Loading...
HomeMy WebLinkAboutSite Plan - Conservation (450) TOWN Of SOUTH WINDS OR DEC 10 1988 INLAND WWn ANDS AND WATNR COURS83 South Windsor APPUCATION INLAND WETLANDS AGENCY/ INL,ANO WtTLANC! Aasl1CY ACTION THIS APPLICATION, ONCE INFt��1�fO�101110 eastm— (SEE BACK OF THIS FORM), SHALL BE RECEIVED AT - REGULARLr SCHEDUL D MMETING OF THE AGENCY AT 1-1APPUCATION NO. TOWN HALL. RECEIVED OATS 9Y THIS APPLICATION MUST BE FILED IN TRIPLICATE A' THE OiF'1ZCE OF TES TOWN CLERL OF SOUTH WINDSOR 1 PUBLIC WEARING OATS 12 NOON AT LEAST' 14 DAYS PRIOR TO THE FIRST �(it "Wn') REGULAR MONTHLY MEETING DATE. THREE SETS. OF K COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGIIIF-L PERMIT GRANTED OATS AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR_ PERMIT OENIED. OATS MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. 1. APPUCANT Jdai G. cjjWj . jr- TEL NO. 644-1157 ADDRESS 152 MaTdng Stm & CITY b STATE Sazth , Cr 06074 JdTi G. Sa , Jr., ad-k-Ed L. M91MEy � B. 644-1157 2. OWNIEPI c o Clark C m-ims A atPs St� Sazth Wurl�, CT 06074 AOOA�S _ -.- .��CITY b STATE 3. LOCATION OF PROPERTY SE camr=r cf E 1 imtrn Rmd and Clark S net i==irn NAMES OF AOJACXIT PIROPSATY OWNERS See 'locati(n map," aZ draAM No. 1 of submitted plans and attached list of abutters. STATE CLEARLY AMC BMOLY 5. PUAPOSE9 AMC DESCRIPTION OF THE P"CPOSBD ACTIVITY.AMC THE TIME ELEMENT INVOLVED: See attached "Statement of Purposes" ATTENTION: THE APPLICANT UNOERSTANOS THAT THIS APPLICATION I$ TO 131E CONSIDERED ONLY _� ALL INFORMATION b DOCUMENTS AEgU1RED BY THE AGaQCY.14AVE SON SUAMITTLD. APPROVAL MAY ALSO 13E NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. AN APPLICATION FEE IS REQUIRED. CONSULT TH REGULATIONS (SECTIONS 6.9, 6.9a 'and 6.9b) A SIGN IS REQUIRED. CONSULT THE TIONS 1,SZ91ON 6.3a . SIGNED: (A 1 , Jr. 1 ( 1 Jda1 G. S&e1, Jr. Ii�riMd 8/12/83 APPLIC M HAS HAD MAPS AND PLA.ALS CERTIFIED BY ;?OIL 6 CCMERV.AMIQE SERVICE TO V=Y COMPLETE COMPLI-MCE W=li CONKECTI= GUIDELINES FOR SOIL ZR(XSIOH AAD. SF.DIMaT CUNTKOL ( AS PFk F-;ZMSC()K, .6 iuy ENDEDED, AND PUBLIC ACT 83-3880, AS AtMDED. DATE OF CERTIFIC4TIM 7. x APPLICATIM IKFORMATICK COMPLIES WITH AGENCY* REGUL46TIONS ( SECTIONS 7.1, a through J. X S. REQUIRED FEE HAS BEEN PAID. DATE RECEIVED g. x APPLIC11M ( OR DESIGNATED REPkESENTATIVE)HEREBY ATTMOPS THAT A SIGt WILL BE Pc=ED AT THE FOLLOWING L.C=Iom(S) as directed by ton staff. BY ( riizME ) ON O8 BEFORE ThE F WIDtG DATE as directed hy tom • SIGKATURE a-�--- , G. amse1, Jr. THIS APPLICNTICK IS FOUND TO BE COMPLETE AidD NOW QUALIFIES FOR P LACE14M ON THE AGEUCY'S AGENDA: DATE SIGNATURE Town Engineer Agency Sec'y Agency Chairman THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING MUMBERED 1T EMS ( FROM ABOVE ) AS CHECXED BELOW: 1 2 3 4 5 6 7 8 9 4. SOIL REPORT continued i i PROJECT TITLE: C'1 a rk C`nrnarc F1 1 i ncrinF,mi ncr Si- South Windsor, CT MAPS/PLANS TRANSMITTED TO CLIENT [k Sketch location of Wetlands and other Soil Types. ❑ None NUMBERING SEQUENCE OF WETLAND BOUNDARY LINE MARKERS 1 THRU 38 39 THRU 43 44 THRU .51 52 THRU 61 62 THRU 71 SUMMARY SOIL DESCRIPTIONS WETLAND SOILS Scantic silt loam (Sc) . This -is a poorly drained, medium over fine textured, glacial lacustrine (lakebed) soil. Swanton very fine sandy loam (Sz) . This is a poorly drained, medium over fine textured, frl.able over compact glaci.,al lacustrine (lakebed) soil. Made land, high groundwater variant (Ma"W") . This .is a poorly to very poorly drained disturbed soil that has had two (2) .feet or more of i.ts original soil surface covered with fi.11., The soil has a high water table and supports wetland vegetation. NONWETLAND SOILS Buxton silt loam (Bx) . This is a moderately well drained, medium over fine textured, glacial lacustrine (lakebed) soil. Elmwood very fine sandy loam (Eo) This is a deep, moderately well drained, moderately coarse over fine textured, friable over compact glacial lacustrine silts and clays (lake bed) soil. Made land (Ma) . This is a well to moderately well drained, disturbed soil that has had two feet or more of its original soil surface excavated or filled. For further information about the soils, refer to Soi.l Survey, Hartford County, Connecticut. SOIL SCIENCE A�ft ENVIRONME'NTAL' SERVIt�S INC. 1 4 Elm Street • Cheshire, Connecticut 06410 • 203-272-7837 SOIL REPORT TO: Fuss & 0 ' Neill Tn SSS Job No. _$$/56-7 Kt� �m niT OA 146 Hartforr� Rnar3 Manc'h s Pr, C'T p�CL�n Client Job No. Site Inspection Date_ 1_,/(/�q PROJECT TITLE AND LOCATION Clark ( nrnPrS F_l l i ngton PROJECT DESCRIPTION: Inland wetland identification and classification of soils METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands X❑ Field marking(flagging) for survey. 0 Field plotting on site —I -- scale: �_� contour: ❑ Field plotting on aerial photography. Non Wetland Soils Q High intensity field identification by Soil Scientist. ❑ Medium intensity identification from USDA, Soil Conseraation'Service Soil Maps. METHOD OF SOIL IDENTIFICATION Spade and Auger SOIL MOISTURE CONDITION X❑ ❑ Dry ❑X Moist [] Wet ❑ Deep test pits (backhoe) ❑ Other Frost Depth 1=4 in. Snow Depth in. The classification system of the National Cooperative Soil Survey;USDA,Soil Conservation Service and the .County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist. All wetland boundary lines established by the undersigned Soil Scientist are subject to change until officially adopted by local, state or federal regulatory agencies. Respectively submitted by SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. ) Approved by Soil Scientist Field Investigator / Kenneth C. Stevens,Jr Principal Soil Scientist See attached page(s) - -.-So CES .9a Coleman Road,Cheshin, Corinecticnt 410--`: LEC w 1986 r SOIL REPORT TO: Cornerstone companies SSS Job No. 86-754=fM—SWI-10 231 Farmington Avenue Client Job No. Farmignton, CT 06032 Site Inspection Date 12/4/8 6 ATTN: Richard Korris PROJECT TITLE AND LOCATION Cornerstone Property. Clark & Deming Stradts South Windsor. CT PROJECT DESCRIPTION:Inland wetland idend ' n and classification' o ils 1�wf so METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands F0 Field marking(lo8ging)for survey. © Field plotting on Tc��graph�-,scale: 200 contour: 2 ft , ❑ Field plotting on aerial photography. Non Wetland Soils ❑ High intensity field identification by Soil Scientist. , ❑ Medium intensity identifuation fi»m USDA,Soil Conservation Service Soil Maps. x �- M MOD OF SOIL IDENTIFICATION_ SOIL MOISUTRE CONDITION © Spade and Auger ❑ Dry ❑ Frozen ❑ Deep test pits(backhoe) ® Moist [],snow ❑ Other ❑ Wet. : The class*ation system of theNational CooperativeSoilSurvey,'USDAS Soil Conservation Service and the County Identification Legend vem:used in this investigation: The investigation,:ryas conducted by the undersigned Certified Soil Scientist. Respectively submitted by SOIL SCIENCE SERVICES Approved by Soil Scientist Kenneth C. Stever4 Jr. Principal Soil Scientist See attached pages) r•l• r�llf�iC; C•v5 ' � � v � y!r � • p r � y S a� � 4•, �tea ? �h :; �wd aft�rr�+xy��� Y�J'•i�, � $"'�' ' s ,ram SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. 