Loading...
HomeMy WebLinkAboutSite Plan - Conservtion (9) ,r 't TOWN OF SOUTH WINDSOR 4� . INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION APPLICATION DATE RECEIVED / INSTRUCTIONS 1. The application, map and plans must be submitted in triplicateA. together with the fee set forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South Windsor. (See Regulations, Section VI). 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be reviewed with respect to the standards and criteria for application evaluation. (See Regulations, Sections VIII - R). 9. The applicant understands that this application is to be considered complete only when all information and documents required by the Agency have been submitted. (See Regulations Section VII). A. APPLICANT'S NAME JFI Associates, Inc. ADDRESS P.O. Box 1061 South Windsor, CT 06074 PHONE: (HOME) 289-7662 (WORK) 289-7662 B. LEGAL OWNER'S NAME: JFI Associates, Inc. ADDRESS P.O. Box 1061 South Windsor, CT 06074 PHONE: (HOMk) 289-7662 (WORK) 289-7662 (List additional owners, addresses, and phone numbers on back of application). C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY OWNERS) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION. D. PROJECT NAME: (if any) Cornerstone East 1. Contact Person(if further information is needed). Ragmnnd ,T_ Al Px ndcsr 3. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES MAP. Northeast corner of the intersection of Sullivan Avenue .and Commerce Way, West of Fire House #3 . PAGE 1 - e F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET IF NECESSARY) � Daniel`.and:.- Marie .Onofrio, Frank and Charlene Smith, !T Town of South Windsor, John Schweir Sons, Inc. j G._ HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS PENDING BEFORE THE AGENCY?. yes **(You are required to supply a copy of the letter with the list of the names of the abutters).** *See F. Above. H PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACTIVITY($) INCLUDING AMOUNT AND TYPES OF FILL AND THE TIME ELEMENT INVOLVED: 1. Conservation Plan_:Approval _. _2., Fill .to provide municipal access_.to.:_culvert _ (9,5Q0C_a. ) :.c1 an . FILL.. #.. Stabilize drainage swale bed 130 c..y:___Rp_ Rap 1 A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1"-401, SHOWING THE AREA TO BE DEVELOPED, EXTENT OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES AND NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED. J;- ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: Swale 0.8_Acres. E:-ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED: n/a L: LINEAL FEET OF PROPOSED STREAM ALTERATION Swale stabilization 280 ,.F. M: TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS: 3 2541 Acres _ 0% Wetlands N: IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIRED WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN 'THIS APPLICATION. (These may include but not be limited to, local Planning & Zoning, Zoning Board of Appeals, D.E.P. , F E.M.A., D.O.T. , The Army Corps of Engineers, and any other States Local or Federal Perilts.) STC Permit- Granted PZC Site Plan of Development- Pending ,0: THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCATION/S 1 Sullivan Avenue 2. Commerce Way by Joseph F. Luzzi NAME Raymond .J.. :Al-exander ON OR BEFORE ;8VFbLLO1TIN eb. 6t 1989 SIGNATURE: THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED MEETING. (See Regulations, Section 6.3a). PAGE 2 f TAE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR A"INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AND 000VIRMS THAT: 1.. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE INLAND WETLAND, WATERCOURSES AND CONSERVATION REGULATION$ OF THE TOWN OF SOUTH WINDSOR'. 2. HE/SHE.UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATRRCOURSES IN -QUESTION AND/OR ANY PROPOSED ACTIVITY. 3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN . THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, 'OR PERFORMANCE EXCEEDING THE LEVELS OF ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF'A�IY PERMIT UNDER THESE REGULATIONS 4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND, WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE-T6 ENTER THE PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE PURPOSE OF INSPECTION AND INVESTIGATION AND OTHSRWISE EVALUATING THE 48RITS OF THE APPLICATION BOTH BEFORE AND AFTER A'FINAL DECISION'HAS BEEN ISSUED. JFI Associates, Inc-. Raymond J. Alexander Sipature of Applicant._ _ _. _. _ _ Date C: _ ReFeived grA filed at the of ice of the Planning Department this - day of �-�c 19 ._. Signature 6f Agent Dote tk�t�r?ktk$tktir'kalt tk fir yirtklktk tk�ktk**�Ir�irietktk*'k7k�itieylnktktk tk*lk7ktktktlt7kaktkl4tktk1ktk7UtktMtktk'ktktktktk sir tktktk tktk'ktk7ktktt lk�r+ktkvktktktk*#'1ktYtk'k#tk�r7ktktk • FEE RECEIVED YES t-'NOR AMOUNT O-p ITE RECEIVED #!ARING DATE HEARING ADV. (1) (2) PPMIT GRANTED DATE PERMIT DENIED DATE PAGE 3 j F I As date al Inc. P.O. Box 1061 t South Windsor, CT 06074 (203) 2W7662 CERTIFIED MAIL January 23, 1989 Mr.