HomeMy WebLinkAboutSite Plan - Conservation (313) Y
TOWN OF SOUTH WINDSOR
INLAND WETLANDS AND WATER COURSES
APR R .5 lyii>i
APPLICATION South Windsor
INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE I�TIO* jp§ f(' L "TE,
(SEE BACK OF THIS FORM),Q9HMRY A
APPLICATION NO. REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
TOWN HALL.
RECEIVED DATE "� THIS APPLICATION.MUST BE FILED IN TRIPLICATE AT.
u THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY
PUBLIC HEARING DATE necessary) 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
COMPLETED APPLICATION REGULAR MONTHLY MEETING DATE. THREE SETS OF MAPS
OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR
PERMIT DENIED DATE MONTHLY MEETING DATE.
PLEASE PRINT OR TYPE.
1. APPLICANT Waldo Bros. Company TEL. NO. 617-445-3000
AOORESS 202 Southampton Street CITY & STATE Boston, MA 02118
2. OWNER Waldo Bros. TEL. NO. same as above
ADDRESS CITY & STATE
3. LOCATION Of PROPERTY Westerly side of Nutmeg Road North
NAMES OF ADJACENT PROPERTY OWNERS Northerly: PVA Monarch, Inc. ;
Easterly: Nutmeg Road North Southerly: Richard M. Winokur, Trustee
and Gerber Scientific, Inc. Westerly: Penn Central Railroad
J
STATE CLEARLY AND BRIEFLY
S. PURPOSES AND DESCRIPTION-OF-THE PROPOSED ACTIVITY, -ELF.MEN-T--I-NVOLVED'
Construction of an Industrial Building.
Approximate time for completion - One (1) Year.
ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED
PLEASE DIRECT ALL COMPLETE ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY THE
CORRESPONDENCE AND AGENCY.HAVE BEEN SUBMITTED.
INQUIRIES TO: APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM-
William E. Grace, Esa. MISSION.
479 Buckland Road AN APPLICATION FEE IS REQUIRED. CONSULT TM2EGULATIONS
South Windsor, CT
06074 (SECTIONS 6.9, 6.9a and 6.9b).
644-1528 A SIGN IS REQUIRED. CONSULT THE REGULA 0 S 046
3a).
WALDO BRO
SIGNED: B
WALMP'9 i
E r e, attornev for .
By: AivW4
(Owner) William E. Grace, Attorney or
Roviad 8/12/85
nv1r.Q
CHECKLIST FOR REQUIRED INFORMATION,
3
6• APPLICANT HAS HAD MAPS AND PLANS CERTIFIED BY SOIL
CONSERVATION SERVICE TO VERIFY COMPLETE COMPLIANCE
WITH CONNECTICUT GUIDELINES FOR SOIL EROSION AND
SEDIMENT CONTROL ( AS PER HANDBOOK, AS AMENDEDED,
AND PUBLIC ACT 83-388, AS AMENDED.
DATE OF CERTIFICATION
7. APPLICATION INFORMATION COMPLIES WITH AGENCY'S
REGULATIONS ( SECTIONS 7.1, a through j.
8. REQUIRED FEE HAS BEEN PAID.
DATE RECEIVED
9. APPLICANT ( OR DESIGNATED REPKESENTATIVE)HEREBY
ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING �
LOCATION(S) as directed by the Town staff.
BY Paul Colgan ( NAME )
ON OR BEFORE ThE FOLLOWING DATE d4rected b the Town staff.
SIGNATURE
THIS APPLICATION IS FOUND TO BE COMPLETE AND NOW
(QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town Engineer
Agency Seely
Agency Chairman
THIS APPLICATIONi IS INCOMPLETE BECAUSE OF THE FOLLOWING
NUMBERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW:
1 2 3 4 5
6 7 8 9
WALDO BROS. COMPANY- RRICK -CONCRETE SPECIALTIES -BUILDING MATERIALS
202 SOUTHAMPTON ST.,BOSTON,MASS.02118-2789 -TEL. 617 445-3000
A�/� Q0 DUNS 00 142 6303
�/�/L71 tOV.
D l
APR
CERTIFIED MAIL # P-625 091 951
April 12 1988
PENN. CENTRAL CORP.
