Loading...
HomeMy WebLinkAboutSite Plan - Conservation (366) • TOWN OF SOUTH WINDSOR INLAND WETLANDS TER COURSES �` 3198 APPLICATION 0 z J i`VN �3 a INLAND WETLANDS AGENCY ACTION THIS APPLICATION SHALL BE RECEIVED BY THE INLAND WETLANDS AGENCY AT THE'REGULAR- LY SCHEDULED MEETING ON THE SECOND MON- APPLICATION NO. 244 DAY OF THE MONTH AT THE TOWN HALL. RECEIVED DATE ti 113 R3 THIS APPLICATION MUST BE FILED IN TRIPLICATE AT THE OFFICE OF THE TOWN CLERK.—TOWN OF PUBLIC HEARING 'DATE(if necessary) SOUTH WINDSOR. AT LEAST TEN DAYS PRIOR TO COMPLETED APPLICATION THE REGULAR MEETING DATE. PERMIT GRANTED DATE A SET OF PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER AT LEAST TEN DAYS PRIOR TO PERMIT DENIED DATE THE REGULAR MEETING DATE. PLEASE PRINT. 1. APPLICANT RSK Contractors, Inc. TEL. NO. 644-8761 ADDRESS 1750 Ellington Road CITY & STATE South Windsor, Connecticut V) 2: OWNER Louis & Shirley Boxer 528-8466 TEL. NO. ADDRESS 945 Ellington Road CITY & STATE South Windsor, Connecticut 3. LOCATION OF PROPERTY Ellington Road NAMES OF ADJACENT PROPERTY OWNERS See Attached Zone Change Map 111=2001, 6/3/80, Revised 4/14/83 STATE CLEARLY AND BRIEFLY 5. PURPOSES AND DESCRIPTION Df THE PROPOSED ACTIVITY,AND THE TIME ELEMENT INVOLVED: Proposed Condominiums _ ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE'CONSIDERED COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED- BY THE AGENCY HAVE BEEN SUBMITTED. APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. g A FIFTEEN DOLLAR >VS) APPLICATION FEE IS REO_UIRED, AND IT MUST BE SUB- MITTED TO THE AGENCY AT ITS REGULAR MEETING. SIGNED: - ( piicant) (Owner). Revised 3/78 a /—f 16 O`•. 0 3gpo_ � 16 a uo e . ) O ySGG t'� O` _ Qrea QCT'G'J-/ �3a QC7+G3 r l�o �JG CT(axgGc�to��i-Q 7jo�,Q� off/(G.3 Qc -'� 7167E 12 0 n �n IV . STORMWATER MANAGEMENT The storm runoff across the site is intercpted by roadways and parking areas and then carried iri pipes to two outfalls . The eastern outfall is to Quarry Brook on property of the Devel- oper . The drainage area to this outfall is 17 .9 acres . With the proposed development and full development on adjoining properties , the peak flow will be 34 cfs for a 10 year frequency storm and 42 cfs for a 25 year storm. The eastern discharge point is approximately 125 feet from Podunk Mill Pond . The drainage area for the pond is 7 , 600 acres as noted in the South Windsor "Comprehensive Plan For Control of Storm Water Drainage" . Because of the size of the Podunk watershed, any change in the flow pattern from the proposed development will not have a measurable effect on Podunk Mill Pond . Any detention that would delay storm runoff into the pond would increase the peak at the dam. Naturally, in this case, any change would be far from measurable . There- fore, we recommend that no detention be incorporated into the design of the eastern discharge . It is proposed to collect the flow to the western side of the site to Route 30 and then north to the Podunk River below the Podunk Mill Dam. The total watershed area is 19 .3 acres and , with full watershed development the peak flows will be 36 cfs FUSS&O'NEILL for a 10 year storm and 44 cfs for a 25 year storm. Here again, we do not recommend detention for the same reasons as for the eastern area. However, we have calculated the required size of a detention facility to limit the peak flow to that which now occurs for a 25 year frequency storm. Based on the methods outlined in Chapter #7 of "Urban Hydrology For Small Watersheds" , Tech- nical Release No . 55 of the Soil Conservation Service, the required detention volume would be 0.7 acre-feet . Because of the steepness of the site , the area between the roads/parking areas and Podunk Mill Pond cannot be diverted to either the eastern or western outfalls . The flow to the pond will be by sheet runoff rather than point discharges . Since 19 .3 acres of the natural watershed is being diverted to a point downstream of the pond, the flows to the pond will be less than at - present . FUSS&O'NEILL WITH MAX, HEIGHT OF 12/ BRICK TYPE ��C" CATCH BASIN CONC. BLOCK 0 2 LAYER BUILDING PAPER 5F — RCP INLET (( J) �•e OUTLET PIPE 0 I"TO 2" STONE ,I 00 o p,Ill to t0 12" Dl A. 12 / MIN. MIN. NOTE: PRECAST CONC. DRYWELL EQUAL TO ROTONDO 0 SONS INC. AVON CT. NO. DWIO HD ( HS20-44 LOAD) ' F/6- 8 C,o Q-Tlii!-OL._l ",4o 7 t SURFACE RESTORATION DESCRIPTION: This work shall consist of placing topsoil, furnishing topsoil when required, fertilizing, seeding and mulching areas shown on the plans . MATERIALS: Materials for this work shall conform to the following requirements: Topsoil : Topsoil excavated from the project shall be used whenever possible. Topsoil supplied by the Contractor shall conform to the requirements of Article M. 13.01-1 of Form 812. Fertilizer: Fertilizer shall conform to the requirements of Article M. 13.03 of Form 812. Mulch: Mulch shall conform to Article M. 13.05 of Form 812 and shall be hay or wood fiber. Seed Mixture: Seed mixture for seeding shall conform to the following requirements: Permanent Grass Areas Proportion Minimum Minimum by Ieight Purity Germination Percent Percent Percent Kentucky Bluegrass 25 85 75 Creeping Red Fescue 35 98 85 K. 31 Tall Fescue 30 98 85 Domestic Ryegrass 5 98 90 Alsike Clover 5 96 85 Temporary grass areas shall be 100 percent perennial Ryegrass. The seed mixture shall be delivered in new, clean, sealed containers. Labels and contents shall conform to all State and Federal regulations . Seed shall be subject to the testing provisions of the Association of Official Seed Analysts. I CONSTRUCTION METHODS: All topsoil excavated from the project shall be used. The areas on which topsoil is to be placed shall be graded to a reasonably true surface. Topsoil shall then be spread and shaped to the lines and grades shown on the plans. All stones, roots, debris, sod, weeds and other undesirable material shall be removed. After shaping and grading, all trucks and other i equipment shall be excluded from the topsoil area to prevent excessive compaction. The Contractor shall perform such work as required to provide a friable surface for seed germination and plant growth prior to seeding. c( y Any earth material that is stockpiled must be immediately seeded with perennial Ryegrass to minimize the dust and erosion. During hauling and spreading operations, the Contractor shall immediately remove any material dumped or spilled on pavement. It shall be the Contractor ' s responsibility to restore to the line, grade and surface all eroded areas with approved material and to keep topsoiled aras in acceptable condition until the completion of the construction work. The areas to be seeded shall be made friable and receptive to seeding by approved methods which will not disrupt the line and grade of the slope surface. In no event will seeding be permitted on hard or crusted soil surface. All areas shall be free from weeds taller than three ( 3) inches. The normal seeding seasons shall be March 15th to June 15th and August 15th to October 15th. Seeding at other times shall be done only when ordered by the Owner. Areas of disturbed soil which will contribute significantly to air -and stream pollution shall be established to the designated i vegetative cover as soon as feasible. Seed shall be uniformly applied by any agronomically acceptable and feasible method approved by the Engineer. Seed mixture shall be applied at the rate of 100 pounds per acre for permanent areas ' and 60 pounds per acre for temporary areas. Fertilizer shall be uniformly placed at the rate of 640 pounds per acre. All seeded areas shall be mulched with hay or, if hydroseeding is used, wood fiber. Hay shall be uniformly applied by an approved method to a placed depth of two (2) inches . Hay shall be held in place by one uniform application of asphalt emulsion Type SS-I, j applied at the rate of 0. 08 gallons per square yard. The emulsion shall have a temperature range within 50 to 120 degrees F at the time of the application. The emulsion may be applied during or immediately after the application of the mulch. Wood fiber mulch shall be uniformly applied at the rate of one (1) ton per acre. The Contractor shall keep all equipment and vehicular and pedestrian traffic off areas that have been seeded to prevent i excessive compaction and damage to young plants . t The Contractor shall be required to replant areas damaged by t t water, wind, fire, equipment or pedestrian traffic. Work under this item shall not be complete until all stones and '. debris have been removed from the seeded areas . In areas where topsoil and seeding are not required, all disturbed areas shall be 4 neatly graded and cleared of all debris. j 945 Ellington Road South Windsor, Ct. 060.74 :dune 9, 19-83 Town of South Windsor Inland Wetlands Agency Town Fall South Windsor, Ct. 0.60..74 RE: Millb_ridge Condominiums (.Boxer Property.. 945 Ellington Road South Windsor, Ct. 060.74 TO WHOM IT'MAY 'CONCERN:: As per your request, this statement is issued to verify that there is a valid contract between Louis and Shirley Boxer and Richard S. Kelley to develop the above named property. I have seen the plan of development and am in full agreement with same. Signed: Louis Boxer Date: — S S&OWEILL consulting engineers June 20, 1983 Mr. Bowen Davies Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Inland Wetlands Approval Phase I - Mill Ridge Condominiums, Ellington Road Dear Bo: As per our recent conversation, we have developed a Phase I scope for the above referenced project and request that the commission approve this first phase. You will note on the attached plan that the overland flow northerly towards Mill Pond will be intercepted by the Phase I roadway. This roadway will contain a drainage system that will move the runoff westerly to the sedimentation/detention basin. This basin will contain hay bale checks and silt fences. It is also our intent to utilize dry wells at some of the- storm drainage structures (See Figure 8). The location of these dry wells will be specified at the time of site plan approval and with the benefit of test pit information. In order to further assure erosion control, we are suggesting the enclosed specification for surface restoration by implementation during construction. Future construction phases will include activities downslope of the proposed roadway. These areas will be protected through the utilization of hay bales and sedimentation fences (See Figure 7) . If you have any questions, please call. Very truly yours, i t I • William D. O'Neill, P.E. i WDO/ldb c Enclosure cc: Buck Page C William Grace Richard Kelley 210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469 SOLID WASTE MANAGEMENT i WASTE WATER SYSTEMS i EROSION CONTROL i WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS i SITE PLANNING HIGHWAYS and BRIDGES i SURVEYING i LANDSCAPE ARCHITECTURE i TRANSPORTATION and TRAFFIC*PUBLIC WORKS MANAGEMENT i HYDROGEOLOGY