& Mrs . Daniel . Onafrio 48 Commerce Way South Windsor , CT 06074 RE: John Fitch Industrial Centre Lots 9 & 10 , 20 Commerce Way, Cornerstone East Dear Property Owner: 0 Monday evening, February 13 , 1989 , at 7:30 p.m. the South Windsor I�and Wetlands Agency/Conservation Commission will hold a public meeting to receive and discuss an application from JFI -Associates, Inc. for a site development plan for the referenced location. As an abutting property owner, you are invited to this public meeting for comments . However, you are not required to attend this meeting. Shoulgd'you ba'6e questions concerning this application, please contact. the office of the Inland Wetland Agency/Conservation Commission at 644-2511, Ext. 253. Sincerely, Raymond J. Alexander RJA/i ba j F 1 bas P.Q. Box 1061 South Windsor, CT 06074 (203)2W7662 CERTIFIED MAIL January 23, 1989 Mr.& Mrs . Daniel Onafrio 48 Commerce Way South Windsor, CT 06074 RE: John Fitch Industrial Centre Lots 9 & 101 20 Commerce Way, Cornerstone East Dear Property Owner: Oh Monday evening, February 13 , 1989, at 7:30 p.m. the South Windsor �nland Wetlands Agency/Conservation Commission will hold a public meeting to receive and discuss an application from 'JFI Associates, It:c. for a site development plan for the referenced location. As an . abutting property owner, you are invited to this public meeting for comments.' However, you are not required to attend this meeting. Shoul-d4you ba'we questions concerning this application, please contact the office of the Inland Wetland Agency/Conservation commission at 644-2511 , Ext. 253. Sincerely, Raymond J. Alexander { RJA/iba JFI ASSOCIATES, INC. CONSERUATIOH NARRATIVE 8a DRAINAGE COMPUTATIONS h FOR CORNERSTONE EAST 20 COMMERCE WAY LOTS 9 & 10 Jtlltt>e J XlMi CONSULTING ENGINEER LAND SURVEYOR SUBDIVISIONS 412 WEST AVON ROAD, AVON, CONNECTICUT 06001 SURVEYS PHONE 673-0446 SITE PLANNING LAND EVALUATION DRAINAGE STUDIES SANITARY SOIL EROSION AND SEDIMENT CONTROL PLAN Lots #9 & #10 Commerce Way Narrative January 1989 A. OVERVIEW: The project is a 22,000 sq. ft. multi-tenant industrial building on a 3.2541 acre parcel. The project site is located on lots 9 & 10 of the John Fitch Industrial Centre Subdivision, Phase I. The parcel is rectangular approximately 360' x 400' and generally flat. The northeast corner of the parcel falls away to a drainage Swale that enters a 54" concrete culvert that passes into the project's comprehensive storm water detention basin. SOIL TYPES; The south 80% of the parcel is well drained soil, (WvA- Windsor Fine Sandy Loam w/ 0-3•� slope with a small area of NnA- Ninigret Fine Sandy Loam w/ 0-3% slope). The remainder 'of the parcel is fill material from previously granted permit (Made Land) . VBGETATION, The parcel is generally open field. The Sullivan Avenue frontage contains a number of trees, (plotted on Conservation Plan), that are incorporated into the Landscaping Plan. The east side of the parcel contains various vegetation ranging from bushes and vines at the edge to 12" diameter trees farther into the woods. The site contains no wetland type soils and it is not located in a flood plain. However, as part of this site development, we are providing stabilization to the bed of the existing drainage Swale. As part of the stabilization system we will be modifying the existing culvert system to provide for a reduction in- stream erosion. B. SCOPE: This project consists of the construction of a 22,000 sq. ft. multi-user building area with its required utilities and storm drainage system on the 3.2541 acre site. Of the 3.2541 acre area in this parcel, this project will entail the disturbance of approximately 2.84 acres on 871/6. Fill area shown is approximately 2,900 sq. ft. or 5% of the site The area of tree and brush to be removed is approximately 8,900 sq. ft or 15% of the site. EXISTING } FROM "TO DRAINAGE AREA TIME RAINFALL' DISCHARGE LENGTH SLOPE SIZE OF MEAN PIPE CAP ' INTENSITY Q OF OF . PIPE VELOCrn FLOWING COMMENTS A A C A C A I C A . A t 1 t t PIPE PIPE FULL I ACRES ACRES ACRES MINI MIN& IN./HR. C.F.S. FT. FT./FT IN. F P S:•. .C.F.S. C tr B' Flo 100 I.o% w G t.�. !✓$ C$ Q2� O.S -I•Z .3S I .be J$•� I='law �o cg n o.G so 7-0 c k G'3 C c— C$ `/ S` 0'S3 o.1cis a a 15� 9 Z �.