500 West Putnam Avenue
Greenwich, CT 06830
RE: WESTERLY SIDE OF NUTMEG ROAD NORTH, SOUTH WINDSOR
Dear Sirs:
In accordance with the regulations of the Inland Wetland
Agency/Conservation Commission I/We hereby give you this
notice of an application filed this date by Waldo Bros.
Company for the construction of an industrial building on
the above-mentioned property and which abutts your property.
The application and plans are on file at the South
Windsor Town Hall, 1540 Sullivan Avenue, if you desire further
information please contact the Planning Department, 644-2511.
Respectfully,
By Paul L. Driscoll
Vice President
Waldo Bros. Company
�OVIN Sf4 `p
co
C F 7-own O-P S-0-atA ?A
9 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�flosee•Co� AREA CODE 203/644-2511
May 2, 1988
Mr. John M. Moran, Jr. , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission]
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Application Review - Waldo Bros . Company - #88-31P
Dear Mr. Moran:
The plans indicate the limits of Inland Wetlands were field
located. The indication from the soils brook is that along the
Stoughton Brook, Walpole Soils can be found in this area. The
regulated activity for which an Inland Wetlands Permit shall be
required include 2. 1 .i, 2. 1 . j , 5. 2 & 5. 3 of the regulations . A
simplified summary includes the construction of the detention
basin and outfall within the wetlands and construction
encroachment of the buffer area.
If a permit were to be considered, a relocation of the storm
drain closer to the building should minimize the amount of
clearing required and the wetlands disturbed.
The conservation plan appears sufficient. If a permit were to be
granted, the following conditions might apply:
1 . Three complete sets of drawings including Sheet 2 of 5
entitled Soil Erosion & Sediment Control Plan, Topographic
Map, Plot Plan, 4-12-88, with modifications, if any shall
be filed with the Town prior to any work on the site.
2 . Prior to any work on the site a $5,000 bond shall be
submitted to assure compliance with the approved
conservation measures.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
cc: Waldo Bros. Company
Michael J. Gantick, Director of Public Works
Marcia A. Banch, Director of Planning
John Shemo
IWA/CC File
owN sE�`�
y �� 01 V&U&ot
C
U
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
OR-CO AREA CODE 203/644-2511
July 21, 1988
Atty. William E. Grace
479 Buckland Road
South Windsor, CT 06074
re: Appl. #88-31P, Waldo Bros`. Company
Site Plan
Gentlemen:
We are pleased to advise that the Planning and Zoning Commission
voted on July 19, 1988 to approve the captioned application for a
Site Plan of Development in accordance with Drawings No. 1
through 5 of 5 dated 4-12-88, revised through 6-28-88, prepared
by Palmberg and Russo, Project No. 86202, and with the following
modifications:
1 . Prior to commencement of any site work, a meeting must be
held with Town Staff .
2 . No building permits will be issued until the final mylars
have been filed in the Town Clerk' s Office.
3 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
4 . An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning
Regulations .
5 . A landscape bond in the amount of $10, 000 is required and
must be submitted prior to filing of mylars .
6 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South .
Windsor.
7 . Details (by an engineer) are required for the grading
adjacent to the proposed concrete loading platform.
8 . Reverse filter design is needed for drainage pipes .
Atty. William E. Grace -2- July' 21, 1988
- 9 . An- access- maintenance drive-to the detention basin'-s -
emergency spillway and outlet structure is required.
10 . Snow fencing is required along areas of tree preservation
to discourage encroachment by heavy equipment operators .
Black and white transparent mylars of Sheet' #2 with the above
modifications, together with three blueprint copies of the entire
set of plans, must be submitted to this Commission within 30 days
to be stamped and signed. The -letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days . After filing these plans, a copy of the receipt must be
s„hm;tt—e to the Planning Department.
: Very truly yours,
P ING AND ZONING COMMISSION
Ra. and F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Registrar of Voters
... Inland Wetlands Agency/Conservation Commission
PZC File
Arch. /Engineer
Applicant
Steven Younis
Priggen Steel
133 Franklin Street
Wrentham, MA 02093
RE: Preconstruction Meeting -W A lication #88-31P
Au ust 23 1988 10 :00 A.M.
