCP `1' �� ►Of l i r /'c•.,� U , ,l g 1.� ••� tV,u i - /f ►� �,\\� •fi'�� i.; p —'` I� __:%1, ?i .1 ,:..(-- —` — '——t—— — (+ �./ !•', \\ � - \ti I �:.• � �I Ali f , �p•N. O�9 ✓ `>o •''�N�� .•;_�• j�i ,' ` '� �`;'l ��`,if `\�•• `a �/ i(�'' i e � U �, ,�' , ��� M per :-s _ • ,$sr, (•�•% 1 1• I I .:ti\,1 \ /�/ al ;••'`'`,. l" , !J;11 '/ r „ '� r 1 ��, % 1 L`� l 2'1 I. I wIa \ F ,V /ir// •'�:/• .� y' J' 4 .�a ',11 �•�la� f �',�•., 1 �+ ROPr SI,� '•� (1��,('•i'! •�•• f' �fh17 ) 0J II` i :11C Ill' x 1 vlc ' ` (14 "I Ii •% ••' •.'• N \J a 6S -� F '. •1 11111\\ (r/ \ .I t •r I� ` •�. /31- II > � ,c �-. _--_nL'•'�'' ;I• :``r� LA 1 -- A '>�''�y�_ 1; II\``� 1 I�` I � 7�� / � U •! /e: /•' .f, ./ I�J �t ' it \\. '}, •. \' h o •. 1 1,�1) �,1 .�i o` - '1 �� 1 0 I cl ?'� _ -�'` 4637 0 0 (i ._ /• •ti :::: .,1 r]i.!' ,�' 1 ' ; t ,.:,�.: ./ -�, (1;i '1 1 F =.III ' vjP r 1 I ,., er-. ' �,I,••\1 r•�� �l (,� ! 1 ( l• \ /,•�� t�' I (�,I• .1•, ' �l .la.n6a,> z 1 I , iy /x S,ibslaltonar ,i.��',, \� ��.... hlILLE 0 -.`..- \.l,ll l� I �I�� ) I�•1 7 ` ,• �'\1 -_3f/1, �\ 262It ' L-' .!•lh.11 �•s. f •J':-1�— ` \ ..\-gQlr' ''1 ` `•'. r LI• / � � �� �• .. ,, � '/ •, l��"•' .a 'I {• O:r' i eF fl' J I � 1 i �h., 4636 , �- _ �I`t T- �••_•' _ \•i� ••�'L• ,I •I. '`!~' Q I ltd• Ji �\ Teml qIleth 11111 %,. r' I Q i�• 1 y/cali lI I ROAD...... 1 .: _ 11 _ o ZH I'd O ro ! f •; •� '•�•.'•�� 7.1,' f l ` O 111 }�.Ilr. / , l FEET d d l c') 7d 1�)) \ ■'g hnr l (/ ( l 1' J• I I \ l x' \ \ x O H H �t)AR -' F / . \ � 1 \ '' �•' ���1 J'� �'1 j1)t' �� it \ III ,�..1 ) I tri pa es i' '/ , , r 1 1p F] '1 I q Snutlf,Wlni aro I ��1 . � , •t !/.'I I` ,II,, :.''• r�.,jy'U,. •h� I very •Ilrel^ \,i'" 01 `11 �!• � �) 1 , to H l• Ill. .( igh St. `1 c' tl'!r• )�( I Il' o ) _� !•<l. 65 l l� 1, ''�:�:1t:' J14i''1 1 j O 35 �/ •• O ICJ) ..�5 1 •, J• ' r''� .. 1 ��' .t �J !►'• � II f/ 'T .� \ O s- •�':�\;l\\. '1�`��'� • •r f • /• �J% /-`���,�••l`�'�. •\�\'l< )' 1l t /••.•"' /t,�l�l\>,�\\•;!`�\\•���,\l\�(:Il�� (�a1�''1';11I,.•!�,t1 l', I I` I' '1't.`1.'�t.),,,\\ 50,O 'rs/ O 0rid J/w r VI � ,� li •���•. z*;f� ,. ��\�\� � .�9'. \ ,�.\ \ 1 i :may'• ��',� •I i ,o .. w -- spoll AM /VAMP i i Section 404 Only Conditions In addition to the General Conditions, the following conditions apply only to activities that involve the discharge of dredged or fill material and must be followed in order for authorization by the nationwide permits to be valid: 1. Water supply intakes. No discharge of dredged or fill material may occur in the proximity of a public water supply intake except where the discharge is for repair of the public water supply intake structures of adjacent bank stabilization. 2. Shellfish production. No discharge of dredged or fill material may occur in areas of concentrated shellfish production, unless the discharge is directly related to a shellfish harvesting activity authorized by nationwide permit 4. 3. Suitable material. No discharge of dredged or fill material may consist of unsuitable material (i.g. , trash, debris, car bodies, etc.) and material discharged must be free from toxic pollutants in toxic amounts (see* Section 367 of the Clean Water Act) . 4. Mitigation. Discharges of dredged or fill material into waters of the United States must be minimized or avoided to the - maximum extent practicable at the project site (i.e. on-site) , unless the DE has approved a. compensation mitigation plan for the specific regulated .activity. 5. Spawning areas. Discharges in spawning areas during spawning seasons must be avoided to the maximum extent practicable. 6. Obstruction of _high flows. To the maximum extent practicable, discharges must not permanently restrict or impede the passage of normal or expected high flows or cause the relocation of the water (unless the primary purpose of the fill is to impound waters) . 