HomeMy WebLinkAboutSite Plan - Conservation (287) TOWN OR SOUTH WINDSOR
OCT , 1988
INLAND WETLANDS AND WATER COURSES South Windsor
4
APPLICATION INLAND WETLANDS AGENCY/
THIS APPLICATION, ONCE IN " �3MLlETE�
INLrtND WETLANDS AGENCY ACTION
(SEE BACK OF THIS FORM), SHALL BE RECEIVED AT A
REGULARLY SCHEDULED MEETING OF THE AGENCY AT THE
APPLICATION NO. TOWN HALL.
RECEIVED DATE THIS APPLICATION MUST BE FED IN TRIPLICATE AT
IL
THE OFFICE OF THE TOWN CLERIC OF SOUTH WINDSOR 131
PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST
(ifnocamory) REGULAR MONTHLY MEETING DATE. THREE SETS. OF MAI
COMPLETED APPLICATION OR PLAINS MUST BE SUBMITTED TO THE TOWN ENGINEER
PERMIT GRANTED OATS AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR-
P
ERMIT OENIED OATS MONTHLY MEETING DATE.
PLEASE PRINT OR TYPE.
ICANT Steven Turner & Leonard Schwartz
TEL NO.
RESS 237 Homeadow Street CITY 3 STATE Simsbury, CT 06070
ER John Fitch Manaaenent TEL NO. 528-6814
RES$ 57 Al1iGnn prixn- CITY & STATE South Windsor, CT 06074
ATION OF PROPERTYLots #6 & 7, Bidwell Road (J.E.S. I Park)ES OF ADJACENT PROPERTY OWNERS N/F J. E. Shepard
\ 9 D W 'L
S tit;% l ✓L o4 In,2
STATE CLaMLY AMC BRIEFLY /wt
S. PURPOSES AND OESCRIPTION OF THE PROPOSED ACTIVITY.AND THE Tl ENT INVOLVED:
Conservation plan approval for construction of an industrial building and related
Pl� site improvements. No inland wetlands on site per John Ianni. Certified Soil
\ Scientist.
ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIOERED
COS E ONLY WHEN ALL INFORMATION & OOCUMENTS REgUTAED 8Y THE
AGENCY.NAVE BEEN SUBMITTED.
Y
AP!VAL MAY ALSO BE NECESSARY FROM THE PLANNING AND ZONING C®M-
MISSION.
n AM APPLICATION FEE IS REQUIRED. CONSULT THLJJEGULATIONS
�( (SECTIONS 6.9, 6.9a `and 6.9b) .
A SIGN IS REQUIRED. CONSULT THE E 0 ECTION 6.3a) .
f
SIGNED:
PP t
Owner)
s....:.�w a 1 I/A 5
V1�`rLLJ.LJl 1 vat LY.Cri1 ti L"L3rL LiYI yi`G1Yi[S1 1 yt'B _
APPLICUT HAS HAD MALPS AND PI.-AM CERTIFIED BY $OIL
CONSERVATION, SERVICE TO VERIFY COb(PLr=E COMPLIANCE
WITH CONNECTICUT GUIDELINES FOR SOIL EROSION AND
St:DDIENT CUNTROL ( AS PER FRUDBOUK, .66 ALMIDEED,
AU PUBLIC ACT 83-3 88, AS A ENDED.
DATE OF CERTIFICATION
7, APPLICATICU IKFORMATIOM COMPLIES WITH iGEXCY'S
REGULATIONS ( SECTIONS 7.1, a through J..
S. REQUIRED FEE HAS BEEN PAID.
DATE RECEIVES)
9. APPLICANT ( OR DESIGNATED REPRESENTATIVE)HEREBY
AT'ivEr THAT A SIGN WILL BE PUSXED AT THE FOLLOWING
LOCATION(S) As directed by Town staff
BY Design Professionals, Inc. ( NAME )
ON OR BEFORE ThE FOLLOWIRG DATE As directed by Town staff
SIGNATURE
Peter R. DeMallie/Principal
THIS APPLIC.ATIGNi IS FOUND TO BE COMPLETE AND NOW
(QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA:
DATE SIGNATURE
Town Engineer
Agency See'y
Agency Chairman
THIS APPLICATION, IS INCOMPLETE BECAUSE OF THE FOLLOWUG
DiUM BERED ITEMS ( FROM ABOVE ) AS ChECKED BELOW:
1 2 3 4 5
6 7 8 9
t
� t
■
esign
rofessionals, inc,
civil engineers • planners • surveyors LETTER OF TRANSMITTAL
■
TO:
J. E. Shepard DATE: 10/1(./88
c% Nu Way Tobacco Coupany
200 Sullivan Avenue
South Windsor, CT 06074
REGARDING: Bidwell Industrial Cmiplex PROJ. NO. 88-304
Bidwell Road (Lots #6 & 7)
South Windsor, Connecticut
WE ARE SENDING YOU:
for your use at your request
for approval for your files
for review and comment X for your information
THE FOLLOWING: Please be advised that Steven Turner and Leonard Schwartz have
applied to the South Windsor Inland Wetlands Agency/Conservation Cmmission for
approval of an industrial building and related site improvements on Bidwell
Road. Any inquiries should be directed to the Plaunj= D mart ment- at the S011th
Windsor Town Hall (Tel. 644-2511) . Thank you.
