HomeMy WebLinkAboutSite Plan - Conservation (262) n TOWN OF SOUTH WINDSOR
INLAND WETLAND, WATERCOURSES AND CONSERVATION APPLICATION
APPLICATION �. ` DATE RECEIVED
INSTRUCTIONS
1. The application, map and plans must be submitted in triplicate, together with the fee set
forth in the Inland Wetlands, Watercourses and Conservation Regulations, Town of South
Windsor. (See Regulations, Section VI).
2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should be
reviewed with respect to the standards and criteria for application evaluation. (See
Regulations, Sections VIII - X).
3. The applicant understands that this application is to be considered complete only when all
information and documents required by the Agency have been submitted. (See Regulations
Section VII).
JFI Associates , Inc.
A. APPLICANT'S NAME
ADDRESS P.O. Box 1061 75 Commerce Way
South Windsor, CT 06074
PHONE: .(HOME) 644-4955 (WORK) 289-7662
B. LEGAL OWNER'S NAME: J F I Associates , Inc.
ADDRESS P.0. Box 1061 �D
584t.h Windsor, elp 069g4
PHONE: (HOME) 644-4955 (WORK) 289-7662
(List additional owners, addresses, and phone numbers on back of application).
C. IF THE APPLICANT IS NOT THE OWNER OF THE SUBJECT PROPERTY, A LETTER BY THE PROPERTY
OWNER(S) AUTHORIZING THE PROPOSED REGULATED ACTIVITY SET FORTH IN THE APPLICATION MUST
ACCOMPANY THIS FORM AND WILL BE PART OF THE APPLICATION.
D. PROJECT NAME: (if any) 154 Commerce Way
1. Contact Person (if further information is needed).
Raymond Alexander P.O. Box 1061 South Windsor 289-7662
E. THE GEOGRAPHICAL LOCATION OF THE PROPERTY WHICH IS TO BE AFFECTED BY THE PROPOSED
REGULATED ACTIVITIES INCLUDING A DESCRIPTION OF THE LAND IN SUFFICIENT DETAIL TO ALLOW
IDENTIFICATION OF THE PROPERTY ON THE INLAND WETLAND AND WATERCOURSES MAP.
Lots # 37 & 38 Commerce way, John Fitch Industrial Centre, Phase 2
PAGE 1
F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SHEET IF NECESSARY) r
Norris Associates
J & M Grinding, Inc.
William P. and Colleen J.. Green ,
G. HAVE YOU NOTIFIED ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS
PENDING BEFORE THE AGENCY?.
VeS **(You are required to supply a copy of the letter with the list of the names of
the abutters).**
H. PURPOSE AND DESCRIPTION OF ALL PROPOSED REGULATED ACTIVITY(S) INCLUDING AMOUNT AND TYPES
OF FILL AND THE TIME ELEMENT INVOLVED:
No wetlands are involved. This application is for approval of a
conservation plan.
I. A CLASS A-2 MAP OF THE PROPERTY DRAWN TO 1"-409 , SHOWING THE AREA TO BE DEVELOPED, EXTENT
OF THE WETLANDS AND WATERCOURSES AFFECTED, TOPOGRAPH, EXISTING AND PROPOSED ACTIVITIES AND
NAMES AND LOCATIONS OF ADJACENT PROPERTY OWNERS MUST BE SUBMITTED.
J. ACREAGE OF WETLANDS AND WATERCOURSES TO BE ALTERED: 0
4
. 0 w
R. ACREAGE OF WETLANDS AND WATERCOURSES TO BE CREATED:
0
L. LINEAL FEET OF PROPOSED STREAM ALTERATION
M. TOTAL LAND AREA OF PROJECT AND PERCENTAGE WHICH IS WETLANDS: 0
N. IDENTIFY ALL OTHER PERMITS OR APPROVALS THAT HAVE BEEN ISSUED, APPLIED FOR, OR REQUIRED
WITH RESPECT TO THE PROPOSED ACTIVITY SET FORTH IN THIS APPLICATION. (These may include
but not be limited to, local Planning i Zoning, Zoning Board of Appeals, D.E.P. , F.E.M.A. ,
D.O.T. , The Army Corps of Engineers, and any other State, Local or Federal Permits.)