7. Adverse impacts from impoundments. If the discharge creates an impoundment of water, adverse impacts on the aquatic system caused by the accelerated passage of water and/or the restriction of its flow shall be minimized to the maximum extent practicable. 8. Waterfowl breeding areas. Discharges into breeding areas for migratory waterfowl must be avoided to the maximum extent practicable. 9. , Removal of temporary fills. Any temporary fills must be removed in their entirety and the affected areas returned to their preexisting. elevation. 6 .� DEPARTMENT OF THE ARMY NEW ENGLAND DIVISION, CORPS OF ENGINEERS ( 424 TRAPELO ROAD WALTHAM, MASSACHUSETTS 02254-9149 �p REPLY TO March 9, 1993 M�1(i d ATTENTION OF Regulatory Division South Windsor CENED-OD-R-19-93-00498 INLAND WETLANDS AGENCY1 CONSERVATION COMMISSION Jean Zurbrigen, Town Manager Town Of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Ms. Zurbrigen: This letter is in reference to your application to replace an existing culvert with two precast culverts under Graham Road at the Podunk River in South Windsor, Connecticut. That work is permitted under Title 33 Code of Federal Regulations, Part 330 Appendix A, 26, Nationwide Permits, as published in the November 22 , 1991 Federal Register and does not require further processing. This authorization is made in accordance with the attached plans in 4 sheets entitled, "CULVERT REPLACEMENT GRAHAM ROAD AT IYODUNK RIVER IN SOUTH WINDSOR CONNECTICUT1" dated MARCH 1993, and subject to the attached conditions. This verification will be valid for a period of no more than two years from the date of this letter, unless the Nationwide Permit is modified, suspended, or revoked, such that the activity would no longer comply with the terms and conditions of the Nationwide Permit. . Note that these conditions require the use of other practical alternatives to avoid or minimize the discharge of dredged or fill material into waters and wetlands of the United States. Before you begin work, you are required to obtain any necessary state and/or local permits and other necessary federal permits. Page 2: 19-1993-00498 If you have any questions, please contact Don Birmingham of my staff at (617) 647-8860, or use our toll free number 800-343-4789 or 800-363-4367 if calling from within Massachusetts. Sincerely, Robert J. DeSista Chief, Permits Branch Regulatory Division Enclosure Copy Furnished: Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Sally Snyder CT DEP Inland Water Resources Div. State Office Building 165 Capitol Avenue Hartford, CT 06106 W (� o' N / F 5NET )WN OF SOUTH WINDSOR � lk Lu N/F 12 TOWN W h ;OF SOUTH WINDSOR r.F,66 P3 O I } N k O ! U a rFe,et 2 y 5 P-' EX�SF/6B 54,v HA.YNOLI: 2 EXISTING SANIT,M - /e, jr OFF NfALL TO BE FX 7f NOEO TO •F.L' r r6I6,16 - .. 1 3 17 S,YET /PPORT 36"RCP 6/.6/ PROP•�S 0995 FL.AREO END 24 r 36'R CURB'•EO l '• -._. _._ i '-• 'o odd TYe-CC& 1 RUCT_ 1�O -I1MlrS FL.BROOK rO 0 PROPOSED 4 x BOX CULVE<� /62.4 L.F. 5z0.005 LAO /2.4 o --- y13 40 rO• PRO PO - —�1NGBOY CULVERT �``4 x' 8 BOX ULVER 2B ° ���° /62.9�K 11 —� w 24 M ,69.r6 y H H j CONSTRUCTION LIMITS W x HPd - O H tt b z C7 /, ( s wE*' Nc _nvrs A. •� d (� EXISTING SANIT.MANHOLE O !Z+ FL*:16J.75 N. •�+ , �y F.L•162.74 S. p1 z FL 162.55 E O C H Ir � sser I PROPOSE.)5 I c.a C CONS TRUC N PTIO LAN l6a 5 _Cv-per,^ 7 S W O !n ` i C � '•, ------------------ 4' X /0' PR ECAST CULVERT 4'X b PRECAST CULVERTI'!,r •':;' Hr. 12 ' :.r Iz•• o� 12 CRUSHED STONE FOR BEDDING TYPICAL PRECAST BOX CULVERT SECTION SCALE T H�RE IS NO PROPOSED CHANGE IN THE PAVEMENT GRADE +Iy APPROX. LOCATIONOF YANKEE GAS MAIN . LOCATION BY OTHERS tsj y C � NOT_ i:E.K15TlNG CULVERT WILL dE REMOVED Z O O O 01 0 0 O O MEET NQ.ES O YR1 i � C7 d n Ekl£TrroC ERp;,► t PROPOSED90K EXISTING 10"SANITAR r SEWER' O H F.L. 162.9E TD BE RESET _-._-_• "RO•'CSED J D pf A 1 J r H 0, �� .2 CRUSHED STONE F0OR BEDDING H O 0 -D BE PLACED ON Sol, A� C] Ov V EVISTItWG 1?"WATER MAW ♦•, ✓�p W y O ELEVATIOF BYOTHERS d.