HomeMy WebLinkAboutWapping Com ChurSite Plan - Conservation TOWN Of SOUTH WINDSOR
INLANO WI TLANDS MO WATU COUAa43MAR
APPMATION South Windsor
THIS APPLICATION, ONa INf'0l %4MWq1 LETS
INLAND WETLANW. AaNCY ACTIVN _ (SEE BACK OF -THIS FORM). '03 � AT
R Y St�EDULED MEETING OF THE AGENCY AT =�
APPLICATION NO. 'TOWN R"..
RECEIVED OAS._._ THIS APPLICATION MUST BE FILED IN CA A"
THE Ot�'FICS OF THS TOW CLERK OF R i
PU§UC HEARING OATS 12 NOON AT YS 16 DA PRIOR TO THE FIRST
(It n Y) RE=,kR WWMr ► DATE. THREE` SETS OF K
COMPLETED APPuCATION OR PLANS MUST BE SUBiMITTED TO THE TOWN ENGINEEi
PIRMIT- GRANTED OATS rMEETING
. 14 DAYS PRIOR TO- THE- FIRST-_RZGUL ARPGAMIT DENIED OATS GATE.
PLEASE PRIMP OR TYPE.
1. APPLICANT Win i n C o mt i n i t y C h u ghi TV,, NC.
AOOA,= 1790 Ellington Road CITY 3 STATE
Smith' GTinricn rr
2 O% NEVI Same TIL. NO.
AOOAES3 - CITY A STATE
3. LOCATION OF PROPIRrf 1790 Ellington Road,
NAME! OF AOJACXNT P110PSATY OWNEi13 To _North: Town of South Windsor
To East Frank and Cheryl Caval.iere .,(across Route 74)
To South: Robert J . Smith , Jr . ; Society for Savings
To West : Shirley V . Waynei-, (across Community Road)-
See key map for additional properties
$TAT% CLAARLY AMC MOLY (No wetlands on site)
S. PURPOSES ANO OESC, IFITION OF TWE PROP03ED ACTIVITY,ANC THE TIMIK GLIMENT INVOLVED:.
Conservation plan .'for. proposed addition and parking
niR hprlP to a watercourse (plum' Culley Brook) across Ellington
Rnarl Construction to begin August 1988 .
ATTVITIONt TWE APPUCAMIT UNCOWANCS TWAT T1413 APPLICATION 13 TO 134 CONSIOERED
CEO N Y wmm Ate, , INFORMATION AOOCUMENTS Ragul ap 13Y THE
A4INCY.WAVE SEEN $UGMITT1>iD.
APP"O VAL AAAY ALAa NEC ►AY FRCAA THE PV►NNING AMC ZONING COM-
M133ION.
AN APPLICATION FEE IS REQUIM. CONSULT ONS
(SECTIONS 6.9, 6.9a and 6.9b) .
A SIGN IS MUIM. CONSULT 0 (SECTION 6.3a) .
sIaNED:
(Aagocam) Earle A. Smi t , Jr . Chairman
,..Building Committee
(Cwn*r) Selena L . Blackwell
. { : ,. �.
t 041 8f1
F 7own o-P SotdA ?&7�
a
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
f�dsoR-C AREA CODE 203/644-2511
March 17, 1988
Mr. John M. Moran, Jr. , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
RE: WAPPING COMMUNITY CHURCH, APPLICATION REVIEW
Dear Mr. Moran:
The soils within the proposed construction area are of the
Manchester Classification, a non wetland soils, as shown. The
proposal is for a 1511 storm water discharge intc Plum Gulley
Brook. This would be the regulated activity, Section 5 .1, 5 . 2
& 5 . 3 .
A simplified summary would be that they propose to erect an
addition to their existing building and relocate the parking
area, about 70,003 sq. ft. disturbed and then made impervious .
Their proposal includes picking up the storm and foundation
drainage and discharging it into the Plum Gulley Watershed and
floodplain without detention. The natural direction of flow
would be towards the five corners and down an inadequate system
in Ellington Road to the Podunk Watershed.
If a permit were to be considered, the following conditions might
be appropriate.
1 . All the rights and/or permits from NIP Cavaliere.
2 . An approval from the appropriate agencies to permit the
discharge from another watershed.