Planning and Zoning, Site Development Plan
0. THE APPLICANT (OR DESIGNATED REPRESENTATIVE) HEREBY ATTESTS THAT A SIGN WILL BE POSTED AT
THE FOLLOWING LOCATIONS 154 Commerce Way
by Ila B. Alexander, Corp. Secretary NAME JFI Associates, Inc.
ON OR BEFORE THE
LOWING DATE:
SIGNATURE: pf- •
THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVE DAYS PRIOR TO SCHEDULED
MEETING. (See Regulations, Section 6.3a) .
PAGE 2
t
THE UNDERSIGNED HEREBY APPLIES FOR THE REGULATED ACTIVITIES LISTED IN PARAGRAPH H ABOVE, FOR
fr A INLAND WETLAND, WATERCOURSES AND CONSERVATION PERMIT FOR THE PROPERTY DESCRIBED HEREIN AND
CONFIRMS THAT:
1. HE IS FAMILIAR WITH THE CURRENTLY EFFECTIVE •INLAND WETLAND, WATERCOURSES AND CONSERVATION,
REGULATIONS OF THE TOWN OF SOUTH WINDSOR.
2. HE/SHE UNDERSTANDS THAT AT ANY TIME DURING THE REVIEW PERIOD, THE AGENCY MAY REQUIRE THE
APPLICANT TO PROVIDE MORE INFORMATION ABOUT THE WETLANDS AND/OR WATERCOURSES IN QUESTION
AND/OR ANY PROPOSED ACTIVITY.
3. ALL INFORMATION SUBMITTED IN THE APPLICATION FOR REVIEW SHALL BE CONSIDERED FACTUAL, OR IN
THE CASE OF ANTICIPATED ACTIVITY, BINDING. A KNOWING FAILURE OF THE APPLICANT OR ANY OF
HIS/HER AGENTS TO PROVIDE CORRECT INFORMATION, OR PERFORMANCE EXCEEDING THE LEVELS OF
ACTIVITY ANTICIPATED, SHALL BE SUFFICIENT GROUNDS FOR REVOCATION OF ANY PERMIT UNDER THESE
REGULATIONS .
4. BY MAKING THIS APPLICATION, THE APPLICANT GIVES PERMISSION TO THE INLAND WETLAND,
WATERCOURSES AND CONSERVATION COMMISSION MEMBERS AND/OR ITS REPRESENTATIVE TO ENTER THE
PORTIONS OF THE PREMISES WHICH ARE SUBJECT OF THE APPLICATION FOR THE PURPOSE OF
INSPECTION AND INVESTIGATION AND OTHERWISE EVALUATING THE MERITS OF THE APPLICATION BOTH
BEFORE AND AFTER A FINAL DECISION HAS BEEN ISSUED.
Signature of Applicant Date
Received and filed at the office of the Planning Department this
day of 19
SEP 42 1989
Signature 'of Agent Date OUt
ND wElIHiVD� AGENsFIY
QU
FEE RECEIVED YES_ NO_ AMOUNT
DATE RECEIVED by
HEARING DATE HEARING ADV. (1) (2)
PERMIT GRANTED DATE PERMIT DENIED DATE
PAGE 3
STATEWIDE INLAND WETLAND & WATERCOUA6L ;,� (EPORTING FORM
(See instructions on back)
•r
In accordance with the requirements of Section 22a-39-14 of the Regulations of
Connecticut State Agencies, this form is to be completed for each action.
Completed forms for all reportable actions during a calendar month shall be
mailed to the Commissioner by the local agency no later than the 15th day of
the month following the month in which the action was taken.
*******************************************************************************
I . TOWN: South Windsor
2 . A. LOCATION: (Attach an 82 by 11 inch photocopy at the original scale of
the appropriate U_SGS Quad May with the project site outlined.
B. USGS QUAD MAP NAME OR UNIT: Manchester Quadrant
3 . APPLICANT'S OR VIOLATOR'S NAME: JFI Associates, Inc.