�n 36.OITOFF WALL VVV 36-CUT OFT WALL 5 i r ♦Up + 3B PROFILE SECTION SCALE--P-?ApERT LL'�R/Z STATE CONDITIONS ON NATIONWIDE PERMITS February 11, 1992 MAINE No State Conditions Most NWPs 401 denied or CZM objection, several NWPs waived. NEW HAMPSHIRE All NWPs 401 denied. All NWPs (CZM condition) - For projects within coastal NH requiring PDN to the Corps, the Corps shall furnish a copy of the PDN to NH Coastal Programs in accordance with Condition 13 of 33 CFR 330 App A. VERMONT General Conditions 1. The activity must comply with the Vermont State Water Quality Standards pursuant to 10 V.S.A. Chapters 37,47, and 29 V.S.A. Chapter 11 Management of Lakes and Ponds. 2. At the request of the Secretary of the Vermont Agency of Natural Resources, NED shall suspend use of a NWP and require and individual permit for a particular activity on a case-by-case basis. 3. The Secretary of the Vermont Agency of Natural -Resources reserves the right to withdraw certification for any NWP and require water quality certification on a case specific basis whenever is appears that such action is necessary to protect water quality and related resources. MASSACHUSETTS No Conditions. Most NWPs 401 denied and CZM objection. CONNECTICUT General Conditions For projects reviewed by the Corps of Engineers under the pre-discharge notification provisions of 33 CFR 330 App A (13) , the CT DEP Inland Water Resources Division and DEP Natural Resources Center shall be included in the coordination. NWP Specific Conditions NWP 7 - Outfall structures shall be designed and constructed to provide for the dissipation of energy to prevent scour and erosion within receiving waters. 1 NWP 13 - Water Quality Certification is denied for bank stabilization activities greater than 100 feet in length. NWP 14 - The crossing shall be designed to allow passage of 100 year frequency flood flows with zero increase in backwater. NWP 15 - Proposed discharges shall be designed and carried out to allow passage of 100 year frequency flood flows with zero increase in backwater. NWP 26 - Water Quality Certification is denied for discharges of dredged or fill materials that cause the loss of more than 0.5 acres of waters of the U.S. NWP 33 - Water Quality Certification of temporary construction and access activities is denied for any bridge construction whose associated permanent activity is not regulated by the U.S. Army Corps of Engineers or the U.S. Coast Guard. RHODE ISLAND General Conditions Erosion and siltation controls shall be used and maintained in proper working order. Section 404 Only Conditions r (1) Discharges to spawning areas shall be avoided. (2) Discharges into waterfowl breeding areas shall be avoided. NWP Specific Conditions NWP 3 - (1) No change to structure from that originally authorized shall be allowed. (2) No sediment disturbance shall occur during maintenance activities. (3) Facilities which could be used for habitation are not authorized by this NWP. (4) Repairs must be commenced or under contract within one year of the date of the structure's destruction or damage. NWP 4 - (1) No aquaculture activities shall be allowed. NWP 5 - (1) No weirs or flumes shall be allowed. NWP 14 - (1) Authorization shall be limited to single driveway crossing to single family house which is not part of a subdivision or other planned unit development. 2 r NWP 32 - (1) RIDEM shall be party to the Federal court action, consent decree or settlement agreement. NWP 38 - (1) RIDEM shall be party to containment, stabilization or removal activities. 3 January 23, 1992 FEDERAL CONDITIONS ON NATIONWIDE PERMITS General Conditions: The following general conditions must be followed in order for any authorization by a nationwide permit to be valid: 1. Navigation. No activity may cause more than a minimal adverse effect on navigation. 2 . Proper Maintenance. Any structure or fill authorized shall be properly maintained, including maintenance to ensure public safety. 