104 Elm Street • Cheshire, Connecticut 06410 • 203-272-7837 KENNETH C.STEVENS,JR.,PRINCIPAL SOIL SCIENTIST THOMAS W.PIETRAS,SENIOR SOIL SCIENTIST SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. is an environmental consulting firm that specializes in Inland Wetland boundary line identification and soil classification and mapping. The firm also evaluates the significance of wetlands, assesses impacts on wetlands by present or proposed development activities, proposes mitigating measures to reduce development impacts, conducts sieve, permeability, and compaction tests and most recently the firm is providing preliminary site inspections for toxic waste. Since the fi_rm's inception in 1978, its personnel have mapped wetlands in 145 Connecticut municipalities and 7 states. In all, the firm has performed over 7,000 jobs for private and government clients involving wetland identification, environmental assessments, physical soil tests and soil classification and mappi.ng. Thomas W. Pietras Certified Soil Scientist Education / Professional organizations BS Forestry Resource Management, West Virginia University, 1975. Major studies - forestry. MS Natural Resource Conservation, University of Connecticut. 1981 Major studies - soil science and soil and water conservation. Graduate studies in Soil Engineering and On-Site Sewage Disposal, University of Connecticut, 1981-82. Member of Southern New England Chapter of Society of Soil Scientists. Experience Mr. Pietras was with the Peace Corps in Ghana, West Africa from 1975 to 1977 serving as a forestry education officer. In 1978 he was a surveyor party chief for a Forestry Consultant Firm in North Carolina. In 1981 he was hired by a consultant to map wetlands in the City of Middletown for the revision of their Inland Wetlands and Water Courses Map. In 1981 Mr. Pietras joined Soil Science Services as a Soil Scientist. He has specialized in wetland identification, soil evaluation for on-site sewage disposal and foundations, permeability testing and textural analysis. He was responsible for revising Inland Wetlands and Water Courses maps for the towns of Westport, Simsbury and Bloomfield. More recently Mr. Pietras has been active in performing wetland delineations according to U.S. Army Corps of Engineers methods as well as making detailed environmental analysis for purposes of site development. \ INLAND WETLANDS IDENTIFICATION ENVIRONMENTAL ASSESSMENTS SOIL CLASSIFICATION AND MAPPING PHYSICAL SOIL TESTING TOXIC WASTE INSPECTIONS Application of John G. Samsel, Jr. Statement of Purpose The purpose of the regulated activities is to provide parking, access and drainage for a proposed office and commercial development on the upland portions of the site. Please refer to "Plot Plan Clark Corners" (Sheet 3 of9) and "Erosion and Sediment Control Plan" (Sheet 5 of 9) of the site plan submitted with this application for the wetlands and watercourse boundary, 40-foot setback delineation and location of regulated activities. A summary of wetlands impacts for all phases is provided on Sheet 5. Phase I - Regulated Activities Phase I regulated activities are: excavation of proposed pond; filling and construction for access roads and parking; construction of road crossing and culvert; installation of stormwater catchbasins and piping; discharge of stormwater to proposed pond; and, construction of portions of buildings within the 40-foot regulated area, but not within the wetlands boundary. All activities during Phase 1 are expected to be completed within one calendar year. Phase II - Regulated Activities Phase II regulated activities are: filling and construction for parking along the wetlands edge, and within the 40-foot regulated area; leak-off discharge of stormwater to wetlands edge from parking areas; construction of a building within the 40-foot regulated area. Phase II is expected to be complete within six months of the completion of Phase I. Phase III - Regulated Activities Phase III regulated activities are: filling and construction for parking and completion of access road; leak-off discharge of stormwater to wetlands; and, construction of portions of two buildings within the 40-foot regulated area. Phase III is expected to be complete within six months of the completion of Phase II. O I I N i I O u _ I ay C1 ARK WA(� 6AMy �r iT.y O O V All O T �3 O 2 Oc _ N/F OLDE WAPPING REALTY INC. Om N N/F RWR ASSOCIATE z 404 O Op�i •~ O N/OeC�24QFly G Z i� O O v O O O 0 W D 60 I 4 m y r y r m , a r O "'•""'' COMMUNITY RD. 1 � O� ...... 00 dr a -- RD. _ BUCKLAND In A1' RD. RT T f, 4 o � STORMWATER DETENTION AT CLARK CORNERS Presently, there is a natural detention basin on the property that discharges through a 15 inch pipe at Ellington Road to the north. At the Town Shopping Center, a detention basin was designed with a 15 inch outfall pipe and a weir structure, both of which discharge to a piped system in Ellington Road as required by the Town of South Windsor. This detention basin will limit the peak flows to the present level for 2, 10, 25, 50 and 100 year frequency storms. It has been proposed to connect the Clark Corners project to the Town Shopping Center project with a drive paralleling Ellington Road to ease internal traffic circulation. This drive would pass through the Town Shopping Center detention basin, reducing the available storage. To compensate for this it would be necessary to modify the outlet structure. The 15 inch pipe to Ellington Road would be modified with a 12"orifice plate and new 12 inch pipe would be constructed in the connector drive and would discharge into the detention basin at Clark Corners. This basin would be enlarged slightly and the outlet would be restricted by placing a steel plate with an 11 inch round opening over the existing 15 inch outlet pipe. This proposed construction would maintain peak flows at the present level for 2, 10, 25, 50 and 100 year frequency storms. Attached is a summary of peak flows at Clark Corners, both existing and proposed. Also attached is a summary of peak flows from Town Shopping Center, including proposed to Ellington Road, proposed to Clark Corners and existing to Ellington Road. 87-546 Corres. 