Loading...
HomeMy WebLinkAboutSite Plan - Conservation (287) TOWN OR SOUTH WINDSOR OCT , 1988 INLAND WETLANDS AND WATER COURSES South Windsor 4 APPLICATION INLAND WETLANDS AGENCY/ THIS APPLICATION, ONCE IN " �3MLlETE� INLrtND WETLANDS AGENCY ACTION (SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE APPLICATION NO. TOWN HALL. RECEIVED DATE THIS APPLICATION MUST BE FED IN TRIPLICATE AT IL THE OFFICE OF THE TOWN CLERIC OF SOUTH WINDSOR 131 PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST (ifnocamory) REGULAR MONTHLY MEETING DATE. THREE SETS. OF MAI COMPLETED APPLICATION OR PLAINS MUST BE SUBMITTED TO THE TOWN ENGINEER PERMIT GRANTED OATS AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR- P ERMIT OENIED OATS MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. ICANT Steven Turner & Leonard Schwartz TEL NO. RESS 237 Homeadow Street CITY 3 STATE Simsbury, CT 06070 ER John Fitch Manaaenent TEL NO. 528-6814 RES$ 57 Al1iGnn prixn- CITY & STATE South Windsor, CT 06074 ATION OF PROPERTYLots #6 & 7, Bidwell Road (J.E.S. I Park)ES OF ADJACENT PROPERTY OWNERS N/F J. E. Shepard \ 9 D W 'L S tit;% l ✓L o4 In,2 STATE CLaMLY AMC BRIEFLY /wt S. PURPOSES AND OESCRIPTION OF THE PROPOSED ACTIVITY.AND THE Tl ENT INVOLVED: Conservation plan approval for construction of an industrial building and related Pl� site improvements. No inland wetlands on site per John Ianni. Certified Soil \ Scientist. ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIOERED COS E ONLY WHEN ALL INFORMATION & OOCUMENTS REgUTAED 8Y THE AGENCY.NAVE BEEN SUBMITTED. Y AP!VAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING C®M- MISSION. n AM APPLICATION FEE IS REQUIRED. CONSULT THLJJEGULATIONS �( (SECTIONS 6.9, 6.9a `and 6.9b) . A SIGN IS REQUIRED. CONSULT THE E 0 ECTION 6.3a) . f SIGNED: PP t Owner) s....:.�w a 1 I/A 5 V1�`rLLJ.LJl 1 vat LY.Cri1 ti L"L3rL LiYI yi`G1Yi[S1 1 yt'B _ APPLICUT HAS HAD MALPS AND PI.-AM CERTIFIED BY $OIL CONSERVATION, SERVICE TO VERIFY COb(PLr=E COMPLIANCE WITH CONNECTICUT GUIDELINES FOR SOIL EROSION AND St:DDIENT CUNTROL ( AS PER FRUDBOUK, .66 ALMIDEED, AU PUBLIC ACT 83-3 88, AS A ENDED. DATE OF CERTIFICATION 7, APPLICATICU IKFORMATIOM COMPLIES WITH iGEXCY'S REGULATIONS ( SECTIONS 7.1, a through J.. S. REQUIRED FEE HAS BEEN PAID. DATE RECEIVES) 9. APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY AT'ivEr THAT A SIGN WILL BE PUSXED AT THE FOLLOWING LOCATION(S) As directed by Town staff BY Design Professionals, Inc. ( NAME ) ON OR BEFORE ThE FOLLOWIRG DATE As directed by Town staff SIGNATURE Peter R. DeMallie/Principal THIS APPLIC.ATIGNi IS FOUND TO BE COMPLETE AND NOW (QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer Agency See'y Agency Chairman THIS APPLICATION, IS INCOMPLETE BECAUSE OF THE FOLLOWUG DiUM BERED ITEMS ( FROM ABOVE ) AS ChECKED BELOW: 1 2 3 4 5 6 7 8 9 t � t ■ esign rofessionals, inc, civil engineers • planners • surveyors LETTER OF TRANSMITTAL ■ TO: J. E. Shepard DATE: 10/1(./88 c% Nu Way Tobacco Coupany 200 Sullivan Avenue South Windsor, CT 06074 REGARDING: Bidwell Industrial Cmiplex PROJ. NO. 88-304 Bidwell Road (Lots #6 & 7) South Windsor, Connecticut WE ARE SENDING YOU: for your use at your request for approval for your files for review and comment X for your information THE FOLLOWING: Please be advised that Steven Turner and Leonard Schwartz have applied to the South Windsor Inland Wetlands Agency/Conservation Cmmission for approval of an industrial building and related site improvements on Bidwell Road. Any inquiries should be directed to the Plaunj= D mart ment- at the S011th Windsor Town Hall (Tel. 644-2511) . Thank you. Design Professionals, Inc. By: - 4 e,4VA - cc: Marcia Banach, Planning Director/ Peter R. DeMallie Principal 1170 Ellington Road (Route 30), South Windsor, CT 06074 • (203) 291-8755 EDWIN RD. W g H 2 GOVERNOR'S HIGHWAY . s P l O� . RR� COLONY t NE o � U a egRBA > RD. SOUTH O MASCOLO R v SATELIIT c� w z SITE LOCUS SCALE 1"= 800' i BIDWELL ROAD NO O Q h0 J � J V � a 1 r ac r W a � U y� 23 _ Z o W vl'o Z° 01 a�°, ►���a ` COLONY N Y R 0 A D Q ' D November 14, 1988 esign rofessionals, inc. civil engineers • planners • surveyors John Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission Town of South Windsor South Windsor, CT v RE: Application #88-104P Bidwell Industrial Commons Review comments addressed. I. Construction grading extends nearly to the property line on all sides of the parcel . The silt fence is to be constructed just inside the property line. II. SEQUENCE OF CONSTRUCTION 1 . Install silt fence around site perimeter. 