Loading...
HomeMy WebLinkAboutRoad Maintenance (2) TOWN OF SOUTM WINDSOA INLAND WNTLANDS AND WATT! COuwass MAR ` APl.JCATION IIiILAlO EE�'!'t.MICE A/iiE� AC710N THIS APPLICATION, ON II�F�O�►i� ` s • (SEL BACL OF THISFORM). 11MsA AT A/M .JCATION No. 7 REGiJ &r St MM= N!E TW�F A2 TOW HALL. AGCiIVED CATE THIS APPLICATION MUST BE FILED IN CA A THE 0M. CZ OF TZ TOWN CLMM OF SOUTH WINNOR PUGUC HEARING OATI 12 NOON AT kw.' 14 9Ajj PRIOR TO THE FIRST (it neces"I y) RFma "Mr MTING DATE. SETS OF u COMPLSTIW APPLICATION OR PLANS MIDST BE Si NU ITgD TO E KINEE PWMIT WANTED OATI AT LEAST 14 DAYS PRIOR TO THE FIRST RMLAR_ PWMIT 06HUM OAT11E MOVMY MEE7MC DATE. PLEASE PRINT OR TM. 1, APPLICANT Town of South Windsor TK. NO. 644-2511 ACCX= 1540 Sullivan Avenue COY S STATg South Windsor, CT 06074 Z Town of South Windsor TIL NO, 644-2511 AOORE3.! 1540 Sullivan Avenue C3TY a BTATR South Windsor, CT 06074 3. LOCATION OF PROPWR Chapel Road from John Fitch Boulevard to Manchester Town Line, NAMES OR AGJACI NT PROPERTY OWNERS See Attached List STATN CL"MY AMC 8MOLY S. PURF0$=AMC OE3C11IPTION OF THE PROP=8V ACTIVITY,AMC THE TIME E"GNT INVOLVED: To reconstruct Chapel Road. The permit activity would fall under Section 5 of the regulations. The time frame would be 2 years. AI'MENTION: THE APPUCANT UNOER3 I AMC$ TMAT TM1S APPLICATION 13 TO 64 CONSIOERED ONLY VWV4 AL INFORMATION A OOCUIMENT3 AECUIRED BY THE AGNOCY.HAVI 8M SUBMITT7�, AP"0 AMAY ALSO ll NECE33AAY FROM THE PLANNING -AMID ZONING COM- AA13310N. AN APPLICATION FM IS REQUIRED. CONSULT TEM.AEGULATIONS (SECTIONS 6.9, 6.9a 'and 6.9b) . A SIGN IS REQUIRED. CONSULT THE TI (SE N SIGNED: tA00IiCSAt1 neww..a 8/12/85 r, APPLICATION FOR DEPARTMENT OF THE ARMY PERMIT OMB APPR(5VAL NO. 0702-0036 (33 CPR 326) Expires 30 June 1986 The Department of the Army permit program is authorized by Section 10 of the River and Harbor Act of 1899,Section 404 of the Clean Water Act and Section 103 of the Marine,Protection,Research and Sanctuaries Act. These laws require permits authorizing activities in or affecting navigable waters of the United States,the discharge of dredged or fill material into waters of the United States, and the transportation of dredged material for the purpose of dumping it into ocean waters. Information provided on this form will be used in evaluating the application for a permit. Information in this application is made a matter of public record through issuance of a public notice. Disclosure of the information requested is voluntary;however,the data requested are necessary in order to communicate with the applicant and to evaluate the permit applic gt.ion. If necessary information is not provided,the permit application cannot be processed nor can a permit be issued. One set of original drawings or good reproducible copies which show the location and character of the proposed activity must be attached to this application(see sample drawings and instructions) and be submitted to the District Engineer having jurisdiction over the location of the proposed activity. An application that is not completed in full will be returned. • 1.APPLICATION NUMBER(To be assigned by Corps) 3.NAME,ADDRESS,AND TITLE OF AUTHORIZED AGENT 2.NAME AND ADDRESS OF APPLICANT Telephone no.during business hours Richard J. Sartor, Town Manager Town of South Windsor A/C e ) (Residers«) 1540 Sullivan Avenue A/C c ) romee) South Windsor, CT 06074 Statement of Authorization: I hereby designate and authorize. Michael J. Gantick to act in my behalf se my Telephone no,during business hours - agent in the processing of this permit application and to furnish,upon request, supplemental Information in support of the application. A/C( ) (Residence) SIGNAT E O APPLICA DATE A/C(203) 644-2511 (#2001 ro�>•i�el ��� 4.DETAILED DESCRIPTION OF PROPOSED ACTIVITY 4a.ACTIVITY Reconstruction of about 9,500 L.F. of Chapel Road with related utilities. , 4b.PURPOSE Replace the roadway to a standard cross section to permit reasonable east-west traffic in this section of South Windsor. 4c.DISCHARGE OF DREDGED OR FILL MATERIAL The disposition of the excess fill in Town shall require a Town agency approval. A spot has not been designated on the plans. ENG FOAM 4345 Aar 83 EDITION OF 1 OCT 77 IS OBSOLETE (Proponent: DAEN-CWO-N) 5.NAMES AND ADDRESSES OF ADJOINING PROPERTY OWNERS,LESSEES,ETC.,WHOSE PROPERTY ALSO ADJOINS THE WATERWAY State of Connecticut, Department of Transportation g.WATERBODY AND LOCATION ON WATERBODY WHERE ACTIVITY EXISTS OR IS PROPOSED Podunk River 7. LOCATION ON LAND WHERE ACTIVITY EXISTS OR IS PROPOSED ADDRESS: John Fitch Boulevard, Connecticut Route 5, near Chapel Road STREET,ROAD,ROUTE OR OTHER DESCRIPTIVE LOCATION Hartford CT 06074 COUNTY STATE ZIP CODE South Windsor Town Council LOCAL GOVERNING BODY WITH JURISDICTION OVER SITE S. Is any portion of the activity for which authorization is sought now complete? ❑YES JZ]NO If answer is-Yes"give reasons,month and year the activity was completed. Indicate the existing work on the drawings. 9.List all approvals or certifications and denials received from other federal,interstate,state or local aganeies for any structures,construction, discharges or other activities described in this application. ISSUING AGENCY TYPE APPROVAL IDENTIFICATION NO. DATE OF APPLICATION DATE OF APPROVAL DATE OF DENIAL 10.Application is hereby made for a permit or permits to authorize the activities described herein. 