3. Erosion and Siltation Controls. Appropriate erosion and siltation controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills must be permanently stabilized at the earliest practicable date. 4. Aquatic Life Movements. No activity may substantially disrupt the movement of those species of aquatic life indigenous to the waterbody," including those species which normally migrate through the area, unless the activity's primary purpose is to ' impound water. 5. Equipment. Heavy equipment working in wetlands must be placed 'on mats, or other measures must be taken to minimize soil disturbance. 6. Regional. and Case-by-case Conditions. The activity must - comply with any regional'conditions which may have been added by the Division Engineer (see 33 CFR 330.4(e) ) and any case specific conditions added by the Corps. 7. Wild. and Scenib Rivers. - No activity may occur in a component of the National Wild ,and Scenic River System, or in a river officially designated by Congress as a "study river" for possible inclusion in the system, while the river is in an official study status. Information on Wild and Scenic`Riveis may be obtained from -the National Park Service and the U.S. Forest Service. 8. Tribal- Rights. No activity-.or its operation may impair reserved tribal rights, including, but not- limited to, - reserved water- rights and •treaty' fishing and hunting rights. 9.• . Water Quality Certification.' In certain states, an individual state water quality certification must be obtained or waived (see - 10. Coastal Zone Management. In certain states, an individual state coastal zone -management consistency'.condurrence`must be obtained •or waived '(see 33 CFR' 330.1 11. Endangered Species. No activity is authorized under any NWP which is likely to jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act, or which is likely to destroy or adversely modify the critical habitat of such species. Non-federal permittees shall notify the district engineer if any listed species or critical habitat might be affected or is in the vicinity of the project and shall not begin work on the activity until notified by the district engineer that the requirements of the Endangered Species Act have been satisfied and that the activity is authorized. Information on the location of threatened and endangered species and their critical habitat can be obtained from the U.S. Fish and Wildlife Service and National Marine Fisheries Service (see 33 CFR 330.4(f) ) . 12. Historic Properties.. No activity which- may affect historic properties listed, or eligible for listing, in the National Register of Historic Places is authorized, until the DE had complied with the provisions of 33 CFR 325, Appendix C. The prospective permittee must notify the District Engineer if the authorized activity may affect any historic, properties listed, determined to be eligible, _or which the prospective permittee has reason to believe may be eligible for listing on the National Register of Historic Places and shall not begin the activity until notified by the District Engineer that the requirements of the National Historic Preservation Act have been satisfied and y that the activity is authorized. Information on the location and existence ofhistoric resources can be obtained from the State Historic ,Preservation Office ,and- the National. Register of Historic Places (see 33 CFR 330.4 (g) ) . 