$ tPQ I.O� Is Flow to OcJ e�' 0. 11 O.g b.0 1.30 8 S', 0 7 o o k cis ,. .40 .yo 6 g 2.3 �.�� � Via. 4 -�� o1C, Luzzq- 412 AVO I ROAD c Mal d . • LUZZ1 ENGINEERING & SURVEYING Sheet 1 _ Of . Project D�-a� yei�ri �- - ---� Date_Oc Al 117 1,0 O�'�1+1 { 4I I ' / I 10* OV ta -� •� j # -ICI , 71 w; T 00 III ' l ; ir I , - , I , III + � I ( I :I � � � � • . � ' ; ' �h�; - I � '.' II '• ! � I � { # { •! �.' I. I I ! t � , � I I I I I I i i � ._1��. '... 1. '., ,. ; _ - •�... . . : LUZZI ENGINEERING & 'SURVEYING Sheet Of _ Project i J ra,, B ssot►� �i�._ Date cgs ly F•I.: ` ! III II I iu FLON J. 000 i 1 _ _ � i ff r '`.n - - - �. I ' �, I ! I I i .'ri ) ! � ! I I ; `I. I I I }• ! I � I ' I•) � 1 � I II Ii � I1II � � i i I ' _ — I I ' i li IIiIII I1t � i ! tII + I �Sa ;�wr , , i - ! I I I r •' �., � - I- I � ii � ! , )_;:Ii III.I III 1 ' t i 1iI . , • - I I I. tl'J"��.• �' _. _..... .. I I i I- I i .I , I i i 1 , I,I I I ! ' I 4 - - - - ..III .� ; I ► Ill , i I , : il , I i li IIII . I ' —I� i ! i . II:.� � ) I � .) j ! Ii II• •I a l _iill � � il i . , I ; r ..-�-.1. . � ,• .,:, 1i � Ii , ! II' � I , II � IIII. 1 , . � I , . : � , r , , LUZZI ENGINEERING & 'SURVEYING Sheet 3. Of Project_ 9r*\,r, S7).� �.' Asn��,��,�c C Date Dec- [A Y I ���, r�i A,• ----•- ,_ _ _._._ ;���i iT00 _ r T.I , t I , f jj , :. ..... ,.- I ' • f l �.. , I .I. - I , { I I + 4. „ I -i I �_.. _ -4[.4 I r I'I ! i i l •I t i�_ NJ i I I -i - I ,J i i+ I , rill I ( � � I LI• � I i I i' I I I ; ( , Ifi � Y I i �i� , I I I I I .. i r ( i -,l• I i i I i ( I . I , I , , _ I ,• 1 t' 1 + ' - I , ; r ; , ' I , i II i , l�.l , l• � i � � l II :) � ;:i ; i � ; + ; j ' � � � + i �llii• i , f S fP 1' RE: Preconstruction Meeting - IN ATTENDANCE Name Company/Address Telephone # r. The ,following is a brief summary of points discussed during the meeting. Public Works` 1 . All erosion and sedimentation control measures are to be in place prior to earth moving operations in each area and maintained/cleaned out during construction. Call Zoning/Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 2 . Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs. 3. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a) after site is staked out b) all drainage work c) Preparation of subgrade, compaction tests as required by the Town. d) Preparation of subbase, six (6) inch lifts e) Placement of bituminous concrete, 1 1/2 inch layers. 1 •- e5 �'t-� r r��re Ce1��2�,ti,� w we C yn ti 4 . Certification of gravel used as subbase will be required by an approved testing company. 5 . N�� No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. As built plans are to include horizontal and vertical _ location of all underdrains footin drains and sanitary 'W ? sewers located by a certified land surveyor. Progress �h�nr�e .sanitary sewer as-builts required prior to gravelling of co road. 7 . All topsoil stockpile areas to be protected (ringed with haybales or equal) . 08 . `t All pipe and structures to be backfilled with free draining vs material, compacted in maximum one foot lifts with approved NO g�� compaction equipment. 9 . During construction of the road/driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Calcium chloride is ed for dust control as required. O 'R���rc�✓�►, 10. Any problems and/or questions regarding construction of this project will be directed to in the field. 2 11 All filling to be done in accordance with Department of Transportation specifications . To be compacted in maximum lifts and tested as necessary. 12 . Weekly job meetings will be held as needed. 13 . Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days ) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy. 14 . Only approved copies of lot site plans to be used. Any proposed changes are to be presented to Engineering/Planning Department prior to implementation on change sheet. 15. DOT Permit needed for all work within state road. Copy to the Planning Department. D6 . No paving after October 15 without written approval from Director of Public Works. 17 . Hours of operation 7 :00 A.M. - 5:00 P.M. , no work on Sunday. Any pipe/structure work requires inspection prior to _ b kfilling. �-�1�a�dtcJx.l1S 18 . S�TF zsS 19 . cv.tJ 20 . w -Arm-440KrC-i, 21 . 22. Planning Department: 1 . 2 . W.P.C.A. 1 . 2. SNET/NU 1 . Contact utilities for coordination of utilities connection. IWA/CC 1. 2. Fire Marshal 1. Blasting (if required) to be coordinated with the Fire Marshal. Police Department: 1. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 2. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. 