3 . Modifications to the plans to include a barrier at Ellington
Road to prohibit traffic on the driveway until it is paved.
Riprap through and across the Plum Gulley Brook in the area
of discharge and Item 3 in the construction schedule and E&S
notes 'as soon as possible' is too vague.
Mr. John M. Moran, Jr. , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
RE: Wapping Community Church Application Review
Page 2.
4. The anti tracking apron shall be as shown.
5 . A $3,000 bond might be adequate to assure compliance with the
plans .
Very truly yours,
10)
A. Bowen Davies
Deputy Town Engineer.
ABD/jsv
Enclosure
cc: Wapping Community Church
Michael J. Gantick, Director of Public Works
Marcia A. Banach, Director of Planning
IWA/CC File
F<T
Rpq
GjQj r
R A
ZO
ZONE C ZONE A5
Dirt Rod
118
JIB
PO
O
RM59 P
0
0
ZONE B
Rp :}
-9Q
Footbridge ZONE B
N 106
ZONE B ^ Footbridge
o ZONE B
110�
ZONE A3 ZONE B
ZONE B 10
100 YEAR FLOOD ZONE B
CONTAINED IN RM33 ZON ,ZONE B
RM34 CULVERT E B
x
ENUE 194
_a
30
tow" •��
e �
Town. ate S-oads Vzqd4ot
a
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
R•co�'� AREA CODE 203/644-2511
April 26, 1988
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
Gentlemen:
At the April .25, 1988 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions
Application #88016W.
The following conditions must be adhered to for this permit to be
valid:
1. Consult with the State as to the viability of making the
crossing of Ellington Road to Plum Gulley further (north at
the Town Hall entrance) where there currently is a
crossing.
2 Plans must show a cross section of sewer pipe located on
Ellington Road.
3. - A more detailed description of the installation of the
outlet structure and plunge pool. Also show how the brook
will be protected and stabilized on the easterly bank. ,
4 . Modifications to the plans to, include a barrier at
Ellington Road to prohibit traffic on the driveway until it
is paved. Item 3 in the construction schedule and E&S
measures notes "as soon as possible" should be defined..
5 . All the rights and/or permits from N/F Cavaliere.
6 . Approval from the appropriate agencies to permit the
discharge from another watershed.
7 . The anti tracking apron shall be as shown with the railroad
ties rremoved.
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
Page Two
8. We recommend a bond in the amount of $3000.00 to be
submitted to Planning & Zoning Commission to ensure
compliance with Erosion and Sedimentation Control measures.
9. Three (3) . blueprint copies of the approved map with all
modifications must be submitted to the IWA/CC- within 65
days for review.
10. Construction activities shall be subject to the approval
of the Town Engineer.
11 . The application shall indemnify and hold harmless the Town
of South Windsor .against any liability which might result
from the proposed operation or use.
12. The permit is valid for one year and shall expire April 25,
1989 .
Very truly yours,
' John M. Mor , Jr. ,
Chairman
w/ Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc: A.B. Davies, Deputy Town Engineer
Raymond Hallowell, Chairman, Planning & Zoning Comm.
Building Department
Marcia Banach, Director of Planning
014N 8f 4O-P saa&
`� -
� o
G U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
�SOR•CON
June 2, 1988
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
re: Application #88016W
Gentlemen:
It has been noted that Modification #1 as listed in our April 26,
1988 approval letter for the above-referenced application is
incorrect. Modification #1 of said letter is hereby corrected to
read, "Consult with the State as to the viability of discharging
to Plum Gulley further (north at the Town Hall entrance) where
there currently is a crossing. "
We regret any inconvenience this may cause, and appreciate your
cooperation in making the necessary revisions .
Very truly yours,
yours,
ohn M. Moran, Jr. , Chairman
Inland Wetlands Agency/
Conservation Commission
JMMJr./pmm
cc: A.B.Davies, Deputy Town Engineer
Raymond Hallowell, Chairman, P&Z
John R. Collins, Chief Building Official
Marcia A. Banach, Director of Planning
Michael Gantick, Director of Public Works
�SpNM 8E�
C N
S
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
e•CO AREA CODE 203/644-2511
June 8, 1988
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
Attn: Mr. Earle H. Smith, Jr.