1 certify that 1 am familiar with the information contained in this application,and that to the best of my knowledge and belief such information Is true,complete,and accurate. I further certify that 1 possess the authority to undertake the propose aotivitieror I am acting as the duly authorized agent of the applicant. Ric d J. Sartor Michael J. Gantick ; IGNATURE O AP ICANT DATE SIGNATU OF AGENT DATE Town M ager Director of Public Works The application newt be signed by the person who desires to undertake the proposed activity (applicant)or it may be signed by a duly authorized agent if the statement in Block 3 has been filled out and signed. 18 U.S.C.Section 1001 provides that: Whoever,in any manner within the jurisdiction of any department or agency of The United States knowingly and willfully falsifies,conceals,or covers up by any trick,scheme,or device a material fact or makes any false,fictitious of fraudulent statements or representations or makes or uses any false writing or document knowing same to contain any falsefietitious or fraudulent statement or entry,shall be fined not more than$10,000 or imprisoned not more than five years,or both. Do not send a permit processing fee with this application. The appropriate fee will be assessed when a permit is issued. �SOwN 8f+`� C H T-au� V/ Sou� ?&U&ot D ti �(d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ��osoR•co�� AREA CODE 203/644-2511 March 28, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: Application #88 27W - Reconstruction of Chapel Road LOCATION: Chapel Road from John Fitch Boulevard to Manchester Town Line Gentlemen : Your meeting with the South Windsor Inland Wetlands Agency/ Conservation. Committee is scheduled for : DAY DATE TIME Monday April 18, 1988 7 : 30 PM The Agency/Commission meets in meeting room "B" , Sprenkel Room, lower level Town Hall , 1540 Sullivan Avenue , South Windsor , Connecticut Very truly yours , . m. Phyllis M. Mann , Secretary Inland Wetlands Agency/ Conservation Commission Town of South Windsor REMINDER : A sign must be posted on the property where it can be seen from a town street . Said sign must be posted for five continuous days prior to the above meeting , and is available at the Town Hall if not already acquired . �P to•NN SE,`� /J q 1 C + a G V a 9 e 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SO AREA CODE 203/644-2511 � REGISTERED MAIL March 30, 1988 Town Clerk Town of Manchester Town Hall 41 Center Street Manchester, CT 06040 re: P. A. 87-307 Dear Sir/Madam: In accordance with the captioned 1987 legislation concerning notification to municipalities regarding Inland Wetlands/Conservation Commission applications that could affect the abutting town, we hereby notify you of the application of The Town of South Windsor for the Chapel Road reconstruction project which will take place on Chapel Road between John Fitch Blvd. and the Manchester town line. This application will be heard by the Inland Wetlands/ Conservation Commission on April 18, 1988. Interested persons are invited to attend and make comments . If you have any questions, please feel free to contact the Planning Department at 644-2511. Thank you. Very truly Yours, 'ma,� Marcia Banach Director of Planning 7t�o•M N SE,` C..• F �� O-P slaw& Vznd-4-0-t a U 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �fNdSOR•co AREA CODE 203/644-2511 REGISTERED MAIL March 30, 1988 Town Clerk Town of East Hartford Town Hall 740 Main Street East Hartford, CT 06118 re: P. A. 87-307 Dear Sir/Madam: In accordance. with the captioned 1987 legislation concerning notification to municipalities regarding Inland Wetlands/Conservation Commission applications that could affect the abutting town, we hereby notify you of the application of The Town of South Windsor for the Chapel Road reconstruction project which will take place on Chapel Road between John Fitch Blvd. and the Manchester town line. This application will be heard by the Inland Wetlands/ Conservation Commission on April 18, 1988. Interested persons are invited to attend and make comments . If you have any questions, please feel free to contact the Planning Department at 644-2511 . Thank you. Very truly Yours, Marcia Banach Director of Planning Carol & Jon Mitnick 25 Marty Lane South Windsor, Conn. 0607 289-8425 April 30, 1988 John Moran and Members of the South Windsor Inlands Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, Conn. 06074 Dear John and Inlands Wetlands Commission Members: Unfortunately, we were out of town on business and could not attend the meeting held April 18, to review the effects of the Chapel Road Reconstruction on the Inland Wetlands. Thel,Chapel Road Reconstruction will severely affect the conservation easement on our property -- 25 Marty Lane. The State of Connecticut plans to take 0 .033+ acres of our property containing the conservation easement which means that most of the trees in this part of the easement will be cut down to accomodate grading for the reconstructed road. We are very concerned about the loss of the trees, and the impact this will have on erosion, drainage, etc. Attached is a map of our property. The blue line on the map indicates the portion of the conservation easement affected by the road reconstruction. This conservation easement is supposed to be "protected" land which enhances the natural beauty of our town and shelters wild/plant life, and yet this road reconstruction is being allowed to seriously alter this conserved area. We hope that the Inlands Wetlands Agency/Conservation Commission will come out to view this property and examine the impact that the road reconstruction will have. Sincerely, += .. Reino E. Iayyppa & AssociAites y CivII Engineers Glastonbury, Connectic,u: 110 OPEC SF 1IV \ Q N 104 oc \ w W s \ 0 tl.! Cli J► }� .