13. Notification. a. Where required by the terms of the NWP, the prospective permittee must notify the District Engineer- as early as possible and shall not begin the activity: (1) Until notified by the District Engineer that the activity may proceed under the NWP with any special conditions imposed by the District or Division Engineer; or (2) If notified by the District or Division Engineer that an individual permit is required; or (3) Unless 30 days have passed from the District Engineer's receipt of the notification and the prospective permittee has not received notice from the District or Division Engineer. Subsequently, the permittee's right to proceed under the NWP may be modified, suspended, or revoked only in accordance with the procedure set forth in 33 CFR 330.5(d) (2) . b. The notification,must be in :writing and include the following information and any required fees: -. 2 (1) Name; address, and telephone number of the prospective permittee; (2) Location of the proposed project; (3) Brief description of the proposed project; the project's purpose; direct and indirect adverse environmental effects the project would cause; any other NWP(s) , regional general permit(s) , or individual permit(s) used or intended to be used to authorize any part of the proposed project or any related activity; (4) Where required by the terms of the NWP, a delineation of affected special aquatic sites, including wetlands; and (5) A statement that the prospective permittee has contacted: I. The USFWS/NMFS regarding the presence of any federally listed (or proposed for listing) endangered or threatened species or critical habitat in the permit area that my be affected by the proposed project; and any available information provided by those agencies. (The prospective permittee may contact Corps District Offices for USFWS/NMFS agency contacts and lists of critical habitat. ) II. The SHPO regarding :the presence of any historic properties in the permit area that may be affected by the proposed project; and the available information, if any, - provided by that agency. c. The standard individual..permit 'application ,form (Form ENG 4345) .,may be used as. the notification _but must-clearly indicate that it `is a PDN' and must include all of-the -information required" in (b)_(i)-(5) ;of ,General'Condition`13 d. In reviewing-`an` activity.under"the -notification procedure, -the District Engineer will'-first ;determine'whether the activity will result in more than minimal individual"or cumulative adverse ,environmental effects or _will ..be .contrary to the public -interest.-.-- �prospective-permittee may; ;_at .his option-, submit a.proposedInitigation plan'with-the"predischarge notification to-expedite-the"-prFolciess' and the_Distiict `Engineer will consider any optional mitigation-the applicant has',.included in the pioposal `-in determininq'`whether `the net "adverse ' " environmental effects of the`propose&-,work *are'minimal, The District Engineer will consider anycomments from federal .and state agencies-concerning the proposed .,activity!s compliance with the terms`and -conditions of the nationwide" permits and the need for mitigation `to 'reduce the 'pioject's 'adverse,environmental effects to a minimal level. The District Engineer will upon receipt of a notification provide immediately (e.g. ,-facsimile transmission, overnight -mail, or other expeditious-manner).-__a copy to the appropriate offices of the Fish and Wildlife Service, state natural resource or "water qu1.ality,agency, ;.EPA, •and, if. appropriate, the_-National Mari'ne`7isheries;�service. ; ;With the exception 'of °NWP 37,.`these agencies will then have'51calendar 3 " .v days from the date the material is transmitted to telephone the District Engineer if they intend to provide substantive, site- specific comments. If so contacted by an agency, the District Engineer will wait an additional 10 calendar days before making a decision on the notification. The District Engineer will fully consider agency comments received within the specified time frame but will provide not response to the resource agency. The . District Engineer will indicate in the administrative record associated with each notification that the resource agencies' concerns were considered. Applicants are encouraged to provide the Corps multiple copies of