Chairman, Building Committee
re: Appl. #88-16P - Same - Addition
Site Plan
Gentlemen:
We are pleased to inform you that the Planning and Zoning Commission
voted at its June 7, 1988 meeting to approve the captioned
application for a Site Plan of Development in accordance with
Drawings No. 1 through 7 of 7 prepared by Fuss & O'Neill revised
through 6-1-88, Project No. 87-65, and with the following
modifications :
1 • Prior to commencement of any site work, a meeting must be
held with Town Staff.
2 • No building permits will be issued until the final mylars Y
have been filed in the Toim Clerk's Office.
3 • This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
4 • An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning
Regulations .
5 • A landscape bond in the amount of $5000 is required and
must be submitted prior to filing of mylars .
6 • All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
Wapping Community Church 2 June 8, 1988
7 . Slope rights to be shown on the plot plan when obtained.
8 . Concrete stairs to the existing offices should not encroach
on the building line.
9 . Drainage is subject to approval of the Town Engineer.
10 . Speed bump is to be installed across parking areas at
walkways to discourage through traffic.
11. Additional plantings must be added to the north property
boundary abutting Town property as appropriate and as
approved by the Town.
Black and white transparent mylars of Sheets #1 and 2 with the above
modifications, together with three blueprint copies of the entire set
of plans, must be submitted to this Commission to be stamped and
signed. The letters of approval of this Commission, as well as the
Inland Wetlands Agency/Conservation Commission, must be. reproduced on
the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
t�ond
F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Inland Wetlands Agency/Conservation Commission
Registrar of Voters
Architect/Engineer
Applicant
PZC File
O
FUSS&O'NEILL
consulting engineers
u
June 21, 1988 -
John M. Moran, Jr.
Chairman
Inland Wetlands Agency
Conservation Commission
Town of South Windsor
1540 Sullivan Ave
South Windsor, CT 06074
Dear Mr. Moran:
We are submitting this letter along with our revised plans in
order to clarify our response to the conditions in your letter of
April 26, 1988.
1. The State will be consulted regarding the discharge to Plum
Gulley Brook via the existing culvert when an encroachment
permit is sought.
2. The sewer pipe in Ellington Road is shown on the profile
sheet 4 of 7.
3. The impact basin is also shown on the profile and is depicted
in grater detail on sheet 7 of 7. The structure will be
constructed approximately ten feet from the brook with a
double row of haybales to protect it from sedimentation. The
rip rap outfall from the basin to the brook has been extended
to the opposite easterly bank; even though the erosive forces
from the church's discharge will be controlled within the
impact basin itself.
4. Barrier has been noted and Item 3 has been defined as within
30 days or as directed, see sheet 6 of 7.
5. Easement has been acquired.
6. Discharge permit to be obtained as necessary.
146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY
FUSS&O'N8M
John M. Moran, Jr.
June 21, 1988
Page 2
7. The anti-tracking apron has been shown with ties removed, see
sheet 7 of 7.
8-12. Will comply.
Very truly yours,
William ,li m D. O'Neill PE Betsy A. Kaemmerlen
President Landscape Architect
/PJ g
cc: Earl Smith
Marcia Banach
87-65 Corres.
0621A88BAK1
Construction Inspection Report
Project P a Z N° Date
Street Developers i
G1 S4i• d am, / - ��
Weathe - —_ Te p.r�. Contractor
� - /77/ .
Work in Progress .T� ` C D — —ta_1kzJ eXI/YI-4
eo
Problem reas r-
Special Instructions/Orders
pa el, Time on Site Inspector
-cam
47
a �
s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
��osoR•CO AREA CODE 203/644-2511
January 17, 1989
Mr. Chris Nelson
Conyers Construction Co. Inc.
77 Tolland Turnpike
Manchester, CT 06040
RE: Wauny �iurch otpton
Dear Mr. Nelson:
Last Wednesday, Mr. Gantick, Public Works Director, Mr. McCahill,
Zoning Enforcement Officer, and myself visited your site and
encountered a condition that shall probably jeopardize
consideration of the Certificate of Occupancy for your site.
A little over three months ago, you participated in a
"Preconstruction Meeting" establishing the basic ground rules
expected during construction and inspection routine, to assure
compliance, quality control and allow construction to proceed in
an orderly manner. I presume your payment for services rendered
is probably regulated by acceptance to these standards by your
client and appropriate Town Commissions .