$ 0 JOB 40 � 1 � LTW _ -I� — .' __ _ 2 ` ��-` t^ �-1�•�`v A �\ \dip e �S r � . t NI ti V 46, •- A-•Lf� ►.3 S-2(.-L+3 / `a off+0. Fo•.,. Lot Ae, ►-6 7A'YW%-J(- Va'-ATM JS via" v MART NM: Lot 1.4-ncs from xap rm file it 7 - r na G e k Ot..t ,i' i'Pa ] r a �.� ant�tlrtd Plot Pla. Sxticr Co Pl.aasaui 7a1.1ay�Hames LAtJE South Tel ndeor., Cr nn.v ( 1 Scale ].,'- $Gf Dots -2-81 A-20 7-oNE flap Nu, 22C-14-1s Rev, 2-Z-82 Re i no E. . by Hyyppa 3 Assoc axes Glastonbury, CT. P;;�EPAR E n Fc R lwreby cartify ttrtt :his mau and survey were prepared in PLE p5 A NT VA L L.F-Y 1v1 i z-cordanc .vith the;,andards of a Class A•2 survey as defined the existirz Code of Pra^tice for Standards of Accuracy of 50 UTI4 W 1 NDS0 2, ::)w N. -ur:-eys and Mam adoptid by :he Connecticut Association: of and Sunrayom kv- SCALE t"s 40' D A,- S-10-8S 43 _y-104 a 411 , �S014 St '6 y r Town o�SotdA ?Aoluaot o � G U w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e•co�'� AREA CODE 203/644-2511 May 26, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application #88-27W - Chapel Road Reconstruction Gentlemen: Please be advised that the Inland Wetlands Agency/Conservation Commission voted on May 25, 1988 to approve with modifications the above application for the reconstruction of Chapel Road subject to the following: 1. The Town shall replant buffer areas with screening type planting; such as cedar, pine or red oak. 2 . Three ( 3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 3. Construction activities shall be subject to the approval of the Town Engineer. 4 . The permit is valid for one year and shall expire on May 25, 1989 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. Very truly yours, John J. Moran, Jr. ;-Chairman Inland Wetlands Agency/ Conservation Commission JJMJr. /pmm; cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Officials Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, PZC _ �A�owN Sf'q` oTiowf-1 01 G U 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 soe•cor AREA CODE 203/644-2511 May 10, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 CERTIFIED MAIL RE: Application #88-28W Gentlemen: At the May 9, 1988 meeting the South Windsor Inland Wetlands Agency/Conservation Commission voted to approve with conditions Application #88-28W. The following conditions must be adhered to for this permit to be valid: 1 . Hydrant to be moved out of the road. 2. Town of South Windsor to take care of proper drainage behind curb line and do proper grading. 3 . The permit is valid for one year and shall expire on May 9, 1989 . Very truly yours, John M. Moran, Jr. Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm cc: A.B.Davies, Depty Town Engineer Marcia Banach, Director of Planning Michael. Gantick, Director or Public Works John R. Collins, Chief Building Inspector Raymond Hallowell, Chairman, PZC 011 Stq r `, y r Town �Soam ? o � e a 9 ad�lot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e•Co AREA CODE 203/644-2511 May 26, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application #88-27W - Chapel Road Reconstruction Gentlemen: Please be advised that the Inland Wetlands Agency/Conservation _ Commission voted on May 25, 1988 to approve with modifications the above application for the reconstruction of Chapel Road subject to the following: 1 . The Town shall replant buffer areas with screening type planting; such as cedar, pine or red oak. 2 . Three . ( 3 ) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 3 . Construction activities shall be subject to the approval of the Town Engineer. 4 . The permit is valid for one year and shall expire on May 25, 1989 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. Very truly yours, John J. Moran, Jr. Lthairman j Inland Wetlands Agency/ • Conservation Commission JJMJr. /pmm; cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Officials Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, PZC U _ — 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN 06074 AREA CODE 203/644 2511 June 6, 1988 Mr. William Ginter, Associate :Fuss & O'Neill 146 Hartford Road Manchester, CT 06040 'a RE Chapel Road Reconstruction Enclosed is the copy of the action by the Inland Wetlands Agency/Conservation Commission.- Items 1 & 2 appear to be the r� only ones that need attention at this time. Perhaps a copy of the approval on one of the sheets would be adequate. I am presuming the filing copies would be the same abridged plans. Any questions, I can be contacted at 644-2511, Ext. '240. Very truly yours, A. Bowen Davies Deputy Town Engineer y` ; �; w. .; a '�,c r ^^. s.��w ��s 'F"t -.t�s: r.•: _ a-.,....at �.,ks+«,1 �w: y ABD/]sv Enclosure 4 cc: Michael-J. Gantick, Director of Public Works Marcia A.' Banach, Director of Planning PROW 4w. �`•�1 i f f m f f� �3R•�`���,,� FYtX` �„�5 3 � � ""'_ - *'�-*' '} 'L--.- s -- d� u7:.: r .; tr .':lr.t.,� � •:. .. -- _ - .. _._. _._ ._ ..Tn►.:.- _._. .,.. ..•,y>.x•.+tr+-.>..ra R...x.nu•:..+.rw-,•*.• . .^.',�'�.."wYs?gS::RttiC4Z°'eC°�'?�R; �x .w. .