1214A88BAK FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. O 0��M VIIS1 Y consulting engineers 4jr B 0 S U M 11-A AMY SHEET NO. of Ve Al . �_ - - - ISM- -A -17 � N j L d ♦ .P = � t � � r ■ ■ r } PREPARED BY: DATE: f, � FLISS&D,NgL.L MANCHESTER. CONNECTICUT SH.NO. I Q� Z CHECKED BY. DATE: ATM -Z�-gg PRO.No. ?7 -S4e �. GUTTER FLOW ANALYSIS TOWN Soy+ C lock Cor'ner-� �'1 WIncl AI Entering Catch Ni Basin 02 4- O O � _ Q AI Bypassing Inlet O i 0 Bypassing Inlet Width of Flow (nM mV� N N Depth of Flow at utter Cross Slope of a. + Shoulder O O O - Grade of Gutter N N N N o a O 0 10 C to Inlet 0 N - N + Rainfall Intensity _ 19^ r i Total Al — •r o 0 Sum of Al Al v� Runoff Coefficient r Area in Acres `-6 �. + 0 Time to Inlet o Inlet Number _ FUSS&O NEILL PREPAREb DATE CHECKED DATE PROJECT NO. consulting engineers BY BY CLARK COPO&P-S 50(>T14 WIJVJA-eR, SHEET NO. J of 1 � � t � A5 1 _. -- - -- E tT 1 _ , -- { 3j r 1 < E € X� 3 = -= T ; t - . p£. r : -� FUSS&O'NEILL 'PREPARED DATE CHECKED DATE PROJECT NO. O consulting engineers BY Q BY p e.lTj� (�tJl1Vj? SHEET NO. �i Y GRK CoRWS S c of lop E r 3 7 t , F I j s `a f , ' s € i t 43 7 r i i } a 1 Ion, ' - - f 3 2- � • fr — i FO-#110 FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. O consulting engineers BY BY SHEET NO. of L& 4- Jr-) -4 Aj 72 -4--j- F04110 tttttttttttttttttt$d-80 LIST OF INPUT DATA FOR TR-20 HYDROLOBYtttttttttttttttttt JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 SAMSEL EXIST O 87 546 CLARK CORNERS 3 STRUCT 01 8 72.0 0.0 0.0 8 73.0 2.8 .573 8 74.0 6.5 2.068 8 76.0 10.8 7.781 9 ENDTBL 6 RUNOFF 1 001 6 .0427 70.0 .5 1 1 1 6 RESVOR 2 01 6 7 72.0 1 1 1 1 ENDATA 7 INCREM 6 .10 7 COMPUT 7 001 Of 0.0 3.15 1.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 001 Of 0.0 4.8 1.0 2 2 01 10 ENDCMP f 7 COMPUT 7 001 Of 0.0 5.4 1.0 2 2 01 25 ENDCMP f - 7 COMPUT 7 001 01 0.0 6.15 1.0 2 2 01 50 ENDCMP f 7 COMPUT 7 001 Of 0.0 6.9 1.0 2 2 01 99 ENDCMP 1 ENDJOB 2 tttttttttttttttttttttttttttttttEND.OF 80-80 IISTtttttttttttttttttttttttttttttttt TR20 XEQ 12-09-88 12:36 SAMSEL EXIST 9 87 546 CLARK CORNERS JOB 1 SUMMARY REV PC 09/83(.2) PAGE 12 "SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDR06RAPH A QUESTION MARK(?) INDICATES A HYDR06RAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME -----J------------------ RUNOFF -------------------------------------- ID OPERATION AREA 4 COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SQ MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 XSECTION 1 RUNOFF .04 2 2 .10 .0 3.15 24.00 .80 --- 12.23 16.17 378.7 STRUCTURE 1 RESVOR .04 2 2 .10 .0 3.15 24.00 .79 73.07 13.28 3.00 72.0 ALTERNATE i STORM 10 XSECTION 1 RUNOFF .04 2 2 .10 .0 4.80 24.00 1.89 --- 12.21 42.10 985.9 STRUCTURE i RESVOR .04 2 2 .10 .0 4.80 24.00 1.87 73.93 13.33 6.25 146.3 ALTERNATE 1 STORM 25 XSECTION i RUNOFF .04 2 2 ;10 .0 5.40 24.00 2.34 --- 12.20 52.66 1233.3 STRUCTURE 1 RESVOR .04 2 2 .10 .0 5.40 24.00 2.32 74.17 13.40* 6.86* 160.7 ALTERNATE 1 STORM 50 XSECTION 1 RUNOFF .04 2 2 .10 .0 6.15 24.00 2.92 --- 12.20 66.40 1555.1 STRUCTURE i RESVOR .04 2 2 .10 .0 6.15 24.00 2.89 74.46 13.57 7.48 175.1 ALTERNATE i STORM 99 XSECTION 1 RUNOFF .04 2 2 .10 .0 6.90 24.00 3.53 --- 12.20 80.59 1887.4 STRUCTURE 1 RESVOR .04 2 2 .10 .0 6.90 24.00 3.48 74.76 13.68 8.13 190.5 fR20 XEA 12-09-88 12t36 SAMSEL EXIST D 87 546 CLARK CORNERS JOB 1 SUMMARY REV PC 09/83f.2f PAGE 13 3UMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (S0 MI) 2 10 25 50 99 STRUCTURE 1 .04 ALTERNATE 1 3.08 6.25 6.86 7.48 8.13 XSECTION 1 .04 ALTERNATE 1 16.17 42.10 52.66 66.40 80.59 t*****************80-80 LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 87 546 3 STRUCT O1 8 72.0 0.0 0.0 8 73.0 2.3 .972 8 74.0 3.9 2.782 8 76.0 6.00 9.702 9 ENDTBL 6 RUNOFF 1 001 6 .0428 74.0 .5 1 1 1 6 ADDHYD 4 002 1 6 7 1 1 1 6 RESVOR 2 01,7 6 72.0 1 1 1 1 ENDATA 7 INCREN 6 .10 7 READHD 8 1 7 READHD 9 0.0 .10 .0428 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 _ 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 a.o 8 0.0 0.0 0.0 0.0 -0.0 8 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 .25 .45 .45 .45 .45 8 .45 .45 .45 .45 .5 8 .55 .6 .6 .65 .7 8 .85 1.15 1.95 3.35 4.05 8 4.9 5.35 5.7 5.85 5.95 8 5.95 5.9 5.8 5.65 5.5 8 5.35 5.2 5.05 4.7 4.4 8 4.1 3.8 3.5 3.2 2.45 8 1.95 1.65 1.4 1.25 1.15 8 1.1 1.0 1.0 .95 .9 9 ENDTBL 4fffff#fttff#ffttf##tfa0-80 LIST OF INPUT DATA (CONTINUED)tffftfffff#f#f###ff#ff 7 COMPUT 7 001 01 0.0 3.15 1.0 2 2 01 02 ENDCMP 1 7 READND 8 1 7 READND 9 0.0 .10 .0428 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0,0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 8 0.0 0.0 0.0 0.0 0.0 a 0.0 0.0 0.0 0.0 0.0 B 0.0 0.0 0.0 0.0 0.0 B .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 0 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 B .45 .65 .7 .7 .75 8 .75 .8 .8 .8 .85 8 0.9 1.0 1.1 1.25 1.5 8 2.05 3.35 4.15 5.25 6.1 8 6.85 7.4 7.5 7.7 7.75 B 7.7 7.65 7.5 7.4 7.35 8 7.3 7.2 7.05 6.85 6.7 a 6.5 6.3 6.15 5.9 5.7 6 5.55 5.35 5.15 4.95 4.6 8 4.3 4.0 3.7 3.5 3.3 9 ENDTBL 7 COMPUT 7 001 01 0.0 4.8 1.0 2 2 02 10 ENDCMP i ENDJOB 2 tfttftffftf#fffffffffffff#tf#ttEND OF 80-80 LISTtft#ftfffffftt#ff#t#tfffff#ft#ft 'R20 XEQ 12-13-88 13:33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 87 546 JOB I PASS I REV PC 09/831.2) PAGE i :XECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .10 HOURS RECORD ID :XECUTIVE CONTROL OPERATION READHD DISCHARGE HY➢ROGRAPH, HYDROGRAPH LOCATION 1 RECORD ID STARTING TIME= .00 TIME INCREMENT= .10 DRAINAGE AREA= .04 BASE FLOW= .00 .00 .00 .00 .00 .00 i .00 .00 .00 .00 .00 i .00 .00 .00 .00 .00 i .00 .00 .00 .00 .00 1 .00 .00 .00 .00 .00 i .00 .00 .00 .00 .00 _ 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 1 .DO .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 A 3 .00 .00 _ .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00. .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .00 .00 .00 .00 .00 3 .25 .45 .45 .45 .45 a .45 .45 .45 .45 .50 3 .55 .60 .60 .65 .70 a .85 1.15 1.95 3.35 4.05 3 4.90 5.35 5.70 5.85 5.95 a 5.95 5.90 5.80 5.65 5.50 3 5.35 5.20 5.05 4.70 4.40 8 4.10 3.80 3.50 3.20 2.45 a 1.95 1.65 1.40 1.25 1.15 a 1.10 1.00 1.00 .95 .90 9 ENDTBL EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION 1 TO STRUCTURE 1 RECORD I➢ STARTING TIME = .00 RAIN DEPTH = 3.15 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COND= 2 ALTERNATE NO.= 1 STORM NO.