4 . PROJECT NAME (If any) : 154 Commerce Way
5 • ACTIVITY TYPE CODE (See list of codes in instructions) : . . . . 13
type of activity:
If Type Code is 13 "other," describe the t • • • . . . j ]
6 . ACTIVITY PURPOSE CODE (See list of codes in instructions) : . . . . . . . . . . . [ D
]
7 . ACREAGE OF WETLANDS AND WATERCOURSES ALTERED (or proposed to be altered) :
( for all agency actions; permits, denials and enforcement)
A. Soil type(s) (If Available) . . . . . . . . . . . . . . . . . . [ 0 ACRES]
B. Only if soil type is not available specify area altered as follows:
Swamp. . . . . . . . . . . [ 0ACRES] Marsh. .
Bog• • • • • • • • • • • • • [_0 ACRES] Op water. , , • • • [ 0 ACRES]
en
• [ 0 ACRES]
8 . ACREAGE OF WETLANDS OR WATERCOURSES CREATED: . . . . . . • • • • • • • • . • [ 0 ACRES]
9 . LINEAR FEET OF STREAM ALTERATION: . . . . . . . . .
. . . . . . . . . . . . . . . . . . [ 0 FEET]
10 . TOTAL ACREAGE OF PROJECT SITE: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 .4609
ACRES]
For Local wetland Agency Use Only
For State Use Only
*
11 . REPORTING MONTH:
*
* GIS CODE:
12 . PUBLIC HEARING HELD: YES NO
*
*
13 . ACTION: (Circle only one action)
*
A. permit issued B. permit denied
*
*
C. permit extension/amendment
*
D. map amendment E. enforcement
*
*
F. jurisdictional ruling
* *
14 . AGENT: * DATE RECEIVED
*
o IVI o �• r
er
0
It C
It
I—' r I St`p Boo � so :�• °• J\��"°
Cyr .• ' l ,,�• . i
37 n 'soFR
a
II O Ry
u o p 100
If
o, t indsor o -
IR' \ � ' M73. � •O�a o
r`• \ to •o $ CGNpAIL
1 II \ \ wol 94 ♦O DU o
II ��IJJ I ��0.II :East Win %x. o . , .��/ /i � \0
It o' /
r � � •rV � o
it BONG 0�• - 50 -- \ 8` o�
Q
r p
I) , �) rick u d, -
5
0 '
•
ear -�
ns�el �c titute Clayplt _
\ 0 - •°// (Hartfond Gi rate Cent o i a B
- o — • U
41
BM . —� iris 0
oU - T ,
O
yo"•` o -- -
0
... to Cem,
o l
�00
c � o
N e,to e / ` « / `� �! •• @o GyQ y a v W
0 9-�
o
•�•...
EMIC�TOrJ ..
SOUL
$� •� •/I
o •
ni n.f
} IndSOr 'off �� ' \. \��./:• '�. i r�� /(/
000
3 �272LUiJ9
-�
Z.
Soil Erosion And Sediment Control Plan
154 Commerce Way
Narrative
September 15, 1989
A. OVERVIEW:
The project is a 11 ,000 s. f. industrial building on a 1 . 45 acre
parcel . The project site is located on lots 37 and 38 of the John
Fitch Industrial Centre Subdivision, Phase II . The parcel is
rectangular and flat, (2' maximum elevation change), with well drained
soil , (recently cultivated AfA
&1222.) . The site contains no wetland types soils, is not located in a
flood plain and has no trees.
B. SCOPE:
This project consists of the construction of an 11 ,000 s. f.
distribution facility with its required utilities and storm drainage i
system on the 1 . 45 acre site. Of the 1 . 45 acre area in this parcel
this project will entail the disturbance of approximately 1 acre or
69%.
C. OFF-SI-TE EFFECTS:
The run off from the site go via the subdivision storm water system
into a comprehensive storm water detention basin that was designed to
handle the run-off for the entire water shed.
CONSTRUCTION SEQUENCE & CONTROL MEASURES
Construction on this project should commence during the fall of
1989 and be completed in the spring of 1989. Access to the site
will be by a new curb cut on to Commerce Way.
1 . Install truck pad at the new Commerce Way curb cut.