�-.v C w F 70w;n V/ s-otd f/ Vzoi&iat 0 a ti �G 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 so TOAREA CODE 203/644-2511 December 29, 1988 M E M O R A N D U M TO: John McCahill, Zoning Enforcement Officer FROM: A. Bowen Davies, Deputy Town Engineer ,, f RE: On December 8, 1988, the town was granted a nationwide permit from the Army Corps of Engineers for this construction activities . ABD/jsv cc: John Moran, Jr. , Chairman, IWA/CC IWA/CC File Public Works File r i t: DEPARTMENT OF THE ARMY NEW ENGLAND DIVISION,CORPS OF ENGINEERS 424 TRAPELO ROAD WALTHAM,MASSACHUSETTS 02254-9149 { flEFtY TO - ATfENT�ONOE DEG 8 1989 7 Regulatory Branch in CENED-OD-R-11-88-0995 Richard J. Sartor Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Dear Sir: ' This is in response to your request for a determination of need for a Department of the Army permit for construction activities in conjunction with the reconstruction of Chapel Road, South Windsor, Connecticut. These activities consist of the following: the placement of fill onto approximately 0.5 acres of A wetlands for shoulder widening and addition of a sidewalk; the replacement and backfilling of a culvert; the placement of approximately 13 cy of riprap and gravel in the bed of an intermittent stream for a splash pad at the end of said culvert; and the placement of approximately 138 cy of gravel and riprap for a splash pad for a storm drain outlet in wetlands above the OHWM on the bank of the Podunk River. .3 That work is permitted under Title 33 Code of Federal _? Regulations, Part 330.5(a) (7) and (23) ., Nationwide Permits, as i' published in the November 13, 1986 Federal Register, and does not require further processing. This authorization is made in accordance with the attached - plans entitled, "Reconstruction of Chapel Road" dated "august 1988" and subject to the attached conditions. Any temporary fill, such as roadways or cofferdams, etc., a:3 placed in the waterway or wetlands to facilitate construction of this activity will require an individual permit. This verification that the work is permitted by a Nationwide permit is valid only for a period of two (2) years from the date of this letter. If work is not commenced or under contract by that date you must request a new verification to determine whether this Nationwide permit has been modified, suspended or revoked. U S C T-own O-P SaaA V&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 R•co�'�w AREA CODE 203/644-2511 March 29, 1989 Mr. John J. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission Town of South Windsor MARS 1989 1540 Sullivan Avenue South Windsor South Windsor, CT 06074 INLAND WETLANDS AGENCY/ RE: Application #88-27W - Chapel Road Reconstruction CONSERVATION COMMISSION Dear Mr. Moran: The Town of South Windsor/State of Connecticut's project for the reconstruction of Chapel Road will not be complete before the expiration daze for Permit #88-27W of May 23, 1989 . We are therefore, requesting a one year extension of this permit so that we can continue with the project. If you have any questions, please call me on 644-2511, Ext. 245 . Very truly yours, :er y Iazz , P.E. g neer�, I/jsv cc: Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning Ray Hallowell, Chairman, PZC Project File �10WN a Town o-P SotdA ?l, 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 f�osoa-C AREA CODE 203/644-2511 April 12, 1989 Town of South Windsor 1540 Sullivan Avenue South Windsor, Ct 06074 Re: Application #88-27W - Chapel Road Dear Madam/Sir: At the April 10, 1989 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-27W .with all original conditions. In addition to the original conditions you are also required to contact John M,cCahill, Zoning/Wetlands Enforcement Officer (644- 2511, x229) immediately upon approval notification. This is to re- confirm the contact person for the site and establish a site visit with that person to verify all erosion and sedimentation control measures are in place according to the plan. Application #88-27w becomes effective May 23, 1989 and expires on May 23, 1990. Very truly yours, ,1 %John M. Moran, Jr. , Chai ?air Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, PZC Jerry Iazzetta, Town Engineer Enclosure a. TOWN OF S INLAND' WETLAND, WATERCOURS MNSZZVA70' ICATION APPLICATION i. �"a7� - DATE RECEIVED MAR 111) 1qA(� ZONE INSTRUCTIOfDuth Windsor INLAND WETLANDS AGENCY/' I. The application, map and plans must be submitE Ej*TI@MSQ gN together with the f s t forth in the Inland Wetlands. Watercourses and Conservation Regulations, Town of South ee e Windsor. (See Regulations, Section VI). 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application evaluation. (See Regulations, Sections VIII - X). 3. The applicant understands that this application is to be considered complete only ashen al information and documents required by the Agency have been submitted. (See Regulations Section VII). Also complete state filing form. A. APPLICANT'S NAME Town of South Windsor ADDRESS 1540 Sullivan Avenue South Windsor, CT 06074 PHONE: (HOME) (WORK) 6 4 4-2 511 B. LEGAL OWNER'S NAME: Town of South Windsor ADDRESS 1540 Sullivan Avenue South Windsor, CT 06074 PHONE: (HOME) ' (WORK) 6 4 4-2 511 (List additional owners, addresses, and phone numbers on back of application). C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH. IN THE APPLICATION MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. D. PROJECT Naas (if any) Chapel Road Reconstruction I. Contact Porem (if further information is needed). �zct,,�� Mr. J. C. Iazzetta, 1540 Sullivan Avenue, Souindsor, CT 06074 E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES MAP. Chapel Road from John Fitch Blvd. to Clark Street PAGE 1 F. NABS Of ALL ABUTTING PROPERTY OWNZRSs (USE SSPARATs S$EZT IF NZCZSUAY) , See attached sheet ----------------- G. BAVs YOU NOTIPZSD ALL ABUTTING PROPERTY OWNSRs By CERTIFIED LETTER THAT AN APPLICATION PSNDI= BEFORE TSZ AGENCY?. Yam_ **(You are