Our immediate focus was on the storm drain outfall area east of
Ellington Road, in and around Mr. Lavaliere's property. Our
observation was, the stone being used in Plum Gulley Brook was an
improper size, the impact basin was at the wrong elevation and
was supported on the 15" storm pipe and the integrity of the
unknown structure, damaged due to construction, had not been
restored.
The items in the October 5, 1988 outline highlight procedures and
concerns to be addressed during construction. No. 16 requires
approval of changes prior to implementation. There are no
requests in our public works or planning file. The Plum Gulley
Brook, at this point, probably collects storm water runoff from
over 3 ,000 acres and is funneled—through this narrow area. The
size of the rip rap was designed to hopefully prevent a scouring
effect and eroding Mr. Cavaliere's property further. The impact
basin has been constructed without adequate support at the
easterly end, which in time will probably cause a failure in the
pipe supporting it. Also the bottom of the basin was designed to
be about one foot above the brook bed.
^' Mr. Chris Nelson - 2 - January 17 , 1989
r
The hole in the unknown structure exposes us all to an unplanned
and unnecessary liability. This structure is outside any .
indicated construction limits and to leave it open to the
elements for weeks isn't too clever. Most of the houses in
Wapping existed prior to the availability of municipal water and
wells were their domestic water supply. Using the worst case
scenario, presume, until you know better, that this is someone's
water supply. You have certainly contacted your professional
engineer for a detailed report including recommendations and
perhaps a schedule for a connection to a municipal system, if
required. . Ample time has passed to have- this -report- available,
we would like a copy please. Also a copy of your daily log when
the hole occurred with your recommendation, for our records.
Please contact us prior to any restoration. No. 20 in the
preconstruction report goes on to require inspection prior to
backfilling. Our visit was per chance, not by request. The
filling was not being inspected and could raise additional
concerns as - to what else was -covered without__inspection. - The --
standard condition of approval by the Planning and Zoning
Commission requiring an as built drawing to be submitted for
approval prior to the issuance of a certificate of occupancy is
reinforced in Item #6 of the preconstruction letter indicating
the basic accuracy expected, Locating the buried utilites . This
is not a waivable matter. Construction was initiated with this
condition in effect, your engineer shall certify to that
accuracy.
As indicated earlier, searching our files we find no requests for
changes or modifications to the approved plans or standards from
either your client or yourself, as general contractors, since the
October meeting. It seems a safe conclusion would be to expect
no deviation up to this point, from the approved site plan.
In anticipation of additional work in the area around the outfall
at Plum Gulley Brook, please call us prior to this activity,
consistent with the October letter, so we can provide suitable
inspection. The inspector can be contacted at 644-2511, Ext.
257 . I can be reached at extension 240 .
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Earle Smith
Michael J. Gantick, Director of Public Works
Marcia A. Banach, Director of Planning
John McCahill, Zoning Enforcement Officer
File
Enclosure
__ sr��' '-� * �a*'': •,,1 � '.yd/✓ ,;� x /,l —� q h4. � pia&,; �;T°�'fj"�«,'A..
ON
4i y?,r, y1iy 1 1 Q till /�' • �. ' '''A °,�y f• ',`d..p ���'�►v',+�,1,.'.. ►. S '. t I,. y.
I �
kP1�ICM/T
r
l ,?Y IO lkT 333 1
Risen
����unuuu�nnn��Iuu,
MOPII►IAP RIP gAP
$o,_ n�
t'�0o03F "am c /5 e
5,4N .... PAs/N
,vE,c�11,w _ �� � IN1 \ �ASEME/YT REQ'p
-- -- ._ \.�-_�•��� ; FOR CON ST/'CUGT/oti/�
/ r ( 6.F1. 'eL-EV.= 12S•5 9' _ __1;l 1 \ �) I /4CL�S s NAIL- MA/N r�NA
L WP-ST SIDE or- _ S I 1 I /f Nc�
\'}2 MAPLE 03" A.&. y 1 / � � / pAj
l
NO W�TLANt75 Pxe-5�w/T
O
CEMETERY
x-xI r. rr:P
J �Zu /1f.f0'N. ofMH
87.5'N.Or w252
ti •¢1.3'S. �.�253
00' LONG
r7r To
� VE/zlvy tocl►T.