2. Remove and stockpile topsoil in the topsoil central stockpile
as located on the plan cover sheet. Areas disturbed are to be
for immediate construction only. Stabilize the material newly
added to the stockpile by spreading hay mulch with blower at a
rate of 70-90#/1 ,000 s. f. Tacking may be either by applying a
chemical binder, Terratack or equal or tracking by driving a
tracked vehicle up and down the slope over the entire surface
so that cleat marks are parallel to the contour. The central
stockpile shall have staked hay bales at the south or down
slope side of the pile .
3. Excavate for foundation and commence building construction
activities.
4. After completion of the foundation walls construct the storm
drainage system and install utilities. Box and place bank-run
gravel in all areas to be paved. Place hay bales around each
catch basin and secure in place with 2"x2"x3' wood stakes to
form a tight enclosure around the inlet.
e
5. After April 15 remove all temporary structures and erosion
control systems including accumulated silt. rass>h grads the
site and plant permanent• vegetative cover, g
process shall be Completmendations later
ofthan
Guidelines. forPlant
grass
Soil
in accordance with recom a es 6-5 thru 6-?. Seed mixture
Erosion and Sediment Control , p g
to be Cadwell & Jones's "Charter Oak Blend' :
Kentucky Bluegrass 25#/acre
Creeping red fescue 13#/acre
Perennial ryegrTotal 45#/acre
6
Persons responsible for the maintenance of the soil erosion
and sediment control plan are : 289-7662
Joseph F. Luzzi 644-2333
Raymond J. Alexander i
0
to*N 8f•I
O E"
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f�osoR•co��w AREA CODE 203/644-2511
October 10, 1989
TO: James Lombardi, Acting Chairman, Inland Wetland
Agency/Conservation Commission
FROM: John E. McCahill, Zoning/Wetlands Enforcement
Officer )f
RE: Application #89-77P, JFI Associates, Lots #37 and
#38 Commerce Way
DOCUMENTS REVIEWED: Application form, Site Plans for Lots #37
and #38 Commerce Way (JFI Associates,
Inc. ) , Soil Erosion and Sedimentation
Control Plan narrative, and Drainage
Computation by Luzzi Engineering and
Surveying.
• COMMENTS:
1• _ There ae no wetlands on this site.
The area is t
very sandy. The Soil Erosion and Sedimentation Controlly
plan narrative identifies the soil as Agawam Fine Sandy
Loam. The plans are being submitted to the Commission for
Conservation approval.
2. The total proposed impervious coverage for the site is
48. 6%.
3. The Conservation Plan is shown on sheet #2. There will be
a total of about one acre of disturbance. The site is very
level and there are no existing trees on the site. The
erosion and sedimentation control measures are stated in
the "Construction Sequence and Control Measures
Stockpiling will take place Off-site at the central
stockpile located westerly of the site. Given the nature
of the site they should be able to control erosion and
sedimentation by minimizing disturbance and stabilizing
areas as stated in the construction sequence. A
construction entrance is indicated and storm drains are to
be ringed with haybales.
4 • The run off will be carried, via the subdivision storm
drain, into the detention basin constructed for the entire
subdivision.
" c
•
5. I see no problem with approving the conservation plan as
submitted. A bond should be established to ensure
compliance with the erosion and sedimentation plans. 9
S55.53'35'E 217.20'
N/F
J. F. I. ASSOC I A TES, I NC.
CONSERVATION --PLAN
COMMERCE
_ WAY
CONVERT
EXISTING TYPE
9. ,.C.' C.B.
� ---so
DWATER
DEL EC. •5 R-4 !7. 8i' d= — F��fi,-o---------
0'4 ' A■204. 58, _ --- ---
D GAS so r 75'- 6. P.V.C. ---so
—� C2/.OX
12"ADS N-/2 so /.OX
5X 35'BU/LD/NG
i L I�'—E TYPE C-l."
C"C.B. *2 79.4 — 7a 72./8
= 78.50 , • aro. . °o //2 1F.L. = 72.43
= 73.13 9.4 so
� so /00-12"ADS N-12
cs O 0.5X
Z �
TYPE C-L"C.B.