Design Professionals, Inc.
By: -
4 e,4VA -
cc: Marcia Banach, Planning Director/ Peter R. DeMallie
Principal
1170 Ellington Road (Route 30), South Windsor, CT 06074 • (203) 291-8755
EDWIN RD.
W
g
H
2
GOVERNOR'S
HIGHWAY .
s
P
l
O�
. RR�
COLONY
t
NE
o �
U
a egRBA
> RD.
SOUTH O
MASCOLO R
v SATELIIT
c�
w
z
SITE LOCUS
SCALE 1"= 800'
i
BIDWELL ROAD
NO
O
Q
h0
J �
J
V � a
1 r ac
r
W
a �
U
y� 23 _ Z
o W
vl'o
Z°
01
a�°, ►���a ` COLONY N Y R 0 A D Q
' D
November 14, 1988
esign rofessionals, inc.
civil engineers • planners • surveyors
John Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Commission
Town of South Windsor
South Windsor, CT
v
RE: Application #88-104P Bidwell Industrial Commons
Review comments addressed.
I.
Construction grading extends nearly to the property line on all
sides of the parcel . The silt fence is to be constructed just inside
the property line.
II.
SEQUENCE OF CONSTRUCTION
1 . Install silt fence around site perimeter.
2. Clear and grub trees and shrubs.
3. Remove topsoil where found on the western
portion of the site. Stockpile topsoil at
the location shown on the plans.
4. Topsoil stockpile shall be mulched or seeded
as specified for temporary vegetative cover.
S. Grade and install anti-tracking aprons.
b. Begin construction of building foundation.
7. Rough grade site.
8. Begin installation of site utilities.
9. Finish building foundation and site utilities.
10. Finish grade and install parking lot binder
and curbing.
11 . Install loam and seed.
12. Remove silt fence upon stabilization of soil.
13. Install landscape plantings.
III.
The proposed development will have 74% impervious coverage. The
balance of the site t29,850 ft ?maybe covered with 4" of topsoil
from the stockpile in the area shown. This stockpile would measure
40' x 80' and be 4.25' in height with 2:1 side slopes
Sin r l
Steven R. Colbath - - - -
Project Engineer
1170 Ellington Road (Route 30), South Windsor, CT 06074 • (203) 644-4795
C �
a
ti
y Town o-P SpatA ?Aezd4at
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
f��soe•CO AREA CODE 203/644-2511
November 4, 1988
TO: John M. Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Ccission
FROM: Michele R. Lipe, Assistant Planner
RE: Application #88-100P, Bidwell Industrial Commons - IWA/CC
permit for the construction of a industrial building
located on the north sde of Bidwell cul-de-sac and
northwesterly of John Fitch Boulevard, I zone.
DOCUMENTS REVIEWED: Application Form and site plan
COMMENTS
1 . This plan is for conservation approval. Certified soils
scientist, John Ianni, verified that there are no wetlands on
the site.
2 . The silt fence as shown is inside of the grading. There should
be a reasonable space between the silt fence and the limit of
construction.
3 . It is a sandy soil site and it appears that topsoil will be
brought to the site. Is the size of the stockpile area adequate
for to the amount of topsoil being brought on-site?
4 . There is no sequence nor narrative for the conservation plan.
IF APPROVAL IS CONSIDERED, SUGGESTED APPROVAL CONDITIONS:
1 . Limit of construction/grading should be shown on the plans .
2 . A sequence and narrative should be provided.
3 . A bond should be established.
4 . A contact person should be listed.
�tpWN d�r,,�
1540 SULLIVAN AVENUE SOIJJH WIINDSOR�j ON 14
R CON
ARfA8��"2U3647X511�9�
Steven Turner
Leonard Schwartz
237 Hopmeadow Street
Simsbury, CT 06070
RE: Application #88-100P - Bidwell Industrial Commons
Gentlemen:
At the November 21, 1988 meeting, the Inland Wetlands
Agency/Conservation Commission approved with modifications
Application #88-100P - IWA/CC permit for the construction of a
industrial building located on the north side of Bidwell cul-de-sac
and northwesterly of John Fitch Boulevard, I zone.
The following modifications must be adhered to for this permit to be
valid:
1 . Black and white transparent mylars of sheets # 3 & 4 with the
above modifications and this letter reproduced thereon
together with two blueprint copies of the entire set of plans,
must be submitted to this Commission to be stamped and signed.
This must be completed and reviewed prior to any construction
activity on the site.
2. Construction activities shall be subject to the approval of
the Town Engineer.
3. The application shall indemnify and hold harmless the Town of
South Windsor against any liability which might result from
the proposed operation or use.