IURCH I
t
S C 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
e•Co AREA CODE 203/644-2511
January 31, 1989
Mr. Chris Nelson
Conyers Construction Co. , -Inc. -
77 Tolland Turnpike
Manchester, CT 06040
Dear Mr. Nelson
Subject: Wapping Community Church - Outlet Drainage
During an inspection of the site, it was observed that the outlet
structure for the storm drainage was not built according to the
approved plans . Additionally, the material being used as channel
stabilization did not meet the specifications called for on the
plans .
At the time of the inspection, Town Staff requested through the
on-site representative from Mitchell Trucking, that the Design
Engineer be contacted to evaluate the present conditions.
Accordingly, would you please have the Design Engineer provide
the Town with the following so that we may resolve this matter.
1 . Provide evaluation to determine if there is still
capacity in storm outlet for the designed storms .
- 2 . Provide method of securing outlet structure base. As
constructed, outlet base acts as a cantilevered
structure. May eventually settle.
3 . Provide Engineering report on channel material
stabilization. Material to have proper bedding,
modified riprap was to be used and material to be
properly "chinked" .
I thank you in advance for your attention to this matter. Should
you have any questions please feel free to contact me.
Very truly yours,
Michael J. nt1ck
Director of Public Works
MJG/jsv
cc: Mr. George Johnson, ConnDOT
Mr. Earl Smith, Wapping Community Church
Mr. William Mitchell, Mitchell Trucking
Mr. Lester Braddock, Sr. Engineering Inspector
Mr. John McCahill, Zoning Enforcement Officer
Project File
S D.N N 8
o
r `raven- 0p South
e
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soa•co�'�w AREA CODE 203/644-2511
February 23, 1989
Wapping Community Church
1790 Ellington Road
P
South Windsor, CT 06074
RE: Application #88-16P
Gentlemen:
This is a reminder that the permit with the Inland Wetlands
Agency/Conservation Commission, Application #88-16P will expire on
April 25, 1989 .
The Agency requires a letter requesting extension together with a
fee of $25. 00 . This should be submitted at least 45 days prior to
the expiration date of the permit. If work has been finished or
will be finished by the expiration date, please have an engineer
send a letter stating work is completed according to the approved
plan.
In the event that you are requesting an extension, Section 4 . 13 . 6
of the Zoning Regulations, Conservation Plan (a copy enclosed)
establishes the criteria for such a plan and a method of monitoring
its application. A permit for your proposal was granted, with a
bond as assurance of compliance with its sedimentation and erosion
control measures . To assist in the review process by the IWA/CC,
whether for a permit extension or specific inquiry request, the
provisions for verification through progress reports by the
developer's/applicant's Engineer demonstrating that each Erosion
and Sedimentation control measure has been installed and
maintained, in accordance with the approved plan shall be required.
It is requested that this verification report be submitted thirty
days before the regular meeting of the IWA/CC, April 17, 1989, to
permit time for the Commissioners to evaluate your project
controls .
If you have any questions, please contact Phyllis Mann or John
McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253)
7truly yours,
k-11
hn M. Moran, Jr. , Chai rr
nland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
Enclosure
V V G�rp
1790 ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT 06074
C RICHARD S.TOSH,SENIOR MINISTER (203)644-0833
�p
�- JAMES R.HANSEN,MINISTER OF CHRISTIAN EDUCATION D
°yfjecH FEB �? 1989
South Windsor
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
February 27, 1989
Inland Wetlands Agency/
Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
Gentlemen:
This is a request for an extension of our permit #88-16P
which expires April 25 , 1989. We expect that the work will
be completed on or shortly after the expiration of the
permit. A letter from Fuss & O'Neill Engineers will be
forwarded to you in the near future.
Sincerel ,
Earle Smith
Chairman, Building Committee
Wapping Community Church
Enclosed $25 check for fee
UNITED CHURCH OF CHRIST,CONGREGATIONAL
p
�O
FUSS&aNEILL MAR 1989
consulting engineers South Windsor
INLAND WETLANDS AGENCY(
CONSERVATION COMMISSION
_;�/wv(
WAPPING CHURCH
Erosion and Sedimentation Control Report
March 16, 1989
1. The anti-tracking apron requirement was waived by town
staff in favor of keeping the existing paved drive. Now
the new pavement is serving as the sole construction
vehicle entrance. Ellington Road drive remains barricaded
even though paved.