T.F. = 75.50
F.L. = 72.93
Z tei \
Z _ PROPOSED \ U
_ \ � Z
m 8U/LD/NG \ o
N 10,517 SG.FT, w vi
to
co FF = 79.70 \ \ Q
\ca v \ C)
Z 7 p z �
Q o co
Q
79.0 It
LL LL
6"P.V C. ROOF
ORA/N a 40%
�-Y5'REA-RD
S55'53'35'E 20.20'
N/F
J. F. 1. ASSOCIATES, INC.
UTILITY & TOPOGRAPHIC PLAN
s N/F
NORRIS
�1 ASSOCIATES
c
\� N/F
J. i M. /
GRINDING
� INC. /
N/F
J. F. 1. /
ASSOCIATES
N/F
THE J. E.
p ` SHEPARD
!� COMPANY
N/F
CONNECTICUT
NATIONAL SANK,
TRUSTEE
•/� N/F
SHELL OIL
COMPANY
F
NO TE
PROPOSED S/TE 1S NO T L OCA TED
/N A /00 YEAR FLOOD PL A/N.
�CCC _
S55.53'35'E 217.20'
N/F
J. F. I. ASSOC I ATES, INC.
CONSERVATION PLAN
COMMERCE
WAY
CONVERT EXISTING TYPE "C- C.B.
TO TYPE "C-L" C.B.
— _
DWATER �-- - -- -F— - --__ F.�_�iao
R -- --------
'4 l7. 8!' 5 -- ---
D ELEC. d`� 0'48 A■204. 58' --eo
eo 75'- 6"P.V.C. Will.
D GAS aiAN. LAI. 68-15"R.C.P.
@1.OX @ LOX
so
12"ADS N-/2 35'BUILDING
7.5X LINE TYPE C-L"C.B. *3
0 !/5%F.L. = 72.18
C" C.B. �2 79.6 — 79. m° 112"IF.L. = 72.43
= 78.50 i r
eo eo
= 73./3 zs. 9.4 /00-12"ADS N-12
c!0.5X
Z TYPE C-L"C.B.
?F ao T.F. = 75.50
Y 777 �B F.L. = 72.93
U7
Z
CU c o Z
"' PROPOSED o
BUILDING c
Z .� 16 n7
N cli
10,917 SQ.FT. W
w
U-) F—
io
g y F.F. = 79.70
LL- c e; Z CC)
Q Q
6 --
79.0 O L
7s.o Z 7
6"P.V.C. ROOF
DRAIN a/.OX
'REA_—R YARD
S55.53'35'E 217.20'
N/F
J. F. I. ASSOCIATES, INC.
UTILITY & TOPOGRAPHIC PLAN
N
NORR I S
ASSOCIATES
A
N/F
J. t M.
GRINDING
INC.
\ i
N/F
J. F. I.
ASSOCIATES
N/F
E THE J. E.
SHEPARD
N/F COMPANY
CONNECTICUT
NATIONAL BANK.
N TRUSTEE
N/F
SKLL OIL
COMPANY
- may
�F
NO TE.•
PROPOSED S/TE /S NOT L OCA TED
IN A /00 YEAR FLOOD PL A IN.
r
P.O. Box 1061
• South Windsor, CT 06074
(203) 289-7662
CERTIFIED MAIL
September 20, 1989
Mr. Joseph Dumond, President
J&M Grinding, Inc.
140 Commerce Way
South Windsor, CT 06074
RE: John Fitch Industrial Centre
Lots 37 & 38, 154 Commerce Way
Dear Property Owner:
On Monday evening, October 16 , 1989 , at 7: 30 p.m. the South Windsor
Inland Wetlands Agency/Conservation Commission will hold a public
meeting to receive and discuss an application from JFI Associates,
Iric. for a site development plan for the referenced location. As an
abutting property owner, you are invited to this. public meeting for
comments . However, you are not required to attend this meeting.
Should you have questions concerning this application, please contact
the office of the Inland Wetland Agency/Conservation Commission at
644-2511 , Ext. 253 .
Sincerely,
Raymond J. A xander
RJA/iba
cc: William & Colleen Green
J&M Grinding
Norris Associates
'TFZ -
Loin �cc VJ4v — � k; � t ':En c.
FROM' TO EXISTING
DRAINAGE AREA TIME RAINFALL DISCHARGE LENGTH SLOPE SIZE OF MEAN PIPE CAP.