4. We recommend a bond in the amount $2500.00 to be submitted to
the Planning and Zoning Commission to ensure compliance with
the erosion and sedimentation control measures.
5 . The permit if valid for one year and shall expire October 24,
1989 .
6 . All approvals required must be- obtained and submitted prior to
any activity on the site.
7 . A contact person shall be identified directly on the plans.
8 A pre-construction meeting must be held with Town Staff prior
to construction.
9 . A sequence and narrative should be provided.
10. Open areas are to be mulched.
Very truly yours,
John M. Moran, Jr , airman
Inland Wetlands A ncy/
Conservation Commission
JMMJr. /pmm
Enclosure
cc: A.B. Davies, Deputy Town Engineer
Marcia Banach, Director of Planning
John R. Collins, Chief Building Official
Michael Gantick, Director of Public Works
Raymond Hallowell, Chairman, Planning & Zoning
r co
Town apsoa& 701
a
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
����soR•co�'`�w AREA CODE 203/644-2511
11 January 1989
Design Professionals, Inc.
1170 Ellington Road
South Windsor, CT 06074
Attn: Peter DeMallie
re: Appl. 88-100P, Steven Turner & Leonard Schwartz Site Plan
Bidwell Industrial Complex
Lots 6 & 7 J.E.S. Industrial Park
Gentlemen:
We are pleased to advise you that the Planning and Zoning
Commission voted at its January 10, 1989 meeting to approve the
captioned application for a site plan of development in accordance
with Drawings 1-5 of 5 dated 9-21-88, revised through 12/16/88,
prepared by Design Professionals, Project No. 88-304, and Drawings
L-1, A-1, and boundary survey, and with the following
modifications:
1 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
2 . No building permits will be issued until the final mylars
have been filed in the Town Clerk's Office. .
3 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission,
including a bond in the amount of $2500 .
4 . An as-built plan is required -prior to issuance of a
Certificate of Occupancy per Section 4 . 13. 10 of the Zoning
Regulations .
5 . A landscape bond in the amount of $10,000 is required and
must be submitted prior to filing of mylars .
6 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
Design Professionals , Inc . -2- 11 January 1989
7 . Parking is prohibited on Town streets. If at any time the r
provided parking proves inadequate, additional parking must
be provided on site.
8 . Plot plan must be revised to .reflect parking/dumpster
modifications shown on topographic map.
. 9 . Increase height of shrubs at planting.
10 . Limits of construction should be shown, as grading along
property lines appears tight; 73 contour is needed between
road and west parking area.
11 . More spot elevations are needed along parking areas,
especially in corners . Contour 72/73 grade at the
northeast corner of the building may be a problem.
12 . Drainage is subject to Town Engineer's approval.
13 . Map legend noting existing iron pins/iron pins to be set
should be shown on plot plan.
14 . Correct data block to 65% impervious coverage allowed (ZBA
letter required on plan to permit 74%) .
15 . Remove the word "temporary" from dumpster pad detail.
Black and white transparent mylars of Sheet#2 with the above
modifications, together with three blueprint copies of the entire
set of plans, must be submitted to this Commission within 30 days
to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND- ZONING COMMISSION
Raymond F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
'Registrar of Voters
•/'Inland Wetlands Agency/Conservation Commission
PZC File
Applicant
i OwN SC4
t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�1oSOR-CO AREA CODE 203/644-2511
September 18, 1989
Design Professionals
1170 Ellington Road
South Windsor, Ct 06074
Dear Madam/Sir:
Re: Application #88-100P - Bidwell Commons
Application #88-96P - Fastener Specialties
This is a reminder that the permits with the Inland Wetlands
Agency/Conservation Commission, Application #88-100P and
Application #88-96P will expire on November 21, 1989
If you plan to extend your project beyond the above expiration
date, the Agency requires a letter requesting extension together
with a fee of $25.00. This should be submitted 30 days prior to
the expiration of the permit.
In the event that you are requesting an extension, Section 4. 13. 6
of the Zoning Regulations (a copy enclosed) , establishes the
criteria for a conservation plan and a method of monitoring its
effectiveness. A permit for your proposal was granted, with a bond
as assurance of compliance with its sedimentation and erosion
control measures. To assist in the review process by the IWA/CC,
whether for a permit extension or specific inquiry request, the
provisions for verification through progress reports by the
developer's/applicant's Engineer demonstrating that each Erosion
and Sedimentation control measure has been installed and maintained
in accordance with the approved plan, shall be required.
This verification report must be submitted 30 days prior to
expiration date of the permit to allow time for the Commissioners
to evaluate your project controls.
If work has been finished or will be finished by the expiration
date, please have an engineer send a letter stating work is
completed according to the approved plan.
If you have any questions, please contact Phyllis Mann or John
McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253)
ry truly ours,
vet_
Lombardi, Actin
Inland Wetlands Agency/
Conservation Commission
JL/pmm