2. Clear and grub trees and shrubs. 3. Remove topsoil where found on the western portion of the site. Stockpile topsoil at the location shown on the plans. 4. Topsoil stockpile shall be mulched or seeded as specified for temporary vegetative cover. S. Grade and install anti-tracking aprons. b. Begin construction of building foundation. 7. Rough grade site. 8. Begin installation of site utilities. 9. Finish building foundation and site utilities. 10. Finish grade and install parking lot binder and curbing. 11 . Install loam and seed. 12. Remove silt fence upon stabilization of soil. 13. Install landscape plantings. III. The proposed development will have 74% impervious coverage. The balance of the site t29,850 ft ?maybe covered with 4" of topsoil from the stockpile in the area shown. This stockpile would measure 40' x 80' and be 4.25' in height with 2:1 side slopes Sin r l Steven R. Colbath - - - - Project Engineer 1170 Ellington Road (Route 30), South Windsor, CT 06074 • (203) 644-4795 C � a ti y Town o-P SpatA ?Aezd4at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f��soe•CO AREA CODE 203/644-2511 November 4, 1988 TO: John M. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Ccission FROM: Michele R. Lipe, Assistant Planner RE: Application #88-100P, Bidwell Industrial Commons - IWA/CC permit for the construction of a industrial building located on the north sde of Bidwell cul-de-sac and northwesterly of John Fitch Boulevard, I zone. DOCUMENTS REVIEWED: Application Form and site plan COMMENTS 1 . This plan is for conservation approval. Certified soils scientist, John Ianni, verified that there are no wetlands on the site. 2 . The silt fence as shown is inside of the grading. There should be a reasonable space between the silt fence and the limit of construction. 3 . It is a sandy soil site and it appears that topsoil will be brought to the site. Is the size of the stockpile area adequate for to the amount of topsoil being brought on-site? 4 . There is no sequence nor narrative for the conservation plan. IF APPROVAL IS CONSIDERED, SUGGESTED APPROVAL CONDITIONS: 1 . Limit of construction/grading should be shown on the plans . 2 . A sequence and narrative should be provided. 3 . A bond should be established. 4 . A contact person should be listed. �tpWN d�r,,� 1540 SULLIVAN AVENUE SOIJJH WIINDSOR�j ON 14 R CON ARfA8��"2U3647X511�9� Steven Turner Leonard Schwartz 237 Hopmeadow Street Simsbury, CT 06070 RE: Application #88-100P - Bidwell Industrial Commons Gentlemen: At the November 21, 1988 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-100P - IWA/CC permit for the construction of a industrial building located on the north side of Bidwell cul-de-sac and northwesterly of John Fitch Boulevard, I zone. The following modifications must be adhered to for this permit to be valid: 1 . Black and white transparent mylars of sheets # 3 & 4 with the above modifications and this letter reproduced thereon together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed and reviewed prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4. We recommend a bond in the amount $2500.00 to be submitted to the Planning and Zoning Commission to ensure compliance with the erosion and sedimentation control measures. 5 . The permit if valid for one year and shall expire October 24, 1989 . 6 . All approvals required must be- obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans. 8 A pre-construction meeting must be held with Town Staff prior to construction. 9 . A sequence and narrative should be provided. 