A A C ACA '5 C A A t a t INTENSITY Q OF OF PIPE YELOC FLOWING
! PIPE PIPE FULL .COMMENTS
! ACRES ACRES ACRES MINS. MINS. IN/HR_ C F.S. FT. FT./FT. IN. F P.S. C.F.S.
2.5
C8 Z C.S ` J.37 G.-7 0.2to 6.2Ce, S 5 �.! I.�'.' �` O d•5% 8 ,
Ice6.g4 6$- �.o'
I �
� 1a� 4 s NN is
1 -
r t
tvlc o l
EXISTING
FROM TO DRAINAGE AREA TIME RAINFALL' DISCHARGE LENGTH SLOPE SIZE OF MEAN PIPE CAP. '
INTENSITY Q. OF OF PIPE VELOCITYFLOWING
AA C A C A MCA A t ' t V PIPE. PIPE FULL COMMENTS
ACRES ACRES ACRES MIN& MINS. IN./HR. C.F.S. FT. ' FT./FT IN. F P.S. C.F.S.
y �•'� 5 6. 1 Z.5 100 0:5%
i C8� 2• C6 0.3? 0.-7 0 2co 6.2�• S 5 ln.1 !.G 1`t0 �. % iZ
2.S
E
s • ��,
I �
s (
7 7.3
Sail Erosion And Sediment Control Plan
154 Commerce Way
Narrative
September 15, 1989
A. OVERVIEW:
The project is a 11 ,000 s. f. industrial building on a 1 . 45 acre
parcel . The project site is located on lots 37 and 38 of the John
Fitch Industrial Centre Subdivision, Phase II. The parcel is
rectangular and flat, (2' maximum elevation change), with well drained
soil , (recently cultivated AfA - g��►��!_ i1B _ �i1S�Y_LQs�1�_5t/_Q_
212Qe) . The site contains no w
flood plain and has no trees. etland types soils, is not located in a
B. SCOPE:
This project consists of the construction of an 11 ,000 s. f.
distribution facility with its required utilities and storm drainage
system on the 1 . 45 acre site . Of the 1 . 45 acre area in this parcel
this project will entail the disturbance of approximately 1 acre or
69%.
C. OFF-SITE EFFECTS:
The run off from the site go via the subdivision storm water system
into a comprehensive storm water detention basin that was designed to
handle the run-off for the entire water shed.
CONSTRUCTION SEQUENCE & CONTROL MEASURES
Construction on this project should commence during the fall of
1989 and be completed in the spring of 1989. Access to the site
will be by a new curb cut on to Commerce Way.
I . Install truck pad at the new Commerce Way curb cut.
2. Remove and stockpile topsoil in the topsoil central stockpile
as located on the plan cover sheet . Areas disturbed are to be
for immediate construction only. Stabilize the material newly
added to the stockpile by spreading hay mulch with blower at a
rate of 70-90#/ 1 ,000 s. f. Tacking may be either by applying a
chemical binder, Terratack or equal or tracking by driving a
tracked vehicle up and down the slope over the entire surface
so that cleat marks are parallel to the contour. The central
stockpile shall have staked hay bales at the south or down
slope side of the. pile .
3. Excavate for foundation and commence building construction
activities.
4. After completion of the foundation walls construct the storm
drainage system and install utilities. Box and place bank-run
gravel in all areas to be paved. Place hay bales around each
catch basin and secure in place with 2"x2"x3' wood stakes to
form a tight enclosure around the inlet.
j
5. After April 15 remove all temporary structures ,and erostion
control systems including accumulated silt. Finish grade the
site and plant permanent vegetative cover, (grass) . This
process shall be completed no later than June 15. , Plant grass
in accordance with recommendations of Guidelines for Soil
Erosion and Sediment Control , pages 6-5 thru 6-7. Seed mixture
to be Cadwell & Jones's "Charter Oak Blend" :
Kentucky Bluegrass 25#/acre
Creeping red fescue 13#/acre
Perennial ryegrass _Magm
Total 45#/acre
6. Persons responsible for the maintenance of the soil erosion
and sediment control plan are :
Joseph F. Luzzi 289-7662
Raymond J. Alexander 644-2333
s P.O. Box 1061
South Windsor, CT 06074
(203) 289-7662
CERTIFIED MAIL
September 20, i989
Mr. Joseph Dumond, President
J&M Grinding, Inc.
