Loading...
HomeMy WebLinkAboutSite Plan - Conservation (304) TOWN OF SOUTH WINDSOR, R. CQURSES INLAND WETLANDS AND WATER _ APPLICATION INLAND WETLANDS AGENCY ACTION THIS APPLICATION, ONCE„_ INF RM Tlm& 5 S C01FF (SEE BACK OF THIS FORM), SHALL—$E RCI E �j REGttL�ARLY SCHEDUI�ED MEETI,NtI.O�' THE k R1 C - T THE APPLICATION NO. // Vr-� TOWN HALL. RECEIVED DATE THIS APPLICATION MUST BE FILED iN.' It AT THE OFFICE OF THE TOWN CLERK OF S PUBLIC HEARING DATE 1Z NOON_AT LEAST 14. DAYS,PRIOR T� TIf (if necessary) REGULAR [MONTHLY MEETI�G t7ATE. .. 0�'. COMPLETED APPLICATION, OR 'PLANS MUST BE' SUBMITTED TO x � PERMIT GRANTED DATE AT YEAST 14 DAYS PRIOR TO THE`FIES` REGULAR PERMIT,DENIED DATE MONT Y ME "TING PLEASE PRINT,OR` TYPE. t. APPLICANT JFI Associates, Inc . TEL. .NO. 28g-7662 =� r LM 3 ADDRESS, P .O.. `Box 1061 CITY &-STATE =South Wa ndsor, CT t 2. OWNER` JFI Associates Inc` TEL, NO.' 28q=?f•62 ADDRESS P.O. Box 1061, , CITY & STATE South, Windsor 10 Commerce Way/Lots 35 & .36; 3. .LOCATION OF PROPERTY ., NAMES OF ADJACENT PROPERTY OWNERS JFI Associates, Inc yt4 4.. o STATtE CLBAALY AND BRIEFLY '4" 5. PURPOSES AND DESCRIPTION OF THE PROPOSED ACTIVITY,AND THE TIME ELEMENT IN�/Ii.VEn�L� APPROVAL OF THE CONSERVATION PLAN fdr the cons uctor of a Machine Show,c i � ,ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE rCON&ICEflED, COMPLETE O_NLY WHEN ALL INFORMATION A DOCUMENTS REGt{IAEO yY .TH`E AG_ENCY.HAVE BEENSUB,_MITTED, APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING AND�ZONINCI, <t?M:= MISSION. AN APPLICATION FEE IS REQUIRED. CONSULT THE..l&p=TIONS (SECTIONS 6.9, 6.9a and 6.9b). A SIGN IS REQUIRED. CONSULT THE REGULATIONS (SECTION 6.3a). SIGN EAM nt) (Owner)co }.. . Revised 8/12/85 u, OVER Appliction #88-50P Permit Expires 071F.9 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 re: Construction of a machine shop /o'8 y facility j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 Rf • JUN I!TV� June 24 , 1988 South Windsor INLAND WETLANDS AGENCY) CONSERVATION COMMISSI01N Mr. John M. Moran, Jr. , Chairman Inland Wetlands and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: John Fitch Business Centre Drainage Swale Dear Mr. Moran: This is to inform the Commission of our plans to clean up the drainage swale that runs from Rye Street, near the AM-PM store to the rear of Firehouse #3 . In its present state, the swale is a derelict receptacle for trash . It is our intent to maintain the swale as a water course and a landscape feature for the site. After consulting with Mr . Scherer of the Soil Conservation Service and Mr. Davies of the town staff, the following scenario has been set: 1. Town Tree Warden to mark the desirable trees to remain along the swale 2 . Cut and remove dead and unmarked vegetation and the accumulated trash , (no excavation or filling will occur at this time ) 3 . Inventory the swale as a basis for the development of a conservation and landscape plan for the swale. 4 . Present plan to the Commission At this point we have set no timetable for beginning this action. We will be working on the landscape plan through the coming winter season, therefore, we will be finished with the inventory process by the end of October 1988. We will be pleased to answer any questions the commission may have concerning this matter . ARaym tr yours , nd Alexander RJA/iba cc: A.B. Davies O-PSV"M V&&Z'at C � ti 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 OR-CO AREA CODE 203/644-2511 June 29, 1988 JFI Associates Inc. P.O. Bo 1 Sou Windsor, CT 06074 Application #88-50P FI, Lots #35-36 Gen At the June 27, 1988 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-50P for the construction of an industrial building located on the west side of Commerce Way, north of Sullivan Avenue, I zone as shown on the plans prepared by Luzzi Engineering and Surveying, dated 6/8/88 The follow modifications must be adhered to for this permit to be valid: 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $4000. to be submitted to Planning & Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on June 27, 1989 . 6 . All approvals required must be obtained and submitted prior to any activity on' the site. V 9 � 7 . Stabilization of exposed areas during a non growing season is required. 