HomeMy WebLinkAboutSite Plan - Conservation (304) TOWN OF SOUTH WINDSOR,
R. CQURSES
INLAND WETLANDS AND WATER
_
APPLICATION
INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE„_ INF RM Tlm& 5 S C01FF
(SEE BACK OF THIS FORM), SHALL—$E RCI E
�j REGttL�ARLY SCHEDUI�ED MEETI,NtI.O�' THE k R1 C - T THE
APPLICATION NO. // Vr-� TOWN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FILED iN.' It AT
THE OFFICE OF THE TOWN CLERK OF S
PUBLIC HEARING DATE 1Z NOON_AT LEAST 14. DAYS,PRIOR T� TIf
(if necessary) REGULAR [MONTHLY MEETI�G t7ATE. .. 0�'.
COMPLETED APPLICATION, OR 'PLANS MUST BE' SUBMITTED TO x �
PERMIT GRANTED DATE AT YEAST 14 DAYS PRIOR TO THE`FIES` REGULAR
PERMIT,DENIED DATE MONT Y ME "TING
PLEASE PRINT,OR` TYPE.
t. APPLICANT JFI Associates, Inc . TEL. .NO. 28g-7662 =� r
LM
3
ADDRESS, P .O.. `Box 1061 CITY &-STATE =South Wa ndsor, CT
t
2. OWNER` JFI Associates Inc` TEL, NO.' 28q=?f•62
ADDRESS P.O. Box 1061, , CITY & STATE South, Windsor
10 Commerce Way/Lots 35 & .36;
3. .LOCATION OF PROPERTY .,
NAMES OF ADJACENT PROPERTY OWNERS JFI Associates, Inc
yt4 4..
o
STATtE CLBAALY AND BRIEFLY
'4"
5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT IN�/Ii.VEn�L�
APPROVAL OF THE CONSERVATION PLAN fdr the cons uctor of a
Machine Show,c i �
,ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE rCON&ICEflED,
COMPLETE O_NLY WHEN ALL INFORMATION A DOCUMENTS REGt{IAEO yY .TH`E
AG_ENCY.HAVE BEENSUB,_MITTED,
APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND�ZONINCI, <t?M:=
MISSION.
AN APPLICATION FEE IS REQUIRED. CONSULT THE..l&p=TIONS
(SECTIONS 6.9, 6.9a and 6.9b).
A SIGN IS REQUIRED. CONSULT THE REGULATIONS (SECTION 6.3a).
SIGN
EAM
nt)
(Owner)co
}.. .
Revised 8/12/85 u,
OVER
Appliction #88-50P Permit Expires 071F.9
JFI Associates, Inc.
P.O. Box 1061
South Windsor, CT 06074
re: Construction of a machine shop
/o'8 y facility
j F I Associates, Inc.
P.O. Box 1061
South Windsor, CT 06074
(203) 289-7662 Rf •
JUN I!TV�
June 24 , 1988 South Windsor
INLAND WETLANDS AGENCY)
CONSERVATION COMMISSI01N
Mr. John M. Moran, Jr. , Chairman
Inland Wetlands and Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor , CT 06074
RE: John Fitch Business Centre
Drainage Swale
Dear Mr. Moran:
This is to inform the Commission of our plans to clean up the drainage
swale that runs from Rye Street, near the AM-PM store to the rear of
Firehouse #3 . In its present state, the swale is a derelict
receptacle for trash . It is our intent to maintain the swale as a
water course and a landscape feature for the site.
After consulting with Mr . Scherer of the Soil Conservation Service and
Mr. Davies of the town staff, the following scenario has been set:
1. Town Tree Warden to mark the desirable trees to remain along
the swale
2 . Cut and remove dead and unmarked vegetation and the accumulated
trash , (no excavation or filling will occur at this time )
3 . Inventory the swale as a basis for the development of a
conservation and landscape plan for the swale.
4 . Present plan to the Commission
At this point we have set no timetable for beginning this action. We
will be working on the landscape plan through the coming winter
season, therefore, we will be finished with the inventory process by
the end of October 1988.
We will be pleased to answer any questions the commission may have
concerning this matter .
ARaym
tr yours ,
nd Alexander
RJA/iba
cc: A.B. Davies
O-PSV"M V&&Z'at
C �
ti
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
OR-CO AREA CODE 203/644-2511
June 29, 1988
JFI Associates Inc.
P.O. Bo 1
Sou Windsor, CT 06074
Application #88-50P FI, Lots #35-36
Gen
At the June 27, 1988 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with modifications
Application #88-50P for the construction of an industrial
building located on the west side of Commerce Way, north of
Sullivan Avenue, I zone as shown on the plans prepared by Luzzi
Engineering and Surveying, dated 6/8/88
The follow modifications must be adhered to for this permit to be
valid:
1 . Three (3) blueprint copies of the approved map with all
modifications be submitted to the IWA/CC within 65 days for
review prior to any construction activity on the site.
2 . Construction activities shall be subject to the approval of
the Town Engineer.
3 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
4 . We recommend a bond in the amount of $4000. to be submitted
to Planning & Zoning Commission to ensure compliance with
the Erosion and Sedimentation Control Measures .
5 . The permit is valid for one year and shall expire on June
27, 1989 .
6 . All approvals required must be obtained and submitted prior
to any activity on' the site.
V 9 �
7 . Stabilization of exposed areas during a non growing season
is required.