3. Barns, garages and outbuilding which are located on the s imme premises as a numbered structure are excluded. 4 . Erect temporary sign on the site during construction identifying the project. 5 . If an alarm is to be installed contact the Police Department. Building Department: 1 . Plan review with Building Official/Fire Marshall required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, Marcia A. Banach Director of Planning MAB/pmm cc: Jerry C. Iazzetta, Town Engineer A.B. Davies, Deputy Town Engineer Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Minh V. Le, SNET Hal Clisby, CL&P John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning Enforcement Officer r �So.NN sf,`co c � s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 ii Pw flosOR-CO AREA CODE 203/644-2511 February 9, 1989 TO: John M. Moran, Jr. , Chairman, Inland Wetlands Agency/ Conservation Commission FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer Pv/ RE: Application #89-07P JFI, Cornerstone East - Conservation Approval for the construction of an industrial subdivision located on the northerly side of Sullivan Avenue, I zone. DOCUMENTS REVIEWED: Application form, site plan and drainage computations. COMME�4S: 1 . `Although there are no wetlands soils on the site, the proposal includes alterations to the stream channel. This includes rip- rap along approximately 2501 , upstream of proposed development. 2. Tree protection should be provided for trees that exist along the easterly property line. Although most trees will be cut down for parking, a limit should be established prior to cutting. 3. The rip-rap channel detail appears somewhat generic and should be modified to the existing site and slopes . 4 . The plan should include cleaning the detention basin downstream as necessary thoughout the time of construction. The detention basin to be used should have approval by the Town Engineer. 5 . The conservation plans show no erosion and sedimentation controls for the actual development site. The sandy soils of this area are easily windblown. 6 . Identify how access to the stream channel will be accomplished. Necessary rights must be obtained prior to construction activity. It appears some work may take place on Town property. There should also be a sequence of construction for the stream stabilization. This should include the time of year the stream stabilization will take place. r 7 . Phasing the project would be beneficial. The construction sequence has building construction and culvert activities happening concurrently. 8. Limits of construction should be indicated on the plans. IF APPROVAL IS CONSIDERED, SUGGEST APPROVAL CONDITIONS INCLUDE: 1 . Tree protection should be indicated on the plans for the easterly property. 2. Show adequate erosion and sedimentation for the actual development site. 3. Phase the project to reduce the activity taking place at one given time. 4 . Necessary rights to work must be obtained prior to construction activities . 11 5 . lA sequence of construction should be indicated on the plans for stream stabilization. 6 . Limits of construction should be indicated on the plans . j F I Associates, Inc. P.O. Box iosi D South Windsor, CT 06074 (203) 289-7662 MAR 17 19K South Windsor INLAND WETLANDS AGENCY1 March 3 , 1989 CONSERVATION COMMISSIO* Mr. John M. Moran, Jr . , Chairman Inland Wetlands and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE : Cornerstone East , 20 Commerce Way Application #89-07P Dear Mr . Moran: We ,are writing to address the application review, for the referenced application, presented to us at the February 27, 1989 meeting of your agency. Subsequent to the receipt of the comments , we met with Mr. McCahill, Marcia Banach and Michael Gantick for a plan review. We believe we have made the necessary accommodations , either by explanation or by plan modification, to satisfy the concerns expressed in Mr . McCahill 's review. If you have any questions concerning this please contact us . Sincerely, Raymond J. A ex er RJA/iba cc: John McCahill SAWN 8E� oR To� O-Psa� ?d G U ' a s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �osoR-CO AREA CODE 203/644-2511 April 19, 1989 JFI Associates, Inc . P.O. Box 1061 South Windsor, CT 06074 RE: Application #89-07P - Cornerstone East Dear Madam/Sir: At ,the April 17, 1989 meeting, the Inland Wetlands Agency/Conservation Commission approved with modifications an IWA/CC permit for the constriletion of an industrial subdivision located on the northerly side of Sullivan Avenue and the easterly side of Commerce Way, I zone. This approval is based on plans prepared by Luzzi Engineering & Surveying, 412 West Avon Road, Avon, CT dated 5/88 and revised 3/7/89 . The following modifications must be adhered to for this permit to be valid: 1 . Black and white transparent mylars of sheets # 4 of 5 with the above modifications and this letter reproduced thereon together with two blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or -use. 4 . We recommend a bond in the amount of $10,000 to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on April 25, 1990 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A contact person shall be identified directly on the plans. 