Loading...
HomeMy WebLinkAboutSite Plan - Conservation (309) 0 TOWN OF SOUTH WINDSOR INLAND WETLANDS AND WATER COURSES APPU CAT1 O N THIS APPLICATION, ONCE INFORMATION COMPLETE INL.Aso WETLANDS AGENCY ACTION (SEE BACK OF- THIS FORM) , SHALL BE RECEIVED AT REGULARLY SCHEDULED MEETING OF THE AGENCY AT T �� UL APF4--CATION NO. - TOWN HALL. RECEIVED OATS THIS APPLICATION MUST BE FILED IN TRIPLICATE A THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST (if necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF COMPj_ETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEF PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR PERMIT DENIED DATE MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. Paul's Distributor's Trust 643-1136 t. APPLICANT D_A_T�}Tlp�w64ee TEL NO. o Domi c J Sauatr_ito, Esq. CITY & STATE Mangy er, CT ADORESS 7� Mainreef 2 OWNER EL,John J. Woodcock, Jr. T NO. 528-4144 34 Woodcock Lane CITY 3 STATE South Windsor, CT ADDRESS _-- 3. LOCATION OF PROPERTY Kennedy Road South Windsor CT NAMES OF ADJACENT PROPERTY OWNERS N/F Handy & Harmon; N/F Culbro Corp. , N/F Penn Central Railroad; N/F Rex Lumber Co. , N/F Charboneau, Andre L. ; N/F Gerber Scientific, Inc. , N/F Mal Tool, Inc. STATE CLLAAL.Y ANO 9AIEFLY 5. PURPOSES ANO OESCAIPTION OF THE PROPOSED ACTIVITY.ANO THE TIME ELEMENT INVOLVED: There are no regulated activities proposed at this time. The purpose is to convey ownership of Lot Number 6 as shown on attached maps. ATTENTION: THE APPLICANT UNOERSTANOS THAT THIS APPLICATION IS TO BE CONSIDER4D COMPIL ONLY WHEN ALL INFORMATION & DOCUMENTS REQUIRED BY TH AGENCY,HAVE BEEN SUBMITTED, APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. AN APPLICATION FEE IS REQUIRED. CONSULT THFEGULATIONS (SECTIONS 6.9, 6.9a 'and 6.9b) . A SIGN IS REQUIRED. CONSULT THE TIONS (SECTION a pa - u for t SIGN cant ni J t , His Attorney (O ) Jo . Woodcock, Jr. CHE-OC IST FOR REQUIRED jl�iFOkM.4S.'lUL� a . APPLIC.!k= HA5 HAD NS�pS AND PL:�.NS CE-aIFIED BY SOIL CONSERVATION SERVICE TO VERIFY CO�[PL R C1SIOtI A.�CGMPL .NCE ��ITH CONNECTICUT GUIDELINES FOR SUIT; E �;ND SEDDENT CONTROL ( AS. PER F;IuRDBOOK, IS AMENDrEDED, AUD PUBLIC ACT 83-388, AS kvENDED . DATE OF CMIFICATI(:N 70 APPLlCATICU INFORMATION COMPLIES WITH AGENCY'S RE IONS ( SECTIONS 7.I, a trh r ouch is 8. REQUIRED FEE HAS BEER PAID. DATE RECEIVED 3 APPLJC. D= ( OR DESIGNATED REPRESENTATIVE)HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING BY ODI BEFORE ThE F0 WtdG DATE SIGNATT THIS APPLICaTICS IS FOUND TO BE COMPLETE AND NOW (4UALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer Agency Sec'y Agency Chairmai THIS Ap p LICAT I ON IS IN:CON[P L ET E BECAUSE OF THE FOLLOWING HM BERED ITEMS ( FROM ABOVE ) AS CHECKED BELOW: 1 2 3 4 S 8 9 6 -7 1 ��.NN Sfq wn OP S-OU& Vzn&at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•co�'�w AREA CODE 203/644-2511 May 18, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: Paul's Distribution, Lot 6, Application Review Dear Mr. Moran: This application by Pauls' Distributers on Mr. Woodcocks's Land is similar to the previous application on Kennedy Road. In essence, they are creating a one acre lot, around the existing building, out of the 4 .664 acres on the westerly side of Kennedy Road. It has been indicated that they intend no regulated activity. The plan submitted indicates a wetlands limits and a nomenclature inconsistent with the Town Plan. Apparently they are claiming that this land is- improperly designated on the inventory map and is therefore exempt from these regulations, per Section 3.3. There is insufficient information to process the "Request for Exemption" . The owner should recognize that an eventual approval of Lot 6, as with Lot 3, does not automatically make the other lots building lots . They would have to comply with the regulations in effect at that time. There appears to be no regulated activity for which a permit is required. The exemption should be sufficient, Once approved. Very truly yours, 11� 6 A. Bowen Davies Deputy Town Engineer ABD/jsv Enclosure cc: John Woodcock Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning IWA/CC 1 ••••,'•,1. 