IN ATTENDANCE } P'%'T"So' s4"`'"P
Name Company Telephone #
Marcia Banach Town of South Windsor 644-2511
Steven Younis Priggen Steel/Waldo 508-384-7795
Gerry Lewis Town of South Windsor 644-2511
Michael Gantick Town of South Windsor 644-2511
r Fred Shaw Town of South Windsor 644=2511
John E. McCahill Town of South Windsor 644=2511
A.B. Davies Town of South Windsor 644-2511
The following is a brief summary of points discussed during the
meeting.
Public Works
1. All erosion and sedimentation control measures are to be
in place prior to earth moving operations in each area
and maintained/cleaned out during construction. Call
ZEO/IWA Enforcement Officer for inspection when measures
are in place.
2 . Four complete sets of approved/revised plans to be
provided to Town prior to start of construction. They
will be stamped by Planning Department along with plans
developer needs .
,
3 . The Public Works Department is to be notified forty-eight
( 48) hours prior to the start of major construction work
with inspections and testing per Developers Checklist
required for the following:
a) After road is staked out
b) All drainage work
c) Preparation of subgrade, compaction tests as
required by the Town.
d) Preparation of subbase, six ( 6) inch lifts
e) Placement of bituminous concrete, 1 1/2 inch
layers.
4 . Certification of gravel used as subbase will be required
by an approved testing company.
5 . No subgrade formation/base in frozen ground/snow. Same
for pipe/structure installation.
6 . As built plans are to include horizontal and vertical
location of all road underdrains, footing drains and
sanitary sewer located by a certified land surveyor .
7 . All topsoil stockpile areas to be protected ( ringed with
haybales or equal) .
n
8 . All pipe and structures to be backfilled with free
draining material, compacted in maximum one foot lifts
` with approved compaction equipment.
9 . During construction of the driveway, a crushed stone
tracking pad is to be installed and maintained to
minimize tracking of dirt/gravel onto Nutmeg Road N.
Calcium chloride is to be used for dust control as
required.
10 . Any problems and/or questions regarding construction of
this project will be directed to Steven Younis in the
field.
11 . Driveway is to be paved with base course prior to
issuance of Certificate of Occupancy. No utility cuts
after paving
12 . Developer/Contractor to submit mark-up print of any
buryhole locations . To be shown on as-builts.
13 . All filling to be done in accordance with Department of
Transportation specifications . To be compacted in
maximum lifts and tested as necessary.
14 . Weekly job meetings will be held if needed on the site.
15 . Forty-eight (48 ) hours notice needed for Certificate of
Occupancy inspection. Two week review period (10 working
days) needed for all individual site ( lot) plans prior to
issuance of building permit (may be longer if application
is incomplete) . Certificate of Occupancy guidelines given
to Steven Younis .
16 . Only approved copies of subdivision plans and lot site
plans to be used. Any proposed changes are to be
presented to Engineering/Plannng & Zoning prior to
implementation on change form.
17 . No paving after October 15 without written approval from
the Director of Public Works .
18 . Hours of operation 7 :00 A.M. - 5 :00 P.M. , no work on
Sunday. Any pipe/structure work requires inspection
prior to backfilling .
Planning Department
1. Access maintenance drive base of 6" gravel , foamed and
seeded. To be installed at time of outlet structure,
then not disturbed.
2 . Inspection of tree preservation flagging to be done by
Zoning/Wetlands Enforcement Officer prior to clearing.
Wetlands
1 . No stump dump is planned, stumps will go off-site.
2 . Disturbed areas to be stabilized as soon as possible.
W.P.C.A.
1. Drain layer' s permit required prior to construction of
sanitary sewers .
2 . DEP discharge permit required if industrial waste
generated, or flow is in excess of 5000 gallons per day.
r
SNET/NU
1. Contact utilities for coordination of utilities
connection.
Fire Marshal
1 . Blasting ( if required) to be coordinated with the Fire
Marshal .
Police Department
1 . Emergency phone numbers for the duration of the
construction must be provided to the Police Department on
a company letterhead. If the developer occupies or owns
the building( s) after construction emergency numbers must
be provided to the Police Department.