8 . Municipal access to culvert. 9 . Tree protection should be indicated on the plans for the easterly side of the property. 10 . Include narrative or plans for adequate erosion and sedimentation for the building construction site. 11 . Phase the project to reduce the activity taking place at any given time. 12 . A sequence of construction should be indicated on the plans for stream stabilization. 13 . Limits of construction should be indicated on the plansq Very truly yours, John M. Moran, Jr. , C irman Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm Enclosure cc: Jerry Iazzetta, Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Official A. Bowen Davies, Deputy Town Engineer Raymond Hallowell, Chairman, Planning & Zoning Luzzi Engineering & Surveying 412 West Avon Road, Avon, CT 06001 J F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 D (203) 289-7662 )UN 9 1999 June 9 , 1989 South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMM1SS10N Mr. John M. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: John Fitch Centre, Phase II Lot 9/10 , 20 Commerce Way, App. #89-07P Cornerstone East Deax Mr. Moran: Attached, for signature and stamping, you will find plan sheets as required by the April 19 , 1989 approval letter for the referenced project . The attached are: Quantity (1 ) Black and white transparent mylar of Sheets #4 & 5 (2) Blueprint copies of the entire set S ` ely, Raymond J. Ale der RJA/iba cc: John McCahill attachments � w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l�os0R•co� AREA CODE 203/644-2511 -- _ February ,14;_ 19 9 0 JFI Associates P.O. Box 1061 - - - - - - South Windsor, CT 06074 , Dear Madam/Sir: Res Application #89-07P Cornerstone East This is a reminder that the -permit with the Inland Wetlands Agency/Conservation Commission, Application >#89'-07P will expire on April 25, 1990 . If you plan to extend your project beyond the' -above expiration date, the Agency requires a letter requesting_ extension together with # fee of $25,00. This should be submitted 30 days prior to the expiration of the permit. In the event -that you are requesting an extension, Section 4 . 13 . 6 of the Zoning Regulations (a copy enclosed) , establishes the criteria fora conservation plan and a method of monitoring its effectiveness . A permit for your proposal was granted, with a bond as assurance of compliance with its , sedimentation and erosion control measures. To assist. in the review process by the IWA/CC, whether for a permit extension or specific inquiry requests the provisions for verification through progress reports - by the developer's/applicant's Engineer demonstrating that each Erosion- and Sedimentation control measure has been installed and maintained in accordance with the approved plan, shall be required. This : verification report must " be submitted 30 days prior to expiration date of the permit to allow time for the Commissioners to evaluate your project controls. If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan. If you have any questions, .please contact Phyllis Mann or John McCahill, Zoning/Wetlands Enforcement Officer. (644-2511 Ext. 253) V ry truly y rs, mes Lomba�Chairmaf Inland Wetlands Agency Conservation Commission JAL/pmm Enclosure j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 March 5 , 1990 Mr . James Lombardi , Chairman Inland Wetlands Agency and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor , CT 06074 RE: Application #89-07P - Cornerstone East - 20 Commerce Way Dear-, Mr . Lombardi: This to advise you on the status of the referenced application. While the site construction for the actual building has not yet begun, the swale stabilization portion of the application has been substantially completed. All erosion and sedimentation control facilities were erected prior to the construction activities and have functioned successfully. These facilities will remain in place until the disturbed areas establish the permanent ground cover. An extension of the existing permit is required. If you have any questions concerning this matter please contact me at your