notifications to expedite agency notification. If the District Engineer determines that the activity complies with the terms and conditions of the NWP and that the adverse effects are minimal, he will notify the permittee and include any conditions he deems necessary. If the District Engineer determines that the adverse effects of the proposed work 'are more than minimal, then he will notify the applicant either: (1) that the project does not .qualify for authorization under the NWP and instruct the applicant on the procedures to seek .authorization under an individual permit; or (2) that the project is authorized under the nationwide permit subject to the applicant's submitting a mitigation proposal that would reduce the adverse effects to the minimal level. This mitigation proposal must be approved by the District Engineer - prior to commencing work. If the prospective permittee elects to submit a mitigation plan, the DE will expeditiously review the proposed .mitigation plan but will not commence a second 30-day - notification procedure. If the net adverse effects of the project (with.the mitigation .proposal) ..are determined by the District Engineer to be minimal, the District Engineer will provide a timely written response to the applicant informing him that the project can proceed under the terms and conditions of the nationwide permit. f. e. Wetlands Delineations. Wetland delineations must be prepared .in.-.accordance with the current method required by the Corps. .The;Pirmittee may ask :the':Corps;,to delineate the .special aquatic 'site*- There may be some delay.-if the Corps does the delineation. Furthermore, the ,30-day period will not start until the wetland delineation has been completed. f. Mitigation. Factors that the District Engineer will consider when determining the acceptability of -appropriate and practicable-mitigation -include,' but are not limited to: (1) To be `practicable 'the mitigation- must be available and capable of being done .considerinq. costs, existing technology, and logistics in light of overall project purposes; (2) To the extent appropriate, ..permittees_.should consider mitigation banking and other ,forms of mitigation including contributions-to wetlan&Erust''funds, Swhich contribute 4 to the restoration, creation, replacement, enhancement, or preservation of wetlands. Furthermore, examples of mitigation that may be appropriate and practicable include but are not limited to: reducing the size of the project; establishing buffer zones to protect aquatic resource values; and replacing the loss of aquatic resource values by creating, restoring, and enhancing similar functions and values. In addition, mitigation must address impacts and cannot be used to offset the acreage of wetland losses that would occur in order to meet the .acreage limits of some of the nationwide -permits (e.g. 5 acres of wetlands cannot be created to change a 6 acre loss of wetlands to a 1 acre loss; however, the 5 created acres can be used to reduce the impacts of the 6 acre loss) . 5 cam- sioa& iov� O-P Vau&ot �0 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R.Co� AREA CODE 203/644-2511: CERTIFIED MAIL P 293 143 931 MAR 9 1993 March 8, 1993 South Windsor INLAND WETLANDS AGENCY/ 'CONSERVATION COMMISSION Mr. Thomas C. Knox 661 Graham Road So. Windsor, CT 06074 Dear Mr. Knox: Re: Graham Road Culvert Replacement The Town of South Windsor is proposing to replace the culvert under Graham Road near the intersection of Graham and Nevers Road. In accordance with Section 7 . 