2 All buildings located on property which abuts a public
highway must be numbered. Such number (address) shall
be visible from the street. All numbering shall comply
with Town Ordinance 6-800 thru 6-802 .
Barns, garages and outbuilding which are located on the
same premises as a numbered structure are excluded.
3 . Locate temporary business sign during construction.
Very truly yours,
` a Aa4ta�
Marcia A. Banach
Director of Planning
MAB/pmm
cc: A. Bowen Davies, Deputy Town Engineer
Gerald Lewis, SWPD
Karl Reichle, Public Works
Mel Stead, Public Works
Michael J. Gantick, Director of Public Works
Minh V. Le, SNET
Hal Clisby, CL&P
Lester Braddock, Engineering
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
John E. McCahill , Zoning Enforcement Officer
10 Sfq(
Slat
`t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOe c ,w AREA CODE 203/644-2511
March 15, 1989
Waldo Brothers Company ---
202 Southampton Street
Boston, MA 02118
RE: Application #88-31P - Industrial building located on
the westerly side of Nutmeg Road
North, South Windsor
Gentlemen:
This is a reminder that the permit with the Inland Wetlands
Agency/Conservation Commission, Application #88-31P will expire on
May 23, 1989
The Agency requires a letter requesting extension together with a
fee of $25 . 00 . This should be submitted at least 45 days prior to
the expiration date of the permit. If work has been finished or
will be finished by the expiration date, please have an engineer
send a letter stating work is completed according to the approved
plan.
In the event that you are requesting an extension, Section 4 . 13 . 6
of the Zoning Regulations, Conservation Plan (a copy enclosed)
establishes the criteria for such a plan and a method of monitoring
its application. A permit for your proposal was granted, with a
bond as assurance of compliance with its sedimentation and erosion
control measures . To assist in the review process by the IWA/CC,
whether for a permit extension or specific inquiry request, the
provisions for verification through progress reports by the
developer' s/applicant's Engineer demonstrating that each Erosion
and Sedimentation control measure has been installed and
maintained, in accordance with the approved plan shall be required.
It is requested that this verification report be submitted thirty
days before the regular meeting of the IWA/CC, May 8, 1989 , to
permit time for the Commissioners to evaluate your project
controls .
If you have any questions, please contact Phyllis Mann or John
McCahill, Zoning/Wetlands Enforcement Officer. ( 644-2511 Ext. 253)
ry truly yours,
hn M. Moran, Jr. , hairman
Inland Wetlands Ag ncy/
Conservation Commission
JMMJr. /pmm
Enclosure
WALDO BROS. COMPANY• BRICK •CONCRETE SPECIALTIES • BUILDING MATERIALS
202 SOUTHAMPTON ST.,BOSTON,MASS.02118-2789 •TEL. 617 445-3000
WA
O DUNS 00 142 6303
BROS. yr6Lt2'yr1
Rik
MAR 22 1989
Town of South Windsor South Windsor March 20,1989
1540 Sullivan Ave. INLAND WETLANDS AGENCY/
South Windsor, CT 06074 CONSERVATION CU„rMiSSION
Attn: Ms. Phyllis Mann
Zoning/ Wetlands Enforcement
RE: Application #88-31P Industrial building located
on the westerly side of Nutmeg
Road North, South Windsor
Gentlemen:
We most certainly would like to extend our permit with the Inland
Wetlands Agency/Conservation Commission, Application #88-31P, which
is due to expire on May 23, 1989. We have enclosed a check for
$25.00, payable to The Town of South Windsor, per instructions
outlined in a letter dated March 15, 1989, from Mr. John M. Moran,
Jr. , Chairman, Inland Wetlands Agency/Conservation Commission. We
are also enclosing a copy of our Permit Bond, that is still in
effect. We have not, as of this date, started construction, so
progress reports from our Engineer are unavailable.
I hope that this correspondence is sufficient for our request, but if
it is not, I would appreciate any assistance you could give to us. I
am available at the above address and phone number should you need to
contact me. Thank you for your consideration.