= 2 MAIN TIME INCREMENT = .10 HOURS OPERATION RUNOFF CROSS SECTION i OUTPUT HYDROGRAPH= 6 AREA= .04 SO MI INPUT RUNOFF CURVE= 74. TIME OF CONCENTRATION= .50 HOURS 'R20 XER 12-13-88 13.33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 489 B7 546 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 9 iUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) )ECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE )TRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA 4 COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SO MI) (HR) (HR) (IN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 2 :SECTION 1 RUNOFF .04 2 2 .10 .0 3.15 24.00 1.00 --- 12.22 21.65 505.9 (SECTION 2 ADDHYD .09 2 2 .10 .0 3.15 24.00 .74 --- 12.22 27.39 320.0 ;TRUCTURE 1 RESVOR .09 2 2 .10 .0 3.15 24.00 .68 73.56 14.30* 3.19* 37.2 ALTERNATE 2 STORM 10 (SECTION 1 RUNOFF .04 2 2 .10 .0 4.80 24.00 2.20 --- 12.20 50.07 1169.9 (SECTION 2 ADDHYD .09 2 2 .10 .0 4.80 24.00 1.50 --- 12.20 57.58 672.6 STRUCTURE i RESVOR .09 2 2 .10 .0 4.80 24.00 1.25 74.57 14.95 4.50 52.5 iR20 XE8 12-13-88 13:33 KELLY SAMSEL DRIVE IN DETENT RUN 2 85 487 87 54L JOB i SUMMARY REV PC 09/83(.2) PAGE 10 3UMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES (SECTION/ DRAINAGE 3TRUCTURE AREA STORM NUMBERS.......... ID (So MI) 2 10 STRUCTURE 1 .09 ALTERNATE 1 3.19 .00 ALTERNATE 2 .00 4.50 XSECTION 1 .04 ALTERNATE 1 21.0 .00 ALTERNATE 2 .00 50.07 XSECTION 2 .09 ALTERNATE 1 27.39 .00 ALTERNATE 2 .00 57.58 LIST OF INPUT DATA FOR TR-20 HYDROLOGY****************** JOB TR-20 FULLPRINT SUMMARY NOPLOTS TITLE 001 KELLY SAMSEL RUN 3 85 499 87 546 3 STRUCT 01 8 72.0 0.0 0.0 8 73.0 2.3 .972 8 74.0 3.9 2.782 a 76.0 6.0 8.702 9 ENDTBL 6 RUNOFF 1 001 6 .0428 74.0 .5 1 1 1 6 ADDHYD 4 002 1 6 7 1 1 1 6 RESVOR 2 01 7 6 72.0 1 1 1 1 1 ENDATA 7 INCREM 6 .1 7 READHD 8 1 7 READHD 9 0.0 .1 .0428 0.0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 _ 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 , .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .55 .7 .8 .85 .85 8 .9 .9 .9 .9 .9 8 .95 1.0 1.05 1.15 1.25 8 1.45 1.75 2.4 3.5 4.5 8 5.55 6.5 7.3 7.7 7.9 8 7.95 7.95 7.9 7.85 7.8 8 7.7 7.6 7.4 7.35 7.3 8 7.2 7.0 6.85 6.65 6.5 8 6.3 6.1 5.95 5.75 5.55 8 5.35 5.2 5.0 4.7 4.4 8 4.1 4.0 3.9 3.0 3.7 LIST OF INPUT DATA (CONTINUED)********************** 9 ENDTBL 7 COMPUT 7 001 01 0.0 5.4 1.0 2 2 01 25 ENDCMP 1 7 READHO 8 1 7 READHD 9 0.0 .10 .0428 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 % .0 .0 .0 .0 8 .0 .0 .0 .0 .0 0 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 _ 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 0 .0 .0 .0 .0 .0 6 .6 .8 .9 .95 1.0 8 1.0 1.05 1.05 1.05 1.1 a 1.1 1.15 1.25 1.3 1.45 8 1.7 2.05 2.85 3.7 4.9 8 5.9 6.95 7.7 9.0 8.1 8 8.15 8.15 8.1 9.05 7.95 8 7.85 7.8 7.650 7.5 7.35 a 7.3 7.3 7.15 7.0 6.8 8 6.65 6.45 6.3 6.15 5.95 8 5.75 5.5 5.3 5.2 5.1 9 ENDTBL 7 COMPUT 7 001 01 0.0 6.15 1.0 2 2 02 50 ENDCMP 1 7 READHD 8 1 7 READHD 9 0.0 .1 .0428 0.0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 I LIST OF INPUT DATA (CONTINUED)*********f*ffff*ffff** B .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .0 B .0 .0 .0 .0 .0 B .0 .0 .0 .0 .0 8 .0 .0 .0 .0 .00 a .0 .0 .0 .0 .0 a .0 .0 .0 .0 .0 8 .0 .Q .0 .0 .0 a .0 .0 .0 .0 .0 a .Q .0 .0 .0 .0 a .65 .85 1.0 1.05 1.1 a 1.15 1.2 1.2 1.25 1.25 8 1.3 1.35 1.45 1.55 1.7 _ 8 1.95 2.4 3.25 3.9 5.15 B 6.25 7.3 7.95 8.25 8.4 B 8.4 9.3 8.2 8.1 8.05 8 7.95 7.9 7.8 7.65 7.5 a 7.4 7.35 7.3 7.2 7.05 8 6.9 6.75 6.6 6.4 6.25 a 6.1 5.95 5.75 5.6 5.45 8 5.25 5.1 5.0 4.9 4.8 9 ENDTBL 7 COMPUT 7 001 01 0.0 6.9 1.0 2 2 03 99 ENDCMP 1 ENDIOB 2 fffff*fff*ffff#f*ff**ffffffffffEND OF 80-80 LIST#ffff*ffffffffffffff#fffff#*fff* TR20 XEII 12-13-88 14:28 KELLY SAMSEL RUN 3 85 489 87 546 JOB I PASS f REV PC 09/83t.23 PAGE i EXECUTIVE CONTROL OPERATION INCREM MAIN TIME INCREMENT = .10 HOURS RECORD ID EXECUTIVE CONTROL OPERATION READHO DISCHARGE HYDR06RAPH, HYDR06RAPH LOCATION i RECORD ID STARTING TIME= .00 TIME INCREMENT= .10 DRAINAGE AREA= .04 BASE FLOW= .00 6 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 _ 8 .00 .00 .00 .00 .00 B .00 .00 .00 .00 .00 6 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 a .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 6 .00 .00 .00 .00 .00 a .00 .00 .00 .00 .00 8. .00 .00 .00 .00 .00 6 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 8 .00 .00 .00 .00 .00 a .00 .00 .00 .00 .00 a .55 .70 .80 .85 .85 a .90 .90 .90 .90 .90 8 .95 1.00 1.05 1.15 1.25 8 1.45 1.75 2.40 3.50 4.50 8 5.55 6.50 7.30 7.70 7.90 8 7.95 7.95 7.90 7.85 7.80 8 7.70 7.60 7.40 7.35 7.30 a 7.20 7.00 6.05 6.65 6.50 8 6.30 6.10 5.95 5.75 5.55 8 5.35 5.20 5.00 4.70 4.44 8 4.10 4.00 3.90 3.80 3.70 9 ENDTBL EXECUTIVE CONTROL OPERATION COMPUT FROM XSECTION I TO STRUCTURE I RECORD ID STARTING TIME = .00 RAIN DEPTH = 5.40 RAIN DURATION= 1.00 RAIN TABLE NO.= 2 ANT. MOIST. COND= 2 ALTERNATE NO.= i STORM NO.=25 MAIN TIME INCREMENT= .10 HOURS OPERATION RUNOFF CROSS SECTION I TR20 XE9 12-13-88 14:28 KELLY SAMSEL RUN 3 85 489 87 546 JOB 1 SUMMARY REV PC 09/83(.2) PAGE 13 SUMMARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED (A STAR(*) AFTER THE PEAK DISCHARGE TIME AND RATE (CFS) VALUES INDICATES A FLAT TOP HYDROGRAPH A QUESTION MARK(?) INDICATES A HYDROGRAPH WITH PEAK AS LAST POINT.) SECTION/ STANDARD RAIN ANTEC MAIN PRECIPITATION PEAK DISCHARGE STRUCTURE CONTROL DRAINAGE TABLE MOIST TIME ------------------------- RUNOFF -------------------------------------- ID OPERATION AREA # COND INCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE RATE (SH MI) (HR) (HR) (LN) (HR) (IN) (FT) (HR) (CFS) (CSM) ALTERNATE 1 STORM 25 XSECTION I RUNOFF .04 2 2 .10 .0 5.40 24.00 2.68 --- 12.20 61.32 1432.7 XSECTION 2 ADDHYD .09 2 2 .10 .0 5.40 24.00 1.79 --- 12.20 68.63 801.8 STRUCTURE 1 RESVOR .09 2 2 .10 .0 5.40 24.00 1.39 74.89 15.46 4.84 56.5 _ ALTERNATE 2 STORM 50 XSECTION i RUNOFF .04 2 2 .10 .0 6.15 24.00 3.31 --- 12.20 75.78 1770.5 XSECTION 2 ADDHYD .09 2 2 .10 .0 6.15 24.00 2.09 --- 12.20 83.47 975.1 STRUCTURE 1 RESVOR .09 2 2 .10 .0 6.15 24.00 1.53 75.23 15.00 5.20 60.7 ALTERNATE 3 STORM 99 XSECTION i RUNOFF .04 2 2 .10 .0 6.90 24.00 ' 3.95 --- 12.19 90.55 2115.7 XSECTION 2 ADDHYD .09 2 2_ .10 .0 6.90 24.00 2.47 --- 12.20 98.48 1150.5 STRUCTURE i RESVOR .09 2 2 .10 .0 6.90 24.00 1.68 75.67 15.49 5.66 66.1 TR20 XEA 12-13-OB 14:28 KELLY SAMSEL RUN 3 85 489 87 546 JOB 1 SUMMARY REV PC 09/83(.2) FARE 14 3UMMARY TABLE 3 - DISCHARGE (CFS) AT XSECTIONS AND STRUCTURES FOR ALL STORMS AND ALTERNATES XSECTION/ DRAINAGE STRUCTURE AREA STORM NUMBERS.......... ID (So MI) 25 50 99 STRUCTURE 1 .09. ALTERNATE 1 4.84 .00 .00 ALTERNATE 2 .00 5.20 .00 ALTERNATE 3 .00 .00 5.66 XSECTION 1 .04 ALTERNATE 1 61.32 .00 .00 - ALTERNATE 2 .00 75.78 .00 ALTERNATE 3 .00 .00 90.55 