convenience. Sincerely, Joseph F. Luzzi , P.E. Supervising Engineer RJA/iba cc: John McCahill j F I Associates, Inc. P.O. sox 1061 South Windsor, CT 06074 (203) 289-7662 DVV March 6 , 1990 MAR 149n South Wi iidsor INLAND WETLANDS AGENCY/ Mr. James Lombardi, Chairman CONSERVATION COMMI5$IAM Inland Wetlands Agency and Conservation Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Cornerstone East, 20 Commerce Way Application #89-07P Dear Mr. Lombardi: This is a request for an extension of our existing permit for the referenced application. Our permit is due to expire on April 25 , 1990. With this letter of request for extension, you will find our check #1883 for $25 .00 and a progress report by our su si engineer . Further, at this time, we request tha the existing bond of $10,00 be reduced to $5 ,000 . You may recall t at this site contains no designated wetlands , however, becaus of its proximity to a sto water culvert we included the swale tabilization as part of e' application. As indicated in the let r from the superv' ' g engineer, the stabilization work is sub ete. The remainder of the permit then is for a conservation plan which has generally carried bond amounts of between $2,000 and $5 ,000. If you have any questions concerning this please contact us . Si ere 1 N Raymon J. Ale r 6 K �o RJA/iba � `" Dge02 .10 cc: John McCahill <0,0 a f, 0 �~ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �f�4soInt C � AREA CODE 203/644-2511 March 22, 1990 JFI Associates P. O. Box 1061 South Windsor, CT 06074 Dear Madam/Sir: Re: Application 89-07P - Cornerstone East At the March 19, 1990 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of App1i bation #89-07P with all original conditions. Application #89-07P becomes effective April 25, 1990 and expires on April 25, 1991 . Very truly yours, 1-4 mess A. Lombardi, Chairman Inland Wetlands Agency/ Conservation Commission JAL/pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure J F I Associates, Inc. P.O. sox 1061 9;tr1A21yE South Windsor, CT 06074 [:1 (203) 289-7662 FEB 1 1991 South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION February 12, 1991 Mr. John E. McCahill Zoning/Wetlands Enforcement Officer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application# 89-07P - Cornerstone East Dear John: Thank you for the reminder of our permit expiration for the referenced project. At this date we have completed the stabilization project for the existing drainage swale/culvert, however, owing to the current economic crisis that exists in our state we have not utilized the project',a.: conservation plan. In view of existing economic conditions, we request that the Commission waive the expiration provisions of its regulations and allow for additional extensions for approved permits. At no small expense, this project has received all required municipal approvals and permits, including a building permit, and ,all bonds have been filed. For this reason we will be soliciting the assistance of the Director of Economic Development, John Shemo to obtain emergency relief from the Town regarding expirations of permits during this crisis. We trust that the Inland Wetlands Agency/Conservation Commission recognizes the impact of its permit process on the viability of projects such as this and will be sympathetic to it in the context of the current economic climate. Sincere Raymond Alexander RJA/iba ��cP i r tS cc: John Sherno 4 zs�g tcw" SEA a F 70-Wn 071e s,Otd. ?vt ev 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 < 4, r��soR•ca� AREA CODE 203/644-2511 February 26, 1991 Raymond J. Alexander J.F. I. Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 Dear Ray: Re: Application #89-07P, Cornerstone East At the February 25, 1991 regular meeting the Inland Wetlands Agency/Conservation Commission discussed your letter, dated February 12, 1991, requesting that the Commission waive the expiration provision of its Regulations and allow for additional extensions for approved permits. Although the -Commission is sympathetic to you, and others like you, who ar__e struggling with today' s difficult economic climate, they do not feel there is a provision for the waiver you have requested. The cost of reapplying is actually fairly minimal and includes; the $100 . 