required to supplya copy of the latter with the list of the anus o the abutters)*** N. PURPOSE AND DESCRIPTION Of ALL PROPOSED REGULATED ACTIVITY(S) INCLOM AMUNT An TYPE: OF FILL AM THS TIM ZLSNSNT INVOLVSDs To reconstruct Chapel Road including a new storm drainage system. It is anticipated that construction will be completed by May 1, 19917 Me�— Total fill in the wetland area is estimated at 1400 cubic yards. I. ♦ CLASS ♦-Z MAP Of THE PROPQTY DRAWN TO 1'-409, SHORING THE AREA TO as DSVELOP=, ZZZ= OF THE WZTLANDS AND WATERCOUISU AFFECTED. TOPOORAPs. SZIST= AND PROPOSED ACTVZTIES . HUM AND LOCATIONS OF ADJACENT PROPERTY ovnMS MUST As SUWTTSD. J. AC1Z0Z Of WNTLANDS AND VATERCOURSU TO as ALTERED s 0.5 acres R: ACRSAGS Of WITLANDS AND V♦TIRCODRSss TO Ss CRSA1'SDs - 0- - L. LINEAL FZST OF PROPOSZD STRZAM ALTERATION - 0 - M. TOTAL LAND AREA OF PROJECT AND PZRCENTAGZ W$ICH IS WZTLANDSs 13 acres of which I_8% is wetlands N. IDENTIFY ALL OTHER PZRMITS OR APPROVALS TUT BAVZ ago ISSUED, APPLIED FOR. OR RZQtTIRED WITH RZSPSC! TO THs PROPOSSO A=MTY SS! FORTS IN THIS APPLICATION. (These my include but not be Baited to, local Plaaoins i Zoaias. Zonias Board of Appeals, D.S.P., F.S.M.. D.O.T., The Army Corps of Sagineers, and any other State. Local or Federal Posits.) IWA/CC approval (appl. #88-27W) expires on May 23, 1990 Army Corp of Engineers approval 0. THs APPLZC Ml (Oi DESIGNATED R2712321TAIM) NO= ATTESTS, THAT A Sill WILL as POSTED THE FOLiA1RM4 LOCM=JS Chapel Road @ Route 5 and Chapel Road @ Clark street by Town of South Windsor NAM Jerry C. Iazzetta ON OR Soon Tag rol . DAlt May 8 , 199 SIGNATM98 THZSZ SIGNS MUS DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED M WIM- (See 1e6ulations. Section 6.3a). PAGX 2 Fol FIE UNDERSIGNED HEREBY APPLIES FOR TIE REGULATED ACTIVITIES LISTED IN PAjtAGRAPg ItA INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOB TIE PEOP;RTY DESCRIBED HEREIN An CONFIRM$ THAT: 1. IS IS FAKUJAi VXTf TU CURRENTLY EFFECTM -INLAND WETLAND, WATERCOURSES AND CONSERVATI01 RECULAT3oMs OR Ills TM or soUTH WINDSOR. 2. HE/SEE UMDER$IANN TRAT AT ANY TIM DURING TIE REVIEW PERIOD, TEE AGENCY MAY RgVW THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT TES WETLANDS AND/OR WATERCOURSES IN QUESTION AND/OR ANY PROPOSED' ACTIVIITY. 3. ALL INFORMATION SUBMITTED IN TEE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR I THE CAS= Of ANTICIPATED ACTIVITY. BINDING. A MOWING FAILUIS Of TEE APPLICANT OR ANY OF HIS/AEI AGENTS TO PROVIDE CORRECT INFORMATION, OR PSRFORNANCE Z==ING TES LEVELS OF ACTIVITY ANTICIPATED. SHALL BE SUFFICIENT GROUNDS FOR REVOCATION Of ANY PERMIT UNDER TEES REVOCATIONS . 4. BY MARK TgIS APPLICATION. TEE APPLICANT GIVES PSRMIS$ION TO.T= INLAND WETLAND, WATERCOURSES AND CONSERVATION COIWSSION MEMBERS AD/OR ITS REPRESENTATIVE TO ENTER TEE PORTION= Of TEE PREMISES WEICE ARE SUBJECT Of TEE APPLICATION FOR TIM PURPOSE OE INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING TU MERIT$ OP TES APPLICATION HOTS BEFORE AND AFTER A FINAL DECISION US BEEN ISSUED. Signature of Applicant Date 1M Received and filed at the of ice of the Planning Department this day of 19 Signs a of Agent Date_ March 29, 19 9 0 ################### ####################################################################### FEE RECEIVED YES_ NO_ AMOUNT DATE RECEIVED by HEARING DATE HEARING ADV. PERMIT GRANTED DATE PERMIT DENIED DATE PAGN 3 L t pwN dF4 O-PS V&Uaot 7 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Int-C � AREA CODE 203/644-2511 March 19, 1990 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Madam/Sir: Re: Application #88-27W - Chapel Road Reconstruction This is a reminder that Application #88-27W for permit and one year extension will expire on May 23, 1990. A new new a�licatton will be required be r�red in accordance with Section VI and VII of the regulations if you plan to extend your project beyond the above expiration date, along with the required fee of $25.00 for a single family house and all others $100.00. The complete application and fee must be submitted at least 14 working days prior to the first regular monthly meeting date of the Agency. To assist in the review process by the IWA/CC a report by the developers)/applicant(s) Engineer demonstrating that erosion and sedimentation control measures have been installed and maintained, in accordance with the approved plan, shall be be required. Section 4.13 . 6 of the Zoning Regulations (a copy enclosed) , establishes the criteria for a conservation plan and a method of monitoring its application. This verification report must also be submitted with the application to allow time for Commissioners to evaluate your project controls . If work has been completed or will be completed by the expiration date, a letter from the engineer of the project will be warranted as to the status of the application. If you have any questions, please contact Phyllis Mann, Secretary, or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644- 2511, Ext 253. ry truly ours, . mes A. Lombardi, Chairma Inland Wetlands Agency/ JAL/pmm Conservation Commission Enclosure I CONSULTING ENGINEERS z Windsor March 30, 1990 1N�0 wE ), 4v Yl s yA104 Jerry Iazzetta South Windsor Town Engineer 1540 Sullivan Avenue South Windsor, CT. 06074 RE: Chapel Road Reconstruction Inland Wetland Permit Dear Mr. Iazzetta: In reference to your reapplication for the wetland permit on the referenced project, all soil erosion and control measures required for the Chapel Road Reconstruction Project are in place. The construction activity is proceeding in accordance with the contract requirements. Very truly yours, A-N CONSULTING ENGINEERS, INC _ J mes K. O'Brien, P.E. esident Engineer JKO/dld 1174-Iazze-1 cc: Bill Bright 505 Willard Avenue Newington,Connecticut 06111 (203)666-3366 Fax:(203)666-5163 .::r^J-,:z �-��rT:.