XSECTION 2 .09 ALTERNATE 1 68.63 .00 .00 ALTERNATE 2 .00 83.47 .00 ALTERNATE 3 .00 .00 98.48 v AGREEMENT AGREEMENT MADE AND ENTERED into between OLDE WAPPING REALTY, INC. , acting herein by EDWARD R. KUEHN, its President, hereunto duly authorized, of South Windsor, Connecticut, and JOHN ,SAMSEL, of the Town of South Windsor, County of Hartford and State Of Connecticut. W I T N E S S E T 11 : WHEREAS, John Samsel has entered into an ©motion Agre�t for the purchase of approximately 15 .2 acres of .land from' Stanley Waldron and Florence Waldron; and 1 WHEREAS, it has been revealed to John Samsel that- Olde Wapping Realty, Inc. has a license and permission to maintain and operate an existing ,drain extending from the rear of their premises at 1665 Ellington Road in South Windsor, Connecticut, over premises belonging to Florence Waldron, and extending to the swale on said premises; and WHEREAS, it is the desire of all parties that the permission be released by Olde Wapping Realty, Inc. and relocated on the said premises of said Florence Waldron when. and if John f3c �e� Samsel does exercise lIis e reil to purchase the premises of Stanley Waldron ind Florence Waldro NOW THEREFORE, it is mutually agreed as follows: Olde Wapping Realty will release its right to drain and maintain a drain pipe from their premises at 1665 Ellington Road across premises of Florence Waldron to the swale on the premises of Florence Waldron in return for which John Samsel will transfer the fee to a ten (101 ) foot strip of land immediately adjacent to and -on the rear of premises owned by Olde Wapping Realty, Inc. , and will relocate the drain pipe in accordance with plans acceptable to the Town Planning and zoning Commission, Town of i Windsor, and the Town Town of South' Windsor Wilw&Of J.Rpm the event that John Samsel shall fail to exercise his LAW OFFICE'S � Agreement with Stanley Waldron and Florence Waldron, this KUEFIN.CAVANAUGFI Agreement shall be null and void and the parties hereto shall be AND CUMMINGS,P.C. released from all obligations hereunder. `"i0 i MtMIN(iTON AVENUE WEST HARIFORO.CT 06107 12031 236.2973 1 Dated at West Hartford, Connecticut, this day of Se� 1987 . Y Signed, Sealed and Delivered OLDE WAPPING REALTY, INC. in 4thepreen�� of: Edward R. u Iin Its President, Duly Authorized ohn Samsel � i i 0 LAW OFFICES KUEHN.CAVANAUG14 AND CUMMINGS.P.C. 96n FARMINGTON AVENUE WEST HARTFORO.CF —3- 06107 12031236.2973 Application of John G. Samsel, Jr. Statement of Purpose The purpose of the regulated activities is to provide parking, access and drainage for a proposed office and commercial development on the upland portions of the site. Please refer to "Plot Plan Clark Corners" (Sheet 3 -of- 9) and "Erosion and Sediment Control Plan" (Sheet 5 of 9) of the site plan submitted with this application for the wetlands and watercourse boundary, 40-foot setback delineation and location of regulated activities. A summary of wetlands impacts for all phases is provided on Sheet 5. Phase I - Regulated Activities Phase I regulated activities are: excavation of proposed pond; filling and construction for access roads and parking; construction of road crossing and culvert; installation of stormwater catchbasins and piping; discharge of stormwater to proposed pond; and, construction of portions of buildings within the 40-foot regulated area, but not within the wetlands boundary. All activities during Phase 1 are expected to be completed within one calendar year. Phase II - Regulated Activities Phase II regulated activities are: filling and construction for parking along the wetlands edge, and within the 40-foot regulated area; leak-off discharge of stormwater to wetlands edge from parking areas; construction of a building within the 40-foot regulated area. Phase II is expected to be complete within six months of the completion of Phase I. Phase III - Regulated Activities Phase III regulated activities are: filling and construction for parking and completion of access road; leak-off discharge of stormwater to wetlands; and, construction of portions of two buildings within the 40-foot regulated area. Phase III is expected to be complete within six months of the completion of Phase II. SOIL SCIENCE SERVICES 968 Coleman Road, Cheshire, Connecticut 06410-- SOIL REPORT TO: Cornerstone Companies SSSJobNo. 86-754"CT-SWI-10 231 Farmington Avenue Client Job No. Farming on, CT . 06032 Site Inspection Date April 5, PROJECT TITLE AND LOCATION Cornerstone Property, Lark & Demming Sts`. , South Windsor, CT. 0 PROJECT DESCRIPTION:Inland wetland identification and classification of soils METHOD FOR IDENTIFICATION OF MAP UNITS ldl Wetlands Field marking(flagging) for survey. Field plotting on Topographic Map , scale: 200 , contour: 2 ft. Field plotting on aerial photography. Non Wetland Soils ❑X High intensity field identification by Soil Scientist. ❑ Medium intensity identification from USDA, Soil Conservation Service Soil Maps. METHOD OF SOIL IDENTIFICATION SOIL MOISUTRE CONDITION X❑ Spade and Auger ❑ Dry ❑ Frozen. Deep test pits(backhoe) ❑X Moist ❑ Snow ❑ Other ❑ Wet The classification system of the National Cooperative Soil Survey, USDA,Soil Conservation Service and the County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist.- Respectively submitted by SOIL SCIENCE SERVICES - Approved by WIOW44 Soil Scientist Kenneth C. Stevens,Jr. Thomas .W. Pietras Principal Soil Scientist ; • _ . See attached page(s) b. SOIL REPORT continued PROJECT TITLE; rtu, Clark r- _nemi n Streets Windsor, CT South Wi �T MAPS/PLANS TRANSMITTED TO CLIENT ketch location of Wetlands and other Soil Types. None NUMBERING SEQUENCE OF WETLAND BOUNDARY LINE MARKERS 1 THRU 29 30 THRU 35 36 THRU 41 ------------ SUMMARY SOIL DESCRIPTIONS WETLAND- SOILS Scantic silt loam (Sc) . This is a poorly drained, medium over fine textured, glacial lacustrine (lakebed) soil. Made land, high groundwater variant (Ma"W") .This is a poorly to very poorly drained disturbed soil that has had two (2) feet or more of its original soil surface covered with fill. The soil has a high water - table and supports wetland vegetation. 