140 Commerce Way
South Windsor, CT 06074
RE John Fitch Industrial Centre
Lots 37 & 38 , 154 Commerce Way
Dear Property Owner:
Or; Monday evening, October 16 , 1989 , at 7:30 p.m. the South Windsor
Inland Wetlands Agency/Conservation Commission will hold a public
meeting to receive and discuss an application from JFI Associates,
Inc. for a site development plan for the referenced location. As an
abutting property owner, you are invited to this public meeting for
comments . However, you are not required to attend this meeting.
Should you have questions concerning this application, please contact
the office of the Inland Wetland Agency/Conservation Commission at
644-2511 , Ext. 253 .
Sincerely,
Raymond J. A xander
RJA/iba
cc: William & Colleen Green
J&M Grinding
Norris Associates
S 0wN Sf�
o r /�i sou�
C
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�l�osoR-coN� AREA CODE 203/644-2511
October 25, 1989
Raymond Alexander
JFI Associates, Inc.
P.O. Box 1061
South Windsor, CT
Dear Mr. Alexander:
Re: Application #89-77P - Lots #37 & #38, Commerce Way
At the October 23, 1989 meeting, the Inland Wetlands
Agency/Conservation Commission approved with modifications
Application #89-77P - Conservation plan for the construction of an
industrial building on property located at Lots #37 & #38 on the
southerly side of Commerce Way, I zone as shown on plans prepared by
Luzzi Engineering & Surveying dated September 1989, project #89-13.
1 . Black and white transparent mylars of sheets # 2 of 4 with
the above modifications, together with two blueprint copies
of the entire set of plans, must be submitted to this
Commission to be stamped and signed. This must be
completed within 65 days of approval prior to any
construction activity on the site.
2• Construction activities shall be subject to the approval of
the Town Engineer.
3• The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
4• We recommend a bond in the amount of 5000.00 to be
submitted to Planning and Zoning Commission to ensure
compliance with the Erosion and Sedimentation Control
Measures .
5 . The permit is valid for one year and shall expire on
October 23, 1990
6 . All approvals required must be obtained and submitted prior
to any activity on the site.
JFI Associates, Inc. Page Two
Application #89-77P October 25, 1989
7 . A contact person shall be identified directly on the plans.
Very truly yours,
James A. Lombardi, Chairman
Inland Wetlands Agency/
Conservation Commission
JAL/pmm
cc: Jerry C. Iazzetta, Town Engineer
Marcia A.Banach, Director of Planning _
John R. Collins, Chief Building Official
Planning & Zoning Commission
Palmberg & Russo, 15 Barber Pond Road, Bloomfield 06002 -
�tONN Sf,
0'P s
R•co 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
rN�so �'�w AREA CODE 203/644-2511
October 25, 1989
Raymond Alexander
JFI Associates, Inc.
P.O. Box 1061
South Windsor, CT
Dear Mr. Alexander:
Re: Application #89-77P - Lots #37 & #38, Commerce Way
At the October 23, 1989 meeting, the Inland Wetlands
Agency/Conservation Commission approved with modifications
Application#89-77P - Conservation plan for the construction of an
industrial building on property located at Lots #37 & #38 on the
southerly side of Commerce Way, I zone as shown on plans prepared by
Luzzi Engineering & Surveying dated September 1989, project #89-13.
1 • Black and white transparent mylars of sheets # 2 of 4 with
the above modifications, together with two blueprint copies
of the entire set of plans, must be submitted to this
Commission' to be stamped and signed. This must be
completed within 65 days of approval prior to any
construction activity on the site.
2 • Construction activities shall be subject to the approval of
the Town Engineer.
3 • The application shall indemnify and hold harmless the Town
Of South Windsor against any liability which might result
from the proposed operation or use.
4 • We recommend a bond in the amount of 5000. 00 to be
submitted to Planning and Zoning Commission to ensure
compliance with the Erosion and Sedimentation Control
Measures.