8. Plans should be modified to show the anti-tracking pad detail. Very truly yours, John M. Moran, . , Chairman Inland Wetlands Agency/ Conservation Commission JMMJr. ,/pmm Enclosures cc: A.B. Davies, Deputy Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building official Raymond Hallowell, Chairman, Planning & Zoning Luzzi Engineering & Surveying N Sf A`� ' U � n oP Soad, Vl�u� 6 j 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 R.. AREA CODE 203/644-2511 16 September 1988 JFI Associates, Inc. P. 0. Box 1061 South Windsor, CT 06074 Attn: Raymond Alexander re: Appl. #88-50P, JFI / Commerce Way Lot #35/36 Site Plan Gentlemen: We are pleased to advise that the Planning and Zoning Commission voted on Sept. 13, 1988 to approve the captioned application for a site plan of development in accordance with Drawing dated June, 1988 prepared by Luzzi Engineering, Project No. 88-21D and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 .10 of the Zoning Regulations . 5 . A landscape bond in the amount of $5000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . A DEP permit for removal of any toxic wastes is required prior to issuance of Certificate of Occupancy. JFI Associates, Inc. . -2- September 16, 1988 Black--and white- transparent -mylars of, Key- Map And -Plot-.Plan with the - - above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters �•• Inland Wetlands Agency/Conservation Commission PZC File Arch. /Engineer Applicant �SOWM SE+` O p U 70� 01P Saa& ?&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ��Nosoe.CO�' AREA CODE 203/644-2511 -April-10, 1989 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 RE: Application #88-50P, construction of a machine shop facility Dear Madam/Sir: This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, Application #88-50P will expire on June 27, 1989 . The Agency requires a letter requesting extension together with a fee of $25. 00. This should be submitted at least 45 days prior to the expiration date of the permit. If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan. In the event that you are requesting an extension, Section 4.13. 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures . To assist in the review process by the IWA/CC, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted thirty days before the regular meeting of the IWA/CC, May 8, 1989, to permit time for the Commissioners to evaluate your project controls . If you have any questions, please contact Phyllis Mann or John McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253) y truly yours, d'o M. Moran, Jr. , Chai; 2nland Wetlands Agency/ Conservation Commission j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 ® �� MAY 9 1989 May 8, 1989 South Windsor INLAND WETLANDS AGENCYI CONSERVATION COMMISSIL;N Mr . John M. Moran, Jr. , Chairman Inland Wetlands and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: John Fitch Centre , Phase II Application #88-50P - Lot #35/36 - 140 Commerce Way Dear Mr. Moran: This to advise you that no further work is required to be performed relative to the referenced application number . Site construction is complete and the provisions of the conservation plan have been complied with. No extension of the existing permit is required. If you have any questions concerning this matter please contact me at your convenience. Very trul y rs , oseph F. Luzzi , P.E. Supervising Engineer RJA/iba cc: Michele Lipe John McCahill CONSULTING ENGINEER LAND SURVEYOR SUBDIVISIONS 412 WEST AVON ROAD, AVON, CONNECTICUT 06001 SURVEYS PHONE 673-0446 SITE PLANNING LAND EVALUATION DRAINAGE STUDIES SANITARY JUN 6 1989 June 2, 1989 South Windsor INLAND WETLANDS AGENCY/ ' Mr. John M. Moran, Jr. ,Chairman CONSERVATION COMMISSIGr4 Inland Wetlands & Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT. 06074 Re: John Fitch Industrial Centre, Phase II Application #88-50P - Lot #35/36 - 140 Commerce Way Dear Mr. Moran: This letter is to advise you that no further work is required to be performed relative to the above referenced application number. Site construction has been competed and the provisions of the conservation plan have been complied with. No extension of the existing permit is required. If you have any questions concerning this matter please contact me at your convenience. Very truly yours, James J Luzzi, .�& L.S. cc: Michele Lipe John McCahill Ray Alexander