1�'• .'•i, i Y , , o o. .. o • , •. ;•. , • • E ' o o ., . . ••••i •• '•• ' •t• ,• r•• , ••• •moo. •• S•�i•• • • • • •' ,:y _ d •..••. Y ' '.:• .: o •;: •• ' M08 4 nj .'o •. y1[ .•o'• • ,:: �• • • o.•, •'ool, r. , ,• ,•.j,:• , •• • .••••• '• ••••• ••• ,1 , • •• 1•• • •• , .•, •,. • •r •• ,•.Sys ••o ..• O)o 00 ' • • •.•0 1 •••�•`•• • • •••••• ••.✓:••• •••�.r. •, • •' '• .�.nn ':i ' :••��•••• ••'• ':••• • `• per SS •• �' �• • ••• •••• • ' • •.. v, • `•• •:�•.• �1• •• ,r- t r � �tpWN Sf,` Town 0-.-119S-0aA ?&-U/46at � 0 U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l��soIR'.CO � AREA CODE 203/644-2511 -- Apri 'n, 1989 Paul's Distributor's Trust Paul Tosi, Trustee c/o Dominic J. Squatrito, Esq. 773 Main Street Manchester, CT 06040 RE: Application #88-42P, Kennedy Road Dear Attorney Squatrito: This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, Application #88-42P will expire on June 27, .1989 . The Agency requires a letter requesting extension together with a fee of $25. 00. This should be submitted at least 45 days prior to the expiration date of the permit. If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan. In the event that you are requesting an extension, Section 4. 13. 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the IWA/CC, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted thirty days before the regular meeting of the IWA/CC, May 8, 1989, to permit time for the Commissioners to evaluate your project ' controls. If you have any questions, please contact Phyllis Mann or John McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253) , er truly yours, J n M. Moran, Jr. , Cha' / F land Wetlands Agency/�/, Conservation Commission JMMJr. /pmm , i �So�N 8F, To�� O-P S-0� ?d&U144-0t `� , U 9 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 R•co� AREA CODE 203/644-2511 June 29, 1988 Paul's Distributors' Trust Paul Tosi, Trustee c/o Dominic J. Squatrito, Esq. 773 Main Street Mancheste T-06-@49 RE: pplication #88-42P - Paul's Distributors Lot #6 Dear At the June 27, 1988 meeting, The South Windsor Inland Wetlands Agency/Conservation Commission approved Application #88-42P IWA/CC permit for the resubdivision of land to create a building lot on the west side of Kennedy Road. No activity is proposed. I zone as shown on plans prepared by Lucek Engineering Assoc. ,Inc. , dated 11/6/87, revised 4/28/88 . The following conditions must be adhered to for this permit to be valid: 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expire on June 27, 1989 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. i t i 6 . The owner (John J. Woodcock, Jr. ) should recognize that an eventual approval of Lot 6, as with Lot 3, does not automatically make the other lots building Pots. They would have to comply with the regulations in effect at that time. Very truly yours, Ahn M. Moran, Jr Chairman Inland Wetlands Agency/ Conservation Commission JMMJr.lpmm Enclosures cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Town Planning Michael Gantick, Director of Public Works Building Department Raymond Hallowell, Chairman, PZC John J. Woodcock, Jr. Lucek Engineering __Application__#88-42P 6�.17/�� _------------_—. _�ermtt Expires ------ Paul's Distributor's Trust - Paul Tosi, Trustee C/O Dominic J. Squatrito, ESq. 773 Main Street Manchester, CT 06040 ,tJ _ RE Kennedy Road