8. Plans should be modified to show the anti-tracking pad
detail.
Very truly yours,
John M. Moran, . , Chairman
Inland Wetlands Agency/
Conservation Commission
JMMJr. ,/pmm
Enclosures
cc: A.B. Davies, Deputy Town Engineer
Marcia A.Banach, Director of Planning
John R. Collins, Chief Building official
Raymond Hallowell, Chairman, Planning & Zoning
Luzzi Engineering & Surveying
N Sf A`� '
U
� n oP Soad, Vl�u�
6 j 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
R.. AREA CODE 203/644-2511
16 September 1988
JFI Associates, Inc.
P. 0. Box 1061
South Windsor, CT 06074
Attn: Raymond Alexander
re: Appl. #88-50P, JFI / Commerce Way Lot #35/36
Site Plan
Gentlemen:
We are pleased to advise that the Planning and Zoning Commission
voted on Sept. 13, 1988 to approve the captioned application for a
site plan of development in accordance with Drawing dated June, 1988
prepared by Luzzi Engineering, Project No. 88-21D and with the
following modifications:
1 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
2. No building permits will be issued until the final mylars
have been filed in the Town Clerk's Office.
3 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
4 . An as-built plan is required prior to issuance of a
Certificate of Occupancy per Section 4 . 13 .10 of the Zoning
Regulations .
5 . A landscape bond in the amount of $5000 is required and
must be submitted prior to filing of mylars .
6 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
7 . A DEP permit for removal of any toxic wastes is required
prior to issuance of Certificate of Occupancy.
JFI Associates, Inc. . -2- September 16, 1988
Black--and white- transparent -mylars of, Key- Map And -Plot-.Plan with the - -
above modifications, together with three blueprint copies of the
entire set of plans, must be submitted to this Commission within 30
days to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Registrar of Voters
�•• Inland Wetlands Agency/Conservation Commission
PZC File
Arch. /Engineer
Applicant
�SOWM SE+`
O p
U 70� 01P Saa& ?&U&ot
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
��Nosoe.CO�' AREA CODE 203/644-2511
-April-10, 1989
JFI Associates, Inc.
P.O. Box 1061
South Windsor, CT 06074
RE: Application #88-50P, construction of a machine shop facility
Dear Madam/Sir:
This is a reminder that the permit with the Inland Wetlands
Agency/Conservation Commission, Application #88-50P will expire on
June 27, 1989 .
The Agency requires a letter requesting extension together with a
fee of $25. 00. This should be submitted at least 45 days prior to
the expiration date of the permit. If work has been finished or
will be finished by the expiration date, please have an engineer
send a letter stating work is completed according to the approved
plan.
In the event that you are requesting an extension, Section 4.13. 6
of the Zoning Regulations, Conservation Plan (a copy enclosed)
establishes the criteria for such a plan and a method of monitoring
its application. A permit for your proposal was granted, with a
bond as assurance of compliance with its sedimentation and erosion
control measures . To assist in the review process by the IWA/CC,
whether for a permit extension or specific inquiry request, the
provisions for verification through progress reports by the
developer's/applicant's Engineer demonstrating that each Erosion
and Sedimentation control measure has been installed and
maintained, in accordance with the approved plan shall be required.
It is requested that this verification report be submitted thirty
days before the regular meeting of the IWA/CC, May 8, 1989, to
permit time for the Commissioners to evaluate your project
controls .
If you have any questions, please contact Phyllis Mann or John
McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253)
y truly yours,
d'o M. Moran, Jr. , Chai;
2nland Wetlands Agency/
Conservation Commission
j F I Associates, Inc.
P.O. Box 1061
South Windsor, CT 06074
(203) 289-7662 ® ��
MAY 9 1989
May 8, 1989 South Windsor
INLAND WETLANDS AGENCYI
CONSERVATION COMMISSIL;N
Mr . John M. Moran, Jr. , Chairman
Inland Wetlands and Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: John Fitch Centre , Phase II
Application #88-50P - Lot #35/36 - 140 Commerce Way
Dear Mr. Moran:
This to advise you that no further work is required to be performed
relative to the referenced application number . Site construction is
complete and the provisions of the conservation plan have been
complied with.
No extension of the existing permit is required.
If you have any questions concerning this matter please contact me at
your convenience.
Very trul y rs ,
oseph F. Luzzi , P.E.
Supervising Engineer
RJA/iba
cc: Michele Lipe
John McCahill
CONSULTING ENGINEER
LAND SURVEYOR
SUBDIVISIONS 412 WEST AVON ROAD, AVON, CONNECTICUT 06001
SURVEYS PHONE 673-0446
SITE PLANNING
LAND EVALUATION
DRAINAGE STUDIES
SANITARY JUN 6 1989
June 2, 1989
South
Windsor
INLAND WETLANDS AGENCY/
' Mr. John M. Moran, Jr. ,Chairman CONSERVATION COMMISSIGr4
Inland Wetlands & Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT. 06074
Re: John Fitch Industrial Centre, Phase II
Application #88-50P - Lot #35/36 - 140 Commerce Way
Dear Mr. Moran:
This letter is to advise you that no further work is required to
be performed relative to the above referenced application number.
Site construction has been competed and the provisions of the conservation
plan have been complied with.
No extension of the existing permit is required.
If you have any questions concerning this matter please contact me
at your convenience.
Very truly yours,
James J Luzzi, .�& L.S.
cc: Michele Lipe
John McCahill