3b of the "Town of South Windsor Inland Wetlands, Watercourses , and Conservation Regulations" , we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard please contact Phyllis Mann, Recording Secretary, or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511 . Very truly yours , Je hE4neer---,*,- Iaz a, P.E. T JCl/jsv 4oww s°4 w� 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 Q��oSOR•Co�'� AREA CODE 203/644-2511 CERTIFIED MAIL P 293 143 929 March 8, 1993 MAR 9 1993 South Windsor INLAND WETLANDS AGENCY{ Mr. Thomas A. Pellette __CONSERVATION COMMISSION 635 Graham Road So. Windsor, CT 06074 Dear Mr. Pelette: Re: Graham Road Culvert Replacement The Town of South Windsor is proposing to replace the culvert under Graham Road near the intersection of Graham and Nevers Road. In accordance with Section 7 . 3b of the "Town of South Windsor Inland Wetlands, Watercourses , and Conservation Regulations" , we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard please contact Phyllis Mann, Recording Secretary, or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511 . Very truly yours, rry Ia z ta, P.E. own g i n e e-LI JCl/jsv tOwm 8 4 4 w� 1540 SULLIVAN AVENUE SOUTH WINDSOR,'CONN. 06074 R.co� AREA CODE 203/644-2511 CERTIFIED MAIL P 293 143 930 MAR 9 1993 March 8, 1993 South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Mr. & Mrs . Mark L. Girouard 666 Graham Road So. Windsor, CT 06074 Dear Mr. & Mrs . Girouard Re: Graham Road Culvert Replacement The Town of South Windsor is proposing to replace the culvert under Graham Road near the intersection of Graham and Nevers Road. IR accordance with Section 7 . 3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations", we are required to notify you that an application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited 'to the hearing to ask questions and/or give comments, however, you are not required to attend. You may also submit written comments regarding the application prior to the hearing if you so desire. For further information regarding the specific date this will be heard please contact Phyllis Mann, Recording Secretary, or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511 . Very truly yours, rry C JT Ia ze a, P.E. wn inee JCl/jsv b,towN at 4 [(J`12 it-CO coN�'�G 1540 SULLIVAN AVEN C � SOULT.►�-/yyiNOSO AREA C R. co'Yly- 06074 ODE 20g/644_2511 CE 293 9 3 F 14D AIL P 934 March 22, 1993 635 Helen M. Helm Graham Road So. Windsor, CT 0607¢ Dear Ms , Helm: Re: Graham Road Culvert Replacement under Grahafm South Windsor Road. Road near theis Proposing to intersec ion Of In accordanceGrahal-n the culvert Inland with and Nevers az•e Wetlands r Section 7 the required to fnoatercourses, Sane f the "Town Inla Property abutting Of you that COnservat ' °f South W. nd Wetlands ing Y°urs and an application n Regulatiorsndsor and plans are on fglewith ser"ation Commect to ash been fiwe led on Y the ask que ing As all abutting Pro o the South WindsoriplanninThe application to attend, s and/or give caner You are g Department. aPPlicat • You may also comments, howeve ited to the he info ion Prior to the submit r aring to rmation re hear . Written Coy �'OU are not contactgarding the g if 'dents required zoningWet 'Ilis Mann, specific date so desire.regarding the 644-2511 . lands Enfo , Recording Secret this will be For further ement Officer at a he John E e M�C please ll Planning Department Ve truly Yours, • J rY C. T E i eazze t P.E. er JC1/jsy. DT1T. t �pWN Sf4 S'C•VIA Cw"kr Ptu,oN Tawn aps-oail% Vzol"�Ot d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e w rldsOR-00) ` AREA CODE 203/644-2511 March 23, 1993 TO: Elizabeth A. Warren, Chairman, IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer Re: Application #93-08W, Graham Road Culvert Replacement DOCUMENTS REVIEWED: Application form and plans for Graham Road - Podunk River Culvert Replacement (2/11/93 ) COMMENTS: 1. Application #93-07W, Graham Road Culvert Replacement was on the March agenda but was withdrawn. The concern with the application as submitted for March was that the notification to abutters, via certified mail, had not been done. This is therefore a new application and notification has been done per Section 7 .3b of the Regulations . 