HomeMy WebLinkAboutSite Plan - Construction 11
OV 1984
TOWN OF SOUTH WiNDSVfkvri Clerk
INLAND .WETLANDS AND WATER COURSES
APPLICATION
tNt AND WETLANDS AEiENlyY ACTIt?N THIS APPLICATION SHALL BE RECEIVED BY THE
INLAND WETLANDS AGENCY AT THE REGULAR
t LY SCHEDULED MEETING ON THE SECOND MON-
APPLMATION NO.. DAY OF THE MONTH AT THE TO
1NN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLICATE
AT THE OFFICE OF THE TOWN CLERK, TOWN OF
PUBLtC HARING DATE* SQUTH WINDSOR, AT LEAST TEN DAYS PRIOR TO
COMPLETED(ff nt3c�i THETING DATE.
ED APPLICATION E REGULAR ME_
PI=RAIT'�^ii�ANTED DATE A SET OF PLANS MUST BE SUBMITTED TO THE
TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO
PERMIT DENIED-DATE SHE REGULAR MEETING DATE.
s.
PLEASE PRINT.
1. :,APPLr Alai tti _may
C" a l3_TEL?.NO. y�
ADDRESS CITY"1 STATE tat'.
�� �ta�
{)1htNER1tc.. ��. 7`EL No.
�. � ADDRESS tt �.`.a a ...'CITY•& 'STATE --Mane ,.
f t
.`"`�?` LOCATION, OP PROPERTY t� �� ut-njgmSt
IIRME$ 'ADJACSN PR'Q TY ?W E
=�r
J -
STATE;mkARLY;AND' SRtEfLY.
b. PU'RPOSS AND DESCRIPTION QF'THE.PROp ACTIVITY;AND THE TIME ELEMENT`INVOLVED:
Y
AT'tlNT1�'i{V THE APPLIC,hI�t ``7 # TANL TFtAT 1`1 tS APPLtG ATI,QNAS TO `9E CONSIDERED
-- �---+ ---, 5
OMPLETE O '� W L} IN#.- AmAl10N & DOCUMEt�t'Y'S RI QUIR`ED BY THE
,AEG NCY HAYE.af*EN suss,
d .d0ORoVAL MAY ALSO E� I Y f i tJl ;THE PLANN[NG,ANp. 2 NING COM
MATI ONS.
01
IMAM
r.-
�i A0*N 8E44awn 0-Ye SotdA ?&UI-14ot
'N
o
C U
w(d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
lypsoR.CO AREA CODE 203/644-2511
December 11, 1984
Mr. Douglas Johnson
34 Clinton Street
Manchester, Connecticut 06040 CERTIFIED MAIL
Dear Mr. Johnson:
At the December 10, 1984 meeting the South Windsor Inland Wetlands approved
with conditions Application No. 301 for the purpose of constructing a single-
family residential home; Lot #2 on subdivision plan entitled "Long Hill Acres",
Burnham Street, South Windsor, Connecticut.
4 The permit is based on the plans entitled "Lot No. 2 - Long Hill Acres"
prepared for Douglas Johnson, 34 Clinton Street, Manchester, Connecticut, by
consulting engineers of Gardner and Peterson Associates. Such plans are dated
November .11, 1984, no revisions; sheets 1 through 2 of 2.
The following conditions must be adhered to for this permit to be valid:
1. Sanitary sewers and water service is subject to approval by
the Town Sanitarian.
2. Any change in the use of the property would require a new
application and permit.
3. The proposal is subject to the approval of the Town Engineer.
4. The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result from
the proposed operation or use.
5. The permit is valid for one year and shall expire December 10,
1985, if not initiated and completed within one year from the
date of approval.
Very truly yours,
Constance Eriksson, Chairman
Inland Wetlands Agency
CE/se Town of South Windsor
cc: Gardner & Peterson Associates
A.B. Davies, Deputy Town Engineer
Jacqueline J. Smith, Town Clerk
Richard Sartor, Town Manager
Richard Ryan, Deputy Mayor
Robert F. Gilligan, Chairamn PZC
Thoms D"Auria, Building Official
Peter DeMallie, Director of Planning
Kenneth Brill, Chairman EDC