2. Haybales at basins, and silt fence at slopes and around
stockpile are in place.
3. Additional haybales were added at the base of slope along
Ellington Road where unanticipated disturbance occurred.
4. Impact basin requires some modification due to being built
at incorrect elevation. This is presently under review by
the Town Engineer.
5. Rip rap was extended and upsized to protect the brook
channel.
6. Haybales within brook channel will require maintenance or
replacement if damaged by spring storm flows.
t I
Respectfully submitted,
Betsy A. Kaemmerlen
/gnh
87-65/Corr.
0316A89BAK1
146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING 0 LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC 9 PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY
° " Towt, o-P SotdA VzQd&A
• U
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�f�psoe•Co� AREA CODE 203/644-2511
April 12, 1989
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
Re: Application #88-16P - Conservation plan for proposed
addition and parking.
Dear Madam/Sir:
At the April 10, 1989 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one' year extension of
Application #88-16P with all original conditions.
In addition to the original conditions you are also required to
contact John McCahill, Zoning/Wetlands Enforcement Officer (644-
2511, x229) immediately upon approval notification. This is to re-
confirm the contact person for the site and establish a site visit
with that person to verify all erosion and sedimentation control
measures are in place according to the plan.
Application #88-16P becomes effective May 19, 1989 and expires on
May 19, 1990.
Very truly yours,
)v
,h
)dh M. Moran, Jr. , Chairman
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc:John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
Jerry Iazzetta, Town Engineer
Enclosure
C
appm�p
1790 ELLINGTON ROAD SOUTH WINDSOR, CONNECTICUT 06074
RICHARD S.TOSH,SENIOR MINISTER
JAMES R.HANSEN,MINISTER OF CHRISTIAN EDUCATION (203)644-0833
1 �
O v
�yVRCH O� D
September 19, 1989 p�
SEP 4�) 1989
South Windsor
INLAND WETLANDS AGENoyj '
Mr. Steven Moynihan CONSERVATION COMMISSION
Council Liaison
Inland Wetlands Commission
Town of South Windsor
South Windsor-; CT 06074
Dear Sir:
At this time the construction at the Wapping Church' s
new facilities has been completed.
This letter is a request to release our bond of $3,000
in the form of a bank account to us.
Yours truly,
Earle H. Smith
Chairman Building Committee
Wapping Community Church
EHS:emf
UNITED CHURCH OF CHRIST,CONGREGATIONAL
k
�tOy'N Sf,t�
01
C �
a
ti
9 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
IOSOR,co� AREA CODE 203/644-2511
November 9 , 1989
Mr. Earle H. Smith
Wapping Community Church
1790 Ellington Road
South Windsor, CT 06074
Dear Mr. Smith:
RE: Wapping Community Church - $ 3,000 IWA/CC Bond
$ 5,000 Landscaping Bond
Please be advised that the above referenced bonds were released
by the Planning and Zoning Commission at their October 24, 1989
meeting.
Please make arrangements with the Planning Department at 644-2511
to pick up the bonds .
Very Truly Yours,
Marcia A. Banach
Director of Planning
Cc
PZC file
TOWN OF SOUTH WINDSOR
STAFF SITE CHANGE
FOR SITE & SUBDIVISION
GENERAL: CL
C
CHANGE ORDER CONTACT PERSON 4 ;/t! ft9 r Phone No o'�O Y �Q 7
Address
Site Name_ ,mod �' , �, , 7 � P&Z No.
Owner<,/�421Az a.- cam � t,f r elf Phone No G' ~ ' /-G 3
ContractorC j h
Signature of Owner Date:
Signature of Design ng Date: $
CHANGE: (Describe location a ur of change. Include
Four (4) /copies of. plan/profile of Change. )
! 4' "eye- --,t;
f
Reasf /
on for Change: (why is change required)
A
r
APPROVALS: (As Required)
Dir.. Of Planning Date: /o / 7
Town Engineer i,�j z Date:
Dir. of Public W ks Date:
Other: M Date:
STAFF COMMENTS:
White - Town Engineer Yellow - Applicant
Pink - Director of Planning Goldenrod - Engineering Department