'NONWETLAND SOILS Elmwood very fine sandy loam (Eo) . This is a deep, moderately well drained, moderately coarse over fine textured, friable over compact glacial lacustrine silts and clays (lake bed) soil. Buxton silt loam (Bx) . This is a moderately well drained, medium over fine textured, glacial lacustrine (lakebed) soil. Made land (Ma) . This is a well to moderately well drained, disturbed soil that has had two feet or more of its original soil surface excavated or filled. For further .information-.about the soils, refer' to Soil Survey,. Hartford County, Connecticut. Iv kn ji —_ - , - - - '"------- -T- -- col ! � � �._._.. i � '� •\ '`� i ' Old 4 - . r - d 6TIM, nr i �' Q ,�r�v Yam•; � .:, IL r i tea--�--- \•' �r _ i , STORMWATER DETENTION AT CLARK CORNERS Presently, there is a natural detention basin on the property that discharges through a 15 inch pipe at Ellington Road to the north. At the Town Shopping Center, a detention basin was designed with a 15 inch outfall pipe and a weir structure, both of which discharge to a piped system in Ellington Road as required by the Town of South Windsor. This detention basin will limit the pear flows to the present level for 2, 10, 25, 50 and 100 year frequency storms. It has been proposed to connect the Clark Corners project to the Town Shopping Center project with a drive paralleling Ellington Road to ease internal traffic circulation. This drive would pass through the Town Shopping Center detention basin, reducing the available storage. To compensate for this it would be necessary to modify the outlet structure. The 15 inch pipe to Ellington Road would be modified with a 12"orifice plate and new 12 inch pipe would be constructed in the connector drive and would discharge into the detention basin at Clark Corners. This basin would be enlarged slightly and the outlet would be restricted by placing a scee-1 plate with an ii inch round opening over t e e ing inc ou a pi This proposed construction would maintain peak flows at the present level for 2, 10, 25, 50 and. 100 year frequency storms. Attached is a summary of peak flows at Clark Corners, both existing and proposed. Also attached is a summary of peak flows from Town Shopping Center, including proposed to Ellington Road, proposed to Clark Corners and existing to Ellington Road. 87-546 Corres. 1214A88BAK Z"it wJ l 4�WN 3E,` " Tio o siou� V&U&at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �tioSOR-C AREA CODE 203/644-2511 December 19, 1988 Denise Conklin Hartford County Soil and Water Conservation District 1101 Kennedy Road Windsor, CT 06095 Dear Denise: Re: Application #88-118P - Clark Corners After a meeting with the Chairman of the South Windsor Inland Wetlands Agency/Conservation Commission, a request was made to forward the above noted plans to your office for your review and input. The commission would like input with regards to the effect this project will have on the wetlands and drainage in the area. If you should have any questions, please don't ;hesitate to contact the Planning Department, 644-2511 Ext. 253. Very Truly Yours, John E. McCahill Zoning/Wetlands Enforcement Officer JEM/pmm SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR, CT 06074 (203) 644-1157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER December 28, 1988 Richard S . Kelley RSK-Kellco 1744 Ellington Road South Windsor, CT 06074 Dear Chick, Enclosed, please find prints titled "Terry Office Park" ( revised 12-22-88 ) . Contained are three pages showing road improvements to the existing internal road system of Terry Office Park and an additional building of 4, 000 square feet . I intend to submit these revisions with the additional building shown to Planning and Zoning on Friday, December 30, 1988 for their consideration and I hope, approval . At this time, I make reference to your letter of December 13, 1988, and ask you if you would want to be part of this application. Please call if you have any questions or suggestions . Sincerely, John Samsel,Jr . cc: Marsha Banach, Director of Planning, Town of South Windsor Enclosure : 3 i a January 12 1989 Steven and Jill Andross 1583 Ellington Rd. South Windsor Ct. 06074 To' whom it may consern; We wish it to be known that we are not apposed to the proposed development referred to as Clark Corners located on the property formally owned by the Waldron family bordering Clark Street, Ellington Road and deming Street. I am a resident of South Windsor for thirty one years and Jill for seven. Together we have seen much development in this town and feel that John Samsel Jr' s proposed development of, the above mentioned parcel will be an asset to the residents of South Windsor and the best use of that particular property. Sincerely, Steve and Jill ndross ROBINSON & COLE LAW OFFICES ONE COMMERCIAL PLAZA HARTFORD,CONNECTICUT 06103-3597 203.275-8200 FINANCIAL CENTRE POST OFFICE BOX 10305 - LINNEA C. MCCAFFREY STAMFORD,CONNECTICUT 06904-2305 HARTFORD 203-964-1200 LAND USE ANALYST TELECOPIER HARTFORD 203-275-8299 TELECOPIER STAMFORD 203-359-8576 January 2 5 , 1989 TELEX BOTH OFFICES 99-4407 PLEASE REPLY TO HARTFORD Mr. John Moran, Chairman Inland Wetlands, Watercourses and Conservation Commission Town of South Windsor 1540 Sullivan Avenue tpo South Windsor, CT 06074 SGclfi77 Re: Application of John G. Samsel, Jr. C�NS�RV�rtpry_C� `y oMrva� � Dear Mr. Moran: 011( At the public meeting on January 9 , 1989, two different soils reports were submitted for the above application. I am enclosing ten copies of the correct soils report, on which a "site inspection date" of "1 /6/89" is shown in the upper right-hand corner of the first page. As Mr. Pietras mentioned in his presentation, the wetlands on the site had recently been re- surveyed. The January 1989 report documents that survey and supercedes the December 4, 1986 soils report which some members of the Commission received. You will note that the January 1989 report, based on Mr. Pietras ' detailed field location of the wetlands boundary, includes an additional wetlands soil type, the SZ-Swanton very fine sandy loam. I apologize for any confusion resulting from the mix-up. Mr. Pietras will be available to answer your questions at the public hearing. Very truly yours, Linnea McCaffrey, AICP Land Use Analyst LM/nb cc: John McCahill John G. Samsel Tom Pietras " '' United States Soil �Q�d I Department of Conservation 1101 Kennedy Road, ROOM 105B Agriculture Service Windsor, Cr 06095 Phone: 688-7725 January 26, 1989 4y;t JAN �n 1989 TO: Denise Conkling, District Manager South Windsor Hartford County Soil and Water Conservation Service INLAND WETLANDS AGENCY/ conasERvAT110N comMissftM FROM: J. Eric Scherer, District Conservationist USDA-Soil Conservation Service FOR: John E. Mc Cahill, Zoning/Wetlands Enforcement Officer Town of South Windsor, Cr RE: SITE PLAN REVIEW FOR "CLARK CORNERS" - ELLINGTON ROAD, CLARK STREET, DEMING.STREET, SOUTH WINDSOR, CT. On January 26, 1989 a site plan review of the above referenced proposal was made. Sheet 2 of 9 (dated August 30, 1988 and revised 12-5-88) , Sheets 3 and 4 of 9 (dated 9-13-88 