• �R.�r::�..1'�ff-'$•LS>.!Tk`�.v-:-fyY.: as^r rrl•sP F ry+.-tom' xe�T+i'1"E..!^.Y..' €1' 3`a; +,+<' ,ts[^ ,:^m r "5�^ ':>:n; ,.r<nr^9'. _•:'�'za?»1?!A, r-+r "'r --:--i—Pr� SUBJECT STATE Of CONNECTICUT DATE DEPARTMENT OF TRANSPORTATION 3_2 _94 '? J' P.O.Drawer A (.j Please type or write your answer in the space provided below. ACG366 REV, 7/84 MESSAGE FORM 24 Wolcott Hill Road,Wethersfield, CT. 06109 _ _Retain canary copy for,your files,return white and pink copies, TO: k Ja nes C,°yrul, -c6ntral-Paving FROM: william 3xi ht •..'?�n Corisulting Engineers k- .Chief TrisYectOr • C rcj r L PH NE 566 ti MESSAGE i, iidll confine my irstx:uctiq� s tc> ou to remove the bzcca�cen ' ices"of 1 b tun nous asphalt frac�c{ the 'fill material a-1cng the :slopes cif the d WE:tlaxldS area, ►eta 73-112-� i +. Tte fil'material to l graced irx1ap�Jedttl�ndsara`msaGnormthe � yF & 4 REPLY V. cat on Ism ^yi s [. y� � �de.�4� i a� *'C _ i� � �' y,r�E-.1�ti-�� •�.� �•+>'" - �3�.. f a� ,�� dL ,F ��,eyS �F � .� }-'°�L a £�:ts s '¢` '•.� i i� £ i a �:�++ :.�t� z-�,r rt it � `iTk�i+ssL� at ti'_ s `:t. i'- r �'t s - � � s td 1� w t n' '��-, fw;41: .t �'1 4 .._Rt ..c .-•ryr s.RI'-_ p ' H.�}'� �y y� ,�,,�+"�r�:��E•�e:t+�." ;7 4 C'�s ry-a t{ 'Ss � � � ...�' + { � r. �'x�+ nr�t� ��� *�3` �gsy,'S•'-*.srt l ys�t' r �`� �'t�i4�#6�;` -"' s `N 4.�r�`�`` '��s��s� - - '� `; '�L'^��.��"•�"�I°'a3" 1�.'�£�3 't"�S`tc�s ^efiw,'h 'ShA4. .'C 5� �:.f. _ "t •t �2 aR•r r at e'x N.-' �La6_Y• ,/�R. � fr�. �"�`�,�•i L3y��� ..i's x�/ � +' ..�ry,y� Y,�, -�� •x �.} - :,� r y' "-�a'�'�,�-srRn�'�yya3s..�c'�Y' .'. � _ j �« �.,t�e � ._ ¢ _�hr r Rs� >f�Yi a. ,; .� s� 4 ,�, rr.. c• I h e _ Lj.�33�'�`�..�'��� � �iL:���'�s 'i" y •.� 3La�.a.+ .�tL -„f�"€r' _ �' 'ti �'_s -1K .r d f�T*� _ T` v�}LAC.., ;_• -T �y 4't.l.,�_.�y r li �i��." r } i.:r .S.�i=- r l ?.] _ S. � l , - L y ~ 71aan o-P sloam ?1 G U _ w� 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 fNosol-co��• AREA CODE 203/644-2511 April 3, 1990 MEMORANDUM TO: James A. Lombardi, Chairman - IWA/CC FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: Asphalt and debris northerly of Chapel Road At the March 26, 1990 regular meeting of the IWA/CC there were concerns expressed regarding asphalt and debris which has been placed northerly of Chapel Road, easterly of Betty Drive. In response to this; on April 2, 1990 Jerry Iazzetta, Town Engineer and myself met with William Bright, Project Engineer for the Chapel Road Reconstruction. He was instructed to ensure that all the asphalt and debris which has been placed in the area northerly of Chapel Road be removed by April 13, 1990. - - - - pMMI.;, _ cc: Jerry C. Iazzetta, Town Engineer William Bright, A-N Consulting Engineers 565 Willard Avenue, Newington, 06111 �pqN $f'4 co O w F Towt-t o-P S--otdA 70k;vzd4at a w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R.Co� AREA CODE 203/644-2511 April 9 , 1990 CERTIFIED MAIL Mr. John Doe 1540 Sullivan Avenue South Windsor, CT 06074 Dear Property Owner: RE: Chapel Road Reconstruction Town of South Windsor In accordance with Section 6 . 3b of the "Town of South Windsor Inland Wetlands, Watercourses, and Conservation Regulations" , we are required to notify you that a re-application has been filed on the property abutting yours and is subject to a hearing by the Inland Wetlands Agency/Conservation Commission. This re- application is for the Reconstruction of Chapel Road project and is necessary because the initial approval granted in 1988 has expired. As you know, this project is currently under construction. The application and plans are on file with the South Windsor Planning Department. As an abutting property owner you are invited to the hearing to ask questions and/or give comments. However, you are not required to attend. Meetings are usually held by the Commission on the second and third Mondays of the month at 7:30 p.m. in the Town Hall . For further information regarding the specific date this will be heard; please contact Phyllis Mann, Recording Secretary, or John E. McCahill, Zoning/Wetlands Enforcement Officer at the Planning Department, 644-2511 . Very truly yours, i Iazzt , P.E.r neer JCl/jsv 7- 7- 3 G39 ChgP�t fad .8vrk harts /.v�'//iori, 4'' L.oa s..,..� P o9 y '5q .5 7-2 G47 Ch4pc / Rd ,4i 'k�n� l/ivi4n y, Ho vs c� _ . •. � 5 4m•G� Q 3 •/G/ L:n9 h/�'// 4 i •SD GtJ�H o�S J D y G-23 / _ G.GG.a�d o r-•�s k i S4 C�c// LG-►c. / _. ........ ..... _G -24 /,�'.3 C o i/ L Inc L. /nd P4,«t • � - � S �.y+t -. .._ .....: _ _ Qua�/- ".-. v � % Jr f�Ch•+�/a= _ hti c1 'Rd j jlossickl ' f�70 Gr40ld s L n L. IVa eel 44S �o '7 ChapG/ _.,Qc/R. ;Lo�h•�., k/ i//taw►___: 17 th r_ S m4� G. + itni�k� J'on4 thoN r c�4.wl �• .. t n� '.� =xm`'P� Pi�prr�y /�C�o/✓,.1� 4w•-,ter � /Yl�i/iaJ ��o/✓ASS -,34 2 / h��„-�j. Lam.. /V ixan> J"Ja•k W. f�' ss//y , Gc %o// Blvd j /I�u/c4h/> �0�9 /asJ• ti ��c���.� ��� _ _ 3 2,00 L c_Fo// B/vd /vd. Wool/c7`tJi9//Qn F. f�' E/iz4be�7`h L.. DCS17a7 IV,LRolA1a'2, 4, -Rcnae 4Z- �i �r'� C�fhy �4� /YI40 /oc Oka > -43 2,5-0--- 1 Fo /1 I3/va/. �.. %YlAcchii ...F,.,.�k �. ''CGy/� /YL �_• ?_ 44 2.58 Lc Fo/I ,8/vd, RQ%kcn, Si..cc J.f' CaX/ie�i.+a � , .� -8 77s Ch�pc / Rd I fj/�c/Gison/ Rvsse//�. £,� W:/w. , R. �s• N. 7 /2 N•-755 X, S �`• . Q 5 L � G 7 70 I3.W n h4.., 57'• O AVIV=9 Proper-tY /9 k sr-ss DOHer� m� '���� Aori1'reSS oqq _ 'r $ox 2 70 - 38 �Svba��✓isi e.,� S. . !v%holso✓ C aT 1 i 1 1 _.