2. The existing culvert has been in place for well over twenty years, and was installed prior to IWA/CC Regulations, so a wetlands permit was not required. As stated on the plans the culvert needs to be replaced due to erosion of material from under the existing outlet section walls . The existing single box culvert is also significantly undersized and will be replaced with a 4' x 8' and 4' x 10, precast system. 3. The plan states that the existing material is to be removed from site. The construction sequence (sheet 4 of 5) requires that the northerly box culvert be installed while maintaining the flow of the Podunk River through the existing culvert. Once that portion is complete the flow of the Podunk will be diverted to the northerly box culvert; and then the existing system is to be replaced. The flow of the Podunk River will always be maintained. 4 . A series of staked haybale check dams should be provided on the downstream side to control the loss of any sediments beyond the project limits (see attached sketch) . 5. Any disturbed areas should be reseeded and mulched immediately to prevent any erosion of the banks around the culvert ends. 6 . Letters have been sent to the CT. D.E.P. (dated 2/25/93) , and Corps of Engineers (dated 2/25/93) to determine if permits will be required. The Corps of Engineers has responded (correspondence dated 3/9/93) and this activity is permitted under, "Title 33 Code of Federal Regulations, Part 330 Appendix A, 26, Nationwide Permits" . Elizabeth A. Warren Page Two March 23,- 1993 Application #93-08W IY- APPROVAL IS CONSIDERED, SUGGESTED APPROVAL CONDITIONS INCLUDE: 1. A series of haybale check dams shall be provided on the downstream side of the culvert replacement. This shall be noted on the final plans and a detail (see attached sketch) shall also be included on the final plans . 2. Any disturbed areas shall be reseeded and mulched immediately to prevent any erosion of the banks around the culvert ends . This shall be noted on the final plans and shall specify an appropriate seed mixture (as found in figures 6-3 and 7-1 of Ct. Guidelines for Soil Erosion and Sediment Control) . Ft.cuJ STAKED 14AYSALES Na r ra SCA LIT �S0*1N 8E�` y C U .i 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 203/644-2511 April 15, 1993 Jerry C. Iazzetta, Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Iazzetta: Re: Application #93-08W, Graham Road Culvert Replacement At the April 12, 1993 regular meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions application #93-08W - IWA/CC permit for the replacement of the existing culvert located at the intersection of Graham Road and Nevers Road, RR & A20 zones as shown on plans prepared by the Town of South Windsor Engineering Department, Contract No. 92-805 and dated February 11, 1993 . This approval is subject to the following conditions: 1 . Two blueprint copies of the entire set of final plans and this letter reproduced thereon, must be submitted to this Commission. This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3 . The permit is valid for three years and shall expire on April 12, 1996 . 4 . All approvals required must be obtained and submitted prior to any activity on the site. 5 . A contact person shall be identified directly on the final plans . 6 . A series of haybale check dams shall be provided on the downstream side of the culvert replacement. This shall be noted on the final plans and a detail shall also be included on the final plans . Jerry C. Iazzetta Page Two April 15, 1993 Application #98-08W 7 . Any disturbed areas shall be reseeded and mulched immediately to prevent any erosion of the banks around the culvert ends. This shall be noted on the final plans and shall specify an appropriate seed mixture (as found in figures 6-3 and 7-1 of Ct. Guidelines for Soil Erosion and Sediment Control ) . Very truly yours, i� Elizabeth A. Warren Chairman EAW/pmm cc: Planning & Zoning