and revised 12-5-88) , Sheets 5, 6, 7, 8, and 9 of 9 (dated 9-13-88) were reviewed. Also reviewed were a soils report from Soil Science Services (dated 12/4/86) and a hydrology report by Fuss & O'Neill (dated 9-20-88 and 12-13-88) . The following information is offered for consideration: - Approximately 50% of the site is considered reaulated (inland wetland) area under state statu e. is, over (7) a_c_res wi l be directly impacted� o h f' ���,i�r swi-a a tlQn, g wetlands will � 1 -• nn The remaining receive indirect impact from the proposed development. Aerial photos show that this wetland system is part of a larger more extensive system. Land use changes within this system will consequently impact downstream wetlands. - The site plans submitted do not include a detailed inventory of existing conditions nor does it detail or analyze current wetland functions. There appears to be no attempt at mitigation for wetland functions except for the creation of stormwater management devices. - It is apparent that the plans have been developed and are sensitive to planning and zoning 'requirements but they do not appear to address the natural resource concerns in total. It do a t rudent nd �• t ��' feasible alternative to the 12roposed layout' x' si e q�� • that these should 'be explored before the Inland Wetland Agency if not done already. O The Soil Conservation Service l.Jis an agency of the Department of Agriculture 'y, SITE PLAN REVIEW FOR "CLARK CORNERS" - ELLINGTON ROAD, CLAW STREET, DEMING STREET, SOUTH WINDSOR, CT. The plans do not address majo �tnewatercourse issues relative to storm runoff. The direct discharge i system of parking lot runoff is inappropriate. C - The Soil Erosion and Sediment Control Plan is not definitive enough in description of what will happen and when. The.option to install S sediment barriers does not reflect specifications in the CT "Guidelines for Soil Erosion and Sedimentation Control". There is a need for additional control measures including traffic barriers along public rights-of-way. A more detailed phasing sequence is needed as well as a construction check list (see enclosed) . - The proposed crossing downstream of the existing pond is questionable as to it's purpose and need for disturbing this wetland area. enclosure ROBINSON Sc CO LE - fit LAW OFFICES / I ONE COMMERCIAL PLAZA 1/c I G �Nw 4 qe f /t A- � HARTFORD,CONNECTICUT 06103.3597 203.275.8200 F TFB l;JCQ FINANCIAL CENTRE POST OFFICE BOX 10305 STAMFORD,CONNECTICUT 06904-2305 BRIAN R.SMITH Co I 1 ( nr�`S7r HARTFORD 203-964-1200 INLkNE:- �'JE•�L`' JS_AuENCYJ — 203.275.8224 COW,E RVATION COMMISSION TELECOPIER HARTFORD 203-275-8299 February 8 , 1 9 8 9 TELECOPIER STAMFORD 203-359-8576 TELEX BOTH OFFICES 99-4407 PLEASE REPLY TO HARTFORD Mr. John Moran, Chairman Inland Wetlands, Watercourses and Conservation Commission Town of South Windsor 1540 Sullivan Avenue - South Windsor, CT 06074 Re: Application of John G. Samsel, Jr. Dear Mr. Moran: On behalf of Mr. Samsel, I am writing to clarify the information provided on the Erosion and Sediment Control Plan (Sheet 5 of 9 ) of the Clark Corners site plan. On that sheet, the table labeled "AREAS" is based on the town' s official wetlands boundary. (Both the town map boundary and the revised boundary field located by Soil Science Services are shown on the plan. ) The areas of wetland and construction impacts have been recalculated using the revised wetlands boundary based on the January 6 , 1989 soil investigation by Soil Science Services. Those numbers are as follows: 8.80 acres existing wetlands ( 1 /6/89 soil investigation) 3 .63 acres disturbed by construction 0.22 acre area of new waterbody 1 .60 acres impervious coverage 2.84 acres area of filling (includes 1 .60 -acres of impervious surface plus embankments and other site grading) We note that the area of impervious surface has remained relatively low (only 18 percent of total wetlands) despite the variations between the field surveyed wetlands boundary and the town' s official map boundary. Very truly yours, 6�a,LA/-? Brian R. Smith cc: John McCahill John G. Samsel, Jr. Betsy Kaemmerlen CLARK CORNERS ASSOCIATES Richard L. Mahoney Melvyn B. Marks 152 Deming Street John Samsel, Jr. South Windsor, CT 06074 (203) 644-1157 FAX: (203) 644-5992 February 20, 1989 Richard S . Kelley 1744 Ellington Road South Windsor, CT 06074 Re : Clark Corners Associates Letter of Intent Dear Dick, This is my letter of intent to allow a cross easement of vehicular and pedestrian traffic between the proposed Clark Corners and Town Shopping Center when both projects receive both Local 'and State approvals . Sincerely, John Samsel, Jr . Clark Corners Associates SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR, CT 06074 (203) 644-1157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER D � February 20, 1989 FHB3 L489 South Windsor Inland Wetlands/Conservation Commission INLAND WETLANDS AGENCY/ Town of South Windsor CONSERVATION COMMISSION Sullivan Avenue South Windsor, CT 06074 Re : Clark Corners and RSK-KELLCO letter, February 15, 1989 Dear Commissioners : Enclosed are my comments concerning the above letter . Item #1 . At this time, we, (Mr Samsel and Mr Kelley) have no agreement concerning a connector road between Clark Corners and the Town Shopping Center or between Terry Office Park and the Town Shopping Center . Item #2 . I am sure the Planning and Zoning Commission will also require a bond from me if our site plans are approved . Item #3 . An interior road system was a very strong suggestion by town staff and the Planning and Zoning Commission. Our connector road from the Clark Corners to the Town Shopping Center simply abutted a road I believe the Planning and Zoning Commission approved on plans submitted by Town Shopping Center . The connected road from Terry Office Park to the Town Shopping Center was the result of at least two meetings with the land owners and town staff . I intend to construct and install the connector road to the property line and all other improvements as submitted immediately after approval whether or not the connector road ever becomes a reality. Item #4 . I agree that the building at 1665 Ellington Road (the Kuehn building) should be connected to the above mentioned interior road system and eliminate the curb cut it presently has onto Ellington Road . Enclosed is a copy of a condition I agreed to abide by when we purchased the Waldron property. SAMSEL PROPERTIES 152 DEMING STREET SOUTH WINDSOR, CT 06074 (203) 644-1157 TERRY OFFICE PARK BUCKLAND PROFESSIONAL CENTER -2- Also enclosed is a letter from me to Richard S . Kelley dated December 28, 1988, in which I asked him if he wanted to be a part of this application concerning the connector road . To date, there has been no response from Mr . Kelley concerning his willingness to cooperate . Also enclosed is a copy of a letter of intent between the above mentioned projects to Mr . Kelley from myself . Sincerely, John Samsel, Jr . Encl : ( 2 ) 04'_ SC4 4 1540 SULLIVAN AVENUE `;OUTH WINDSOR, CONN. 06074 , S0u.