00 application fee, submission of a new application form, and proof of notifications (by certified mail) to abutting property owners . As the site is idle at this time, no Engineer's report will be necessary and the plans, which are currently part of the file, can be stamped with the new date of submittal. In addition, you will not be required to make a formal presentation before the Commission. I would also like to say that the Commission is aware of the concerns that have been focused on the permit duration and extension process and has been in the process of addressing this through proposed changes to the Regulations . During the past year I have been meeting with the Regulations/Bylaws Subcommittee with the result that the Commission will hopefully go to public hearing, tentatively set for April 15, 1991, to adopt several changes to the Regulations . This, if adopted, would include a three year permit duration with an easier process for extensions . Please feel free to call me for clarification of what should be submitted for renewal of the permit of application #89-07P, or to discuss proposed changes to the Regulations . Mr. Raymond Alexander Page Two February 26, 1991 Very truly yours, ci� J hn E. McCahill Zoning/Wetlands Enforcement Officer JEM/pmm cc: Elizabeth W. Warren, Chairman, IWA/CC John Shemo, Economic Developer r i J F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 MAR 14 1991 TO South Windsor INLAND WETLANDS AGENCY/ March 12, 1991 CONSERVATION commlSSioi#F Mr . John E. McCahill Zoning/Wetlands Enforcement Officer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application# 89-07P - Cornerstone East Dear John: Thank you for your letter of February 26, 1991 concerning the reapplication for a wetlands permit for the referenced project. Based on the information you have provided us, we are herewith, making the required application. At this date we have completed the stabilization project for the existing drainage Swale/culvert, therefore, our application is for Conservation Plan approval . Attached,- you w-ill find our application in triplicate, proof of notification of abutters and the application fee of $100 . 00, (JFI check #2253) Sincerely, Raymond J. nder RJA/iba attachments 4WwN 8f4 O F 70-U"-Z O-P IS-�tz.;1% V&-ti&lot 9 �C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•ca AREA CODE 203/644-2511 April 9, 1991 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 Dear Madam/Sir: Re: Application #89-07P - Cornerstone East At the April 8, 1991 meeting, the Inland Wetlands Agency/Conservation Commission approved with original and standard conditions Application #89-07P - conservation plan approval for the construction of industrial buildings located on the northerly side of Sullivan Avenue I zone; as shown on plans prepared by Luzzi Engineering & Survey Lng, #88-10D and dated May 1988 and revised March 7, 1989 . 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expire on April 25, 1992 . 5 . All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans . 7 . All original approval conditions shall apply to this approval per approval letter dated April 19, 1989 . JFI Associates, Inc Paste Two April 9, 1991 Application #89-07P Very truly yours, 72� x Elizabeth A. Warren, Chairman f Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning Planning & Zoning Commission r j F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 � (203) 289-7662 MAY 7 1991 :South Windsor May 6 , 1991 :INLAND WETLANDS AGENCYt 1CDNSERvA'r10N-commission Mr . John E. McCahill Zoning/Wetlands Enforcement Officer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application# 89-07P - Cornerstone East Dear John: With this letter JFI Associates , Inc. is withdrawing its Inland Wetland Agency/Conservation Commission Application #89-07P and relinquishing its accompanying wetlands permit and conservation plan appro �1 . This unfortunate action is the result of the overwhelmingly negat�%e financial and economic conditions that exist in the region. A sia:rlar letter has been sent to Marcia Banach relative to our PZC approvals . If you have any questions concerning this matter please contact us . S ' , Raymond - . ,A xander RJ a l V� W J F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 �. MAY 8 May 7 , 1991 South Windsor Planning & Zoning COMMissiW Mrs . Louise C. Evans , Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application #89-07P, Cornerstone East Dear Mrs . Evans: This "is to state our understanding that the referenced application will remain in effect for five (5) years from the date approval. [However , it is our further understanding that no building permit will be issued for the project until all required landscape and wetlands/ conservation plan bonds have been filed with the Town of South Windsor. The aforementioned is in lieu of the request for withdrawal of the application as stated in our letter of May 6 , 1991 . Sincerely; Ila B. Alexander IBA/ra STATE OF CONNECTICUT ) ss: South Windsor, May 7, 1991 