5 • The permit is valid for one year and shall expire on
October 23, 1990
6 • All approvals required must be obtained and submitted rior
to any activity on the site. p
JFI Associates, .Inc. Page Two
Application #89-77P October 25, 1989
7 . A contact person shall be identified directly on the plans.
Very truly yours,
James A. Lombardi, Chairman
Inland Wetlands Agency/
Conservation Commission
JAL/pmm
cc: Jerry C. Iazzetta, Town Engineer
Marcia A.Banach, Director of Planning '
John R. Collins, Chief Building Official
Planning & Zoning Commission
Palmberg & Russo, 15 Barber Pond Road, Bloomfield 06002 -
�OwN 8 41 -i
co
r 7-0-wn
o-P Soup
x �
4� 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
R-co�'� AREA CODE 203/644-2511
October 26, 1989
M E M O R A N D U M
TO: John McCahill, Zoning/Wetlands Enfo ement Officer
FROM: Jerry C. Iazzetta, Town Engineer
RE: Plan Review - Wetland Concerns
We have reviewed the plans Distribution Center, Boat
Works Marine Storage and
comments on each. and your
We have no additional comments to make as to wetlands concerns on
these applications.
JCl/jsv
cc: Michael J. Gantick, IIirector of Public Works
. _�,_
s � Q1.U�12
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�hos�,co� AREA CODE 203/644-2511
17 November 1989
Mr. Raymond Alexander
JFI Associates, Inc.
P. 0. Box 1061
South Windsor, CT 06074
Dear Mr. Alexander:
re: Appl. #89-77P, Lots 37/38 Commerce Way
We are pleased to advise that the Planning and Zoning Commis
voted on 14 November 1989 to aabove-referenced sion
application for a site plan ofpdevelopmentnaccordanc ith
Drawings #1 through 4 of 4 dated September 1989 (rev. 10/25/89)
prepared by Luzzi Engineering, Project No. 89-13, and with the
following modifications:
1 . Prior to commencement of any site work, a meetin mus
held with Town Staff. g t be
r 2• No building permits will be issued until the final m
have been filed in the Town Clerk's Office. ylars
3• This application is subject to the conditions of approva
of the Inland Wetlands Agency/Conservation Commission, 1
including a bond in the amount of $5,000.
4 • An as-built plan is required prior to issuance of
Certificate of Occupancy per Section 4. 13. 10 of the Zoning
Regulations.
S. Footing drains are required if the building has a basem
ent.
6 • A landscape bond in the amount of $5,000 is required and
must be submitted prior to filing of mylars.
7• All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
8• Headwater values for 10 year storm for existin a
proposed storm drainage needed. 9 rid
Black and white transparent mylars of Sheet #2 with the above
modifications, together with three blueprint copies of the entire
set Of plans, must be submitted to this Commission within 30 days
to be stamped and signed. The letters of approval of this
Mr. Raymond Alexander -2- 17 November 1989
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars.
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
PLANNING AND ZONING COMMISSION
Louise C. Evans
Chairman
cc: Inland Wetlands Agency/Conservation Commission
M. Banach, Planning Director
J. Collins, Chief Building Official
J. Iazzetta, Town Engineer
F. Shaw, Supt. of Pollution Control
E. Belleville, Assessor
W. Lanning, Fire Marshal
Registrar of Voters
Engineer
Applicant
PZC File
J F I Associates, Inc.
P.O. Box 1061
South Windsor, CT 06074
(203) 289-7662 j;t1*11TV
MAY 1. 1 1990
May 9 , 19 9 0 South INLAND WETLANDS Windsor
GE NCY/
CONSERVATION COMMISSION
Mr. James Lombardi , Chairman
Inland Wetlands Agency and Conservation Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE : Application #89-77P - 154 Commerce Way
Dear Mr . Lombardi:
This to advise you that no further work is required to be performed
relative to the referenced application number. Site construction is
complete and the provisions of the conservation plan have been
complied with.
No extension of the existing permit is required.
If you have any questions concerning this matter please contact me at
your convenience.
Sincerely,
L
jos7eph
F. Luzzi , P.E.
Supervising Engineer
RJA/iba
cc. Michele Lipe
John McCahill
W