10. Open areas are to be mulched. Very truly yours, John M. Moran, Jr , airman Inland Wetlands A ncy/ Conservation Commission JMMJr. /pmm Enclosure cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Official Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, Planning & Zoning r co Town apsoa& 701 a s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ����soR•co�'`�w AREA CODE 203/644-2511 11 January 1989 Design Professionals, Inc. 1170 Ellington Road South Windsor, CT 06074 Attn: Peter DeMallie re: Appl. 88-100P, Steven Turner & Leonard Schwartz Site Plan Bidwell Industrial Complex Lots 6 & 7 J.E.S. Industrial Park Gentlemen: We are pleased to advise you that the Planning and Zoning Commission voted at its January 10, 1989 meeting to approve the captioned application for a site plan of development in accordance with Drawings 1-5 of 5 dated 9-21-88, revised through 12/16/88, prepared by Design Professionals, Project No. 88-304, and Drawings L-1, A-1, and boundary survey, and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. . 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission, including a bond in the amount of $2500 . 4 . An as-built plan is required -prior to issuance of a Certificate of Occupancy per Section 4 . 13. 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $10,000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Design Professionals , Inc . -2- 11 January 1989 7 . Parking is prohibited on Town streets. If at any time the r provided parking proves inadequate, additional parking must be provided on site. 8 . Plot plan must be revised to .reflect parking/dumpster modifications shown on topographic map. . 9 . Increase height of shrubs at planting. 10 . Limits of construction should be shown, as grading along property lines appears tight; 73 contour is needed between road and west parking area. 11 . More spot elevations are needed along parking areas, especially in corners . Contour 72/73 grade at the northeast corner of the building may be a problem. 12 . Drainage is subject to Town Engineer's approval. 13 . Map legend noting existing iron pins/iron pins to be set should be shown on plot plan. 14 . Correct data block to 65% impervious coverage allowed (ZBA letter required on plan to permit 74%) . 15 . Remove the word "temporary" from dumpster pad detail. Black and white transparent mylars of Sheet#2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars. After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND- ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director 'Registrar of Voters •/'Inland Wetlands Agency/Conservation Commission PZC File Applicant i OwN SC4 t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �1oSOR-CO AREA CODE 203/644-2511 September 18, 1989 Design Professionals 1170 Ellington Road South Windsor, Ct 06074 Dear Madam/Sir: Re: Application #88-100P - Bidwell Commons Application #88-96P - Fastener Specialties This is a reminder that the permits with the Inland Wetlands Agency/Conservation Commission, Application #88-100P and Application #88-96P will expire on November 21, 1989 If you plan to extend your project beyond the above expiration date, the Agency requires a letter requesting extension together with a fee of $25.00. This should be submitted 30 days prior to the expiration of the permit. In the event that you are requesting an extension, Section 4. 13. 6 of the Zoning Regulations (a copy enclosed) , establishes the criteria for a conservation plan and a method of monitoring its effectiveness. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the IWA/CC, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained in accordance with the approved plan, shall be required. This verification report must be submitted 30 days prior to expiration date of the permit to allow time for the Commissioners to evaluate your project controls. If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan. If you have any questions, please contact Phyllis Mann or John McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253) ry truly ours, vet_ Lombardi, Actin Inland Wetlands Agency/ Conservation Commission JL/pmm