--„-.__.._.____�_.. .------.____...._ Co„r DoT" ProJ•zc /32-.�9 No C'h s 3/mil�o n { .Scr- yeRec. "Pc•-�y Ad�✓rz.t,S I I Owhtr f1'!•r•'//i�� /¢c�c►/i�t1S 2 `7- B 2 Qc Ch 4/04 11,02 PQ I i s odo i9 vc. • d .,� t-� fj�f� �� �� Eas7• Gv;nG/sor, �7 'O�C��s� 7- 9 Z48f,26o Ch•,oc/ 1��1 ie/scn� ,j o h n �• f Son s /n c. ? 9-/6 ' 282 ..Ch.-.,•c/ /Pd /yW4 Eg cs. (// Co•..L•P Ale, T 5ey p Boa Z7-/o .534 Rd faG9v�SJ ' JG.v/7 /�'J�rC Z 7-/7 C7- - • Ve i//a vac Rc-n c �,. __:.__..._....._..... .. ._ _. - Jo 2713 _2s3 Ch•►Pc/ Rd S4GzQw2J 'TO 'Cp f�'(.-,'enC�ic✓C� . 17.3 37%.�" ---- - �o/q� ••Lours f.. ��' .�a,��jGr4 A. �� -------� � 7 moo. G,J.,,GCs•—, � 9 � - • .�. .r:••IfA+:...•U4r' .•.LLB .. .. .tea• � }�.• �- 97' 'n-vo 0e/7j• fro c//- vcJ Sh •.n E•, 4/ \ qorvE,� ast: 6 h-, C , z Woo C h Ad ,B�Ssc/I/ Cok+I�+on s Inc / s90 Chi e- Aw JB� CScc.C.rr'a/ L;sti�ss� / C h e 7 Zo _ G'v�a/os � S-9 �tsq�l-.,Ue, So• u�0�o�' ?-36 9L CAP•tea/ R.�l. Sa /���iJ An th•ny L . Lj so , A/;yr o/s 3B �/G Ch qpc/ �4d• :earn, Sf��-cn zz 7-39 SZ Ch'��/ R•/• P`,,zZ. rr�► tOj /'c,= /4 33 9 Ch +�� / R� /Yl q�'hcr� Clq>. for► D. £,'L o✓isc C. <s6- 6'3 7 `YJ 4irn S f'• o : •� P/oP�•�'f-y /�ol�✓rsr O...ntr/ �'YIa:/i»� /�a/../r�s3• P V"ncorn 7` f/• - EIS-7` f�4 r 7"�'�•rot , C7 -- ovnq� Frt�cr:ck W, c'�9�dr�yA. <s� 7-/0 ._ 0 � �.... �. ���✓ L23 ,�yc Gh 4�c �� �LL35 J7 .�35 Clsoe / IQG� so l✓i•�o/soij ..C� . . 41S �P ,.5 -kvi -6 4.�� .EI/i�57L " -27 __ .�.� - q inG!/ 'cToscPh J fa'L % .. S 1 7-Z ro Ch 4 a j /Q G/. .. ��!r i r+c l/4) .�os�P h L• .{�ir9 i h i 4 F. 7 DG�,.t Ch•�.• )�s L✓. f�' --ZS 4f 3 G A ,mac I t JP�• �', C-S 24 4 9 3 Ch .i�r,/ Ro bes,-t 'Do 4�V r- � ; � 93 �'h woe/ /�r.I• . . 3 C h�p�I �?o/, Dv bc� J-osc�h i�• S� 7`i�t L5. !.� zro3 Ch ,,•,� / c-r naP a Pr0ae /3a/el✓e>s O..�ncy //f'fp.YiNQ AoJ�/rc�s 92 .5 /1')vri /ylavth h nmow S � - 73 _ 74 �88 Ch�Pa/ Rd Dv Cr C f- _ f - �J� Ch gpa l Rc1 Yic/ram) . .Bost �i lY>Qr/ // �.•:W- -� � S' 6 S�.ric a9 � / • 6 0o G h�P� /. .Rc�. -- - .. 4S mvr;c //c der. Rgposa> �� /.S 7-112 .6.56 Ch�p G/ -Rc�l �"�,.�--- -C�9-s4� Bc 9 �°n ._f •------ • ..._ .___v � 71 -9 �6�f ChAP� 1 R4, I3�ank��� R;ch�.•d Sic&,cnfs•— S AH► :��_ / 90 L,on•J t,+i towM s�, F ca 70� 0yesa � 1540 SULLIVAN AVENUE • SOUTH WINDSOR,CONN. 06074 AREA CODE 203/1644-2511 April 25, 1990 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Madam/Sir: Re: Application #88-27W - Chapel Road Reconstruction At the April 23, 1990 meeting, the Inland Wetlands Agency/Conservation Commission approved with conditions Application #88-27W - IWA/CC permit for the reconstruction of Chapel Road from John Fitch Boulevard to Clark Street as shown on plans prepared by Fuss & O'Neill, project #132-89, dated 1986. 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. _ 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the -proposed operation or use. 4. The permit is valid for one year and shall expire on April 23, 1991. 5. All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans . 7 . All original approval conditions shall apply to this approval. 8. Water is to be used on weekends for dust control. Very truly yours, James A. Lombardi, Chairman Inland Wetlands Agency/Conservation Commission JAL/pmm �O's a 4 U 7-0-1w, O-P Sou& C) 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 l��Soe•co AREA CODE 203/644-2511 June 14, 1990 M E M O R A N D U M TO: John McCahill, Zoning/Wetlands Enforcement Officer FROM: Jerry C. Iazzetta, Town Engineer RE: Chapel Road Reconstruction On Tuesday, .June 12, 1990, we visited the Chapel Road Reconstruction site and found several erosion and soil control items that required attention. These were: 1 . At approximately station 71+50 the pond had silt deposits and needed some silt fencing to prevent additional deposits . 2 . At approximately station 73+00 the storm outlet required approximately 20 linear feet of silt fencing on both sides. 3 . At approximately station 68+00 to. Gail Lane, the potential of erosion from the excavated shoulder area exists . Haybales of silt fence stops will be required. 4. Seeding and mulching of slopes should be accomplished to prevent erosion. 5 . Sumps in catch basins need cleaning. 6 . The stockpile across from Rugby Lane needs to be ringed with silt fence. I relayed this information to Mr. Al Terlizzi of—Central—Pa lg and r. Bil Bright of A-N Consulting Engineers, Inc. on June 12, 1990 . We also indicated that the pond at 71+50 needs to be cleaned. JCl/jsv cc: Michael J. Gantick, Director of Public Works r+ t�.NN Sf� O Y 7-own o-P S-OtI (/ ?d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 June 18, 1990 M E M O R A N D U M TO: John McCahill, Wetlands/Zoning Enforcement Officer FROM: Jerry C. Iazzetta, Town Engineer RE: Chapel Road Reconstruction As a follow-up to my June 14, 1990 memo, I would like to report the following status as of June 18, 1990 at 9 :30 AM: 1 . Hydromulching has started and is scheduled to complete today on the shoulder and embankments on the right side of the road (as you go from Ellington toward Clark Street) . 2. Items 1, 2, 3 & 5 are complete with the exception of silt fence in front of the pond. This will be complete by Tuesday evening. 