Very truly yours,
Paul L. riscoll
Vice President
cc:John M. Moran, Jr. , Chairman-IWA/CC
William E. Grace-Casey, Halpern, Grace
& Dombrowski, PCI
P. B. Colgan, President-Waldo Bros. Company
Enclosures
;Va&dMf & R�� LAND SURVEYORS & ENGINEERS
15 BARBER POND ROAD • BLOOMFIELD, CONNECT'ICUT 06002 0 TELEPHONE(203) 242-2775
WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER
MAR ` '" 1989
March 24, 1989 South Windsor
INLAND WETLANDS AGENCY(
CONSERVATION COMMISS{OM
Town of South Windsor
1540 Sullivan Avenue -
South Windsor, CT. 06074
Attn: John M. Moran Sr. , Chairman
Inland Wetlands Agency/ Conservation Commission
Re Waldo Brothers, Nutmeg Road North, South Windsor.
Dear Mr. Moran:
We are requesting an extension on the permit for Waldo Brothers pro-
posed project on Nutmeg Road North. The reason we are requesting an
extension is because they have been unable to proceed with the project up to
this time. They presently anticipate starting the project in 1989.
If you have any questions please feel free to call me at my office
at any time. Thank you for your cooperation in this matter.
Sincerely,
Joseph R. Russo, L.S. & P.E.
Palmberg &Russo
JRR/bh
cc: Atty. Grace
�S0,$1N Sf 44
G ❑ aie SotdA Vt;nd4ot
U
s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
Soe•co��� AREA CODE 203/644-2511
April 12, 1989
Waldo Brothers
202 Southampton Street
Boston MA 02118
Re: Application #88-31P - IWA/CC permit for the construction of
an idustrial building located on the
westerly side of Nutmeg Road North,
South Windsor, Connecticut
Dear Madam/Sir:
At the April 10, 1989 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one year extension of
Application #88-31P with all original conditions.
In addition to the original conditions you are also required to
contact John McCahill, Zoning/Wetlands Enforcement Officer (644-
2511, x229) immediately upon approval notification. This is to re-
confirm the contact person for the site and establish a site visit
with that person to verify all erosion and sedimentation control
measures are in place according to the plan.
Application #88-31P becomes effective May 23, 1989 and expires on
May 23, 1990.
V y truly yours,
&'h_n M. Moran, Jr. , Chai �anl';�"
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc.-John E. McCahill, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, Director of Planning
John R. Collins, Chief Building Official
Raymond Hallowell, Chairman, PZC
Jerry Iazzetta, Town Engineer
Attorney William Grace
Enclosure
if
PROJECT NAME/LOCATION IlVa14 �J I�"" l'l CA
APPLICATION # IRS- — P
DATE A�9 l98y
NOTE TO THE FILE:
Re: —rlrtL
IM c,a- s n o r. L�
C( [ ^s T r
wi ll sJa.492
r
Signatu
t�wM aE�
m �U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
w
R.0 AREA CODE 203/644-2511
March 19, 1990
Waldo Brothers Company
202 Southampton Street
Boston, MA 02118
Dear Madam/Sir:
Re: Application #88-31P - Industrial building on Nutmeg Road N
This is a reminder that Application #88-31P for permit and one
year extension will expire on May 23, 1990 .
A new application will be required in accordance with Section VI
and VII of the regulations if you plan to extend your project
beyond the above expiration date, along with the required fee of
$25. 00 for a single family house and all others $100.00. The
complete application and fee must be submitted at least 14 working
days prior to the first regular monthly meeting date of the Agency.
To assist In the review process by the IWA/CC a report by the
developers)/applicant(s) Engineer demonstrating that erosion and
sedimentation control measures have been installed and maintained,
in accordance with the approved plan, shall be required. Section
4 . 13 . 6 of the Zoning Regulations (a copy enclosed) , establishes the
criteria for a conservation plan and a method of monitoring its
application. This verification report must also be submitted with
the application to allow time for Commissioners to evaluate your
project controls .
If work has been completed or will be completed by the expiration
date, a letter from the engineer of the project will be warranted
as to the status of the application.
If you have any questions, please contact Phyllis Mann, Secretary,
or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644-
2511, Ext 253.
V ry truly yours
es A. Lombardi, Chairm
nland Wetlands Agency/
JAL/pmm Conservation Commission
Enclosure
cc: Attorney William E. Grace, 479 Buckland Road, South Windsor