`o ar AREA CODE 203/644-2511 February 27 , 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: erd" Engineering Review Please be advised that this Department has received the subject plans dated 1/9/89 and the following comments are noteworthy: 1 . In general the plans are lacking elevation data necessary to fully evaluate how the drainage will function, i .e. , water elevation of existing pond, bottom elevation of proposed pond, spot elevations along parking areas, adjacent to buildings, walkways, drainage Swale, connection to Town Center at intersection of Clark Street, etc. . . . . Topo references should be provided. 2 . Details of materials of construction are missing for I pond, leak-offs (reverse filter design) , sanitary sewer appurtenances, outlet structures, pipes, walkways, etc - _ 3 . Drainage from parking areas is proposed to discharge via leak-offs . Concern regarding erosion control and containment of sediment/sand prior to discharge to ponds and swale. 4 . Details of connection to the Town Shopping Centre and modifications to the existing detention pond should be provided. 5 . Both the wetland and non-wetland soils for the site indicated seasonally high groundwater tables at or near the surface and in general the soils are considered unsuitable for roadway fill or road construction. Design as submitted does not appear to address soil site conditions . !1 r:�arcia A. Banach Clark Corners February 27 , 1989 6 . Roof leader drainage should be shown. 7 . Inlet/outlet drainage protection should be provided. 8 . Guiderailing may be needed along access road near stream. 9 . Consideration of locating sanitary and water in Clark Street should be examined. Improvements along Clark Street and -_ at _ Deming/Clark should be consistent with the Clark Street Preliminary Engineering plans . Provide for realignment of Deming/Clark intersection, improvement @ Ellington/Clark 11 . Physical features should be shown for the west side of Clark Street and the south side of Deming Street along the project limits . 12 . The topo map shows a 24 RCP under Ellington Road, yet the drainage calcs analyze a 15" RCP. Should be clarified. 13 . It is unclear as to whether the proposed detention pond includes flows from the impacted Town Shopping Center detention pond, including drainage calculations . 14 . It appears that under the proposed 50 and 100 year storms, flooding across Ellington Road may occur. Outlet flood/storm stage data should be clarified - - - relative to existing/proposed elevations Overflow structure should be provided for proposed pond. 15 . Details for the proposed pond have not been provided, i .e. cross section/depth, materials of construction. As the pond will entail cuts the concern relative to seepage/stabilization should be evaluated. The maintenance and function of a "live" pond versus a dry pond should be clarified. Pond could be asset to proposal if designed/constructed properly. Once the plans have been modified this Department will re-review them in detail . Should you have any questions please feel free to contact me. MJG/jsv cc: Project File <owM f4 r: <� u 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 ��os�R.cor' AREA CODE 203/644-2511 March 14, 1989 John G. Samsel, Jr. 152 Deming Street South Windsor, CT 06074 RE: Application #89-03P - Clark Corners Dear Mr. Samsel: At the March 13, 1989 meeting of the South Windsor Inland Wetlands Agency/Conservation Commission, the Commission voted to deny without prejudice, Application #89-03P. You may re-apply at any time taking into consideration the concerns expressed by the Agency. The concerns expressed by the Agency are: 1. There could be a feasible and prudent alternative which would have less impact on the wetlands and watercourse. 2. The internal roadway, including crossing the stream, seemed to have an excessive impact on the wetlands . 3 . Significant impact on the wetlands as a result of the number of buildings, roadways, and parking lots. 4. Significant amounts of fill to be placed in regulated area, much of it in wetlands areas. Very truly yours, John M. Moran, J Chairman Inland Wetlands Agency/ Conservation Commission JMMJr/pmm w cc: Marcia A. Banach, Director ofwPlanning Michael J. Gantick, Director--of Public Works John R. Collins, Chief Building Official Raymond Hallowell, Chairman, P&ZCoission Jerry Iazzetta, Town Engineer A. Bowen Davies, Deputy Town Engineer ROBINSON COLE LAW OFFICES y;g1T1,yE1 ONE COMMERCIAL PLAZA HARTFORD.CONNECTICUT 06103-3597 pry 203-275-8200 FEB 9 1989 FINANCIAL CENTRE POST OFFICE BOX 10305 BRIAN R.SMITH HARTFORD South Windsor STAMFORD,CONNECTICUT 0 6 9 04-23 0 5 203.275.8224 INLAND WETLAND,-, AGENCY/ 203-964-1200 CONSERVATION COMMISSION TELECOPIER HARTFORD 203-275-8299 February 8 , 1989 TELECOPIER STAMFORD 203-359-8576 TELEX BOTH OFFICES 99-4407 P Mr. John Moran, Chairman LEASE REPLY TO HARTFORD Inland Wetlands, Watercourses and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application of John G. Samsel, Jr Dear Mr. Moran: On behalf of Mr. Samsel, I am writing to clarify the information provided on the Erosion and Sediment Control Plan (Sheet 5 of 9 ) of the Clark Corners site plan. On that sheet, the table labeled "AREAS" is based on the town' s official wetlands boundary. (Both the town map boundary and the revised boundary field located by Soil Science Services are shown on the plan. ) The areas of wetland and construction impacts have been recalculated using the revised wetlands boundary based on the January 6 , 1989 soil investigation by Soil Science Services. Those numbers are as follows: 8 .80 acres existing wetlands (1 /6/89 soil investigation) 3 .63 acres disturbed by construction 0.22 acre area of new waterbody 1 .60 acres impervious coverage 2.84 acres area of filling (includes 1 .60 acres of impervious surface plus embankments and other site grading) We note that the area of impervious surface has remained relatively low (only 18 percent of total wetlands) despite the variations between the field surveyed wetlands boundary and the town' s official map boundary. Very truly yours, Brian R. Smith cc: John McCahill John G. Samsel, Jr. Betsy Kaemmerlen