COUNTY OF HAR`I'FORD ) Personally appeared Ila B. Alexander, individually and as Corporate Secretary of JFI Associates , Inc. , signer and sealer of the foregoing instrument and acknowledged the same to be her f e act and deed, before me. ComPJ. er the Superior Court Rallexander J F I Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 CERTIFIED MAIL March 11, 1991 Mr . & Mrs . Daniel Onafrio Fasteners Specialties, . Inc. 48 Commerce Way South Windsor, CT 06074 RE: John Fitch Industrial Centre Lots 9 & 10, 20 Commerce Way Dear Property Owner : On or about, April 25, 1991, the South Windsor Inland Wetlands Agencyb,Conservation Commission will hold a public meeting to receive and di-cuss an application from JFI Associates, Inc. for a site cleveloment plan for the referenced location. As an abutting property owner, you are invited to this public meeting for comments. However, you are not required to attend this meeting. Should you have questions concerning this application, please contact the office of the Inland Wetland Agency/Conservation Commission at 644-2511, Ext. 253 . Sincer�ey, Raymond J . Al a der RJA/iba f t r tour N s�� 7 o %WfT O-PSIO� ?V&U/4�0t 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 �I�soR•CO AREA CODE 203/644-2511 January 10, 1992 JFI Associates, Inc. P.O. Box 1061 South Windsor, CT 06074 Dear Madam/Sir: Re: Application #89-07P, Cornerstone East This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, Application #89-07P will expire on April 17, 1992 . If you plan to extend your project beyond the above expiration date, the Agency requires a letter requesting an extension with a fee of $25:00 . Letters requesting extensions shall; 1)include a reference to the documentation and record of the original applications, 2) state the reasons why the authorized activities were not initiated or completed within the time specified in the permit, and 3) describe any changes in facts or circumstances involved with or affecting wetlands or watercourses or the property for which the permit was received. This shall be submitted 65 days prior to the expiration of the permit. In the event that you are requesting an extension, Section 4.13.6 of the Zoning Regulations establishes the process for monitoring the approved conservation plan. Per that regulation, a progress report is required from the applicant's engineer verifying that erosion and sedimentation control measures have been installed and maintained in accordance with the approved conservation plan. A copy of the regulation is enclosed. This verification report shall also be submitted 65 days prior to expiration date of the permit to allow time for the. Commissioners to evaluate your project controls . If work has been finished or will be finished by the expiration date, please have an engineer send a letter stating work is completed according to the approved plan If you have any questions call me or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644-2511 . Ver truly yours, by rinMag Mann RecorSecretary, IWA/CC j F I Associates, Inc. r P.O. Box 1061 South Windsor, CT 06074 (203) 289-7662 d , JAN =3 1992 January 20, 1992 South Windsor INLAND WETLANDS AGENCY/ CONSERVATd0N COMMISSIOM Ms .�' Phyllis M. Mann Recording Secretary, IWA/CC Town of South Windsor 1540 Sullivan Avenue South Windsor,' CT 06074 RE: Application# 89-07P - Cornerstone East Dear Phyllis : Thank you for your letter of January 10, reminding us of the expiration of the referenced permit. Attached, you will find a copy of our letter dated May 6, 1991, effectively withdrawing our Inland Wetland Agency/Conservation Commission Application #89-07P and relinquishing its accompanying wetlands permit and conservation plan approval . - If you have any further questions concerning this matter please contact us. S re'y, r Raym J. Alexander RJA/iba attachment // z,3jyz Cz jlej aA_J • SC4< .l ti s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 CO AREA CODE 203/644-2511 April 15, 1992 ,Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 Dear Madam/Sir: Re: Bonds At the April 13, 1992 meeting of the Inland Wetlands Agency/ Conservation Commission, it was voted to reduce the following bonds: h Application #86-533, Ridgefield IV, reduce amount of bond from $15,000.00 to $5000.00 Application #87-472, Spinner's Estates, reduce amount of bond from $85,000.00 to $5000. 00 It was also voted to release the following bonds: A031.0 9in ount of $5000.00 Application #87-416, Victorian Woods, release the bond in the amount of $2500.00 Very/J truly yours, ,D r rk Elizabeth A. Warren, Chairperson IWA/CC EAW/pmm e cc: Director of Planning Town Engineer