3 . The stockpile will be attended to before the end of the week. This material was scheduled to be utilized at Chapel & Long Hill, but the resolution of the final sloping is still to be agreed upon with the home owners . Meetings are planned for Tuesday, June 19, 1990. JCl/jsv cc: Mr. Michael J. Gantick, Director of Public Works ° 110 St Cn C ' V m ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 c, soe•co`'c AREA CODE 203/644-2511 June 20, 1990 MEMORANDUM TO: Jerry Iazzetta, Town Engineer FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer 9� RE: Chapel Road Reconstruction Project U At the June 18 , 1990 regular meeting of the Inland Wetlands Agency/Conservation Commission, the Commission discussed the Chapel Road Reconstruction Project. Generally speaking they were satisfied with the site relative to compliance with the soil erosion and sedimentation aspects of the plan. The two outstanding concerns are stabilization of the existing stockpiles and more importantly the control of dust from the site on weekdays and weekends . I would suggest a strict watering schedule be developed seven days a week or perhaps the use of calcium chloride or crushed stone to control the dust problems associated with this project. The dust control was a serious concern of the Commission and it should be addressed immediately. JEM/pmm cc: William Bright, A-N Consulting Engineers 505 Willa_d Avenue, Newington, CT 06111 IWA/CC ►T Z. � r ,tie ior 71 1 ' 24!i R.C.P. ' 1 MANHOLE DIFIED RIPRAP -:NNEL CONSTRUCTION SCHEDULE 1 Q - 10 CF.S. 1 . I ', is anticipated construction w _bQaSn �towN ae,`� F 70-u'lon O-PsatdA � u 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ���ps�Co�2ry AREA CODE 203/644-25n 10MORANDUM September 13, 1990 TO: Michael J. Gantick, Department of Public Works FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: Chapel Road Reconstruction Project At the September.,10, 1990 regular meeting of the Inland Wetlands Agency/Conservation Commission, the Commission discussed the Chapel Road Reconstruction Project. There is still a concern with the lack of stabilization and dust control with regard to the stockpile across from Rugby Lane. The construction entrance also would appear to .be inadequate. On September 12, 1990 I spoke with William Bright, A-N Consulting Engineers and told him the problem needs to be addressed and corrected immediately. He is to get back to me with a remedy for this problem. PRIM cc: William Bright, 'A-N Consulting Engineers 505 Willard Avenue, Newington, CT 06111 James A. Lombardi, Chairman, :IWA/CC x" '" :3 ^"21I'r - t,4,s G D U 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 '�dsoR•c� AREA CODE 203/644-2511 February 4, 1991 Jerry C. Iazzetta, Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Iazzetta: Re: Application #88-27P - Chapel Road Reconstruction This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, Application #88-27P will expire on April 23, 1991 .« If you plan to extend your project beyond the above expiration date, the Agency requires a letter requesting extension together with a fee of $25.00. This should be submitted 30 days prior to the expiration of the permit. In the event that you are requesting an extension, Section 4.13.6 of the Zoning Regulations establishes the process for monitoring the approved conservation plan. Per that regulation, a progress report is required from the applicant's engineer verifying that erosion and sedimentation control measures have been installed and maintained in accordance with the approved conservation plan. A copy of the regulation is enclosed. This verification report must be submitted 30 days prior to expiration date of the permit to allow time for the Commissioners to evaluate your project controls. If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan. If you have any questions call me or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644-2511. Very ruly yours, J�J ; n r P yllis Mann, Recording Secretary Inland etlands Agency/Conservation Commission Enclosure M QVIN a 44 FEg 1991 7'� Ol S19� wt�� IN LAID WETLANDS AGENCY/ South sor V�ind w 1540 SULLIVAN AVENUE • SOUTH WINDS �� `OR, CONN. ARYA7 . r►oSOR,Coc AREA CODE 203/644-2511 �N CQMAhI$SfOM February 15, 1991 Ms . Elizabeth Warren, Chairperson Inland Wetland Agency/Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application #88-27P - Chapel Road Reconstruction Dear Ms . Warren: The Town of South Windsor is hereby requesting an extension of our permit for the Reconstruction of Chapel Road (88-27P) . The majority of the work is completed, however there are several items left that will not be complete until after our expiration date. The Engineering Department of the Town of South Windsor has verified that the soil and sedimentation control measures have been installed and maintained in accordance with the approval plans . Very truly yours, #wn e Iaz , P.E. n ineer JCl/jsv cc: Michael J. Gantick, Director of Public Works John McCahill, Zoning/Wetlands Enforcement Officer A-N Consulting Engineers Project File r SE4'C olle Sou� 701�1� � a 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 lN�soR.00 AREA CODE 203/644-2511 February 26, 1991 Jerry C. Iazzetta, Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. Iazzetta: Re: Application 88-27P, Chapel Road Reconstruction h At the February 25, 1991 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-27P with all original and standard conditions. Application #88-27P becomes effective April 23, 1991 and expires on April 23, 1992. Ver t ly yours, zL Q.CL-v Phyllis Mann, Recording Secretary Inland Wetlands Agency/ Conservation Commission cc: Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure 0 i� PROJECT NAME/LOCATION �� L`J \` APPLICATION DAT CVA l NOTE TO THE FILE: C.C. cn2�nn;� S _ NO Qom + Q 1 �o Sig ure